HomeMy WebLinkAboutMiscellaneous - 1570 Osgood Street IL I GF
I'IHY CU—CU14 WE Ut; lb Hrl Hammond Electric MA NU 1H11MZIyJ(Z V. U1
HAMMOND ELECTRIC, Inca
DESIGN ® CONTRACTING SERVICE
6V Q. 4 S"+
FACSIMILE COVER SHEET
COMPANY: 11 AY� ._ ATTN: AlJ �r
FAX NO. S8"�9��" TOTAL PAGES: 12
FROM:p*,� 94*4 DATE: 5- 1-e /
Alle 0 74��, /4:1
25 AVCO Road — Haverhill MA — Te : 9 - - — _ _
78 373 99
79 Fax; 978 5
21 9972
www.hammondelectric.com
MAY-20_2014 TUE 07:26 AM Hammond Electric FAX N0. 19785219972 P. 01/16
®
HAMMOND ELECTRIC, Inco
DESIGN CONTRACTING SERVICE
FACSIMILE COVER SHEET
COMPANY: ATTN: �
FAX NO. Oqy �O Z TOTAL. PAGES: �
FROM: DATE:
Avok-1
25 Avco Road — Haverhill, MA — Tel: 978-373-9979 — Fax: 978-521-9972
www.hammondelectric.com
_ MAY-20-2014 TUE 07;26 AM Hammond Electric FAX N0. 19785219972 P. 02/16
SOLECTRIA
RENEWABLES
Solectria Renewables' Anti-Islandin
g
Test Facility at Osgood Properties
May 19, 2014
Michael Kelly
Mechanical Engineering Manager
Electrical Safety Officer
Solectria Ranewables,LL[,360 Merrimack Street,Lawrence,MA 01843 USA•TEL 978-683-9700•Inverters <olectria.com•www.so eectrio.44lr,
MAY-20-2014 TUE 07:26 AM Hammond Electric FAX N0, 19785219972 P. 03/16
AL
S00"LLECTRIA
RENEWABLES
Mom raLrmax IN",RunjpC
'200A DPUNfJl
LOG7e0 IN AtivF.R OWL 1115
�•I
Al
t21�rusipm PrcoNNECT
rf;9DD AT loos '
8(>88wNN KRo c-ta00ta•
in z&vhn N111141111pr.e0o0lee7'
VAIN Povxg CONrAc7DR r L16E0 AT 7DDA
tlUuLNANN LPs-Ak-eDOav
PDI
200A THREE PNAS6 I'ANEWARD
VAIN 9NEAMEP AT 70�TH
p� FL IND C0NacA FT1�I'o9NErEAR NERS FOR RLDI ANP K82
'App1 suv•J to
so eDo op ao1=9 OR GCI. 7aa17w �' rn tl:Nl7 ELANDINC CtL4rA4'T0P
OUT 03 DI - OG R6 07 DD WA9
601 400 Du 9c)b00?7 DP Sar 7.%M.N W7 M A0-100FW - aDDA fusiar riscaNNEMC
f (JU6fiUANNrLIK-aw-900m,
ti
aLD1 CLDP t0.p1 RLD2 ILDI 192 "11?; NE LOAD BAW'a 1 AND 7
y ars>;7K LOW D•NKF 1 AND a
mt ILDI9.PR
INRICTM LOAD Mgt 1 AMI D
Facility Intent
The Anti-Islanding Test Facility is a purpose-built test facility to administer the IEEE 1547
Unintentional Islanding Test, as described in Section 5.7 of IEEE 1547.1-2005. This test is one of
the tests required to certify a grid-tied solar inverter to the UL 1741 standard under the
authority of a Nationally Recognized Testing Laboratory (NRTL).
The purpose of the Unintentional Islanding Test is to verify that the solar inverter will
cease to energize the grid in the case of an unintentional island within a prescribed amount of
time and under varying conditions.
The unit being tested is designated the Device Under Test (DUT), while the units
providing DC power to the DUT are designated the Supplies (SUPS). The equipment used to
create the islanding conditions are designated the Islanding Components (ICs) and are
comprised of Resistive Load Banks (RLBs), Inductive Load Banks (ILBs) and Capacitive Load
Banks(CLBs).
A test suite on a DUT can take several weeks to complete, depending on the power
rating of the unit as well as the requirements of the NRTL overseeing the test.
Facility Construction
The Anti-Islanding Test Facility is comprised of a 1200A, 480VAC service fed from the
power building into a 1200A rated fusible disconnect with IOOOA Low-Peak fuses.The load side
of the disconnect feeds a contactor control cabinet which houses two large power contactors,
designated SO and S1. SO is the main contactor and acts to power the facility during the test. It
is also designed to deenergize the facility in the case of an emergency by the activation of an
Emergency Power Off (EMO) button. When 50 is closed, power is fed to the two SUP units as
well as to the line side of S1. S1 is the islanding contactor and acts to create the island condition
Solectria Renewables,LLC,360 Merrimack Street,Lawrence,MA 01843 USA•TEL978.683.9700•Inverte.Csflseleetria.com•www.wlectria.coM
MAY-20-2014 TUE 07:27 AM Hammond Electric FAX N0. 19785219972 P. 04/16
St"LEL;TK A
0""' P*
RENEWA L S
between the DUT and the ICs. When S1 is closed, power is fed to the DUT and to all six of the
ICs, comprised of two RLBs, two ILSs and two CEBs.
The DUT and each SUP has an internal AC OCPD and disconnecting means. Each of the
six ICs is supplied by its own 600A rated fusible disconnect.
All of the equipment.is permanently installed, with the exception of the DUT and SUP
units, which require changeover when a new test sequence is started.
Unit Changeover
When it is time to execute the Unintentional Islanding test on a new model, it is usually
necessary to change out the DUT and the SUP units prior to running the test suite. This is
performed by trained technicians and engineers who are qualified to do this work. All of the
personnel involved in the changeover are required to be Electrically Qualified individuals under
Solectria's Electrical Safety Program, which requires training, written tests and ongoing audits
to maintain their status. Under the Program, no Qualified Individual is allowed to work on live
equipment unless it is required for troubleshooting, and then only under certain procedures
and with appropriate PPE. The task of changing over the units is not in the realm of
troubleshooting, so all of the work will be performed in an electrically safe working condition.
Personnel performing the changeover will establish an electrically safe working condition as
prescribed in the Electrical Safety Program before any work is started.
5nlectria Renewabies,LLC,360 Merrimack street,Lawrence,MA 131843 USA•TEL 978-683.9700•Inverters n xnlectrla.com �nr�rw.solectrva,V+L�
I'IHY LU M4 IUt: UI;LI HI71 Hammond Llectric MA NU. lylbOZIMIL r. Ub/lb
9. Electrical Safety Rules Specific to Field Work
9.1. No work can be performed at a customer site alone.
9.1.1.At least two Solectria qualified personnel must be on the site at all times to aid one
another in case of an emergency.
9.1.1.1. EXCEPTION: A second individual, knowledgeable in recognizing electrical hazards
and appointed by the customer, may serve in the role of the second Solectria
qualified personnel.
9.1.2. Personnel must be within sight of one another for the duration of the work.
9.2. No work can be started at a customer's site before the customer communicates a
comprehensive list of all electrical hazards at the site.
9.3. No work can be started at a customer's site before electrically safe working conditions are
established.
9.3.1. Operating the AC and DC disconnects attached to a PVI series inverter (PVI 10-15, PVI
50-100, etc.) is one method for establishing electrically safe working conditions inside a
PVI series enclosure.
9.3.1.1. If work must be performed within the AC or DC disconnect attached to a PVI
series inverter(PVI 10-15, PVI 50-100,etc.), electrically safe working conditions must
be established in such a way that all AC or DC power is removed from the disconnect
prior to the work being started.
9.3.1.1.1. The preferred method of disconnecting DC power will be to utilize
disconnecting string combiners in the array, DC disconnects near regular string
combiners in the array or DC disconnects near the inverter.
9.3.1.1.2. If none of the methods in 9.3.1.1.1 are available, the removal of DC string
combiner fuses will be permitted to establish electrically safe working
conditions. DC string combiner boxes can only be opened with full electrical PPE
and after verifying that no current is flowing in the string.
9.3.2.The complete disconnection of AC power entering a SGI series inverter (SGI, SGI XT, SGI
XTM,SGI M,etc.) is required to establish electrically safe working conditions.
9.3.3.The complete disconnection of DC power entering a SGI series inverter(SGI,SGI XT, SGI
XTM,SGI M,etc.) is required to establish electrically safe working conditions.
9.3.3.1. The preferred method of disconnecting DC power will be to utilize disconnecting
string combiners in the array, DC disconnects near regular string combiners in the
array or DC disconnects near the inverter.
9.3.3.2. If none of the methods in 9.3.3.1 are available,the removal of DC string combiner
fuses will be permitted to establish electrically safe working conditions. DC string
combiner boxes can only be opened with full electrical PPE and after verifying that
no current is flowing in the string.
9.3.4. EXCEPTION: Work that Is infeasible to perform in an electrically safe working condition
may be performed if all of the following conditions are met.-
9.3.4.1.
et:9.3.4.1.The work only Involves voltage.testing; current testing; measurements using a
scope, power meter or power logger;or thermography.
9.3.4.2. Full electrical PPE is worn for the entire duration of the work.
9.3.5. EXCEPTION: Accessing the programming and signal connectors on the rear of power
stages within SGI 225-500 and 500PE inverters is allowed without establishing an
electrically safe working condition if all of the following conditions are met:
9.3.5.1.The connectors are only accessed from the magnetics side of the enclosure.
I'IHY—LU—LU14 IUL U(:Lb flrl Hammond Electric hHX NU 1U(db21ydl2 V. Ub/1b
9.3.5.2. The absence of voltage has been confirmed at the inverter side of the AC breaker
and the inverter side of the DC switch.
9.3.5.3. Full electrical PPE is worn for the entire duration of the work.
9.3.5.3.1. EXCEPTION: One glove and glove protector may be removed to access the
lock on the connector.
9.4. Solectria personnel are not permitted to do any rewiring work outside of the inverter or to any
of the customer connections at the inverter, such as that which may be required to
troubleshoot DC ground faults or change AC phase sequence.
9.5. Solectria personnel are not permitted to operate customer-owned electrical equipment.
9.5.1. EXCEPTION: Solectria personnel may operate customer-owned disconnecting means
only in order to establish electrically safe working conditions if all of the following
conditions are met:
9.5.1.1. The customer has identified ahead of the site visit the proper disconnecting
means,either through pictures, labels,maps or a site diagram.
9.5.1.2. The customer has identified ahead of the site visit the proper procedure and
order for operating the disconnecting means.
9.5.1.3. The disconnecting means controls AC voltages of 600VAC or less or DC voltages of
1000VDC or less.
9.5.1.4. The customer has given written permission ahead of the site visit to operate said
equipment.
9.5.2. EXCEPTION:The disconnecting means are integral to or are part of the original Solectria
equipment being serviced.
fIHY—CU—CU14 WE U!;Zy HM Hammond Electric MA NU, IyMZIUy(Z F. UI/lb
Solectria' Renewables Electrical Safety Program
Revision B,January 22,2013 PJB
Safety first!
IIHY—CU—ZU14 IUh. UI;Zd HM Hammond Llectric NA NU. ldIHbLlddl� f Ud/lb
1. Solectria Renewables' Responsibilities (NFPA 70E 340.7(A))
• Appropriate training and supervision by qualified personnel for:
1. The nature of associated hazards
2. Strategies to minimize hazard
3. Methods of avoiding or protecting against hazard
4. Necessity of reporting any hazardous incident, including near misses
• Properly installed equipment
• Proper access to equipment
• Availability of the correct tools for operation and maintenance
• Proper identification and guarding of dangerous equipment
• Proper documentation of the test setups and test procedures
• Maintenance of a clear and clean work area around the equipment to be worked
• Provision of adequate and proper illumination of the work area
Annual audit of the entire Electrical Safety Program and at least one lockout procedure
2. Employee Responsibilities (NFPA 70E 340.701)
• Continuous alertness and awareness of the possible hazards
• Proper use of tools and procedures for work
• Informing employer of malfunctioning protective measures,such as faulty or inoperable enclosures and locking
schemes
• Examine all relevant work documents provided by the employer,especially those documents indicating
hazardous components location
• Maintaining good housekeeping around the equipment and work space
• Reporting any hazardous incident, including"near misses"
Safety first!
I'IHY—LU—CU14 WE U(:ZJ Hrl Hammond Electric MA NU 1JMZIL JIC t'. UJ/lb
3. Electrical Safety Training
3.1 The company provides electrical safety training within the first 30 days of employment to:
• Unqualified Employees(Assembly workers,office staff, etc.)
Qualified Employees(Electrical engineers, Inverter Test personnel, Field Service Technicians)
3.2 No one is allowed to work on electrical circuits before he or she has undergone-the training for Qualified
Employees and passed a subsequent multiple-choice test.
3.3 All Fmployees will be retrained, as needed.
3.4 Electrical Safety Training attendance sheets and qualification test results are kept on record by the employer.
Safety first1
MAY-20-2014 TUE 07:30 AM Hammond Electric FAX N0. 19785219972 P. 10/16
4. General rules
4.1 Electrical Safety rules in this document do not apply to AC or DC voltages below 50V.
4.2 The maximum voltage in the Solectria Renewables facilities is 600V. No employee shall be allowed to work on
higher voltages than 600V in the field.
4.3 Every electrical conductor or circuit part is considered energized until proven otherwise(visually disconnected
AND with voltmeter).
4.4 No employee qualified or not,shall perform any task that he or she considers being unsafe or risky or he or
she does not feel she is qualified for.
4.5 Safety glasses have to be worn on the shop floor and on customer sites at all times.
4.6 No in-house job involving voltages in excess of 50V shall be performed alone.Another employee shall always
be present within sight.
4.7 No employee is allowed to work on circuits in excess of 50V while their alertness is recognizably impaired due
to illness,fatigue or other reasons.Their manager is to assign them a different task until they have recovered.
4.8 Before any electrical job gets started,the presence of a working phone and defibrillator has to be verified.
4.9 Before any electrical job gets started,the easy access of shutoff mechanism to all energy sources shall be
verified.
4.10 Before any electrical job gets started,the presence of current limiting devices to all energy sources shall be
verified.
S. Job Briefing
5.1 Before starting each job(with the exception of repetitive task and routine work),the employee in charge at
Solectria Renewables shall conduct a job briefing with the employees involved.
5.2 The briefing shall cover such issues as hazards associated with the job,work procedures involved,special
precautions,energy source controls,and personal protective equipment requirements.
Safety firstl
l'IHY CU iMq IUL UI ;bU Hfl Hammond t:lectric PHA NU, lylbOelyyli� V. 11/!b
6. Shock and Arc Flash Protection boundaries
6.1 The Protection Boundaries for energized circuits and parts at Solectria Renewables' premises are:
• Limited approach boundary:4 ft 0 in.
• Restricted Approach Boundary: 1 ft 0 in.
6.2 Unqualified persons shall not be permitted to enter the limited approach boundary only, unless the electric
conductors and equipment involved are in an electrical safe work condition (locked out or visibly disconnected
and tested with a working voltmeter).
6.3 A barrier must be put in place by a qualified person energizing the conductors to keep unqualified people out of
this area.
6.4 Readings off of equipment within the limited approach boundary must be done by an electrically qualified
person.
6.5 Any maintenance work,repair work,wiring work on inverters within the limited approach boundary is not
permitted.
6.6 Qualified persons may enter the Limited approach boundary only if all of the following conditions are met:
• There is no possibility the task can be performed in electrically safe work conditions(locked out or visibly
disconnected and tested with a working voltmeter),such as thermography
• 20cal/cm2 arc rated coverall or shirt/pants,face shield, hard hat,safety glasses,ear canal inserts, leather work
shoes are worn
6.7 Qualified persons may enter the Restricted Approach boundary only if all of the following conditions are met:
• There is no possibility the task can be performed in electrically safe work conditions(locked out or visibly is
connected and tested with a working voltmeter),such as trouble shooting an inverter
• Rubber and/or leather gloves are in use
• Insulated tools are in use
• 20cal/cm2 arc rated coverall or shirt/pants,face shield, hard hat,safety glasses, ear canal inserts, leather work
shoes are worn
6.8 All of the above precautions apply to Solectria Renewables'premises as well as field service work. If higher
voltages are present in the field,the limited approach boundary and restricted approach boundary have to be
increased to meet NFPA 130.2(C). If more than 100kA cycles of fault current are available and increased are
flash protection boundary shall be calculated in the field.
Safety first!
IIHY—LU—M4 IUB. U1;J1 HM Hammond Llectric MA NU IyIMMl IZ t' 1C/1b
7. Lockout procedure
7.1 Purpose
This procedure establishes the minimum requirements for lockout of electrical energy sources. It Is to
be used to ensure that conductors and circuit parts are disconnected from sources of electrical energy,
locked (tagged), and tested before work begins where employees could be exposed to dangerous
conditions. Sources of stored energy, such as capacitors or springs, shall be relieved of their energy,
and a mechanism shall be engaged to prevent the re-accumulation of energy.
7.2 Responsibility
All employees shall be instructed in the safety significance of the lockout procedure. All new or
transferred employees and all other persons whose work operations are or might be in the area shall
be instructed in the purpose and use of this procedure. The Electrical Safety Officer (ESO) shall ensure
that appropriate personnel receive instructions on their roles and responsibilities. All persons installing
a lockout device shall have their name and cell phone number on the tag.
7.3 Preparation for Lockout
7.3.1 Review current diagrammatic drawings (or other equally effective means), tags, labels, and signs to
identify and locate all disconnecting means to determine that power is interrupted by a physical break
and not deenergized by a circuit interlock. Make a list of disconnecting means to be locked.
7.3.2 Review disconnecting means to determine adequacy of their interrupting ability. Determine if it will be
possible to verify a visible open point, or if other precautions will be necessary.
7.3.3 Review other work activity to identify where and how other personnel might be exposed to sources of
electrical energy hazards. Review other energy sources in the physical area to determine employee
exposure to sources of other types of energy. Establish energy control methods for control of other
hazardous energy sources in the area.
7.3.4 Provide an adequately rated voltage detector to test each phase conductor or circuit part to verify that
they are deenergized. Provide a method to determine that the voltage detector is operating
satisfactorily.
7.3.5 Where the possibility of induced voltages or stored electrical energy exists, call for grounding the
phase conductors or circuit parts before touching them. Where it could be reasonably anticipated that
contact with other exposed energized conductors or circuit parts is possible, call for applying ground
connecting devices.
safety first
IIHT N CU14 IUC UI 1d till Ilammond CIectrIC rNA IYU, r. uc
RENEWABLES
Solectria Renewables' Anti-Islanding
Test Facility at Osgood Properties
May 19, 2014
Michael Kelly
Mechanical Engineering Manager
Electrical Safety Officer
Solectrla Renewables,LLC,360 Merrimack Street,Lawrence,MA 01843 USA 9 TEL 978-683.9700•Invcrters@solectria.com•y�wyni M1�lectri-a.cam
MAY-20-2014 TUE 07; 19 AM Hammond Electric FAX N0, 19785219972 P. 03
SuLECTRIA
RENEWA L S
PAW aEcrwlcr.D1FivsTNurlueL
1200 eR[AN EA
=170 IN POWER dulLdIG
i
120DA RIJulA6 P6CONNW
f'L15rP AT moo
M=WANN uPP-0-40DOEP
MNN Fvffl t OONrACTOR D2
LI
FLGED AT 2LE�aIscaNNccr
nl.6,Trunn LP6-DR-noun
PAI
20OA TWEE WASE PANaBOAM
MAIN BRGMEN Ae ZDDA
(PI]d1 THREE POLE BRFj�AEAA PON OLD1 ANO RLB2
EDP 1 Bol.0 •I W`�—I (hN AND CONTROL POIvEB
W Doo an 6GI Do011r DR W 760YI&I .� IM dZMN NI/NDINC LYINTAMA AJI
L------1---,
BUT
cGI A=oa SRI 500T OR BG 9Do11TN an PVI Da-1033 lie ^ DA DI DL on DT DO OODDAD MAIM DICOONpl.Clc
f j f ,ADI FUEu AT euaA
Wr&'Amo LPwOw-scow-
aD+ cLEre FLdt ALEu 1101 n82 C I IACD7w LOAD DANID 1 MVD 2
I-MITN
Iq!!;67ry7:LDAs oANKG 1 AND 2
IL01JIM
Facility Intent
tNWA-1 T LOAD PANIC 1 Ana 7
The Anti-Islanding Test Facility is a purpose-built test facility to administer the IEEE 1547
Unintentional Islanding Test, as described in Section 5.7 of IEEE 1547.1-2005. This test is one of
the tests required to certify a grid-tied solar inverter to the UL 1741 standard under the
authority of a Nationally Recognized Testing Laboratory (NRTL).
The purpose of the Unintentional Islanding Test is to verify that the solar inverter will
cease to energize the grid in the case of an unintentional island within a prescribed amount of
time and under varying conditions.
The unit being tested is designated the Device Under Test (DUT), while the units
providing DC power to the DUT are designated the Supplies (SUPS). The equipment used to
create the islanding conditions are designated the Islanding Components (ICs) and are
comprised of Resistive Load Banks (RLBs), Inductive Load Banks (ILSs) and Capacitive Load
Banks(CLBs).
A test suite on a DUT can take several weeks to complete, depending on the power
rating of the unit as well as the requirements of the NRTL overseeing the test.
Facility Construction
The Anti-Islanding Test Facility is comprised of a 1200A, 480VAC service fed from the
power building into a 1200A rated fusible disconnect with 1000A Low-Peak fuses. The load side
of the disconnect feeds a contactor control cabinet which houses two large power contactors,
designated SO and S1. SO is the main contactor and acts to power the facility during the test. It
is also designed to deenergize the facility in the case of an emergency by the activation of an
Emergency Power Off (EMO) button. When SO is closed, power is fed to the two SUP units as
well as to the line side of S1. Sl is the islanding contactor and acts to create the island condition
Solectrla Ranewables,LL[,360 Merrimack Street,Lawrence,MA 01843 USA 9 TEL 978-693-9700•JO,vS,rLL rs@solectria.com•www;S 1E�4 it Isom
MAY-20-2014 TUE U'020 Aft Hammond Electric hAX NU N(bbMU12 V. U4
RENEWABLES
between the DUT and the ICs. When S1 is closed, power is fed to the DUT and to all six of the
ICs, comprised of two RIBS,two 1LBs and two CLBs.
The DUT and each SUP has an internal AC OCPD and disconnecting means. Each of the
six ICs is supplied by its own 600A rated fusible disconnect,
All of the equipment is permanently installed, with the-exception of the DUT and SUP
units,which require changeover when a new test sequence is started.
Unit Changeover
When it is time to execute the Unintentional Islanding test on a new model, it is usually
necessary to change out the DUT and the SUP units prior to running the test suite. This is
performed by trained technicians and engineers who are qualified to do this work. All of the
personnel involved in the changeover are required to be Electrically Qualified individuals under
Solectria's Electrical Safety Program, which requires training, written tests and ongoing audits
to maintain their status. Under the Program, no Qualified Individual is allowed to work on live
equipment unless it is required for troubleshooting, and then only under certain procedures
and with appropriate PPE. The task of changing over the units is not in the realm of
troubleshooting, so all of the work will be performed in an electrically safe working condition.
Personnel performing the changeover will establish an electrically safe working condition as
prescribed in the Electrical Safety Program before any work is started.
Solectda Ranawablee,LL[,360 Merrimack Street,Lawrence,MA 01843 USA•TEL 978-683.9700•Inverters@solectrla.com,•ww1Y„olectria.cam
IIHY—ZU—CU14 IUt UI ;CU Hfl Hammond t:lectric rH11 NU. Id(OOC100iC r uo
9. Electrical Safety Rules Specific to Field Work
9.1. No work can be performed at a customer site alone.
9.1.1.At least two Solectria qualified personnel must be on the site at all times to aid one
another In case of an emergency.
9.1.1.1. EXCEPTION: A second individual, knowledgeable in recognizing electrical hazards
and appointed by the customer, may serve in the role of the second Solectria
qualified personnel.
9.1.2. Personnel must be within sight of one another for the duration of the work.
9.2. No work can be started at a customer's site before the customer communicates a
comprehensive list of all electrical hazards at the site.
9.3. No work can be started at a customer's site before electrically safe working conditions are
established.
9.3.1. Operating the AC and DC disconnects attached to a PVI series inverter (PVI 10-15, PVI
50-100, etc.) is one method for establishing electrically safe working conditions inside a
PVI series enclosure.
9.3.1.1. If work must be performed within the AC or DC disconnect attached to a PVI
series inverter(PVI 10-15, PVI 50-100, etc.), electrically safe working conditions must
be established in such a way that all AC or DC power is removed from the disconnect
prior to the work being started.
9.3.1.1.1.The preferred method of disconnecting DC power will be to utilize
disconnecting string combiners in the array, DC disconnects near regular string
combiners in the array or DC disconnects near the inverter.
9.3.1.1.2. If none of the methods in 9.3.1.1.1 are available, the removal of DC string
combiner fuses will be permitted to establish electrically safe working
conditions. DC string combiner boxes can only be opened with full electrical PPE
and after verifying that no current is flowing in the string.
9.3.2.The complete disconnection of AC power entering a SGI series inverter(SGI,SGI XT,SGI
XTM,SGI M,etc.) is required to establish electrically safe working conditions.
9.3.3.The complete disconnection of DC power entering a SGI series inverter(SGI, SGI XT,SGI
XTM,SGI M,etc.)is required to establish electrically safe working conditions.
9.3.3.1.The preferred method of disconnecting AC power will be to utilize disconnecting
string combiners in the array, DC disconnects near regular string combiners in the
array or DC disconnects near the inverter.
9.3.3.2. If none of the methods in 9.3.3.1 are available,the removal of DC string combiner
fuses will be permitted to establish electrically safe working conditions. DC string
combiner boxes can only be opened with full electrical PPE and after verifying that
no current is flowing in the string_
9.3. 1. EXCEPTION: Work that is infeasible to perform in an electrically safe working condition
may be performed if all of the following conditions are met:
9.3.4.1. The work only involves voltage 't'esting; current testing; measurements using a
scope, power meter or power logger;orthermography.
9.3.4.2. Full electrical PPE is worn for the entire duration of the work.
9.3.5. EXCEPTION: Accessing the programming and signal connectors on the rear of power
stages within SGI 225-500 and SOOPE inverters is allowed without establishing an
electrically safe working condition if all of the following conditions are met:
9.3.5.1. The connectors are only accessed from the magnetics side of the enclosure.
11HY—CU—GU14 IUt U(;C1 HI"I Hammond f.lectric MA NU. 1U(bbeM(L V. Ub
9.3.5.2. The absence of voltage has been confirmed at the inverter side of the AC breaker
and the inverter side of the DC switch.
9.3.5.3. Full electrical PPE is worn for the entire duration of the work,.
9.3.5.3.1. EXCEPTION: One glove and glove protector may be removed -to access the
lock on the connector.
9.4. Solectria personnel are not permitted to do any rewiring work outside of the inverter or to any
of the customer connections at the inverter, such as that which may be required to
troubleshoot DC ground faults or change AC phase sequence.
9.5.Solectria personnel are not permitted to operate customer-owned electrical equipment.
9.5.1. EXCEPTION: Solectria personnel may operate customer-owned disconnecting means
only in order to establish electrically safe working conditions if all of the following
conditions are met:
9.5.1.1. The customer has identified ahead of the site visit the proper disconnecting
means,either through pictures, labels,maps or a site diagram.
9.5.1.2. The customer has identified ahead of the site visit the proper procedure and
order for operating the disconnecting means.
9.5.1.3.The disconnecting means controls AC voltages of 600VAC or less or DC voltages of
1000VDC or less.
9.5.1.4.The customer has given written permission ahead of the site visit to operate said
equipment.
9.5.2. EXCEPTION: The disconnecting means are integral to or are part of the original Solectria
equipment being serviced.
MAY-20-2014 TUE 07:21 AM Hammond Electric FAX N0. 19785219972 P. 07
Solectria ' Renewables Electrical Safety Program
Revision B,January 22 2013 PJR
Safety firstl
I'IHY CU—LU14 IUL Ul;L2 hrl Hammond Electric PHA NU 1J(HbL1JJl'L V. UH
r
1. Solectria Renewables' Responsibilities (NFPA 70E 340.7(A))
• Appropriate training and supervision by qualified personnel for:
I. The nature of associated hazards
2. Strategies to minimize hazard
3. Methods of avoiding or protecting against hazard
4. Necessity of reporting any hazardous incident, including near misses
• Properly installed equipment
• Proper access to equipment
• Availability of the correct tools for operation and maintenance
• Proper identification and guarding of dangerous equipment
• Proper documentation of the test setups and test procedures
• Maintenance of a clear and clean work area around the equipment to be worked
• Provision of adequate and proper illumination of the work area
• Annual audit of the entire Electrical Safety Program and at least one lockout procedure
2. Employee Responsibilities (NFPA 70E 340.7(B))
• continuous alertness and awareness of the possible hazards
• Proper use of tools and procedures for work
• Informing employer of malfunctioning protective measures, such as faulty or inoperable enclosures and locking
schemes
• Examine all relevant work documents provided by the employer,especially those documents indicating
hazardous components location
• Maintaining good housekeeping around the equipment and work space
• Reporting any hazardous incident, including"near misses"
Safety first!
MAY-20-2014 TUE 07;22 AM Hammond Electric FAX N0. 19785219972 P. 09
3. Electrical Safety Training
3.1 The company provides electrical safety training within the first 30 days of employment to:
O Unqualified Employees(Assembly workers, office staff, etc_)
• Qualified Employees(Electrical engineers, InverterTest personnel, Field Service Technicians)
3.2 No one is allowed to work on electrical circuits before he or she has undergone the training for Qualified
Employees and passed a subsequent multiple-choice test.
3.3 All Employees will be retrained, as needed.
3.4 Electrical Safety Training attendance sheets and qualification test results are kept on record by the employer.
Safety first
MAY-20-2014 TUE 07:23 AM Hammond Electric FAX N0. 19785219972 P. 10
4. General rules
4.1 Electrical Safety rules in this document do not apply to AC or DC voltages below SOV.
4.2 The maximum voltage in the Solectria Renewables facilities is 600V. No employee shall be allowed to work on
higher voltages than 600V in the field.
4.3 Every electrical conductor or circuit part is considered energized until proven otherwise(visually disconnected
AND with voltmeter).
4.4 No employee qualified or not,shall perform any task that he or she considers being unsafe or risky or he or
she does not feel she is qualified for.
4.5 Safety glasses have to be worn on the shop floor and on customer sites at all times.
4.6 No in-house job involving voltages in excess of 50V shall he performed alone.Another employee shall always
be present within sight.
4.7 No employee Is allowed to work on circuits in excess of 50V while their alertness Is recognizably impaired due
to illness,fatigue or other reasons.Their manager is to assign them a differenttask until they have recovered.
4.8 Before any electrical job gets started,the presence of a working phone and defibrillator has to be verified.
4.9 Before any electrical job gets started,the easy access of shutoff mechanism to all energy sources shall be
verified.
4.10 Before any electrical job gets started,the presence of current limiting devices to all energy sources shall be
verified.
S. Job Briefing
5.1 Before starting each job(with the exception of repetitive task and routine work),the employee in charge at
Solectria Renewables shall conduct a job briefing with the employees involved.
5.2 The briefing shall cover such issues as hazards associated with the job,work procedures involved, special
precautions,energy source controls,and personal protective equipment requirements.
Safety first.
1"IHY—LU—M4 WE UI;Cd HPI Hammond Electric MX NU 1y1HbMV2
r
6. Shock and Arc Flash Protection boundaries
6.1 The Protection Boundaries for energized circuits and parts at Solectria Renewables' premises are:
• Limited approach boundary:4 ft 0 in.
• Restricted Approach Boundary: 1 ft 0 in.
6.2 Unqualified persons shall not be permitted to enter the limited approach boundary only,unless the electric
conductors and equipment involved are in an electrical safe work condition(locked out or visibly disconnected
and tested with a working voltmeter).
6.3 A barrier must be put in place by a qualified person energizing the conductors to keep unqualified people out of
this area.
6.4 Readings off of equipment within the limited approach boundary must be done by an electrically qualified
person.
6.5 Any maintenance work, repair work, wiring work on inverters within the limited approach boundary is not
permitted.
6.6 Qualified persons may enter the Limited approach boundary only if all of the following conditions are met:
• There is no possibility the task can be performed in electrically safe work conditions (locked out or visibly
disconnected and tested with a working voltmeter),such as thermography
• 20cal/cm2 arc rated coverall or shirt/pants,face shield, hard hat,safety glasses,ear canal inserts, leather work
shoes are worn
6.7 Qualified persons may enter the Restricted Approach boundary only if all of the following conditions are met:
• There is no possibility the task can be performed in electrically safe work conditions(.locked out or visibly is
connected and tested with a working voltmeter),such as trouble shooting an inverter
• Rubber and/or leather gloves are in use
• Insulated tools are in use
• 20cal/cm2 arc rated coverall or shirt/pants,face shield, hard hat,safety glasses,ear canal inserts, leather work
shoes are worn
6.8 All of the above precautions apply to Solectria Renewables'premises as well as field service work. If higher
voltages are present in the field,the limited approach boundary and restricted approach boundary have to be
increased to meet NFPA 130.2(C). If more than 10okA cycles of fault current are available and increased arc
flash protection boundary shall be calculated in the field.
Safety firstl
[M7
[2]
connecting devices.
Safety first
PINY CU CU14 IUt: UI 'IC4 till Hammond Llectric VMA ICU IdIdOCIddIL r, 1C
I
(9)Simple lockout
(10) Using single line and diagrammatic drawings to identify sources of energy
(11) Use of tags and warning signs
(12) Release of stored energy
(13) Personnel accounting methods
(14) Grounding needs and requirements
(15) Safe use of voltage detecting instruments
S. Work on batteries
8.1 Work on batteries can only be performed by personnel that received specific training for this purpose.
8.2 The use of insulated tools is mandatory,even for voltages below SOV.
9. Electrical Safety Rules specific to Inverter field service work
9.1 No work can be started at a customer's site before the customer communicates a comprehensive list of all
electrical hazards at the site.
9.2 No work can be started at a customer's site before the electrically safety work conditions are established
(lockable disconnects).The removal of DC string combiner fuses will be permitted and acceptable to establish
electrically safe work conditions.
9.3 DC string combiner boxes can only be opened with full shock and arc flash protection.
9.4 Customer service personnel are not allowed to work on AC service panels at any customer's site,with the
exception of turning off AC breakers.
9.5 Customer service personnel are not allowed to do any rewiring work,such as that which may be required to
trouble shoot DC ground faults or change AC phase sequence on commercial inverters.
Revision Nature of changes Approved by Release date
A
Initial release MZM 11/30/2011
B
Added Employee Acknowledgement signoff page PJB 01/22/2013
Safety first(
nHY—CU—CU14 IUL UI;C4 HPI Hammond t:lectric MA NU lVbbZIyVZ V. lb
Remove this sheet and submit to Human Resources Manager. Keep the rest for yourself.
EMPLOYEE ACKNOWLEDGEMENT
have read and understand Solectria Renewables' Electrical Safety Program. I agree to follow this
procedure while conducting my job. If I have any questions, I will bring these to the attention of my
supervisor.
Printed Name
Signature
Date
Safety firstl
IIHT CU N14 I= UI .JC HN Hammond r-lectr ►c PHA NU lyltS�Llyyl� f. l�/!b
7.4 Simple Lockout
The simple lockout procedure will involve all sections of this procedure.
7.5. Sequence of Lockout System Procedures
7.5.1 The employees shall be notified that a lockout system is going to be implemented and the reason
therefore. The qualified employee implementing the lockout shall know the disconnecting means
location for all sources of electrical energy and the location of all sources of stored energy. The
qualified person shall be knowledgeable of hazards associated with electrical energy.
7.5.2 If the electrical supply is energized, the qualified person shall deenergize and disconnect the electric
supply and relieve all stored energy.
7.5.3 The qualified person shall then lockout all disconnecting means with lockout devices. A hasp is
required on all lockouts, even if the intention is for a single lockout to be used. All employees involved
in working on the equipment must apply their personal lockout device to the hasp.
7.5.4 Attempt to operate the disconnecting means to determine that operation is prohibited.
7.5.5 A voltage-detecting instrument shall be used. Inspect the instrument for visible damage. Do not
proceed if there is an indication of damage to the instrument until an undamaged device is available.
7.5.6 Verify proper instrument operation and then test for absence of voltage.
7.5.7 Verify proper instrument operation after testing for absence of voltage.
7.5.8 Where required, install grounding equipment/conductor device on the phase conductors or circuit
parts, to eliminate induced voltage or stored energy, before touching them. Where it has been
determined that contact with other exposed energized conductors or circuit parts is possible, apply
ground connecting devices rated for the available fault duty.
7.5.9 The equipment and/or electrical source is now locked out.
Safety firstl
HHT CU N14 I= UI -.3C Hfl Hammond C.lectric rHA NU. IUWDClHylL r 14/in
7.6 Restoring the Equipment and/or Electrical Supply.to Normal Condition.
7.6.1 After the job or task is complete,visually verify that the job or task is complete.
7.6.2 Remove all tools, equipment, and unused materials and perform appropriate housekeeping.
7.6.3 Remove all grounding equipment/conductor/devices.
7.6.4 Notify all personnel involved with the job or task that the lockout is complete,that the electrical supply
is being restored, and to remain clear of the equipment and electrical supply.
7.6.5 Perform any quality control tests or checks on the repaired or replaced equipment and/or electrical
supply.
7.6.5 Remove lockout devices by the person who installed them.
7.6.7 Notify the equipment and/or electrical supply owner that the equipment and/or electrical supply is
ready to be returned to normal operation.
7.6.8 Return the disconnecting means to their normal condition.
7.7 Procedure Involving More Than One Person.
For a simple lockout and where more than one person is involved in the job or task, each person shall
install his or her own personal lockout device.
7.8 Procedure Involving More Than One Shift.
When the lockout extends for more than one day, the lockout shall be verified to be still in place at the
beginning of the next day.
7.9. Electrical Safety Officer(ESO)
7.9.1 The Electrical Safety Officer is ultimately responsible for the implementation and enforcement of this
lockout procedure.
7.9.2 The Electrical Safety Officer can install locks/tags, or direct their installation on behalf of other
employees.
Safety first
I"IHT CU CU14 IUC Ul .o3 HN Hammond C.lectric MA NU ldlbOelddle t'. 10/10
(9)Simple lockout
(10) Using single line and diagrammatic drawings to identify sources of.energy
(11) Use of tags and warning signs
(1 2) Release of stored energy
(13) Personnel accounting methods
(14)Grounding needs and requirements
(15)Safe use of voltage detecting instruments
8. Work on batteries
8.1 Work on batteries can only be performed by personnel that received specific training for this purpose.
8.2 The use of insulated tools is mandatory, even for voltages below 50V.
9. Electrical Safety Rules specific to Inverter field service work
9.1 No work can be started at a customer's site before the customer communicates a comprehensive list of all
electrical hazards at the site.
9.2 No work can be started at a customer's site before the electrically safety work conditions are established
(lockable disconnects).The removal of DC string combiner fuses will be permitted and acceptable to establish
electrically safe work conditions.
9.3 DC string combiner boxes can only be opened with full shock and arc'Flash protection.
. 9.4 Customer service personnel are not allowed to work on AC service panels at any customer's site,with the
exception of turning off AC breakers.
9.5 Customer service personnel are not allowed to do any rewiring work,such as that which may be required to
trouble shoot DC ground faults or change AC phase sequence on commercial inverters.
Revision Nature of changes Approved by Release date
AInitial release
MZM 11/30/2011
s
Added Employee Acknowledgement signoff page PJB 01/22/2013
Safety first)
my—n—a14 WE U(;JJ HM Hammond Electric hHA NU. 18(6b21U8(2 V. 1b/1b
�9
.i
Remove this sheet and submit to Human Resources Manager. Keep the rest for yourself.
EMPLOYEE ACKNOWLEDGEMENT
I have read and understand Solectria Renewables' Electrical Safety Program. I agree to follow this
procedure while conducting my job. If I have any questions, I will bring these to the attention of my
supervisor.
Printed Name
Signature
Date
Safetyfirst!