Loading...
HomeMy WebLinkAboutMiscellaneous - 1756 SALEM STREET 4/30/2018i rf �LEVAT 1 ONS. 1 t4 / ay sE OUT OF HSE- V-kiA— .4 8 & u u I V btof I r.rrn To V4V- % 0C; U tl i,/ PiMQUrC2ErA V- %otea- 4- -5Ue�'J '.,.E �v POS. l 1.-• !AI\/ C71DF 1►.tTt7 D SOX 1 1� S . `Ca V� J� G� NV to PE �A��I EMU E9 C t C 4 aL � r'i�V �T 91 9E 1 (T�EGT` £� Jrcam. An!�� ry 7 - �{ 0 0 —)Yff OV 0_�i;A_T FAIL OK r i AJILtALLKTIM MMK LIST 1. Distance Tot a. Wetlands b. Drains a. Well 2. Water Line Location 3. No PVC Pipe. a. Tees !--.Length & To Clean Out C b. Cement Pipe to Tank--- on Bath -Sides of Tank 5.1 Distribution Box a. Covers & Box - No Cracks b. All Lines Flowing Equal Amounts c. No Back Flow 6.- Leach Field or_Trench a. Dimensions b. Stone Depth a. Capped Ends d. Clean Double Washed Stone Leach Pits Leach a* Dimansi s / b. Stone epth C. Sp :h Pads d. s e. Pipe to Pit Both Sides f. Clean Double Washed Stone No Garbage Disposal 9. Anal Grading Inspection --10. Barricading Covered System ll.- As Built Submitted a. lot Location b, Dixensions of System c. Location i4th Regard -to Pere Test d. Elevations e. Water Table ' n PPROV ED A`rE PROVIDED NORTH Ai ,Ov r,R BOti", G;D F HALr1 H r Title 5 Reg. 2.5 Fail OK Reg. 6 _,_ _ LoTN -- DISAPPROVED DATE TIME REASON Th ubmitted plan must show as a minumum: i� (a), the lot to be served (area, dimensions, lot #,abutters) .(Planning Board files) location and log of deep observation holes -distance to ties � location and results of percolation tests -distance / to ties (d design calculations & calculations showing required .leaching area (e location and dimensions sf system (including reserve area) existing and proposed contours location of any wet areas within 100' of the sewage disposal system o t- disclaimer (check wetlands mapping. (h) surface and subsurface drains within 100' of sewage /disposal system or disclaimer (1) location of any drainage easements within 100' of image disposal system or disclaimer (planning board /� files) (j) _ . nown _- sou-rce,s of -water_ supply within- 200'. of sewage - dispossystem_ o _-=disclaimer (k)-----Aocation- .of any -proposed well to serve= -the= lot (100' from leaching facility) �(1 location -of hater lines -on property (10' from. leachin facilities) location of benchmark driveways "o) garbage disposers no PVC is to be used in construction �q) a profile of the system (elevations of basement, plum ,f�� pipe septic tank, distribution box inlets and outle:-s distribution.. -field piping and any other elevations) (r --maximum ground water elevation. in area of sewage lisp system (s) plan must be prepared by a Professional Engineer or other professional authorized by law to prepare such plans SeDtic Tanks a) Capacities 150° of flow, water table, tees, depth of tees, access, pumping, Cleanout c 10' from cellar wall or ir_ground swimming pool d 25' from. subsurf ace drains -g.14.1 -g.14.3 g.14.4 g-14.7 1 C g.14 eg. 9.1 eg. 9.6 stribution Boxes (a Slope greater than 0.08 (b� Sump LeachingPits Leaching pits are preferred where the installation -is possible a C -Culations of leaching area (minimum 500 S.F.) (b pi�cing I Surface drainage 2% Vd,Cgver material siV4" Isk I +'e h' r in g Fields Gr_eAter than 20 minutes/inch Area (minimum...900 S.F.) Construction of field Surface drainage 2% e)"- 201 fr om-cellar wall or inground-swimming pool Leaching Trenches a Calculation "b5fleachin area (min. 500 S.F.) f (b Spac'ing ' ft. min. 6 ft, with reserve between)_ Dimensions truction_­-__.- e).-... one"--, .(f) -----Surf ace- drainage -,__2% Downhill Slope_- - �Slope� y1X = to be shown b Y/x X 150 = to be shown� Pum -Pa (a App val )r v .(b�_ Sta/d-by power - SOIL PROFILE & PERCOLATION TEST DATA i North Andover I�?ss. No.&Street Lot No f _ Loc./Subdiv. tan Owner s l } Investigator r Observer ­O�),� SOIL PROFILES -DATE r1, 3, a. f�'.��p� t Elev. ?' Elev. Elev. Elev. 0 0 0 0 1 1 I 1 � Ties to Test Pits : 2 2 2 _ 2 i 3 3 3 3 � 4 4 _ 4 5 5 _ 5 6 6 _ 6 6 g - 8 8 8 9 - 9 9 9 10 10 _ _ 10 10 Benchmark Elevati-on Location Datum Percolation Tests -Date a--7-, A Pit Number 1 2 3 4 S Start Saturation Soak -Mins. Start Test -Time 3; Drop of 3" -Time- oz - Drop of 6" -Time i_90 Mins -1st 3"Dro Tains . 2nd 3"Drop - Notes & Sketches on Back } /K_