Loading...
HomeMy WebLinkAboutMiscellaneous - 148 MAIN STREET 4/30/2018 (27) �� 1�a1 NORTH Town of : Andover . No.kSWO C% �s- A E dover, Mass.,�' 6• _wy� COCHICME.CK AORATED PP�`� 5 �`s E BOARD OF HEALTH Food/Kitchen PER IT D Septic System BUILDING INSPECTOR THIS CERTIFIES THAT......... ... .���.�.. ....... ...........�54fo .......................... . . ................ Foundation has permission to erect... ................................... buil ings on ..�J ... � ... ..'..............4i..yw� Rough to be occupied as...... ..... i�........(ii . .. .. Chimney provided that the person ac epting this permit shall in every respect con to the terms of the application on file in Final this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN ONTHS ELECTRICAL INSPECTOR UNLESS CONS STARTS Rough ... ...... .................................................................................... .. Service BUILDING INSPECTOR Final Occupancy Permit Required to Occupy Building GAS INSPECTOR Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT' Until Inspected and Approved by the Building Inspector. Burner Street No. SEE REVERSE SIDE Smoke Det. GENERAL BUILDING NOTES/CHECKLIST-NOT LIMITED TO ITEMS BELOW POST ALL LOT NUMBERS,ADDRESS, AND PERMIT(COPY OK)..or no inspections INSPECTIONS: (Minimum) Excavation , Footing, Foundation, Frame, Insulation, Final. FOOTINGS: Continuous Full 2x4 Keyway Continuous strip footings for interior columns FOUNDATION: Rebar as required Anchor bolts or straps Damproofing } Foundation drain-pipe/stonelfabric filter/cover and outlet connection. FRAME:Fireblock-over girts/plates between floor joist Penetrations for plumbing, heat, elec, etc. Walls at stair stringers. Windbrace corners and center bearing partitions. Size ridge to provide full bearing at rafter cuts. Hip and Valley rafters-watch bearing at walls. Ridge&Hip- Provide proper connections. Cathedral roof rafters provide proper connections and use"Hurricane Clips"tie to plate. Stair stringers-watch cuts and heal support. Joist hangers-fully nailed w/hanger nails. Sill plates 2-2X6(1 PT)w/sill seal. Girts-solid brick or steel plate bearing at foundations air space at sides in foundation pockets. Lateral bracing at ends. Certified calculations. required for Beams/LVL's Trusses. Solid bearing support for Headers/Beams etc. Check headroom clearances-stairways, under beams Attic Access. (min. 22x30 w/3'headroom above). Crawl space access. (min. 18x24). Bath exhaust fans to have metal duct to exterior(not in soffit). Firecode S/R wood frame of"0"clearance fireplaces&stoves Window Schedule or Every Habitable Room Must Have: Natural light equal to 8%of floor area. of required glazing shall be openable. Bedrooms required min. 20x24 egress window or door. Vent attic spaces-"proper vent", soffit and required ridge vents. Firecode under stairs if used for storage FIREPLACES: Separate permit required. Inspections at Footing-Smoke Chamber- Finish Smooth parging, clean joints,8"solid @ combust. i DECKS: Lag to house, provide flashing. Rails min. 36" high, Baluster max space 5"on center. j Over 8'above grade, use 6x6 posts w/lateral bracing. Lag all posts and rails. Pier footings down 48", Conc. pad at stair base. FINISH: Handrails returned to wall/newall post. Guardrails required alongside open cellar stairs. Exterior grading complete. Certificate or occupancy required prior to occupying structure. I Temporary Stairs required for inspection. Re-inspection fee- $30.00(Be Ready). Certificate of occupancy required prior to occupying structure.