HomeMy WebLinkAboutMiscellaneous - 223 CHICKERING ROAD 4/30/2018 223 CHICKERING ROAD
f 210/046.0-0036-0000.0
I
I
f
�a 3
Add ress c-- H tc-t� r'4,
Title of File
Page of
Date File Open:
Date File Closed:_
Doc Document/Action Tifile
action Date of Refer to other PurP.ose of Document A '
Document/ document/ / coon and
Num. note
Action
Department
----__
Board of Appeads - Board of Health - Planniang.Bo:ard _ Conservatiion Commission
- Bonding Departnlen;t -�-
TOWN OF NORTH ANDOVER p.
MASSACHUSETTS
:0'�,.ao N.4.O ,J
Any appeal shall be filed
within (20) days after the ; ' °:�•`:h "`
date of filing of thss Notice
in the Office ,_ - ,e "T:;vVE
NOTICE OF DECISION
C. .: ...
Date. November. 12, 1993. .
October '19, 1993
Date of Hearing November 2, 1993.
i
Petition Of Cobblestone Crossing Realty Trust . . . . . • . . . . . . . . . . . . . . . . . . . . . . . . .
Premises affected , . .Chickering Road . . . . . . . . . , . . . , , . ,
Referring to the above petition for a special permit from the requirements
of the , , , North Andover. Zoning. Bylaw_ _ Section 8..5. . Planned. Residential Development
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
so as to permit , , .the .construction of .5 .single .family dwellings,, creating . . . .
. . . . . . . . . . . . . . . . . . . . . . .
lots.
.7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
After a public hearing given on the above date, the Planning Board voted
CONDITIONALLY
t0 . APPROVE . . . . . . .the SPECIAL PERMIT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
based upon the following conditions :
CC: Director of Public Works
Building Inspector Signed
Conservation Administrator Richard Nardella, Chairman
Health Agent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Assessors
Police Chief . . .JFiin Simons, Vice Chairman
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fire Chief Joseph Mahoney, Clerk
Applicant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Engineer Richard Rowen
File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
interested Parties
•planning B oard
Cobblestone Crossing Modification
Special Permit
Planned Residential Development
Conditional Approval
The Planning Board herein approves this Modification to the
Special Permit for a Planned Residential Development granted to
White Birch Construction, dated May 12, 1993 . This Modification
creates 6 new lots, with five new homes and was requested by
Cobblestone Crossing Realty Trust, 733 Turnpike Street, North
Andover, MA, on September 24, 1993 . The parcel is 4 .77 acres in
size in a Residential-3 zone. The Planning Board makes the
following findings as required by the Rules and Regulations
Governing the Subdivision of Land Sections 10. 3 , and 10. 31.
A. The specific site is an appropriate location for a Planned
Residential Development as it is an extension of the
existing Cobblestone Crossing subdivision.
B. The use as developed will not adversely affect the
neighborhood as this is an extension of an existing
subdivision.
C. There will be no nuisance or serious hazard to vehicles or
pedestrians.
D. Adequate and appropriate facilities will be provided for the
proper operation of the proposed use.
The Planning Board also makes findings under Section 8 . 5 of the
Zoning Bylaw that this PRD is in harmony with the general purpose
and intent of the Bylaw and that the PRD contains residential
development and open space in a variety to be sufficiently
advantageous to the Town and promotes the public health, safety,
and welfare of the citizens of the Town of North Andover. In
particular, the Planning Board finds that this project will:
A. Promote the more efficient use of land in harmony with its
natural features by preserving additional open space,
reducing the amount of clearing and excavation normally
associated with the construction of residential dwellings on
a site such as this;
B. Encourage the preservation of open space. The applicant has
provided greater than 35% of the total property as Open
Space;
C. Permit greater flexibility and more attractive and efficient
design of residential development;
D. Meet the Town' s housing needs by promoting a diversity of
1
housing types.
The Planning Board also finds that a base density of 6 lots is
appropriate for the PRD. This number of lots has been determined
from a Preliminary Conventional Subdivision Plan provided to the
Planning Board which satisfies the Town' s requirements for
submission of such a plan. This Preliminary Plan is described as
follows:
Plans entitled: Conventional Concept
Cobblestone Crossing Modification
North Andover, Mass
Prepared by: Merrimack Engineering Services, Inc.
66 Park Street
Andover, MA
Dated: September 1993
Scale: 1" = 40 '
This decision is in addition to the Special Permit Approval for
Cobblestone Crossing dated May 12, 1993.
Finally, the Planning Board finds that the Definitive Subdivision
complies with Town Bylaw requirements so long as the applicant
complies with the following conditions:
1. Prior to endorsement of the plans by the planning board and
recording with the Registry of Deeds the applicant shall
adhere to the following:
a. Revised plans must be submitted which include the fifty
foot (501 ) no-cut buffer zone.
b. The applicant shall post (per agreement with the North
Andover Planning Board) a Performance Guarantee in the
amount of five thousand dollars ($5,000) to be held by
the Town of North Andover. The Guarantee shall be in
the form of a check made payable to the Town of North
Andover escrow account. This amount shall cover any
contingencies that might affect the public welfare such
as site-opening, clearing, erosion control and
performance of any other condition contained herein,
prior to the posting of the Performance Security as
described in Condition 3 (b) of the Definitive
Subdivision Conditional Approval . This Performance
Guarantee may at the discretion of the Planning Board
be rolled over to cover other bonding considerations,
be released in full , or partially retained in
accordance with the recommendation of the Planning
Staff and as directed by the vote of the North Andover
Planning Board.
C. All designated open space parcels shall be retained by
2
the owners of the individual lots in trust. A perpetual
restriction of the type described in M.G.L. Chapter
184, Section 31 running to or enforceable by the town
shall be recorded in respect to such land. Such
restriction shall provide that the Usable Open Space
shall be retained in perpetuity for one or more of the
following uses : conservation, agriculture, or
recreation. Revised documents to this effect must be
reviewed by the Planning Staff prior to endorsement.
d. The trust created in Condition 1 (c) above must also
i
provide for the maintenance of the entrance way fence
and landscaping.
e. Restrictive Covenants must be recorded to insure that
the architectural style and materials of the proposed
structures are in accordance with the architectural
plans presented to the Planning Board. These plans are
described as follows: The Magnolia - "A" ; The Hickory
- "B" ; The Chestnut - "C" ; The Laurel "D" created for
Cobblestone Crossing at North Andover, by the Miquelle
- MZO Group.
f. Deeds conveying individual lots must contain a
restriction reflecting the 50 foot not-cut requirement
shown on the PRD plans. A sample deed must be reviewed
by the Planning Staff prior to endorsement of the
plans. All deeds must be in conformance with this
deed.
2 . Prior to any clearing of the site:
a. Yellow "hazard" tape must be placed along the no-cut
buffer zone on all lots to be released. The placement
of the tape will be viewed and approved by the Town
Planner.
b. Tree cutting shall be kept to a minimum throughout the
project to minimize erosion and preserve the natural
features of the site. The Town Planner must be
contacted prior to any cutting on site to review the
marked tree line. Efforts to protect trees on site
must be made.
3 . Prior to any lots being released from the statutory
covenants, the conditions outlined in the Cobblestone
Crossing Modification II Definitive Subdivision Conditional
Approval Modification must be followed and:
a. Copies of the documents concerning the ownership in
trust of the open space, the conservation restriction,
and the restrictive covenants as referenced above, must
3
be submitted to the Board for review.
4 . Prior to FORM U verification (Building Permit Issuance) for
an individual lot, the conditions outlined in the
Cobblestone Crossing Modification II Definitive Subdivision
Conditional Approval must be followed.
5. Prior to a Certificate of Occupancy being issued for an
individual lot, the conditions outlined in the Cobblestone
Crossing Modification II Definitive Subdivision Conditional
Approval must be followed.
6. Prior to the final release of security, the conditions
outlined in the Cobblestone Crossing Modification II
Definitive Subdivision Conditional Approval must be
followed.
7. The applicant shall adhere to the following requirements of
the Fire Department:
a. All structures shall contain residential fire sprinkler
systems the design of which will be approved by the
Fire Department.
b. Smoke alarms must be installed.
8 . This special permit approval shall be deemed to have lapsed
after Mski F:��, �a'i" (two years from the date permit
granted) unless substantial construction of roadway and
utilitiesas
h commenced. Thisro 'ect must be completed b
p 7 P Y
(within two (2) years from the date of
the start of construction)
9. The provisions of this Special Permit shall apply to and be
binding upon the applicant, its employees, contractors and
subcontractors and all successors in interest or control.
10. This Special Permit approval is based upon the approval of a
Definitive Subdivision Plan Modification. The Special
Permit and Definitive Subdivision approvals are both bused
upon the following plans:
a. Plans entitled: Modified Definitive Plan
Cobblestone Crossing
in North Andover, Mass.
Prepared for: Cobblestone Crossing Realty Trust
733 Turnpike Street
North Andover, MA 01845
Prepared by: Merrimack Engineering Services
66 Park Street
4
Andover, Mass
Scale: 1" = 40 '
Dated: September, 1993 ; rev. 10/29/93
Sheets: 1 though 5
cc. Conservation Administrator
Director of Public Works
Health Administrator
Building Inspector
Police Chief
Fire Chief
Assessor
Applicant
Engineer
File
CobblestoneII.PRD
5
' OF,,OAT&, .
KAREN H.P.NELSON 0 Town of 120 Main Street, 01845
Director NORTH ANDOVER (508) 682-6483
BUILDING
CONSERVATION SS�CMU5E4 DIVISION OF
HEALTH
PLANNING PLANNING & COMMUNITY DEVELOPMENT
I
November 12, 1993
Mr. Daniel Long,
Town Clerk
Town Building
120 Main Street
North Andover, MA 01845 Re: Special Permit
PRD - Cobblestone
Crossing
Dear Mr. Long:
The North Andover Planning Board held a public hearing on
October 19, 1993 on the application of Cobblestone Crossing Realty
Trust, 733 Turnpike Street, North Andover, MA. , requesting a
Special Permit under Section 8 . 5 (Planned Residential Development)
of the North Andover Zoning Bylaw. The legal notice was properly
advertised in the North Andover Citizen on September 29 and October
6, 1993 and all parties of interest were duly notified. The
following members were present: Richard Nardella, Chairman, John
Simons, Vice Chairman, Joseph Mahoney, Clerk, Richard Rowen and
John Daghlian, Associate Member.
The petitioner was requesting a Special Permit for the
construction of five (5) single family dwellings, creating seven
(7) lots. This is a modification to an approved plan.
Mr. Mahoney read the legal notices to open the public
hearings.
Mr. Nardella asked why this was a modification, not a new
subdivision.
Mr. Steve Stapinski gave the Board the following information:
1. Site adjacent to Cobblestone Crossing I - extension of
Copley Circle
2 . former Arcidicono property
3 , it is a modification because it needs to cross land that
was dedicated as open space under Cobblestone Crossing I
4 . create one homeowner association with both sections
5. easier to call it a modification so that appropriate
changes can be made to Cobblestone I
Page 2:
Cobblestone Crossing II
Modification
Additional information provided:
350' extension of roadway
subdivide into 5 lots with single family homes
lots 13 and 14 of Cobblestone I will be added to with
original Cobblestone I open space, therefore 7 lots total
are affected but only 5 new homes
water main connected through to existing water main at
existing house, looping water system
catch basins piped to detention area - pipe outlet to
swale currently existing - to drain line on Route 125
detention pond mitigates up to 100 year storms
roadway slopes down to existing Copley Circle catch
basins
more mitigation will be provided in the detention basin
that currently exists
total decrease in amount of run off zero % increase peak
rate
Lot 22 built in Cobblestone I open space
balance of houses on Arcidicono property
all different house designs, but are the same designs as
Cobblestone I
driveways, garages provided
22' wide pavement on Copley Circle originally permitted,
will continue with 22 ' pavement
propose a cul-de-sac island identical to other cul-de-sac
sidewalk terminate at Lot 19
open space provided
no waivers required
Lot 19 will be moved closer to the street than currently
shown on plan
open space adjacent to Old Village Lane
additional plantings will be placed along 199 ' boundary,
plantings will be placed along boundaries where needed to
provide a visual screen
open space taken away from Cobblestone Phase I, but
compensated with Cobblestone Phase II open space
Mr. Mahoney asked about ownership of Lot B. Mr. Stapinski
stated that the developer does not currently own the property.
Mr. Nardella stated that if Lot B not owned it should not be
shown on conventional plan, need to show a revised conventional
plan, need to eliminate Lot B in all calculations.
Mr. Daghlian - water main extension - no utility easement
shown.
Page 3 :
Cobblestone Crossing II
Modification
Mr. Nardella read a letter from D.P.W. received this evening,
dated October 18, 1993 , requirements must be addressed.
Mr. Daghlian asked if the developer had permission from the
State to tie into the State system. Mr. Stapinski stated that he
had a letter from the State stating no permit required if no direct
connection.
Mr. Nardella questioned the standing water in the detention
pond. Mr. Stapinski said no, shallow detention pond.
Mr. Nardella asked how many acres was involved. Mr. Stapinski
told him there were 4 .5 acres.
25, 000 sq. ft. required in R-3 for each lot
Mr. Nardella asked does modification comply with all
subdivision/PRD requirements. Mr. Stapinski answer - yes.
Mr. Nardella asked if homeowners association owns open space.
Mr. Stapinski stated that no lots have been conveyed yet, therefore
homeowners association redone to accommodate new open space.
Mr. Nardella asked what Lot 12A and 13A did to the open space.
Mr. Stapinski stated that 35% open space originally provided, open
space being adjusted over the entire parcel. House on Lot 19 can
be moved closer to the road. Fence on Lot 19, wood fence along
property line to stone wall in woods on Lot 19 . Open space
easement on Lot 19 to provide continuous open space.
Mr. Nardella noted that the detention pond is close to Lot 18 .
Mr. Nicetta stated that this may be a problem, may need a fence.
Mr. David Lanzoni, 99 Restaurant, stated that he had no
objections to the proposed development. There are inherent
problems with restaurants next to residential areas. He wants
landscaping consistent -with 199 ' requirements and protective
barriers along boundary.
Mr. Nardella wants an answer on doors to dumpsters from the
1991 . Mr. Lanzoni told Mr. Nardella that he has been working with
staff to come to a resolution.
Mr. Perna stated that the 22 ' roadway was consistent with
Cobblestone I, but not consistent with the D.P.W. policy of 241 .
Page 4 :
Cobblestone Crossing
Modification
Mr. Nardella asked how do Lot A and B effect total number of
lots in the overall calculations for the subdivision. Mr.
StaP inski stated that subdivision shows them as Form A Plans. Lot
B needs to be eliminated from conventional plan.
Mr. Rowen said that if Lot A is being adjusted, it should be
reviewed as a lot like Lot 6.
Ms. Colwell asked that the center line of the roadway be
staked by the weekend, Board to review site on their own.
On a motion by Mr. Rowen, seconded by Mr. Mahoney, the Board
voted to continue the public hearing to the next meeting of
November 2 , 1993 .
On November 2, 1993 the Planning Board held a regular meeting.
The following members were present: Richard Nardella, Chairman,
John Simons, Vice Chairman, Joseph Mahoney, Clerk and Richard
Rowen.
Mr. Steve P Sta inski resented a conventional subdivision plan
P
showing 5 new lots and one lot with an existing lot. He presented
a PRD plan with Lot B eliminated, explained calculation of open
space.
Mr. Nardella - When Board entered into discussions of
Cobblestone Modification, assumed that new documents and plan filed
at Registry.
Mr. Stapinski - Plan filed, but new documents never filed,
easements, open space documents need to be created and filed, house
designs need to be modified. Mr. Nardella asked at what point in
the process do these new documents get filed. They will be filed
when modification approved and new documents are drafted.
1199" needs to get gates on dumpster.
Add 50' buffer zone and no-cut to plan.
On a motion by Mr. Rowen, seconded by Mr. Simons, the Board
voted to close the public hearing on the Special Permit, PRD and
the Definitive Subdivision for Cobblestone Crossing II.
On a motion by Mr. Mahoney, seconded by Mr. Simons, the Board
voted to approve the definitive subdivision as amended.
Page 5:
Cobblestone Crossing II
Modification
On a motion by Mr. Mahoney, seconded by Mr. Simons, the Board
voted to approve the Special Permit for a PRD as amended. The
Chairman voted in the affirmative.
Attached are those conditions.
Sincerely,
North Andover Planning Board
Richard Nardella, Chairman
cc: Director of Public Works
Building Inspector
Conservation Administrator
Health Agent
Assessors
Police Chief
Fire Chief
Applicant
Engineer
File
Notice to APPLICANTfW0 CLW and Certification of Action of Planning Board
on Definitive Subdivision Plan entitled:
Modified Definitive Plan Cobblestone -Crossing
By: Merrimack Engineering Services, Inc. dated September 1993 19
The North Andover Planning Board has voted to APPROVE said plan, subject to the
following conditions:
1. That the record owners of the subject land forthwith execute and record
a "covenant running with the land", or otherwise provide security for the con-
striction of ways and the installation of municipal services within said sub-
div' 3ionl, all as provided by G.L. Co 4r, S. 81-U.
2. That all such construction and installations shall in all respects
conform to the governing rules and regulations of this Board.
3. That, as required by the North Andover Board of Health in its report to
this Boards no building or other structure shall be built or placed upon Lots
No. as shown on said Plan without the prior
consent of said Board of Health.
k. Other conditions:
See Attached
0
c -
C!'
In the event that no appeal shall have been taken from said approval within
twenty days from this dater the North Andover Planning Board will forthwith
thereafter endorse its formal approval upon said plan.
The North Andover Planning Board has DISAPPROVED said plans for the following
reasons:
NORTH PL�ANNI BOARD
Date: November 2, 1993 By: Richard Nardella Chairman
c
FORK C F
�
APPLICATION FOR APPROVAL Dffi�'Il�ITIVE PIAN `"
1
September 2 `l9 `_
�
`�3s
To the Planning Board of the Town of North Andover:
The undersignedq being the applicant as defined under Chapter 41, Section
81—Lq for approval of a proposed subdivision shown on a plan entitled
Modified Definitive Plan Cobblestone Crossing
by Merrimack Engineering Services, Inc. dated _September. 1993
being land bounded as follows: North by Cobblestone Crossing Realty Trust
East by land of Cahill and Cikacz; South by land of Pierro, Champion, Reilly
and Trustees of Reservations; West by Chickering Road
hereby submits said plan as a DEFINITIVE plan in accordance with the Rules and
Regulations of the North Andover Planning Board and makes application to the
Board for approval of said plan.
Title Reference: North Essex Deeds, Book 1543 , Page 86; or
Certificate of Title No. _, Registration Book page _; or
Other:
Said plan has( ) has not( ) evolved from a preliminary plan submitted to
the Board of 19 and approved (with modifications) ( )
disapproved ( on , 19 .
The undersigned hereby applies for the approval of said DEFINITIVE plan
by the Board, and in furtherance thereof hereby agrees to abide by the Board's
Rules and Regulations. The undersigned hereby further covenants and agrees
with the Town of North Andover, upon approval of said DEFINITIVE plan by the
Board:
1. To install utilities in accordance with the rules and regulations of the
Planning Board, the Public Works Department, the Highway Surveyor, the
Board of Health, and all general as well as zoning by—laws of said Town,
as are applicable to the installation of utilities within the limits of
ways and streets;
2. To complete and construct the streets or ways and other improvements shown
thereon in accordance with Sections Iv and V of the Rules and Regulations
of the Planning Board and the approved DEFINITIVE plan, profiles and cross
sections of the same. Said plan, profiles, cross sections and construction
specifications are specifical.ltiy, by reference, incorporated herein and Made
a part of this application. This application and the covenants and agree—
ments herein shall be binding upon all heirs, executors, administrators,
successors, grantees of the whole or part of said land, and assigns of the
undersigned; and
3. To complete the aforesaid installations and construction within two (2)
years from the date hereof.
Received by Town Clerk:
Date: Signature of Applicant
T
Cobblestone Crossing Real-y Trust
ime:
Signature: 733 Turnpike Street, North Andover, MA 01845
Address
i
a '
Cobblestone Crossing Modification II
Definitive Subdivision
Conditional Approval
The Planning Board herein approves this Modification to the
Subdivision Approval granted to Environeers, Inc. , dated May 12,
1993 and Modified on July 30, 1993 . This Modification creates 6
new lots, with five new homes and was requested by Cobblestone
Crossing Realty Trust, 733 Turnpike Street, North Andover, MA, on
September 24, 1993 . The parcel is 4.77 acres in size in a
Residential - 3 District. The Planning Board makes the following
findings as required by the Rules and Regulations Governing the
Subdivision of Land:
A. The Definitive Plans, dated September, 1993 ; rev. 10/29/93 ,
include all of the information indicated in Section 3 of the
Rules and Regulations concerning the procedure for the
submission of plans.
B. The Definitive Plan adheres to all of the design standards
as indicated in Section 7 of the Rules and Regulations.
C. The Definitive Plan is in conformance with the purpose and
intent of the Subdivision Control Law.
D. The Definitive Plan complies with all of the review comments
submitted by various town departments in order to comply
with state law, town by-laws and insure the public health,
safety, and welfare of the town.
Finally, the Planning Board finds that the Definitive Subdivision
complies with Town Bylaw requirements so long as the following
conditions are complied with:
1. Prior to endorsement of the plans by the Planning Board the
applicant shall comply with the Definitive Subdivision
Approval granted by the Planning Board for Cobblestone
Crossing dated May 12 , 1993 and modified July 30, 1993 in
addition to the following:
a. An updated construction schedule must be submitted as
part of the plans.
b. A revised covenant (Form I) securing all new lots
within the subdivision for the construction of ways and
municipal services must be submitted to the Planning
Board. Said lots may be released from the covenant upon
posting of security as requested in Condition #3 (b) .
C. Revised right-of-way dedication easements for the
proposed roadway shall be prepared at the applicant' s
expense and provided to the Planning Office.
1
d. The applicant must submit to the Town Planner a revised
FORM M for all utilities and easements placed on the
subdivision. The Board will sign the document and it
must be recorded at the Essex North Registry of Deeds.
2 . Prior to the start of construction:
The record plans must be endorsed by the Planning Board and
recorded by the applicant at the Essex North Registry of
Deeds and a copy submitted to the Planning Office.
3. Prior to any lots being released from the statutory
covenants the applicant shall comply with the Definitive
Subdivision Approval granted by the Planning Board for
Cobblestone Crossing dated May 12 , 1993 and modified July
30, 1993 in addition to the following:
a. The applicant must submit a lot release FORM J to the
Planning Board for signature.
b. A Performance Security in an amount to be determined by
the Planning Board, upon the recommendation of the
Department of Public Works, shall be posted to ensure
completion of the work in accordance with the Plans
approved as part of this conditional approval. Items
covered by the Bond may include, but shall not be
limited to:
i. as-built drawings
ii. sewers and utilities
iii. roadway construction and maintenance
iv. lot and site erosion control
V. site screening and street trees
vi. drainage facilities
vii. site restoration
viii. final site cleanup
C. All proper documents and easements required through
Condition 1 shall be in place.
4 . Prior to a- FORM U verification (Building Permit Issiance)
for an individual lot, the applicant shall comply with the
Definitive Subdivision Approval granted by the Planning
Board for Cobblestone Crossing dated May 12 , 1993 and
modified July 30, 1993 in addition to the following:
a. The applicant must submit to the Town Planner proof
that the revised FORM M referred to in Condition 1 (d)
above, was filed with the Registry of Deeds office.
b. Three (3) complete copies of plans and two (2) copies
2
of all documents containing registry of deeds stamps
must be submitted to the Town Planner as proof of
filing.
5. Prior to a Certificate of Occupancy being issued for an
individual lot, the applicant shall comply with the
Definitive Subdivision Approval granted by the Planning
Board for Cobblestone Crossing dated May 12 , 1993 and
modified July 30, 1993 in addition to the following:
a. The lot must be raked and seeded or sodded.
6. Prior to the final release of security retained for the site
by the Town, the applicant shall comply with the Definitive
Subdivision Approval granted by the Planning Board for
Cobblestone Crossing dated May 12 , 1993 and modified July
30, 1993 in addition to the following:
a. Two to two and one half inch caliper (2-2 . 511) street
trees are to be placed every fifty (501 ) feet along
both sides of all new roadways.
7. The applicant must comply with the following Division of
Public Works requirements:
a. The size and invert elevation of existing drain at
Chickering Road and spot elevations or contour lines on
Parcel L downstream of the detention area discharge
must be shown.
b. The detention area must be in a drainage easement.
C. A 20 foot wide utility easement must be provided for
the existing and proposed water main on Parcel P
between Chickering Road and Copley Circle.
d. A 20 foot wide utility easement must be provided for
future water main extension on Parcel P between Copley
Circle and the rear property corner of #59 and #67
Cranberry Lane.
e. A new hydrant must be installed at the end of the cul-
de-sac.
f. A 10 foot separation must be maintained between sewer
and water mains between stations 104+15 and 105+75 .
g. A complete set of signed plans and a copy of the
Planning Board decision must be on file at the Division
of Public Works prior to issuance of permits for
3
connections to utilities.
8. This Definitive Subdivision approval is based upon a Special
Permit granted in accordance with Section 4 . 125, 10. 3 and
10. 31 of the North Andover Zoning Bylaw. The Special Permit
and Definitive Subdivision approvals are both based upon the
following information:
a. Definitive Subdivision Approval dated May 12 , 1993 , and
Modified July 30, 1993 .
b. Special Permit Approval dated May 12, 1993
C. Plans entitled: Modified Definitive Plan
Cobblestone Crossing
in North Andover, Mass.
Prepared for: Cobblestone Crossing Realty Trust
733 Turnpike Street
North Andover, Mass 01845
Prepared by: Merrimack Engineering Services
66 Park Street
Andover, MA 01845
cc. Conservation Administrator
Director of Public Works
Health Administrator
Building Inspector
Police Chief
Fire Chief
Assessor
Applicant
Engineer
File
CobblestoneII.Subd
4