HomeMy WebLinkAboutMiscellaneous - 172 BRIDLE PATH 4/30/2018 (3)�K
"�- IN - 37S- g9II
to int *171- y75.1a37
NEW ENGLAND ENGINEERING SERVICES
INC
Karen and Kevin Merli
179 Bridal Path
North Andover, MA 01845
Re: 179 Bridal Path, North Andover
Environmental monitor services
ITEM
INVOICE
# 03219
November 13, 2003
RECEDED
Nov 13 2003
NORTH ANOOVER
CONSERVATION COMMISSION
Three environmental monitor inspections and letter report to
Town of North Andover
TOTAL AMOUNT DUE
Send payment to 60 Beechwood Drive, North Andover, MA 01845
COST
$ 225.00
$ 225.00
60 BEECHWOOD DRIVE - NORTH ANDOVER, MA 01845 - (978) 686-1768 - (888) 359-7645 - FAX (978) 685-1099
NEW ENGLAND ENGINEERING SERVICES
INC
November 13, 2003
Scott Masse, Chairman
North Andover Conservation Commission
Town Hall Annex
27 Charles Street
North Andover, MA 01845
RE: Bridal Path, North Andover
Dear Mr. Chairman:
Please accept this letter as a report of our inspections that took place during construction
of the new sewer service at the above referenced property. Construction was completed
by F.P.Reilly Inc of Andover, MA. This inspector was on sit twice during the two days
where most of the construction took place. Once installation of the new sewer was
complete and the driveway was re -paved I allowed the removal of the haybales, but not
the silt fence, so grading and stabilization could be completed. As of today the work is
complete and the site is stabile. The area along_ the driveway adjacent to the culvert
crossing was stabilized v,� th ripz� p while the balance of the site was loamed and seeded.
The areas that were loamed and seeded have an established grass cover, however the silt
fence needs to remain in place until the grass is fully stabilized in the spring.
This report concludes our inspection services for this project. If you have any questions
regarding this report please do not hesitate to contact this office.
Sincerely,
Benjamin C. Osgood, J , EIT
President
Cc: homeowner
60 BEECHWOOD DRIVE - NORTH ANDOVER, MA 01845 - (978) 686-1768 - (888) 359-7645 - FAX (978) 685-1099
Town of North. Andover
OFFICE OF spa ops;
COMMUNITY DEV EILOPMENT AND SERVICESo
30 School Street
«V
WILLIAM J. SCOTT
North Andover Massachusetts 01845
Director Ssq
PRE-CONSTR UCT ION INSPECTION SHEET - Single Lot
Inspector: /1 n //*.,,
h nP-R�#.
Date/time: 1163�3a ,
Project Name:
Project Location/Lot #:
PRE -CONSTRUCTION CONDMONS:
1. Has the Order of Conditions been recorded?*S NO
2. Has a cash bond been posted with the Town? 4 YES NO
I Is the applicant working with the approved plans? YES NO
4. Has theapplicant posted a "DEP Sign" in a visible locatior4YYFSS
NO
5. Are all wetland flags visible and labeled correctly? NO
6. Has the applicant subinitted a construction schedule? YES &N
7. Has the applicant provide for a stockpile of emergency
sedimentation/ erosion control devices? YE5 NO
h i A l"M" p*
s exvr"-
--� 8. Has a qualified "Environmental Monitor" been
assigned to the project? 2� 0;51004 N/ A& NO
9. Has the applicant submitted a sighed „Affidavit"? N/A YES NO
CARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
--,�10. No - Construction Zone: Has the applicant staked out the me G 'erlimits?
N/A YES NO
(Please take a measurement in at least 3 locations and note setbacks)
a. Wetland Flag & distance
b. Wetland Flag & distance
c. Wetland Flag & distance
11. No -Disturbance Zone: Has the applicant installed the sedimentation erosion
control barriers in the approved location?
(Please take a measurement in at least 3 locations and note setbacks) N/A� NO
a. Wetland Flag & distance
b. Wetland Flag & distance
c. Wetland Flag & distance
12. Is the applicant granted permission to start work on this date?
YES NO
GENERA, COMMENTS:
M: kY. ?6IIco6rr --1�r 1
16-Y-16Ver
El�DS ion C-oh�4' �IQt7v1lTD (' --
Ym-'Ben 063o0d
(►,r X4 O✓1
CC: Copservation Administrator
NACC Chairman
file
North Andover Conservation Dept_
27 Charles Street
North Andover, MA 01845
To: Mike Donlan Fax: 1-978-475-3102
From: Alison McKay, Conservation Date: 9/11/03
Associate
Re: 172 Bridle Path — Sewer Tie -In Pages: 3 + cover
CC:
❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recyde
Please let me know if you have any further questions or concerns in this regard
i
[e. Co ao
1852
APPLICATION FOR SEWER SERVICE CONNECTION f /� � � �o
North Andover, Mass.'
e
Application by the undersigned is hereby made to connect with the town sewer main in = !� ?1LStreet,
subject to the rules and regulations of the Division of Public Worrk%, s. 7 �
The premises are known as No. t L ` > / Street
or subdivision lot no
e=a,�&,w Ner-11%
Owner
Contractor
6`
21 ck r /ems "
%ldo e.
Address
Address
Applicant's Signature
M c.he.A mu.<54
be- coMPl-'e-d q),,fh
PERMIT TO CONNECT WITH SEWER MAIN,
The Division of Public Works hereby grants permission to
to make a connection with the sewer main at Street
subject to the rules and regulations of the Division of Public Works..
Inspected by
Date
Y
By
See back for rules and regulations
Division of Public Works
r
Town of North Andover
Office of the Conservation Department
Community Development and Services Division
27 Charles Street
Alison McKay North Andover, Massachusetts 01845
Conservation Associate
Conservation Conditions for a Sewer Tie at 172 Bridle Path
Telephone (978) 688-
9530
Fax (978) 688-9542
The following conditions shall be complied with:
1. The sewer shall be installed over the culvert through the center of the driveway only. If this
is not possible, the applicant must file a Notice of Intent with the Conservation Department.
2. Work shall occur during the drier months between July 15 and September 15 only.
Pre -construction
3. Prior to commencement of work, the centerline of the sewer line shall be staked in the field
for review and approval by the Conservation Administrator or the Associate.
4. Prior to commencement of work, the applicant shall submit to the Conservation Department
for approval, a detailed sequence of construction, including the installation of
sedimentation/erosion control devices.
5. Prior to the commencement of work, a de -watering basin shall be set up in a location
approved by the Conservation Administrator or the Associate.
6. Prior to commencement of work, staked hay bales backed by trenched siltation fence shall be
placed along both sides of the driveway along a distance to be determined and approved by
the Conservation Administrator or the Associate during an on site inspection.
X1,7. A minimum of 15 hay bales and sufficient stakes for the staking of said bales shall be on site
for emergency purposes.
8. A wetland Scientist shall be designated as an "Erosion Control Monitor" to oversee the sewer
crossing work.
9. The Conservation Department shall be contacted at least 72 hours in advance of the start of
work for an on-site meeting to ensure that: the erosion controls were placed in the approved
location and properly installed, all other pre -construction conditions have been complied
with, and all conditions are understood.
Durine Construction
10. The Erosion Control Monitor must be present on site during the work duration of the sewer
line installation over the culvert.
11. The Conservation Department shall be notified immediately if de -watering activities are
necessary.
12. The De -watering activities shall be supervised and witnessed by the Erosion Control Monitor
and the designee must be on-site while work specific to dewatering and the culvert crossing
is occurring and this section is complete.
13. Water from any de -watering shall be properly discharged into an approved settling basin and
shall not be discharged directly into any wetland resource area.
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
14. There shall be no stockpiling of soil or other materials within twenty-five feet of any
resource area for a time period of more than 10 hours.
After Construction
15. Upon completion of the work, all disturbed areas shall be properly stabilized against erosion.
16. The Conservation department shall be contacted at least 48 hours in advance of the
completion of work for a post -construction meeting.
RECEIVED
ED
JUN 0 3 2003
NORTH ANDOVER
Guertin fr Associates. Inc. CONSERVATION COMMISSION
Environmentat &
Transportation Engineers April 22, 1999
Mr. & Mrs. Kevin Merli
172 Bridle Path
North Andover, MA 01845
Re: Sewer Contract 3C
File No. 58034.00
Dear Mr. & Mrs. Merli:
We, as consultants to the Town of North Andover, have been contracted to complete the
design of sewers for Bridle Path, Winter St. and So.°Bradford Road. Because of the low
houses along Bridle Path we have spent some time coming up with the best solution for
the Town and the property owners. The form that we previously sent was to initiate our
lines of communication.
We have met with many of your neighbors; we have met with a representative of the
Conservation Commission and we have taken elevations on your driveway. Based on the
information we have collected, we have determined that it will be possible to serve your
house by gravity. The sewer connection will be about 10 feet deep at the street line. It_
will be possible to construct the sewer over the culvert, however, because of the flat grade
in your drive theer_vvill_ofznecessi be flatter than the standard house connection.
We attach a profile of your driveway for your information. Before installing the pipe you
should verify all elevations.
Prior to proceeding with the work you must get the approval of the Conservation
Commission. It will be necessary to stay in the drive to minimize the environmental
impacts. The exact location o e plpe m the street may be adjusted any time prior to the
Contractor digging in front of your house. .
Please call if you have any questions.
Very truly yours,
GUERTIN & ASSOC TES, INC.
Benjamin J. Fehan
Senior Project Manager
91 ;.iontvacAvenut.
Monehan?..'SAA 021110 * �_ T 117:77:.... V...._ :, n c rte:___..._
c.
3Iva -As 43AOUcddV
'ON eor �� 1�.• r As Q3)iO3Ho tial onVH3NO-LS
Sa33NIJN3
+ — ON 133HS - ,.p�y� .N yo /vim 1D3(BfiS 1r$ A8 30VW 'ONI `S31VI3OSSV V NUH3ftz