HomeMy WebLinkAboutMiscellaneous - 226 STEVENS STREET 4/30/2018 (2) 0?0?6 S'�e- (Aeng
s
_-
CONSERVATION DEPARTMENT
Community Development Division
July 29, 2014
Kurt&Martha Mittelstaedt
226 Stevens Street
North Andover, MA 01845
RE: Selective removal of one (1) hemlock tree and pruning of one (1) maple tree within the
buffer zone of a wetland resource area.
This is a follow up letter pertaining to your ,request to remove several trees and prune one (1)
maple tree (Acer sp.) at 226 Stevens Street. The trees were identified during a site visit by the
Conservation Department on July 1, 2014. It was determined that two of the trees are located
within the 25' No-Disturbance Zone pursuant to the North Andover Wetlands Protection Bylaw
(C. 178 of the Code of North Andover). Removal of vegetation, including pruning and cutting,
is prohibited within the No-Disturbance Zone except in rare circumstances, such as for safety.
The two trees within the 25' provide wildlife habitat value and cannot be removed or pruned.
The maple tree is more than 50' from the wetlands and may be pruned, however no pruning of
the canopy will be allowed Several hemlocks were requested to be removed, only one of the
hemlocks is within the 100' Buffer Zone, all requested hemlocks may be removed. The trees
which are permitted to be removed as well as the maple tree which may be pruned are
identified in the attached photos.
**The Conservation Department does not make determinations regarding property ownership
and the location of the trees. It is the responsibility of the owner of 226 Steven's Street to
determine ownership and obtain any necessary permission to cut/remove any of the trees that
are not on the property of 226 Stevens Street.
The approved cutting will be subject to the following conditions:
❖ No machinery shall enter the 25' No Disturbance Zone.
No work shall occur in resource areas.
•'• All tree limbs, brush, and other debris materials shall be taken off site and disposed of
properly.
4- Stumps of the trees shall not be removed and shall be left in place. Stumps may be ground
down or cut flush with the landscape.
1600 Osgood Street,North Andover,Massachusetts 01845
Phone 978.688.9530 Fax 978.688.9542 Web www.townofnorthandover.com
❖ Care shall be taken to prevent damage to surrounding trees during removal of the approved
trees.
❖ Upon completion of the tree removal, all disturbed areas shall be properly stabilized.
❖ The applicant shall notify this department immediately following completion of work for a
final site inspection.
❖ Areas within 100-feet of wetland resource areas shall remain in a natural state and no further
vegetation shall be removed without the prior approval of the Conservation
Department/Commission.
❖ This permit shall expire in six months from the date above.
Please do not hesitate to contact me should you have any further questions or concerns in this
regard.
Sincerely,
NORTH ANDOVER CONSERVATION COMMISSION
o��g,�
Heidi Gaffney
Conservation Field Inspector
Cc: Jennifer Hughes, Conservation Administrator
i �1N
Tree is not within the
buffer zone and may
be removed and/or
pruned
...... �
NZ
1600 Osgood Street,North Andover,Massachusetts 01845
Phone 978.688.9530 Fax 978.688.9542 Web www.townofnorfhandover.com
a -r- '�i''+Se b� � j mow'''•"" Q'�.. `aa ;�
Xv
Large Maple Tree to
g� °� "fit 4Nr
be pruned
All Hemlock Trees 04.
between • yrs
Maple
may be removed (only
one is within the bufferk s •-A
s <.
s
uk }�
MOV
QRRI
PRI112-"M
r �d
I l i lii f ! f l i lii 1 1 1 1 1 1' 11 1
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, 40 242-1414
Provided by DEP
A. Project Information
Important:
When filling out 1 This Certificate of Compliance is issued to:
forms the
computer, use Martha & Kurt Mittelstaedt
_
only the tab Name
key to move C/o Neve-Morin Group, Inc. 447 Old Boston Road, Route 1, Suite 12
your cursor- Mailing Address .
do not use the Topfield MA 01983
return key. Citylrown State
Zip Code
2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to:
Martha Mittelstaedt
Name
October 25, 2007 242-1414
Dated DEP File Number
3. The project site is located at:
226 Stevens Street North Andover
Street Address _ CitylTown
Map 95 Parcel 17
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if different)
Essex North 11019 286
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent, on:
10/7/09
Date
B. Certification
Check all that apply:
® Complete Certification: It is hereby certified fed that the work regulated by the above-referenced
Order of Conditions has been satisfactorily completed.
Partial
❑ Certification: It is hereby certified that only the following portions of work regulated by the
above-referenced Order of Conditions have been satisfactorily completed. The project areas or work
subject to this partial certification that have been completed and are released from this Order are:
wpaform 8b.doc•rev.7/13/04
Page 1 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, 40 242-1414
Provided by DEP
B. Certification (cont.)
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced
Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no
longer valid. No future work subject to regulation under the Wetlands Protection Act may
commence without filing a new Notice of Intent and receiving a new Order of Conditions.
® Ongoing Conditions: The following conditions of the Order shall continue: (Include any
conditions contained in the Final Order, such as maintenance or monitoring, that should continue
for a longer period).
Condition Numbers:
78
C. Authorization
Issued by:
North Andover
Conservation Commission Qate o'Issuance
This Certificate must be signed by a majority of the Conservation p7mmission and a copy sent to the
applicant and appropriate DEP Regional Office (See Attachmen .
Signatures:
f
wpaform 8b.doc•rev.7/13/04
Page 2 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
DEP File Number.
WPA Form 8B — Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 242-1414
Provided by DEP
C. Authorization (cont.)
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex North
On thisDay Of Dc7 6 e-� 060 C)
Month Year
before me, the undersigned Notary Public, personally appeared
John Mabon,
Name of Document Signer
proved to me through satisfactory evidence of identification, which was/were
Massachusetts License
Description of evidence of identification
to be the person whose name.is signed on the preceding or attached document, and acknowledged
to me that he/she signed it voluntarily for its stated purpose.
As m North Andover
ember of
City/Town Conservation Commission
:1
Signature ofNotarry,Public J�/
WTMVFUMC
aoimotrwExTM OF w�sagn�rrs
Printed Name of Notary Public
MY Camp E>q�Yes 15,2016
My C mmissi n Expires(Date)
Place notary seal and/or any stamp above w �P
Signature of Notary Public
wpaform 8b.doc•rev.7/13/04
Page 3 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
IL)
DEP File Number:
WPA Form 8B — Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, 40 242-1414
Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of
Deeds or.the Land Court for the district in which.the land is located.
Detach on dotted line and submit to the Conservation Commission.
To:
North Andover
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
226 Stevens Street 242-1414
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
Essex North
County
for:
Martha & Kurt Mittelstaedt
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book
Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies thisr
t ansaction is:
Document Number
Signature of Applicant
wpaform 8b.doo•rev.7/13/04
Page 4 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource. Protection - Wetlands
DEP Regional Addresses
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Mail transmittal forms and DEP payments,payable to:
Commonwealth of Massachusetts
Department of Environmental Protection
Box 4062
Boston, MA 02211
DEP Western Region Adams Colrain Hampden Monroe Pittsfield Tynngham
436 Dwight Street Agawam Conway Hancock Montague g Alford Cummington Hatfield MontereyPlainfield Wales
Suite 4O2 Amherst Dalton Hawley Mont Richmond Ware
Montgomery
Springfield,MA 01103 Ashfield Deerfield Heath g ry Rowe Warwick
Monson Russell Washington
Phone:413-784-1100 Becket Easthampton Hinsdale Mount Washington Sandisfield Wendell
Belchertown East Longmeadow Holland New Ashford Savoy Westfield
Fax:413484-1149 Bernardston Egremont Holyoke New Marlborough Sheffield Westhampton
- Blandford Erving Huntington New Salem Shelbume West Springfield
Brimfield Florida Lanesborough North Adams Shulesbury West Stockbridge
Buckland Gill Lee Northampton Southampton Whately
Charlemont Goshen Lenox Northfield South Hadley Wilbraham
ChesterCheshiGranby Leverett Orange Southwick Williamsburg. .
Granville Leyden Otis Springfield Williamstown
Chesterfield Great Barrington Longmeadow Palmer Stockbridge Windsor
Chicopee Greenfield Ludlow Pelham Sunderland Worthin ton
Clarksburg Hadley Middlefield Peru Tolland g
DEP Central Region Acton Charlton Hopkinton MillburyUxbridge
Rutland
627 Main Street Ashbumham Clinton Hubbardston Millville Shirley Warren
Ashby Douglas Hudson New Braintree Shrewsbury Webster
Worcester,MA 01608 Athol Dudley Holliston Northborough Southborough
Phone:508-792-7650 Auburn Dunstable Lancaster Westborough
Northbridge Southbridge West Boylston
Fax:508-792-7621 Ayer East Brookfield Leicester North Brookfield Spencer West Brookfield
Barre Fitchburg Leominster Oakham Sterling Westford
TDD:508-767-2788 Bellingham Gardner Littleton Oxford Stow
Berlin Grafton Lunenburg Paxton Westminster
hendon
Blackstone Groton Marlborough Pe Sutton WoPepperell Sturbridge Wo cester
Bolton Harvard Maynard Petersham Worcester
Templeton
Boxborough Hardwick, Medway Philtioston Townsend
Boylston Holden Mendon Princeton Tyngsborough
Brookfield Hopedale Milford Royalston Upton
DEP Southeast Region Abington Dartmouth Freetown Mattapoisett Provincetown Tisbury
20 Riverside Drive Acushnet Dennis Gay Head Middleborough Raynham Truro
Lakeville,MA 02347 Attleboro Dighton Gosnold Nantucket Rehoboth Wareham
Avon Duxbury Halifax New Bedford Rochester Wellfieet
Phone:508-946-2700 Barnstable Eastham Hanover North Attleborough Rockland West Bridgewater
Fax:508-947-6557 Berkley East Bridgewater Hanson Norton Sandwich Westport
TDD:508-946-2795 Bourne Easton Harwich Norwell Scituate West Tisbury
Brewster Edgartown Kingston Oak Bluffs Seekonk Whitman
Bridgewater Fairhaven Lakeville Orleans Sharon Wrentham
Brockton Fall River Mansfield Pembroke Somerset Yarmouth
Carver Falmouth Marion Plainville Stoughton
Chatham Foxborough Marshfield Plymouth Swansea
Chilmark Franklin Mashpee PI m ton
Y P Taunton
DEP Northeast Region Amesbury Chelmsford Hingham Merrimac Quincy Wakefield
Andover Chelsea Holbrook Randolph Walpole
1 Winter Street Methuen
Arlington Cohasset Hull Middleton P
Boston,MA 02108 Ashland Concord Ipswich Millis Reading Waltham
Phone:617-654-6500 Bedford Danvers Lawrence Revere Watertown
Milton Rockport Wayland
Fax: 617-556-1049 Belmont Dedham Lexington Nahant Rowley
Y Wellesley
TDD:617-574-6868 Y Dover Lincoln Natick Salem Wenham
Billerica Dracut Lowell Needham Salisbury West Newbury
Boston Essex Lynn Newbury Saugus Weston
Boxford Everett Lynnfield Newburyport Sherbom Westwood
Braintree Framingham Malden Newton Somerville Weymouth
Brookline Georgetown Manchester-By-The-Sea Norfolk Stoneham Wilmington
Burlington Gloucester Marblehead North Andover Sudbury Winchester
Cambridge Groveland Medfield North Reading Swampscott Winthrop
Canton Hamilton Medford Norwood Tewksbury Woburn
Carlisle Haverhill Melrose Peabody Topsfield
wpaform8b.doc•DEP Addresses•rev.8/14/09
Page 1 of 1
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1414
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information
Important: North Andover
When filling From: 1.Conservation Commission
out forms on
the computer, 2. This issuance is for(check one): ® Order of Conditions ❑ Amended Order of Conditions
use only the
tab key to 3. To: Applicant:
move your
cursor-do not Martha Mittelstaedt
use the return a. First Name b. Last Name c.Company
key. 226 Stevens Street
d. Mailing Address
North Andover MA 01845
e.City/Town f.State g.Zip Code
4. Property Owner(if different from applicant):
Same
a. First Name b. Last Name c.Company
d. Mailing Address
e. City/Town f.State g.Zip Code
5. Project Location:
226 Stevens Street North Andover
a. Street Address b. City/Town
Map 95 Parcel 17
c.Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known (note:
electronic filers will click for GIS locator): e. Latitude f. Longitude
6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel):
Essex North
a. County b.Certificate(if registered land)
9943 218
c. Book d.Page
7. Dates: 9/13/07 le 0/0 2 2 G7
a.Date Notice of Intent Filed b.Date ubl c Hearing Closed c. Date Lf Iss ance
8. Final Approved Plans and Other Documents (attach additional plan or document references as
needed):
Plan of Land
a. Plan Title
The Neve-Morin Group, Inc. John M. Morin, P. E.
b. Prepared By c.Signed and Stamped by
8/30/07, revised 10/2/07 1" =20'
d. Final Revision Date e.Scale
f.Additional Plan or Document Title g. Date
9. Total WPA Fee Paid: $220.00 $42.50 $177.50
a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid
wpaform5.doc• rev.3/1/05 Page 1 of 9
' t _
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1414
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings
i. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution
d. ® Private Water Supply e. ❑ Fisheries f. ® Protection of Wildlife
Habitat
g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
® the following conditions which are necessary in accordance with the performance standards set forth
in the wetlands regulations. This Commission orders that all work shall be performed in accordance
with the Notice of Intent referenced above, the following General Conditions, and any other special
conditions attached to this Order. To the extent that the following conditions modify or differ from the
plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall
control.
Denied because:
❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland
regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is
submitted which provides measures which are adequate to protect these interests, and a final Order of
Conditions is issued. A description of the performance standards which the proposed work cannot
meet is attached to this Order.
❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect
of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may
not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information
and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions
is issued. A description of the specific information which is lacking and why it is necessary is
attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and
wetland boundary (if available) linear feet
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
3. ❑ Bank a. linear feet b. linear feet c.linear feet d. linear feet
4. ❑ Bordering Vegetated
Wetland a.square feet b.square feet c.square feet d.square feet
5. ❑ Land Under a.square feet b.square feet c.square feet d.square feet
Waterbodies and
Waterways
e.cu.yd dredged f.cu.yd dredged
wpaform5.doc• rev.3/1/05 Page 2 of 9
1 t
LlMassachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1414
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
6. ❑ Bordering Land
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood
Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet
7. ❑ Isolated Land Subject
to Flooding a.square feet b.square feet
Cubic Feet Flood
Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
8. ❑ Riverfront area a.total sq.feet b.total sq.feet
Sq ft within 100 ft c. square feet d.square feet e.square feet f.square feet
Sq ft between 100-200 ft e.square feet f.square feet e.square feet f.square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
9. ❑ Designated Port Indicate size under Land Under the Ocean, below
Areas
1o. ❑ Land Under the
Ocean a.square feet b.square feet
c. cu.yd dredged d.cu.yd dredged
11. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
12. ❑ Coastal Beaches a.square feet b.square feet c.c/y nourishmt. d.c/y nourishmt.
13. ❑ Coastal Dunes a.square feet b.square feet c.c/y nourishmt. d.c/y nourishmt
14. ❑ Coastal Banks a. linear feet b. linear feet
15. ❑ Rocky Intertidal
Shores a.square feet b.square feet
16. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet
17. ❑ Land Under Salt
Ponds a.square feet b.square feet
c. cu.yd dredged d.cu.yd dredged
18. ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
19. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
a. cu.yd dredged b. cu.yd dredged
20. ❑ Land Subject to
Coastal Storm Flowage a.square feet b.square feet
wpaform5.doc• rev.3/1/05 Page 3 of 9
f y
LlMassachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1414
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection" [or, WA DEP"]
"File Number 242-1414 "
wpaform5.doc• rev.3/1/05 Page 4 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1414
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before DEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A)to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the
property subject to this Order and to any contractor or other person performing work conditioned by
this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy
Standards.
Special Conditions:
If you need more See attached
space for
additional
conditions,
select box to
attach a text
document
wpaform5.doc• rev.3/1/05 Page 5 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands SEP File Number:
WPA Form 5 - Order of Conditions 242-1414
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
D. Findings Under Municipal Wetlands Bylaw or Ordinance
t. Is a municipal wetlands bylaw or ordinance applicable? M Yes ❑ No
2. The North Andover hereby finds (check one that applies):
Conservation Commission
3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
a. Municipal Ordinance or Bylaw b.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final Order of
Conditions is issued.
4. ® that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
North Andover Wetland Protection Bylaw Chapter 178
a.Municipal Ordinance or Bylaw b.Citation
The Commission orders that all work shall be performed in accordance with the folloWing conditions
and with the Notice of Intent referenced above. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the
conditions shall control.
If you need more C. The special conditions relating to municipal ordinance or law are as follows:
space for P 9 p y
additional See attached
conditions,
select box to
attach a text
document
wpaform5.doc• rev.3/1/05 Page 6 of 9
242-1414
Therefore,the North Andover Conservation Commission (hereafter the "NACU) hereby
finds that the following conditions are necessary in accordance with the Performance
Standards set forth in the local Bylaw and Regulations, to protect those interests noted above.
The NACC orders that all work shall be performed in accordance with said conditions and
with the Notice of Intent referenced below. To the extent that the following conditions
modify or differ from the plans, specifications or other proposals submitted with the Notice
of Intent, the conditions shall control.
GENERAL CONDITIONS
18. Failure to comply with all conditions stated herein, and with all related statutes and other
regulatory measures, shall be deemed cause to revoke or modify this Order.
19. This Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of property rights. However, the
NACC or agent of the NACC reserves the right to enter and inspect the property at all
reasonable times until a Certificate of Compliance is issued, to evaluate compliance with
this Order of Conditions, the Act (310 CMR 10.00), the North Andover Wetland Bylaw
and Regulations, and may require any information, measurements, photographs,
observations, and/or materials, or may require the submittal of any data or information
deemed necessary by the NACC for that evaluation. Further,work shall be halted on the
site if the NACC or agent determines that any of the work is not in compliance with this
Order of Conditions. Work shall not resume until the NACC is satisfied that the work
will comply and has so notified the applicant in writing.
20. This Order does not relieve the permittee or any other person of the necessity of
complying with all other applicable federal, state or local statutes, ordinances, by-laws or
regulations.
21. The work authorized hereunder shall be completed within three years from the date of
this order.
22. This Order may be extended by the issuing authority for one or more periods of up to one
year each upon application to the issuing authority at least thirty days (30) prior to the
expiration date of the Order (Refer to Section 8.3 (p.37) of the North Andover Wetland
Regulations).
23. The NACC reserves the right to amend this Order of Conditions after a legally advertised
public hearing if plans or circumstances are changed or if new conditions or information
so warrant.
24. This Order of Conditions is issued under 242-1414.
C:\Winword\OOC\226StevensSt.doc 1 NACC 10/25/2007
242-1414
25. The conditions of this decision shall apply to, and be binding upon, the applicant, owner,
its employees and all successors and assigns in interest or control. These obligations shall
be expressed in covenants in all deeds to succeeding owners of portions of the property.
26. The term "Applicant" as used in this Order of Conditions shall refer to the owner, any
successor in interest or successor in control of the property referenced in the Notice of
Intent, supporting documents and this Order of Conditions. The NACC shall be notified
in writing within 30 days of all transfers of title of any portion of property that takes place
prior to the issuance of a Certificate of Compliance.
27. The proposed work includes: the construction of a portion of an addition, deck, patio,
shed, driveway extension,gravity block retaining walls, Stormwater BMP's,and
associated grading and landscaping activities within the buffer zone to a BVW
associated with Stevens Pond.
28. The work shall conform to the following:
Notice of Intent filed by: Martha Mittelstaed (Applicant)
226 Stevens Street
North Andover, MA 01845
Received September 13,2007
The Neve-Morin Group, Inc (Representative)
C/o Greg Hochmuth
447 Boston Street,Route 1, Suite 12
Topsfield, MA 01983
Site Plans prepared by: The Neve-Morin Group,Inc
Entitled "Plan of Land in North Andover, MA showing
"Proposed Lot Improvements""
Dated August 30,2007,revised October 2, 2007
Stamped & Signed by Thomas E. Neve, P.E.
Other Record Documents: Letter prepared by The Neve-Morin Group, Inc. dated
October 3,2007.
29. The following wetland resource areas are affected by the proposed work: Buffer Zone to
Bordering Vegetated Wetland (BVW). These resource areas are significant to the
interests of the Town ByLaw as noted above and therein. The applicant has not
attempted to overcome the presumption of significance of these resource areas to the
identified interests.
30. The NACC agrees with the applicant's delineation of the wetland resource areas on the
site as shown on the plans dated referenced herein with exception to the off property
flag (WF 100).
C:\Winword\OOC\226StevensSt.doc 2 NACC 10/25/2007
242-1414
31. The NACC finds that the intensive use of the upland areas and buffer zone proposed on
this site will cause further alteration of the wetland resource areas. In order to prevent
any alteration of wetland resource areas a twenty-five foot (25') No-Disturbance Zone
and a fifty-foot (50') No-Construction Zone, except in those previously disturbed areas
as shown on the approved plan referenced herein, shall be established from the edge of
the adjacent wetland resource area. The Conservation Administrator and/or other agents
of the NACC do not have the authority to waive these setbacks as established under the
local bylaw. No disturbance of existing grade, soils or vegetation is permitted in the No-
Disturbance zone. (See Section 3.4 &Appendix F of the local Regulations).
32. An existing recently installed temporary floating dock held by bottom anchor was
observed on Stevens Pond at the property. NACC member,Deborah Feltovic, acting as
local Harbormaster, hereby grants approval of the temporary dock pursuant to Section
10A of Chapter 91 and CMR 9.07 of the Waterways Regulation.
33. This document shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors, subcontractors, and
other personnel performing the permitting work are fully aware of the permits terms and
conditions. Thereafter, the contractor will be held jointly liable for any violation of this
Order resulting from failure to comply with its conditions.
34. The owners of the project and their successors in title, in the event they proceed to alter
areas subject to the Commission's jurisdiction under the order, agree that the Order does
not in itself impose upon the Town any responsibility to maintain the proposed drainage
system and that said Town shall not be liable for any damage in the event of failure. By
acceptance of this Order, the owners agree to indemnify and hold harmless to the Town
and its residents for any damage attributable to alterations undertaken on this property
pursuant to the Order. Maintenance of the drainage system, if accepted by the Town as
part of a public way,becomes the responsibility of the Town.
35. Issuance of these Conditions does not in any way imply or certify that the site or
downstream areas will not be subject to flooding, storm damage or any other form of
water damage.
PRIOR TO CONSTRUCTION
36. No work shall be undertaken until all administrative appeal periods from this Order have
elapsed or, if such an appeal has been filed, until all proceedings before the Department
or Court have been completed.
37. This Order shall be recorded by the applicant at the Registry of Deeds immediately after
the expiration of all appeal periods. No work shall be undertaken until the Final Order
has been recorded in the Registry of Deeds or the Land Court for the district in which the
C:\Winword\OOC\226StevensSt.doc 3 NACC 10/25/2007
242-1414
land is located, within the chain of title of the affected property. In the case of recorded
land, the Final Order shall also be noted in the Registry's Grantor Index under the name
of the owner of the land upon which the proposed work is to be done. In the case of
registered land, the Final Order shall also be noted on the Land Court Certificate of Title
of the owner of the land upon which the proposed work is to be done. The recording
information shall be submitted to the North Andover Conservation Commission on the
form at the end of this Order prior to commencement of the work. Any Order not
recorded by the applicant before work commences may be recorded by the NACC at
the applicant's expense.
38. A sign shall be displayed at the site not less than two square feet or more than three
square feet in size bearing the words "242-1414.
39. Any changes in the submitted plans caused by the applicant, another Board's decision or
resulting from this Order of Conditions must be submitted to the NACC for approval
prior to implementation. If the NACC finds said changes to be significant, the NACC will
call for another public hearing (at the expense of the applicant). Within 21 days of the
close of said public hearing the NACC will issue an amended or new Order of Conditions.
Any errors found in the plans or information submitted by the applicant shall be
considered as_changes. The.proposed_project.may be still under review by other local or
state boards or agencies. This may result in changes to the project plans or wetland
impacts. If any such changes occur a revised plan and an explanation of the revisions shall
be submitted to the NACC for review and approval prior to the start of construction. No
work shall begin on a project until written approval has been granted by the NACC.
40. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all
conditions of this Order of Conditions are complied with. The project engineer and
contractors are to be provided with a copy of this Order of Conditions and referenced
documents before commencement of construction.
41. Prior to any work commencing on site,the applicant shall submit to the NACC for
approval,a detailed construction sequence,including a dated timetable of construction,
the construction of compensation and retention areas,installation of
sedimentation/erosion control devices,phasing associated with the development and
the construction of the associated stormwater management structures. This timetable
must continue to be updated throughout the project.
42. Wetland flagging shall be checked prior to start of construction and shall be re-established
where missing. All wetland flagging shall remain visible and enumerated per the
approved plan(s) throughout the life of the project and until a Certificate of Compliance is
issued so that erosion control measures can be properly placed and wetland impacts can
be monitored. The proposed limit of work shall be shall be clearly marked with stakes or
flags and shall be confirmed by the NACC. Such markers shall be checked and replaced
as necessary and shall be maintained until all construction is complete. Workers should
be informed that no use of machinery, storage of machinery or materials, stockpiling of
C:\Winword\00C\226StevensSt.doc 4 NACC 10/25/2007
242-1414
soil, or construction activity is to occur beyond this line at any time. All flags used for the
above purposes shall be of a color different from other flagging used on the site.
43. A row of staked hay bales backed by trenched siltation fence shall be placed between all
construction areas and wetlands. The erosion control barrier will be Y
er
propl installed
and placed as shown on the plans approved and referenced herein and shall be inspected
and approved by the NACC prior to the start of construction and shall remain intact until
all disturbed areas have been permanently stabilized to prevent erosion. All erosion
prevention and sedimentation protection measures found necessary during construction
shall be implemented at the direction of the NACC. The NACC reserves the right to
impose additional conditions on portions of this project to mitigate any impacts which
could result from site erosion, or any noticeable degradation of surface water quality
discharging from the site. For example, installation of erosion control measures may be
required in areas not shown on the plan(s) referenced in this Order of Conditions. Should
such installation be required by the NACC, they shall be installed within 48 hours of the
Commissions request.
44. The applicant shall have on hand at the start of any soil disturbance, removal or
stockpiling, a minimum of 20 hay bales and sufficient stakes for staking these bales (or an
equivalent amount of silt fence). Said bales shall be used only for the control of
emergency erosion problems and shall not be used for the normal control of erosion.
45. A check payable to the Town of North Andover shall be provided in the amount of
$3,000,which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and
the NACC, and shall be posted with the North Andover Town Treasurer through the
NACC before commencement of work. Said deposit of money shall be conditioned on the
completion of all conditions hereof, shall be signed by a party or parties satisfactory to the
NACC, and Town Counsel, and shall be released after completion of the project, provided
that provisions, satisfactory to the NACC, have been made for performance of any
conditions which are of continuing nature. The applicant may propose a monetary
release schedule keyed to completion of specific portions of the project for the NACC's
review and approval. This condition is issued under the authority of the local Bylaw.
46. Prior to the commencement of any work,the corners of the proposed shed shall be
staked in the field by a Registered Land Surveyor (R.L.S.). Measurements shall be
taken and verified by the Conservation Department during the Pre-Construction
meeting.
47. The applicant shall designate a Wetland Scientist as an "Erosion Control Monitor" to
oversee any emergency placement of controls and regular inspection or replacement of
sedimentation control devices. The name and phone number of the erosion control
monitor must be provided to the NACC in the event that this person has to be contacted,
due to an emergency at the site, during any 24-hour period, including weekends. Proof
of the retained monitor must be submitted to the Conservation Department on
letterhead by the retained consulting firm. This person shall be given the authority to
C:\Winword\OOC\226StevensSt.doc 5 NACC 10/25/2007
242-1414
stop construction for erosion control purposes. The erosion control monitor will be
required to inspect all such devices and oversee cleaning and the proper disposal of waste
products. Cleaning shall include removal of any entrapped silt.
48. ON EVERY MONDAY of each week, or otherwise arranged by the NACC, in which
construction activities occurs on-site and for as long thereafter as ground remains
unstable, it is the applicant's responsibility that the Environmental/Erosion Control
Monitor (EMC) monitor the site and submit written reports to the NACC. The EMC
shall certify that,to the best of his/her knowledge and belief based on a careful site
inspection, all work is being performed in compliance with this Order of Conditions
and that approved setbacks are being adhered to. The EMC must visually inspect all
sedimentation/ erosion control measures and assume responsibility for their
maintenance on a weekly basis and that they are functioning as intended. In addition, all
wetland resource areas must be visually inspected for siltation, turbidity, and/or other
water quality impacts. The reports shall also include current condition of erosion and
sedimentation controls; describe any erosion or sedimentation repair and / or
replacement; and describe any erosion or sedimentation problems and mitigation
measures implemented. Such reports shall continue until the applicant requests a less
frequent reporting schedule or an end to reports. This request must be submitted in
writing and is subject to approval by the Conservation Administrator.
49. The applicant and/or the legal owner of that portion of land upon which these Orders of
Conditions have been placed shall provide to the NACC prior to transferring, or
assigning any portion of said land to another party,subject to said Orders of
Conditions,the "Compliance Certification Form Affidavit" attached via "Appendix A"
signed under the pains and penalties of perjury, stating that said applicant and/or
owner has read these Orders of Conditions and is in compliance with each and every
condition. This document shall apply to each of the conditions referenced herein and
shall be provided to the Conservation Department at least five (5) business days after to
the closing of said land transaction.
50. Once these above mentioned pre-construction requirements are complete,the applicant
shall contact the Conservation Office prior to site preparation or construction and shall
arrange an on-site conference with an NACC representative,the contractor,the
engineer,wetland scientist and the applicant to ensure that all of the Conditions of this
Order are understood. This Order shall be included in all construction contracts,
subcontracts, and specifications dealing with the work proposed and shall supersede any
conflicting contract requirements. The applicant shall assure that all contractors,
subcontractors and other personnel performing the permitted work are fully aware of the
permit's terms and conditions. Thereafter, the contractor will be held jointly liable for any
violation of this Order of Conditions resulting from failure to comply with its conditions.
The applicant or contractor shall notify the NACC in writing of the identity of the on-site
construction supervisor hired to coordinate construction and to ensure compliance with
this Order. A reasonable period of time shall be provided as notice for each pre-
construction meeting (e.g. 72 hours).
C:\Winword\OOC\226StevensSt.doc 6 NACC 10/25/2007
242-1414
STORMWATER MANAGEMENT CONDITIONS
51. All construction and post-construction stormwater management systems shall be
conducted in accordance with the approved construction sequence, supporting
documents and plans submitted with the Notice of Intent.
52. All drainage structures shall be properly installed and functional. During construction,
all drainage structures shall be maintained.
53. Construction of the stormwater BMP's shall be constructed and functioning as part of
the initial project phase, immediately following clearing and rough grading of the site
to serve as siltation control during construction. Runoff from the site shall be directed
towards these BMPs.
54. There shall be no increase in thee ost development discharges from the storm drainage
P P g g
system or any other changes in post development conditions that alter the post
development watershed boundaries as currently depicted in the Notice of Intent and
approved by this Order of Conditions, unless specifically approved in writing by the
Commission.
55. Water quality down gradient of BVW's shall not differ significantly following completion
of the project from the pre-development conditions. There shall be no sedimentation into
wetlands or water bodies from discharge pipes or surface runoff leaving the site.
56. The applicants, owners, and their successors and assignees, shall maintain all stormwater
BMP's and other elements of the drainage system, unless put into an easement to the
Town of North Andover, in order to avoid blockages and siltation which might cause
failure of the system and/or detrimental impacts to on-site or off-site resource areas, and
shall maintain the integrity of vegetative cover on the site.
DURING CONSTRUCTION
57. IMPORTANT: Immediately upon completion of the installation of the shed, and prior to
further construction activities associated with the site, the applicant shall complete a plan
prepared by a Registered Professional Land Surveyor of the Commonwealth (R.P.L.S.) which
accurately depicts the shed location and it's proximity to wetland resource areas as approved
under this Order of Conditions. Said plan shall be submitted to the Conservation
Administrator for approval.
58. Accepted engineering and Best Management Practices (BMPs) for construction standards
shall be followed in the conduct of all work.
C:\Winword\00C\226StevensSt.doc 7 NACC 10/25/2007
242-1414
59. Erosion control devices shall be inspected regularly; any entrapped silt shall be removed
to an area outside of the buffer zone and wetland resource areas; silt fence and hay bales shall
be replaced as necessary. The areas of construction shall remain in stable condition at the
close of each construction day. All erosion controls shall be in place throughout the duration
of any construction on site or unless authorized by the Conservation personnel.
60. Upon beginning work, the applicant shall submit written progress reports every month
detailing what work has been done in or near resource areas, and what work is anticipated to
be done over the next period. This will update the construction sequence.
61. The sewer lines on the site, where they cross wetland resource areas, shall be tested for
water tightness in accordance with North Andover DPW standards.
62. The Erosion Control Monitor shall be on site during and/or following a major storm
event of 1 inch of rain or greater to ensure that soils remain stable, erosion controls are
adequate and secure,and that all BMP's are adequately functioning.
63.Approved de-watering activities anticipated shall be supervised and witnessed by the
designated erosion control monitor. This designee must be on-site while any dewatering
is occurring. De-watering activities shall be conducted as shown on the approved plans and
shall be monitored daily by the erosion control monitor to ensure that sediment laden water
is appropriately settled prior to discharge toward the wetland resource areas. No discharge
of water is allowed directly into an area subject to jurisdiction of the Wetlands Protection Act
and/or the North Andover Wetland Bylaw. If emergency de-watering requirements arise,
the applicant shall submit a contingency plan to the Commission for approval, which
provides for the pumped water to be contained in a settling basin, to reduce turbidity prior to
discharge into a resource area.
64. Any fill used in connection with this project shall be clean fill, containing no trash, refuse,
rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper,
cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts on any of the foregoing.
65. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized, or
loamed, seeded and mulched,with a layer of mulch hay. All disturbed areas must be
graded, loamed and seeded prior to November 1St of each year. Outside of the growing
season, exposed soil finish grade surfaces shall be stabilized with a layer of mulch hay until
climate conditions allow for seeding. During construction, any area of exposed soils that will
be left idle for more than 30 days shall be stabilized with a layer of mulch hay or other means
approved by the NACC.
66. No re-grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical).
Slopes of steeper grade shall be rip-rapped to provide permanent stabilization.
67. Construction equipment/vehicles shall not be staged overnight within 100 feet of a
wetland resource area.
CAWinword\00C\226StevensSt.doc 8 NACC 10/25/2007
242-1414
68. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of any
resource area. Soils or other materials shall be stockpiled in locations approved by this
department or within the designated areas as shown on the approved plan referenced
herein. Further, due to the existing grade on the site, any approved temporary stockpile
areas shall be adequately surrounded by erosion controls to prevent migration of soils to
the resource area.
69. The existing wooded area to the north of the property has historically been used as a
dumping area for landscaping debris and brush stockpiling. The applicant shall clean up
this area by means of removing and properly disposing of said materials to an off site
location. In the future, similar debris and stockpiling materials shall be stored in the
designated compost storage area as shown on the approved plan referenced herein or shall
be properly disposed of respectively.
70. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage
system, or wetland resource area.
71. All waste generated by, or associated with, the construction activity shall be contained
within the construction area, and away from any wetland resource area. There shall be no
burying of spent construction materials or disposal of waste on the site by any other means.
The applicant shall maintain dumpsters (or other suitable means) at the site for the storage
and removal of such spent construction materials off-site. However, no trash dumpsters will
be allowed within 50' of areas subject to protection under the Act or local Bylaw.
72. During and after work on this project, there shall be no discharge or spillage of fuel, or
other pollutants into any wetland resource area. If there is a spill or discharge of any
pollutant during any phase of construction the NACC shall be notified by the applicant
within one (1) business day. No construction vehicles are to be stored within 100 feet of
wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to
be done within 100 feet of a resource area.
AFTER CONSTRUCTION
73. No underground storage of fuel oils shall be allowed on any lot within one hundred (100)
feet of any wetland resource area. This condition shall survive this Order of Conditions and
shall run with the title of the property. This condition is issued under the authority of the
Town's Wetland protection Bylaw.
74. Fertilizers utilized for landscaping and lawn care shall be slow release, low-nitrogen types
(< 5%), and shall not be used within 25 feet of a resource area. Pesticides and herbicides shall
not be used within 100 feet of a wetland resource area. This condition shall survive this Order
of Conditions and shall run with the title of the property. This condition is issued under the
authority of the Town's Wetland Protection Bylaw and shall remain in perpetuity.
C:\Winword\OOC\226StevensSt.doc 9 NACC 10/25/2007
242-1414
75. Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion. This shall be done either by
loaming and seeding according to SCS standards. If the latter course is chosen, stabilization
will be considered complete once vegetative cover has been achieved.
76. Upon approved site stabilization by Conservation staff,the erosion controls shall be
removed and properly disposed of and all exposed unvegetated areas shall be seeded.
77. Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of Compliance:
a. WPA Form 8A - "Request for a Certificate of Compliance."
b. A letter from the applicant requesting a Certificate of Compliance.
c. The name and address of the current landowner.
d. Signed statements from the individual property owners shall be submitted with
the request for a Certificate of Compliance indicating that they-read and
understood the recorded Order of Conditions prior to purchasing their property.
e. The name and address of the individual/trust or corporation to whom the
compliance is to be granted.
f. The street address and assessor's map/parcel number for the project.
g. The DEP file number.
h. A written statement from a Registered Professional Civil Engineer (and/or
Registered Professional Land Surveyor) of the Commonwealth certifying that the
work has been conducted as shown on the plan(s) and documents referenced
above, and as conditioned by the Commission.
i. An"As-Built" plan prepared and signed and stamped by a Registered Professional
Civil Engineer (and/or Registered Professional Land Surveyor) of the
Commonwealth, for the public record. This plan will include:
➢ "As-Built" post-development elevations of all drainage & stormwater
management structures constructed within 100 feet of any wetland resource
area. NOTE: If portions of the stormwater systems exist partially within the
Buffer Zone than the entire structure must be depicted to accurately verify
compliance.
➢ "As-Built" post-development elevations and grades of all filled or altered
wetland resource areas including the encompassing buffer zone, which is
regulated as a resource area under the local Wetland Protection Bylaw.
➢ Distances from structures to wetland resource areas. Structures include (but
are not limited to) septic systems, additions, fences, sheds, stone walls,
pools, retaining walls, subsurface utilities and decks.
C:\Winword\OOC\226StevensSt.doc 10 NACC 10/25/2007
242-1414
➢ A line showing the limit of work and the extent of existing erosion control
devices. "Work" includes� disturbance of soils or vegetation.
➢ Location of all subsurface utilities entering the property.
78. The following special conditions shall survive the issuance of a Certificate of Compliance
(COC) for this project:
➢ 25' No-Disturbance Zone and a 50' No-Construction Zone shall be established
from the edge of adjacent wetland resource areas except in those locations
approved under this filing. Future work within 100' of existing wetland
resource areas will require a separate filing with the NACC. The Conservation
Administrator and/or other agents of the NACC do not have the authority to
waive these setbacks as established under the local Bylaw (Condition#31);
➢ Discharge or spillage of pollutants (Condition#72);
➢ Prohibition of underground fuels (Condition #73);
➢ Limitations on the use of fertilizers, herbicides, and pesticides (Condition#74).
➢ Maintenance of all culverts, collections basins, traps, outlet structures,
subsurface storage areas, and other elements of the drainage system, unless put
into an easement to the Town of North Andover, in order to avoid blockages
and siltation, which might cause failure of the system and/or detrimental
impacts to on-site or off-site resource areas (Condition#56);
CAWinword\OOC\226StevensSt.doc 11 NACC 10/25/2007
242-1414
APPENDIX A - AFFIDAVIT
I, on oath do hereby depose and state:
(authorized agent of applicant and/ or owner)
(PLEASE CHECK AT LEAST ONE BLOCK)
1) I am the of
(position with applicant) (applicant's name)
the applicant upon whom the Order of Conditions have been
(DEP or NACC File#)
placed upon by the North Andover Conservation Commission (NACC).
and / or
2) I am the of
(position with owner) (owner)
the owner upon whose land Order of Conditions have been
(DEP or NACC File#)
placed upon by the NACC.
♦ I hereby affirm and acknowledge that I have received said Order of Conditions and
have read the same and understand each and every condition,which has been set
forth in said Order of Conditions.
♦- I hereby affirm and acknowledge that on this day of
20 1 inspected said property together with any and
all improvements,which have been made to the same and hereby certify that each
and every condition set forth in the Order of Conditions are presently in
compliance.
♦ I hereby affirm and acknowledge that this document will be relied upon by the
NACC, as well as any potential buyers of said property,which is subject to the
Order of Conditions.
Signed under the pain and penalties of perjury this day of ,20
(Authorized agent of applicant or owner)
C:\Winword\OOC\226StevensSt.doc 12 NACC 10/25/2007
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1414
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years, unless otherwise specified as a special
condition pursuant to General Conditions#4, from the date of issuance. 1. Date OTIssuanIce
Please indicate the number of members who will sign this form: 7
This Order must be signed by a majority of the Conservation Commission. 2. Number of signers
The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
Signatures:
i
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex North
On this 0 y�� of �404e-r d oc?
Day Month Year
Before me, the undersigned Notary Public, c c44- dc�_ss'-
personally appeared Name of Document Signer
proved to me through satisfactory-evidence of identification, which was/were
Massachusetts License
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of North Andover Conservation Commission
City/Town
DONNA M.PUBLISEDC
NOTARY PUBLIC 7
iAi ttAONNJEALTH OF MASSACHUSETTS Signature of Notary Public
My Comm,Expires Aug.;,2009
Printed Name of No ary Public
Place notary seal and/or any stamp above i, 7 `pao z
My Com ission txpires(Date)
This Order is issued to the applicant as follows:
❑ by hand delivery on �J(by certified mail, r turn receipt requested,on
io - 0.
Date Date
wpaform5.doc• rev.3/1/05 Page 7 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1414
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions.
The request must be made by certified mail,or hand delivery to the Department, with the appropriate filing
fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR
10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at
the same time be sent by certified mail or hand delivery to the Conservation Commission and to the
applicant, if he/she is not the appellant.Any appellants seeking to appeal the Department's Superseding
Order associated with this appeal will be required to demonstrate prior participation in the review of this project.
Previous participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or
Determination, or providing written information to the Department prior to issuance of a Superseding Order
or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act, (M.G.L. c. 131, §40) and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Section G, Recording Information is available on the following page.
wpaform5.doc• rev.3/1/05 Page 8 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1414
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information
on Page 7 of this form shall be submitted to the Conservation Commission listed below.
North Andover
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
---------------------------------------------------------------------------------------------------------------------------
To:
North Andover
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
226 Stevens Street 242-1414
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for:
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Pp
Signature of Applicant
9
wpaform5.doc• rev.3/1105 Page 9 of 9