HomeMy WebLinkAboutMiscellaneous - 19 COCHICHEWICK DRIVE 4/30/2018 I Lk eAAJ I*dL-
� v�
C�
i
Location // e ��..��c.._ ,�� ✓�-- .
No. f� �P �7 -0?4/� Date
• - TOWN OF NORTH ANDOVER
•
ATI,ED 1�y6
e
" § Certificate-of Occupancy $
i93 3 • .
Building/Frame Permit Fee $
a , R
Foundation Permit Fee $
e1 p $
4r Other Permit Fee
Ai
TOTAL $
Check#
25131 Building Inspector
32 O�rS �h•�. QL
+ }
(1^ •J
CERTIFICATE OF USE & OCCUPANCY
NCYTOWN OF INORTH ANDOVER
�
1
1
Building Pei7nit Number 004-2012 Date: March 26,2012
_ 1
THIS CERTIFIES THAT
THE BUILDING LOCATED ON 19 Cochichewick Drive_
I
MAY BE OCCUPIED AS One Unit of a Four Unit Townhouse IN ACCORDANCE
WITH THE PROVISI®NS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH
OTHER RE,GULATIONS AS MAY APPLY.
+
Certificate Issued to: Campion Estates LLC �
28 Morgan Drive
Methuen,MA 01844 i
I i
+ it
I 'I
Bui ding Inspector
Fee: $100.00
Receipt: 25131
Check No#:23934
l
1
II
I
I
I
i
a
¢ "o"Th
;} {gLco 6i Nd
Z.
APPLICATION FOR CERTIFICATE OF OCCUPANCYIINSPECTION
BUILDING PEST#_
ADDRFSS/LOCATION OF PROPERTY: 19Cochichewick Drive
:Nlap_ 62 Parce-1- 74 Lat Number.
SUADIVjSloNi Campion Estates --DATE REQUESTED FILFDIREADY FOR JSPECTION: March 5. 20112
CIT.C)SJNG DATE ON 1'TtQPFI2TY: March 10,2012
FIVE(5)DAYS NOTICE PRIOR TO CLf SING DAT]r .S RF,lJJRED
ALL WORK ANTD SIGN-OFFS MUST,IiE COiNIPLF:TFD VTI HIN'iHIS TINIF FRAME. A
RENT SPECTION FEE OF TWENTY DOUARS ($20.00)4'L•'ILT.BE CTIARGED IF THF STRUCT 1RE
DOES NOT NEST ALL APPLICABLE CODES.
AIPPI.JCA.N'T SIGNATUR> - -
Permit Issued.to: Campion estates,LLC, Joseph A Leone,Manager
.� � P 9 t
Address: 28 Morgan ICrive, (Methuen, MA 01844- - - -
's
;ltf)U3'IVf�
TOWN1 ENIGMEE•R, SITE PL AI's-DiRlV&WAY REVIEW O
CONSERVATION 9 3- a 1 a-�
.PLANNING
DPNV-WATER METER
SEWFR CONTINECTION �4
DPW MU5I1NIMCATI THA`!'`HE NVATFIZ METER HAS BI EI INSTALLED PRIOR 1*0
SUBMITTAL OF THE 0(,'C UrPANCY/JNSPFCTlON- REQUIRS'T
DPw dP 1�
SIG:-N[X`UIT,
File:Application for()C.fum rev scd Jan 20071201.1
NORTH
TONM of 2 Andover .. .
0
Al—
TO , dover, Mass., -711,,,,111
O - LAKE
COCHICHEWICK
7� 0RATED
V BOARD OF HEALTH
Food/Kitchen
PERMIT T D Septic System
BUILDING INSPECTOR
THIS CERTIFIES THAT... .. ..:��?./�.-�....o................................:s:............................................................................................ . i
Found tion A,
has permission to erect........................................ buildings on ../ ......... oug
/? f C coney
to be occupied as d a/iz7 ci-s' S.......................................................................................... z
p' ...................................... ...............
provided that the person accepting this permit shall in every respect conform to the terms of the application on file in c� rcz
this office, and to the provisions of the Codes and By relating to the In a tion, Alteration and Con r tion of 17
Buildings in'the Town of North Andover. J� PLU4h1NG INSPECT R '
/4_11VIOLATION of the Zoning or Building Regulations Voids this Permit. � �. 3 zG , Rou�D/,? el �if i012V111
/Ztiiy,G:i .hr. GY= ;/� �`f It/ // / /Z"Fin
PERMIT EXPIRES IN 6 MONTHS i�/�
ELECTRICAL INSPECTOR
UNLESS CONSTRUCTIO STARTS %lre•-_-17 e,/� IP-APs
Rough LO L1
..................� ...�, :- Service
...................
BUILDING INSPECTOR \ Final
Occupancy Permit Required t0 OCCltipy Building GAS INSPECTOR
Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
- - _
-No- Lathing or D Wall To Be Done
- - - - - - . __• _ � FIRE.DEPARTMENT- -
Until Inspected and Approved by the Building-Ins pector-. - - - - - - - Burner- -
Street
"- _ cook t, ,c� �✓�
SEE REVERSE SIDE ��
GENERAL BUILDING NOTES/CHECKLIST-NOT LIMITED TO ITEMS BELOW
�A
POST ALL LOT NUMBERS,ADDRESS, AND PERMIT(COPY OK)..or no inspections
INSPECTIONS: (Minimum) Excavation , Footing, Foundation, Frame, Insulation, Final.
FOOTINGS: Continuous Full 2x4 Keyway
Continuous strip footings for interior columns
FOUNDATION: Rebar as required
Anchor bolts or straps
Damproofing
Foundation drain-pipe/stone/fabric filter/cover and outlet connection.
FRAME:Fireblock-over girts/plates between floor joist
Penetrations for plumbing, heat,elec, etc.
Walls at stair stringers.
Windbrace corners and center bearing partitions.
Size ridge to provide full bearing at rafter cuts.
Hip and Valley rafters-watch bearing at walls.
Ridge&Hip-Provide proper connections.
Cathedral roof rafters provide proper connections and use"Hurricane Clips"tie to plate.
Stair stringers-watch cuts and heal support.
Joist hangers-fully nailed w/hanger nails.
Sill plates 2-2X6(1 PT)w/sill seal.
Girls-solid brick or steel plate bearing at foundations...,
"air space at sides in foundation pockets.
Lateral bracing at ends.
Certified calculations. required for Beams/LVL's Trusses.
Solid bearing support for Headers/Beams etc.
Check headroom clearances-stairways, under beams
Attic Access. (min.22x30 w/3'headroom above).
Crawl space access. (min. 18x24).
Bath exhaust fans to have metal duct to exterior(not in soffit).
Firecode S/R wood frame of"0"clearance fireplaces&stoves
Window Schedule or Every Habitable Room Must Have:
Natural light equal to 8%of floor area.
of required glazing shall be openable.
Bedrooms required min.20x24 egress window or door.
Vent attic spaces-"proper vent", soffit and required ridge vents.
Firecode under stairs if used for storage
FIREPLACES: Separate permit required.
Inspections at Footing-Smoke Chamber-Finish
Smooth parging, clean joints,8"solid @ combust.
DECKS: Lag to house, provide flashing.
\ Rails min. 36"high, Baluster max space 5"on center.
Over 8' above grade, use 6x6 posts w/lateral bracing.
Lag all posts and rails.
Pier footings down 48", Conc. pad at stair base.
FINISH: Handrails returned to wall/newall post.
Guardrails required alongside open cellar stairs. i
Exterior grading complete.
S Certificate or occupancy required prior to occupying structure. o
Temporary Stairs required for inspection.
NL Re-inspection fee- $30.00(Be Ready).
,Q Certificate of occupancy required prior to occupying structure.
- �
.. Date UNIT# ( ROUGH I PASS FAIL I INSP FINAL I PASS I.FAIL I ROUGH I PASS I FAIL FINAL