TOWN OF NORTH ANDOVER
PERMIT FOR WIRING
This certifies that ..................... q le
j2p.5i
... .. ... ...
has permission to perform ........... 41� ... . ......................
wiring in the building of ........ 7- .... !��.
at ........... A 7-... ............................. I North Andover, Mass.
..........
Fee ... .7'7—Lic. No. ...................
ELEcrRICAL INSPEcroR
Check# 3 &/ -7
(4
I
Commonwealth of Massachusetts
Department of Fire Services
BOARD OF FIRE PREVENTION REGULATIONS
Official Use Only
Permit No. 9
Occupancy and Fee Checked
,[Rev. 11/991 (leave blank)
APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK
All work to be perfon-ned in accordance with the Massachusetts Electrical Code (MEC), 527 CMR 12.00
(PLEA SE PRINT IN INK OR TYPE ALL INFORMA TION) Date: -2009
City or Town of. North Andover To the Inspector of Wires:
By this application the undersigned gives notice of his �r—her intention to perform the electrical work described below.
Location (Street & Number) 210 Holt Road
Owner or Tenant : Thomson Brothers, Inc Telephone No. (978) 686-8604
Owner's Address: 210 Holt Road. North Andover. MA 01845
Is this permit in conjunction with a building permit? Yes E No [-] (Check Appropriate Box)
Purpose of Building: Commercial Transfer Station — Utility Authorization No. .3 74- 7 2- E
Existing Service Amps I / Volts Overhead Undgrd No. of Meters
New Service 4000 Amps 480/277 Volts Overhead Undgrd No. of Meters One
Number of Feeders and Ampacity ten sets of four 600MCM
Location and Nature of Proposed Electrical Work: New Transfer Station at 210 Holt Road
Completion ofthe followine table mav be waived bv the Insnector of Wires
No. of Recessed Fixtures
No. of Ceil.-Susp. (Paddle) Fans
No. of , - Total
Transformers KVA
No. of Lighting Outlets
No. of Hot Tubs
Generators KVA
No. of Lighting Fixtures
Above [:] In-
Swimming Pool orrid. grnd. El
No—. -oTEmergency Lighting
Batte!y Units
No. of Receptacle Outlets
No. of Oil Burners
FIRE ALARMS iNo.
of Zones
No. of Switches
No. of Gas Burners
No. of Detection and
Initiating Devices
No. of Ranges
No. of Air Cond. Total
Tons
No. of Alerting Devices
No. of Waste Disposers
Heat Porn
Totals:
mber
I ..................
I Tons
[ ....................... I
IKW
..................
No. of Self -Contained
Detection/Alerting Devices
No. of Dishwashers
Space/Area Heating KW
Local El Mun'C'P?l EJ Other
Connection
No. of Dryers
Heating Appliances KW
Security Systems:
No. of Devices or Equivalent
No. of Water KW
Heaters
No. of No. of
Signs Ballasts
ta Wiring:
No. of Devices or Equivalent
No. Hydromassage Bathtubs
No. of Motors Total UP
lecommunications Wiring:
No. of Devices or Equivalent
IOTHER:
Attach additional detail ifdesired, or as required by the Inspector of Wires.
INSURANCE COVERAGE: Unless waived by the owner, no permit for the performance of electrical work may issue unless
the licensee provides proof of liability insurance including "completed operation" coverage or its substantial equivalent. The
undersigned certifies that such coverage is in force, and has exhibited proof of same to the permit issuing office.
CHECK ONE: INSURANCE N BOND F] OTHER M (Specify:) Netherlands Ins. Co. 3-25-09
(Expiration Date)
Estimated ValueoCElectrical Work: $400,000.00 (When required by municipal policy.)
Work to Start: 7/21/08 Inspections to be requested in accordancewith MEC Rule 10, and upon completion.
'�on on Nh application is true and complete.
I certify, under the pains andpenalties ofperjury, that the infi4!"n
FIRM NAME: Cranney Electric Co.. Inc.
LIC. NO.: A 11918
Licensee: - Brian Cranney Signature\�--%- LIC.NO.: E25704
(Ifapplicable, enter "exempt " in the license number line) Bus.Tel.No.: 1-9 9-750-6900
AddQss: 10 Rainbow Teff., Danvers, MA 01923 Alt. Tel. No.:
OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally
required by law. By my signature below, I hereby waive this requirement. I am the (check one) El owner 0 owner's t
Owner/Agent
Signature Telephone No. E"IT FEE.- $
FP
7pq"-h o1r,
T&&6(- e /,
o-7_ aq -e S� 12-q
? - 6 - a,,Flzr
1- 2, -3 — 67 9 P -z—,
vh-� 1� p-2-d5f4c-,
rza-,�
jhlp)j & 4 / / — Z�
490 py\
9
a
v
i
151 Ca-mranelli Drive, Suite B
Middleborough, MA 02346
Tel: (508) 923-0879
Fax: (508) 923-0894
December 11, 2008,
F
B R 0 W N AND
C A L D W E L L
Town of North Andover Building Department
ATTN: Mr. Brian Leathe — Local Building Inspector
1600 Osgood Street
Building 20, Suite 2-36
North Andover, Massachusetts 01845
RE:- Site Work Construction Completeness. and Final As -built Plan,
TBI Inc., 210 Holt Road, North Andover
Dear Mr. Leathe:
Brown and Caldwell (BC) is submitting this letter on behalf of TBI, Inc., for the completed
site construction of the Recycling Facility and Solid Waste Transfer Station at 210 Holt Road.
As discussed with you on December loth via telephone, we are aware that the Building
Commissioner, Mr. Gerald Brown, is out on vacation for the next week and a -half, and
therefore have.forwarded this letter of construction completeness to your attention, in the
event that you may issue a 30 day temporary occupancy permit for the TBI Facility, if the
remaining affidavits of construction completeness are completed by the architect.
The subject of this letter is strictly for the site work of the Facility, consisting of stormwater
controls, site grading, paving, perimeter fence and gates, etc. Brown and Caldwell is attesting
that the Facility has been constructed in substantial conformance with the plans approved by
the local and state agencies. Any modifications are reflected in the attached as -built record
drawing, which has been stamped and signed by a licensed Massachusetts Professional
Engineer.
We anticipate that in the next few days that TBI will be submitting their permit application to
the Massachusetts Department of Environmental Protection — Solid Waste Division, for an
Authorization to Operate (ATO), which once received, will allow TBI to operate as a solid
waste handling facility.
I hope that you will find all the required information needed, feel free t� contact me at this
office with any questions.
Best regards,
Brown and 3�aldwel�
Philhf�jagMa, P.E.
Senior Engineer
Building Dept Const Complete Itr 121108.doc
cc: Bill Thomson — TBI, Inc.
Gail.Hire, Mackie Shea O'Brien
E n v i r o n m e n t a I E n g i n e e . r s
& C o n s u I t a n t s
HARRY F. DiZOGLIG, P.E.
Consulting Engineer
P.O. Box 19381
JOHNSTON, RHODE ISLAND 02919
(401) 934-2055
TO SALTONSTALL ARCHITECTS
380 Wareham Street
Marion, MA. 02738
THE FOLLOWING WAS NOTED: FIELD REPORT #11
DATE
JOB NO.
October 29, 2008
SA 07-16
PROJECT
TBI, Inc.- Recycle Center & Transfer Station
LOCATION
Holt Road No. Andover, MA. 01845
CONTRAG7,OR
OWNER
Ovmer
Thomson Bros Industries
WEATHFR
Overcast, Cool
TEMP. 0 at AM
44 a 1 1:15
at 1 M
PRESENT AT SITE
Bill,rhomson, TBI
Will Saltonstall, SA C. Jay Wilbur, SA
H. DiZoglio, Engineer 0
> CBI has substantially completed the installation of the interior process equipment. The transfer conveyors and
stacking augers have been installed above the concrete walls at the wood & fines bins; the steel beams supporting
this equipment are also bracing the tops of the 25 ft. high walls. The --ear concrete push walls of these bins have
been extended to about the 26' height with the Lteel push wall as detaikA south of the F line. At the -upper level
Employee mezzanine, the walkway along the south side has been fabficated and erected with the steel bar grate; the
frame is braced off the lower concrete walls with knee braces; the interior steel stair will connect at the east; work
on the steel stair is being delayed while the mijor utility work at the electric room below is in progress. The steel
j -
guard and hand railings have_bee*n installed on the'jupp ay. 'Ai the west and north sides of
connecting steel walkw
the Tipping floor, the upper 8 ft._ pushwalls have been constructed above the concrete With steel studs and plywood
facing; the steel stud framing is braced off the metal building system wall girts. The upper mezzanine area is fully
enclosed with plywood sheathing; the ipAerior partition studding has been installed. The mechanical AHU- I has been
placed above the mezzanine area; theAHU-2 mechanical unit will be placed above the sorting room suspended from
> the roof framing after some added roof purlins, are erected. Electrical, plumbing, HVAC and sprinkler piping work is
in progress throughout the building; The air cooted condensing unit has been installed on the concrete pad at the
exterior of the building, south side near the exterior stair. Metro Swift has started to install the sprinkler piping at
the underside of the metal building roof framing suspending the piping from the roof purlins as scheduled. The metal
railings have been fabricated and erected at the exterior concrete stair on the north side. The steel mill channel O.H.
door jambs have been field painted. The exterior pad mounted electric transformer is in place on the north side of
the building; Bill Thomson expects the electric service to the building to be connected within the next several days.
At the Scale House exterior the H.C. mechanical lift has been placed; interior work for finishes is under�ay.
The entire site has been finish graded and the ba��e course of bituminous concrete surfacing has been placed.
Gerald A. Brown, Inspector of Buildings
COPIES TO Bill Thomson, T 1 File: SATBTSCAY! 1 MOM M32)(201T
SIGNED.
HARRY F. DIZOGLIO, P.E.
Consulting Engineer
P.O. Box 19381
JOHNSTON, RHODE ISLAND 02919
(401) 934-2055
TO SALTONSTALL ARCHITECTS
380 Wareham Street
Marion, MA. 02738
THE FOLLOWING WAS NOTED: FIELD REPORT #10
DATE
OB No.
October 1, 2008 7
SA 07-16
PROJE,-T
TBI, Inc. - Recycle Center & Transfer Station
LOCATfON
Holt Road No. Andover, MA. 01845
CONTRACTOR
OWNER
Owner
Thomson Bros Industries
WEATHER
Cloudy, Lt. Rain
TEMP. at AM
68 : 11:45
at an
PRESENT AT SITE
Site Contractor - JJ Paonessa Co.
Bill Thomson, TBI
L 1-1. DiZoglio, Engineer
> The Metal Building System has been substantially completed; all of the metal eave and rake trim and gutters and
downspouts have been installed; no metal trim will be applied over the O.H. doorjamb steel channels; the Owner will
be finish painting all the channel jarnbs. The exterior O.H. door installations have been completed; the 8" conc. filled
steel pipe bollards are installed at all of O.H. door jambs on the south building side. The added concrete apron slab
has been completed on the south side at the open bins #2 thru #6; the 8" steel bollards are installed for protection at
the front of all the piers and. bin walls, lines 6 1/2to 9 as scheduled. R.A. Murdoch has completed all the scheduled
concrete Work. The exterior. steel stair has bee-n-fabriddted and erected on the south side along -line A between lines
91/2and 11; 10" steel channef sitiin-gers I I tr - ds of stedl bar grate 7 -1/2,' open ri sers, with intermediate and top steel
Pik,
platforms; personnel steel door instal -led at 2n'�-leyel to-e--x-it.from sorting room floor to exterior stairway. Steel
workers are installing the stair enclosure with metal roof deck and metal siding on a steel frame to match main bldg.
The exterior wall louver at the back of the Hydraulic Room has been installed, between line 6 & 7. Work is
continuing at the building interior: the 16" concrete bin wall east of line 12 has been completed at 25'high; the 18"
> wall at Bin #7 has been extended along line A to the I I line pier. CBI, Inc. is continuing work to install the various
equipment; the interior bag house and cyclone is being set up. The employee mezzanine area 2' floor has been
installed with the 2" composite metal deck and concrete slab; the perimeter stud walls and metal ceiling joists (N -S
direction) are in place with plywood sheathing and ice and water membrane complete; the exterior wall louver is
installed; the sorting room ceiling joists and plywood sheathing are complete. The steel walkway connecting the
mezzanine level with the sorting room has been erected complete with the metal bar grating. Electrical work is
underway- within the building including the installation of.the high bay lighting. The Scale House exterior is complete
with the,*indows and siding installed; the adjacent scale pits and concrete platforms are completed including the
approach slabs. The site septic tank and ]each field areas have been fine graded and seeded.
PAj d A. Brown, Inspector of Buildings T-(�p Ir
CID I d-9 HINIM
i I homson, TBI File. SATB18CA.FIO SIGNED /74"-7 2!,
Date.// -.3.-,o .......
ET
TOWN OF NORTH ANDOVER
PERMIT FOR, GAS INSTALLATION
q J.'
This certifies that.
............
has permission for gas installation ..............................
in the buildings f . . .. ...................
at North Andover, Mass.
Fee/ Lic. No.'�/
OAS IN R
Check#
6603
t
MASSACHusurs uNiFoRm APPLIcA,-royFOR pERWr To Do GAs
FTrnNG
(Type or print)
NORTH ANDOVER, MASSACHUSETTS Date
Building Loqations -f
_,00<�
Name
New Renovation Replacement
�SU B—BASEM _ENT
BASEM i—N—T
1STe
FLOO R
2N 1).
FLOOR
3RD.
FLOOR
4 T �HF
L �OO
5TH
FLOOR
6 T H
F L 0 0 R
FL 0 R
ST H
FLO 0 R
Permit # 0/"/, a P�
Amount
Plans Submitted
(Print or type) / .
Name. 041, , _"'
Check one: Certificate Installing Company
M I_
I - "' —VVF- dppllCallon are true and accurate to the
U�aL Uj !ny rnowiecige and that all plumbing work and installations Performed under Permit lAsue or this application will -be in
Compliance with all pertinent provisions of the Massachus state Gas Code and Chapter 142 e General Laws.
By:
Title
City/Town,
IAPPR6V, ED (OFFICE USE ONLY)
Z.15 fiature of Licensed Plumber or Gas Fitter
umber
Gas Fitter
Master
Journeyman
U
W
ri
14
0
0
U
W
z
cc
go
t:
z
0
Z
W
cc
W
W
U
z
U
z
-tz
z
U
1
LIM W
W
Z
--t
Z
Q
U .1
U
I >
(Print or type) / .
Name. 041, , _"'
Check one: Certificate Installing Company
M I_
I - "' —VVF- dppllCallon are true and accurate to the
U�aL Uj !ny rnowiecige and that all plumbing work and installations Performed under Permit lAsue or this application will -be in
Compliance with all pertinent provisions of the Massachus state Gas Code and Chapter 142 e General Laws.
By:
Title
City/Town,
IAPPR6V, ED (OFFICE USE ONLY)
Z.15 fiature of Licensed Plumber or Gas Fitter
umber
Gas Fitter
Master
Journeyman
Saltonstall Arckitects
FIELD REPORT
To: Gerald Brown
Inspector of Buildings
North Andover, MA
Date of Visit: September 10, 2008 job: 07-16 TBI Inc
Holt Road
North Andover, MA
Present at Site: Bill Thomson, Owner/G.C.
Harry DiZoglio, Structural Engineer
Will Saltonstall, AIA,-Saltonstall Architects
C. Jay Wilbur, Saltonstall Architects
Conditions at Time of Visit: Sunny
Waste Transfer Station
Saltonstall Architects Field Report #2 September 12, 2008
Work is progressing well on Holt Road and in accordance with the Construction
Documents, with slight revisions as noted below. The metal building erection has been
completed on the north, east, and west walls. The south wall girts had been fully
installed and siding was being applied. All roll -up doors had been delivered and
installed. There is one egress door opening missing from the sorting room to the
exterior staircase on the south side, Bill Thomson informed us that the door was
ordered and being shipped and would be installed. Since our last visit all of the floor
slabs had been formed and poured. In an amendment to the original plans, which called
for concrete masonry construction, Rick Murdoch had constructed the electrical room,
hydraulic room, and sprinkler rooms of reinforced concrete with guidance from Harry
DiZoglio, structural engineer. No steel work for the employee area floors or walls had
begun as of the date of this visit. Bin -walls in the north-east corner had also been
constructed of reinforced concrete rather than supplied by the equipment manufacturer
as previously specified. Mr. DiZoglio also assisted in the design of these bin -walls. All
floor framing for -the sorting room and picking stations bad been installed and. diamond
plate floor applied. The steel stud walls were erected with plywood sheathing on the
exterior of the sorting room and steel stud ceiling joists were approximately 50%
completed. Most of the equipment provided by Continental Biomass Industries had
been delivered and installed in their final locations. Many pieces were temporarily held
in place by two (2) bolts, the remaining two (2) will be secured when final equipment
layout is complete. The scale in the pit had been installed and the concrete scale slab
had been poured.
The scale house foundations and framing were complete, HVAC and rough electrical
and plumbing has been installed. The hydraulic scales on either side of the scale house
had been installed, and were, being prepared for concrete pours.
Copy: Bill Thomson, Harry DiZoglio, Alan Kirschner
380 Wareham St. Marion, MA 02738 p 508.748,1043 f 508.748.2330
www.saltonstallarchitects.com
HARRY F. WOW% P.E.
Consulting Engineer
P.O. Box 19381
JOHNSTON, RHODE ISLAND 02919
(401) 934-2055
TQ SALTONSTALL ARCHITECTS
380 Wareham Street
Marion, MA. 02738
THE FOLLOWING WAS NOTED: . FIELD REPORT #8
DATE
JOB NO.
August 28, 2008
SA 07-16
PROJECT
TBI, Inc.- Recycle Center & Transfer Station
LOCATION
Holt Road No. Andover, MA. 01845
CONTRACTOR
OWNER
Owner
Thomson Bros Industries
WEATHUR
TEMP. Oat AM
Part Cloudy, Warm
78*at 11:45 po
PRESENT AT SITE
Site Contractor - JJ Paonessa Co.
Wm. Thomson, Sr., TBI R.A. Murdoch
H. DiZoglio, Engineer
> The Metal Building System erectors have been continuing with the installation of the metal wall panels; the north,
west & east elevations are completed with the upper translucent panels also. The metal roof panel installation has
been started on the nor th side -of the roof I . Alf of th� j"�7_'perso'nnel doors and frames have been installed. The O.H.
door installer has set up the opening frames & tracks for all the Ift 16 and 2004 overhead doors. At the inside truck
scale, the platform has been prepped with the metal formdeck, rebar and 3 access opening frames, ready for concrete
placement. The entire east section of the 14" concrete floor slab has been placed and cured including the approach
slab on the south side. RA Murdoch is now forming the new int. RC bin walls at each side of line 11; walls are to be
12" thick to 25' height; the bin wall extension on the east of line 12 will be 16" thick; the walls will be pinned to the
base wall and rear push wall. A cont. sawed- floor joint has been ctft at the front of the bin walls (approx. along "D")
The concrete floor slab at the west section is all prepared for with the vapor barrier, rebar and trench drains in place.
Expected to place monolithic concrete on Friday 8/29 with cover and curing to follow. Murdoch has been directed to
extend the south concrete wall at bin #7 from line 10 to line 11; reviewed this procedure with him. The lower
> perimeter and interior walls at the Hydraulic, Electric & Sprinkler rooms have been formed and placed with 8" reinf.
concrete, approx. 16' height; door openings have been provided. CB1 is continuing to set up the equipment thru-out
the building; the skid mounted equipment is placed in the Hydraulic room; the Sorting room floor is completed with
the steel framing and steel plate floor surface. The steel plate facing is now installed at the lower face of the concrete
push walls, The carpenter (Rick) has installed the steel wall studs at the perimeter of the upper sorting room; 3 5/8"
x l8ga. steel studs to be faced with plywood; reviewed -with him the requirements for the new steel beam at the
ceiling framing. The wood frame scale house on the west side of the building is completely rough framed with the
roof shingles installed-. a concrete slab has been placed below. Work is started at the two adjacent scale pits with the
load cells and anchor placement & concrete approach slabs. Upper p/c concrete retaining' wall has been installed.
Gerald A. Brown, Inspector of Buildings 5 5P 5 A9
COPIES TO Bill Thomsoh—,TBl— File: SATBI8 TK8 MIJEOLIMM32MMU
SIGNED-
HARRY F. DiZOGLIO, P.E.
Consulting Engineer
1126 Hartford Avenue
JOHNSTON, RHODE ISLAND 02919
(401) 274-6690
TO SALTONSTALL ARCHITECTS
380 Wareham Street
Marion, MA. 02738
THE FOLLOWING WAS NOTED: FIELD REPORT #7
i
DATE
August 14, 2008
T7SA 07-16
PROJECT
TBI, Inc.- Recycle Center & Transfer Station
LOCATION
Holt Road No. Andover, MA. 01845
CONTRt,;TOR
Owner
OWNER
Thomson Bros Indusffi.e;.
WEATHER
Par, Cloudy, Warm
TEMP. 0 at AM
800at . 12:OOPM
PRESENT AT SITE
Site Contractor - JJ Paonessa Co.
Bill Thomson, TBI
H. DiZoglio, Engineer
> Northeast Scale has been working at the truck scale pit at the east end of the building setting up the concrete
pedestals, anchors, load cells and structural steel framing; the concrete approach slabs have been placed on the south
and north (entrancelexit) of this bay. The metal budding system erection has been progressing; the wall girts, bracing
and roof purlins are installed; the framing for the O.H. doors is underway; for the 20'x 3 5' O.H. doors, the max.
attainable opening height will be about 33'-8" due to the position of the WF beam header above the opening limiting
the location of the door coil; Bill Thomson indicated that this height wdl be satisfactory. The metal wall panels have
I I I
been placed on the west endwall.. Last'Friday (8/8), the center section of the concrete floor slab (6,000 psi) was
placed and cured as directed; about half of the slab is still wetted and covered with the plastic material. Other
portions of the concrete floor slab haw'been placed behind and flush to the face of the CBI support piers as directed.
In addition, the concrete floor slabs have been placed within the south bin walls #I thru #6; all finished concrete for
the floor slabs looks good. Preparation work for the monolithic concrete floor slab at the east section of the building
has been completed; vapor barrier, isolation joint material and rebar have been placed; trench drain fixtures are in
> place; concrete is expected to be placed on Friday 8/15. The moisturelvapor barrier being used is by Stego
Industries, class A, 10 mil thickness, yellow plastic. Bill Thomson will call Miller Engineaing for field testing of
the fresh concrete. CBI is continuing to set up equipment and the framing & deck for the sorting room floor. CB1
will not be providing the metal bin separation walls at the wood & fines bins; Bill Thomson has arranged for R.A.
Murdoch to construct the waIls of concrete, thickness to be determined hen wall height is known. The two truck
scale pits on the west side of the site flanking the new scale house have been placed; concrete pedestals are being
placed inside the pits today; ten (10) sonotube foundation piers (two rows) have been placed between the scale pits
for support of the wood frame scale house; the septic tank is placed at the north end of the foundation. The site
contractor is backfilling & grading at the site retaining walls; the 6" concrete pads have been placed behind the walls.
Gerald A. Brown, Inspector of Buildings .5-5 M"ILM MZ
COPIES To Biff Thmnson; 9FBI File. SATBIWA.140 -
SIGNED
HARRY F. DiZOGLIO, P.E.
Consulting Engineer
P.O. Box 19381
JOHNSTON, RHODE ISLAND 02919
(401) 934-2055
TO SALTONSTALL ARCFUTECTS
380 Wareham Street
Marion, MA. 02738
THE FOLLOWING WAS NOTED: FIELD REPORT #1
DATE
JOB NO.
April 7, 2008
SA 07-16
PROJECT
TBI , Inc. - Recycle Center & Transfer Station
LOCAT�ON
Holt Road No. Andov MA. 01845
CONTFIAGIOR
OWNER
Owner
Thomson Bros Industries
WEATHER
TEMP. Oat AM
Cool, Sun & Clouds
42'at 12:00 Pm
PRESENT AT SITE
Bill Thomson
Rick Murdoch - Concrete Form Contractor
H. DiZoglio, Engineer
> R. A. Murdoch began forming and placing rebar for the footings on March 284. The reinforcing steel sho . p
drawings prepared and submitted by Barker Steel have been revie wed. The concrete mix desi-an for the 3500 t)si
foundation concrete has been submitted by Kingston Ready -Mix Concrete and approved for use.
J.J. Paonessa Co. is the Site Contractor and excavator preparing the soil for the placement of the footings. Miller
Engineering has been over -seeing earthwork operations and testing the soils compaction procedure. Bill Thomson
will forward soil testing reports as they are received". ''Bill -will also arrange for a field testing program for the
concrete operations. The concrete footings on the west along line I from line'A to F have been completed. The
contractor is adding a 2 foot wide strip footing between the isolated footings for his ease in settinj the grade beam
forms. On the north side the footings are' completed along fine F from lines I to 4. On the south side along line
the concrete footings are complete from line I to 6 1/2. The concrete quality looks good and all the dowels for the
piers reinforcing are in place. The contractor is now preparing the formwork for the large mat footing on the east
along line 13; this includes the footing for the perimeter wall along line 13 plus the foundation mat for the truck
> scale and the footing for the high interior retaining wall. . The sump for the scale pit has been relocated to 4 ft.
north of the D fine. The structural fill soils have been properly placed and prepared for these footings. In addition
the new perimeter footings along the F fine are b!;Lmg formed. Reinforcing steel is being placed in accordance with
the approved shop drawings. The site contractor has installed a well off line A between 12 & 13 to control the
groundwater which is close to the bottom of mat footing vic. El. 73.' The 6" footing drain has been installed
below the footing vic. lines F-12; the water fines have been installed below the footin
g vic. li�e'F-T' Had meeting
with Rick Murdoch to review and answer questions and to review up-comi work, he will need info for co-fumn
base anchor bolts and leveling plat9s. Bill Thomson expects to receive metal building drawings later this week.
This writer met with the local building inspector at 1600 Osgood St, to infonn him of my Reriodic vi.%itg
COPIES TO Gerald A. Brown, Inspector of Buildiggs i - LV 111NIM M32,002'
File: SATB18CA.FRI
SIGNED
t
R' E C E 1\/ ED
r� ;- � 1 n r r!
Town of North Andover
Office of the Planning DepartnI&VU 15 Pm 4: 16
Community Development and Services Dir*, ,�*on
1600 Osgood Street
NORTH '�ffi
"i L- � " ` " � ; ,
North Andover, Massachusetts 01845MASS�;,11!411 ill, --7-,
Any appeal shall be filed
within (20) days after the
date of filing this notice in
the office of the Town Clerk.
NOTICE OF DECISION
Date: October 3, 2007
Date of Hearings: August 12, 2007,
September 4, 2007, and October 2, 2007
Date of Decision: October 2, 2007
Petition of- Thomson Brothers Industries (TBI), Inc., 210 Holt Road, North
Andover, MA 01845
Premises Affected: 210 Holt Road, North Andover, MA within the Industrial -2 Zoning
District, Assessors Map 34, Parcels L27, L38, L40 & Map 77, Parcel
L14.
Referring to the above petition for a Site Plan Review Special Permit from the requirements of
the North Andover Zoning Bylaw, Sections 8.3, 10.3, and 10.31 and MGL C.40A, Sec. 9
So as to allow the construction of a 30,000 s.f. recycling and solid waste transfer station,
extensive grading, lighting plan, landscape improvements, drainage easement, 'and other
improvements within the Industrial 2 Zoning District.
After a public hearing given on the above date, the Planning Board voted to APPROVE A SITE
PLAN REVIEW SPECIAL PERMIT based upon the following conditions:
6IN71oe=hAn��dover Planninw0ard
Abutters Richard Nardella, Chairman
Surrounding Towns John Simons, Vice Chairman
Jennifer Kusek
Tim Seibert, Alternate
Bldg. ' ZBA
Con/Com Health
Fire Chief Police Chief
Town Clerk DPW/Engineers
TBI, Inc., 210 Holt Road
Site Plan Review Special Permit
October 2, 2007 E I V E D
I �7
The Planning Board herein approves the Site Plan Review Special Permit for the construction of a 30,000
s.f. recycling and solid waste transfer station, 76 total parking spaces, extensive MUNT0115 "Wrig 16
plan, landscape improvements, drainage easement and other improvements shown on the "Plans" as
defined below. The project is located in the Industrial 2 Zoning District and is located oft-,IkdL�p.roperty
shown on the North Andover Assessors Maps as Map 34, Parcels L27, U 8, L40 &�M444fphi, -V'11 Nic:81YE-14
consisting of approximately 7.79 acres (339,332 s.f.) of land with approximately ie
frontage on Holt Road. The Site Plan Review Special Permit was requested TBI, Inc., 2 10 Holt Road,
North Andover, MA. This application was filed with the Planning Board on July 5, 2007. The applicant
submitted a complete application which was noticed and reviewed in accordance with Sections 8.3, 10.3,
and 10.31 of the Town of North Andover Zoning Bylaw and MGL c.40A, sec. 9
During the review process, the Applicant and its professional consultants also submitted various revisions
to the plans along with various supplemental memoranda and correspondence in response to requests by
the Planning Board, the Board's peer review consultants, and by the various departments within the Town
of North Andover that reviewed the project. All of these plans, reports and correspondence are contained
in the Planning Board's files and are hereby incorporated by reference into the public record for this
hearing.
The Planning Board makes the following findings as required by the North Andover Zoning Bylaws
Section 8.3 and 1.0.3:
FINDINGS OF FACT:
1) On June 22, 2006, the North Andover Board of Health approved the Site Assignment Decision for the
proposed 30,000 sq. ft. recycling and solid waste transfer station to be located on 5.8 acres of land
and shown on lots labeled 2, 3, and 4 on the "Plans" as defined below. The requirements and
conditions contained within said Decision are hereby incorporated by reference into this decision and
public record.
2) The specific site is an appropriate location for the project as it is located in the Industrial 2 Zoning
District and involves the construction of permitted uses within those zones. Specifically, the Zoning
Bylaw allows in the Industrial 2 District the following use (North Andover Zoning Bylaw, Section
4.133(l 1)): Light manufacturing, including manufacturing, fabrication, processing, finishing,
assembly, packing or treatment of articles or merchandise provided such uses are conducted solely
within a building and further provided that such uses are not offensive noxious, detrimental, or
dangerous to surrounding areas of the Town by reason of dust, smoke, fiimes, odor, noise, vibration,
light or other adverse environmental effect.
3) The use as developed will not adversely affect the neighborhood as the project is surrounded by other
industrial uses and zoned properties and will not impact any residential areas or neighborhoods. In
addition, the project provides for natural a vegetative landscaped buffer along the frontage of the
properties to further insulate the building. All plantings and screening depicted on the approved plans
referenced herein shall remain in perpetuity over the life of the project.
4) There will be no nuisance or serious hazard to vehicles or pedestrians. The proposed parking lot
design and access/egress drives provide for adequate internal and external traffic flow, safety, and
sufficient pedestrian connections throughout the project and surrounding area. Traffic impact studies
have been conducted for the project as part of the applicant's submittal to the Executive Office of
Environmental Affairs (EOEA) and Site Assignment application to the North Andover Board of
Health and Department of Environmental Protection Division of Solid Waste. The reviewing parties
K
TBI, Inc., 210 Holt Road
Site Plan Review Special Permit
October 2, 2007
concluded that the external traffic impacts will not significantly degrade the level of service at any
nearby intersections.
5) In accordance with the terms and conditions of the Site Assignment Decision, the Applicant will fund
up to the $200,000 towards the installation of a traffic light at the intersection of Holt Road and Route
125 to mitigate traffic congestion.
6) The proposed recycling and solid waste transfer station contains architectural elements and treatments
that are commonly present and consistent with structures typically constructed within the Industrial 2
Zoning District. Finally, the Applicant incorporated visual buffering and additional plantings to help
mitigate the impact on the neighboring properties and streetscape.
7) The site drainage system and storm water management design are designed in accordance with the
Town Bylaw requirements and Best Management Practices, and has been reviewed by the outside
consulting engineer, Vanasse, Hangen Brustlin, Inc. (V, HB).
8) The landscaping approved as a part of this plan generally meets the requirements of Section 8.4 of the
North Andover Zoning Bylaw,
9) The applicant has met the requirements of the Town for Site Plan Review as stated in Section 8.3 of
the Zoning Bylaw.
10) Adequate and appropriate facilities will be provided for the proper operation of the proposed use.
11) The project will provide for municipal water, sewer and utilities on the property to adequately address
the needs of the project.
12) This Site Plan Review Special Permit is conditional upon the submission and approval by the
Planning Board of an appropriate Form A Application for Approval of an ANR Plan (Approval Not
Required Plan) which combines the Map 34, Parcels L27, L38, L40 & Map 77, Parcel L14, totaling
approximately 7.79 acres, into one parcel.
Finally the Planning Board finds that this project generally complies with the Town of North Andover
Zoning Bylaw requirements as listed in Section 8.3 but requires conditions in order to be fully in
compliance. The Planning Board hereby votes to both grant the requested waivers as described in the
Applicant's application, and also unanimously votes to grant approval of the Applicant's proposed
project as described in the "Plans" and other supporting information described in the public record,
provided the following conditions are met:
SPECIAL CONDITIONS:
1) Permit Definitions:
a) The "Locus" refers to the 339,332 s.f. parcel of land with land fronting on Holt Road, as shown
on Assessors Map 34, Parcels L27, L38, L40 & Map 77, Parcel L14, also known as 210 Holt
Road, North Andover, Massachusetts.
b) The "Plans" refer to the plans prepared by Brown and Caldwell, 48 Leona Drive, Suite C,
Middleborough, MA 02346, entitled "Site Plan Review 2007, Prepared for TBI, Inc., North
Andover, Massachusetts":
3
TBI, Inc., 210 Holt Road
Site Plan Review Special Permit
October 2, 2007
Sheet I of 10, Revised 9/25/07;
Sheets 2, 3, 4, 5 and 10 of 10, Revised 9/12/07;
Sheet 6 of 10, Revised 9/14/07; and
Sheet 7, 8 and 9 of 10, Revised 8/22/07.
c) The "Project" or "210 Holt Road" refers to construction of a 30,000 s.f. recycling and solid waste
transfer station.
d) The "Applicant" refers to TBI, Inc. as the applicant for the Site Plan Review Special Permit.
2) Environmental Monitor: The developer shall designate an independent Environmental Monitor who
shall be chosen in consultation with the Planning and Community Development Staff. The
Environmental Monitor must be available upon four (4) hours notice to inspect the site with the
Planning Board designated official. The Environmental Monitor will be required to inspect all such
devices and oversee cleaning and the proper disposal of waste products if applicable.
3) Construction Monitor: The applicant shall designate an independent construction monitor who shall
be chosen in consultation with the Planning Department. The construction monitor must be available
upon four (4) hours notice to inspect the site with the Planning Board designated official. The
construction monitor shall make weekly inspections of the project and file monthly reports to the
Planning Board throughout the duration of the project. The monthly reports shall detail area of non-
compliance, if any, and actions taken to resolve these issues. The designated monitor may not be
applicant and/or developer. The weekly inspections and monthly reports provided to the Planning
Department shall include the following:
a) site clearing;
b) erosion control;
c) drainage and detention structures;
d) on-site water and sewer utilities;
e) parking spaces and related pavement;
f) newly constructed roadways/access ways;
g) curb cuts;
h) retaining walls;
i) site screening, landscaping and street trees;
j) site restoration; and
k) final site cleanup
4) PRIOR TO THE ENDORSEMENT OF THE PLANS BY THE PLANNING BOARD, THE
APPLICANT MUST COMPLY WITH THE FOLLOWING CONDITIONS:
a) The final plans must be reviewed and approved by the DPWand the Planning Department and be
endorsed by the Planning Board. The final plans must be submitted for review within ninety (90)
days of filing the decision with the Town Clerk.
b) The final site drainage system must be designed in accordance with the Town Bylaw
requirements and reviewed by the Division of Public Works. All storm water drainage control
facilities utilized by the site shall be shown on the site plan. Storm water drainage calculations
which support the design of the control facilities shown on the plan shall be submitted to the
Department of Public Works for review and approval. Written confirmation of said review and
approval by the Department of Public Works must be submitted to the Planning Department.
4
TBI, Inc., 210 Holt Road
Site Plan Review Special Permit
October 2, 2007
c) A bond in the amount of fifteen dollars ($15,000) must be posted for the purpose of insuring that
a final as -built plan showing the location of all on-site utilities, structures, newly constructed
roadways/access ways, topography, and drainage facilities is submitted. The bond is also in place
to insure that the site is constructed in accordance with the approved plan. The form of security
must be acceptable to the Planning Board.
d) The Applicant, within thirty (30) days after this Decision becomes final, shall submit to the
Planning Board for its approval an appropriate Form A Application for Approval of an ANR Plan
(Approval Not Required Plan) along with an ANR Plan which combines the Map 34, Parcels
L27, L38, L40 & Map 77, Parcel L14 totaling approximately 7.79 acres. No construction
activities authorized by this Decision on the Additional Land shall be commenced until the
Applicant has (a) recorded said approved ANR Plan and (b) caused the title to the Additional
Land to be combined with the Original Land, by recording a Deed for said Additional Land
conveying the title to said Additional Land to Holt Road, LLC.
e) All site plan application and escrow fees must be paid in full and verified by the Town Planner.
5) PRIOR TO THE START OF CONSTRUCTION:
a) A construction schedule shall be submitted to the Planning Staff for the purpose of tracking the
construction and informing the public of anticipated activities on the site.
b) All applicable erosion control measures must be in place and reviewed and approved by the
Planning Department.
c) It shall be the responsibility of the developer to assure that no erosion on the site shall occur
which will cause deposition of soil or sediment upon adjacent properties or public ways, except as
normally ancillary to off-site sewer or other off-site construction. Off-site erosion will be a basis
for the Planning Board making a finding that the project is not in compliance with the plan;
provided, however, that the Planning Board shall give the developer written notice of any such
finding and ten days to cure said condition.
d) A pre -construction meeting must be held with the developer, their construction employees,
Planning Department, Building Department, and Conservation Department to discuss scheduling
of inspections, the construction schedule, and the process/method of informing the public of the
anticipated activities on the site.
e) The developer shall provide the Planning Board with copies of permits, plans and decisions
received from all other North Andover Land -Use Boards or departments. In addition to receipt of
these plans, the applicant shall supply the Town Planner with a letter outlining any and all
.revisions resulting from said permits, plans and decisions received from other town boards,
commissions and departments that differ from the approved plans referenced in Condition 24.
6) � PRIOR TO THE ISSUANCE OF A BUILDING PERMIT:
a) Three (3) copies of the signed, recorded plans must be delivered to the Planning Department.
b) One certified copy of the recorded decision must be submitted to the Planning Department.
TBI, Inc., 210 Holt Road
Site Plan Review Special Permit
October 2, 2007
c) The applicant shall adhere to the following requirement of the North Andover Fire Department
and the North Andover Building Department:
1. All structures must contain a commercial fire sprinkler system. The applicant is required to
extend the sprinklers from the existing plant into the new addition. The plans and hydraulic
calculations for each commercial system shall be submitted for review and approval by the
North Andover Fire Department. Plans and hydraulic calculations for each commercial
system must also be supplied to the Building Department.
7) DURING CONSTRUCTION:
a) During construction, the site must be kept clean and swept regularly throughout the construction
process. Dust mitigation, dewatering and roadway cleaning must be performed weekly, or more
frequently as dictated by site and weather conditions and as directed by the Town Planner. Tarps
shall be placed over any stockpiles to ensure that any dust is mitigated properly.
b) The Board will strictly enforce the policy relative to the stockpiling of materials (dirt, wood,
construction material, etc.) and must be shown on a plan and reviewed and approved by the Town
Planner. Any approved piles must remain covered at all times to minimize potential dust and be
required to install appropriate erosion control measures to mitigate potential impacts to Lake
Cochichewick. Any stockpiles to remain for longer than one week must be covered.
c) In an effort to reduce noise levels, the developer shall keep in optimum working order, through
regular maintenance, any and all equipment that shall emanate sounds from the structures or site.
d) The Town Planner will perform bi-weekly inspections of the site during construction to ensure
that the developer is adhering to the conditions set forth in the decision.
8) PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY:
a) The applicant must submit a letter from the architect and engineer of the project stating that the
building, landscaping, lighting and site layout substantially comply with the plans referenced at the
end of this decision as endorsed by the Planning Board. Alternatively, the applicant and/or property
owner may provide a bond, determined by the Planning Board, to cover the full amount of the
landscaping materials and installation if weather conditions do not permit the completion of the
landscaping prior to the use of the parking area.
b) The Planning Staff shall approve'all artificial lighting used to illuminate the site. All lighting shall
have underground wiring and shall be so arranged that all direct rays from such lighting falls entirely
within the site and shall be shielded or recessed so as not to shine upon abutting properties or streets.
The Planning Staff shall review the site. Any . changes to the approved lighting plan as may be
reasonably required by the Planning Staff shall be made at the owner's expense. The applicant must
submit a letter from the architect and engineer of the project stating that the building, signs,
landscaping, lighting and site layout substantially comply with the plans referenced at the end of this
decision as endorsed by the Planning Board. All site lighting shall provide security for the site and
structures however it must not create any glare or project any light onto adjacent residential
properties.
c) The commercial fire sprinkler systems must be installed in accordance with referenced standard
NFPA 13D and in accordance with 780 CMF, Chapter 9 of the Massachusetts State Building
Code. Certification that the systems have been installed properly in accordance with the above
TBI, Inc., 210 Holt Road
Site Plan Review Special Permit
October 2, 2007
referenced regulations must be provided from both the North Andover Fire Department and the
North Andover Building Department to the applicant. The applicant must then provide this
certification to the North Andover Planning Department.
d) Any and all signage plans for the site, which have been provided to the Planning Board during the
site plan review process, were presented for the materials of the sipage only. This includes any
and all sipage relative to the Site Assignment Decision incorporated as part of this decision.
Any signage plans must conform to Section 6, Signage and Outdoor Lighting Regulations of the
Town of North Andover Zoning Bylaw and must be approved by the Building Department. In no
way is the applicant to construe that the Planning Board has reviewed and approved the signage
plans for Zoning Compliance as that is the jurisdiction of the Building Department. All
additional permits must be obtained by the applicant prior to construction.
e) In accordance with the Site Assignment Decision, TBI shall develop a clear route map for all
trucks (inbound and outbound) that will be distributed to drivers, faxed and emailed. The route
will clearly direct drivers to 1-495 and the Route 125 Connector access/egress point. Further, all
trucks entering and exiting the facility shall follow the designated route except when performing
collection in North Andover, or unless an exception applies pursuant to Board of Health trash
truck regulations.
9) PRIOR TO THE FINAL RELEASE OF ALL SECURITY AND ESCROWED FUNDS
a) The Planning Staff shall review the site. Any screening as may be reasonably required by the
Planning Staff will be added at the Project Owner's expense.
b) A final as -built plan showing final topography, the location of all on-site utilities, structures, curb
cuts, parking spaces, roadway/access way construction, drainage structures, and facilities must be
submitted to the Planning Department. The applicant must submit a letter from the architect and
engineer of the project stating said items substantially comply with the plans referenced at the end of
this decision as endorsed by the Planning Board.
10. The requirements and conditions contained within the Site Assignment Decision dated June 22, 2006
and issued by the North Andover Board of Health are contained in. the Planning Board's files and are
hereby incorporated by reference into this decision and public record. The applicant shall comply
with all conditions and requirements said Decision. Any non-compliance with the requirements and
conditions of said Decision shall violate this Site Plan Review Special Permit
11. In accordance with the Site Assignment Decision, TBI shall contribute up to $200,000 towards the
installation and construction of a traffic light at the intersection of Holt Road and Route 125. Monies
not already utilized for the engineering, installation, and/or construction of the traffic light will be
placed into an escrow account with the Town by the applicant. Said amount shall only be utilized by
the applicant or Town for the purpose of installing and constructing the signalized traffic light at a
future date.
12. All site work and external construction activity shall be limited to between 7:00 a.m. and 7:00 p.m.
Monday through Friday and between 8:00 a.m. and 5:00 p.m. on Saturday.
13. All existing plantings and screening depicted on the approved plans shall remain in perpetuity over
the life of the project.
7
TBI, Inc., 210 Holt Road
Site Plan Review Special Permit
October 2, 2007
12. The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation.
13. Gas, Telephone, Cable and Electric utilities shall be installed underground as specified by the
respective utility companies.
14. No open burning shall be done except as is permitted during burning season under the Fire
Department regulations.
15. No underground fuel storage shall be installed except as may be allowed by Town Regulations.
16. The provisions of this conditional approval shall apply to and be binding upon the applicant, its
employees and all successors and assigns in interest or control.
18. All snow storage is to be removed as needed to provide sufficient access throughout the site and to
ensure the proper safety of vehicles and pedestrians. Snow storage shall not result in the loss of
parking spaces except during removal operations. The Town Planner shall direct the applicant to
remove snow to an offsite location if it is determined that onsite snow storage is insufficient.
19. The Planning Board expects that the project will be built in accordance with the herein referenced
plans and specifications and in full accordance with the design elements and features displayed and
discussed during the Public Hearings. Any revisions shall be submitted to the Town Planner for
review in accordance with Section 8.3.8 of the Zoning Bylaw. If the Town Planner in his/her sole
discretion deems these revisions to be substantial as defined in Section 8.3.8, the applicant must
submit revised plans to the Planning Board for approval.
20. This Special Permit approval shall be deemed to have lapsed after October 2, 2009 (two years from
the date permit granted) unless substantial use or construction has commenced. Substantial use or
construction will be determined by a majority vote of the Planning Board.
2 1. The following information shall be deemed part of the decision:
Plan titled:
Site Plan Review 2007
Prepared for TBI, Inc.
North Andover, Massachusetts
Prepared for:
TBI, Inc.
2 10 Holt Road
North Andover, MA
Prepared by:
Brown and Caldwell
48 Leona Drive, Suite C
Middleborough, MA 02346
Scale:
I" = 40' and I" = 30'
Date:
July 2007, Various Revision Dates
Sheets:
I of 10, Revised 9/25/07;
2, 3, 4, 5 and 10 of 10, Revised 9/12/07;
6 of 10, Revised 9/14/07; and
7, 8 and 9 of 10, Revised 8/22/07
Report titled: Site Plan Review Application
TBI, Inc.
Recycling Facility and Solid Waste Transfer Station
F-*]
TBI, Inc., 210 Holt Road
Site Plan Review Special Permit
October 2, 2007
North Andover, MA
Prepared for: TBI, Inc.
2 10 Holt Road
North Andover, MA
Prepared by: Brown and Caldwell
48 Leona Drive, Suite C
Middleborough, MA O�2346
cc: Town Departments
Applicant
Engineer
Abutters
Fen
R "E", C E IV ED
r, c,7 I f, �--'
'J f
T 0 r' ' R
2001 OCT IS F1 1 G
,rn'.�j�4 01-.
4 L!
Thursday, September 25, 2003 '
Michael McGuire
Local Building Inspector
Town of North Andover
Building Department
27 Charles Street
North Andover, MA 01845
(978) 688-9545
Mike:
I am requesting the seating capacity and occupancy capacity for all holders of liquor licenses
in North Andover as listed on the (2) page report identified as TOWN OF NORTH ANDOVER,
Licensing Commission, 2003, including the following categories listed on the (2) page report:
Common Victuallers - All Alcohol, Restaurant - Wine & Malt, Club - All Alcohol, and Special
(Section 14) Wine & Malt. I inquired at the Town Clerks Office with regards to this information
potentially being on the establishments existing liquor licenses; however, I was told that the 2003
licenses do not provide that information but that the 2004 renewals will call for the information to
be listed on the license. When the information is gathered together if you would call me at (508)
726-1287 1 will swig by your office to pick it up.
210 Holt Road
North Andover, MA 01845
Phone (508) 726-1287
Fax (978) 686-3086
E rur' E � W
SEP 2 5 2003
P K.
BUILDING DEP
TO
DATE
6/. ;ks-
TIME 4y- AM
/0 PM
P-
-T—ROMT
PHONE
H
CELL
OF
7T
FAX
zgg
A
c52 c jl"q -A- 6 P, ke, 6L
v
E
W
po CL C(
E-MAILADDRESS Y-1
SIGNED(
PHONEDE
CALL o
I BACK
RETURNED o
CALL
WANTS TOP
SEE YOU
I WILL CALL [i
AGAIN
WAS IN F7]URGENT
I
Restaurant Establishment
Seating Capacity
Orzo Caf6 Trattoria
1077 Osgood Street
10(o
Culpeppers
815
V G
Turnpike Street
Beijing Restaurant
1250 Osgood St
Bertucci's Restaurant
435 Andover Street
Joe Fish
1120
Osgood Street
Camelot Building Association
505 Sutton Street
b c De r., Le) N
China Blossom
010C P(4 rear,
946 Osgood Street
Jasmine Inc
733 Turnpike Street
f-7
The Loft Restaurant
1140 Osgood Street
99 Restaurant
IBC)
267 Chickering Road
Mango Grille
585 Chickering Road
North Andover Restaurant
39-41 Main Street
Restaurant Zola
57 Water Street
Bollywood Grill
350 Winthrop Ave
Top of the Scales Restaurant
4 Johnson Street
Fuddruckers, Inc
..550 Turnpike Street
VFW Club 2104
ko LV 4 t- h I
Park Street
opper 14A', �00
North Andover Country Club
500 Great Pond Road
Edgewood Retirement Home
.575 Osgood Street
Merrimack College Campus Center
Gildea Hall
Falculty Dinning Room
Francis Hchnes
127 Middlesex Street
John Enright
7 Johnson Street
:0�1
A
TOWN OF NORTH ANDOVER
Licensing Commission
2003
Common Victuallers - All Alcohol - $2,200
Aglio, Inc. d/b/a/Orzo Caf6 Trattoria (M35,P27)
1077 Osgood Street
Michael A. Reppucci, Mgr.
686-6921
TRJ Line Inc.d.b.a. Culpeppers (M98D, P44)
815 Turnpike Street
Thomas Rossi, President
794-1100
Beijing Restaurant, Inc. (M35, P10)
1250 Osgood Street
David Yue, Mgr/
689-3000
Bertucci's Restaurant Corp. d/b/a Bertucci's Brick Oven Pizzeria (M24, P32)
435 Andover Street
Paul Hoagland, Manager
685-4498
The Restaurant Group Inc. d/b/a Joe Fish(M35, P36)
1120 Osgood Street
James Dietz, Manager
685-3663
Approved by Lic. Committee. 7/11/94
Camelot Building Association, Inc. d/b/a Camelot (M74, P23)
505 Sutton Street
Phil Kandrut, Manager
687-9136
China Blossom, Inc. (M74, P3)
946 Osgood Street
San Joe Chu, Mgr.
682-2242
Jasmine, Inc. d/b/a Jasmine (M98D, P69)
733 Turnpike Street
Peter H. Wong, Mgr.
681-1888
North Andover Group, Inc. d/b/a/ The Loft Restaurant (M35,P53)
1140 Osgood Street
Paul V. Cassidy, Mqr.
686-0026
99 Boston, Inc. (M46, P3)
267 Chickering Road
Charles 0. Noyes, Mgr.
683-9999
Alter of premises approved 7/92 by ABCC
WJ Phelan Inc. d/b/a mango Grille (M84, P28 -4B)
585 Chickering Road
Thelma Phelan, Mgr.
License approved by BOS 4/11/94
688-5600
North Andover Restaurant, Inc. d/b/a Rolf's (M18, Pl)
39-41 Main Street
Lesley Carlson, Mqr.
687-9712
Restaurant Zola
57 Water Street
Joseph Messina, Mgr.
(978)794-8344
Bollywood Grill (M27, P27)
North Andover Mall
350 Winthrop Avenue
Malkiat Singh Gill
Top of the Scales Restaurant (M96, P24)
4 Johnson Street
Nancy E. Breen
681-8848
License approved 10/31/94 by BOS
Restaurant - Wine & Malt - $1,400
Fuddruckers, Inc.
550 Turnpike Street
James Boland, Mgr.
557-1100
Club - All Alcohol - $1,400
Club 2104, Inc. (M71, P41) Tax Exempt
Park Street
Kevin Hayes, Mgr.
687-9614
Change of Mgr. approved by ABCC on 8/16/92
North Andover Country Club, Corp. (M64,P6)
SOO Great Pond Road
Jean Bergeron, Mgr.
687-7414
Edgewood Retirement Community
57S Osgood Street
Marlene Rotering
72S-3300
Special (Section 14) Wine & Malt - $900:
Merrimack College - Campus Center (Gildea Hall, Faculty Dining Room ( Tax
Exempt) Adjourning Lounge, and Warrior's Den)
Turnpike Street
Maryellen M. Colliton, Mgr.
683-7111
Package Store - Wine & Malt and Sunday Permits - $900:
Francis A. Holmes d/b/a/ Middlesex Market (M9, P46)
127 Marblehead Street
688-7558
John Enright d/b/a General Store (M96, P22)
7 Johnson Street
John Enright
688-4116
CHECKMATE DEVELOPMENT LLC
lb=oft 2 1 0 H 0 LT ROAD N 0 RTH AN DOVER, MA 0 1 B45
Town of North Andover
Office of the Building Department
27 Charles Street
North Andover, MA 0 1845
RD E C E 9 W E
FMAR 1 1 2003
BUILDING DEPT
- _j
Applicant intends to apply for Special Permit under Sections 8.8
and 2.21.6 under the Adult Use Zone, created and approved May 6,
1996 Annual Town Meeting, Artilce22, as set forth in The Zoning
Bylaw Town Of North Andover As Amended May 2001.
978-580-9083
ent LLC
I
fl
Location
No. Date
,40R,rh TOWN OF NORTH ANDOVER
Certificate of Occupancy $
Building/Frame Permit Fee $
Foundation Permit Fee $
Other Permit Fee av
$
TOTAL
Check #
15510 Building InspOtor
TOWN OF NORTH ANDOVER'BUILDING DEPARTMENT',
APPLICATION TO CONSTRUCT REPAIR, RENOVATE, CHANGE THE USE OR OCCUPANCY OF, OR DEMOLISH ANY BUILDING. -
OTHER TIL4,N A ONE OR TWO FAMILY DWELLING
ffThis Section for Official Use Onl!
BUILDING PERMIT NUNIBER: DATE ISSUED: --p
SIGNATURE: -516
- Al
Buildi—n,& tomrnissi2!��r���Or of Buildings
1 1010.
1. 1 Property Address:
1.2 Assessors Map and Parcel Number:
z/0 t:60- i2t-J.
-
,7
Map Number
Parcel Numbe(
1.3 Zoning Information:
1.4 Property Dimensions:
Zoning District Proposed Use
i��- (st)
Frontage 00
1.6 BUHDING SETBACKS (ft)
Front Yard
Sidc Yard
Rear Yard
Required Provide
Required
Provided
red
Provided
1.7 Water Supply M.G.L.C.40. 54) 1.5. Flood Zone Information:
1.9 Sewerap Disposal Systenr.
Public 0 Private 0 Zone — Outside Flood Zone 0 Municipal On Site Disposal System 0
2.1 Owner of Record
Name (Print) Address for Service:
S, r Telephone
2-2—Authorized Agent
Name Print Address for Service:
Signature Telephone
A'N ".1.11 WWA" Sim
3.1 Licensed Construction Supervisor
Not Applicable 0
E�ki O's
C S O's Z 4+ 9
Address
License Number
Licensed Construction Summpii
t2-- /3 - oz -
'Ion I
Signq6- Telephone
3. egistered Home Improvement Contractor
Not Applicable 0
CompanyName_
Registration Number
Address
Expiration Date
Signature Telephone
ic
-4
0
r4
0
M
3:
z
0
z
M
90
0
M
G)
I, t"' as Owner/Authorized
Agent
Hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my
knowledge and belief.
Signed under the pains and penalties of peijury
V,
Print Name
4 Z
-
Signature of Owner/Agent Date
I
11 61 '' zA-K ii'h
Item Estimated Cost (Dollars) to be 0 VY.
YJE�
"I 0o
Completed by applicant
pernut NEER,
1. Building (a) Building Permit Fee
Multiplier
2 Electrical
*6DC)
(b) Estimated Total Cost of
Construction from (6)
3 Plumbing
1'q
Building Permit fee (a) x (b)
4 Mechanical (HVAC)
1A
5 Fire Protection
WA
6 Total (1+2+3+4+5)
Check Number
i�g
NO. OF STORIES SIZE
BASEMENT OR SLAB
SIZE OF FLOOR TIMBERS iST 2 ND 3 RD
SPAN
DEMENSIONS, OF SILLS
DEMENSIONS OF POSTS
DIMENSIONS OF GIRDERS
HEIGHT OF FOUNDATION THICKNESS
SIZE OF FOOTING x
MATERIAL OF CHIMNEY
IS BUILDING ON SOLID OR FELLED LAND
IS BUILDING CONNECTED TO NATURAL GAS LINE
Workers Compensation Insurance affidavit must be completed and
issuance of the building permit.
Signed affidavit Attached Yea ....... 0 No ....... 0
5 PRIOFMO , AZIM"'j,
SEM
IN
100 'M
— N�' OL
5.1 Registered Architect:
Name:
Address
Signature
with this application. Failure to provide this affidavit will result in the denial of the
Telephone
7 50 Not Applicable 0
Company Name:
c7D t:�-w OS,
Responsible in Charge of Construction
Area of Responsibility
Registration Number
Expiration Date
Name:
Address:
Signature Total
Not applicable 0
Registration Number
Expiration Date
Name:
Address
Signature Telephone
Area of Responsibility
Registration Number
Expir�tion Date
Name
Address
Signature Telephone
Area of Responsibility
Registration Number
Expiration Date
Name
Address
Signature Telephone
7 50 Not Applicable 0
Company Name:
c7D t:�-w OS,
Responsible in Charge of Construction
New Construction 0
Existing Building 0
Repair(s) 0
USE GROUP (Check as applicable)
T�ilerations(s) 0
Addition
Accessory Bldg. RK
Demolition 0
Other 0 Specify
A-2
A-5
Brief Description of Proposed Work:
Two e5l�111,
/if r7-:, io
-J
t r _3 k,
>c -Z 4
1-15
A/10 EP
-J
BUILDING AREA E)USTING (if applicable) PROPOSED
Number of Floors or Stories Include cr, ;, S01
Basement levels
Floor Area per Floor (sf) Zoe lg*c 7- al X Zet I
Total Area (sf)
Total Heip-ht (ft)
Independent Structural Engineering Structural Peer Review Required Yes 0 No [I
SECTION 10a Owner Authorization - TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR "PLIES FOR BUILDING PERMIT
1,
Owner of the subject property
Hereby authorize to act on
My behalf, in all matters relative two work authorized by this building permit application
Signature of Owner
Date
USE GROUP (Check as applicable)
CONSTRUCTION
TYPE
A Assembly
0 A -I 0
AA 0
A-2
A-5
0 A-3
0
0
]A
IB
0
0
B Business
0
2A
2B
2C
11
11
0
C Educational 0
F Factory 0 F -I 0 F-2 0
H High Hazard
0
3A
3B
0
11
1 Institutional 0 1-1 0 1-2 0 1-3 0
M Mercantile
0
4
0
R residential
0
R -I 0
R-2
0 R-3
0
5A
5B
11
0
S Storage 0 S-1 0 S-2 0
U utility
M Nfixed Use
S Special Use
0
0
0
peci
Specify:
Specify:
COMPLETE TIHS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS, ADDITIONS AND OR CHANGE IN USE
Existing Use Group:
Existing Hazard Index 780 CMR 34:
Proposed Use Group:
Proposed Hazard Index 780 CMR 34:
BUILDING AREA E)USTING (if applicable) PROPOSED
Number of Floors or Stories Include cr, ;, S01
Basement levels
Floor Area per Floor (sf) Zoe lg*c 7- al X Zet I
Total Area (sf)
Total Heip-ht (ft)
Independent Structural Engineering Structural Peer Review Required Yes 0 No [I
SECTION 10a Owner Authorization - TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR "PLIES FOR BUILDING PERMIT
1,
Owner of the subject property
Hereby authorize to act on
My behalf, in all matters relative two work authorized by this building permit application
Signature of Owner
Date
I
R;;
!R
coo
LU
ui
C.3
COD
CD
c ts
C',
o
co
tjj
E.E
0, 'ICE
cm A�
M
C a
C3
Mo
CM
u
.,:j
0
41
C/'
0
Or.
VE
ch
u
—cfj
x
0
C2
4154
0
u
C2
Cf)
co
L14
C2
—ca
ZW
cc
0
Cf) —A
!R
coo
LU
ui
C.3
COD
CD
c ts
C',
o
co
tjj
E.E
0, 'ICE
cm A�
M
C a
C3
Mo
CM
C/)
z
0
C/)
C6
Cf)
C/)
a
0
12
4.4
co
C3
E
CD
0
co
CL
0 CA
CD cm
Q
co 9=
.0 CD
E cm
CD 0 CD
L- 1�. =
CD Cc
CO
CD
Q
cc 0 CL
M: rmcc
C2 Cc
CJ —J
CL C2 CD
CO3 ts
CD
0 CL
C.3 (A
cc
'a
CA
w
0
CD
w
U)
(r
w
w
cr
w
w
U)
E
ch
cm
cc
LO2
CM
CD
10
CL. 0
pq
0
*;;
A
0
to
C.3 .0 CCD3
Z
CJ a jE CM
ca
Mom 0 -S
Do- I=
o . ma
cc
=
0 L..
0... CL
C/)
z
0
C/)
C6
Cf)
C/)
a
0
12
4.4
co
C3
E
CD
0
co
CL
0 CA
CD cm
Q
co 9=
.0 CD
E cm
CD 0 CD
L- 1�. =
CD Cc
CO
CD
Q
cc 0 CL
M: rmcc
C2 Cc
CJ —J
CL C2 CD
CO3 ts
CD
0 CL
C.3 (A
cc
'a
CA
w
0
CD
w
U)
(r
w
w
cr
w
w
U)
I
arl
CO C
'0
C3 (A
:.— C
1; C3
CL
C2;w
In
CC2
0 CL
:*-- W d
A
cm
c
C*
u
0
cn
0
F-4
u
go
09,
—C,
r.
x
0
H
PQ
0
—Cd
0
ZW
w
c
6
_hd
0
arl
CO C
'0
C3 (A
:.— C
1; C3
CL
C2;w
In
CC2
0 CL
:*-- W d
A
cm
c
C*
Cf)
z
0
C/)
P-4
cf)
Cf)
2
M
jig
51,
u
0
a)
E
0
z CL
0
CD cm
ca
CD
LA CD
E cc cc
CD 0 co
co
0. CM<
ca
0 Cc
= Cc
L-5 --j =
= 0 CD
ca z ts
CD
0
ca
CL
CA
is
w
0
CD
w
w
w
cr
w
w
C/)
CA
cm
CA
0
Cc
Cc
cis
E
CD 0
cm
CLcm3
co
C2
:10
CD
S
CCI
LO2
cm3 .
0
co
=(D
CL4
a S
N
CD
CO)
!!�
5
Z 4.3 =
=
E.
N
A -M c=G
C,
Im-
cc
cop)
CL.=
= *- ,;,—
.0 CA
z
cm
LLJ
C3
b-
0
CM
C3 CD
CL
CO
0
cc
CD L-= am
ZZ CL .0 -
Cf)
z
0
C/)
P-4
cf)
Cf)
2
M
jig
51,
u
0
a)
E
0
z CL
0
CD cm
ca
CD
LA CD
E cc cc
CD 0 co
co
0. CM<
ca
0 Cc
= Cc
L-5 --j =
= 0 CD
ca z ts
CD
0
ca
CL
CA
is
w
0
CD
w
w
w
cr
w
w
C/)
FORM U - LOT RELEASE FORM
INSTRUCTIONS: This form is used to verify that all necessary approvals/permits fro . m
Boards and Departments having jurisdiction have been obtained. This does not relieve
the applicant and/or landowner from compliance with any applicable or requirements.
"""APPLICANT FILLS OUT THIS SECTION*********************** ---I
APPLICANT -7— FOr-d 60, J�qc',,
LOCATION: Assessor's Map Number
SUBDIVIS
S T R E E T ",? I V, I -JO t -1 -
RECOMMENDATIONS OF TOWN AGENTS:
CONSERVATION ADMINISTRATOR DATE APPROVED
DATE REJECTED—
COMMENTS
TOWN PLANNER DATE APPROVED
DATE REJECTED—
COMMENTS
FOOD INSPECTOR -HEALTH DATE APPROVED
DATE REJECTED -
SEPTIC INSPECTOR -HEALTH DATE APPROVED
DATE REJECTED -
COMMENTS
PUBLIC WORKS - SEWER/WATER CONNECTIONS
DRIVEWAY PERMIT
FIRE DEPARTMENT
RECEIVED BY BUILDING INSPECTO
Revised 9\97 im
PHONE -17B 3 S Z
PARCELO
LOT (S) ell
ST.NUMBER
USE
TE_
0
11
BOARD OF BUILDING REGULA71ONS
License: CONSTRUCTION SUPERVISOR
Number CS 052449
Birthdat�: 12/13/1956
5581
Expires: 12/13r2002 Tr. no:
Restricted To, 00
JOHN L ENOS
2 LANS DOWNE CT -
LYNNFIELD, MA 01940
Administrator
Name:
2,10
The Commonwealth of Massachusetts
Depallment of Industrial Accidents
Office of Investigations
Boston, Mass. 02111
Workers' Compensation Insurance Affildavit
Please Print
Ci1y —Phone --J'7a
= -am a homeowner performing all work myself.
=1 am a sole proprietor and have no one working in any capacity
am an employer providing workers' compensation for my employees working on this job.
g-,Qmmny name: rid 4�)
Address
I
1 /65
Com
pM name:
Address
city, Phone
Fadlure, to secure coverage as requh-ed under Section 25A or A4GL 162 can lead to the MVWWon of aMnal Penalfles.of a fine up to $1 sM.00
andlor one years! imprisonment as -well as civil penalties in the form of a STOP WORK ORDER and 3 fine Of ($10D-00) a day against M'e. I
understand that a copy of this statement maY be fOwarded to the Offlca of Investigations d the DIA for coverage verNication.
I do herby ceft under the pains and peno�es of perjury that the infonnatAm pm4cbd above is &ue and coffect
Slanature,W,,'M_
Print
Official use only do not write in this area to be completed by city or town official'
EIGheck YiMmediate response is requ#ed Building Dept
Contact person: Phone
RM WORKMAN'S COMPENSATION
WAMM
# �278 � aZ
El
Building Dept '_
•
Licensing Board
•
Selectman's Offic&
0
Health Department
0
Offier
Zoning Bylaw Review Form
Town Of North Andover Building Department
%
27 Charles St. North Andover, MA. 01845
C
Phone 978498-954-5 Fax 916-688".6542
Map/Lot:
Applicant: 40!
Request: el-. A 1;
Date:
Please be -advised that after r
eview of your Application,.And Plans, that your Application is
*-'DENIED for the folloWiAg'Zibininig' 13yIaW".edaso6s-:'1
Zonina =- --3 -, , 4,
,ceme y for the at
Item # S
pecial Pei
IL Site Plan Re,
�ccess other
Frontaqe Ex(
Common Dri
Congregate I
--E-o—nfinuing C
Independent
Lar e Estate
Planned Dev
Planned Res
R-6 Density
Wa—tershed S
is checked below.
STU�ni�h§ Boar�d
ft :)ecipf Permit
r6 �
nta e S �eciai Pe�rmit
on Lot Special Permit
ay Special Permit
i,ing Special Perm -it
�etirement �Spedial Permit
Special Permit
Permit
Item # Variance
,7 back, Varian
ce
Parking Variance.
Lot Area Variance
Height Variance
Variance for Sign
Special Permits Zoning Board
a[ Permit Non -Conforming UserZBA
Earth Removal S2ecial Permit ZBA
Special Permit Use not Listed but Similar
Special Permit for Sign
g_q -Special yermit fef-pmeoig"
The above review and attached explanation of such is based on the plans and information submitted. No definitive review and
or advice shall be based on verbal "explanations by the applicant nor shall such Verbal explanations by the applicant serve to
Provide definitive answers to the above reasons for Any inaccuracies, misleading information, or other subsequent
changes to the information submitted by the applicant shall be grounds for this review to be voided at the discretion of the
Building Department. The attached document titled "Plan ReviewNarrative" shall be attached hereto and incorporated herein
by reference. The building department will retain all plans, and documentation fo . r the above file. YOU must file a new permit
application form and begin the permitting Process.
-10-03
nff
Auildiingo Deppartrnent Offibial Signat
n.nt ----
Application Received Application Denied
Item Notes
Item
Notes
A
Lot Area
--
F
Frontage
I
Lot area InsuffiJ Ti e-
6T7
2
Lot Area P�eekistlng
2
Frontage !�§�rppries���
Cie 15
-3,
J-ot,Area Co ropties
PreeXistingfron ge�
4
Insufficient Inform Ition
4
Insufficient Information
B:,,
-�Use
access ovef Frontage
1
Allowed
G
Contiguous Buil ing Area
2
Not Allowed
1
Insufficient Area
3
Use-Rreexistin
2"
---------------
4-C&n6li
. -es
4
Special Permit Required
-
Preexisting CBA
IS,
Insufficient, l.nf0rmatidh'
4
.
ffins`uft0e�t Iniormati—on
C
Setback
� - , - 12. 1
--
H,-.,
B4!I.ding Height
I
Ali setbacks comp)
C4 e 5
1
Heigiht Exceeds,Maximum
_L��
Front ffisufficiprit ., �,
.
I
3
Left Side Insuffici , eht
3
�Preexisting Height
L J
4� Right Side Msuffi6ikt,�
7� %h qA%
"InsUfficidint lnform�t�io—n-
5
Rear Insufficient,
-.3
144,40ing Coverjage.
-C.
777 - .
7 'Preexisting setback(sy-
Lf
Covera . ge exceeds ma' ximu—m
j
-Iq§ufficieptInformation
--,Goverag6 Comolii6s
D
Watershed 7
3
Co , verage Preexisting
I,-
Not in Watershed,"." -
4
ln�6fficient Information
2
In Watershed
j
Sign.,,,
3
Lot
prior to, 0/24/04
1
Sicin not allo—
wed
.4
Zpne'to be Determined
. I
S'*"- Mplies,
. , ign Co
5
insufficient Information
''..,Historic
3
Insufficient Information
`E
Diswlcf� -�t
K Parkin'
9
1,
In District review required..
More Pqrking�, . �equired�
in district
--i---P-a-r-k"ing
Complies
j
Insufficientinformation
3
Insuffid , ent,informati6n
4
Pre-existina Parking
,ceme y for the at
Item # S
pecial Pei
IL Site Plan Re,
�ccess other
Frontaqe Ex(
Common Dri
Congregate I
--E-o—nfinuing C
Independent
Lar e Estate
Planned Dev
Planned Res
R-6 Density
Wa—tershed S
is checked below.
STU�ni�h§ Boar�d
ft :)ecipf Permit
r6 �
nta e S �eciai Pe�rmit
on Lot Special Permit
ay Special Permit
i,ing Special Perm -it
�etirement �Spedial Permit
Special Permit
Permit
Item # Variance
,7 back, Varian
ce
Parking Variance.
Lot Area Variance
Height Variance
Variance for Sign
Special Permits Zoning Board
a[ Permit Non -Conforming UserZBA
Earth Removal S2ecial Permit ZBA
Special Permit Use not Listed but Similar
Special Permit for Sign
g_q -Special yermit fef-pmeoig"
The above review and attached explanation of such is based on the plans and information submitted. No definitive review and
or advice shall be based on verbal "explanations by the applicant nor shall such Verbal explanations by the applicant serve to
Provide definitive answers to the above reasons for Any inaccuracies, misleading information, or other subsequent
changes to the information submitted by the applicant shall be grounds for this review to be voided at the discretion of the
Building Department. The attached document titled "Plan ReviewNarrative" shall be attached hereto and incorporated herein
by reference. The building department will retain all plans, and documentation fo . r the above file. YOU must file a new permit
application form and begin the permitting Process.
-10-03
nff
Auildiingo Deppartrnent Offibial Signat
n.nt ----
Application Received Application Denied
Plan Review Narrative
The following narrative is provided to further explalin. the reasons for DENIAL fort I he
APPLICATION for the property indicated on the reve'r�e side:
"MR: 11 % . . . . . . . . . . a, I L ..... .. .... 2'';
ReferTed To:
Fire
Police
Conservati&n--
Y Planning
—it —he T.-
Ae,
,eel
--±- . �tper
0 IAV
C? 4,
5� _8&7)
Nil
gf
-MIN-
4LL�f -0(
t AP -at,
0/9 C 3
Ao,
L
1,A d&-C'A-,0,P 'INV lee,
e Cle-
5 3
I El -1
A4�
A
e,�
C11 r- at
44 N,7,_
r
Health
—%6 zonih-a Board
De artment of Public Works
Historical Co
Building Departmem
-------------
One` hundre& and fifty,Cl'50) feet
1. The minimum frontage dr:a',-strePt.�shallS&
',cur icuts*(m6asure at
The d. th6'stre6t� ot line or
shall Wthift M)V-'6f--,bdffi8f9-rftihyJ e inte Aedby, entran 'es or 6xits
`�-`rrup' normal�
c
and shall noVbe requited�With't6n,(�'-10)'fe"et,bf*"a, stf6et, lot ine-
r4v;
8.3 Plan Wvie*'(--v�
1. Purpow - J;
a) The purpose of this s ' ecti6n igl or:i protect the,health, safety,: convenience and
general twelfard� of 1 the' iihh�bitant§ of the Town -.by providing for a review of
j ;.. 'r 1', i 1, Y I "; i ifficani,'imp'
"Which,4hayj ave signi 1
-'plans: for uses -and Vl' '�I structurd§,,� h acts, both within
the'site* and �in;'kelati -on' to. -J1,11- ja jacen.j]�rop6itieg.'i�hd::I�treets';f-ton� pedestrian and
vehicular traffic �This revfeW�' Considers' -'�the impact I,on,): public, services and
infrastructure; environm6ntal,�' 'niq'ue-andi
hist6ric� Tesburces;! abutting properties;
and community character and ambiance.
if-,x,-m-bq(A -;-Aw i;,z,�r�,;,
At! ;�!)i j
I-) b Thi _BYj`: 'is 4�
s �sectibd bf the Z6nihgl aw. dopted p6r* suant,tol Chapter. 40A, Section 9.
All Site �Plan'Review'appli�.��ii'ohs!subnutted Wider"the provisions of this section
shall be reviewed by the Planning Board as a Special Permit.
V (J I p t
c): Sites and :developments'.�.'to I -W -M
6h-! on
i lihis lecti ; �,applies�i�shdllk omp
ly� with the
;regulation§ A L�I>"bfthis' s e6c'tibn'�,8 other:;hpph`cAble,JT own Bylaws, or the,
requirem&nts: of-,,"; ',the' Coinm&rw d alIthI-'dffMdssa'ch`6settg�, prior' �to'anycbnstruction being
undertaken in the Town" of North Andover.
f r , ::. 'I
ju "111"I tl;� UO��, I "�k 1
'Ai
fe—WAI j;
a) Site Plan is required w'h6h:
fwhic'h'
i) Any -new ibuildin�O orconstruction
contains, more -than two
thousand)(2,,000)'r t
Wq are etbfgrosst. dor area which: islundertak'
en
o
on land �.Witfiin T64'n- : f Noilh� Andover
quirernerit ff-five,(5) 7®r -mon- Pat
10 5
CL
-iich, results, in the additioniof more than two
Any cons truction.,,,w)
(2,000) square feet of gross, floor, area to an existing
thousand
structure; or results in the requirement of five (5) or more new or
additional arking spaces;
p
--s i roverne ts,�ndw..usesl-,ine.
iii) -n. Any,,construction,,
n �isting,,,,structures
,..which �: :contain�;, n ew s not normally
or AeYelpprp�ptsi
-the existiniz use and which result in changes in the
associated wift
potential nuisance to adjacent property; traffic circulation; storm
water drainage; onto or off of the site; and/or the,application of the
parking standards,,of Section 8.1 indicate the need for five (5) or more
new or,additional,parking spaces.
iv) The constructiory-of any, new.Wireless service facility on a previously
pem-litted,: facility-, i as set fourth, in. Section 8.9(3)(a)(ii) Wireless
Service Facilities Use Regulations (1998/38).
0
b) The following developipprit(s),.ge exempt from Site Plan Review::.,,
ily dwelling(s),jaAd two family. dwelling(s);.,
i), Single fam
iiy Small, structures:,or, �adoitions which do, not. exceed. two thousand (2,000)
square feet of gross floor, area and do not require five (5) or more parking
.,,:Spaces.
1 y tj
f _"5 �;J
Routine, repairs apd,Maipt�pance�.that do not. exceed the, provisions of Section
8.31
c) Waiver of Site Plan Review.
i) When in the opinion of the Planning B oard, the alteration.or, reconstruction
of an existing., structure ,or new use, or change in..use.will not have a
significant impact.,both within the, site injelatiqn, to adjacent proper -ties
and streets; on, pedestrian i and,, vehicular, traffiic;�f public services and
infrastructure; environmental, unique and historic resources; abutting
properties; and,! community, ppeds,,: the Planning Boar,&, ma determine,
V
�thg,�subniission of a site plan reyiew,application is
Without a pub�cbearipg,),
not required.
ii) The applicant must request a waiver from Site,Plan Review;in writing and
may be required to submit supporting documentation that Site Plan Review is
106
40
a) Any protection�"a'�g"ains'tzc$nlftg.chahg6�'�ioNiided�by' M.G.L�c. 40A, s.6,
shall be extended'to the earliest date on which the final unit in the
deve opmen coul& b'd"difth6iiie'di iftid6kthisibylaw.,
j VO. 'V W��A 14,
0
8. SEVERABILITY
a) isldiis"-'ofl,thisby-�l'a'w;"'a'r.e",her'e�ly"d�e'c'lared-'severable�and if any
hdll,b6h&ld ffiV I 6i h I
provision s �ffld' fti&6 stitutiona ; it shall not be construed
A&dffect the validif�'O"r'cbnstittitioi�dlity,,of'�hy of the remaining provisions
of this by'ldw.. �z) "I(I I�A;t i 11 11 ,J
(Section 8.7 created and approved A n nu: ad f town Meeting, May 6, 1996)
1.! rY --3 W I I Jinl
elg
�V o
IL
r f
Section 8.8,Adult Me Zone'
e s 't6bii fied','"
-Th6`Adult'Us&'Z6n—' i ';fieii6ft�f 9 as Odkl#'disth -'and shall be!superimposed on
the otlier'distiict§.,'6�tablisheld-,b"yr,,-itWg;--B�l,aWI r- eirequirem.ents enumerated for this Adult
,x I
lhanlilifi pl,
U's 6, ' Z6ne ,slial'i b to I
e in�,I�dditil6fi I -,-'fAthdf- ac&-ofi4thalrdquirements of the other
may"be"�all-
districts. 'Adult uses" owed'bY'-'t-S"pe't'i�d'Pomut-'in:fhle�Ad'Lilt Use -Zone, as described
H6� dd dfr "I ihe'Town.
below.' Adu'it �u'ses "s'lial prohibit bther, ocation in
t) 3 (�I ai i� �� I f 1'.) il
The following regulation shall apply to Adult Uses as defined in Section 2 of this Bylaw.
10
X
s-'6NhellAdult �Usd'Zofie` are shown Ion -i the: Zoning Map and
1. �B ound a�n;- e's: Boundafie
-shall"in6lude, the followin4�'gip�ar.cels'6s'identifi6d on the'1995'Asses'sor's Map: Map
- arcels 27 and Md
"(!-34P'
I
.,-Map 34 Parcel 27
oil
:!'i'Northerly'25 )-4:/-I",.by;HoltRbad
Easte;rly'340`-+A-'bY Lot 2:
Southerly 240' +/- by City of Lawrence -Airport
j
I,", �W6§t6kiy,-330!t" Ou;, i i c
Ali
L--Ma*p"77 Parcel 13, fTOI,
-�YH61t Rbdd;.
Northerly' 00, +/1
E as '370' yUt4T,,!��
terly +/-, �
Southerly 130' +/- by Parcel 3
Westerly 400' +/- by Clark'S66e"'f',',,`
13 1-.
Map 77 Parcel 14
It go 41
10 1) �T ii:.A, Northerly,245!t -�+Tj by Ho
Emterly.330'. + - by Lot 3-
Southerl� 250"'+/- ��Y Parcel 3
'by
r7ii
:r; M 'Nesterl '370'[j+/, -
RIX
Map 77 Parcel 3
orth y,,410)wFh--,by,Lots3- 4* and. 7
e4y 7, -f�-
�/!Y7d�, r,Easterly2�01, +!,-, by� Q-ty.."Of Ldwr.ence.Airpprt.Q
S.outhul .465, _by,
qityQf Lawrence AilpomComm,
Westerly.460' +/-,by Clarkl,SqQet; r-, i
-�Map-77 Parcel, 12,(3,,sided4
v d
%, . 4K 41.
Northerly 4 10" +/:-by Parcel 17
C
Easterlyi2,01+/�, by,,, lark Street, f.;i
Law
ty
S , i Qf rport'C .;,-and,
outherly,,,28�',+ by C
-J. io �d i t,
-Map.77.Parcel 17., -LI) ;1,1,
Northerly 120' by City of Lawrence Airport C9mm.:t
by Clark Street
Easterly 210" +/
Southerly, 4,101 �by,parcel 12c
'by -ity, ILawre-ijcq;Ai
Westerlyj5,901 *\7 C- of,
r
pqr(
k", A) '0 1
2. Separation Distances: Adult uses may not be located: .
VIA 0-11-
a) within five hundred feet (500') of the propqrty-line: of an' R sidential Zoning
y -P
Distri school, park, or playfield.
cts, church'.
�0- 4.1 ti t n i
b) within five hundred feet (500') of other adult use as defined herein;
C) within three hundred feet (300') of any establishment licensed under MGL
Ch..438, Sec.,'12v
iiththe; exception i ofi an-� adult cabaret or an adult
3. Maximum Usable Floor�,,Area;J.W
motion picture theater- -adult' uses may not exceed three thousand five hundred
(3;500) square feet'ofus6ablefflobr.'ar0a.,. 1
4. Parking Requirements: The following parking requirements shall apply:
132
a)
b)
C)
Parking shall be provided..in the'side or front yard only.
All parking areas shall,',,.�d'���'illu:'nun'ated,"�and altlighting shall be contained on
"V�J
the property.
J
f' th the appropriate
Parking 'are* shall be.�'Ia'n&c'a pe'd'Afi; �con ormance wi
provisions of the zoning by-law.
Screening and bufferin At a,-,'mimmum,-.IIa1,-five (5)1 foot wide'la6dscaped buffer shall be
provided along the,-S'1dd-,and4ieari-prope ,lines' of an adult use�'estdblishment consist�ig of
n height?' th' time of planting, or a
evergreen shrubs oi.ir6es:i'iio-t'lo'gs,�.'thai�I �Five;(5)/f6evii :at e
'i
solid fence not less than six (6) feet in-161ght-.�
5. All building openings, entries and windows shall be screened in- such �a, manher: as to -
prevent visual access to the interior of the establishment by the public..
6. No adult use shall be allowe&'C6';diSIplayJf6r adV6rtisemeht or other purpose any
signs,-, td the 'g'6fieral public' on the exterior of the
building or on the interior wher(�the same may be seen through glass or other like
transparent material any sexually explicit figures or words as defined in M.G.L.� Sec.
�J 10 V V d Lr�!) I
31 Ch.�272.,�_)
7. Application 'information: Th6 i �ppli6ati6n`% for a special,:p�rmit for an adult use
"Ustifi6lude.the�.,f6liowiiikinf6rrhaif6n--�,,iz Vf'
establishmerit'm n
a), Name and addres S of th�Ie al owner of the establishment, and of the legal
9
owner of the property;
",:-b) Name and address of all persons having lawful equity or security interests in
the establishmen M-1 Io
-uy
r10
Name and address'of the" m anager;
Number of employees;
Proposed provisiohs for security within and without"the7establishment;
'I'The 'physical layqftbf
.j 'theIfit6rio'ri6f the establishinent.e
8. Special Permit Granting Authori :iiThe:.26ning.-Bo�rdtof Appeals-i'shall be the
Special Permit Granting Authority.
133
9. No adult use special permit shall be issued to any person convicted of violating the
provisions of MGL Ch. 119, Sec.�63, or MGL Ch. 272, Sec. 28.
i -perrnit,s all onlybe issued following a,publiQ hearing held
An. adult,: use,.spec al q
within sixty-five (65) days after the filing.ofan application 'with the special perrait
granting authority, a copy of which shall forthwith be given to the Town Clerk by the
applicant.,
11. Special permits for adult uses shall be granted only upon the determination by the
Special Permit.Oranting;_Authority� that, the'location. and design of the- facility are in
harmony with its surroundings, and that adequate safeguards.exist through licensing
or other means to assure on a continuing basis that activities therein will not be
patently: contrary.,to Prevailing %standards of, adults.,in the community, and will not
involve n-iinors in any, way. -
12. Any section of this by-law, or portion thereof, declared invalid shall not affect the
validity or application of the remainder of the by�law,':
(Section 8.8 created and approved May 6,1996Annual Town Meeting, Article 22)_
Section 8.9 Wireless Service Facilities
1) Purpose
a) It is the express purpose of this Bylaw to minimize the visual and environmental
impacts as well as'any potential'deleten- 6�s impact on" property -value; ofwireless
service facilities upon properties located within the Town or adjacent thereto. No
wireless service facility"shall be'placed,i'constructed or 'Modified withine the Town
without �:first- obt�ining',�site.�:plan,appro'vaI from the Special Permit Granting
Authority (SPGA). The Planning Board shall be' the Special, Permit Granting
Authority for the issuance of a special permit to allow the placement, construction
and modification, of wireless -service; facilities within the bwn. This. bylaw is
intended to- be used in:conjunction1with other regulations adopted by the Town,
and other zoning and general bylaws designed to encourage appropriate land use,
environmental protection, preservation of North �Andover's rural character and the
provision of adequate irifrastructure'development in North Andover.
b)
The regulation of wireless service facilities is consistent with the purpose of the
North Andover Zoning B a - � d'�'l i � fforfs authe'lo'dal government level to
yl w -an p anning 6
further the conservation and preservation of developed, natural and undeveloped
areas, wildlife, flora and habitats for'endangered �species�; protection of Ahe natural
resources of North Andover, enhancement of open � space areas and respect for
North Andover's rural,character.
134
MASSACHUSETTS UNIFORM APPLICATION FOR PERMIT TO DO PLUMBING
(Type or print)
NORTH ANDOVER, MASSACHUSETTS
Building Location Date
,�21 0 4/0 121-161, Owner's Name L 7
Permit
Ole -
Type of Occupancy 4�� Amount
New Renovation rl Replacement Plans Submitted'yes No
FIXTUPUES
bate.
TOWN OF NORTH ANDOVER
0
PERMIT FOR PLUMBING
SACHUS
This certifies that
has permission to erform ........
p ..........
plumbing in the buildingsof .... .
at
...... ...... North Andove Mass.
Foe�j- c. No'???�'119�
UM TOR
Check# PL�
7774
By:
Ul I-AUCHNUCI rJumber—
:1eck one: Certificate
r-1 Corp.
Partner.
C 0.
;e box:
Bond F1
)lication does not, have any one of the above
nt 11
�c application are true and accurate to the
t Issued for this application will be in
I
,hapter 142 of the General Laws.
1 Title of Plumbing License
City/Town 4 -9 !2
1NUMDeY - MastpT El Journeyman
FPROVE5 (oFFicE USE ONLY 0--�
HARRY F. DiZOGLIO, P.E.
Consulting Engineer
P.O. Box 19381
JOHNSTON, RHODE ISLAND 02919
(401) 934-2055
TO SALTONSTALL ARCI1ITECTS---.
380 Wareham Street
Marion, MA. 02738
THE FOLLOWING WAS NOTED: . FIELD REPORT #9
DATE
JOB NO.
September 10, 2008
SA 07-16
PROJECT
TEI, Inc.- Recycle Center & Transfer Station
LOCATiON
Holt Road No. Andover, MA. 01845
-E-VAC VOR
ONT
OWNER
Owner
Thomson Bros Industries
WEATHER
TEMP. Oat AM
Par�, Cloudy, Cool
72 -at 11:45 40
PRESENT AT SIT E
Site Contractor - JJ Paonessa Co.
Bill Thomson, TBI Will Saltonstall, SA
H. DiZoglio, Engineer C.Jay Wilbur, SA
> The metal building syste . in erection is progressing; the metal roof parlels are completely installed; the metal siding
panels are being installed along the south side of the building; the rake trim has been started on the east endwall; the
crew chief expects the building erection to be completed within another week. The overhead door installations are
still in progress on the building's south side. At the east end lower truck scale bay, the concrete slab for the scale
platform has been placed. Bill Thomson related that he has changed the planned location of the 1,000 gal. holding
tank from above the truck scale bay to an exterior location to be determined around the east side of the building.
The'ise�ptic tank and j6bSjjrf�c-�'e'rsewage dispogal'sy�te-m'hds.been installed in the vicinity of the north east comer of
the build ing-hpejr the' -sit6 plan's,iwaiting'fiiial insoectioK and darth- cover.- , The bag house equipment has been installed
on a concrete pad'at the exterior north 1,�,est c6mef-6f thCbuilding.- The rough grading has been completed on the
north side of the building; the rough grading ea the south side of the building is in progress today. At the interior of
the building, the concrete floor slab at the west section for the tipping room has been placed and cured; the three
approach slabs at the south west adjacent to the o.h. doors have been fi)rmed and placed also. The two interior bin
> concrete walls at the wood & fines bins are complete to the 25 ft. height; R.A. Murdoch is forming the 16" wide bin
end wall above the concrete wall adjacent to line 12 for a concrete pour in the next day or so. The 1/4" steel plate
facing at the lower portion of the push walls has been completed. The W10x22 steel floor beams for the employees'
mezzanine are being fabricated at the site and'erected at the top of the lower concrete walls; the metal deck is
expected to be delivered tomorrow together with the perimeter pour stop metal. The carpenter is continuing work at
the sorting room above the bihs; plywood is beivg'applied to both sides of the steel stud walls; the light gage metal
ceiling joists ire being installed with the center support interior steel bearn. CBI, Incs is continuing tofurrish and
install the various items of 6q6ipment. � On the west area of the site, work is progressing at theiscale house and
adjacent scale pits; rough plumbing & electrical at the scale house and scale platform framing at the scale pits.
Gerald A. Brown, Inspector of Buildings
COPIES TO 1-9' J UAILIM MZE)GR&
Bill Thomson, TBI File: SAT CA.FR9
SIGNED—§--X-�7�
a C.Z
HARRY F. DiZOGLIO, P.E.
Consulting Engineer
P.O. Box 19381
JOHNSTON, RHODE ISLAND 02919
(401) 934-2055
TO SALTONSTALL ARCHITECTS
380 Wareham Street
Marion, MA. 02738
THE FOLLOWING WAS NOTED: . FIELD REPORT # 12
DATE
December 11, 20087
SA 07-16
PROJECT
TBI, Inc.- Recycle Center & Transfer Station
LOCATION
Holt Road No. Andover, MA. 01845
CONTRACTOR
Owner
OWNER
Thomson Bros Industries
WEATHER
Overcast, Rain
TEIVIR Oat 12:00 AK
34 -at PM
PRESFNI AT SITE
Bil,,'Thomson, TBI
11. DiZoglio, Engineer
> This Engineer visited the No. Andover Building Dept. office at 1600 Osgood St. to inquire about the form for
submitting the Engineer's & Architect's final certification; directed to prepare and submit the appropriate statement
on own letterhead. I was handed two forms: "Determination of Final Cost" and "Application for Certificate of
Occupancy" - both the forms were given to Bill Thomson for his completion & submission as the Owner/Contractor.
The large air handling unit, AHU#2, has been installed suspended from the MBS roof structure above the east side of
the sorting room; the Reznor unit.is hung at F, points, with -1/2" threaded rod; two additional roof Z -purlins were
r r-,
erected.between two of the normal positioned pi irlins io� carry the addifionaf�fflt'16ading.
The upper pushwall extensions above the concrete at the -side and end of the Tippinj flob'r have been completed with
the steel stud �aming and plyw�od sheathing. The ere'ction"of the steel stair from ground to mezzanine level has
been in progress and is just being completed with the stair treads being field welded to the stringers; two new 411x 4ff
steel posts support the intermediate landing; wall string is a C8 channel and outside string is an MC12 channel; stair
width is 48 " with open risers (T) and steel bar grate treads (I I"); wall hand rail and outer handrail have been placed.
> This steel stair connects to the steel ba:r grate walkway; reviewed with the steel worker the requirement to connect
and fasten the outside MCI 2 stringer to the tl�)or slab with a clip angle; the C8 wall string is fastened to the concrete
wall. The fire sprinkler piping has been completely installed suspended from the MBS roof structure as scheduled.
The metal doors have been installed on the Sprinkler room, Electric room and Hydraulic room. Interior finish work
will be continuing at the mezzanine level employee's rooms. At the Hydraulic room, one of the large 250 hp motors
has been removed for replacement, as the unit was determined to be electrically defective. CBI, Inc. has been
continuing to check out all of their installed equipment for eventual startup. A fabric canopy, wall attached, has been
installed above the exterior concrete stairway f�r protection. The 1,000 'gal. Holdi ng Tank is installed on the
exterior, adjacent to the conc. foundation wall at line 13 beiween D'& E, and south of the leaching INM trenches.
Gerald A. Brown, Inspector of Buildings
" j
COPIES TO jg -
Bill Thomson, 1:131 F iI67SATBT8 CX.F rZ_
SIGNED_
0
Location Date
No.
.141,
TOTAL
TOWN OF NORTH ANDOVER
Certificate of occupancy $
BuildipglFrame Permit Fee $
Foundation Permit Fee $
other Permit Fee $
Sewer Connection Fee $
Water Connection Fee $
1292'-Ar/"/98 11:17
Building inspector 411
65-00 PAID Div. Public Works //
d\l g
ILL,
5P 4 4
<
-w I
d
z
9
V,
<
LU
Z
Z. LLJ
LLI
u
rz,
rl&
z
LU
z
vzz�
LU
z
u
1z"
<
W
,j
c .5
<
t
z
z
qZ
Lall
WZ
4
z
z
�jj
�w
z
Z
<
C
0
<
z
LL)
z
LL,
z
z
z
<
z
<
z
V,
z
zf)
u
z
u
V)
rt -
Ln
�n
z
u
z
z
z
z
zz'Zt
z
ILA
<
LL,
L:
d\l g
ILL,
5P 4 4
<
-w I
d
z
9
V,
<
LU
Z
Z. LLJ
LLI
u
rz,
rl&
z
LU
z
vzz�
LU
u
1z"
<
W
,j
c .5
<
t
z
z
qZ
Lall
WZ
�jj
�w
z
<
z
LL,
<
z
<
z
V,
z
u
z
z
<
LL,
d\l g
ILL,
5P 4 4
<
-w I
d
z
9
V,
<
LU
Z
Z. LLJ
LLI
u
rz,
rl&
LU
z
PROJECT NUMBER:.
[:: �RO J E C T T I T —LE: -
PROJECT LOCA
NAME OF BUILDING: 411le
NATURE OF PROJECT: e -C,21
OFFICE OF BUILDING INSPECTOR
TOWN OF NORTH ANDOVER
CONSTRUCTION CONTROL
Olt X
r -T A
("V4_7(c- 0 �rtop_ E�W,0&)
IN A�C�OJDANCE W5H AXTICLE 1� OF THr MASSACHUSETTS STATE BUILDING CODE,
I
REGISTRATION NO. -38SSS'
BEING A REGISTERED PROFESSIONAL ENGINEERIARCHITECH HEREBY CERTIFY THAT I
HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS,
COMPUTATIONS AND SPECIFICATIONS CONCERNING:
ENTIRE PROJECT A ARCHITECTURAL 11 STRUCT*URAL 1:1 MECHANICAL El
FIRE PROTECTION 0 ELECTRICAL 0 OTHER (SPECIFY)
FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEGE, SUCH PLANS,
COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISION OF THE MASSACHUSETTS
STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRATICES.
AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY.
I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE
PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT
THE WORK IS PROCEEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING
PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0
1. Review, for conformance to the design concept, shop drawings, samples and other submittals
which are submitted by the contractor in accordance with the requirements of the construction
documents.
2. Review and approval of the quality control procedures for all code -required controlled materials.
3. Be present at intervals appropriate to the stage of construction to become, generally familiar
with, the progress and quality of the work and to determine, in general, if the work is being
performed in a manner consistent with the construction documents.
PURSUANT TO SECTION 116.2.2 1 SHALL SUBMIT WEEKLY, A PROGRESS REPORT
TOGETHER WITH PERTINENT COMMENTS TO THE NORTH ANDOVER BUILDING INSPECTOR.
UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE
SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANCY.
SIGNATURE
SUBSCRIBED AND SWORN TO BEFORE ME THIS led DAYOFJL,:L��-190�-
NOTARY PUBLIC MY COMMISSION EXPIRES 3 - 6 0
FORM U - LOT RELEASE FORM
INSTRUCTIONS: This form is used to verify that all necessary approvals/permits from
Boards and Departments having jurisdiction have been obtained. This does not relieve
the applicant and/or landowner from compliance with any applicable or requirements.
**-*,"*.*-********'*��*�*-****APPLICANT FILLS OUT THIS SECTION*,N*-*-
APPLICANT 2&o,i^4e CIA PHONE
LOCATION: Assesw(s Map Number P A R C E L
SUBDIVISION LOT (S)
STREET ST. NUMBERC:2/0
"r* -"/*-*********"********OFFICIAL USE
IONS OF TOWN AGENTS:
7MI, 1� i—k (9 Q oil
CONSORV&ICNJADMINI�TRATOR DATE APPROVED
DATE REJECTED
COMMENTS
-4-
TOWN PLANNER
COMMENTS
FOOD INSPECTOR -HEALTH
SEPTIC INSPECTOR -HEALTH
COMMENTS
J. � .11. .. 7 - -
6—ATE APPROVED
DATE REJECTED.
DATE APPROVED
DATE REJECTED -
DATE APPROVED ZZ.Z i7l s2Z!t d -
DATE REJECTED
PUBLIC WORKS - SEWER/WATER CONNECTIONS #Al,
DRJVEW Y -PERMIT
F-I,RE DEPARTMENT
RECEIVED BY BUILDING INSPECTOR DATE
The Commonwealth of Massachusetts
Department of Industrial Accidents
X Mice 01101vestf9atf8fis
600 Washington Street
Boston, Mass. 02111
Workers' Compensation fnsurance Affidavit
NOW 11,11
L A IVO) -QJ
,�-f #ea)h /9, kmkll�,q /;Z/&' wo,/� /;/. kvw,�I/tk
I am a -sole proprietor, general contractor, or homeowner (circle one) and have hired the contractors listed below who have
the following workers' compensation polices:
...... ....
. ........ .
corrinsnivrianne, 194av�e
Failure to secure coverage as required under Sic (ion 25A ofiVIGL 152 can 1c2d to the imposition of criminal penalties of a fine up to S1,500.00 and/or
one years' imprison men( 23 Well 23 Civil penal ties in the form ofa STOP WORK ORDER and a fine of$ 100.00 a day against me. I understand that a
copy of this statement may be forwarded to the Office of Investigations of (he DIA for coverage verirIC2tiOn.
I do hereby certify un er the pains and en ties of perjury that the information provided above is true and correct
S i arure DaLe Z,2
/-V 0
Print name -Phone
�fficial use only do no( write in this area to be completed by city or town official
city or town:
C3 check if immediate response is required
(r"ued V95 PJA)
permit/license rl Building Department
oLicensing Board
C]Sclectmen'3 Office
C3Hc2lth Department
phone 0: r7Othcr
PROJECT NUMBER:
T -- -7
iTLE:
PROJECT LOCATION: '_x
NAME OF BUILD
NATURE OF PROJECT:
A g)
OFFICE OF, BUILDING INSPECTOR
TOWN OF NORTH ANDOVER
CONSTRUCTION CONTROL
-1
IN AC_CO_RDANCEWITH—AAT-IGLE 1 6 OF TH7 MASSACHUSETTS STATE BUILDING CODE,
REGISTRATION NO,
BEING A REGISTERED PROFESSIONAL ENGINEERIARCHITECH HEREBY CERTIFY THAT I
HAVE PREPARED OR DIRECTLY SUPERVISEDTHE PREPARATION OF ALL DESIGN PLANS,
COMPUTATIONS AND SPECIFICATIONS CONCERNING:
ENTIRE PROJECT 34 ARCHITECTURAL 17 STRUCTU'RAL 11 MECHANICAL E
FIRE PROTECTION E ELECTRICAL � D OTHER (SPECIFY)
FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEGE, SUCH PLANS,
COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISION OF THE MASSACHUSETTS
STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRATICES.
I
AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY.
I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE
PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT
THE WORK IS PROCEEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING
PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0
1. Review, for conformance to the design concept, shop drawings, samples and other subrr&als
which are submifted by the contractor in accordance with the requirements of the construction
documents.
2, Review and approval of the quality control procedures for all code -required controlled matedals.
3. Be present at intervals appropriate to the stage of construction to become, generally familiar
with the progress and quality of the work and to determine, in general, if the work is being
performed in a manner consistent with the construction documents.
PURSUANT TO SECTION 116.2.2 1 SHALL SUBMIT WEEKLY, A PROGRESS REPORT
TOGETHER WITH PERTINENT COMMENTS TO THE NORTH ANDOVER BUILDING INSPECTOR.
UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE
SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANCY.
SIG RE
SUBSCRIBED AND SWORN TO BEFORE ME THIS DAY OF 9 4
NOTARY PUBLIC MY COMMISSION EXPIRES
of
OFFICE OF BUILDING INSPE TOR
a TOWN OF NORTH AND041
R
CONSIRUCTION CONTRQL
PROJECT NUMBER:
PROJECT TITLE:
PROJECT LOCATION: C;�j 0 151011 R C�!
NAME OF BUILDING:
NATURE OF PROJECT:
11.e r V, I km Iq �
2"21 m uv,0�-
icce� E,
IN AgCORDANCE WI�H AgICLE I OF T MASSACHUSETTS STATE BUILDING CO()E,
--.REGISTRATION NO. 18'SSE
BEING A REGISTERED PROFESSIONAL ENGINEERIARCHITECH HEIIEBY CERTIFY THAT I
HAVE PREPARED OR DIRECTLY SUPERVISEb THE PREPARATION OF ALL DESIGN PLANS,
COMPUTATIONS AND SPECIFICATIONS CONCERNING: �; .
ENTIRE PROJECT ARCHITECTURAL F-1 STRUCTURA� F� MECHANICAL
FIRE PROTECTION ELECTRICAL 7 OTHER (SPECIFY)
FOR THE ABOVE NAMED PROJECT AND THAT, TO� THE BEST OF MY KNOW4EGE, SUCH PLANS,
COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISION, OF THE MASSACHUSETTS
STATE BUILDING CODE. ALL ACCEPTABLE ENGINEERING FRAMES.
AND APPLICABLE LAWS AND ORDINANCES FOR T�HE PROPOSED USE AND OCCUPANCY.
I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE:
PRESENT ON THE CONSTRUCTION SITE ON A Re�GULAR ANQ PERIODIC B�SIS TO DETERMINE THAT
THE WORK IS PROCEEEDING IN ACCORDANCE NTH THE DOP-UMENTS APPROVED FOR THE BUILDING
PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0
1. Review. for conformance to the design concept, shop dra�lngs, samplos and other submittals
which are submitted by the contractor in accoitclance with the requiremints of the construction
documents.
1"OF04-
% v
2. Review and approval of the quality control- p micedures for; all code-reqOired controlled material
.. �T.
ROBERT P.
RI
3. Be present at intervals appropriate to the stage of construction to become, generally familiar (C.Z(BRECKNOCK
STF
TRI
�STRUCTURAL
J�
,.if the work is being
with- the progress and quality of the work andto determine, in general, cc) 0
go. 385M
performed in a manner consistent with the co0struction documents.
PURSUANT TO SECTION 116.2.2 1 SHALL SUBMIT WEEKLY, A PROGRESS REPORT 7VAP"
L
TOGETHER -WITH PERTINENT COMMENTS TO THE NORTH ANDOVER BUILDING INSPECTOR.
UPON COM ' R�LETION OF THE WORK, I SHALL SUBMIT A HNAL REPORT AS TO THE
SATISFACTORY COMPLETION AND READINE$S OF THE OROJECT FPR OCCUPANCY.
IG URE
SUBSCRIBED AND SWORN TO BEFORE ME THIS /6 DAY OF 19
NOTARY PUBLIC MY COMMISSION EXPIRES 3
FROM : SCOTT'S WELDING PHONE NO. : 603 666 5716 Nov. 23 1998 e4:23PM P1
PRODLICER VATE (MM?Dtwyy)
Dunlap cor-p (Manc�jester) THIS CERTIFICATE.jg_j$'�jyj�6 WS" A , TN_Fa_kMAf10N
G. Su) , p 3 ONLY AND CONFERS N
_11,var� 0 RIGHTS UPON THE CERTIFICATE
1175 Canal, sti-e.p HOLDER, THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
t !HE_COVERAGF A00RDED AV THE POLICIES BELOW.
Manchester, N14 03101 COMPANIES AFFORDING COVERAoE
i COMPANY
Ki'Zi R I A�Iax - t. - ford T.risu.:r.&j-IcE- Group
COMPANY
ScOtt�'s Portable Welding, Inc, Insul:anc.,e Croup
722 East Industrial Park Drive.
Manchester, Nli 03109 COMPANY
COMPANY
D
:7777777777777777777777777' -'-",---
THIS I$ TO CERTt
S�RANCE LISTFD BELOW HAVE RSEN ISSUED TO THE INSURED NA
FY THAT THE POLJOES OF IN
NOTWTHSTANDING, VIED ABO\JE FOR THE POUCY PERIOD
ANY'RIOUiREMiN. -,JER 10140'ITIOW:0P �ANY':CMRAOT I �,OTHOk';D.(� �.OSNT:
T, M. OR J�
oiwt: MAY 8EAt$UFD' `bA'.M4y`p
pRTAN,,"TH)EAN8
:�7-:
__' - ...... . r^V CLAIMS.
I MIN",
00
LTR TYPE OF INSURANCE POLICVNUMBGR POLICY 9PPECTIVE POLICY rxPjqATI0N
welt
7— 1 DATE (MIVVDt;IYY) 04TE (MWDMY) um"
A GrINGRALLIAMUrY 1 0 4, U U C G,!TJJfO 2-0 3 ('F'NE_RALAQGRE—GA 2 000,000
X (;D,MPZRCKL GENERAL LIABILITY ...... , - - T�_ �.. "...... ...—
I .... I�AGG s2,,.000,�0,00
CLA]msmAPE XIOCCUR PRODUCT,1�-COMP10 _", .-
PERSONAL & ADV INJ�!�Y
OWNER'$ A OC)NTRACTOR'S PROT __ .1 . I _L � I. ... 1L.".9 0 0, 1. () 0 0
EACH o=RPFN
0 0 0
$so, 000
';IRr- 0AMAGS (Any one fing
MED EXP (Any Ont prron) 1$5 000
MOIBILE LIABILITY 04UECGUO692- -08/16/9-9
ANY AE)TO COMBINED SINOLF LI_m_1T $300,000
. .........
ALL OWNED AUTOG
GODRY INJURY
SC149DULEDAUTOS
(Por Won)
HIREDAUTOS
X NQN-001NEDAUTOS BODILYINJURY
PROPERTYIDAMAGE
GARAGE LIABILITY
AUTO ONLY-EAACCIDE-NT S
ANY AUTO ......... ...
0,Tt1�-R.2!LNAUTq 9�N
... . ......
EACH ACCIL*NT
EXCM Lmetpry t�AC H 2�22UMEtO_
UMBRELLA FORM AC, $
OTHER THAN UMRA
911A FORM
B WORMP-S COMPINSATION AND SCWC924412
08/16/98 STATUTORY LIM ITS
EMPLOYERS'LIABILIYY . ...... f
THE PR"ETOR/ INCL . 5EACH A . CCIDENT a 0 0
PARrNER&VECUTiVE DISFASE-PWCY LIMIT
OFFICERS ARE: EXCL
C714ER DISCA,';;,:. EACH EMPL, 1$10 0
Vr VVCKA11GM1LWAjjOfN3jVEKCt
Work to be done at
-7777777
Merrimac Cartage SHOLU ANY OF THE ABOVE DESCRIBED pGUCIES BE CANCEI.LED 60:0RIE THE
210 Holt Road EXPIRATION DATZIrMEREOpTHELVOING COMPANY WILL EN DEAVOR TO MAII,
3-D.– DAYs wmTrfi I m wy TICE TO THE CERI . ISCATE HOLDER NAMED To THE Lgpt,
North Andover
MA 01845 BUT FAILURE to MAIL-SLICtf NoInCr 3NALL IMPOSE N6.O8L'IGA1fQN OR UAINLITY
� OF ANY Klmn tionu — --- - -
OF
Sent bj:IJINDHAM INSUPANCE Dec -15-98 10:41am from 802,254 81584 Paqe 2/
Inc.
I)avid True
540 Bancroft Hwy.
Manchester, NE
03057
4TEOFI�
D A T
X
12/15/1998
THIS CERTIFICATE IS ISSUED AS A MATTER OF iNFOAMATION
ONLY AND CONFERS NO RIGHT$ UPON THE CERTIFICAr
E
HOLDER, THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
AJER TI I[ COVERAGE AFFORDEL) BY THE POLICIES BELOW.
.............. ........ .. ........................
COMPANIES AFFORDING COVERAQE
.................................. .............
A Concord General
...................
.. ..........
6 National Council oni Ins.
............ ............. .. ...
..........
....................................................
P A D'N
D
..............
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVF BEEN 16SUED TO THE" INS�UR�b'4:AMED ABOVE 'FOR TH'E POLIC'�
PERIOD INDICATED, NOTWIT'HSTANDING ANY REQU REMENT,
TERM OR CONDIT ON OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPEC-
To WHICH THIS CERTIrICATE rAAY BE ISSUED OR MAY
PERTAIN, THE INZURANCE AFFORDED BY THE POLICIES D6SCRIBED HEREIN !F
SU8JECT 1() ALL THE TERMS, EXCLUSICNS AND CONDITIONS
OF SUCH POLICIFS. LIMITS SHOWN MAY HAVE I EEN REDL)CE.D BY PAID CLAIMS
....................... I'll .............
...................... .................. . ..
LIDAITS
... .. ........
G t.. ER 6,L I AE ILI-
............ .............. . .. .......................
GENERAL ACGRCG14TE 1 2,000,000
X �IAEI,L T,
....... ...................... ............. . ... ......
I I
FROOUCTS-Com",? i o�, AG 2,000,000
............
X E806094
.............. - ...... .. .. ............
FIC19,50INAL a, A0V INJUMy
08/151,1998: 08/15/1999� 5 1, 000,000
.......... .. . . ......... ... ........... ........... .
EACH DC�URRIENCE 1,000,000
....................................... ...... . .. ........ .
FIRE DAMAGE lAny o,)q 50,000
.. . ... ......... EYT �Ally oil,,, pelFoni 5, 000.
'UT �%11,5 LE L -3 IT"
.... ......... ..... ....... ......... ....
q
COMBINED SING�E LIP.11T
...................
BODILY iww(
I, r A TO
.... ........ . ..... ...... ....
SQDILY INJVRY
............... .1- ..... . . ..... . ...... .....
PROPERTY DAMAGE
1L.810 f Y
...... ........ ..
�AUTOONLY-!A,��CIO!NT;�
. .... .................... ....... ...... .. .. .
OTHER THAN Au'ro
.............
EACH ACCID�NT
.................... .......... .
..................
............. , ............
............ ......... ............ .
AQ(:F.E(3ATE
�7r,ER TWI.
...... .. .. ....
. ... ........ . ...... . ...... .... . .
...... . ......................... .......... ... ...
Y:! STATUTORY LIMITS
WC131S311685018
.....................
08/21/1998: 08/21 /1 999� EACH ACCIDENT 100,000
............. ............. .
7L4= -RO-RIET,1�.:
I1rjILK;*y Ur*�'11"I"
500,000
i.c
R7X.". �,:K,T
-1-1-1- - ........... . . .. ..... .. .
-0 zr C L 7., X
L)15�'ASE, �.ACH EMPLOYEE t 100,000
........... .. ........
TIC t..�; sn' i�� _:5
............ ..................
Masonry --garage door opening/walls 1-- 1-
AA6LM*
;�N` QFTHt AeOVE VtGCRI=S0 `00_'tr� 13E QANICEI�LIED BE!7001_�,c
�X'IRATIO% AT -E THILMCOP, THC 13SUINCi �;UIVIFANI.' �,VILL ENOEAV,--RTD VAII.
; D
15 NOT ICE -1-0 THE CERTIFICATE HOLD�Ik N 10'il� I HE JFT
Merrimack Cartage ro `,',AIL �UCH NOTICE EHALL II[l(i POSE. NQ O;LIGAT ION (1,11 0 -
;I� 17�
210 Holt Road
North Andover , MA .... .. .... .. .... .. .. . .. . ..
. .. ........ ;7. - , ,
GEORGE PERNA
D:AECTOA
TOWN OF NORTH ANDOVER. MASSACHUSETTS
DIVISION OF PUBLIC WORKS
364 OSGOCID SrREET. UIB-15
r io
DRIVEWAY PERMIT
Date: -5 0713
LOCATION: 'Zlc>
BUILDER: phone:
OWNER
phone:
Telephone (508) 685-095o
Fax (508) 688-9573
The North Andover Superintendent of Highway Utilities & Operations MUST be notified of the
grade and'set-�back from street established in any driveway entry onto any street or way maintained by
the TOWN. Call the Highway Superintendent's Office, before finish grading and surfacing for approval
of such entry.
FAILURE TO COMPLY AND OBTAIN APPROVAL VOIDS THIS PERMIT.
I Remarks:
Approvak,
PRODUCER
Dunlap Corp (Manchester)
R. G. Sullivan Building
175 Canal Street
Manchester, NH 031QI—
IINSURED
Scott�Zls Portable Welding, Inc.
722 -- t Indust
M�L- rial Park Drive
hester, NH 03109
. .............. ...................
.. F� .. .............. .... DATE (MM/DDIYY)
<AN:
::,:::: . . .... ..... .......
11 / 19 / 9 8
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
COMPANIES AFFORDING COVERAGE
COMPANY
AHartford Insurance G
COMPANY
BGuard Insurance Grou
COMPANY
C
COMPANY
D
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE*FOR THE POLICY PERIOD
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. -
CO
LTR
TYPE OF INSURANCE
POLICY NUMBER
POLICY EFFECTIVE
DATE (MM/DDfYY)
POLICY EXPIRATION
DATE (MMIDDfYY)
LIMITS
A
GENERAL
X
—
LIABILITY
COMMERCIAL GENERAL LIABILITY
F;�71
1CLAfMS MADE I A -I OCCUR
OWNER'S & CONTRACTOR'S PROT
04UUCGUO203
08/16/98
08/16/99
GENERAL AGGREGATE s2,000,000
PRODUCTS-COMP/OP AGG $2,000,000
PERSONAL & ADV INJURY $1,000,000
—
EACH OCCURRENCE $1,000,000
FIRE DAMAGE (Any one flre) s50,OOO
$
MED EXP (Any one person) s5,000
A
AUTOM0131LE
LIABILITY
04UECGUO692
08/16/98
08/16/99
AUTO ONLY -EA ACCIDENT S
.1 .............
.............. ....... ... .........
OTHER THAN AUTO ONLY: ........... . ......
..... .............. ..... .
EACH ACCIDENT $
ANY AUTO
AGGREGATE $
EXCESS LIABILITY
UMBRELLA FORM
OTHER THAN UMBRELLA FORM
COMBINED SINGLE LIMIT $300,000
X
ALL OWNED AUTOS
SCHEDULED AUTOS.
AGGREGATE $
$
B
BODILY INJURY $
(Per person)
SCWC9244'12'
I i
X
HIRED AUTOS.
STATUTORY LIMITS ..... ............... ........ ...
.
EACH ACCIDENT $100,000
DISEASE -POLICY LIMIT $500,000
D ISEASE- EACH EM PLOYEE, $10 0 , 0 0 0
X
NON -OWNED AUTOS
BODILY INJURY
(Per aCcident) $
PROPERTY DAMAGE $
IDESCRIPII N OF OPERATIONS/LOCATIONS/VEHICLES/SPECIAL ITEMS
Workoto be done at transfer station
Merrimac Cartage
210 Holt Road
North Andover, MA
Somervill
t. "-
SHOULD ANY`DP`I`HEJ1r130VE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL
'10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFr,
01845 BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY
OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE
GARAGE
H
LIABILITY
ANY AUTO
AUTO ONLY -EA ACCIDENT S
.1 .............
.............. ....... ... .........
OTHER THAN AUTO ONLY: ........... . ......
..... .............. ..... .
EACH ACCIDENT $
AGGREGATE $
EXCESS LIABILITY
UMBRELLA FORM
OTHER THAN UMBRELLA FORM
EACH OCCURRENCE $
AGGREGATE $
$
B
WORKERS COMPENSATION AND
EMPLOYERS' LIABILITY
THE PROPRIETOR/ INCL
PARTNERSIEXECUTIVE
OFFICERS ARE: X EXCL
OTHER — R
SCWC9244'12'
I i
08/16/98
I
08/16/99
--I
STATUTORY LIMITS ..... ............... ........ ...
.
EACH ACCIDENT $100,000
DISEASE -POLICY LIMIT $500,000
D ISEASE- EACH EM PLOYEE, $10 0 , 0 0 0
IDESCRIPII N OF OPERATIONS/LOCATIONS/VEHICLES/SPECIAL ITEMS
Workoto be done at transfer station
Merrimac Cartage
210 Holt Road
North Andover, MA
Somervill
t. "-
SHOULD ANY`DP`I`HEJ1r130VE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL
'10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFr,
01845 BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY
OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE
Sent b�:WINDHAM INSURAHCE Nov -25-98 11:41am from 802 254 81584 - Page 3/ 3
1, C7,
'T
ERIV
11/25/1998
'THIS CERTIFICATE 15 ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERT151CATE
HOLDE�R. THIS CERTIFICATE DOES NOT AMEND, EXTEND OF
Windham insuranCe ALTPR THF COV�,RACE AFFORDED BY THE POt.ICIES BELOW.
.. . ........ 1.11.1 ................................... 1 ................. ....... .. .
P.O. Box 8177 COMPANIES AFFORDING COVERAGE
... .... . . ......... ......................
Brat eboro. V -.V-,,05304 comcANY
304 Nation�ii Council'od'Comp.Ins.
A
........... ............. ........... .............................. ......... ..
..... . ....... ... - .
David True WCIWANY
t
540 Bancroft Hwy. ............... ..................... .. ............
NH
Manchester, NH
03057 . . ... .... ..... ...............
D
SHOJILD ANv OF THE ABOVE DESCRIBED POLICIES 8C CANCCLLEO BEFORETHit
(zKPIRATICN DATE TMERtOF, THE ISSUING COMI'ANY WILL ZNDEAVOR70 MAI�
DAYS ',%'RITTEfd NOTICE TO TH1 CERTIFICATE I,-iOLOZR Nt,,MED -0 'r.c- LEFT.
Merrimack Cartage 6UT FAILI)4k TO MAIL SUCH NOTICE SHALL IN4PQ$F NO OI!IUGATiorq 09 LIABILITY
210 Holt Road OF AN� KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES
North Andover, MA ............... ..................... .. ....... . ....
AUTkOR17�0 REPRESENTATIVE
'N
TH S IS TO CE:�:" Y YH;A�T::t1`HE PQi1t1ES
OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY
PERIOD 1141DICATE WITW�S-�ANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT
,
To WHICH THIS CERTIFICATE MAY BE 155UED OR MAY PERTAIN, THE INSURANCE AFPURDED BY THE PO�ICIES DESCRIBED HEREIN 15
SUBJECT TO ALL. �'K TERMS, EXCLUSIONS AND CONOITION� OF SUCA POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
........... .......... ........ ... .. ........ ......... ............ ...................... .. ............ . .. ....... ...
P0LCYErrEcrI,,E POLICY EXPIRATION:;
PO-d�,\ NLjV5F.F LIDAITS
VAIL irotwxo'� I DATE �(Y1(,I!0D1YY)
,TP
3EN!�,At, L;A9,L.TY
.. .............. . ........ ............. . .... ........................ ...... . ..........
GENERAL AGGREGATE
CCt,.V.!F.C1AL GENERAL .,!Ae,L TY
w-
FRODUCTS-CONIP j OPAGG: t5
irot, PA -DE C""L'p.
............. . .... ..... .
PERSONAL F, AOV INJURY S
.................
01ANEP's 11 CONT P" C7
EACH OCCURRENCE
........................................ .........
j PIRE DAMAGIt (Awy Q'IL, (ifol t
a
. ................... .... .. .... ... ..................
............ .......... .... ........................ ..........
AU-�VIQUIIt L!Atl!�IT\
COMBINED SINGLE LIMT
AN A -J70
................ .. ..... .. . . ...............
JPqr pqrson�
AOTOS
......................... .............. .... ....
H!qEL
........... ..
BODILY-(NJURY
(Per accident) 5
70S
........................ .. ...
PROPERTY OAF-AAGE
,3ARAGE LtA5-,IT�
.......... . ....... ................. - .......... -
AUTO ONLY - EA ACCIDENT
A�-jl AjT0
OTHER THAN AUTO ONLY-..
.................. .. .. .. .... .
tEACM A=IPENT
.............. 11 ......... . .
....... ... - . .. ... ....... ...... . . . ....... A(5(3REGATE
1XC9$$ 0AB!LI I Y
................. .................. . ........ -- .............. .............. .. ........ ..... . . ......
EACH OCCURRENCE 5
UAISqULA FORM
. .................................. .
OT- U� 7; AN JfJONE�. FOMA
.... . .... ...
..............................
........... . ..... .........................
rIOMPENSATION AND
........... ................
STATv*ropy tit,11T,; t
5
A
............ .... V-1
WC1 31S31 1685019 08/2111998. 08/21 /1999! EACH AC,�I[)961T
7�-.E PRL)PRjE7CR:
................. ..1001000
...............
:015EASE — POLICY LINIT 50Q1 000
PARME95.; EyEcu-,vE
........... ........... .... ... I .. ..............
OPF CER; ARE EXCL
. ... . ...... ... ... .
VMEA51� - kA(;H EMPLOYEE
..... ...... ....... .. ................... 100,000
............... .. .........
07HER
.
.... .... .. .......... ........... .............. ............ ......... .. .
IDE C19:PTION QF UPFRATiON' LCCAI 1011S ! VEHICLE& SPECIA1
SHOJILD ANv OF THE ABOVE DESCRIBED POLICIES 8C CANCCLLEO BEFORETHit
(zKPIRATICN DATE TMERtOF, THE ISSUING COMI'ANY WILL ZNDEAVOR70 MAI�
DAYS ',%'RITTEfd NOTICE TO TH1 CERTIFICATE I,-iOLOZR Nt,,MED -0 'r.c- LEFT.
Merrimack Cartage 6UT FAILI)4k TO MAIL SUCH NOTICE SHALL IN4PQ$F NO OI!IUGATiorq 09 LIABILITY
210 Holt Road OF AN� KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES
North Andover, MA ............... ..................... .. ....... . ....
AUTkOR17�0 REPRESENTATIVE
ClientU: 21181
TAMP..qT.AM
ACORM CERTIFICATE OF LIABILITY INSURANCE
DATE MM DDIYY
11/ ( 19 1 /98
PRODUCER
The Insurance Exchange, Inc.
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
PO Box 6360
40 Sta3Z-
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
LIMITS
Ma�Wester NH 03.108
INSURERS AFFORDING COVERAGE
OORED
Cames Lanoie
68 Healy Rd
INSURER A: Travelers Insurance Co
INSURER B:
EACH OCCURRENCE $1,000,000
Candia, NH 0) 3 0 J34
INSURER C:
INSURER D:
I INSURER E:
..
kI
dQVERAGES -
THe—FTO'UCIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTwrrHSTANDiNG
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
Im
TYPE OF INSURANCE
POLICYNUMBER
LICYIEFFECTIVE
PODATE(MM/DDIYYI
POLICY EXPIRATION
LIMITS
A
GENERAL LIABILITY
X COMMERCIAL GENERAL LIABILITY
I CLAIMS MADEEX-JOCCUR
1680353P9021TCT
05/19/98
-1
05/19/99
EACH OCCURRENCE $1,000,000
FIRE DAMAGE (Any one f ire) s300,OOO
MED EXP (Any one person) s51000
PERSONAL & ADV INJURY $1,000,000
GENERAL AGGREGATE s2,000,000
GEN'LAGGREGATE LIMIT APPLIES PER:
R
17 POLICYF—] JECOT- F� LOC
PRODUCTS-COMP/OPAGG s2,000,000
AUTOMOBILE
LIABILITY
ANYAUTO
ALL OWNED AUTOS
SCHEDULEDAUTOS
HIRED AUTOS
NON -OWNED AUTOS
COMBINED SINGLE LIMIT $
(Ea accident)
BODILY INJURY
(Per person) $
BODILYINJURY
(Per accident) $
PROPERTY DAMAGE
(Per accident) $
GARAGE LIABILITY
ANYAUTO
AUTO ONLY- EA ACCIDENT $
OTHERTHAN EAACC $
AUTO ONLY: AGG $
EXCESS LIABILITY
7 OCCUR FICLAIMS MADE
DEDUCTIBLE
RETENTION $
EACH OCCURRENCE $
AGGREGATE $
1$
$
WORKERS COMPENSATION AND
EMPLOYERS! LIABILITY
WC STATU. TH-
ITORYLIMITS TCER
E.L. EACH ACCIDENT $
E.L. DISEASE -EA EMPLOYEE $
E.L. DISEASE -POLICY LIMIT $
OTHER
DESCRIPTION OF OPERATIONS/ LOCATIONS/VEH 10 LESIEXC LUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS
Merrimac Cartag
210 Holt Road
North Andover, 01845
-ACORD 2S -S (7/97)1 of 2 if2739
SHOULD ANY OFTHE ABOVE DESCRIBE D POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATETHEREOF,THE ISSUING INSURERWILLENDEAVORTO MAI Ll 0 DAYSWFUTTEN
NOTICIETO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURERITS AGENTS OR
AUTHORIZED
XKP
TION 1988
menimac
Merrimac Cartage Inc. Phone: (978) 686-2020
CaMge Inc. 210 Holt Road FAX: (978) 686-3086
North Andover, MA 01845 email:
Wednesday, November 18,1998
Town Of North Andover
Board Of Health
Planning Department &
Building Department
The building located at 210 Holt Road is an 18,000 square foot building. The
building has a footprint of 15,000 square feet (100'x 150') and a mezzanine above the office
area in the front of the building that adds the additional 3,000 sq. ft. of office space. The
building is broken up between office space (6,000 sq. ft). and maintenance shop space
(12,000 sq. ft.). The proposed building modification will eliminate 1,000 sq. ft. of office
space: 500 sq. ft. ground level and 500 sq. ft. mezzanine level. The modification to the
building is being done to allow for drive through access to the shop maintenance area of
the building. There will be no change in the current use of the building.
wa4�<gAov�� I q -b
Bill Thomson 1.
FORM U - LOT RELEASE FORM
INSTRUCTIONS: This form is used to verify that all necessary approval s/permits from
Boards and Departments having jurisdiction have been obtained, This does not relieve
the applicant andlor landowner from compliance with any applicable or requirements.
"AA*****APPLICANT FILLS OUT THIS SECTION"
APPLICANT )J)erj,) M,4e r-..4 P HONE
LOCATION: Asseswrs Map Number PARCEL_2��-38 —2 7-4/0
SUBDIVISION --------------- LOT (S)
STREET ST. NUMBERC?'/D
0 F F I C I A L U S . E ONLY****-"*"**�—*��
R E 1� JETI*CNS OF TOWN AGENTS:
C M
CONSVRV,�TldNJADMINI�TR.ATOR
COMMENTS
DATE APPROVED
DATE REJECTED
TOWN HLANNtK
COMMENTS
FOOD INSPECTOR -HEALTH
SEP'rl-C INSPECTOR -HEALTH
COMMENTS I
DATE REJECTED
DATE �PPROVED
DATE REJECTED_
DATE APPROVED
DATE REJECTED_
PUBLIC WORKS - SEWER/WATER CONNECTIONS
DRJJVEW PERMIT
Y�
41
F'I,RE DEPARTMENT_
A
RJECEIVED BY BUILDING INSPECTOR
DATE
a
M
DEPARTMENT Of PUBLIC SAFPY
CONSTRUCTION SUPERVISOR LICENSE
Number: Expires: Birthdate:
CS 052707 09/25/1999 P/25/1960
Restricted To, 00
r
1� JAMEIS: RO
READING. MA 01867
- - ---- 1- 4 - - - - - -
0
10
3 73 8 2
f aclocled spacp
1 A
e T. i 1 , :I i P
'ac hu 3, 1 1 s, )l 1 p R. r
1� dt 11 'i 0 f f� r 1 P—i
p r! s e
n
9/L 61,�.Imeo,.Iuveal& I
01PARIdINI 'If PIJPLyf.
0 �il U p P!
Restricted To: 00
37382 1
00 - 35,000 cf enclosed space
(MGL C.112 SAL)
A - Masonry only
IG - I & 2 Family Homes
Failure to possess a current edition of the
Massachusetts State Building Code
is cause for revocativi o'f this license.
0 1 PAP, I HEN I OF P U PIL I r F
C 1) N R U 11 T 10 N.' )^ ii P F R
yr, I r— i
5 0
i 1 � d 1
AT 000CHARIA110F
Ras
we, is. n Icer
Phone: 978-"&-""
124 Main St.
North Andover, MA 01845 Fax: 979-4&9594
N
co N
Howe- aul
OA1
cwj 6 VC
4-A (fz (Oop -
e1v
menimac
Merrimac Cartage Inc. Phone: (978) 686-2020
CarMge Inc, 210 Holt Road FAX: (978) 686-3086
North Andover, MA 01845 email:
Wednesday, November 18,1998
Town Of North Andover
Board Of Health
Planning Department &
Building Department
The building located at 210 Holt Road is an 18,000 square foot building. The
building has a footprint of 15,000 square feet (100'x 150') and a mezzanine above the office
area in the front of the building that adds the additional 3,000 sq. ft. of office space. The
building is broken up between office space (6,000 sq. ft). and maintenance shop space
(12,000 sq. ft.). The proposed building modification will eliminate 1,000 sq. ft. of office
space: 500 sq. ft. ground level and 500 sq. ft. mezzanine level. The modification to the
building is being done to allow for drive through access to the shop maintenance area of
the building. There will be no change in the current use of the building.
Bill Thomson
LO
L—V—
coo BERM
to
Ol
P- v Ic, 1 �01 0
2! - 01
0 1p.
mv. vu
dD k T-
5) f1me romi - . LL
wAmm (rYr) 1899
kFWD
IL
02
J -j
LIJ
lij
?POP c-,F-FT\C- e5\(,--,TF—M p CL.
ON, 0 0
E, to 1�- N -2
c
21-
10 4 Y, 9
�OA
(T �Tly P)
/0
py? p
FUDO,
MOX
J— bi J
\OC
cotic
c -.z, -T E P-, (f)
Ij
uj
7:-7-
qu V(p
Fee. 0
7c CL
Dwp)
1p
u , i
34
R
3)
Uj
ui
�OA
(T �Tly P)
/0
py? p
FUDO,
MOX
J— bi J
\OC
cotic
c -.z, -T E P-, (f)
Ij
uj
7:-7-
qu V(p
Fee. 0
7c CL
Dwp)
1p
u , i
34
R
3)
r*
041
P -t
i 'Lei
I
ri
rp
tv
VA
0
X
u
t
0
C/)
u
-Z
u
w
P4
Cf)
z
0
c
:�
0
Z
LZ
CD
co
x
V)
to
Cd
x
0
u
'COL.- CS
I-
"
Ci)
0
—cz
CO
U)
o
co
:t
4t
's, .j
C2
c 4w.
ILO
CL.
zM Cc
Alt:= 0
cc 0
jr m
2 ui
C4 06
FO
0
F=04
:U
w
Cg A
-,.CM AM ai
E
cL:R >
:E Cf)
cm
cc C/)
AL
55
CD's C=O
CLC.2 co
0 cm
m -s
.4-; Zk
- =
M
ca
S. C -!q P-4
�:j
0 LD a 0 IOD = c
0 C#* CL 0 0 :6
zC:L.@-. Cc
-3%%-
1%
W
C6
I
rl%i
u
0
s
"-C:3
(U
CD
0
E
CD
z
co
co
LIO
E
CD
co
co
Q
M
CL
CL
CO2
cc
cc
"a
COD
r�m_l
lz
CD
CL o
CIO
CD
gll
:2
CD =
co cm
0 CD
CL
cm
E
CD
z ts
co
Cm -)—
COD
Q, ro C)
0
Z
LZ
CD
CD CL
3:
0
'COL.- CS
I-
"
C*
cog
:.,-; -0 E
ui
I.-
0=
a 2% lo�
CL=
Z
C= :� COD
CD
5
ui
.2
0
r7!
0 LD a 0 IOD = c
0 C#* CL 0 0 :6
zC:L.@-. Cc
-3%%-
1%
W
C6
I
rl%i
u
0
s
"-C:3
(U
CD
0
E
CD
z
co
co
LIO
E
CD
co
co
Q
M
CL
CL
CO2
cc
cc
"a
COD
r�m_l
lz
CD
CL o
CIO
CD
gll
:2
CD =
co cm
0 CD
CL
cm
E
CD
z ts
co
Cm -)—
COD