Loading...
HomeMy WebLinkAboutMiscellaneous - 150 CHRISTIAN WAY 4/30/2018 150 Christian Way _1- f Lot & Street iVIar/Parcel CONSTRUCTION APPROVAL Has plan review fee been paid; S NO Pe rmltm�` Plan Approval: Date: q/Z7 Approved by. Designer: rL 4NTIcl- Plan Date: Conditions: Water Supply: ` - Well Well Permit: Driller: --_ Well Tests: Chemical \� Date Approved =- Bacteria I Date-Approved Bacteria I[ Date Approved Plumbing.Sign-Off — — Comments: Wiring Sign-Off p,PProval: Date Issued APProval to-Issue.. YES VO Conditions: By: Final Approval: All Permits Paid? ,� Well Construction Approval? NO Septic System Construction Approval? YES NO Certification? NO Other CYE, NO YES NO Any Variance Needed? YES NO MAL BOARD O�HEALTH APPROVAL: APPROVED HY: ' t • SEPTIC SYSTEM INSTALLATION Is the installer licensed? _ NO Type of Construction: REPS New Construction: - -Certified Plot Plan Review YES NO —Floor Plan Review YES, NO _— Conditions of Approval from Form U YES NO _Issuance of DWC permit.- NO _DWC Permit Paid? — N ---DWC_Permit#—Z/ Installer: Begin Inspection:_ � NO Excavation Ins ction: _Needed: o _ r, 4 —_Passed: By: -Construction Inspection: Needed: As BuiltPlan Satisfactory: YES: Approval of Backfill: Date: ' 9By: -Final Grading Approval: Date: fl By: Final Construction Approval: Date: // - Q— By: / s Certificate of Compliance: Approval://, Date: /h Z2 2 LOCATION AS-BUILT PROPOSED AT HOUSE 163.00 163.00 ISEPTIC TANK IN 162.74 162.80 SEPTIC TANK OUT 162.48 162.55 ID-BOX IN 162.42 162.48 m D-BOX OUT 162.26 162.31 \ �o BEGINNING FIELD 162.22 162.21 \ N END FIELD 162.00 162.00 O 98-5-1 BSO, \\ / TIE DISTANCES \� v X TO TANK = 26.0 0 �� Y TO TANK = 24.7 X TO D.BOX = 32.3 Y TO D.80X = 30.5 / AS-BUILT FIELD p 22' WIDE X 41' LONG. � G SEPARATION BETWEEN 2a LINES = 6' SEPARATION BETWEEN o LINES/EDGE FIELD = 2' GZ AS-BUILT LEACHING G AREA = 902 S.F VIP 98-5-2 V/ 0 DIST. 00 BOX EXISTING WATER PER CONTRACTOR 0000 V BENCH MARK "0" BOLT OF HYDRANT AT END OF CHRISTIAN WAY EL.=176.28' SEPTIC AS - BUILT ATLANT/C ENG/NEER/NG & OF N SURVEY CONSULTANTS INC. 97 TENNEY STREET - SUITE 5 MARMM. N . ANDOVER , MASS. GEORGETOWN, MA 018JJ DA TE.' OCT. 13, 1999 SCALE 1" = 20 FT. JOB NO. 9906-17 LOCATION: OWNER: LOT 5 CHRISTIAN WAY EXT. MITSU REALTY TRUST OC 1 , 1 99 N. ANDOVER, MASS. TEWKSBURY, MASS. AS-BUILT LEACHING,,"'.' AREA 902 S.F ;98-5-2 t C) SEPTIC DIST. L 0 T 5 TANK BOX m CS EXISTING WATER PER CONTRACTOR MAP 104-D �O Y PART PARCEL 1 / / / / / + / Nlb BENCH MARK "0" BOLT OF HYDRANT AT END OF CHRISTIAN WAY EL.=176.28' / SEPTIC AS- BUILT A 7LAN77C ENG/NEER/NG & O IN SURVEY CONSULTANTS INC. MARTIN M. 97 TENNEY STREET - SU1 TF 5 N . ANDOVER , MASS. GEORGETOW, MA 018JJ DAM: OCT. 13, 1999 SCALE 1" = 20 FT. ✓OB NO. 9906-17 � y LOCATION: OWNER: OC 1 1 99 LOT 5 CHRISTIAN WAY EXT. MITSU REALTY TRUST N. ANDOVER, MASS. TEWKSBURY, MASS. 149.85' L� Ln m o-o .� LOT 5 m MAP 104—D PART PARCEL 1 CHRISTIAN WAY EXTENSION i 4 � � 5 � 6 /S v� TOWN OF NORTH ANDOVER SYSTEM PUMPING RECORD DATE: ld—o2CJ�l SYSTEM OWNER & ADDRESS SYSTEM LOCATION (example: left front of house) mr Cullen / / 15o cif/ go/A 7 DATE OF PUMPING: I a" �'G l QUANTITY PUMPEDT a GALLONS CESSPOOL: NO YES SEPTIC TANK: NO YES L/ NATURE OF SERVICE: ROUTINE EMERGENCY OBSERVATIONS: GOOD CONDITION /FULL TO COVER HEAVY GREASE BAFFLES IN PLACE ROOTS LEACHFIELD RUNBACK EXCESSIVE SOLIDS FLOODED SOLIDS CARRYOVER OTHER (EXPLAIN) T rR nTr1%�FDFlI 'PV- A COMMENTS: CONTENTS TRANSFERRED TO: Address c W CLt S?�A� ul by Tide of File P.age _ of Date File Open: Doc Document/ /Action Title Date of Date File Closed:-_------ action losed:_Taction Refer to _ other Purpose of Documeent/Act of hand notes Num. Document/ doeunvent/ --- Action De artment Board ofi Appeals — Board of Heal h Plann�ng Board _ Canse ruallon Commission - Buildin-g Depa rtm, en;t —_�—_