Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miscellaneous - 24 EAST WATER STREET 4/30/2018 (3)
Z N CA a a (a s w CL a 0 w J U U F - w N 0 U U k 04 r N �f V (/ vi c i Z O Y �I I v f '^A JnA Ghcit 9.6 <` —'� Ab � 1 11 � S so f �r 2"4 2 JQ, l ]_-w P/%l d CJCO 2 dlt,,e A� F� le, G ' —k2tl�s 120' ILA kuQev's �h ore NORTH ANDOVER CONSERVATION DEPARTMENT TELEPHONE LOG DATE: f/-5-01 NAME: A) a ri C Robinson FIRWAGENCY: SUBJECT: (1 zt E 2 57 RE S /c oo ©o - � 1,, i f u F Word lid -T--Wil( cuducl -. (,,,ve 0 q tate -(1,, _ S U cee(CS TELEPHONE #t4g78)-55Z-9336 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 9A — Enforcement Order DEP File Number: Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Construction of house addition and driveway within the 200 -foot Riverfront Area of Cochichewick Brook. Proposed work includes grading, installation of a 24x30 foundation, concrete floor, footing for a deck (4) and a driveway (see Contractor Proposal by Simmons Remodeling, Mortgage Plot Plan prepared by Northern Associates, Inc (3-4-92) and house addition plans prepared by G.J. Bruno Associates (7-25-01)). The proposed project is subject to the following conditions: 1. Install and maintain staked haybale line 100 -feet from the edge of the chain link fence until post construction inspection is conducted by NACD. All disturbed surfaces must be stabilized with vegetation prior to the removal of the haybale boundary. 2. The haybale boundary shall serve as the limit of work for the project. 3. The property owner shall provide the NACD with monthly updates on the progress of project. 4. Notify the NACD when construction is complete so a post construction inspection can be conducted. The North Andover Conservation Commission will permit 14 weeks (deadline Feb. 15, 2002) for the project to be completed, with the exception of the final paving for the driveway. If the project is not completed within the 14 week period, the property owner must file a Notice of Intent with the North Andover Conservation Commission.' wpaform9a.doc • rev. 12/15/00 Page 1 of 3 A. Violation Information Important: When filling out This Enforcement Order is issued by: forms on the North Andover Conservation Commission 11-6-01 computer, use only the tab Conservation Commission (Issuing Authority) Date key to move To: your cursor - do not use the Nancy C. Robinson return key. Name of Violator 24 E. Water Street f) Address 1. Location of Violation: Property Owner (if different) 24 E. Water Street Street Address North Andover 01845 City/rown Zip Code Map 69 Parcel 29, Lot 4 Assessors Map/Plat Number Parcel/Lot Number 2. Extent and Type of Activity: Construction of house addition and driveway within the 200 -foot Riverfront Area of Cochichewick Brook. Proposed work includes grading, installation of a 24x30 foundation, concrete floor, footing for a deck (4) and a driveway (see Contractor Proposal by Simmons Remodeling, Mortgage Plot Plan prepared by Northern Associates, Inc (3-4-92) and house addition plans prepared by G.J. Bruno Associates (7-25-01)). The proposed project is subject to the following conditions: 1. Install and maintain staked haybale line 100 -feet from the edge of the chain link fence until post construction inspection is conducted by NACD. All disturbed surfaces must be stabilized with vegetation prior to the removal of the haybale boundary. 2. The haybale boundary shall serve as the limit of work for the project. 3. The property owner shall provide the NACD with monthly updates on the progress of project. 4. Notify the NACD when construction is complete so a post construction inspection can be conducted. The North Andover Conservation Commission will permit 14 weeks (deadline Feb. 15, 2002) for the project to be completed, with the exception of the final paving for the driveway. If the project is not completed within the 14 week period, the property owner must file a Notice of Intent with the North Andover Conservation Commission.' wpaform9a.doc • rev. 12/15/00 Page 1 of 3 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 9A —Enforcement Order Provided b Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 y DEP B. Findings The Issuing Authority has determined that the activity described above is in violation of the Wetlands Protection Act (M.G.L. c. 131, § 40) and its Regulations (310 CMR 10.00), because: ❑ the activity has been/is being conducted without a valid Order of Conditions. ❑ the activity has been/is being conducted in violation of the Order of Conditions issued to: Name File Number B. Findings (cont.) ® Other (specify): Dated Condition number(s) The activities described in Section A.2. are permitted under this Enforcement Order. Any changes to the project that will result in proposed structures being located closer to Cochichewick Brook will require the filing of a Notice of Intent with the NACC. C. Order The issuing authority hereby orders the following (check all that apply): ❑ The property owner, his agents, permittees, and all others shall immediately cease and desist from the further activity affecting the Buffer Zone and/or wetland resource areas on this property. ❑ Wetland alterations resulting from said activity should be corrected and the site returned to its original condition. ❑ Complete the attached Notice of Intent. The completed application and plans for all proposed work as required by the Act and Regulations shall be filed with the Issuing Authority on or before Date No further work shall be performed until a public hearing has been held and an Order of Conditions has been issued to regulate said work. ❑ The property owner shall take the following action to prevent further violations of the Act: wdpaform9a.doe • rev. 12/15/00 Page 2 of 3 Massachusetts Department of Environmental Protection - Bureau of Resource Protection - Wetlands WPA Form 9A - Enforcement Order Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: vroviaea oy uLt, Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts General Laws Chapter 131, Section 40 provides: "Whoever violates any provision of this section (a) shall be punished by a fine of not more than twenty-five thousand dollars or by imprisonment for not more than two years, or both, such fine and imprisonment; or (b) shall be subject to a civil penalty not to exceed twenty-five thousand dollars for each violation". Each day or portion thereof of continuing violation shall constitute a separate offense. D. Appeals/Signatures An Enforcement Order issued by a Conservation Commission cannot be appealed to the Department of Environmental Protection, but may be filed in Superior Court. Questions regarding this Enforcement Order should be directed to: Richard C. Paquette, Jr., Conservation Administrator Name 978-688-9530 Phone Number M -F 8:30 - 4:30 Hours/Days Available Issued by: North Andover Conservation Commission In a situation regarding immediate action, an Enforcement Order may be signed by a single member or agent of the Commission and ratified by majority of the members at the next scheduled meeting of the Commission. Signatures: R (/ Signature of delivery person or certi a mail number wpaform9a.doc • rev. 12/15/00 Page 3 of 3 Massachusetts Department of Environmental Protection l Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 9A — Enforcement Order (' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Violation Information Important: When filling out This Enforcement Order is issued by: forms on the North Andover Conservation Commission 11-6-01 computer, use Conservation Commission (Issuing Authority) Date only the tab key to move To: your cursor - do not use the Nancy C. Robinson return key. Name of Violator 24 E. Water Street Address 1. Location of Violation: Property Owner (if different) 24 E. Water Street Street Address North Andover 01845 City/Town Zip Code Map 69 Parcel 29, Lot 4 Assessors Map/Plat Number ParceKot Number 2. Extent and Type of Activity: Construction of house addition and driveway within the 200 -foot Riverfront Area of Cochichewick Brook. Proposed work includes grading, installation of a 24x30 foundation, concrete floor, footing for a deck (4) and a driveway (see Contractor Proposal by Simmons Remodeling, Mortgage Plot Plan prepared by Northern Associates, Inc (3-4-92) and house addition plans prepared by G.J. Bruno Associates (7-25-01)). The proposed project is subject to the following conditions: 1. Install and maintain staked haybale line 100 -feet from the edge of the chain link fence until post construction inspection is conducted by NACD. All disturbed surfaces must be stabilized with vegetation prior to the removal of the haybale boundary. 2. The haybale boundary shall serve as the limit of work for the project. 3. The property owner shall provide the NACD with monthly updates on the progress of project. 4. Notify the NACD when construction is complete so a post construction inspection can be conducted. The North Andover Conservation Commission will permit 14 weeks (deadline Feb. 15, 2002) for the project to be completed, with the exception of the final paving for the driveway. If the project is not completed within the 14 week period, the property owner must file a Notice of Intent with the North Andover Conservation Commission.' wpaform9a.doc • rev. 12/15/00 Page 1 of 3 Massachusetts Department of Environmental Protection L1'1f Bureauof Resource Protection - WetlandsDEP File Number: WPA Form 9A —Enforcement Order Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Findings The Issuing Authority has determined that the activity described above is in violation of the Wetlands Protection Act (M.G.L. c. 131, § 40) and its Regulations (310 CMR 10.00), because: ❑ the activity has been/is being conducted without a valid Order of Conditions. ❑ the activity has been/is being conducted in violation of the Order of Conditions issued to: Name Dated File Number Condition number(s) B. Findings (cont.) ® Other (specify): The activities described in Section A.2. are permitted under this Enforcement Order. Any changes to the project that will result in proposed structures being located closer to Cochichewick Brook will require the filing of a Notice of Intent with the NACC. C. Order The issuing authority hereby orders the following (check all that apply): ❑ The property owner, his agents, permittees, and all others shall immediately cease and desist from the further activity affecting the Buffer Zone and/or wetland resource areas on this property. ❑ Wetland alterations resulting from said activity should be corrected and the site returned to its original condition. ❑ Complete the attached Notice of Intent. The completed application and plans for all proposed work as required by the Act and Regulations shall be filed with the Issuing Authority on or before Date No further work shall be performed until a public hearing has been held and an Order of Conditions has been issued to regulate said work. ❑ The property owner shall take the following action to prevent further violations of the Act: wpaform9a.doc • rev. 12/15/00 Page 2 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 9A - Enforcement Order { Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: Provided by DEP Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts General Laws Chapter 131, Section 40 provides: "Whoever violates any provision of this section (a) shall be punished by a fine of not more than twenty-five thousand dollars or by imprisonment for not more than two years, or both, such fine and imprisonment; or (b) shall be subject to a civil penalty not to exceed twenty-five thousand dollars for each violation". Each day or portion thereof of continuing violation shall constitute a separate offense. D. Appeals/Signatures An Enforcement Order issued by a Conservation Commission cannot be appealed to the Department of Environmental Protection, but may be filed in Superior Court. Questions regarding this Enforcement Order should be directed to: Richard C. Paquette, Jr., Conservation Administrator Name 978-688-9530 Phone Number M -F 8:30 - 4:30 Hours/Days Available Issued by: North Andover Conservation Commission In a situation regarding immediate action, an Enforcement Order may be signed by a single member or agent of the Commission and ratified by majority of the members at the next scheduled meeting of the Commission. Signatures: 61 Signature of delivery per96n or certiirfed`mail number wpaform9a.doc • rev. 12/15/00 Page 3 of 3 Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. ra�rn Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 9A — Enforcement Order Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Violation Information This Enforcement Order is issued by: To: North Andover Conservation Commission Conservation Commission (Issuing Authority) Nancy C. Robinson Name of Violator 24 E. Water Street Address 1. Location of Violation: Property Owner (if diffen 24 E. Water Street 11-6-01 Date Street Address North Andover 01845 City/Town Zip Code Map 69 Parcel 29, Lot 4 Assessors Map/Plat Number Parcel/Lot Number 2. Extent and Type of Activity: DEP File Number: Provided by DEP Construction of house addition and driveway within the 200 -foot Riverfront Area of Cochichewick Brook. Proposed work includes grading, installation of a 24x30 foundation, concrete floor, footing for a deck (4) and a driveway (see Contractor Proposal by Simmons Remodeling, Mortgage Plot Plan prepared by Northern Associates, Inc (3-4-92) and house addition plans prepared by G.J. Bruno Associates (7-25-01)). The proposed project is subject to the following conditions: 1. Install and maintain staked haybale line 100 -feet from the edge of the chain link fence until post construction inspection is conducted by NACD. All disturbed surfaces must be stabilized with vegetation prior to the removal of the haybale boundary. 2. The haybale boundary shall serve as the limit of work for the project. 3. The property owner shall provide the NACD with monthly updates on the progress of project. 4. Notify the NACD when construction is complete so a post construction inspection can be conducted. The North Andover Conservation Commission will permit 14 weeks (deadline Feb. 15, 2002) for the project to be completed, with the exception of the final paving for the driveway. If the project is not completed within the 14 week period, the property owner must file a Notice of Intent with the North Andover Conservation Commission.' wpaform9a.doc • rev. 12/15/00 Pagel of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands L111 \- - WPA Form 9A — Enforcement Order Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings DEP File Number: Provided by DEP The Issuing Authority has determined that the activity described above is in violation of the Wetlands Protection Act (M.G.L. c. 131, § 40) and its Regulations (310 CMR 10.00), because: ❑ the activity has been/is being conducted without a valid Order of Conditions. ❑ the activity has been/is being conducted in violation of the Order of Conditions issued to: Name File Number . Findings (cont.) ® Other (specify): Dated Condition number(s) The activities described in Section A.2. are permitted under this Enforcement Order. Any changes to the project that will result in proposed structures being located closer to Cochichewick Brook will require the filing of a Notice of Intent with the NACC. G. Order The issuing authority hereby orders the following (check all that apply): ❑ The property owner, his agents, permittees, and all others shall immediately cease and desist from the further activity affecting the Buffer Zone and/or wetland resource areas on this property. ❑ Wetland alterations resulting from said activity should be corrected and the site returned to its original condition. ❑ Complete the attached Notice of Intent. The completed application and plans for all proposed work as required by the Act and Regulations shall be filed with the Issuing Authority on or before nate No further work shall be performed until a public hearing has been held and an Order of Conditions has been issued to regulate said work. ❑ The property owner shall take the following action to prevent further violations of the Act: wpaform9a.doc • rev. 12/15/00 Page 2 of 3 Massachusetts Department of Environmental Protection ;�-- Bureau of Resource Protection - Wetlands WPA Form 9A - Enforcement Order Massachusetts Wetlands Protection Act M.G. L. c. 131, §40 DEP File Number: Provided by DEP Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts General Laws Chapter 131, Section 40 provides: "Whoever violates any provision of this section (a) shall be punished by a fine of not more than twenty-five thousand dollars or by imprisonment for not more than two years, or both, such fine and imprisonment; or (b) shall be subject to a civil penalty not to exceed twenty-five thousand dollars for each violation". Each day or portion thereof of continuing violation shall constitute a separate offense. D. Appeals/Signatures An Enforcement Order issued by a Conservation Commission cannot be appealed to the Department of Environmental Protection, but may be filed in Superior Court. Questions regarding this Enforcement Order should be directed to: Richard C. Paquette, Jr., Conservation Administrator Name 978-688-9530 Phone Number M -F 8:30 - 4:30 Hours/Days Available Issued by: North Andover Conservation Commission In a situation regarding immediate action, an Enforcement Order may be signed by a single member or agent of the Commission and ratified by majority of the members at the next scheduled meeting of the Commission. Signatures: 2 Signature of delivery pergon or certifred mail number wpaform9a.doc • rev. 12/15/00 Page 3 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 9A — Enforcement Order I; Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: Provided by DEP Construction of house addition and driveway within the 200 -foot Riverfront Area of Cochichewick Brook. Proposed work includes grading, installation of a 24x30 foundation, concrete floor, footing for a deck (4) and a driveway (see Contractor Proposal by Simmons Remodeling, Mortgage Plot Plan prepared by Northern Associates, Inc (3-4-92) and house addition plans prepared by G.J. Bruno Associates (7-25-01)). The proposed project is subject to the following conditions: 1. Install and maintain staked haybale line 100 -feet from the edge of the chain link fence until post construction inspection is conducted by NACD. All disturbed surfaces must be stabilized with vegetation prior to the removal of the haybale boundary. 2. The haybale boundary shall serve as the limit of work for the project. 3. The property owner shall provide the NACD with monthly updates on the progress of project. 4. Notify the NACD when construction is complete so a post construction inspection can be conducted. The North Andover Conservation Commission will permit 14 weeks (deadline Feb. 15, 2002) for the project to be completed, with the exception of the final paving for the driveway. If the project is not completed within the 14 week period, the property owner must file a Notice of Intent with the North Andover Conservation Commission.' wpaform9a.doc - rev_ 12/15/00 Page 1 of 3 A. Violation Information Important: When filling out This Enforcement Order is issued by: forms on the North Andover Conservation Commission 11-6-01 computer, use only the tab Conservation Commission (Issuing Authority) Date key to move To: your cursor - do not use the Nancy C. Robinson return key. Name of Violator 24 E. Water Street IYQ Address IL 1. Location of Violation: Property Owner (if different) 24 E. Water Street Street Address North Andover 01845 City/Town Zip Code Map 69 Parcel 29, Lot 4 Assessors Map/Plat Number Parcel/Lot Number 2. Extent and Type of Activity: DEP File Number: Provided by DEP Construction of house addition and driveway within the 200 -foot Riverfront Area of Cochichewick Brook. Proposed work includes grading, installation of a 24x30 foundation, concrete floor, footing for a deck (4) and a driveway (see Contractor Proposal by Simmons Remodeling, Mortgage Plot Plan prepared by Northern Associates, Inc (3-4-92) and house addition plans prepared by G.J. Bruno Associates (7-25-01)). The proposed project is subject to the following conditions: 1. Install and maintain staked haybale line 100 -feet from the edge of the chain link fence until post construction inspection is conducted by NACD. All disturbed surfaces must be stabilized with vegetation prior to the removal of the haybale boundary. 2. The haybale boundary shall serve as the limit of work for the project. 3. The property owner shall provide the NACD with monthly updates on the progress of project. 4. Notify the NACD when construction is complete so a post construction inspection can be conducted. The North Andover Conservation Commission will permit 14 weeks (deadline Feb. 15, 2002) for the project to be completed, with the exception of the final paving for the driveway. If the project is not completed within the 14 week period, the property owner must file a Notice of Intent with the North Andover Conservation Commission.' wpaform9a.doc - rev_ 12/15/00 Page 1 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 9A — Enforcement Order Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings DEP File Number: Provided by DEP The Issuing Authority has determined that the activity described above is in violation of the Wetlands Protection Act (M.G.L. c. 131, § 40) and its Regulations (310 CMR 10.00), because: ❑ the activity has been/is being conducted without a valid Order of Conditions. ❑ the activity has been/is being conducted in violation of the Order of Conditions issued to: Name File Number B. Findings (cont.) ® Other (specify): Dated Condition number(s) The activities described in Section A.2. are permitted under this Enforcement Order. Any changes to the project that will result in proposed structures being located closer to Cochichewick Brook will require the filing of a Notice of Intent with the NACC. C. Order The issuing authority hereby orders the following (check all that apply): ❑ The property owner, his agents, permittees, and all others shall immediately cease and desist from the further activity affecting the Buffer Zone and/or wetland resource areas on this property. ❑ Wetland alterations resulting from said activity should be corrected and the site returned to its original condition. ❑ Complete the attached Notice of Intent. The completed application and plans for all proposed work as required by the Act and Regulations shall be filed with the Issuing Authority on or before Date No further work shall be performed until a public hearing has been held and an Order of Conditions has been issued to regulate said work. ❑ The property owner shall take the following action to prevent further violations of the Act: wpaform9a.doc • rev. 12/15/00 Page 2 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 9A - Enforcement Order Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: Provided by DEP Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts General Laws Chapter 131, Section 40 provides: "Whoever violates any provision of this section (a) shall be punished by a fine of not more than twenty-five thousand dollars or by imprisonment for not more than two years, or both, such fine and imprisonment; or (b) shall be subject to a civil penalty not to exceed twenty-five thousand dollars for each violation". Each day or portion thereof of continuing violation shall constitute a separate offense. D. Appeals/Signatures An Enforcement Order issued by a Conservation Commission cannot be appealed to the Department of Environmental Protection, but may be filed in Superior Court. Questions regarding this Enforcement Order should be directed to: Richard C. Paquette, Jr., Conservation Administrator Name 978-688-9530 Phone Number M -F 8:30 - 4:30 Hours/Days Available Issued by: North Andover Conservation Commission In a situation regarding immediate action, an Enforcement Order may be signed by a single member or agent of the Commission and ratified by majority of the members at the next scheduled meeting of the Commission. Signatures: Signature of deliveryper4cin or certi a mail number wpaform9a.doc • rev. 12/15100 Page 3 of 3 North Andover Conservation Commission Site Inspection Sheet Dep File # 242 - does not have permit with Conservation Commission Date: j l D ) Address: a Gen epresent, present: Findings: C tj brnS Ha C wO-s�- 'Owner ,V v,e,C- w (k Id firr ,� LU urs Ug ►n.e,P-ds -b d ccUr- S