Loading...
HomeMy WebLinkAboutMiscellaneous - 223 CHICKERING ROAD 4/30/2018 223 CHICKERING ROAD f 210/046.0-0036-0000.0 I I f �a 3 Add ress c-- H tc-t� r'4, Title of File Page of Date File Open: Date File Closed:_ Doc Document/Action Tifile action Date of Refer to other PurP.ose of Document A ' Document/ document/ / coon and Num. note Action Department ----__ Board of Appeads - Board of Health - Planniang.Bo:ard _ Conservatiion Commission - Bonding Departnlen;t -�- TOWN OF NORTH ANDOVER p. MASSACHUSETTS :0'�,.ao N.4.O ,J Any appeal shall be filed within (20) days after the ; ' °:�•`:h "` date of filing of thss Notice in the Office ,_ - ,e "T:;vVE NOTICE OF DECISION C. .: ... Date. November. 12, 1993. . October '19, 1993 Date of Hearing November 2, 1993. i Petition Of Cobblestone Crossing Realty Trust . . . . . • . . . . . . . . . . . . . . . . . . . . . . . . . Premises affected , . .Chickering Road . . . . . . . . . , . . . , , . , Referring to the above petition for a special permit from the requirements of the , , , North Andover. Zoning. Bylaw_ _ Section 8..5. . Planned. Residential Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . so as to permit , , .the .construction of .5 .single .family dwellings,, creating . . . . . . . . . . . . . . . . . . . . . . . . . . . lots. .7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . After a public hearing given on the above date, the Planning Board voted CONDITIONALLY t0 . APPROVE . . . . . . .the SPECIAL PERMIT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . based upon the following conditions : CC: Director of Public Works Building Inspector Signed Conservation Administrator Richard Nardella, Chairman Health Agent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Assessors Police Chief . . .JFiin Simons, Vice Chairman . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fire Chief Joseph Mahoney, Clerk Applicant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Engineer Richard Rowen File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . interested Parties •planning B oard Cobblestone Crossing Modification Special Permit Planned Residential Development Conditional Approval The Planning Board herein approves this Modification to the Special Permit for a Planned Residential Development granted to White Birch Construction, dated May 12, 1993 . This Modification creates 6 new lots, with five new homes and was requested by Cobblestone Crossing Realty Trust, 733 Turnpike Street, North Andover, MA, on September 24, 1993 . The parcel is 4 .77 acres in size in a Residential-3 zone. The Planning Board makes the following findings as required by the Rules and Regulations Governing the Subdivision of Land Sections 10. 3 , and 10. 31. A. The specific site is an appropriate location for a Planned Residential Development as it is an extension of the existing Cobblestone Crossing subdivision. B. The use as developed will not adversely affect the neighborhood as this is an extension of an existing subdivision. C. There will be no nuisance or serious hazard to vehicles or pedestrians. D. Adequate and appropriate facilities will be provided for the proper operation of the proposed use. The Planning Board also makes findings under Section 8 . 5 of the Zoning Bylaw that this PRD is in harmony with the general purpose and intent of the Bylaw and that the PRD contains residential development and open space in a variety to be sufficiently advantageous to the Town and promotes the public health, safety, and welfare of the citizens of the Town of North Andover. In particular, the Planning Board finds that this project will: A. Promote the more efficient use of land in harmony with its natural features by preserving additional open space, reducing the amount of clearing and excavation normally associated with the construction of residential dwellings on a site such as this; B. Encourage the preservation of open space. The applicant has provided greater than 35% of the total property as Open Space; C. Permit greater flexibility and more attractive and efficient design of residential development; D. Meet the Town' s housing needs by promoting a diversity of 1 housing types. The Planning Board also finds that a base density of 6 lots is appropriate for the PRD. This number of lots has been determined from a Preliminary Conventional Subdivision Plan provided to the Planning Board which satisfies the Town' s requirements for submission of such a plan. This Preliminary Plan is described as follows: Plans entitled: Conventional Concept Cobblestone Crossing Modification North Andover, Mass Prepared by: Merrimack Engineering Services, Inc. 66 Park Street Andover, MA Dated: September 1993 Scale: 1" = 40 ' This decision is in addition to the Special Permit Approval for Cobblestone Crossing dated May 12, 1993. Finally, the Planning Board finds that the Definitive Subdivision complies with Town Bylaw requirements so long as the applicant complies with the following conditions: 1. Prior to endorsement of the plans by the planning board and recording with the Registry of Deeds the applicant shall adhere to the following: a. Revised plans must be submitted which include the fifty foot (501 ) no-cut buffer zone. b. The applicant shall post (per agreement with the North Andover Planning Board) a Performance Guarantee in the amount of five thousand dollars ($5,000) to be held by the Town of North Andover. The Guarantee shall be in the form of a check made payable to the Town of North Andover escrow account. This amount shall cover any contingencies that might affect the public welfare such as site-opening, clearing, erosion control and performance of any other condition contained herein, prior to the posting of the Performance Security as described in Condition 3 (b) of the Definitive Subdivision Conditional Approval . This Performance Guarantee may at the discretion of the Planning Board be rolled over to cover other bonding considerations, be released in full , or partially retained in accordance with the recommendation of the Planning Staff and as directed by the vote of the North Andover Planning Board. C. All designated open space parcels shall be retained by 2 the owners of the individual lots in trust. A perpetual restriction of the type described in M.G.L. Chapter 184, Section 31 running to or enforceable by the town shall be recorded in respect to such land. Such restriction shall provide that the Usable Open Space shall be retained in perpetuity for one or more of the following uses : conservation, agriculture, or recreation. Revised documents to this effect must be reviewed by the Planning Staff prior to endorsement. d. The trust created in Condition 1 (c) above must also i provide for the maintenance of the entrance way fence and landscaping. e. Restrictive Covenants must be recorded to insure that the architectural style and materials of the proposed structures are in accordance with the architectural plans presented to the Planning Board. These plans are described as follows: The Magnolia - "A" ; The Hickory - "B" ; The Chestnut - "C" ; The Laurel "D" created for Cobblestone Crossing at North Andover, by the Miquelle - MZO Group. f. Deeds conveying individual lots must contain a restriction reflecting the 50 foot not-cut requirement shown on the PRD plans. A sample deed must be reviewed by the Planning Staff prior to endorsement of the plans. All deeds must be in conformance with this deed. 2 . Prior to any clearing of the site: a. Yellow "hazard" tape must be placed along the no-cut buffer zone on all lots to be released. The placement of the tape will be viewed and approved by the Town Planner. b. Tree cutting shall be kept to a minimum throughout the project to minimize erosion and preserve the natural features of the site. The Town Planner must be contacted prior to any cutting on site to review the marked tree line. Efforts to protect trees on site must be made. 3 . Prior to any lots being released from the statutory covenants, the conditions outlined in the Cobblestone Crossing Modification II Definitive Subdivision Conditional Approval Modification must be followed and: a. Copies of the documents concerning the ownership in trust of the open space, the conservation restriction, and the restrictive covenants as referenced above, must 3 be submitted to the Board for review. 4 . Prior to FORM U verification (Building Permit Issuance) for an individual lot, the conditions outlined in the Cobblestone Crossing Modification II Definitive Subdivision Conditional Approval must be followed. 5. Prior to a Certificate of Occupancy being issued for an individual lot, the conditions outlined in the Cobblestone Crossing Modification II Definitive Subdivision Conditional Approval must be followed. 6. Prior to the final release of security, the conditions outlined in the Cobblestone Crossing Modification II Definitive Subdivision Conditional Approval must be followed. 7. The applicant shall adhere to the following requirements of the Fire Department: a. All structures shall contain residential fire sprinkler systems the design of which will be approved by the Fire Department. b. Smoke alarms must be installed. 8 . This special permit approval shall be deemed to have lapsed after Mski F:��, �a'i" (two years from the date permit granted) unless substantial construction of roadway and utilitiesas h commenced. Thisro 'ect must be completed b p 7 P Y (within two (2) years from the date of the start of construction) 9. The provisions of this Special Permit shall apply to and be binding upon the applicant, its employees, contractors and subcontractors and all successors in interest or control. 10. This Special Permit approval is based upon the approval of a Definitive Subdivision Plan Modification. The Special Permit and Definitive Subdivision approvals are both bused upon the following plans: a. Plans entitled: Modified Definitive Plan Cobblestone Crossing in North Andover, Mass. Prepared for: Cobblestone Crossing Realty Trust 733 Turnpike Street North Andover, MA 01845 Prepared by: Merrimack Engineering Services 66 Park Street 4 Andover, Mass Scale: 1" = 40 ' Dated: September, 1993 ; rev. 10/29/93 Sheets: 1 though 5 cc. Conservation Administrator Director of Public Works Health Administrator Building Inspector Police Chief Fire Chief Assessor Applicant Engineer File CobblestoneII.PRD 5 ' OF,,OAT&, . KAREN H.P.NELSON 0 Town of 120 Main Street, 01845 Director NORTH ANDOVER (508) 682-6483 BUILDING CONSERVATION SS�CMU5E4 DIVISION OF HEALTH PLANNING PLANNING & COMMUNITY DEVELOPMENT I November 12, 1993 Mr. Daniel Long, Town Clerk Town Building 120 Main Street North Andover, MA 01845 Re: Special Permit PRD - Cobblestone Crossing Dear Mr. Long: The North Andover Planning Board held a public hearing on October 19, 1993 on the application of Cobblestone Crossing Realty Trust, 733 Turnpike Street, North Andover, MA. , requesting a Special Permit under Section 8 . 5 (Planned Residential Development) of the North Andover Zoning Bylaw. The legal notice was properly advertised in the North Andover Citizen on September 29 and October 6, 1993 and all parties of interest were duly notified. The following members were present: Richard Nardella, Chairman, John Simons, Vice Chairman, Joseph Mahoney, Clerk, Richard Rowen and John Daghlian, Associate Member. The petitioner was requesting a Special Permit for the construction of five (5) single family dwellings, creating seven (7) lots. This is a modification to an approved plan. Mr. Mahoney read the legal notices to open the public hearings. Mr. Nardella asked why this was a modification, not a new subdivision. Mr. Steve Stapinski gave the Board the following information: 1. Site adjacent to Cobblestone Crossing I - extension of Copley Circle 2 . former Arcidicono property 3 , it is a modification because it needs to cross land that was dedicated as open space under Cobblestone Crossing I 4 . create one homeowner association with both sections 5. easier to call it a modification so that appropriate changes can be made to Cobblestone I Page 2: Cobblestone Crossing II Modification Additional information provided: 350' extension of roadway subdivide into 5 lots with single family homes lots 13 and 14 of Cobblestone I will be added to with original Cobblestone I open space, therefore 7 lots total are affected but only 5 new homes water main connected through to existing water main at existing house, looping water system catch basins piped to detention area - pipe outlet to swale currently existing - to drain line on Route 125 detention pond mitigates up to 100 year storms roadway slopes down to existing Copley Circle catch basins more mitigation will be provided in the detention basin that currently exists total decrease in amount of run off zero % increase peak rate Lot 22 built in Cobblestone I open space balance of houses on Arcidicono property all different house designs, but are the same designs as Cobblestone I driveways, garages provided 22' wide pavement on Copley Circle originally permitted, will continue with 22 ' pavement propose a cul-de-sac island identical to other cul-de-sac sidewalk terminate at Lot 19 open space provided no waivers required Lot 19 will be moved closer to the street than currently shown on plan open space adjacent to Old Village Lane additional plantings will be placed along 199 ' boundary, plantings will be placed along boundaries where needed to provide a visual screen open space taken away from Cobblestone Phase I, but compensated with Cobblestone Phase II open space Mr. Mahoney asked about ownership of Lot B. Mr. Stapinski stated that the developer does not currently own the property. Mr. Nardella stated that if Lot B not owned it should not be shown on conventional plan, need to show a revised conventional plan, need to eliminate Lot B in all calculations. Mr. Daghlian - water main extension - no utility easement shown. Page 3 : Cobblestone Crossing II Modification Mr. Nardella read a letter from D.P.W. received this evening, dated October 18, 1993 , requirements must be addressed. Mr. Daghlian asked if the developer had permission from the State to tie into the State system. Mr. Stapinski stated that he had a letter from the State stating no permit required if no direct connection. Mr. Nardella questioned the standing water in the detention pond. Mr. Stapinski said no, shallow detention pond. Mr. Nardella asked how many acres was involved. Mr. Stapinski told him there were 4 .5 acres. 25, 000 sq. ft. required in R-3 for each lot Mr. Nardella asked does modification comply with all subdivision/PRD requirements. Mr. Stapinski answer - yes. Mr. Nardella asked if homeowners association owns open space. Mr. Stapinski stated that no lots have been conveyed yet, therefore homeowners association redone to accommodate new open space. Mr. Nardella asked what Lot 12A and 13A did to the open space. Mr. Stapinski stated that 35% open space originally provided, open space being adjusted over the entire parcel. House on Lot 19 can be moved closer to the road. Fence on Lot 19, wood fence along property line to stone wall in woods on Lot 19 . Open space easement on Lot 19 to provide continuous open space. Mr. Nardella noted that the detention pond is close to Lot 18 . Mr. Nicetta stated that this may be a problem, may need a fence. Mr. David Lanzoni, 99 Restaurant, stated that he had no objections to the proposed development. There are inherent problems with restaurants next to residential areas. He wants landscaping consistent -with 199 ' requirements and protective barriers along boundary. Mr. Nardella wants an answer on doors to dumpsters from the 1991 . Mr. Lanzoni told Mr. Nardella that he has been working with staff to come to a resolution. Mr. Perna stated that the 22 ' roadway was consistent with Cobblestone I, but not consistent with the D.P.W. policy of 241 . Page 4 : Cobblestone Crossing Modification Mr. Nardella asked how do Lot A and B effect total number of lots in the overall calculations for the subdivision. Mr. StaP inski stated that subdivision shows them as Form A Plans. Lot B needs to be eliminated from conventional plan. Mr. Rowen said that if Lot A is being adjusted, it should be reviewed as a lot like Lot 6. Ms. Colwell asked that the center line of the roadway be staked by the weekend, Board to review site on their own. On a motion by Mr. Rowen, seconded by Mr. Mahoney, the Board voted to continue the public hearing to the next meeting of November 2 , 1993 . On November 2, 1993 the Planning Board held a regular meeting. The following members were present: Richard Nardella, Chairman, John Simons, Vice Chairman, Joseph Mahoney, Clerk and Richard Rowen. Mr. Steve P Sta inski resented a conventional subdivision plan P showing 5 new lots and one lot with an existing lot. He presented a PRD plan with Lot B eliminated, explained calculation of open space. Mr. Nardella - When Board entered into discussions of Cobblestone Modification, assumed that new documents and plan filed at Registry. Mr. Stapinski - Plan filed, but new documents never filed, easements, open space documents need to be created and filed, house designs need to be modified. Mr. Nardella asked at what point in the process do these new documents get filed. They will be filed when modification approved and new documents are drafted. 1199" needs to get gates on dumpster. Add 50' buffer zone and no-cut to plan. On a motion by Mr. Rowen, seconded by Mr. Simons, the Board voted to close the public hearing on the Special Permit, PRD and the Definitive Subdivision for Cobblestone Crossing II. On a motion by Mr. Mahoney, seconded by Mr. Simons, the Board voted to approve the definitive subdivision as amended. Page 5: Cobblestone Crossing II Modification On a motion by Mr. Mahoney, seconded by Mr. Simons, the Board voted to approve the Special Permit for a PRD as amended. The Chairman voted in the affirmative. Attached are those conditions. Sincerely, North Andover Planning Board Richard Nardella, Chairman cc: Director of Public Works Building Inspector Conservation Administrator Health Agent Assessors Police Chief Fire Chief Applicant Engineer File Notice to APPLICANTfW0 CLW and Certification of Action of Planning Board on Definitive Subdivision Plan entitled: Modified Definitive Plan Cobblestone -Crossing By: Merrimack Engineering Services, Inc. dated September 1993 19 The North Andover Planning Board has voted to APPROVE said plan, subject to the following conditions: 1. That the record owners of the subject land forthwith execute and record a "covenant running with the land", or otherwise provide security for the con- striction of ways and the installation of municipal services within said sub- div' 3ionl, all as provided by G.L. Co 4r, S. 81-U. 2. That all such construction and installations shall in all respects conform to the governing rules and regulations of this Board. 3. That, as required by the North Andover Board of Health in its report to this Boards no building or other structure shall be built or placed upon Lots No. as shown on said Plan without the prior consent of said Board of Health. k. Other conditions: See Attached 0 c - C!' In the event that no appeal shall have been taken from said approval within twenty days from this dater the North Andover Planning Board will forthwith thereafter endorse its formal approval upon said plan. The North Andover Planning Board has DISAPPROVED said plans for the following reasons: NORTH PL�ANNI BOARD Date: November 2, 1993 By: Richard Nardella Chairman c FORK C F � APPLICATION FOR APPROVAL Dffi�'Il�ITIVE PIAN `" 1 September 2 `l9 `_ � `�3s To the Planning Board of the Town of North Andover: The undersignedq being the applicant as defined under Chapter 41, Section 81—Lq for approval of a proposed subdivision shown on a plan entitled Modified Definitive Plan Cobblestone Crossing by Merrimack Engineering Services, Inc. dated _September. 1993 being land bounded as follows: North by Cobblestone Crossing Realty Trust East by land of Cahill and Cikacz; South by land of Pierro, Champion, Reilly and Trustees of Reservations; West by Chickering Road hereby submits said plan as a DEFINITIVE plan in accordance with the Rules and Regulations of the North Andover Planning Board and makes application to the Board for approval of said plan. Title Reference: North Essex Deeds, Book 1543 , Page 86; or Certificate of Title No. _, Registration Book page _; or Other: Said plan has( ) has not( ) evolved from a preliminary plan submitted to the Board of 19 and approved (with modifications) ( ) disapproved ( on , 19 . The undersigned hereby applies for the approval of said DEFINITIVE plan by the Board, and in furtherance thereof hereby agrees to abide by the Board's Rules and Regulations. The undersigned hereby further covenants and agrees with the Town of North Andover, upon approval of said DEFINITIVE plan by the Board: 1. To install utilities in accordance with the rules and regulations of the Planning Board, the Public Works Department, the Highway Surveyor, the Board of Health, and all general as well as zoning by—laws of said Town, as are applicable to the installation of utilities within the limits of ways and streets; 2. To complete and construct the streets or ways and other improvements shown thereon in accordance with Sections Iv and V of the Rules and Regulations of the Planning Board and the approved DEFINITIVE plan, profiles and cross sections of the same. Said plan, profiles, cross sections and construction specifications are specifical.ltiy, by reference, incorporated herein and Made a part of this application. This application and the covenants and agree— ments herein shall be binding upon all heirs, executors, administrators, successors, grantees of the whole or part of said land, and assigns of the undersigned; and 3. To complete the aforesaid installations and construction within two (2) years from the date hereof. Received by Town Clerk: Date: Signature of Applicant T Cobblestone Crossing Real-y Trust ime: Signature: 733 Turnpike Street, North Andover, MA 01845 Address i a ' Cobblestone Crossing Modification II Definitive Subdivision Conditional Approval The Planning Board herein approves this Modification to the Subdivision Approval granted to Environeers, Inc. , dated May 12, 1993 and Modified on July 30, 1993 . This Modification creates 6 new lots, with five new homes and was requested by Cobblestone Crossing Realty Trust, 733 Turnpike Street, North Andover, MA, on September 24, 1993 . The parcel is 4.77 acres in size in a Residential - 3 District. The Planning Board makes the following findings as required by the Rules and Regulations Governing the Subdivision of Land: A. The Definitive Plans, dated September, 1993 ; rev. 10/29/93 , include all of the information indicated in Section 3 of the Rules and Regulations concerning the procedure for the submission of plans. B. The Definitive Plan adheres to all of the design standards as indicated in Section 7 of the Rules and Regulations. C. The Definitive Plan is in conformance with the purpose and intent of the Subdivision Control Law. D. The Definitive Plan complies with all of the review comments submitted by various town departments in order to comply with state law, town by-laws and insure the public health, safety, and welfare of the town. Finally, the Planning Board finds that the Definitive Subdivision complies with Town Bylaw requirements so long as the following conditions are complied with: 1. Prior to endorsement of the plans by the Planning Board the applicant shall comply with the Definitive Subdivision Approval granted by the Planning Board for Cobblestone Crossing dated May 12 , 1993 and modified July 30, 1993 in addition to the following: a. An updated construction schedule must be submitted as part of the plans. b. A revised covenant (Form I) securing all new lots within the subdivision for the construction of ways and municipal services must be submitted to the Planning Board. Said lots may be released from the covenant upon posting of security as requested in Condition #3 (b) . C. Revised right-of-way dedication easements for the proposed roadway shall be prepared at the applicant' s expense and provided to the Planning Office. 1 d. The applicant must submit to the Town Planner a revised FORM M for all utilities and easements placed on the subdivision. The Board will sign the document and it must be recorded at the Essex North Registry of Deeds. 2 . Prior to the start of construction: The record plans must be endorsed by the Planning Board and recorded by the applicant at the Essex North Registry of Deeds and a copy submitted to the Planning Office. 3. Prior to any lots being released from the statutory covenants the applicant shall comply with the Definitive Subdivision Approval granted by the Planning Board for Cobblestone Crossing dated May 12 , 1993 and modified July 30, 1993 in addition to the following: a. The applicant must submit a lot release FORM J to the Planning Board for signature. b. A Performance Security in an amount to be determined by the Planning Board, upon the recommendation of the Department of Public Works, shall be posted to ensure completion of the work in accordance with the Plans approved as part of this conditional approval. Items covered by the Bond may include, but shall not be limited to: i. as-built drawings ii. sewers and utilities iii. roadway construction and maintenance iv. lot and site erosion control V. site screening and street trees vi. drainage facilities vii. site restoration viii. final site cleanup C. All proper documents and easements required through Condition 1 shall be in place. 4 . Prior to a- FORM U verification (Building Permit Issiance) for an individual lot, the applicant shall comply with the Definitive Subdivision Approval granted by the Planning Board for Cobblestone Crossing dated May 12 , 1993 and modified July 30, 1993 in addition to the following: a. The applicant must submit to the Town Planner proof that the revised FORM M referred to in Condition 1 (d) above, was filed with the Registry of Deeds office. b. Three (3) complete copies of plans and two (2) copies 2 of all documents containing registry of deeds stamps must be submitted to the Town Planner as proof of filing. 5. Prior to a Certificate of Occupancy being issued for an individual lot, the applicant shall comply with the Definitive Subdivision Approval granted by the Planning Board for Cobblestone Crossing dated May 12 , 1993 and modified July 30, 1993 in addition to the following: a. The lot must be raked and seeded or sodded. 6. Prior to the final release of security retained for the site by the Town, the applicant shall comply with the Definitive Subdivision Approval granted by the Planning Board for Cobblestone Crossing dated May 12 , 1993 and modified July 30, 1993 in addition to the following: a. Two to two and one half inch caliper (2-2 . 511) street trees are to be placed every fifty (501 ) feet along both sides of all new roadways. 7. The applicant must comply with the following Division of Public Works requirements: a. The size and invert elevation of existing drain at Chickering Road and spot elevations or contour lines on Parcel L downstream of the detention area discharge must be shown. b. The detention area must be in a drainage easement. C. A 20 foot wide utility easement must be provided for the existing and proposed water main on Parcel P between Chickering Road and Copley Circle. d. A 20 foot wide utility easement must be provided for future water main extension on Parcel P between Copley Circle and the rear property corner of #59 and #67 Cranberry Lane. e. A new hydrant must be installed at the end of the cul- de-sac. f. A 10 foot separation must be maintained between sewer and water mains between stations 104+15 and 105+75 . g. A complete set of signed plans and a copy of the Planning Board decision must be on file at the Division of Public Works prior to issuance of permits for 3 connections to utilities. 8. This Definitive Subdivision approval is based upon a Special Permit granted in accordance with Section 4 . 125, 10. 3 and 10. 31 of the North Andover Zoning Bylaw. The Special Permit and Definitive Subdivision approvals are both based upon the following information: a. Definitive Subdivision Approval dated May 12 , 1993 , and Modified July 30, 1993 . b. Special Permit Approval dated May 12, 1993 C. Plans entitled: Modified Definitive Plan Cobblestone Crossing in North Andover, Mass. Prepared for: Cobblestone Crossing Realty Trust 733 Turnpike Street North Andover, Mass 01845 Prepared by: Merrimack Engineering Services 66 Park Street Andover, MA 01845 cc. Conservation Administrator Director of Public Works Health Administrator Building Inspector Police Chief Fire Chief Assessor Applicant Engineer File CobblestoneII.Subd 4