Loading...
HomeMy WebLinkAboutMiscellaneous - 224 SUMMER STREET 4/30/2018 (2) rf -224 SUMMER STREET 21-0/038.0-01 72-c)-ddd.d i �P 1. F i _ 11 Lot& Street ' C� Map/parcel CONSTRUCTION AppROVqL Has plan review fee been paid YE PlanNO Approval: Date: Permit# Designer: Approved by; Conditions: Plan Date: Water Supply. Town Well Well Permit: Well Tests: Chemical Driller: Bacteria 1 to Approved Bacteria 11 Dat Q proved Date App ed Plumbing Sign-off.. Comments: Wirin - g Sign-offf., Form "U»Approval: !, Date Issued Approval to Issue: Conditions: BYES NO y: Final Approval: 1 All Permits P Well Construct on A Septic System Constuchon Approval? NO Certification? pproval? YES NO Other? YES NO YES NO Any Variance Needed? YES NO FINAL BOARD OFYES NO DATE: HEALTH APPROVAL: APPROVED BY: SEPTIC SYSTEM INSTALLATION CONDITIONS: Is the installer licensed? Type of Construction: NO New Construction: Certified Plot Plan Review NEW RIR Floor Plan Review NO Conditions of Approval from Form U YES Issuance of DWC permit: S N DWC Permit Paid? �5 DWC Permit# 20� / YES NO Installer: Begin Inspection: YES NO Excavation Inspection: Needed: Passed: 68 By: Construction Inspection: Needed: 0 As Built Plan Satisfactory: YES: i Approval of Backfill: Date: By: Final Grading Approval: Date: By: Final Construction Approval: Date: By: Certificate of Compliance: Approval: Date: