HomeMy WebLinkAboutMiscellaneous - 2 BLUEBERRY HILL LANE 4/30/2018 (3) __
/ � �3GuE G.�,�� l��'ll��
� � o
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1341
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information
Important: North Andover
When filling From. 1.Conservation Commission
out forms on
the computer, 2. This issuance is for(check one): ® Order of Conditions ❑ Amended Order of Conditions
use only the
tab key to 3. To: Applicant:
move your
cursor-do not Stacey Furlong
use the return a. First Name b. Last Name c.Company
key. 2 Blueberry Hill Lane
d.Mailing Address
Q North Andover MA. 01845
e.Cityrrown f.State g.Zip Code
r 4. Property Owner(if different from applicant):
Sarre
a.First Name b. Last Name c.Company
d. Mailing Address
e.City/Town f. State g.Zip Code
5. Project Location:
2 Blueberry Hill Lane North Andover
a.Street Address b.City/Town
Map 98C Parcel 79
c.Assessors Map/Plat Number d.Parcel/Lot Number
Latitude and Longitude, if known (note:
electronic filers will click for GIS locator): e. Latitude f. Longitude
6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel):
Essex North
a.County b.Certificate(if registered land)
82 317
c. Book d. Pa e
10/14/05
7. Dates: �) / '� � {
a. Date Notice of Intent Filed b.Date Pu lic Hearing Closed c.DA of Iss ance
s. Final Approved Plans and Other Documents (attach additional plan or document references as
needed):
Plot Plan
a.Plan Title
LeBlanc Survey Associates, Inc. Vernon J. LeBlanc P. L. S
b.Prepared By c.Signed and Stamped by
rj /I /o.s 1" = 20'
d. F nal evision Date e.Scale
f.Additional Plan or Document Title g. Date
9. Total WPA Fee Paid: $267.50 $42.50 $ 225.00
a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid
wpaform5.doc• rev.311/05 Page 1 of 9
i
Massachusetts Department of Environmental Protection
�—, Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1341
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings
i. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution
d. ® Private Water Supply e. ❑ Fisheries f. ® Protection of Wildlife
Habitat
g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
® the following conditions which are necessary in accordance with the performance standards set forth
in the wetlands regulations. This Commission orders that all work shall be performed in accordance
with the Notice of Intent referenced above, the following General Conditions, and any other special
conditions attached to this Order. To the extent that the following conditions modify or differ from the
plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall
control.
Denied because:
❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland
regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is
submitted which provides measures which are adequate to protect these interests, and a final Order of
Conditions is issued. A description of the performance standards which the proposed work cannot
meet is attached to this Order.
❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect
of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may
not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information
and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions
is issued. A description of the specific information which is lacking and why it is necessary is
attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and
wetland boundary (if available) linear feet
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
3. ❑ Bank a.linear feet b.linear feet c. linear feet d.linear feet
a. ❑ Bordering Vegetated
Wetland a.square feet b.square feet c.square feet d.square feet
5. ❑ Land Under a.square feet b.square feet c.square feet d.square feet
Waterbodies and
Waterways
e.cu.yd dredged f.cu.yd dredged
wpaform5.doc• rev.3/1/05 Page 2 of 9
Massachusetts Department of Environmental Protection L7
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1341
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
6. ❑ Bordering Land _
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood
Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet
7. ❑ Isolated Land Subject
to Flooding a.square feet b.square feet
Cubic Feet Flood
Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
a. ❑ Riverfront area a.total sq.feet b.total sq.feet
Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet
Sq ft between 100-200 ft e.square feet f.square feet e.square feet f.square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
9. ❑ Designated Port Indicate size under Land Under the Ocean, below
Areas
1o. ❑ Land Under the
Ocean a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
11. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
12. ❑ Coastal Beaches a.square feet b.square feet c.c/y nourishmt. d.c/y nourishmt.
13. ❑ Coastal Dunes a.square feet b.square feet c.c/y nourishmt. d.c/y nourishmt
14. ❑ Coastal Banks a. linear feet b. linear feet
15. ❑ Rocky Intertidal
Shores a.square feet b.square feet
16. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet
17. ❑ Land Under Salt
Ponds a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
18. ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
19. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
a.cu.yd dredged b.cu.yd dredged
20. ❑ Land Subject to
Coastal Storm Flowage a.square feet b.square feet
wpaform5.doc• rev.3/1/05 Page 3 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1341
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MA DEP"]
"File Number 242-1341 "
wpaform5.doc• rev.3/1/05 Page 4 of 9
Massachusetts Department of Environmental Protection L7
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1341
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before DEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A)to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the
property subject to this Order and to any contractor or other person performing work conditioned by
this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy
Standards.
Special Conditions:
If you need more See attached
space for
additional
conditions,
select box to
attach a text
document 11
wpaform5.doc• rev.3/1/05 Page 5 of 9
L1Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
1 WPP Form 5 - Order of Conditions 242-1341 _
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The North Andover hereby finds (check one that applies):
Conservation Commission
3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
a. Municipal Ordinance or Bylaw b.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final Order of
Conditions is issued.
4. ® that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
North Andover Wetland Protection Bylaw Chapter 178
a. Municipal Ordinance or Bylaw b.Citation
The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the
conditions shall control.
If you need more c. The special conditions relating to municipal ordinance or bylaw are as follows:
space for
additional See attached
conditions,
select box to
attach a text
document Z
wpaform5.doc• rev.3/1/05 Page 6 of 9
i
DEP FILE # 242 -1341
Therefore, the North Andover Conservation Commission (hereafter the "NACU) hereby
finds that the following conditions are necessary, in accordance with the Performance
Standards set forth in the State Regulations, the local Bylaw and Regulations, to protect those
interests noted above. The NACC orders that all work shall be performed in accordance with
said conditions and with the Notice of Intent referenced below. To the extent that the
following conditions modify or differ from the plans, specifications or other proposals
submitted with the Notice of Intent, the conditions should control.
GENERAL CONDITIONS
18. Failure to comply with all conditions stated herein, and with all related statutes and other
regulatory measures, shall be deemed cause to revoke or modify this Order.
19. This Order does notYPro g rant an property rights or an exclusive privileges; it does not
p Y g Y
authorize any injury to private property or invasion of property rights. However, the
NACC, agent of the NACC or the Department of Enviromnental Protection (DEP)
reserves the right to enter and inspect the property at all reasonable times until a
Certificate of Compliance is issued, to evaluate compliance with this Order of Conditions,
the Act (310 CMR 10.00), the North Andover Wetland Bylaw and Regulations, and may
require any information, measurements, photographs, observations, and/or materials, or
may require the submittal of any data or information deemed necessary by the NACC for
that evaluation. Further, work shall be halted on the site if the NACC, agent or DEP
determines that any of the work is not in compliance with this Order of Conditions.
Work shall not resume until the NACC is satisfied that the work will comply and has so
notified the applicant in writing.
20. This Order does not relieve the permittee or any other person of the necessity of
complying with all other applicable federal, state or local statutes, ordinances, by-laws or
regulations.
21. The work authorized hereunder shall be completed within three years from the date of
this order.
22. This Order may be extended by the issuing authority for one or more periods of up to one
year each upon application to the issuing authority at least thirty days (30) prior to the
expiration date of the Order (Refer to Section 8.3 (p.37) of the Nortll Andover Wetlaltd
Regl.datioiis).
23. The NACC reserves the right to amend this Order of Conditions after a legally advertised
public hearing if plans or circumstances are changed or if new conditions or information
so warrant.
j C':AWinword\OOC\2131ueben'}'I-IiIIRd.doc 1 NACC 11/22/2005
DEP FILE # 242 -1341
24. Where the Department of Environmental Protection (DEP) is requested to make a
determination and to issue a Superseding Order, the Conservation Commission shall be a
party to all agency proceedings and hearings before the Department.
25. This Order of Conditions is issued under File No. 242-1341.
26. The conditions of this decision shall apply to, and be binding upon, the applicant, owner,
its employees and all successors and assigns in interest or control. These obligations shall
be expressed in covenants in all deeds to succeeding owners of portions of the property.
27. The term "Applicant" as used in this Order of Conditions shall refer to the owner, any
successor in interest or successor in control of the property referenced in the Notice of
P
Intent, supporting documents and this Order of Conditions. The NACC shall be notified
p
in writing within 30 days of all transfers of title of any portion of property that takes place
prior to the issuance of a Certificate of Compliance.
28. The proposed work includes: Restoration of portions of the disturbed Bordering
Vegetated Wetland (BVW) associated with an unnamed perennial stream (tributary to
Mosquito Brook) as well as portions of the Buffer Zone. Minor grading of areas outside
of the 25-foot No Disturbance Zone is allowable for landscaping activities.
29. The work shall conform to the following (except as noted in the remainder of this
document where revisions may be required):
Notice of Intent filed by: Stacey Furlong (Applicant)
2 Blueberry Hill Lane
North Andover, MA 01845
Date submitted: October 14, 2005.
Site Plans and NOI prepared by: LeBlanc Survey Associates, Inc., entitled,
"Plot Plan: 2 Blueberry Hill Lane", dated
October 13, 2005 revised on November 1,
2005. Stamped & signed by Vernon J.
LeBlanc, PLS.
Additional Documentation: Restoration Plan, dated October 13, 2005;
North Andover Conservation Commission
Waiver Request Form for the 25-foot No
Disturbance Zone dated October 30, 2005;
i
North Andover Conservation Commission
Waiver Request Form for the 50-foot No
Build Zone dated October 30, 2005;
i
C:\Winvord\0002131ueberry1-1iIIRd.doc 2 NACC 11/22/2005
DEP FILE #242 -1341
30. The followingwetland resource areas are affected b the proposed work: Buffer Zone
Y P p ii
associated with Bordering Vegetated Wetlands (BVW), 200-foot Riverfront Resource
Area, 25-foot No Disturbance Zone and 50-foot No-Build Zone. These resource areas are
significant to the interests of the Act and Town Bylaw as noted above and therein. The
applicant has not attempted to overcome the presumption of significance of these
resource areas to the identified interests.
31. The NACC agrees with the applicant's delineation of the wetland resource areas on the
site as shown on the plans dated referenced herein.
32. The NACC hereby GRANTS the applicant a waiver for work within the regulated 25'
No Disturbance Zone for the purposes of restoring the Buffer Zone area and enhancing
portions of the No Disturbance Zone only. The NACC finds that the approved
restoration activities are necessary to prevent future inadvertent encroachment into the
wetland resource areas.
33. The NACC hereby DENIES the applicant a waiver for the proposed work within the
regulated 50' No Build Zone for the purposes of constructing portions of a stone
walkway, associated stairs and retaining wall. The NACC finds that there are other
feasible alternatives that would locate the above-mentioned activities outside of the 50'
No Build Zone.
34. The NACC finds that the intensive use of the upland areas, and Buffer Zone proposed on
this site will cause further alteration of the wetland resource areas. In order to prevent
any alteration of wetland resource areas a twenty-five foot (25') No-Disturbance Zone
and a fifty-foot (50') No-Construction Zone shall be established from the edge of the
t3' g
adjacent wetland resource area (BVW), except in those approved locations as depicted
on the plan and specified in this Order. The Conservation Administrator and/or other
agents of the NACC do not have the authority to waive these setbacks as established
under the local bylaw. No disturbance of existing grade, soils or vegetation is permitted
in the No-Disturbance zone. (See Section 3.4 &Appendix F of the local Regulations).
35. The NACC find the applicant's proposal of approximately 500 s.f. of Bordering
Vegetated Wetland (BVW) and 2,000 s.f. of the Buffer Zone/Riverfront Resource Area
(RRA) restoration to be adequate. The wetland restoration area shall be constructed in
accordance with the approved "Restoration Report", dated October 13, 2005 prior to
other construction activities on site and shall be reflected in the construction sequence.
(Refer to Section 5.3 (page 28) of the local Regulations for performance standards).
36. A qualified wetland scientist shall monitor the wetland and buffer zone restoration
area for two consecutive growing seasons. Monitoring reports shall be submitted to the
Conservation Department at the end of each growing season (Spring and Fall),which
shall document the survivability, health and vigor of the restored areas. If at the end of
the second growing season, or at any time within the 2-yr growing season period, it has
CAWinword\00C\2B1ueberryHiIIRd.doc 3 NACC 11/22/2005
DEP FILE #242 -1341
been determined that a 75% success rate has not been achieved,the NACC shall require
additional mitigation measures, such as additional plantings.
37. This document shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors, subcontractors, and
other personnel performing the permitting work are fully aware of the permits terms and
conditions. Thereafter, the contractor will be held jointly liable for any violation of this
i
Order resulting from failure to comply with its conditions.
38. The owners of the project and their successors in title, in the event they proceed to alter
areas subject to the Commission's jurisdiction under the order, agree that the Order does
not in itself impose upon the Town any responsibility to maintain the proposed drainage
system and that said Town shall not be liable for any damage in the event of failure. By
acceptance of this Order, the owners agree to indemnify and hold harmless to the Town
and its residents for any damage attributable to alterations undertaken on this property
pursuant to the Order.
39. Issuance of these Conditions does not in any way imply or certify that the site or
downstream areas will not be subject to flooding, storm damage or any other form of
water damage.
PRIOR TO CONSTRUCTION
40. No work shall be undertaken until all administrative appeal periods from this Order have
elapsed or, if such an appeal has been filed, until all proceedings before the Department
or Court have been completed.
41. This Order shall be recorded by the applicant at the Registry of Deeds immediately after
the expiration of all appeal periods. No work shall be undertaken until the Final Order
has been recorded in the Registry of Deeds or the Land Court for the district in which the
land is located, within the chain of title of the affected property. In the case of recorded
land, the Final Order shall also be noted in the Registry's Grantor Index under the name
of the owner of the land upon which the proposed work is to be done. In the case of
registered land, the Final Order shall also be noted on the Land Court Certificate of Title
of the owner of the land upon which the proposed work is to be done. The recording
information shall be submitted to the North Andover Conservation Commission on the
form at the end of this Order prior to commencement of the work. Any Order not
recorded by the applicant before work commences may be recorded by the NACC at
the applicant's expense.
42. A sign shall be displayed at the site not less than two square feet or more than three
square feet in size bearing the words "Massachusetts DEP,File Number 242-1341."
C:\Wimeord\OOC\2BIticberryllillRd.doc 4 NACC 11/22/2005
. i
DEP FILE# 242 -1341
43. Any changes in the submitted plans caused by the applicant, another Board's decision
or resulting from this Order of Conditions must be submitted to the NACC for
approval prior to implementation. If the NACC finds said changes to be significant, the
NACC will call for another public hearing (at the expense of the applicant). Within 21
days of the close of said public hearing the NACC will issue an amended or new Order of
Conditions. Any errors found in the plans or information submitted by the applicant shall
be considered as changes. The proposed project may be still under review by other local
or state boards or agencies. This may result in changes to the project plans or wetland
impacts. If any such changes occur a revised plan and an explanation of the revisions shall
be submitted to the NACC for review and approval prior to the start of construction. No
work shall begin on a project until written approval has been granted by the NACC.
44. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all
conditions of this Order of Conditions are complied with. The project engineer and
contractors are to be provided with a copy of this Order of Conditions and referenced
documents before commencement of construction.
45. Prior to any work,the applicant shall submit in writing the names, addresses, and
business telephone numbers of all applicable parties (i.e., contractor, environmental
monitor) responsible for the approved work and ensuring compliance with this Order.
46. Prior to any work commencing on-site, the applicant shall submit to the NACC for
approval, a detailed sequence of construction, including the construction of
compensation and retention areas, installation of sedimentation/erosion control devices
and re-vegetation to be completed before other work begins on-site.
47.Wetland flagging shall be checked prior to start of construction and shall be re-
established where missing. All wetland flagging shall remain visible and enumerated per
the approved plan(s) throughout the life of the project and until a Certificate of
Compliance is issued so that erosion control measures can be properly placed and
wetland impacts can be monitored. The proposed limit of work shall be shall be clearly
marked with stakes or flags and shall be confirmed by the NACC. Such markers shall be
checked and replaced as necessary and shall be maintained until all construction is
complete. Workers should be informed that no use of machinery, storage of machinery or
materials, stockpiling of soil, or construction activity is to occur beyond this line at any
time. All flags used for the above purposes shall be of a color different from other
flagging used on the site.
48. The existing line of erosion control (hay bales and silt fence) shall be removed and a
new line of staked hay bales backed by trenched siltation fence shall be installed as
shown on the record plan. The erosion control barrier will be properly installed and
placed in this approved location and shall be inspected and approved by the NACC
prior to the start of construction. The erosion controls shall remain intact until all
disturbed areas have been permanently stabilized to prevent erosion. All erosion
prevention and sedimentation protection measures found necessary during construction
shall be implemented at the direction of the NACC. The NACC reserves the right to
CAW i mvord\000213 I ueberryH i I I Rd.doc 5 NACC 11/22/2005
DEP FILE #242 -1341
impose additional conditions on portions of this project to mitigate any impacts which
could result from site erosion, or any noticeable degradation of surface water quality
discharging from the site. For example, installation of erosion control measures may be
required in areas not shown on the plan(s) referenced in this Order of Conditions. Should
such installation be required by the NACC, they shall be installed within 48 hours of the
Commission's request.
49. The applicant shall have on hand at the start of any soil disturbance, removal or
stockpiling, a minimum of 10 hay bales and sufficient stakes for staking these bales (or an
equivalent amount of silt fence). Said bales shall be used only for the control of
emergency erosion problems and shall not be used for the normal control of erosion.
50. A Registered Land Surveyor shall stake the 25-foot No Disturbance Zone in the field in
three prominent locations. These stakes shall represent the limit of grading for the
applicant and the contractor.
51. All wood chips found within the limits of the Bordering Vegetated Wetland (BVW)
shall be removed by hand, using a shovel and wheel barrow, and disposed of properly.
This removal of the wood chips will be verified during the pre-construction meeting.
52. A check payable to the Town of North Andover shall be provided in the amount of
$2,500,which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and
the NACC, and shall be posted with the North Andover Town Treasurer through the
NACC before commencement of work. Said deposit of money shall be conditioned on the
completion of all conditions hereof, shall be signed by a party or parties satisfactory to the
NACC, and Town Counsel, and shall be released after completion of the project, provided
that provisions, satisfactory to the NACC, have been made for performance of any
conditions which are of continuing nature. The applicant may propose a monetary release
schedule keyed to completion of specific portions of the project for the NACC's review
and approval. This condition is issued under the authority of the local Bylaw.
53. The applicant shall designate a Professional Wetland Scientist as the project's
"Environmental Monitor" (EM) to oversee the construction of the restoration activities
and landscape features, regular inspections, and any emergency placement or
replacement of erosion and sedimentation control devices. The name and phone number
of the erosion control monitor must be provided to the NACC in the event that this
person has to be contacted, due to an emergency at the site, during any 24-hour period,
including weekends. This professional must submit a letter on company letterhead
stating they have been retained as the project's Environmental Monitor. The designated
Environmental Monitor is subject to approval by the NACC. This person shall also be
given the authority to stop construction for erosion control purposes. The ECM will be
required to inspect all such devices and oversee cleaning and the proper disposal of waste
products. Cleaning shall include removal of any entrapped silt.
CAW i nword\0002 III UeberryHiIIRd•doc 6 NACC 11/22/2005
I
DEP FILE #242 -1341
54. ON EVERY MONDAY OF EACH WEEK, or otherwise arranged by the NACC or the
Conservation Administrator, in which construction activities within the jurisdictional
areas, referenced herein, occurs on-site and for as long thereafter as the ground remains
unstable, it is the applicant's responsibility that the Environmental Monitor (EM)
monitor the site and submit written reports to the NACC. The EM shall certify that, to
the best of his / her knowledge and belief based on a careful site inspection, all work is
being performed in compliance with this Order of Conditions and that approved setbacks
are being adhered to. The EM must visually inspect all sedimentation/ erosion control
measures and assume responsibility for their maintenance on a weekly basis and that they
are functioning as intended. In addition, all wetland resource areas must be visually
inspected for siltation, turbidity, and/or other water quality impacts. The reports shall
also include current condition of erosion and sedimentation controls; describe any erosion
or sedimentation repair and / or replacement; and describe any erosion or sedimentation
problems and mitigation measures implemented. Such reports shall continue until the
applicant requests a less frequent reporting schedule or an end to reports. This request
must be submitted in writing and is subject to approval by the Conservation
Administrator.
55. Prior to construction, the applicant shall permanently mark the delineated edge of the
wetland resource area with six (6) markers incorporating the following text: "Protected
Wetland Resource Area". This will designate their sensitivity and assure no further
inadvertent encroachment into the wetland. These markers can be purchased at the
Conservation Department for$2.00 per marker. These permanent markers are subject to
review and approval by the NACC. The applicant shall instruct all agents to explain
these markers to buyers/lessees/landscapers and all persons taking over the property
from the applicant.
56. The applicant and/or the legal owner of that portion of land upon which these Orders of
Conditions have been placed shall provide to the NACC prior to transferring,or
assigning any portion of said land to another party, subject to said Orders of
Conditions,the "Compliance Certification Form Affidavit" attached via "Appendix A"
signed under the pains and penalties of perjury, stating that said applicant and/or
owner has read these Orders of Conditions and is in compliance with each and every
condition. This document shall apply to each of the conditions referenced herein and
shall be provided to the Conservation Department at least five (5) business days prior to
the closing of said land transaction.
57. Once these above mentioned pre-construction requirements are complete,the applicant
shall contact the Conservation Office prior to site preparation or construction and shall
arrange an on-site conference with an NACC representative,the contractor, the
g P
engineer,wetland scientist and the applicant to ensure that all of the Conditions of this
Order are understood. This Order shall be included in all construction contracts,
subcontracts, and specifications dealing with the work proposed and shall supersede any
conflicting contract requirements. The applicant shall assure that all contractors,
subcontractors and other personnel performing the permitted work are fully aware of the
C:AWinword\00C\213WeberryllilIRd.doc 7 NACC 11/22/2005
DEP FILE #242 -1341
permit's terms and conditions. Thereafter, the contractor will be held jointly liable for any
violation of this Order of Conditions resulting from failure to comply with its conditions.
The applicant or contractor shall notify the NACC in writing of the identity of the on-site
construction supervisor hired to coordinate construction and to ensure compliance with
this Order. A reasonable period of time shall be provided as notice of the pre-
construction meeting (e.g. 72 hours).
DURING CONSTRUCTION
58. Accepted engineering and construction standards and procedures shall be followed in the
completion of the project.
59. There shall be no increase in the post development discharges from the storm drainage
system or any other changes in post development conditions that alter the post
development watershed boundaries as currently depicted in the Notice of Intent and
approved by this Order of Conditions, unless specifically approved in writing by the
Commission.
60. Water quality of the adjacent BVW shall not differ significantly following completion of
the project from the pre-development conditions. There shall be no sedimentation into
wetlands or water bodies from discharge pipes or surface runoff leaving the site.
61. Upon completion of the restoration activities,the project's Environmental Monitor
shall submit an inventory report identifying the types and number of plant species
installed to the Conservation Department.
62. Any fill used in connection with this project shall be clean fill, containing no trash, refuse,
rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper,
cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts on any of the
foregoing.
thirty 30 days, unless approved
63. No exposed area shall remain unfinished for more than t y ( ) y , pp
by the NACC. If soils are left to idle greater than thirty days, all areas shall be seeded
with rye seed to provide immediate stabilization.
64. The contractor will take all steps necessary to control dust onsite so that adverse effects on
adjacent resource areas and / or habitat do not occur.
than 2:1 horizontal: vertical).
65. No re-grading din in the buffer zone shall have a slope steeper )
g g p
1 erosion controls to provide
Slopes of steeper grade shall be rip rapped or biodegradable p
permanent stabilization.
66. There shall be no stockpiling of soil or other materials within fifty (50) feet of any resource
area.
C:\Winword\OOC\2I31ueberryllilIRd.doc 8 NACC 11/22/2005
i I
DEP FILE #242 -1341
67. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage
system, or wetland resource area.
68. All waste generated by, or associated with, the construction activity shall be contained
within the construction area, and away from any wetland resource area. There shall be no
burying of spent construction materials or disposal of waste on the site by any other
means. The applicant shall maintain dumpsters (or other suitable means) at the site for
the storage and removal of such spent construction materials off-site. However, no trash
dumpsters will be allowed within 50' of areas subject to protection under the Act or
local Bylaw.
69. Duringand after work on this project, there shall be no discharge orspillage of fuel or
p l � g
other pollutants into any wetland resource area. If there is a spill or discharge of any
pollutant during any phase of construction the NACC shall be notified by the applicant
within one (1) business day. No construction vehicles are to be stored within 100 feet of
wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance
is to be done within 100 feet of a resource area.
AFTER CONSTRUCTION
70. No underground storage of fuel oils shall be allowed on any lot within one hundred (100)
feet of any wetland resource area. This condition shall survive this Order of Conditions
and shall run with the title of the property. This condition is issued under the authority
of the Town's Wetland protection Bylaw.
71. Fertilizers utilized for landscaping and lawn care shall be slow release, low-nitrogen types
(< 5%), and shall not be used within 25 feet of a resource area. Pesticides and herbicides
shall not be used within 100 feet of a wetland resource area. This condition shall survive
this Order of Conditions and shall run with the title of the property. This condition is
issued under the authority of the Town's Wetland Protection Bylaw and shall remain in
perpetuity.
72. Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion. This shall be done either
by loaming and seeding according to SCS standards. If the latter course is chosen,
stabilization will be considered complete once vegetative cover has been achieved.
73. Upon approved site stabilization by Conservation staff, the erosion controls shall be
removed and properly disposed of and all exposed areas shall be seeded.
74. Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of Compliance:
a. WPA Form 8A - "Request for a Certificate of Compliance."
C:AWinN-ord\00C\2B1ucberry1MlRd.doc 9 NACC 11/22/2005
DEP FILE #242 -1341
b. A letter from the applicant requesting a Certificate of Compliance;
c. The name and address of the current landowner
d. Signed statements from the individual property owners shall be submitted with
the request for a Certificate of Compliance indicating that they read and
understood the recorded Order of Conditions prior to purchasing their property;
e. The name and address of the individual / trust or corporation to whom the
compliance is to be granted;
f. The street address and assessor's map / parcel number for the project;
g. The DEP file number;
h. A written statement from a Professional Wetland Scientist certifying that the
wetland and buffer zone restoration areas are functioning as intended and in
compliance with the performance standards set forth under the North Andover
Wetlands Protection Bylaw & Regulations;
i. A written statement from a Registered Professional Civil Engineer (and/or
Registered Professional Land Surveyor) of the Commonwealth certifying that the
work has been conducted as shown on the plan(s) and documents referenced
above, and as conditioned by the Commission;
j. An"As-Built" plan prepared and signed and stamped by a Registered Professional
Civil Engineer (and/or Registered Professional Land Surveyor) of the
Commonwealth, for the public record. This plan will include:
"As-Built" post-development elevations and grades of all filled or altered
wetland resource areas including the encompassing buffer zone,which is
regulated as a resource area under the local Wetland Protection Bylaw.
Y Distances from structures to wetland resource areas. Structures include (but
are not limited to) septic systems, additions, fences, sheds, stonewalls, pools,
retaining walls, subsurface utilities and decks.
A line showing the limit of work and the extent of existing erosion control
devices. "Work" includes a�disturbance of soils or vegetation.
y Location of all subsurface utilities entering the property.
75. The following special conditions shall survive the issuance of a Certificate of Compliance
(COC) for this project:
2 -
5 No-Disturbance Zone and a 50 N
o Construction Zone shall be
established from the edge of adjacent wetland resource areas, except in
C:\Wimsord\OOC\2BItieberi-,,I MlRd.doc 10 NACC 11/22/2005
DEP FILE #242 -1341
previously disturbed areas. Future work within 100' of existing wetland
resource areas will require a separate filing with the NACC. The
Conservation Administrator and/or other agents of the NACC do not have
the authority to waive these setbacks as established under the local Bylaw
(Condition # 34);
Discharge or spillage of pollutants (Condition #69);
y Prohibition of underground fuels (Condition #70);
Limitations on the use of fertilizers, herbicides, and pesticides (Condition
#71).
C:\Wimsord\OOC\2Bluebcrryl-IiIIRd.doc I 1 NACC 11/22/200
I
DEP FILE # 242 -1341
APPENDIX A —AFFIDAVIT
I, on oath do hereby depose and state:
(authorized agent of applicant and / or owner)
(PLEASE CHECK AT LEAST ONE BLOCK)
1) 1 am the of
(position with applicant) (applicant's name)
the applicant upon whom the Order of Conditions have been
(DEP or NACC File#)
placed upon by the North Andover Conservation Commission (NACC).
and / or
2) 1 am the of
(position with owner) (owner)
the owner upon whose land Order of Conditions have been
(DEP or NACC File#)
placed upon by the NACC.
♦ I hereby affirm and acknowledge that I have received said Order of Conditions and
have read the same and understand each and every condition, which has been set
forth in said Order of Conditions.
♦ I hereby affirm and acknowledge that on this day of
20 , I inspected said property together with any and
all improvements, which have been made to the same and hereby certify that each
and every condition set forth in the Order of Conditions are presently in
compliance.
♦ I hereby affirm and acknowledge that this document will be relied upon by the
NACC, as well as any potential buyers of said property, which is subject to the
Order of Conditions.
Signed under the pain and penalties of perjury this day of 20
(Authorized agent of applicant or owner)
C:\Wim%ord\OOC\2131ucberr)'IiillRd.doc 12 NACC 11/22/2005
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1341
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years, unless otherwise specified as a special .?
condition pursuant to General Conditions#4, from the date of issuance. 1. Date of Issuarice
Please indicate the number of members who will sign this form: 61-
This Order must be signed by a majority of the Conservation Commission. 2. Number of signers
The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Departmeat of
Environmental Protection Regional Office, if not filing electronically, and the property�ner, if different
from applicant.
Signatures:
vl j i
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex North
On this
it., 1 of LIC)L/t.w" I) �.os
Day Month Year
Before me, the undersigned Notary Public, S<(, MuS Ste.
personally appeared Name of Document Signer
proved to me through satisfactory evidence of identification, which was/were
Massachusetts License
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of North Andover Conservation Commission
City/Town
DONNA M.WEDGE �--
.�j,_ NCiTARYPUBLIC ignature of Notary Public
COMMONWEALTH OF MASSACHUSETTS \ 7
4a IVY Comm.Expires Aug.7,2009
Printed Name of NotaPublic
Place notary seal and/or any stamp above My commission Ex fres(Date)
This Order is issued to the applicant as follows:
❑ by hand delivery on �by certified mail, return receipt requested, on
Date Date
wpaform5.doc• rev.3/1/05 Page 7 of 9
Massachusetts Department of Environmental Protection L7
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1341
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions.
The request must be made by certified mail or hand delivery to the Department, with the appropriate filing
fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR
10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at
the same time be sent by certified mail or hand delivery to the Conservation Commission and to the
applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding
Order associated with this appeal will be required to demonstrate prior participation in the review of this project.
Previous participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or
Determination, or providing written information to the Department prior to issuance of a Superseding Order
or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act, (M.G.L. c. 131, §40)and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Section G, Recording Information is available on the following page.
i I
wpaform5.doc• rev.3/1/05 Page 8 of 9
o
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1341
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Go Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information
on Page 7 of this form shall be submitted to the Conservation Commission listed below.
North Andover
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
---------------------------------------------------------------------------------------------------------------------------
To:
North Andover
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
242-1341
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
9 ►Y
County Book Page
for:
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaform5.doc• rev.3/1105
Page 9 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance
242-1341
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the Stacey Furlong
computer, use Name
only the tab
key to move 2 Blueberry Hill Lane
your cursor- Mailing Address
do not use the North Andover MA 01845
return key. City/Town State Zip Code
2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to:
Stacey Furlong
Name
RAM November 22, 2005 242-1341
Dated DEP File Number
3. The project site is located at:
2 Blueberry Lane North Andover
Street Address City/Town
Map 98C Parcel 79
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Stacey Furlong/William Attrachi
Property Owner(if different)
Essex North 82 317
County Book Page
91697
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent, on:
11/3/08
Date
B. Certification
Check all that apply:
® Complete Certification: It is hereby certified that the work regulated by the above-referenced
Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the
above-referenced Order of Conditions have been satisfactorily completed. The project areas or work
subject to this partial certification that have been completed and are released from this Order are:
wpaform 8b.doc•rev.7/13/04 Page 1 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance
242-1341
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification (cont.)
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced
Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no
longer valid. No future work subject to regulation under the Wetlands Protection Act may
commence without filing a new Notice of Intent and receiving a new Order of Conditions.
® Ongoing Conditions: The following conditions of the Order shall continue: (Include any
conditions contained in the Final Order, such as maintenance or monitoring, that should continue
for a longer period).
Condition Numbers:
75
C. Authorization
Issued by:
North Andover // LOS"
Conservation Commission Date of Issuance
This Certificate must be signed by a majority of the Conserv *on Commission a� a copy sent to the
applicant and appropriate DEP Regional Office (See Attach
A
Signatures: ,j i/��/�� z" •,
i
wpaform 8b.doc•rev.7/13/04 Page 2 of 4
y `
A.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance
242-1341
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
C. Authorization (cont.)
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex North
's
On this
Day Of Month Year
before me, the undersigned Notary Public, personally appeared
Doh Ai /'n.9 L 02?
Name of Document Signer
proved to me through satisfactory evidence of identification, which was/were
Massachusetts License
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged
to me that he/she signed it voluntarily for its stated purpose.
As member of North Andover Conservation Commission
City/Town
r'' DONNA M.WEDGE ignature of Notary Public
NOTARY PUBLIC
COMIAOITNF.atTHOFMASSACHUSETTS - Printed Name of Nota Public
My Comm Expires Aug.7,2009 Notary
My Commissio Expires(Date)
Place notary seal and/or any stamp above- ��'���
Sigfnature of Notary Pu lic
wpaform 8b.doe-rev.7/13/04
Page 3 of 4
Massachusetts Department of Environmental Protection `
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance
242-1341
Ll Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of
Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
---------------------------------------------------------------------------------------------------------------------------
To:
North Andover
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
2 Blueberry Lane 242-1341
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
Essex North
County
for:
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpaform 8b.doc•rev.7/13/04 Page 4 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
DEP Regional Addresses
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Mail transmittal forms and DEP payments,payable to:
Commonwealth of Massachusetts
Department of Environmental Protection
Box 4062
Boston, MA 02211
DEP Western Region Adams Colrain Hampden Monroe Pittsfield Tyringham
436 Dwight Street Agawam Conway Hancock Montague Plainfield Wales
Alford Cummington Hatfield Monterey Richmond Ware
Suite 402 Amherst Dalton Hawley Montgomery Rowe Warwick
Springfield,MA 01103 Ashfield Deerfield Heath Monson Russell Washington
Phone:413-784-1100 Becket Easthampton Hinsdale Mount Washington Sandisfield Wendell
Belchertown East Longmeadow Holland New Ashford Savoy Westfield
Fax:413-784-1149 Bernardston Egremont Holyoke New Marlborough Sheffield Westhampton
Blandford Erving Huntington New Salem Shelburne West Springfield
Brimfield Florida Lanesborough North Adams Shutesbury West Stockbridge
Buckland Gill Lee Northampton Southampton Whately
Charlemont Goshen Lenox Northfield South Hadley Wilbraham
Cheshire Granby Leverett Orange Southwick Williamsburg
Chester Granville Leyden Otis Springfield Williamstown
Chesterfield Great Barrington Longmeadow Palmer Stockbridge Windsor
Chicopee Greenfield Ludlow Pelham Sunderland Worthington
Clarksburg Hadley Middlefield Peru Tolland
DEP Central Region Acton Charlton Hopkinton Millbury Rutland Uxbridge
627 Main Street Ashburnham Clinton Hubbardston Millville Shirley Warren
Ashby Douglas Hudson New Braintree Shrewsbury Webster
Worcester, MA 01608 Athol Dudley Holliston Northborough Southborough Westborough
Phone:508-792-7650 Auburn Dunstable Lancaster Northbridge Southbridge West Boylston
Fax:508-792-7621 Ayer East Brookfield Leicester North Brookfield Spencer West Brookfield
Barre Fitchburg Leominster Oakham Sterling Westford
TDD:508-767-2788 Bellingham Gardner Littleton Oxford Stow Westminster
Berlin Grafton Lunenburg Paxton Sturbridge Winchendon
Blackstone Groton Marlborough 'Pepperell Sutton Worcester
Bolton Harvard Maynard Petersham Templeton
Boxborough Hardwick Medway Phillipston Townsend
Boylston Holden Mendon Princeton Tyngsborough
Brookfield Hopedale Milford Royalston Upton
DEP Southeast Region Abington Dartmouth Freetown Mattapoisett Provincetown Tisbury
20 Riverside Drive Acushnet Dennis Gay Head Middleborough Raynham Truro
Attleboro Dighton Gosnold Nantucket Rehoboth Wareham
Lakeville, MA 02347 Avon Duxbury Halifax New Bedford Rochester Wellfleet
Phone: 508-946-2700 Barnstable Eastham Hanover North Attleborough Rockland West Bridgewater
Fax:508-947-6557 Berkley East Bridgewater Hanson Norton Sandwich Westport
Bourne Easton Harwich Norwell Scituate West Tisbury
TDD: 508-946-2795 Brewster Edgartown Kingston Oak Bluffs Seekonk Whitman
Bridgewater Fairhaven Lakeville Orleans Sharon Wrentham
Brockton Fall River Mansfield Pembroke Somerset Yarmouth
Carver Falmouth Marion Plainville Stoughton
Chatham Foxborough Marshfield Plymouth Swansea
Chilmark Franklin Mashpee Plympton Taunton
DEP Northeast Region Amesbury Chelmsford Hingham Merrimac Quincy Wakefield
1 Winter Street Andover Chelsea Holbrook Methuen Randolph Walpole
Arlington Cohasset Hull Middleton Reading Waltham
Boston,MA 02108 Ashland Concord Ipswich Millis Revere Watertown
Phone:617-654-6500 Bedford Danvers Lawrence Milton Rockport Wayland
Fax: 617-556-1049 Belmont Dedham Lexington Nahant Rowley Wellesley
Beverly Dover Lincoln Natick Salem Wenham
TDD:617-574-6868 Billerica Dracut Lowell Needham Salisbury West Newbury
Boston Essex Lynn Newbury Saugus Weston
Boxford Everett Lynnfield Newburyport Sherborn Westwood
Braintree Framingham Malden Newton Somerville Weymouth
Brookline Georgetown Manchester-By-The-Sea Norfolk Stoneham Wilmington
Burlington Gloucester Marblehead North Andover Sudbury Winchester
Cambridge Groveland Medfield North Reading Swampscott Winthrop
Canton Hamilton Medford Norwood Tewksbury Woburn
Carlisle Haverhill Melrose Peabody Topsfield
wpaform8b.doc•DEP Addresses•rev.10/27/08 Page 1 of 1