Loading...
HomeMy WebLinkAboutMiscellaneous - 210 HOLT ROAD 4/30/2018 (2)' N N J J 0 Q J � Q �'i g � J �g �g 0 Date ....... TOWN OF NORTH ANDOVER PERMIT FOR WIRING This certifies that ..................... q le j2p.5i ... .. ... ... has permission to perform ........... 41� ... . ...................... wiring in the building of ........ 7- .... !��. at ........... A 7-... ............................. I North Andover, Mass. .......... Fee ... .7'7—Lic. No. ................... ELEcrRICAL INSPEcroR Check# 3 &/ -7 (4 I Commonwealth of Massachusetts Department of Fire Services BOARD OF FIRE PREVENTION REGULATIONS Official Use Only Permit No. 9 Occupancy and Fee Checked ,[Rev. 11/991 (leave blank) APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be perfon-ned in accordance with the Massachusetts Electrical Code (MEC), 527 CMR 12.00 (PLEA SE PRINT IN INK OR TYPE ALL INFORMA TION) Date: -2009 City or Town of. North Andover To the Inspector of Wires: By this application the undersigned gives notice of his �r—her intention to perform the electrical work described below. Location (Street & Number) 210 Holt Road Owner or Tenant : Thomson Brothers, Inc Telephone No. (978) 686-8604 Owner's Address: 210 Holt Road. North Andover. MA 01845 Is this permit in conjunction with a building permit? Yes E No [-] (Check Appropriate Box) Purpose of Building: Commercial Transfer Station — Utility Authorization No. .3 74- 7 2- E Existing Service Amps I / Volts Overhead Undgrd No. of Meters New Service 4000 Amps 480/277 Volts Overhead Undgrd No. of Meters One Number of Feeders and Ampacity ten sets of four 600MCM Location and Nature of Proposed Electrical Work: New Transfer Station at 210 Holt Road Completion ofthe followine table mav be waived bv the Insnector of Wires No. of Recessed Fixtures No. of Ceil.-Susp. (Paddle) Fans No. of , - Total Transformers KVA No. of Lighting Outlets No. of Hot Tubs Generators KVA No. of Lighting Fixtures Above [:] In- Swimming Pool orrid. grnd. El No—. -oTEmergency Lighting Batte!y Units No. of Receptacle Outlets No. of Oil Burners FIRE ALARMS iNo. of Zones No. of Switches No. of Gas Burners No. of Detection and Initiating Devices No. of Ranges No. of Air Cond. Total Tons No. of Alerting Devices No. of Waste Disposers Heat Porn Totals: mber I .................. I Tons [ ....................... I IKW .................. No. of Self -Contained Detection/Alerting Devices No. of Dishwashers Space/Area Heating KW Local El Mun'C'P?l EJ Other Connection No. of Dryers Heating Appliances KW Security Systems: No. of Devices or Equivalent No. of Water KW Heaters No. of No. of Signs Ballasts ta Wiring: No. of Devices or Equivalent No. Hydromassage Bathtubs No. of Motors Total UP lecommunications Wiring: No. of Devices or Equivalent IOTHER: Attach additional detail ifdesired, or as required by the Inspector of Wires. INSURANCE COVERAGE: Unless waived by the owner, no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including "completed operation" coverage or its substantial equivalent. The undersigned certifies that such coverage is in force, and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE N BOND F] OTHER M (Specify:) Netherlands Ins. Co. 3-25-09 (Expiration Date) Estimated ValueoCElectrical Work: $400,000.00 (When required by municipal policy.) Work to Start: 7/21/08 Inspections to be requested in accordancewith MEC Rule 10, and upon completion. '�on on Nh application is true and complete. I certify, under the pains andpenalties ofperjury, that the infi4!"n FIRM NAME: Cranney Electric Co.. Inc. LIC. NO.: A 11918 Licensee: - Brian Cranney Signature\�--%- LIC.NO.: E25704 (Ifapplicable, enter "exempt " in the license number line) Bus.Tel.No.: 1-9 9-750-6900 AddQss: 10 Rainbow Teff., Danvers, MA 01923 Alt. Tel. No.: OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally required by law. By my signature below, I hereby waive this requirement. I am the (check one) El owner 0 owner's t Owner/Agent Signature Telephone No. E"IT FEE.- $ FP 7pq"-h o1r, T&&6(- e /, o-7_ aq -e S� 12-q ? - 6 - a,,Flzr 1- 2, -3 — 67 9 P -z—, vh-� 1� p-2-d5f4c-, rza-,� jhlp)j & 4 / / — Z� 490 py\ 9 a v i 151 Ca-mranelli Drive, Suite B Middleborough, MA 02346 Tel: (508) 923-0879 Fax: (508) 923-0894 December 11, 2008, F B R 0 W N AND C A L D W E L L Town of North Andover Building Department ATTN: Mr. Brian Leathe — Local Building Inspector 1600 Osgood Street Building 20, Suite 2-36 North Andover, Massachusetts 01845 RE:- Site Work Construction Completeness. and Final As -built Plan, TBI Inc., 210 Holt Road, North Andover Dear Mr. Leathe: Brown and Caldwell (BC) is submitting this letter on behalf of TBI, Inc., for the completed site construction of the Recycling Facility and Solid Waste Transfer Station at 210 Holt Road. As discussed with you on December loth via telephone, we are aware that the Building Commissioner, Mr. Gerald Brown, is out on vacation for the next week and a -half, and therefore have.forwarded this letter of construction completeness to your attention, in the event that you may issue a 30 day temporary occupancy permit for the TBI Facility, if the remaining affidavits of construction completeness are completed by the architect. The subject of this letter is strictly for the site work of the Facility, consisting of stormwater controls, site grading, paving, perimeter fence and gates, etc. Brown and Caldwell is attesting that the Facility has been constructed in substantial conformance with the plans approved by the local and state agencies. Any modifications are reflected in the attached as -built record drawing, which has been stamped and signed by a licensed Massachusetts Professional Engineer. We anticipate that in the next few days that TBI will be submitting their permit application to the Massachusetts Department of Environmental Protection — Solid Waste Division, for an Authorization to Operate (ATO), which once received, will allow TBI to operate as a solid waste handling facility. I hope that you will find all the required information needed, feel free t� contact me at this office with any questions. Best regards, Brown and 3�aldwel� Philhf�jagMa, P.E. Senior Engineer Building Dept Const Complete Itr 121108.doc cc: Bill Thomson — TBI, Inc. Gail.Hire, Mackie Shea O'Brien E n v i r o n m e n t a I E n g i n e e . r s & C o n s u I t a n t s HARRY F. DiZOGLIG, P.E. Consulting Engineer P.O. Box 19381 JOHNSTON, RHODE ISLAND 02919 (401) 934-2055 TO SALTONSTALL ARCHITECTS 380 Wareham Street Marion, MA. 02738 THE FOLLOWING WAS NOTED: FIELD REPORT #11 DATE JOB NO. October 29, 2008 SA 07-16 PROJECT TBI, Inc.- Recycle Center & Transfer Station LOCATION Holt Road No. Andover, MA. 01845 CONTRAG7,OR OWNER Ovmer Thomson Bros Industries WEATHFR Overcast, Cool TEMP. 0 at AM 44 a 1 1:15 at 1 M PRESENT AT SITE Bill,rhomson, TBI Will Saltonstall, SA C. Jay Wilbur, SA H. DiZoglio, Engineer 0 > CBI has substantially completed the installation of the interior process equipment. The transfer conveyors and stacking augers have been installed above the concrete walls at the wood & fines bins; the steel beams supporting this equipment are also bracing the tops of the 25 ft. high walls. The --ear concrete push walls of these bins have been extended to about the 26' height with the Lteel push wall as detaikA south of the F line. At the -upper level Employee mezzanine, the walkway along the south side has been fabficated and erected with the steel bar grate; the frame is braced off the lower concrete walls with knee braces; the interior steel stair will connect at the east; work on the steel stair is being delayed while the mijor utility work at the electric room below is in progress. The steel j - guard and hand railings have_bee*n installed on the'jupp ay. 'Ai the west and north sides of connecting steel walkw the Tipping floor, the upper 8 ft._ pushwalls have been constructed above the concrete With steel studs and plywood facing; the steel stud framing is braced off the metal building system wall girts. The upper mezzanine area is fully enclosed with plywood sheathing; the ipAerior partition studding has been installed. The mechanical AHU- I has been placed above the mezzanine area; theAHU-2 mechanical unit will be placed above the sorting room suspended from > the roof framing after some added roof purlins, are erected. Electrical, plumbing, HVAC and sprinkler piping work is in progress throughout the building; The air cooted condensing unit has been installed on the concrete pad at the exterior of the building, south side near the exterior stair. Metro Swift has started to install the sprinkler piping at the underside of the metal building roof framing suspending the piping from the roof purlins as scheduled. The metal railings have been fabricated and erected at the exterior concrete stair on the north side. The steel mill channel O.H. door jambs have been field painted. The exterior pad mounted electric transformer is in place on the north side of the building; Bill Thomson expects the electric service to the building to be connected within the next several days. At the Scale House exterior the H.C. mechanical lift has been placed; interior work for finishes is under�ay. The entire site has been finish graded and the ba��e course of bituminous concrete surfacing has been placed. Gerald A. Brown, Inspector of Buildings COPIES TO Bill Thomson, T 1 File: SATBTSCAY! 1 MOM M32)(201T SIGNED. HARRY F. DIZOGLIO, P.E. Consulting Engineer P.O. Box 19381 JOHNSTON, RHODE ISLAND 02919 (401) 934-2055 TO SALTONSTALL ARCHITECTS 380 Wareham Street Marion, MA. 02738 THE FOLLOWING WAS NOTED: FIELD REPORT #10 DATE OB No. October 1, 2008 7 SA 07-16 PROJE,-T TBI, Inc. - Recycle Center & Transfer Station LOCATfON Holt Road No. Andover, MA. 01845 CONTRACTOR OWNER Owner Thomson Bros Industries WEATHER Cloudy, Lt. Rain TEMP. at AM 68 : 11:45 at an PRESENT AT SITE Site Contractor - JJ Paonessa Co. Bill Thomson, TBI L 1-1. DiZoglio, Engineer > The Metal Building System has been substantially completed; all of the metal eave and rake trim and gutters and downspouts have been installed; no metal trim will be applied over the O.H. doorjamb steel channels; the Owner will be finish painting all the channel jarnbs. The exterior O.H. door installations have been completed; the 8" conc. filled steel pipe bollards are installed at all of O.H. door jambs on the south building side. The added concrete apron slab has been completed on the south side at the open bins #2 thru #6; the 8" steel bollards are installed for protection at the front of all the piers and. bin walls, lines 6 1/2to 9 as scheduled. R.A. Murdoch has completed all the scheduled concrete Work. The exterior. steel stair has bee-n-fabriddted and erected on the south side along -line A between lines 91/2and 11; 10" steel channef sitiin-gers I I tr - ds of stedl bar grate 7 -1/2,' open ri sers, with intermediate and top steel Pik, platforms; personnel steel door instal -led at 2n'�-leyel to-e--x-it.from sorting room floor to exterior stairway. Steel workers are installing the stair enclosure with metal roof deck and metal siding on a steel frame to match main bldg. The exterior wall louver at the back of the Hydraulic Room has been installed, between line 6 & 7. Work is continuing at the building interior: the 16" concrete bin wall east of line 12 has been completed at 25'high; the 18" > wall at Bin #7 has been extended along line A to the I I line pier. CBI, Inc. is continuing work to install the various equipment; the interior bag house and cyclone is being set up. The employee mezzanine area 2' floor has been installed with the 2" composite metal deck and concrete slab; the perimeter stud walls and metal ceiling joists (N -S direction) are in place with plywood sheathing and ice and water membrane complete; the exterior wall louver is installed; the sorting room ceiling joists and plywood sheathing are complete. The steel walkway connecting the mezzanine level with the sorting room has been erected complete with the metal bar grating. Electrical work is underway- within the building including the installation of.the high bay lighting. The Scale House exterior is complete with the,*indows and siding installed; the adjacent scale pits and concrete platforms are completed including the approach slabs. The site septic tank and ]each field areas have been fine graded and seeded. PAj d A. Brown, Inspector of Buildings T-(�p Ir CID I d-9 HINIM i I homson, TBI File. SATB18CA.FIO SIGNED /74"-7 2!, Date.// -.3.-,o ....... ET TOWN OF NORTH ANDOVER PERMIT FOR, GAS INSTALLATION q J.' This certifies that. ............ has permission for gas installation .............................. in the buildings f . . .. ................... at North Andover, Mass. Fee/ Lic. No.'�/ OAS IN R Check# 6603 t MASSACHusurs uNiFoRm APPLIcA,-royFOR pERWr To Do GAs FTrnNG (Type or print) NORTH ANDOVER, MASSACHUSETTS Date Building Loqations -f _,00<� Name New Renovation Replacement �SU B—BASEM _ENT BASEM i—N—T 1STe FLOO R 2N 1). FLOOR 3RD. FLOOR 4 T �HF L �OO 5TH FLOOR 6 T H F L 0 0 R FL 0 R ST H FLO 0 R Permit # 0/"/, a P� Amount Plans Submitted (Print or type) / . Name. 041, , _"' Check one: Certificate Installing Company M I_ I - "' —VVF- dppllCallon are true and accurate to the U�aL Uj !ny rnowiecige and that all plumbing work and installations Performed under Permit lAsue or this application will -be in Compliance with all pertinent provisions of the Massachus state Gas Code and Chapter 142 e General Laws. By: Title City/Town, IAPPR6V, ED (OFFICE USE ONLY) Z.15 fiature of Licensed Plumber or Gas Fitter umber Gas Fitter Master Journeyman U W ri 14 0 0 U W z cc go t: z 0 Z W cc W W U z U z -tz z U 1 LIM W W Z --t Z Q U .1 U I > (Print or type) / . Name. 041, , _"' Check one: Certificate Installing Company M I_ I - "' —VVF- dppllCallon are true and accurate to the U�aL Uj !ny rnowiecige and that all plumbing work and installations Performed under Permit lAsue or this application will -be in Compliance with all pertinent provisions of the Massachus state Gas Code and Chapter 142 e General Laws. By: Title City/Town, IAPPR6V, ED (OFFICE USE ONLY) Z.15 fiature of Licensed Plumber or Gas Fitter umber Gas Fitter Master Journeyman Saltonstall Arckitects FIELD REPORT To: Gerald Brown Inspector of Buildings North Andover, MA Date of Visit: September 10, 2008 job: 07-16 TBI Inc Holt Road North Andover, MA Present at Site: Bill Thomson, Owner/G.C. Harry DiZoglio, Structural Engineer Will Saltonstall, AIA,-Saltonstall Architects C. Jay Wilbur, Saltonstall Architects Conditions at Time of Visit: Sunny Waste Transfer Station Saltonstall Architects Field Report #2 September 12, 2008 Work is progressing well on Holt Road and in accordance with the Construction Documents, with slight revisions as noted below. The metal building erection has been completed on the north, east, and west walls. The south wall girts had been fully installed and siding was being applied. All roll -up doors had been delivered and installed. There is one egress door opening missing from the sorting room to the exterior staircase on the south side, Bill Thomson informed us that the door was ordered and being shipped and would be installed. Since our last visit all of the floor slabs had been formed and poured. In an amendment to the original plans, which called for concrete masonry construction, Rick Murdoch had constructed the electrical room, hydraulic room, and sprinkler rooms of reinforced concrete with guidance from Harry DiZoglio, structural engineer. No steel work for the employee area floors or walls had begun as of the date of this visit. Bin -walls in the north-east corner had also been constructed of reinforced concrete rather than supplied by the equipment manufacturer as previously specified. Mr. DiZoglio also assisted in the design of these bin -walls. All floor framing for -the sorting room and picking stations bad been installed and. diamond plate floor applied. The steel stud walls were erected with plywood sheathing on the exterior of the sorting room and steel stud ceiling joists were approximately 50% completed. Most of the equipment provided by Continental Biomass Industries had been delivered and installed in their final locations. Many pieces were temporarily held in place by two (2) bolts, the remaining two (2) will be secured when final equipment layout is complete. The scale in the pit had been installed and the concrete scale slab had been poured. The scale house foundations and framing were complete, HVAC and rough electrical and plumbing has been installed. The hydraulic scales on either side of the scale house had been installed, and were, being prepared for concrete pours. Copy: Bill Thomson, Harry DiZoglio, Alan Kirschner 380 Wareham St. Marion, MA 02738 p 508.748,1043 f 508.748.2330 www.saltonstallarchitects.com HARRY F. WOW% P.E. Consulting Engineer P.O. Box 19381 JOHNSTON, RHODE ISLAND 02919 (401) 934-2055 TQ SALTONSTALL ARCHITECTS 380 Wareham Street Marion, MA. 02738 THE FOLLOWING WAS NOTED: . FIELD REPORT #8 DATE JOB NO. August 28, 2008 SA 07-16 PROJECT TBI, Inc.- Recycle Center & Transfer Station LOCATION Holt Road No. Andover, MA. 01845 CONTRACTOR OWNER Owner Thomson Bros Industries WEATHUR TEMP. Oat AM Part Cloudy, Warm 78*at 11:45 po PRESENT AT SITE Site Contractor - JJ Paonessa Co. Wm. Thomson, Sr., TBI R.A. Murdoch H. DiZoglio, Engineer > The Metal Building System erectors have been continuing with the installation of the metal wall panels; the north, west & east elevations are completed with the upper translucent panels also. The metal roof panel installation has been started on the nor th side -of the roof I . Alf of th� j"�7_'perso'nnel doors and frames have been installed. The O.H. door installer has set up the opening frames & tracks for all the Ift 16 and 2004 overhead doors. At the inside truck scale, the platform has been prepped with the metal formdeck, rebar and 3 access opening frames, ready for concrete placement. The entire east section of the 14" concrete floor slab has been placed and cured including the approach slab on the south side. RA Murdoch is now forming the new int. RC bin walls at each side of line 11; walls are to be 12" thick to 25' height; the bin wall extension on the east of line 12 will be 16" thick; the walls will be pinned to the base wall and rear push wall. A cont. sawed- floor joint has been ctft at the front of the bin walls (approx. along "D") The concrete floor slab at the west section is all prepared for with the vapor barrier, rebar and trench drains in place. Expected to place monolithic concrete on Friday 8/29 with cover and curing to follow. Murdoch has been directed to extend the south concrete wall at bin #7 from line 10 to line 11; reviewed this procedure with him. The lower > perimeter and interior walls at the Hydraulic, Electric & Sprinkler rooms have been formed and placed with 8" reinf. concrete, approx. 16' height; door openings have been provided. CB1 is continuing to set up the equipment thru-out the building; the skid mounted equipment is placed in the Hydraulic room; the Sorting room floor is completed with the steel framing and steel plate floor surface. The steel plate facing is now installed at the lower face of the concrete push walls, The carpenter (Rick) has installed the steel wall studs at the perimeter of the upper sorting room; 3 5/8" x l8ga. steel studs to be faced with plywood; reviewed -with him the requirements for the new steel beam at the ceiling framing. The wood frame scale house on the west side of the building is completely rough framed with the roof shingles installed-. a concrete slab has been placed below. Work is started at the two adjacent scale pits with the load cells and anchor placement & concrete approach slabs. Upper p/c concrete retaining' wall has been installed. Gerald A. Brown, Inspector of Buildings 5 5P 5 A9 COPIES TO Bill Thomsoh—,TBl— File: SATBI8 TK8 MIJEOLIMM32MMU SIGNED- HARRY F. DiZOGLIO, P.E. Consulting Engineer 1126 Hartford Avenue JOHNSTON, RHODE ISLAND 02919 (401) 274-6690 TO SALTONSTALL ARCHITECTS 380 Wareham Street Marion, MA. 02738 THE FOLLOWING WAS NOTED: FIELD REPORT #7 i DATE August 14, 2008 T7SA 07-16 PROJECT TBI, Inc.- Recycle Center & Transfer Station LOCATION Holt Road No. Andover, MA. 01845 CONTRt,;TOR Owner OWNER Thomson Bros Indusffi.e;. WEATHER Par, Cloudy, Warm TEMP. 0 at AM 800at . 12:OOPM PRESENT AT SITE Site Contractor - JJ Paonessa Co. Bill Thomson, TBI H. DiZoglio, Engineer > Northeast Scale has been working at the truck scale pit at the east end of the building setting up the concrete pedestals, anchors, load cells and structural steel framing; the concrete approach slabs have been placed on the south and north (entrancelexit) of this bay. The metal budding system erection has been progressing; the wall girts, bracing and roof purlins are installed; the framing for the O.H. doors is underway; for the 20'x 3 5' O.H. doors, the max. attainable opening height will be about 33'-8" due to the position of the WF beam header above the opening limiting the location of the door coil; Bill Thomson indicated that this height wdl be satisfactory. The metal wall panels have I I I been placed on the west endwall.. Last'Friday (8/8), the center section of the concrete floor slab (6,000 psi) was placed and cured as directed; about half of the slab is still wetted and covered with the plastic material. Other portions of the concrete floor slab haw'been placed behind and flush to the face of the CBI support piers as directed. In addition, the concrete floor slabs have been placed within the south bin walls #I thru #6; all finished concrete for the floor slabs looks good. Preparation work for the monolithic concrete floor slab at the east section of the building has been completed; vapor barrier, isolation joint material and rebar have been placed; trench drain fixtures are in > place; concrete is expected to be placed on Friday 8/15. The moisturelvapor barrier being used is by Stego Industries, class A, 10 mil thickness, yellow plastic. Bill Thomson will call Miller Engineaing for field testing of the fresh concrete. CBI is continuing to set up equipment and the framing & deck for the sorting room floor. CB1 will not be providing the metal bin separation walls at the wood & fines bins; Bill Thomson has arranged for R.A. Murdoch to construct the waIls of concrete, thickness to be determined hen wall height is known. The two truck scale pits on the west side of the site flanking the new scale house have been placed; concrete pedestals are being placed inside the pits today; ten (10) sonotube foundation piers (two rows) have been placed between the scale pits for support of the wood frame scale house; the septic tank is placed at the north end of the foundation. The site contractor is backfilling & grading at the site retaining walls; the 6" concrete pads have been placed behind the walls. Gerald A. Brown, Inspector of Buildings .5-5 M"ILM MZ COPIES To Biff Thmnson; 9FBI File. SATBIWA.140 - SIGNED HARRY F. DiZOGLIO, P.E. Consulting Engineer P.O. Box 19381 JOHNSTON, RHODE ISLAND 02919 (401) 934-2055 TO SALTONSTALL ARCFUTECTS 380 Wareham Street Marion, MA. 02738 THE FOLLOWING WAS NOTED: FIELD REPORT #1 DATE JOB NO. April 7, 2008 SA 07-16 PROJECT TBI , Inc. - Recycle Center & Transfer Station LOCAT�ON Holt Road No. Andov MA. 01845 CONTFIAGIOR OWNER Owner Thomson Bros Industries WEATHER TEMP. Oat AM Cool, Sun & Clouds 42'at 12:00 Pm PRESENT AT SITE Bill Thomson Rick Murdoch - Concrete Form Contractor H. DiZoglio, Engineer > R. A. Murdoch began forming and placing rebar for the footings on March 284. The reinforcing steel sho . p drawings prepared and submitted by Barker Steel have been revie wed. The concrete mix desi-an for the 3500 t)si foundation concrete has been submitted by Kingston Ready -Mix Concrete and approved for use. J.J. Paonessa Co. is the Site Contractor and excavator preparing the soil for the placement of the footings. Miller Engineering has been over -seeing earthwork operations and testing the soils compaction procedure. Bill Thomson will forward soil testing reports as they are received". ''Bill -will also arrange for a field testing program for the concrete operations. The concrete footings on the west along line I from line'A to F have been completed. The contractor is adding a 2 foot wide strip footing between the isolated footings for his ease in settinj the grade beam forms. On the north side the footings are' completed along fine F from lines I to 4. On the south side along line the concrete footings are complete from line I to 6 1/2. The concrete quality looks good and all the dowels for the piers reinforcing are in place. The contractor is now preparing the formwork for the large mat footing on the east along line 13; this includes the footing for the perimeter wall along line 13 plus the foundation mat for the truck > scale and the footing for the high interior retaining wall. . The sump for the scale pit has been relocated to 4 ft. north of the D fine. The structural fill soils have been properly placed and prepared for these footings. In addition the new perimeter footings along the F fine are b!;Lmg formed. Reinforcing steel is being placed in accordance with the approved shop drawings. The site contractor has installed a well off line A between 12 & 13 to control the groundwater which is close to the bottom of mat footing vic. El. 73.' The 6" footing drain has been installed below the footing vic. lines F-12; the water fines have been installed below the footin g vic. li�e'F-T' Had meeting with Rick Murdoch to review and answer questions and to review up-comi work, he will need info for co-fumn base anchor bolts and leveling plat9s. Bill Thomson expects to receive metal building drawings later this week. This writer met with the local building inspector at 1600 Osgood St, to infonn him of my Reriodic vi.%itg COPIES TO Gerald A. Brown, Inspector of Buildiggs i - LV 111NIM M32,002' File: SATB18CA.FRI SIGNED t R' E C E 1\/ ED r� ;- � 1 n r r! Town of North Andover Office of the Planning DepartnI&VU 15 Pm 4: 16 Community Development and Services Dir*, ,�*on 1600 Osgood Street NORTH '�ffi "i L- � " ` " � ; , North Andover, Massachusetts 01845MASS�;,11!411 ill, --7-, Any appeal shall be filed within (20) days after the date of filing this notice in the office of the Town Clerk. NOTICE OF DECISION Date: October 3, 2007 Date of Hearings: August 12, 2007, September 4, 2007, and October 2, 2007 Date of Decision: October 2, 2007 Petition of- Thomson Brothers Industries (TBI), Inc., 210 Holt Road, North Andover, MA 01845 Premises Affected: 210 Holt Road, North Andover, MA within the Industrial -2 Zoning District, Assessors Map 34, Parcels L27, L38, L40 & Map 77, Parcel L14. Referring to the above petition for a Site Plan Review Special Permit from the requirements of the North Andover Zoning Bylaw, Sections 8.3, 10.3, and 10.31 and MGL C.40A, Sec. 9 So as to allow the construction of a 30,000 s.f. recycling and solid waste transfer station, extensive grading, lighting plan, landscape improvements, drainage easement, 'and other improvements within the Industrial 2 Zoning District. After a public hearing given on the above date, the Planning Board voted to APPROVE A SITE PLAN REVIEW SPECIAL PERMIT based upon the following conditions: 6IN71oe=hAn��dover Planninw0ard Abutters Richard Nardella, Chairman Surrounding Towns John Simons, Vice Chairman Jennifer Kusek Tim Seibert, Alternate Bldg. ' ZBA Con/Com Health Fire Chief Police Chief Town Clerk DPW/Engineers TBI, Inc., 210 Holt Road Site Plan Review Special Permit October 2, 2007 E I V E D I �7 The Planning Board herein approves the Site Plan Review Special Permit for the construction of a 30,000 s.f. recycling and solid waste transfer station, 76 total parking spaces, extensive MUNT0115 "Wrig 16 plan, landscape improvements, drainage easement and other improvements shown on the "Plans" as defined below. The project is located in the Industrial 2 Zoning District and is located oft-,IkdL�p.roperty shown on the North Andover Assessors Maps as Map 34, Parcels L27, U 8, L40 &�M444fphi, -V'11 Nic:81YE-14 consisting of approximately 7.79 acres (339,332 s.f.) of land with approximately ie frontage on Holt Road. The Site Plan Review Special Permit was requested TBI, Inc., 2 10 Holt Road, North Andover, MA. This application was filed with the Planning Board on July 5, 2007. The applicant submitted a complete application which was noticed and reviewed in accordance with Sections 8.3, 10.3, and 10.31 of the Town of North Andover Zoning Bylaw and MGL c.40A, sec. 9 During the review process, the Applicant and its professional consultants also submitted various revisions to the plans along with various supplemental memoranda and correspondence in response to requests by the Planning Board, the Board's peer review consultants, and by the various departments within the Town of North Andover that reviewed the project. All of these plans, reports and correspondence are contained in the Planning Board's files and are hereby incorporated by reference into the public record for this hearing. The Planning Board makes the following findings as required by the North Andover Zoning Bylaws Section 8.3 and 1.0.3: FINDINGS OF FACT: 1) On June 22, 2006, the North Andover Board of Health approved the Site Assignment Decision for the proposed 30,000 sq. ft. recycling and solid waste transfer station to be located on 5.8 acres of land and shown on lots labeled 2, 3, and 4 on the "Plans" as defined below. The requirements and conditions contained within said Decision are hereby incorporated by reference into this decision and public record. 2) The specific site is an appropriate location for the project as it is located in the Industrial 2 Zoning District and involves the construction of permitted uses within those zones. Specifically, the Zoning Bylaw allows in the Industrial 2 District the following use (North Andover Zoning Bylaw, Section 4.133(l 1)): Light manufacturing, including manufacturing, fabrication, processing, finishing, assembly, packing or treatment of articles or merchandise provided such uses are conducted solely within a building and further provided that such uses are not offensive noxious, detrimental, or dangerous to surrounding areas of the Town by reason of dust, smoke, fiimes, odor, noise, vibration, light or other adverse environmental effect. 3) The use as developed will not adversely affect the neighborhood as the project is surrounded by other industrial uses and zoned properties and will not impact any residential areas or neighborhoods. In addition, the project provides for natural a vegetative landscaped buffer along the frontage of the properties to further insulate the building. All plantings and screening depicted on the approved plans referenced herein shall remain in perpetuity over the life of the project. 4) There will be no nuisance or serious hazard to vehicles or pedestrians. The proposed parking lot design and access/egress drives provide for adequate internal and external traffic flow, safety, and sufficient pedestrian connections throughout the project and surrounding area. Traffic impact studies have been conducted for the project as part of the applicant's submittal to the Executive Office of Environmental Affairs (EOEA) and Site Assignment application to the North Andover Board of Health and Department of Environmental Protection Division of Solid Waste. The reviewing parties K TBI, Inc., 210 Holt Road Site Plan Review Special Permit October 2, 2007 concluded that the external traffic impacts will not significantly degrade the level of service at any nearby intersections. 5) In accordance with the terms and conditions of the Site Assignment Decision, the Applicant will fund up to the $200,000 towards the installation of a traffic light at the intersection of Holt Road and Route 125 to mitigate traffic congestion. 6) The proposed recycling and solid waste transfer station contains architectural elements and treatments that are commonly present and consistent with structures typically constructed within the Industrial 2 Zoning District. Finally, the Applicant incorporated visual buffering and additional plantings to help mitigate the impact on the neighboring properties and streetscape. 7) The site drainage system and storm water management design are designed in accordance with the Town Bylaw requirements and Best Management Practices, and has been reviewed by the outside consulting engineer, Vanasse, Hangen Brustlin, Inc. (V, HB). 8) The landscaping approved as a part of this plan generally meets the requirements of Section 8.4 of the North Andover Zoning Bylaw, 9) The applicant has met the requirements of the Town for Site Plan Review as stated in Section 8.3 of the Zoning Bylaw. 10) Adequate and appropriate facilities will be provided for the proper operation of the proposed use. 11) The project will provide for municipal water, sewer and utilities on the property to adequately address the needs of the project. 12) This Site Plan Review Special Permit is conditional upon the submission and approval by the Planning Board of an appropriate Form A Application for Approval of an ANR Plan (Approval Not Required Plan) which combines the Map 34, Parcels L27, L38, L40 & Map 77, Parcel L14, totaling approximately 7.79 acres, into one parcel. Finally the Planning Board finds that this project generally complies with the Town of North Andover Zoning Bylaw requirements as listed in Section 8.3 but requires conditions in order to be fully in compliance. The Planning Board hereby votes to both grant the requested waivers as described in the Applicant's application, and also unanimously votes to grant approval of the Applicant's proposed project as described in the "Plans" and other supporting information described in the public record, provided the following conditions are met: SPECIAL CONDITIONS: 1) Permit Definitions: a) The "Locus" refers to the 339,332 s.f. parcel of land with land fronting on Holt Road, as shown on Assessors Map 34, Parcels L27, L38, L40 & Map 77, Parcel L14, also known as 210 Holt Road, North Andover, Massachusetts. b) The "Plans" refer to the plans prepared by Brown and Caldwell, 48 Leona Drive, Suite C, Middleborough, MA 02346, entitled "Site Plan Review 2007, Prepared for TBI, Inc., North Andover, Massachusetts": 3 TBI, Inc., 210 Holt Road Site Plan Review Special Permit October 2, 2007 Sheet I of 10, Revised 9/25/07; Sheets 2, 3, 4, 5 and 10 of 10, Revised 9/12/07; Sheet 6 of 10, Revised 9/14/07; and Sheet 7, 8 and 9 of 10, Revised 8/22/07. c) The "Project" or "210 Holt Road" refers to construction of a 30,000 s.f. recycling and solid waste transfer station. d) The "Applicant" refers to TBI, Inc. as the applicant for the Site Plan Review Special Permit. 2) Environmental Monitor: The developer shall designate an independent Environmental Monitor who shall be chosen in consultation with the Planning and Community Development Staff. The Environmental Monitor must be available upon four (4) hours notice to inspect the site with the Planning Board designated official. The Environmental Monitor will be required to inspect all such devices and oversee cleaning and the proper disposal of waste products if applicable. 3) Construction Monitor: The applicant shall designate an independent construction monitor who shall be chosen in consultation with the Planning Department. The construction monitor must be available upon four (4) hours notice to inspect the site with the Planning Board designated official. The construction monitor shall make weekly inspections of the project and file monthly reports to the Planning Board throughout the duration of the project. The monthly reports shall detail area of non- compliance, if any, and actions taken to resolve these issues. The designated monitor may not be applicant and/or developer. The weekly inspections and monthly reports provided to the Planning Department shall include the following: a) site clearing; b) erosion control; c) drainage and detention structures; d) on-site water and sewer utilities; e) parking spaces and related pavement; f) newly constructed roadways/access ways; g) curb cuts; h) retaining walls; i) site screening, landscaping and street trees; j) site restoration; and k) final site cleanup 4) PRIOR TO THE ENDORSEMENT OF THE PLANS BY THE PLANNING BOARD, THE APPLICANT MUST COMPLY WITH THE FOLLOWING CONDITIONS: a) The final plans must be reviewed and approved by the DPWand the Planning Department and be endorsed by the Planning Board. The final plans must be submitted for review within ninety (90) days of filing the decision with the Town Clerk. b) The final site drainage system must be designed in accordance with the Town Bylaw requirements and reviewed by the Division of Public Works. All storm water drainage control facilities utilized by the site shall be shown on the site plan. Storm water drainage calculations which support the design of the control facilities shown on the plan shall be submitted to the Department of Public Works for review and approval. Written confirmation of said review and approval by the Department of Public Works must be submitted to the Planning Department. 4 TBI, Inc., 210 Holt Road Site Plan Review Special Permit October 2, 2007 c) A bond in the amount of fifteen dollars ($15,000) must be posted for the purpose of insuring that a final as -built plan showing the location of all on-site utilities, structures, newly constructed roadways/access ways, topography, and drainage facilities is submitted. The bond is also in place to insure that the site is constructed in accordance with the approved plan. The form of security must be acceptable to the Planning Board. d) The Applicant, within thirty (30) days after this Decision becomes final, shall submit to the Planning Board for its approval an appropriate Form A Application for Approval of an ANR Plan (Approval Not Required Plan) along with an ANR Plan which combines the Map 34, Parcels L27, L38, L40 & Map 77, Parcel L14 totaling approximately 7.79 acres. No construction activities authorized by this Decision on the Additional Land shall be commenced until the Applicant has (a) recorded said approved ANR Plan and (b) caused the title to the Additional Land to be combined with the Original Land, by recording a Deed for said Additional Land conveying the title to said Additional Land to Holt Road, LLC. e) All site plan application and escrow fees must be paid in full and verified by the Town Planner. 5) PRIOR TO THE START OF CONSTRUCTION: a) A construction schedule shall be submitted to the Planning Staff for the purpose of tracking the construction and informing the public of anticipated activities on the site. b) All applicable erosion control measures must be in place and reviewed and approved by the Planning Department. c) It shall be the responsibility of the developer to assure that no erosion on the site shall occur which will cause deposition of soil or sediment upon adjacent properties or public ways, except as normally ancillary to off-site sewer or other off-site construction. Off-site erosion will be a basis for the Planning Board making a finding that the project is not in compliance with the plan; provided, however, that the Planning Board shall give the developer written notice of any such finding and ten days to cure said condition. d) A pre -construction meeting must be held with the developer, their construction employees, Planning Department, Building Department, and Conservation Department to discuss scheduling of inspections, the construction schedule, and the process/method of informing the public of the anticipated activities on the site. e) The developer shall provide the Planning Board with copies of permits, plans and decisions received from all other North Andover Land -Use Boards or departments. In addition to receipt of these plans, the applicant shall supply the Town Planner with a letter outlining any and all .revisions resulting from said permits, plans and decisions received from other town boards, commissions and departments that differ from the approved plans referenced in Condition 24. 6) � PRIOR TO THE ISSUANCE OF A BUILDING PERMIT: a) Three (3) copies of the signed, recorded plans must be delivered to the Planning Department. b) One certified copy of the recorded decision must be submitted to the Planning Department. TBI, Inc., 210 Holt Road Site Plan Review Special Permit October 2, 2007 c) The applicant shall adhere to the following requirement of the North Andover Fire Department and the North Andover Building Department: 1. All structures must contain a commercial fire sprinkler system. The applicant is required to extend the sprinklers from the existing plant into the new addition. The plans and hydraulic calculations for each commercial system shall be submitted for review and approval by the North Andover Fire Department. Plans and hydraulic calculations for each commercial system must also be supplied to the Building Department. 7) DURING CONSTRUCTION: a) During construction, the site must be kept clean and swept regularly throughout the construction process. Dust mitigation, dewatering and roadway cleaning must be performed weekly, or more frequently as dictated by site and weather conditions and as directed by the Town Planner. Tarps shall be placed over any stockpiles to ensure that any dust is mitigated properly. b) The Board will strictly enforce the policy relative to the stockpiling of materials (dirt, wood, construction material, etc.) and must be shown on a plan and reviewed and approved by the Town Planner. Any approved piles must remain covered at all times to minimize potential dust and be required to install appropriate erosion control measures to mitigate potential impacts to Lake Cochichewick. Any stockpiles to remain for longer than one week must be covered. c) In an effort to reduce noise levels, the developer shall keep in optimum working order, through regular maintenance, any and all equipment that shall emanate sounds from the structures or site. d) The Town Planner will perform bi-weekly inspections of the site during construction to ensure that the developer is adhering to the conditions set forth in the decision. 8) PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY: a) The applicant must submit a letter from the architect and engineer of the project stating that the building, landscaping, lighting and site layout substantially comply with the plans referenced at the end of this decision as endorsed by the Planning Board. Alternatively, the applicant and/or property owner may provide a bond, determined by the Planning Board, to cover the full amount of the landscaping materials and installation if weather conditions do not permit the completion of the landscaping prior to the use of the parking area. b) The Planning Staff shall approve'all artificial lighting used to illuminate the site. All lighting shall have underground wiring and shall be so arranged that all direct rays from such lighting falls entirely within the site and shall be shielded or recessed so as not to shine upon abutting properties or streets. The Planning Staff shall review the site. Any . changes to the approved lighting plan as may be reasonably required by the Planning Staff shall be made at the owner's expense. The applicant must submit a letter from the architect and engineer of the project stating that the building, signs, landscaping, lighting and site layout substantially comply with the plans referenced at the end of this decision as endorsed by the Planning Board. All site lighting shall provide security for the site and structures however it must not create any glare or project any light onto adjacent residential properties. c) The commercial fire sprinkler systems must be installed in accordance with referenced standard NFPA 13D and in accordance with 780 CMF, Chapter 9 of the Massachusetts State Building Code. Certification that the systems have been installed properly in accordance with the above TBI, Inc., 210 Holt Road Site Plan Review Special Permit October 2, 2007 referenced regulations must be provided from both the North Andover Fire Department and the North Andover Building Department to the applicant. The applicant must then provide this certification to the North Andover Planning Department. d) Any and all signage plans for the site, which have been provided to the Planning Board during the site plan review process, were presented for the materials of the sipage only. This includes any and all sipage relative to the Site Assignment Decision incorporated as part of this decision. Any signage plans must conform to Section 6, Signage and Outdoor Lighting Regulations of the Town of North Andover Zoning Bylaw and must be approved by the Building Department. In no way is the applicant to construe that the Planning Board has reviewed and approved the signage plans for Zoning Compliance as that is the jurisdiction of the Building Department. All additional permits must be obtained by the applicant prior to construction. e) In accordance with the Site Assignment Decision, TBI shall develop a clear route map for all trucks (inbound and outbound) that will be distributed to drivers, faxed and emailed. The route will clearly direct drivers to 1-495 and the Route 125 Connector access/egress point. Further, all trucks entering and exiting the facility shall follow the designated route except when performing collection in North Andover, or unless an exception applies pursuant to Board of Health trash truck regulations. 9) PRIOR TO THE FINAL RELEASE OF ALL SECURITY AND ESCROWED FUNDS a) The Planning Staff shall review the site. Any screening as may be reasonably required by the Planning Staff will be added at the Project Owner's expense. b) A final as -built plan showing final topography, the location of all on-site utilities, structures, curb cuts, parking spaces, roadway/access way construction, drainage structures, and facilities must be submitted to the Planning Department. The applicant must submit a letter from the architect and engineer of the project stating said items substantially comply with the plans referenced at the end of this decision as endorsed by the Planning Board. 10. The requirements and conditions contained within the Site Assignment Decision dated June 22, 2006 and issued by the North Andover Board of Health are contained in. the Planning Board's files and are hereby incorporated by reference into this decision and public record. The applicant shall comply with all conditions and requirements said Decision. Any non-compliance with the requirements and conditions of said Decision shall violate this Site Plan Review Special Permit 11. In accordance with the Site Assignment Decision, TBI shall contribute up to $200,000 towards the installation and construction of a traffic light at the intersection of Holt Road and Route 125. Monies not already utilized for the engineering, installation, and/or construction of the traffic light will be placed into an escrow account with the Town by the applicant. Said amount shall only be utilized by the applicant or Town for the purpose of installing and constructing the signalized traffic light at a future date. 12. All site work and external construction activity shall be limited to between 7:00 a.m. and 7:00 p.m. Monday through Friday and between 8:00 a.m. and 5:00 p.m. on Saturday. 13. All existing plantings and screening depicted on the approved plans shall remain in perpetuity over the life of the project. 7 TBI, Inc., 210 Holt Road Site Plan Review Special Permit October 2, 2007 12. The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 13. Gas, Telephone, Cable and Electric utilities shall be installed underground as specified by the respective utility companies. 14. No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 15. No underground fuel storage shall be installed except as may be allowed by Town Regulations. 16. The provisions of this conditional approval shall apply to and be binding upon the applicant, its employees and all successors and assigns in interest or control. 18. All snow storage is to be removed as needed to provide sufficient access throughout the site and to ensure the proper safety of vehicles and pedestrians. Snow storage shall not result in the loss of parking spaces except during removal operations. The Town Planner shall direct the applicant to remove snow to an offsite location if it is determined that onsite snow storage is insufficient. 19. The Planning Board expects that the project will be built in accordance with the herein referenced plans and specifications and in full accordance with the design elements and features displayed and discussed during the Public Hearings. Any revisions shall be submitted to the Town Planner for review in accordance with Section 8.3.8 of the Zoning Bylaw. If the Town Planner in his/her sole discretion deems these revisions to be substantial as defined in Section 8.3.8, the applicant must submit revised plans to the Planning Board for approval. 20. This Special Permit approval shall be deemed to have lapsed after October 2, 2009 (two years from the date permit granted) unless substantial use or construction has commenced. Substantial use or construction will be determined by a majority vote of the Planning Board. 2 1. The following information shall be deemed part of the decision: Plan titled: Site Plan Review 2007 Prepared for TBI, Inc. North Andover, Massachusetts Prepared for: TBI, Inc. 2 10 Holt Road North Andover, MA Prepared by: Brown and Caldwell 48 Leona Drive, Suite C Middleborough, MA 02346 Scale: I" = 40' and I" = 30' Date: July 2007, Various Revision Dates Sheets: I of 10, Revised 9/25/07; 2, 3, 4, 5 and 10 of 10, Revised 9/12/07; 6 of 10, Revised 9/14/07; and 7, 8 and 9 of 10, Revised 8/22/07 Report titled: Site Plan Review Application TBI, Inc. Recycling Facility and Solid Waste Transfer Station F-*] TBI, Inc., 210 Holt Road Site Plan Review Special Permit October 2, 2007 North Andover, MA Prepared for: TBI, Inc. 2 10 Holt Road North Andover, MA Prepared by: Brown and Caldwell 48 Leona Drive, Suite C Middleborough, MA O�2346 cc: Town Departments Applicant Engineer Abutters Fen R "E", C E IV ED r, c,7 I f, �--' 'J f T 0 r' ' R 2001 OCT IS F1 1 G ,rn'.�j�4 01-. 4 L! Thursday, September 25, 2003 ' Michael McGuire Local Building Inspector Town of North Andover Building Department 27 Charles Street North Andover, MA 01845 (978) 688-9545 Mike: I am requesting the seating capacity and occupancy capacity for all holders of liquor licenses in North Andover as listed on the (2) page report identified as TOWN OF NORTH ANDOVER, Licensing Commission, 2003, including the following categories listed on the (2) page report: Common Victuallers - All Alcohol, Restaurant - Wine & Malt, Club - All Alcohol, and Special (Section 14) Wine & Malt. I inquired at the Town Clerks Office with regards to this information potentially being on the establishments existing liquor licenses; however, I was told that the 2003 licenses do not provide that information but that the 2004 renewals will call for the information to be listed on the license. When the information is gathered together if you would call me at (508) 726-1287 1 will swig by your office to pick it up. 210 Holt Road North Andover, MA 01845 Phone (508) 726-1287 Fax (978) 686-3086 E rur' E � W SEP 2 5 2003 P K. BUILDING DEP TO DATE 6/. ;ks- TIME 4y- AM /0 PM P- -T—ROMT PHONE H CELL OF 7T FAX zgg A c52 c jl"q -A- 6 P, ke, 6L v E W po CL C( E-MAILADDRESS Y-1 SIGNED( PHONEDE CALL o I BACK RETURNED o CALL WANTS TOP SEE YOU I WILL CALL [i AGAIN WAS IN F7]URGENT I Restaurant Establishment Seating Capacity Orzo Caf6 Trattoria 1077 Osgood Street 10(o Culpeppers 815 V G Turnpike Street Beijing Restaurant 1250 Osgood St Bertucci's Restaurant 435 Andover Street Joe Fish 1120 Osgood Street Camelot Building Association 505 Sutton Street b c De r., Le) N China Blossom 010C P(4 rear, 946 Osgood Street Jasmine Inc 733 Turnpike Street f-7 The Loft Restaurant 1140 Osgood Street 99 Restaurant IBC) 267 Chickering Road Mango Grille 585 Chickering Road North Andover Restaurant 39-41 Main Street Restaurant Zola 57 Water Street Bollywood Grill 350 Winthrop Ave Top of the Scales Restaurant 4 Johnson Street Fuddruckers, Inc ..550 Turnpike Street VFW Club 2104 ko LV 4 t- h I Park Street opper 14A', �00 North Andover Country Club 500 Great Pond Road Edgewood Retirement Home .575 Osgood Street Merrimack College Campus Center Gildea Hall Falculty Dinning Room Francis Hchnes 127 Middlesex Street John Enright 7 Johnson Street :0�1 A TOWN OF NORTH ANDOVER Licensing Commission 2003 Common Victuallers - All Alcohol - $2,200 Aglio, Inc. d/b/a/Orzo Caf6 Trattoria (M35,P27) 1077 Osgood Street Michael A. Reppucci, Mgr. 686-6921 TRJ Line Inc.d.b.a. Culpeppers (M98D, P44) 815 Turnpike Street Thomas Rossi, President 794-1100 Beijing Restaurant, Inc. (M35, P10) 1250 Osgood Street David Yue, Mgr/ 689-3000 Bertucci's Restaurant Corp. d/b/a Bertucci's Brick Oven Pizzeria (M24, P32) 435 Andover Street Paul Hoagland, Manager 685-4498 The Restaurant Group Inc. d/b/a Joe Fish(M35, P36) 1120 Osgood Street James Dietz, Manager 685-3663 Approved by Lic. Committee. 7/11/94 Camelot Building Association, Inc. d/b/a Camelot (M74, P23) 505 Sutton Street Phil Kandrut, Manager 687-9136 China Blossom, Inc. (M74, P3) 946 Osgood Street San Joe Chu, Mgr. 682-2242 Jasmine, Inc. d/b/a Jasmine (M98D, P69) 733 Turnpike Street Peter H. Wong, Mgr. 681-1888 North Andover Group, Inc. d/b/a/ The Loft Restaurant (M35,P53) 1140 Osgood Street Paul V. Cassidy, Mqr. 686-0026 99 Boston, Inc. (M46, P3) 267 Chickering Road Charles 0. Noyes, Mgr. 683-9999 Alter of premises approved 7/92 by ABCC WJ Phelan Inc. d/b/a mango Grille (M84, P28 -4B) 585 Chickering Road Thelma Phelan, Mgr. License approved by BOS 4/11/94 688-5600 North Andover Restaurant, Inc. d/b/a Rolf's (M18, Pl) 39-41 Main Street Lesley Carlson, Mqr. 687-9712 Restaurant Zola 57 Water Street Joseph Messina, Mgr. (978)794-8344 Bollywood Grill (M27, P27) North Andover Mall 350 Winthrop Avenue Malkiat Singh Gill Top of the Scales Restaurant (M96, P24) 4 Johnson Street Nancy E. Breen 681-8848 License approved 10/31/94 by BOS Restaurant - Wine & Malt - $1,400 Fuddruckers, Inc. 550 Turnpike Street James Boland, Mgr. 557-1100 Club - All Alcohol - $1,400 Club 2104, Inc. (M71, P41) Tax Exempt Park Street Kevin Hayes, Mgr. 687-9614 Change of Mgr. approved by ABCC on 8/16/92 North Andover Country Club, Corp. (M64,P6) SOO Great Pond Road Jean Bergeron, Mgr. 687-7414 Edgewood Retirement Community 57S Osgood Street Marlene Rotering 72S-3300 Special (Section 14) Wine & Malt - $900: Merrimack College - Campus Center (Gildea Hall, Faculty Dining Room ( Tax Exempt) Adjourning Lounge, and Warrior's Den) Turnpike Street Maryellen M. Colliton, Mgr. 683-7111 Package Store - Wine & Malt and Sunday Permits - $900: Francis A. Holmes d/b/a/ Middlesex Market (M9, P46) 127 Marblehead Street 688-7558 John Enright d/b/a General Store (M96, P22) 7 Johnson Street John Enright 688-4116 CHECKMATE DEVELOPMENT LLC lb=oft 2 1 0 H 0 LT ROAD N 0 RTH AN DOVER, MA 0 1 B45 Town of North Andover Office of the Building Department 27 Charles Street North Andover, MA 0 1845 RD E C E 9 W E FMAR 1 1 2003 BUILDING DEPT - _j Applicant intends to apply for Special Permit under Sections 8.8 and 2.21.6 under the Adult Use Zone, created and approved May 6, 1996 Annual Town Meeting, Artilce22, as set forth in The Zoning Bylaw Town Of North Andover As Amended May 2001. 978-580-9083 ent LLC I fl Location No. Date ,40R,rh TOWN OF NORTH ANDOVER Certificate of Occupancy $ Building/Frame Permit Fee $ Foundation Permit Fee $ Other Permit Fee av $ TOTAL Check # 15510 Building InspOtor TOWN OF NORTH ANDOVER'BUILDING DEPARTMENT', APPLICATION TO CONSTRUCT REPAIR, RENOVATE, CHANGE THE USE OR OCCUPANCY OF, OR DEMOLISH ANY BUILDING. - OTHER TIL4,N A ONE OR TWO FAMILY DWELLING ffThis Section for Official Use Onl! BUILDING PERMIT NUNIBER: DATE ISSUED: --p SIGNATURE: -516 - Al Buildi—n,& tomrnissi2!��r���Or of Buildings 1 1010. 1. 1 Property Address: 1.2 Assessors Map and Parcel Number: z/0 t:60- i2t-J. - ,7 Map Number Parcel Numbe( 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use i��- (st) Frontage 00 1.6 BUHDING SETBACKS (ft) Front Yard Sidc Yard Rear Yard Required Provide Required Provided red Provided 1.7 Water Supply M.G.L.C.40. 54) 1.5. Flood Zone Information: 1.9 Sewerap Disposal Systenr. Public 0 Private 0 Zone — Outside Flood Zone 0 Municipal On Site Disposal System 0 2.1 Owner of Record Name (Print) Address for Service: S, r Telephone 2-2—Authorized Agent Name Print Address for Service: Signature Telephone A'N ".1.11 WWA" Sim 3.1 Licensed Construction Supervisor Not Applicable 0 E�ki O's C S O's Z 4+ 9 Address License Number Licensed Construction Summpii t2-- /3 - oz - 'Ion I Signq6- Telephone 3. egistered Home Improvement Contractor Not Applicable 0 CompanyName_ Registration Number Address Expiration Date Signature Telephone ic -4 0 r4 0 M 3: z 0 z M 90 0 M G) I, t"' as Owner/Authorized Agent Hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of peijury V, Print Name 4 Z - Signature of Owner/Agent Date I 11 61 '' zA-K ii'h Item Estimated Cost (Dollars) to be 0 VY. YJE� "I 0o Completed by applicant pernut NEER, 1. Building (a) Building Permit Fee Multiplier 2 Electrical *6DC) (b) Estimated Total Cost of Construction from (6) 3 Plumbing 1'q Building Permit fee (a) x (b) 4 Mechanical (HVAC) 1A 5 Fire Protection WA 6 Total (1+2+3+4+5) Check Number i�g NO. OF STORIES SIZE BASEMENT OR SLAB SIZE OF FLOOR TIMBERS iST 2 ND 3 RD SPAN DEMENSIONS, OF SILLS DEMENSIONS OF POSTS DIMENSIONS OF GIRDERS HEIGHT OF FOUNDATION THICKNESS SIZE OF FOOTING x MATERIAL OF CHIMNEY IS BUILDING ON SOLID OR FELLED LAND IS BUILDING CONNECTED TO NATURAL GAS LINE Workers Compensation Insurance affidavit must be completed and issuance of the building permit. Signed affidavit Attached Yea ....... 0 No ....... 0 5 PRIOFMO , AZIM"'j, SEM IN 100 'M — N�' OL 5.1 Registered Architect: Name: Address Signature with this application. Failure to provide this affidavit will result in the denial of the Telephone 7 50 Not Applicable 0 Company Name: c7D t:�-w OS, Responsible in Charge of Construction Area of Responsibility Registration Number Expiration Date Name: Address: Signature Total Not applicable 0 Registration Number Expiration Date Name: Address Signature Telephone Area of Responsibility Registration Number Expir�tion Date Name Address Signature Telephone Area of Responsibility Registration Number Expiration Date Name Address Signature Telephone 7 50 Not Applicable 0 Company Name: c7D t:�-w OS, Responsible in Charge of Construction New Construction 0 Existing Building 0 Repair(s) 0 USE GROUP (Check as applicable) T�ilerations(s) 0 Addition Accessory Bldg. RK Demolition 0 Other 0 Specify A-2 A-5 Brief Description of Proposed Work: Two e5l�111, /if r7-:, io -J t r _3 k, >c -Z 4 1-15 A/10 EP -J BUILDING AREA E)USTING (if applicable) PROPOSED Number of Floors or Stories Include cr, ;, S01 Basement levels Floor Area per Floor (sf) Zoe lg*c 7- al X Zet I Total Area (sf) Total Heip-ht (ft) Independent Structural Engineering Structural Peer Review Required Yes 0 No [I SECTION 10a Owner Authorization - TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR "PLIES FOR BUILDING PERMIT 1, Owner of the subject property Hereby authorize to act on My behalf, in all matters relative two work authorized by this building permit application Signature of Owner Date USE GROUP (Check as applicable) CONSTRUCTION TYPE A Assembly 0 A -I 0 AA 0 A-2 A-5 0 A-3 0 0 ]A IB 0 0 B Business 0 2A 2B 2C 11 11 0 C Educational 0 F Factory 0 F -I 0 F-2 0 H High Hazard 0 3A 3B 0 11 1 Institutional 0 1-1 0 1-2 0 1-3 0 M Mercantile 0 4 0 R residential 0 R -I 0 R-2 0 R-3 0 5A 5B 11 0 S Storage 0 S-1 0 S-2 0 U utility M Nfixed Use S Special Use 0 0 0 peci Specify: Specify: COMPLETE TIHS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS, ADDITIONS AND OR CHANGE IN USE Existing Use Group: Existing Hazard Index 780 CMR 34: Proposed Use Group: Proposed Hazard Index 780 CMR 34: BUILDING AREA E)USTING (if applicable) PROPOSED Number of Floors or Stories Include cr, ;, S01 Basement levels Floor Area per Floor (sf) Zoe lg*c 7- al X Zet I Total Area (sf) Total Heip-ht (ft) Independent Structural Engineering Structural Peer Review Required Yes 0 No [I SECTION 10a Owner Authorization - TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR "PLIES FOR BUILDING PERMIT 1, Owner of the subject property Hereby authorize to act on My behalf, in all matters relative two work authorized by this building permit application Signature of Owner Date I R;; !R coo LU ui C.3 COD CD c ts C', o co tjj E.E 0, 'ICE cm A� M C a C3 Mo CM u .,:j 0 41 C/' 0 Or. VE ch u —cfj x 0 C2 4154 0 u C2 Cf) co L14 C2 —ca ZW cc 0 Cf) —A !R coo LU ui C.3 COD CD c ts C', o co tjj E.E 0, 'ICE cm A� M C a C3 Mo CM C/) z 0 C/) C6 Cf) C/) a 0 12 4.4 co C3 E CD 0 co CL 0 CA CD cm Q co 9= .0 CD E cm CD 0 CD L- 1�. = CD Cc CO CD Q cc 0 CL M: rmcc C2 Cc CJ —J CL C2 CD CO3 ts CD 0 CL C.3 (A cc 'a CA w 0 CD w U) (r w w cr w w U) E ch cm cc LO2 CM CD 10 CL. 0 pq 0 *;; A 0 to C.3 .0 CCD3 Z CJ a jE CM ca Mom 0 -S Do- I= o . ma cc = 0 L.. 0... CL C/) z 0 C/) C6 Cf) C/) a 0 12 4.4 co C3 E CD 0 co CL 0 CA CD cm Q co 9= .0 CD E cm CD 0 CD L- 1�. = CD Cc CO CD Q cc 0 CL M: rmcc C2 Cc CJ —J CL C2 CD CO3 ts CD 0 CL C.3 (A cc 'a CA w 0 CD w U) (r w w cr w w U) I arl CO C '0 C3 (A :.— C 1; C3 CL C2;w In CC2 0 CL :*-- W d A cm c C* u 0 cn 0 F-4 u go 09, —C, r. x 0 H PQ 0 —Cd 0 ZW w c 6 _hd 0 arl CO C '0 C3 (A :.— C 1; C3 CL C2;w In CC2 0 CL :*-- W d A cm c C* Cf) z 0 C/) P-4 cf) Cf) 2 M jig 51, u 0 a) E 0 z CL 0 CD cm ca CD LA CD E cc cc CD 0 co co 0. CM< ca 0 Cc = Cc L-5 --j = = 0 CD ca z ts CD 0 ca CL CA is w 0 CD w w w cr w w C/) CA cm CA 0 Cc Cc cis E CD 0 cm CLcm3 co C2 :10 CD S CCI LO2 cm3 . 0 co =(D CL4 a S N CD CO) !!� 5 Z 4.3 = = E. N A -M c=G C, Im- cc cop) CL.= = *- ,;,— .0 CA z cm LLJ C3 b- 0 CM C3 CD CL CO 0 cc CD L-= am ZZ CL .0 - Cf) z 0 C/) P-4 cf) Cf) 2 M jig 51, u 0 a) E 0 z CL 0 CD cm ca CD LA CD E cc cc CD 0 co co 0. CM< ca 0 Cc = Cc L-5 --j = = 0 CD ca z ts CD 0 ca CL CA is w 0 CD w w w cr w w C/) FORM U - LOT RELEASE FORM INSTRUCTIONS: This form is used to verify that all necessary approvals/permits fro . m Boards and Departments having jurisdiction have been obtained. This does not relieve the applicant and/or landowner from compliance with any applicable or requirements. """APPLICANT FILLS OUT THIS SECTION*********************** ---I APPLICANT -7— FOr-d 60, J�qc',, LOCATION: Assessor's Map Number SUBDIVIS S T R E E T ",? I V, I -JO t -1 - RECOMMENDATIONS OF TOWN AGENTS: CONSERVATION ADMINISTRATOR DATE APPROVED DATE REJECTED— COMMENTS TOWN PLANNER DATE APPROVED DATE REJECTED— COMMENTS FOOD INSPECTOR -HEALTH DATE APPROVED DATE REJECTED - SEPTIC INSPECTOR -HEALTH DATE APPROVED DATE REJECTED - COMMENTS PUBLIC WORKS - SEWER/WATER CONNECTIONS DRIVEWAY PERMIT FIRE DEPARTMENT RECEIVED BY BUILDING INSPECTO Revised 9\97 im PHONE -17B 3 S Z PARCELO LOT (S) ell ST.NUMBER USE TE_ 0 11 BOARD OF BUILDING REGULA71ONS License: CONSTRUCTION SUPERVISOR Number CS 052449 Birthdat�: 12/13/1956 5581 Expires: 12/13r2002 Tr. no: Restricted To, 00 JOHN L ENOS 2 LANS DOWNE CT - LYNNFIELD, MA 01940 Administrator Name: 2,10 The Commonwealth of Massachusetts Depallment of Industrial Accidents Office of Investigations Boston, Mass. 02111 Workers' Compensation Insurance Affildavit Please Print Ci1y —Phone --J'7a = -am a homeowner performing all work myself. =1 am a sole proprietor and have no one working in any capacity am an employer providing workers' compensation for my employees working on this job. g-,Qmmny name: rid 4�) Address I 1 /65 Com pM name: Address city, Phone Fadlure, to secure coverage as requh-ed under Section 25A or A4GL 162 can lead to the MVWWon of aMnal Penalfles.of a fine up to $1 sM.00 andlor one years! imprisonment as -well as civil penalties in the form of a STOP WORK ORDER and 3 fine Of ($10D-00) a day against M'e. I understand that a copy of this statement maY be fOwarded to the Offlca of Investigations d the DIA for coverage verNication. I do herby ceft under the pains and peno�es of perjury that the infonnatAm pm4cbd above is &ue and coffect Slanature,W,,'M_ Print Official use only do not write in this area to be completed by city or town official' EIGheck YiMmediate response is requ#ed Building Dept Contact person: Phone RM WORKMAN'S COMPENSATION WAMM # �278 � aZ El Building Dept '_ • Licensing Board • Selectman's Offic& 0 Health Department 0 Offier Zoning Bylaw Review Form Town Of North Andover Building Department % 27 Charles St. North Andover, MA. 01845 C Phone 978498-954-5 Fax 916-688".6542 Map/Lot: Applicant: 40! Request: el-. A 1; Date: Please be -advised that after r eview of your Application,.And Plans, that your Application is *-'DENIED for the folloWiAg'Zibininig' 13yIaW".edaso6s-:'1­ Zonina =- --3 -, , 4, ,ceme y for the at Item # S pecial Pei IL Site Plan Re, �ccess other Frontaqe Ex( Common Dri Congregate I --E-o—nfinuing C Independent Lar e Estate Planned Dev Planned Res R-6 Density Wa—tershed S is checked below. STU�ni�h§ Boar�d­ ft :)ecipf Permit r6 � nta e S �eciai Pe�rmit on Lot Special Permit ay Special Permit i,ing Special Perm -it �etirement �Spedial Permit Special Permit Permit Item # Variance ,7 back, Varian ce Parking Variance. Lot Area Variance Height Variance Variance for Sign Special Permits Zoning Board a[ Permit Non -Conforming UserZBA Earth Removal S2ecial Permit ZBA Special Permit Use not Listed but Similar Special Permit for Sign g_q -Special yermit fef-pmeoig" The above review and attached explanation of such is based on the plans and information submitted. No definitive review and or advice shall be based on verbal "explanations by the applicant nor shall such Verbal explanations by the applicant serve to Provide definitive answers to the above reasons for Any inaccuracies, misleading information, or other subsequent changes to the information submitted by the applicant shall be grounds for this review to be voided at the discretion of the Building Department. The attached document titled "Plan ReviewNarrative" shall be attached hereto and incorporated herein by reference. The building department will retain all plans, and documentation fo . r the above file. YOU must file a new permit application form and begin the permitting Process. -10-03 nff Auildiingo Deppartrnent Offibial Signat n.nt ---- Application Received Application Denied Item Notes Item Notes A Lot Area -- F Frontage I Lot area InsuffiJ Ti e- 6T7 2 Lot Area P�eekistlng 2 Frontage !�§�rppries��� Cie 15 -3, J-ot,Area Co ropties PreeXistingfron ge� 4 Insufficient Inform Ition 4 Insufficient Information B:,, -�Use access ovef Frontage 1 Allowed G Contiguous Buil ing Area 2 Not Allowed 1 Insufficient Area 3 Use-Rreexistin 2" --------------- 4-C&n6li . -es 4 Special Permit Required - Preexisting CBA IS, Insufficient, l.nf0rmatidh­'­ 4 . ffins`uft0e�t Iniormati—on C Setback � - , - 12. 1 -- H,-., B4!I.ding Height I Ali setbacks comp) C4 e 5 1 Heigiht Exceeds,Maximum _L�� Front ffisufficiprit ., �, . I 3 Left Side Insuffici , eht 3 �Preexisting Height L J 4� Right Side Msuffi6ikt,�­ 7� %h qA% "InsUfficidint lnform�t�io—n- 5 Rear Insufficient, -.3 144,40ing Coverjage. -C. 777 - . 7 'Preexisting setback(sy- Lf Covera . ge exceeds ma' ximu—m j -Iq§ufficieptInformation­ --,Goverag6 Comolii6s D Watershed 7 3 Co , verage Preexisting I,- Not in Watershed,"." - 4 ln�6fficient Information 2 In Watershed j Sign.,,, 3 Lot prior to, 0/24/04 1 Sicin not allo— wed .4 Zpne'to be Determined . I S'*"- Mplies, . , ign Co 5 insufficient Information ''..,Historic 3 Insufficient Information `E Diswlcf� -�t K Parkin' 9 1, In District review required.. More Pqrking�, . �equired� in district --i---P-a-r-k"in­g Complies j Insufficientinformation 3 Insuffid , ent,informati6n 4 Pre-existina Parking ,ceme y for the at Item # S pecial Pei IL Site Plan Re, �ccess other Frontaqe Ex( Common Dri Congregate I --E-o—nfinuing C Independent Lar e Estate Planned Dev Planned Res R-6 Density Wa—tershed S is checked below. STU�ni�h§ Boar�d­ ft :)ecipf Permit r6 � nta e S �eciai Pe�rmit on Lot Special Permit ay Special Permit i,ing Special Perm -it �etirement �Spedial Permit Special Permit Permit Item # Variance ,7 back, Varian ce Parking Variance. Lot Area Variance Height Variance Variance for Sign Special Permits Zoning Board a[ Permit Non -Conforming UserZBA Earth Removal S2ecial Permit ZBA Special Permit Use not Listed but Similar Special Permit for Sign g_q -Special yermit fef-pmeoig" The above review and attached explanation of such is based on the plans and information submitted. No definitive review and or advice shall be based on verbal "explanations by the applicant nor shall such Verbal explanations by the applicant serve to Provide definitive answers to the above reasons for Any inaccuracies, misleading information, or other subsequent changes to the information submitted by the applicant shall be grounds for this review to be voided at the discretion of the Building Department. The attached document titled "Plan ReviewNarrative" shall be attached hereto and incorporated herein by reference. The building department will retain all plans, and documentation fo . r the above file. YOU must file a new permit application form and begin the permitting Process. -10-03 nff Auildiingo Deppartrnent Offibial Signat n.nt ---- Application Received Application Denied Plan Review Narrative The following narrative is provided to further explalin. the reasons for DENIAL fort I he APPLICATION for the property indicated on the reve'r�e side: "MR: 11 % . . . . . . . . . . a, I L ..... .. .... 2''; ReferTed To: Fire Police Conservati&n-- Y Planning —it —he T.- Ae, ,eel --±- . �tper 0 IAV C? 4, 5� _8&7) Nil gf -MIN- 4LL�f -0( t AP -at, 0/9 C 3 Ao, L 1,A d&-C'A-,0,P 'INV lee, e Cle- 5 3 I El -1 A4� A e,� C11 r- at 44 N,7,_ r Health —%6 zonih-a Board De artment of Public Works Historical Co Building Departmem ------------- One` hundre& and fifty,Cl'50) feet 1. The minimum frontage dr:a',-streP­t.�shallS& ',cur icuts*(m6asure at The d. th6'stre6t� ot line or shall Wthift M)V-'6f--,bdffi8f9-rftihyJ e inte Aedby, entran 'es or 6xits `�-`rrup' normal� c and shall noVbe requited�With't6n,(�'-10)'fe"et,bf*"a, stf6et, lot ine- r4v; 8.3 Plan Wvie*'(--v� 1. Purpow - J; a) The purpose of this s ' ecti6n igl or:i protect the,health, safety,: convenience and general twelfard� of 1 the' iihh�bitant§ of the Town -.by providing for a review of j ;.. 'r 1', i 1, Y I "; i ifficani,'imp' "Which,4hayj ave signi 1 -'plans: for uses -and Vl' '�I structurd§,,� h acts, both within the'site* and �in;'kelati -on' to. -J1,11- ja jacen.j]�rop6itieg.'i�hd::I�treets';f-ton� pedestrian and vehicular traffic �This revfeW�' Considers' -'�the impact I,on,): public, services and infrastructure; environm6ntal,�' 'niq'ue-andi hist6ric� Tesburces;! abutting properties; and community character and ambiance. if-,x,-m-bq(A -;-Aw i;,z,�r�,;, At! ;�!)i j I-) b Thi _BYj­`: 'is 4� s �sectibd bf the Z6nihgl aw. dopted p6r* suant,tol Chapter. 40A, Section 9. All Site �Plan'Review'appli�.��ii'ohs!subnutted Wider"the provisions of this section shall be reviewed by the Planning Board as a Special Permit. V (J I p t c): Sites and :developments'.�.'to I -W -M 6h-! on i lihis lecti ; �,applies�i�shdllk omp ly� with the ;regulation§ A L�I>"bfthis' s e6c'tibn'�,8 other:;hpph`cAble,JT own Bylaws, or the, requirem&nts: of-,,"; ',the' Coinm&rw d alIthI-'dffMdssa'ch`6settg�, prior' �to'anycbnstruction being undertaken in the Town" of North Andover. f r , ::. 'I ju "111"I tl;� UO��, I "�k 1 'Ai fe—WAI j; a) Site Plan is required w'h6h: fwhic'h' i) Any -new ibuildin�O orconstruction contains, more -than two thousand)(2,,000)'r t Wq are etbfgrosst. dor area which: islundertak' en o on land �.Witfiin T64'n- : f Noilh� Andover quirernerit ff-five,(5) 7®r -mon- Pat 10 5 CL -iich, results, in the additioniof more than two Any cons truction.,,,w) (2,000) square feet of gross, floor, area to an existing thousand structure; or results in the requirement of five (5) or more new or additional arking spaces; p --s i roverne ts,�ndw..usesl-,ine. iii) -n. Any,,construction,, n �isting,,,,structures ,..which �: :contain�;, n ew s not normally or AeYelpprp�ptsi -the existiniz use and which result in changes in the associated wift potential nuisance to adjacent property; traffic circulation; storm water drainage; onto or off of the site; and/or the,application of the parking standards,,of Section 8.1 indicate the need for five (5) or more new or,additional,parking spaces. iv) The constructiory-of any, new.Wireless service facility on a previously pem-litted,: facility-, i as set fourth, in. Section 8.9(3)(a)(ii) Wireless Service Facilities Use Regulations (1998/38). 0 b) The following developipprit(s),.ge exempt from Site Plan Review::.,, ily dwelling(s),jaAd two family. dwelling(s);., i), Single fam iiy Small, structures:,or, �adoitions which do, not. exceed. two thousand (2,000) square feet of gross floor, area and do not require five (5) or more parking .,,:Spaces. 1 y tj f _"5 �;J Routine, repairs apd,Maipt�pance�.that do not. exceed the, provisions of Section 8.31 c) Waiver of Site Plan Review. i) When in the opinion of the Planning B oard, the alteration.or, reconstruction of an existing., structure ,or new use, or change in..use.will not have a significant impact.,both within the, site injelatiqn, to adjacent proper -ties and streets; on, pedestrian i and,, vehicular, traffiic;�f public services and infrastructure; environmental, unique and historic resources; abutting properties; and,! community, ppeds,,: the Planning Boar,&, ma determine, V �thg,�subniission of a site plan reyiew,application is Without a pub�cbearipg,), not required. ii) The applicant must request a waiver from Site,Plan Review;in writing and may be required to submit supporting documentation that Site Plan Review is 106 40 a) Any protection�"a'�g"ains'tzc$nlftg.chahg6�'�ioNiided�by' M.G.L�c. 40A, s.6, shall be extended'to the earliest date on which the final unit in the deve opmen coul& b'd"difth6iiie'di iftid6kthisibylaw., j VO. 'V W��A 14, 0 8. SEVERABILITY a) isldiis"-'ofl,thisby-�l'a'w;"'a'r.e",her'e�ly"d�e'c'lared-'severable�and if any hdll,b6h&ld ffiV I 6i h I provision s �ffld' fti&6 stitutiona ; it shall not be construed A&dffect the validif�'O"r'cbnstittitioi�dlity,,of'�hy of the remaining provisions of this by'ldw.. �z) "I(I I�A;t i 11 11 ,J (Section 8.7 created and approved A n nu: ad f town Meeting, May 6, 1996) 1.! rY --3 W I I Jinl elg �V o IL r f Section 8.8,Adult Me Zone' e s 't6bii fied','" -Th6`Adult'Us&'Z6n—' i ';fieii6ft�f 9 as Odkl#'disth -'and shall be!superimposed on the otlier'distiict§.,'6�tablisheld-,b"yr,,-itWg;--B�l,aWI r- eirequirem.ents enumerated for this Adult ,x I lhanlilifi pl, U's 6, ' Z6ne ,slial'i b to I e in�,I�dditil6fi I -,-'fAthdf- ac&-ofi4thalrdquirements of the other may"be"�all- districts. 'Adult uses" owed'bY'-'t-S"pe't'i�d'Pomut-'in:fhle�Ad'Lilt Use -Zone, as described H6� dd dfr "I ihe'Town. below.' Adu'it �u'ses "s'lial prohibit bther, ocation in t) 3 (�I ai i� �� I f 1'.) il The following regulation shall apply to Adult Uses as defined in Section 2 of this Bylaw. 10 X s-'6NhellAdult �Usd'Zofie` are shown Ion -i the: Zoning Map and 1. �B ound a�n;- e's: Boundafie -shall"in6lude, the followin4�'gip�ar.cels'6s'identifi6d on the'1995'Asses'sor's Map: Map - arcels 27 and Md "(!-34P' I .,-Map 34 Parcel 27 oil :!'i'Northerly'25 )-4:/-I",.by;HoltRbad Easte;rly'340`-+A-'bY Lot 2: Southerly 240' +/- by City of Lawrence -Airport j I,", �W6§t6kiy,-330!t" Ou;, i i c Ali L--Ma*p"77 Parcel 13, fTOI, -�YH61t Rbdd;. Northerly' 00, +/1 E as '370' yUt4T,,!�� terly +/-, � Southerly 130' +/- by Parcel 3 Westerly 400' +/- by Clark'S66e"'f',',,` 13 1-. Map 77 Parcel 14 It go 41 10 1) �T ii:.A, Northerly,245!t -�+Tj by Ho Emterly.330'. + - by Lot 3- Southerl� 250"'+/- ��Y Parcel 3 'by r7ii :r; M 'Nesterl '370'[j+/, - RIX Map 77 Parcel 3 orth y,,410)wFh--,by,Lots3- 4* and. 7 e4y 7, -f�- �/!Y7d�, r,Easterly2�01, +!,-, by� Q-ty.."Of Ldwr.ence.Airpprt.Q S.outhul .465, _by, qityQf Lawrence AilpomComm, Westerly.460' +/-,by Clarkl,SqQet; r-, i -�Map-77 Parcel, 12,(3,,sided4 v d %, . 4K 41. Northerly 4 10" +/:-by Parcel 17 C Easterlyi2,01+/�, by,,, lark Street, f.;i Law ty S , i Qf rport'C .;,-and, outherly,,,28�',+ by C -J. io �d i t, -Map.77.Parcel 17., -LI) ;1,1, Northerly 120' by City of Lawrence Airport C9mm.:t by Clark Street Easterly 210" +/ Southerly, 4,101 �by,parcel 12c 'by -ity, ILawre-ijcq;Ai Westerlyj5,901 *\7 C- of, r pqr( k", A) '0 1 2. Separation Distances: Adult uses may not be located: . VIA 0-11- a) within five hundred feet (500') of the propqrty-line: of an' R sidential Zoning y -P Distri school, park, or playfield. cts, church'. �0- 4.1 ti t n i b) within five hundred feet (500') of other adult use as defined herein; C) within three hundred feet (300') of any establishment licensed under MGL Ch..438, Sec.,'12v iiththe; exception i ofi an-� adult cabaret or an adult 3. Maximum Usable Floor�,,Area;J.W motion picture theater- -adult' uses may not exceed three thousand five hundred (3;500) square feet'ofus6ablefflobr.'ar0a.,. 1 4. Parking Requirements: The following parking requirements shall apply: 132 a) b) C) Parking shall be provided..in the'side or front yard only. All parking areas shall,',,.�d'���'illu:'nun'ated,"�and altlighting shall be contained on "V�J­ the property. J f' th the appropriate Parking 'are* shall be.�'Ia'n&c'a pe'd'Afi; �con ormance wi provisions of the zoning by-law. Screening and bufferin At a,-,'mimmum,-.IIa1,-five (5)1 foot wide'la6dscaped buffer shall be provided along the,-S'1dd-,and4ieari-prope ,lines' of an adult use�'estdblishment consist�ig of n height?' th' time of planting, or a evergreen shrubs oi.ir6es:i'iio-t'lo'gs,�.'thai�I �Five;(5)/f6evii :at e 'i solid fence not less than six (6) feet in-161ght-.� 5. All building openings, entries and windows shall be screened in- such �a, manher: as to - prevent visual access to the interior of the establishment by the public.. 6. No adult use shall be allowe&'C6';diSIplayJf6r adV6rtisemeht or other purpose any signs,-, td the 'g'6fieral public' on the exterior of the building or on the interior wher(�the same may be seen through glass or other like transparent material any sexually explicit figures or words as defined in M.G.L.� Sec. �J 10 V V d Lr�!) I 31 Ch.�272.,�_) 7. Application 'information: Th6 i �ppli6ati6n`% for a special,:p�rmit for an adult use "Ustifi6lude.the�.,f6liowiiikinf6rrhaif6n--�,,iz Vf' establishmerit'm n a), Name and addres S of th�Ie al owner of the establishment, and of the legal 9 owner of the property; ",:-b) Name and address of all persons having lawful equity or security interests in the establishmen M-1 Io -uy r10 Name and address'of the" m anager; Number of employees; Proposed provisiohs for security within and without"the7establishment; 'I'The 'physical layqftbf .j 'theIfit6rio'ri6f the establishinent.e 8. Special Permit Granting Authori :iiThe:.26ning.-Bo�rdtof Appeals-i'shall be the Special Permit Granting Authority. 133 9. No adult use special permit shall be issued to any person convicted of violating the provisions of MGL Ch. 119, Sec.�63, or MGL Ch. 272, Sec. 28. i -perrnit,s all onlybe issued following a,publiQ hearing held An. adult,: use,.spec al q within sixty-five (65) days after the filing.ofan application 'with the special perrait granting authority, a copy of which shall forthwith be given to the Town Clerk by the applicant., 11. Special permits for adult uses shall be granted only upon the determination by the Special Permit.Oranting;_Authority� that, the'location. and design of the- facility are in harmony with its surroundings, and that adequate safeguards.exist through licensing or other means to assure on a continuing basis that activities therein will not be patently: contrary.,to Prevailing %standards of, adults.,in the community, and will not involve n-iinors in any, way. - 12. Any section of this by-law, or portion thereof, declared invalid shall not affect the validity or application of the remainder of the by�law,': (Section 8.8 created and approved May 6,1996Annual Town Meeting, Article 22)_ Section 8.9 Wireless Service Facilities 1) Purpose a) It is the express purpose of this Bylaw to minimize the visual and environmental impacts as well as'any potential'deleten- 6�s impact on" property -value; ofwireless service facilities upon properties located within the Town or adjacent thereto. No wireless service facility"shall be'placed,i'constructed or 'Modified withine the Town without �:first- obt�ining',�site.�:plan,appro'vaI from the Special Permit Granting Authority (SPGA). The Planning Board shall be' the Special, Permit Granting Authority for the issuance of a special permit to allow the placement, construction and modification, of wireless -service; facilities within the bwn. This. bylaw is intended to- be used in:conjunction1with other regulations adopted by the Town, and other zoning and general bylaws designed to encourage appropriate land use, environmental protection, preservation of North �Andover's rural character and the provision of adequate irifrastructure'development in North Andover. b) The regulation of wireless service facilities is consistent with the purpose of the North Andover Zoning B a - � d'�'l i � fforfs authe'lo'dal government level to yl w -an p anning 6 further the conservation and preservation of developed, natural and undeveloped areas, wildlife, flora and habitats for'endangered �species�; protection of Ahe natural resources of North Andover, enhancement of open � space areas and respect for North Andover's rural,character. 134 MASSACHUSETTS UNIFORM APPLICATION FOR PERMIT TO DO PLUMBING (Type or print) NORTH ANDOVER, MASSACHUSETTS Building Location Date ,�21 0 4/0 121-161, Owner's Name L 7 Permit Ole - Type of Occupancy 4�� Amount New Renovation rl Replacement Plans Submitted'yes No FIXTUPUES bate. TOWN OF NORTH ANDOVER 0 PERMIT FOR PLUMBING SACHUS This certifies that has permission to erform ........ p .......... plumbing in the buildingsof .... . at ...... ...... North Andove Mass. Foe�j- c. No'???�'119� UM TOR Check# PL� 7774 By: Ul I-AUCHNUCI rJumber— :1eck one: Certificate r-1 Corp. Partner. C 0. ;e box: Bond F1 )lication does not, have any one of the above nt 11 �c application are true and accurate to the t Issued for this application will be in I ,hapter 142 of the General Laws. 1 Title of Plumbing License City/Town 4 -9 !2 1NUMDeY - MastpT El Journeyman FPROVE5 (oFFicE USE ONLY 0--� HARRY F. DiZOGLIO, P.E. Consulting Engineer P.O. Box 19381 JOHNSTON, RHODE ISLAND 02919 (401) 934-2055 TO SALTONSTALL ARCI1ITECTS---. 380 Wareham Street Marion, MA. 02738 THE FOLLOWING WAS NOTED: . FIELD REPORT #9 DATE JOB NO. September 10, 2008 SA 07-16 PROJECT TEI, Inc.- Recycle Center & Transfer Station LOCATiON Holt Road No. Andover, MA. 01845 -E-VAC VOR ONT OWNER Owner Thomson Bros Industries WEATHER TEMP. Oat AM Par�, Cloudy, Cool 72 -at 11:45 40 PRESENT AT SIT E Site Contractor - JJ Paonessa Co. Bill Thomson, TBI Will Saltonstall, SA H. DiZoglio, Engineer C.Jay Wilbur, SA > The metal building syste . in erection is progressing; the metal roof parlels are completely installed; the metal siding panels are being installed along the south side of the building; the rake trim has been started on the east endwall; the crew chief expects the building erection to be completed within another week. The overhead door installations are still in progress on the building's south side. At the east end lower truck scale bay, the concrete slab for the scale platform has been placed. Bill Thomson related that he has changed the planned location of the 1,000 gal. holding tank from above the truck scale bay to an exterior location to be determined around the east side of the building. The'ise�ptic tank and j6bSjjrf�c-�'e'rsewage dispogal'sy�te-m'hds.been installed in the vicinity of the north east comer of the build ing-hpejr the' -sit6 plan's,­iwaiting'fiiial insoectioK and darth- cover.- , The bag house equipment has been installed on a concrete pad'at the exterior north 1,�,est c6mef-6f thCbuilding.- The rough grading has been completed on the north side of the building; the rough grading ea the south side of the building is in progress today. At the interior of the building, the concrete floor slab at the west section for the tipping room has been placed and cured; the three approach slabs at the south west adjacent to the o.h. doors have been fi)rmed and placed also. The two interior bin > concrete walls at the wood & fines bins are complete to the 25 ft. height; R.A. Murdoch is forming the 16" wide bin end wall above the concrete wall adjacent to line 12 for a concrete pour in the next day or so. The 1/4" steel plate facing at the lower portion of the push walls has been completed. The W10x22 steel floor beams for the employees' mezzanine are being fabricated at the site and'erected at the top of the lower concrete walls; the metal deck is expected to be delivered tomorrow together with the perimeter pour stop metal. The carpenter is continuing work at the sorting room above the bihs; plywood is beivg'applied to both sides of the steel stud walls; the light gage metal ceiling joists ire being installed with the center support interior steel bearn. CBI, Incs is continuing tofurrish and install the various items of 6q6ipment. � On the west area of the site, work is progressing at theiscale house and adjacent scale pits; rough plumbing & electrical at the scale house and scale platform framing at the scale pits. Gerald A. Brown, Inspector of Buildings COPIES TO 1-9' J UAILIM MZE)GR& Bill Thomson, TBI File: SAT CA.FR9 SIGNED—§--X-�7� a C.Z HARRY F. DiZOGLIO, P.E. Consulting Engineer P.O. Box 19381 JOHNSTON, RHODE ISLAND 02919 (401) 934-2055 TO SALTONSTALL ARCHITECTS 380 Wareham Street Marion, MA. 02738 THE FOLLOWING WAS NOTED: . FIELD REPORT # 12 DATE December 11, 20087 SA 07-16 PROJECT TBI, Inc.- Recycle Center & Transfer Station LOCATION Holt Road No. Andover, MA. 01845 CONTRACTOR Owner OWNER Thomson Bros Industries WEATHER Overcast, Rain TEIVIR Oat 12:00 AK 34 -at PM PRESFNI AT SITE Bil,,'Thomson, TBI 11. DiZoglio, Engineer > This Engineer visited the No. Andover Building Dept. office at 1600 Osgood St. to inquire about the form for submitting the Engineer's & Architect's final certification; directed to prepare and submit the appropriate statement on own letterhead. I was handed two forms: "Determination of Final Cost" and "Application for Certificate of Occupancy" - both the forms were given to Bill Thomson for his completion & submission as the Owner/Contractor. The large air handling unit, AHU#2, has been installed suspended from the MBS roof structure above the east side of the sorting room; the Reznor unit.is hung at F, points, with -1/2" threaded rod; two additional roof Z -purlins were r r-, erected.between two of the normal positioned pi irlins io� carry the addifionaf�fflt'16ading. The upper pushwall extensions above the concrete at the -side and end of the Tippinj flob'r have been completed with the steel stud �aming and plyw�od sheathing. The ere'ction"of the steel stair from ground to mezzanine level has been in progress and is just being completed with the stair treads being field welded to the stringers; two new 411x 4ff steel posts support the intermediate landing; wall string is a C8 channel and outside string is an MC12 channel; stair width is 48 " with open risers (T) and steel bar grate treads (I I"); wall hand rail and outer handrail have been placed. > This steel stair connects to the steel ba:r grate walkway; reviewed with the steel worker the requirement to connect and fasten the outside MCI 2 stringer to the tl�)or slab with a clip angle; the C8 wall string is fastened to the concrete wall. The fire sprinkler piping has been completely installed suspended from the MBS roof structure as scheduled. The metal doors have been installed on the Sprinkler room, Electric room and Hydraulic room. Interior finish work will be continuing at the mezzanine level employee's rooms. At the Hydraulic room, one of the large 250 hp motors has been removed for replacement, as the unit was determined to be electrically defective. CBI, Inc. has been continuing to check out all of their installed equipment for eventual startup. A fabric canopy, wall attached, has been installed above the exterior concrete stairway f�r protection. The 1,000 'gal. Holdi ng Tank is installed on the exterior, adjacent to the conc. foundation wall at line 13 beiween D'& E, and south of the leaching INM trenches. Gerald A. Brown, Inspector of Buildings " j COPIES TO jg - Bill Thomson, 1:131 F iI67­SATBT8 CX.F rZ_ SIGNED_ 0 Location Date No. .141, TOTAL TOWN OF NORTH ANDOVER Certificate of occupancy $ BuildipglFrame Permit Fee $ Foundation Permit Fee $ other Permit Fee $ Sewer Connection Fee $ Water Connection Fee $ 1292'-Ar/"/98 11:17 Building inspector 411 65-00 PAID Div. Public Works // d\l g ILL, 5P 4 4 < -w I d z 9 V, < LU Z Z. LLJ LLI u rz, rl& z LU z vzz� LU z u 1z" < W ,j c .5 < t z z qZ Lall WZ 4 z z �jj �w z Z < C 0 < z LL) z LL, z z z < z < z V, z zf) u z u V) rt - Ln �n z u z z z z zz'Zt z ILA < LL, L: d\l g ILL, 5P 4 4 < -w I d z 9 V, < LU Z Z. LLJ LLI u rz, rl& z LU z vzz� LU u 1z" < W ,j c .5 < t z z qZ Lall WZ �jj �w z < z LL, < z < z V, z u z z < LL, d\l g ILL, 5P 4 4 < -w I d z 9 V, < LU Z Z. LLJ LLI u rz, rl& LU z PROJECT NUMBER:. [:: �RO J E C T T I T —LE: - PROJECT LOCA NAME OF BUILDING: 411le NATURE OF PROJECT: e -C,21 OFFICE OF BUILDING INSPECTOR TOWN OF NORTH ANDOVER CONSTRUCTION CONTROL Olt X r -T A ("V4_7(c- 0 �rtop_ E�W,0&) IN A�C�OJDANCE W5H AXTICLE 1� OF THr MASSACHUSETTS STATE BUILDING CODE, I REGISTRATION NO. -38SSS' BEING A REGISTERED PROFESSIONAL ENGINEERIARCHITECH HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ENTIRE PROJECT A ARCHITECTURAL 11 STRUCT*URAL 1:1 MECHANICAL El FIRE PROTECTION 0 ELECTRICAL 0 OTHER (SPECIFY) FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISION OF THE MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRATICES. AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0 1. Review, for conformance to the design concept, shop drawings, samples and other submittals which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality control procedures for all code -required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become, generally familiar with, the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. PURSUANT TO SECTION 116.2.2 1 SHALL SUBMIT WEEKLY, A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE NORTH ANDOVER BUILDING INSPECTOR. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANCY. SIGNATURE SUBSCRIBED AND SWORN TO BEFORE ME THIS led DAYOFJL,:L��-190�- NOTARY PUBLIC MY COMMISSION EXPIRES 3 - 6 0 FORM U - LOT RELEASE FORM INSTRUCTIONS: This form is used to verify that all necessary approvals/permits from Boards and Departments having jurisdiction have been obtained. This does not relieve the applicant and/or landowner from compliance with any applicable or requirements. **-*,"*.*-********'*��*�*-****APPLICANT FILLS OUT THIS SECTION*,N*-*- APPLICANT 2&o,i^4e CIA PHONE LOCATION: Assesw(s Map Number P A R C E L SUBDIVISION LOT (S) STREET ST. NUMBERC:2/0 "r* -"/*-*********"********OFFICIAL USE IONS OF TOWN AGENTS: 7MI, 1� i—k (9 Q oil CONSORV&ICNJADMINI�TRATOR DATE APPROVED DATE REJECTED COMMENTS -4- TOWN PLANNER COMMENTS FOOD INSPECTOR -HEALTH SEPTIC INSPECTOR -HEALTH COMMENTS J. � ­ .11. .. 7 - - 6—ATE APPROVED DATE REJECTED. DATE APPROVED DATE REJECTED - DATE APPROVED ZZ.Z i7l s2Z!t d - DATE REJECTED PUBLIC WORKS - SEWER/WATER CONNECTIONS #Al, DRJVEW Y -PERMIT F-I,RE DEPARTMENT RECEIVED BY BUILDING INSPECTOR DATE The Commonwealth of Massachusetts Department of Industrial Accidents X Mice 01101vestf9atf8fis 600 Washington Street Boston, Mass. 02111 Workers' Compensation fnsurance Affidavit NOW 11,11 L A IVO) -QJ ,�-f #ea)h /9, kmkll�,q /;Z/&' wo,/� /;/. kvw,�I/tk I am a -sole proprietor, general contractor, or homeowner (circle one) and have hired the contractors listed below who have the following workers' compensation polices: ...... .... . ........ . corrinsnivrianne, 194av�e Failure to secure coverage as required under Sic (ion 25A ofiVIGL 152 can 1c2d to the imposition of criminal penalties of a fine up to S1,500.00 and/or one years' imprison men( 23 Well 23 Civil penal ties in the form ofa STOP WORK ORDER and a fine of$ 100.00 a day against me. I understand that a copy of this statement may be forwarded to the Office of Investigations of (he DIA for coverage verirIC2tiOn. I do hereby certify un er the pains and en ties of perjury that the information provided above is true and correct S i arure DaLe Z,2 /-V 0 Print name -Phone �fficial use only do no( write in this area to be completed by city or town official city or town: C3 check if immediate response is required (r"ued V95 PJA) permit/license rl Building Department oLicensing Board C]Sclectmen'3 Office C3Hc2lth Department phone 0: r7Othcr PROJECT NUMBER: T -- -7 iTLE: PROJECT LOCATION: '_x NAME OF BUILD NATURE OF PROJECT: A g) OFFICE OF, BUILDING INSPECTOR TOWN OF NORTH ANDOVER CONSTRUCTION CONTROL -1 IN AC_CO_RDANCE­WITH—AAT-IGLE 1 6 OF TH7 MASSACHUSETTS STATE BUILDING CODE, REGISTRATION NO, BEING A REGISTERED PROFESSIONAL ENGINEERIARCHITECH HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISEDTHE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ENTIRE PROJECT 34 ARCHITECTURAL 17 STRUCTU'RAL 11 MECHANICAL E FIRE PROTECTION E ELECTRICAL � D OTHER (SPECIFY) FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISION OF THE MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRATICES. I AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0 1. Review, for conformance to the design concept, shop drawings, samples and other subrr&als which are submifted by the contractor in accordance with the requirements of the construction documents. 2, Review and approval of the quality control procedures for all code -required controlled matedals. 3. Be present at intervals appropriate to the stage of construction to become, generally familiar with the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. PURSUANT TO SECTION 116.2.2 1 SHALL SUBMIT WEEKLY, A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE NORTH ANDOVER BUILDING INSPECTOR. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANCY. SIG RE SUBSCRIBED AND SWORN TO BEFORE ME THIS DAY OF 9 4 NOTARY PUBLIC MY COMMISSION EXPIRES of OFFICE OF BUILDING INSPE TOR a TOWN OF NORTH AND041 R CONSIRUCTION CONTRQL PROJECT NUMBER: PROJECT TITLE: PROJECT LOCATION: C;�j 0 151011 R C�! NAME OF BUILDING: NATURE OF PROJECT: 11.e r V, I km Iq � 2"21 m uv,0�- icce� E, IN AgCORDANCE WI�H AgICLE I OF T MASSACHUSETTS STATE BUILDING CO()E, --.REGISTRATION NO. 18'SSE BEING A REGISTERED PROFESSIONAL ENGINEERIARCHITECH HEIIEBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISEb THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: �; . ENTIRE PROJECT ARCHITECTURAL F-1 STRUCTURA� F� MECHANICAL FIRE PROTECTION ELECTRICAL 7 OTHER (SPECIFY) FOR THE ABOVE NAMED PROJECT AND THAT, TO� THE BEST OF MY KNOW4EGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISION, OF THE MASSACHUSETTS STATE BUILDING CODE. ALL ACCEPTABLE ENGINEERING FRAMES. AND APPLICABLE LAWS AND ORDINANCES FOR T�HE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE: PRESENT ON THE CONSTRUCTION SITE ON A Re�GULAR ANQ PERIODIC B�SIS TO DETERMINE THAT THE WORK IS PROCEEEDING IN ACCORDANCE NTH THE DOP-UMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0 1. Review. for conformance to the design concept, shop dra�lngs, samplos and other submittals which are submitted by the contractor in accoitclance with the requiremints of the construction documents. 1"OF04- % v 2. Review and approval of the quality control- p micedures for; all code-reqOired controlled material .. �T. ROBERT P. RI 3. Be present at intervals appropriate to the stage of construction to become, generally familiar (C.Z(BRECKNOCK STF TRI �STRUCTURAL J� ,.if the work is being with- the progress and quality of the work andto determine, in general, cc) 0 go. 385M performed in a manner consistent with the co0struction documents. PURSUANT TO SECTION 116.2.2 1 SHALL SUBMIT WEEKLY, A PROGRESS REPORT 7VAP" L TOGETHER -WITH PERTINENT COMMENTS TO THE NORTH ANDOVER BUILDING INSPECTOR. UPON COM ' R�LETION OF THE WORK, I SHALL SUBMIT A HNAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINE$S OF THE OROJECT FPR OCCUPANCY. IG URE SUBSCRIBED AND SWORN TO BEFORE ME THIS /6 DAY OF 19 NOTARY PUBLIC MY COMMISSION EXPIRES 3 FROM : SCOTT'S WELDING PHONE NO. : 603 666 5716 Nov. 23 1998 e4:23PM P1 PRODLICER VATE (MM?Dtwyy) Dunlap cor-p (Manc�jester) THIS CERTIFICATE.jg_j$'�jyj�6 WS" A , TN_Fa_kMAf10N G. Su) , p 3 ONLY AND CONFERS N _11,var� 0 RIGHTS UPON THE CERTIFICATE 1175 Canal, sti-e.p HOLDER, THIS CERTIFICATE DOES NOT AMEND, EXTEND OR t !HE_COVERAGF A00RDED AV THE POLICIES BELOW. Manchester, N14 03101 COMPANIES AFFORDING COVERAoE i COMPANY Ki'Zi R I A�Iax - t. - ford T.risu.:r.&j-IcE- Group COMPANY ScOtt�'s Portable Welding, Inc, Insul:anc.,e Croup 722 East Industrial Park Drive. Manchester, Nli 03109 COMPANY COMPANY D :7777777777777777777777777' -'-",--- THIS I$ TO CERTt S�RANCE LISTFD BELOW HAVE RSEN ISSUED TO THE INSURED NA FY THAT THE POLJOES OF IN NOTWTHSTANDING, VIED ABO\JE FOR THE POUCY PERIOD ANY'RIOUiREMiN. -,JER 10140'ITIOW:0P �ANY':CMRAOT I �,OTHOk';D.(� �.OSNT: T, M. OR J� oiwt: MAY 8EAt$UFD' `bA'.M4y`p pRTAN,,"TH)EAN8 :�7-: _­_' - ...... . r^V CLAIMS. I MIN", 00 LTR TYPE OF INSURANCE POLICVNUMBGR POLICY 9PPECTIVE POLICY rxPjqATI0N welt 7— 1 DATE (MIVVDt;IYY) 04TE (MWDMY) um" A GrINGRALLIAMUrY 1 0 4, U U C G,!TJJfO 2-0 3 ('F'N­E_RALAQGRE—GA 2 000,000 X (;D,MPZRCKL GENERAL LIABILITY ...... , - - T�_ �.. "..­.... ...— I .... I�AGG s2,,.000,�0,00 CLA]msmAPE XIOCCUR PRODUCT,1�-COMP10 _", ­­ .- PERSONAL & ADV INJ�!�Y OWNER'$ A OC)NTRACTOR'S PROT ­__­ .1 . I _L � I. ... 1L.".9 0 0, 1. () 0 0 EACH o=RPFN 0 0 0 $so, 000 ';IRr- 0AMAGS (Any one fing MED EXP (Any Ont prron) 1$5 000 MOIBILE LIABILITY 04UECGUO692- -08/16/9-9 ANY AE)TO COMBINED SINOLF LI_m_1T $300,000 . ......... ALL OWNED AUTOG GODRY INJURY SC149DULEDAUTOS (Por Won) HIREDAUTOS X NQN-001NEDAUTOS BODILYINJURY PROPERTYIDAMAGE GARAGE LIABILITY AUTO ONLY-EAACCIDE-NT S ANY AUTO ......... ... 0,Tt1�-R.2!LNAUTq 9�N ... . ...... EACH ACCIL*NT EXCM Lmetpry t�AC H 2�22UMEtO_ UMBRELLA FORM AC, $ OTHER THAN UMRA 911A FORM B WORMP-S COMPINSATION AND SCWC924412 08/16/98 STATUTORY LIM ITS EMPLOYERS'LIABILIYY . ...... f THE PR"ETOR/ INCL . 5EACH A . CCIDENT a 0 0 PARrNER&VECUTiVE DISFASE-PWCY LIMIT OFFICERS ARE: EXCL C714ER DISCA,';;,:. EACH EMPL, 1$10 0 Vr VVCKA11GM1LWAjjOfN3jVEKCt Work to be done at -7777777 Merrimac Cartage SHOLU ANY OF THE ABOVE DESCRIBED pGUCIES BE CANCEI.LED 60:0RIE THE 210 Holt Road EXPIRATION DATZIrMEREOpTHELVOING COMPANY WILL EN DEAVOR TO MAII, 3-D.– DAYs wmTrfi I m wy TICE TO THE CERI . ISCATE HOLDER NAMED To THE Lgpt, North Andover MA 01845 BUT FAILURE to MAIL-SLICtf NoInCr 3NALL IMPOSE N6.O8L'IGA1fQN OR UAINLITY � OF ANY Klmn tionu — --- - - OF Sent bj:IJINDHAM INSUPANCE Dec -15-98 10:41am from 802,254 81584 Paqe 2/ Inc. I)avid True 540 Bancroft Hwy. Manchester, NE 03057 4TEOFI� D A T X 12/15/1998 THIS CERTIFICATE IS ISSUED AS A MATTER OF iNFOAMATION ONLY AND CONFERS NO RIGHT$ UPON THE CERTIFICAr E HOLDER, THIS CERTIFICATE DOES NOT AMEND, EXTEND OR AJER TI I[ COVERAGE AFFORDEL) BY THE POLICIES BELOW. .............. ........ .. ........................ COMPANIES AFFORDING COVERAQE .................................. ............. A Concord General ................... .. .......... 6 National Council oni Ins. ............ ............. .. ... .......... .................................................... P A D'N D .............. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVF BEEN 16SUED TO THE" INS�UR�b'4:AMED ABOVE 'FOR TH'E POLIC'� PERIOD INDICATED, NOTWIT'HSTANDING ANY REQU REMENT, TERM OR CONDIT ON OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPEC- To WHICH THIS CERTIrICATE rAAY BE ISSUED OR MAY PERTAIN, THE INZURANCE AFFORDED BY THE POLICIES D6SCRIBED HEREIN !F SU8JECT 1() ALL THE TERMS, EXCLUSICNS AND CONDITIONS OF SUCH POLICIFS. LIMITS SHOWN MAY HAVE I EEN REDL)CE.D BY PAID CLAIMS ....................... I'll ............. ...................... .................. . .. LIDAITS ... .. ........ G ­t.. ER 6,L I AE ILI- ............ .............. . .. ....................... GENERAL ACGRCG14TE 1 2,000,000 X �IAEI,L T, ....... ...................... ............. . ... ...... I I FROOUCTS-Com",? i o�, AG 2,000,000 ............ X E806094 .............. - ...... .. .. ............ FIC19,50INAL a, A0V INJUMy 08/151,1998: 08/15/1999� 5 1, 000,000 .......... .. . . ......... ... ........... ........... . EACH DC�URRIENCE 1,000,000 ....................................... ...... . .. ........ . FIRE DAMAGE lAny o,)q 50,000 .. . ... ......... EYT �Ally oil,,, pelFoni 5, 000. 'UT �%11,5 LE L -3 IT" .... ......... ..... ....... ......... .... q COMBINED SING�E LIP.11T ................... BODILY iww( I, r A TO .... ........ . ..... ...... .... SQDILY INJVRY ............... .1- ..... . . ..... . ...... ..... PROPERTY DAMAGE 1L.810 f Y ...... ........ .. �AUTOONLY-!A,��CIO!NT;� . .... .................... ....... ...... .. .. . OTHER THAN Au'ro ............. EACH ACCID�NT .................... .......... . .................. ............. ­,­ ............ ............ ......... ............ . AQ(:F.E(3ATE �7r,ER TWI. ...... .. .. .... . ... ........ . ...... . ...... .... . . ...... . ......................... .......... ... ... Y:! STATUTORY LIMITS WC131S311685018 ..................... 08/21/1998: 08/21 /1 999� EACH ACCIDENT 100,000 ............. ............. . 7L4= -RO-RIET,1�.: I1rjILK;*y U­r*�'11"I" 500,000 i.c R7X.". �­,:K,T -1-1-1- - ........... . . .. ..... .. . -0 zr C L 7., X L)15�'ASE, �.ACH EMPLOYEE t 100,000 ........... .. ........ TIC t..�; sn' i�� _:5 ............ .................. Masonry --garage door opening/walls 1-- 1- AA6LM* ;�N` QFTHt AeOVE VtGCRI=S0 `00_'tr� 13E QANICEI�LIED BE!7001_­�,c �X'IRATIO% AT -E THILMCOP, THC 13SUINCi �;UIVIFANI.' �,VILL ENOEAV,--RTD VAII. ; D 15 NOT ICE -1-0 THE CERTIFICATE HOLD�Ik N 10'il� I HE JFT Merrimack Cartage ro `,',AIL �UCH NOTICE EHALL II[l(i POSE. NQ O;LIGAT ION (1,11 0 - ;I� 17� 210 Holt Road North Andover , MA .... .. .... .. .... .. .. . .. . .. . .. ........ ;7. - , , GEORGE PERNA D:AECTOA TOWN OF NORTH ANDOVER. MASSACHUSETTS DIVISION OF PUBLIC WORKS 364 OSGOCID SrREET. UIB-15 r io DRIVEWAY PERMIT Date: -5 0713 LOCATION: 'Zlc> BUILDER: phone: OWNER phone: Telephone (508) 685-095o Fax (508) 688-9573 The North Andover Superintendent of Highway Utilities & Operations MUST be notified of the grade and'set-�back from street established in any driveway entry onto any street or way maintained by the TOWN. Call the Highway Superintendent's Office, before finish grading and surfacing for approval of such entry. FAILURE TO COMPLY AND OBTAIN APPROVAL VOIDS THIS PERMIT. I Remarks: Approvak, PRODUCER Dunlap Corp (Manchester) R. G. Sullivan Building 175 Canal Street Manchester, NH 031QI— IINSURED Scott�Zls Portable Welding, Inc. 722 -- t Indust M�L- rial Park Drive hester, NH 03109 . .............. ................... .. F� .. .............. .... DATE (MM/DDIYY) <AN: ::,:::: . . .... ..... ....... 11 / 19 / 9 8 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. COMPANIES AFFORDING COVERAGE COMPANY AHartford Insurance G COMPANY BGuard Insurance Grou COMPANY C COMPANY D THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE*FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. - CO LTR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE DATE (MM/DDfYY) POLICY EXPIRATION DATE (MMIDDfYY) LIMITS A GENERAL X — LIABILITY COMMERCIAL GENERAL LIABILITY F;�71 1CLAfMS MADE I A -I OCCUR OWNER'S & CONTRACTOR'S PROT 04UUCGUO203 08/16/98 08/16/99 GENERAL AGGREGATE s2,000,000 PRODUCTS-COMP/OP AGG $2,000,000 PERSONAL & ADV INJURY $1,000,000 — EACH OCCURRENCE $1,000,000 FIRE DAMAGE (Any one flre) s50,OOO $ MED EXP (Any one person) s5,000 A AUTOM0131LE LIABILITY 04UECGUO692 08/16/98 08/16/99 AUTO ONLY -EA ACCIDENT S .1 ............. .............. ....... ... ......... OTHER THAN AUTO ONLY: ........... . ...... ..... .............. ..... . EACH ACCIDENT $ ANY AUTO AGGREGATE $ EXCESS LIABILITY UMBRELLA FORM OTHER THAN UMBRELLA FORM COMBINED SINGLE LIMIT $300,000 X ALL OWNED AUTOS SCHEDULED AUTOS. AGGREGATE $ $ B BODILY INJURY $ (Per person) SCWC9244'12' I i X HIRED AUTOS. STATUTORY LIMITS ..... ............... ........ ... . EACH ACCIDENT $100,000 DISEASE -POLICY LIMIT $500,000 D ISEASE- EACH EM PLOYEE, $10 0 , 0 0 0 X NON -OWNED AUTOS BODILY INJURY (Per aCcident) $ PROPERTY DAMAGE $ IDESCRIPII N OF OPERATIONS/LOCATIONS/VEHICLES/SPECIAL ITEMS Workoto be done at transfer station Merrimac Cartage 210 Holt Road North Andover, MA Somervill t. "- SHOULD ANY`DP`I`HEJ1r130VE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL '10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFr, 01845 BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE GARAGE H LIABILITY ANY AUTO AUTO ONLY -EA ACCIDENT S .1 ............. .............. ....... ... ......... OTHER THAN AUTO ONLY: ........... . ...... ..... .............. ..... . EACH ACCIDENT $ AGGREGATE $ EXCESS LIABILITY UMBRELLA FORM OTHER THAN UMBRELLA FORM EACH OCCURRENCE $ AGGREGATE $ $ B WORKERS COMPENSATION AND EMPLOYERS' LIABILITY THE PROPRIETOR/ INCL PARTNERSIEXECUTIVE OFFICERS ARE: X EXCL OTHER — R SCWC9244'12' I i 08/16/98 I 08/16/99 --I STATUTORY LIMITS ..... ............... ........ ... . EACH ACCIDENT $100,000 DISEASE -POLICY LIMIT $500,000 D ISEASE- EACH EM PLOYEE, $10 0 , 0 0 0 IDESCRIPII N OF OPERATIONS/LOCATIONS/VEHICLES/SPECIAL ITEMS Workoto be done at transfer station Merrimac Cartage 210 Holt Road North Andover, MA Somervill t. "- SHOULD ANY`DP`I`HEJ1r130VE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL '10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFr, 01845 BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE Sent b�:WINDHAM INSURAHCE Nov -25-98 11:41am from 802 254 81584 - Page 3/ 3 1, C7, 'T ERIV 11/25/1998 'THIS CERTIFICATE 15 ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERT151CATE HOLDE�R. THIS CERTIFICATE DOES NOT AMEND, EXTEND OF Windham insuranCe ALTPR THF COV�,RACE AFFORDED BY THE POt.ICIES BELOW. .. . ........ 1.11.1 ................................... 1 ................. ....... .. . P.O. Box 8177 COMPANIES AFFORDING COVERAGE ... .... . . ......... ...................... Brat eboro. V -.V-,,05304 comcANY 304 Nation�ii Council'od'Comp.Ins. A ........... ............. ........... .............................. ......... .. ..... . ....... ... - . David True WCIWANY t 540 Bancroft Hwy. ............... ..................... .. ............ NH Manchester, NH 03057 . . ... .... ..... ............... D SHOJILD ANv OF THE ABOVE DESCRIBED POLICIES 8C CANCCLLEO BEFORETHit (zKPIRATICN DATE TMERtOF, THE ISSUING COMI'ANY WILL ZNDEAVOR70 MAI� DAYS ',%'RITTEfd NOTICE TO TH1 CERTIFICATE I,-iOLOZR Nt,,MED -0 'r.c- LEFT. Merrimack Cartage 6UT FAILI)4k TO MAIL SUCH NOTICE SHALL IN4PQ$F NO OI!IUGATiorq 09 LIABILITY 210 Holt Road OF AN� KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES North Andover, MA ............... ..................... .. ....... . .... AUTkOR17�0 REPRESENTATIVE 'N TH S IS TO CE:�:" Y YH;A�T::t1`HE PQi1t1ES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD 1141DICATE WITW�S-�ANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT , To WHICH THIS CERTIFICATE MAY BE 155UED OR MAY PERTAIN, THE INSURANCE AFPURDED BY THE PO�ICIES DESCRIBED HEREIN 15 SUBJECT TO ALL. �'K TERMS, EXCLUSIONS AND CONOITION� OF SUCA POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ........... .......... ........ ... .. ........ ......... ............ ...................... .. ............ . .. ....... ... P0LCYErrEcrI,,E POLICY EXPIRATION:; PO-d�,\ NLjV5F.F LIDAITS VAIL irotwxo'� I DATE �(Y1(,I!0D1YY) ,TP 3EN!�,At, L;A9,L.TY .. .............. . ........ ............. . .... ........................ ...... . .......... GENERAL AGGREGATE CCt,.V.!F.C1AL GENERAL .,!Ae,L TY w- FRODUCTS-CONIP j OPAGG: t5 irot, PA -DE C""L'p. ............. . .... ..... . PERSONAL F, AOV INJURY S ................. 01ANEP's 11 CONT P" C7 EACH OCCURRENCE ........................................ ......... j PIRE DAMAGIt (Awy Q'IL, (ifol t a . ................... .... .. .... ... .................. ............ .......... .... ........................ .......... AU-�VIQUIIt L!Atl!�IT\ COMBINED SINGLE LIMT AN A -J70 ................ .. ..... .. . . ............... JPqr pqrson� AOTOS ......................... .............. .... .... H!qEL ........... .. BODILY-(NJURY (Per accident) 5 70S ........................ .. ... PROPERTY OAF-AAGE ,3ARAGE LtA5-,IT� .......... . ....... ................. - .......... - AUTO ONLY - EA ACCIDENT A�-jl AjT0 OTHER THAN AUTO ONLY-.. .................. .. .. .. .... . tEACM A=IPENT .............. 11 ......... . . ....... ... - . .. ... ....... ...... . . . ....... A(5(3REGATE 1XC9$$ 0AB!LI I Y ................. .................. . ........ -- .............. .............. .. ........ ..... . . ...... EACH OCCURRENCE 5 UAISqULA FORM . .................................. . OT- U� 7; AN JfJONE�. FOMA .... . .... ... .............................. ........... . ..... ......................... rIOMPENSATION AND ........... ................ STATv*ropy tit,11T,; t 5 A ............ .... V-1 WC1 31S31 1685019 08/2111998. 08/21 /1999! EACH AC,�I[)961T 7�-.E PRL)PRjE7CR: ................. ..1001000 ............... :015EASE — POLICY LINIT 50Q1 000 PARME95.; EyEcu-,vE ........... ........... .... ... I .. .............. OPF CER; ARE EXCL . ... . ...... ... ... . VMEA51� - kA(;H EMPLOYEE ..... ...... ....... .. ................... 100,000 ............... .. ......... 07HER . .... .... .. .......... ........... .............. ............ ......... .. . IDE C19:PTION QF UPFRATiON' LCCAI 1011S ! VEHICLE& SPECIA1 SHOJILD ANv OF THE ABOVE DESCRIBED POLICIES 8C CANCCLLEO BEFORETHit (zKPIRATICN DATE TMERtOF, THE ISSUING COMI'ANY WILL ZNDEAVOR70 MAI� DAYS ',%'RITTEfd NOTICE TO TH1 CERTIFICATE I,-iOLOZR Nt,,MED -0 'r.c- LEFT. Merrimack Cartage 6UT FAILI)4k TO MAIL SUCH NOTICE SHALL IN4PQ$F NO OI!IUGATiorq 09 LIABILITY 210 Holt Road OF AN� KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES North Andover, MA ............... ..................... .. ....... . .... AUTkOR17�0 REPRESENTATIVE ClientU: 21181 TAMP..qT.AM ACORM CERTIFICATE OF LIABILITY INSURANCE DATE MM DDIYY 11/ ( 19 1 /98 PRODUCER The Insurance Exchange, Inc. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE PO Box 6360 40 Sta3Z- HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. LIMITS Ma�Wester NH 03.108 INSURERS AFFORDING COVERAGE OORED Cames Lanoie 68 Healy Rd INSURER A: Travelers Insurance Co INSURER B: EACH OCCURRENCE $1,000,000 Candia, NH 0) 3 0 J34 INSURER C: INSURER D: I INSURER E: .. kI dQVERAGES - THe—FTO'UCIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTwrrHSTANDiNG ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR Im TYPE OF INSURANCE POLICYNUMBER LICYIEFFECTIVE PODATE(MM/DDIYYI POLICY EXPIRATION LIMITS A GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY I CLAIMS MADEEX-JOCCUR 1680353P9021TCT 05/19/98 -1 05/19/99 EACH OCCURRENCE $1,000,000 FIRE DAMAGE (Any one f ire) s300,OOO MED EXP (Any one person) s51000 PERSONAL & ADV INJURY $1,000,000 GENERAL AGGREGATE s2,000,000 GEN'LAGGREGATE LIMIT APPLIES PER: R 17 POLICYF—] JECOT- F� LOC PRODUCTS-COMP/OPAGG s2,000,000 AUTOMOBILE LIABILITY ANYAUTO ALL OWNED AUTOS SCHEDULEDAUTOS HIRED AUTOS NON -OWNED AUTOS COMBINED SINGLE LIMIT $ (Ea accident) BODILY INJURY (Per person) $ BODILYINJURY (Per accident) $ PROPERTY DAMAGE (Per accident) $ GARAGE LIABILITY ANYAUTO AUTO ONLY- EA ACCIDENT $ OTHERTHAN EAACC $ AUTO ONLY: AGG $ EXCESS LIABILITY 7 OCCUR FICLAIMS MADE DEDUCTIBLE RETENTION $ EACH OCCURRENCE $ AGGREGATE $ 1$ $ WORKERS COMPENSATION AND EMPLOYERS! LIABILITY WC STATU. TH- ITORYLIMITS TCER E.L. EACH ACCIDENT $ E.L. DISEASE -EA EMPLOYEE $ E.L. DISEASE -POLICY LIMIT $ OTHER DESCRIPTION OF OPERATIONS/ LOCATIONS/VEH 10 LESIEXC LUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS Merrimac Cartag 210 Holt Road North Andover, 01845 -ACORD 2S -S (7/97)1 of 2 if2739 SHOULD ANY OFTHE ABOVE DESCRIBE D POLICIES BE CANCELLED BEFORE THE EXPIRATION DATETHEREOF,THE ISSUING INSURERWILLENDEAVORTO MAI Ll 0 DAYSWFUTTEN NOTICIETO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURERITS AGENTS OR AUTHORIZED XKP TION 1988 menimac Merrimac Cartage Inc. Phone: (978) 686-2020 CaMge Inc. 210 Holt Road FAX: (978) 686-3086 North Andover, MA 01845 email: Wednesday, November 18,1998 Town Of North Andover Board Of Health Planning Department & Building Department The building located at 210 Holt Road is an 18,000 square foot building. The building has a footprint of 15,000 square feet (100'x 150') and a mezzanine above the office area in the front of the building that adds the additional 3,000 sq. ft. of office space. The building is broken up between office space (6,000 sq. ft). and maintenance shop space (12,000 sq. ft.). The proposed building modification will eliminate 1,000 sq. ft. of office space: 500 sq. ft. ground level and 500 sq. ft. mezzanine level. The modification to the building is being done to allow for drive through access to the shop maintenance area of the building. There will be no change in the current use of the building. wa4�<gAov�� I q -b Bill Thomson 1. FORM U - LOT RELEASE FORM INSTRUCTIONS: This form is used to verify that all necessary approval s/permits from Boards and Departments having jurisdiction have been obtained, This does not relieve the applicant andlor landowner from compliance with any applicable or requirements. "AA*****APPLICANT FILLS OUT THIS SECTION" APPLICANT )J)erj,) M,4e r-..4 P HONE LOCATION: Asseswrs Map Number PARCEL_2��-38 —2 7-4/0 SUBDIVISION --------------- LOT (S) STREET ST. NUMBERC?'/D 0 F F I C I A L U S . E ONLY****-"*"**�—*�� R E 1� JETI*CNS OF TOWN AGENTS: C M CONSVRV,�TldNJADMINI�TR.ATOR COMMENTS DATE APPROVED DATE REJECTED TOWN HLANNtK COMMENTS FOOD INSPECTOR -HEALTH SEP'rl-C INSPECTOR -HEALTH COMMENTS I DATE REJECTED DATE �PPROVED DATE REJECTED_ DATE APPROVED DATE REJECTED_ PUBLIC WORKS - SEWER/WATER CONNECTIONS DRJJVEW PERMIT Y� 41 F'I,RE DEPARTMENT_ A RJECEIVED BY BUILDING INSPECTOR DATE a M DEPARTMENT Of PUBLIC SAFPY CONSTRUCTION SUPERVISOR LICENSE Number: Expires: Birthdate: CS 052707 09/25/1999 P/25/1960 Restricted To, 00 r 1� JAMEIS: RO READING. MA 01867 - - ---- 1- 4 - - - - - - 0 10 3 73 8 2 f aclocled spacp 1 A e T. i 1 , :I i P 'ac hu 3, 1 1 s, )l 1 p R. r 1� dt 11 'i 0 f f� r 1 P—i p r! s e n 9/L 61,�.Imeo,.Iuveal& I 01PARIdINI 'If PIJPLyf. 0 �il U p P! Restricted To: 00 37382 1 00 - 35,000 cf enclosed space (MGL C.112 SAL) A - Masonry only IG - I & 2 Family Homes Failure to possess a current edition of the Massachusetts State Building Code is cause for revocativi o'f this license. 0 1 PAP, I HEN I OF P U PIL I r F C 1) N R U 11 T 10 N.' )^ ii P F R yr, I r— i 5 0 i 1 � d 1 AT 000CHARIA110F Ras we, is. n Icer Phone: 978-"&-"" 124 Main St. North Andover, MA 01845 Fax: 979-4&9594 N co N Howe- aul OA1 cwj 6 VC 4-A (fz (Oop - e1v menimac Merrimac Cartage Inc. Phone: (978) 686-2020 CarMge Inc, 210 Holt Road FAX: (978) 686-3086 North Andover, MA 01845 email: Wednesday, November 18,1998 Town Of North Andover Board Of Health Planning Department & Building Department The building located at 210 Holt Road is an 18,000 square foot building. The building has a footprint of 15,000 square feet (100'x 150') and a mezzanine above the office area in the front of the building that adds the additional 3,000 sq. ft. of office space. The building is broken up between office space (6,000 sq. ft). and maintenance shop space (12,000 sq. ft.). The proposed building modification will eliminate 1,000 sq. ft. of office space: 500 sq. ft. ground level and 500 sq. ft. mezzanine level. The modification to the building is being done to allow for drive through access to the shop maintenance area of the building. There will be no change in the current use of the building. Bill Thomson LO L—V— coo BERM to Ol P- v Ic, 1 �01 0 2! - 01 0 1p. mv. vu dD k T- 5) f1me romi - . LL wAmm (rYr) 1899 kFWD IL 02 J -j LIJ lij ?POP c-,F-FT\C- e5\(,--,TF—M p CL. ON, 0 0 E, to 1�- N -2 c 21- 10 4 Y, 9 �OA (T �Tly P) /0 py? p FUDO, MOX J— bi J \OC cotic c -.z, -T E P-, (f) Ij uj 7:-7- qu V(p Fee. 0 7c CL Dwp) 1p u , i 34 R 3) Uj ui �OA (T �Tly P) /0 py? p FUDO, MOX J— bi J \OC cotic c -.z, -T E P-, (f) Ij uj 7:-7- qu V(p Fee. 0 7c CL Dwp) 1p u , i 34 R 3) r* 041 P -t i 'Lei I ri rp tv VA 0 X u t 0 C/) u -Z u w P4 Cf) z 0 c :� 0 Z LZ CD co x V) to Cd x 0 u 'COL.- CS I- " Ci) 0 —cz CO U) o co :t 4t 's, .j C2 c 4w. ILO CL. zM Cc Alt:= 0 cc 0 jr m 2 ui C4 06 FO 0 F=04 :U w Cg A -,.CM AM ai E cL:R > :E Cf) cm cc C/) AL 55 CD's C=O CLC.2 co 0 cm m -s .4-; Zk - = M ca S. C -!q P-4 �:j 0 LD a 0 IOD = c 0 C#* CL 0 0 :6 zC:L.@-. Cc -3%%- 1% W C6 I rl%i u 0 s "-C:3 (U CD 0 E CD z co co LIO E CD co co Q M CL CL CO2 cc cc "a COD r�m_l lz CD CL o CIO CD gll :2 CD = co cm 0 CD CL cm E CD z ts co Cm -)— COD Q, ro C) 0 Z LZ CD CD CL 3: 0 'COL.- CS I- " C* cog :.,-; -0 E ui I.- 0= a 2% lo� CL= Z C= :� COD CD 5 ui .2 0 r7! 0 LD a 0 IOD = c 0 C#* CL 0 0 :6 zC:L.@-. Cc -3%%- 1% W C6 I rl%i u 0 s "-C:3 (U CD 0 E CD z co co LIO E CD co co Q M CL CL CO2 cc cc "a COD r�m_l lz CD CL o CIO CD gll :2 CD = co cm 0 CD CL cm E CD z ts co Cm -)— COD