Loading...
HomeMy WebLinkAboutMiscellaneous - 240 CHARLES STREET 4/30/2018 (5)6 GREATER LAWRENCE SANITARY DISTRICT 240 CHARLES STREET NORTH ANDOVER, MASSACHUSETTS ADDENDUM NO. 1 TO THE PLANS BIDDING REQUIREMENTS, CONTRACT DOCUMENTS AND SPECIFICATION MANUAL FOR THE PRIMARY CLARIFIER AND AERATION SYSTEM IMPROVEMENTS CONTRACT 1 CWSRF ID 43492 .- - PREPARED BY: WRIGHT-PIERCE 99 Main Street Topsham, Maine 04086 Tel. (207) 725-8721 Fax(207)729-8414 January 25; 2012 Addendum No. 1 12284A Page 1 of 18 ADDENDUM NO. 1 GREATER LAWRENCE SANITARY DISTRICT PRIMARY CLARIFIER AND AERATION SYSTEM IMPROVEMENTS CONTRACTI This Addendum amends and/or supplements the Bid Documents as indicated below. Only these items alter the Bid Documents; any verbal discussions or responses are hereby declared null and void. The Bidder shall indicate the receipt of all issued Addenda on the Bid Form. Each holder of the Bid Documents registered with the OWNER shall receive a copy of the Addendum. GENERAL CLARIFICATIONS 1-1 Specification Section 00020, Page 00020-2 lists the Department of Environmental Protection (MassDEP) DBE Requirements and the associated forms (EEO -DEP -190 & EEO -DEP -191) to be submitted with the Bid. Refer to Specification 00800, Page SC -20- 3 for more information regarding the MassDEP DBE Requirements. 1-2 Specification Section 00100, Paragraph 27.07.E lists the Commonwealth of Massachusetts MBE/WBE goals for Minority and Women Workforce Participation. Refer to Specification 00800, Page SC -20-21 for more information regarding the Commonwealth of Massachusetts MBE/WBE Minority and Women Workforce Participation goals. SPECIFICATIONS The following changes are made to the Specifications: 1-3 In Specification 00020, Bid Advertisement, ADD the following sentence at the end of the second paragraph: "General Contractors shall include a Division of Capital Asset Management (DCAM) certificate of eligibility in the category of Sewage and Water Treatment Plants and a DCAM Update Statement with the bid." 1-4 In Specification 00020, Bid Advertisement, ADD the following paragraph after the fourth paragraph: "Bids will be valid only when accompanied by; (1) a current certificate of eligibility issued by the Division of Capital Asset Management (DCAM), showing that the General Bidder has the classification of Sewage and Water Treatment Plants and a capacity to perform this work and (2) an update statement summarizing the General Bidder's record for the period between the latest DCAM certification and the date the bid is submitted." 1-5 In Specification 00100, Instructions to Bidders, ADD the following paragraph to the end of ARTICLE 3: "3.03 General Bids will be valid only when accompanied by (1) a current certificate of eligibility issued by the Division of Capital Asset Management (DCAM), showing that the General Bidder has the classification of Sewage and Water Treatment Plants and a capacity to perform this work and (2) an update January 25; 2012 Addendum No. l 12284A Page 2 of 18 statement summarizing the General Bidder's record for the period between the latest DCAM certification and the date the bid is submitted." 1-6 In Specification 00100, Instructions to Bidders, DELETE the first sentence of Article 7.01, and REPLACE with the following: "All questions about the meaning or intent of the Bidding Documents are to be submitted to the Engineer in writing." 1-7 In Specification 00100, Instructions to Bidders, ADD the following sentence at the end of Article 15.01: "G. Required DCAM paperwork including (1) a current certificate of eligibility issued by the Division of Capital Asset Management (DCAM), showing that the General Bidder has the classification of Sewage and Water Treatment Plants and a capacity to perform this work and (2) an update statement summarizing the General Bidder's record for the period between the latest DCAM certification and the date the bid is submitted." 1-8 In Specification 00300, Form for General Bid, ADD the following to the list of documents attached to and made a condition of the Bid on Page 00300-5: "(h) Signed Compliance Statement (Section 00406) (i) Certification of Eligibility from Division of Capital Asset Management 0) Update Statement with supporting data." 1-9 In Specification 00300, Form for General Bid, ADD Pages 6 through 15 of this Addendum to the end of Specification 00300. 1-10 In Specification 01800, Equipment Start-up Certification and Operator Training, DELETE Paragraph 3.3.E in its entirety, and REPLACE with the following: "E. At the Owner's discretion, the training sessions may be video recorded by the Owner for Owner's future use. If available, a DVD of operation and maintenance instructions shall be provided by the manufacturer." 1-11 In Specification 02050A, Demolition, DELETE Paragraphs 3.1.1.1, 3.1.1.2, and 3.1.I.3 in their entirety and REPLACE with the following paragraphs: 1. Contractor shall give Owner 14 days minimum notice prior to beginning work in tanks requiring draining and cleaning; which are to be renovated as part of this project. The Owner will be responsible for removal and disposal of the liquid contents, and any accumulated grit and sludge of the existing tanks, with the exception of the center sump in the primary sedimentation tanks. The Owner will do a "hose down" cleaning of the walls and floors of existing tanks (once), after being notified by the Contractor of the intent to begin demolition work. 2. If the demolition work does not commence within the Contractor's approved project schedule, the tank(s) may be placed back in operation by the Owner. If the tanks are required to be drained and hosed down beyond the initial draining and cleaning, the Owner will perform the work and reserves the right to back -charge the Contractor for this repeated effort. 3. When the existing tank(s) are empty (drained and "hosed down" by the Owner), the Contractor shall perform any cleaning that he deems necessary to perform the work." 1-12 In Division 2, ADD Specification 02201, Excavation and Backfill (Attached to the end of this Addendum). 1-13 In Specification 02756, Monolithic Pipelining, DELETE the words "Owner's representative" in the first sentence of Paragraph 3.5.E, and REPLACE with "Contractor." January 25, 2012 Addendum No. 1 12284A Page 3 of 18 DRAWINGS The following changes are made to the Drawings: 1-14 1-15 1-18 1-19 1-20 1-21 1-22 1-23 1-24 1-25 1-26 On Drawing S-1, ADD the following Duct Bank Detail and notes: 4" (am) ELECTRICAL CONDUIT /4 O 36- NOTE: SEE ELECTRICAL DRAWINGS FOR ADDITIONAL DETAILS. ELECTRICAL DUCT BANK REINFORCING STEEL DETAIL SMLI NTS 4 O 18' ONRNUOUS On Drawing M-1, DELETE Process General Note 4 in its entirety, and REPLACE with, "All process and plant water hose bibs shall be provided with a sign indicating NOT SUITABLE FOR DRINKING."' On Drawing M-3, DELETE the following from Note No. 9: "Bid Item Notes 5, 6, & 7," and REPLACE with "Bid Item Notes 6, 7, & 8." On Drawing M-14, Primary Effluent Slide Gate No. I and No. 2 are to be Channel Bottom Mount type per Section B -B. On Drawing E-4, Ductbank Section A -A, DELETE Conduits P5 and C4. On Drawing E-4, Ductbank Section C -C, DELETE Conduits P2 and C2. On Drawing E-7, Demolition Notes, ADD the following sentence to the end of Demolition Note No. 5: "The existing conduit inside the Sludge and Grit Pumping Station No. 2 shall remain and be re -used for new conductors (P3) from Lighting Panel LD to the pull box OO shown on Drawing E-8" On Drawing E-7, Demolition Notes, ADD the following sentence to the end of Demolition Note No. 6: "The existing conduit inside the Sludge and Grit Pumping Station No. 1 shall remain and be re -used for new conductors (P6) from Lighting Panel LC to the pull box 21 shown on Drawing E-9" On Drawing E-7, Demolition Notes, ADD the following sentence to the end of Demolition Note No. 7: "The existing conduit inside the Sludge and Grit Pumping Station No. 2 shall remain and be re -used for new control wires (Cl) from MCC -213 to the pull box 29 shown on Drawing E-8" On Drawing E-7, Demolition Notes, ADD the following sentence to the end of Demolition Note No. 9: "The existing conduit inside the Sludge and Grit Pumping Station No. 1 shall remain and be re -used for new control wires (0) from MCC -2C to the pull box 19 shown on Drawing E-9" On Drawing E-8, Sludge and Grit Pumping Station No. 2 Modifications, DELETE Conduits P2 and C2 in their entirety. On Drawing E-9, Sludge and Grit Pumping Station No. 1 Modifications, DELETE Conduits P5 and C4 in their entirety. On Drawing E-11, Sludge and Primary Sedimentation Tanks No. 1 and No. 2 Modifications, DELETE Conduits P2, P5, C2 and C4 in their entirety. January 25, 2012 Addendum No. 1 12284A Page 4 of 18 1-27 On Drawing E-13, Conduit and Wire Schedule, DELETE Conduits P2, P5, C2 and C4 in their entirety. 1-28 On Drawing E-13, Conduit and Wire Schedule, ADD the following Note at the bottom of the table: "1. Conduit P3 shall utilize the existing 1" conduit inside the Sludge and Grit Pumping Station No. 2 from Lighting Panel LD to the pull box OO shown on Drawing E- 8." 1-29 On Drawing E-13, Conduit and Wire Schedule, ADD the following Note at the bottom of the table: "2. Conduit P6 shall utilize the existing 1" conduit inside the Sludge and Grit Pumping Station No. 1 from Lighting Panel LC to the pull box 21 shown on Drawing E- 9.11 1-30 On Drawing E-13, Conduit and Wire Schedule, ADD the following Note at the bottom of the table: "3. Conduit C1 shall utilize the existing 1-1/4" conduit inside the Sludge and Grit Pumping Station No. 2 from MCC -213 to the pull box 29 shown on Drawing E-8." 1-31 On Drawing E-13, Conduit and Wire Schedule, ADD the following Note at the bottom of the table: "4. Conduit C3 shall utilize the existing 1-1/4" conduit inside the Sludge and Grit Pumping Station No. 1 from MCC -2C to the pull box 19 shown on Drawing E-9." January 25, 2012 Addendum No. 1 12284A Page 5 of 18 EFFECTIVE MARCH 30, 2010 Commonwealth of Massachusetts Division of Capital Asset Management PRIME/GENERAL CONTRA C TOR UPDATE STATEMENT TO ALL BIDDERS AND AWARDING AUTHORITIES A COMPLETED AND SIGNED PRIME/GENERAL CONTRACTOR UPDATE STATEMENT MUST BE SUBMITTED WITH EVERY PRIME/GENERAL BID FOR A CONTRACT PURSUANT TO M.G.L. c.149, §44A AND M.G.L. c. 149A. ANY PRIME/GENERAL BID SUBMITTED WITHOUT AN APPROPRIATE UPDATE STATEMENT IS INVALID AND MUST BE REJECTED. Caution: This form is to be used for submitting Prime/Genera/ Contract bids. It is not to be used for submitting Filed Sub -Bids or Trade Sub -Bids. AWARDING AUTHORITIES If the Awarding Authority determines that the bidder does not demonstrably possess the skill, ability, and integrity necessary to perform the work on the project, it must reject the bid. BIDDER'S AFFIDAVIT I swear under the pains and penalties of perjury that I am duly authorized by the bidder named below to sign and submit this Prime/General Contractor Update Statement on behalf of the bidder named below, that I have read this Prime/General Contractor Update Statement, and that all of the information provided by the bidder in this Prime/General Contractor Update Statement is true, accurate, and complete as of the bid date. Bid Date Print Name of Prime/General Contractor Project Number (or Business Address name if no number) Awarding Authority Telephone Number SIGNATUREb Bidder's Authorized Representative January 25; 2012 Addendum No. 1 12284A Page 6 of 18 INSTRUCTIONS INSTRUCTIONS TO BIDDERS This form must be completed and submitted by all Prime/General contractors bidding on projects pursuant to M.G.L. c. 149, §44A and M.G.L. c. 149A You must give complete and accurate answers to all questions and provide all of the information requested. MAKING A MATERIALLY FALSE STATEMENT IN THIS UPDATE STATEMENT IS GROUNDS FOR REJECTING YOUR BID AND FOR DEBARRING YOU FROM ALL PUBLIC CONTRACTING. This Update Statement must include all requested information that was not previously reported on the Application used for your firm's most recently issued (not extended or amended) Prime/General Contractor Certificate of Eligibility. The Update Statement must cover the entire period since the date of your Application, NOT since the date of your Certification. You must use this official form of Update Statement. Copies of this form may be obtained from the awarding authority and from the Asset Management Web Site: www.mass.-gov/deam. If additional space is needed, please copy the appropriate page of this Update Statement and attach it as an additional sheet. See the section entitled "Bidding Limits" in the Instructions to Awarding Authorities for important information concerning your bidding limits. INSTRUCTIONS TO AWARDING AUTHORITIES Determination of Bidder Qualifications It is the awarding authority's responsibility to determine who is the lowest eligible and responsible bidder. You must consider all of the information in the low bidder's Update Statement in making this determination. Remember: this information was not available to the Division of Capital Asset Management at the time of certification. The bidder's performance on the projects listed in Parts 1 and 2 must be part of your review. Contact the project references. AWARDING AUTHORITIES ARE STRONGLY ENCOURAGED TO REVIEW THE LOW BIDDER'S ENTIRE CERTIFICATION FILE AT THE DIVISION OF CAPITAL ASSET MANAGEMENT. Telephone (617) 727-9320 for an appointment. Bidding Limits Single Project Limit: The total amount of the bid, including all alternates, may not exceed the bidder's Single Project Limit. Division of Capital Asset Management Prime/ General Contractor Update Statement Effective March 30, 2010 Aggregate Work Limit: The annual value of the work to be performed on the contract for which the bid is submitted, when added to the annual cost to complete the bidder's other currently held contracts, may not exceed the bidder's Aggregate Work Limit. Use the following procedure to determine whether the low bidder is within its Aggregate Work Limit: Step 1 Review Update Statement Question #2 to make sure that all requested information is provided and that the bidder has accurately calculated and totaled the annualized value of all incomplete work on its currently held contracts (column 9). Step 2 Determine the annual dollar value of the work to be performed on your project. This is done as follows: (i) If the project is to be completed in less than 12 months, the annual dollar value of the work is equal to the full amount of the bid. (ii) If the project will take more than 12 months to complete, calculate the number of years given to complete the project by dividing the total number of months in the project schedule by 12 (calculate to 3 decimal places), then divide the amount of the bid by the calculated number of years to find the annual dollar value of the work. Step 3 Add the annualized value of all of the bidder's incomplete contract work (the total of column 9 on page 5) to the annual dollar value of the work to be performed on your project. The total may not exceed the bidder's Aggregate Work Limit. Correction of Errors and Omissions in Update Statements Matters of Form: An awarding authority shall not reject a contractor's bid because there are mistakes or omissions of form in the Update Statement submitted with the bid, provided the contractor promptly corrects those mistakes or omissions upon request of the awarding authority. [810 CMR 8.05(1)]. Correction of Other Defects: An awarding authority may, in its discretion, give a contractor notice of defects, other than mistakes or omissions of form, in the contractor's Update Statement, and an opportunity to correct such defects, provided the correction of such defects is not prejudicial to fair competition. An awarding authority may reject a corrected Update Statement if it contains unfavorable information about the contractor that was omitted from the Update Statement filed with the contractor's bid. [810 CMR 8.05(2)]. January 25, 2012 Addendum No. 1 12284A Page 7 of 18 LL LL OOQ LU W F- < z Qz COO wLLp W F- W VUO Z2W U) pp} LIJ WCO W D Jp0 mww w OQa- (1)WH Q00 =pz 2 W Z p Iwo LLQ owW o }�O U) ZZ LIjpW W COD Z Ouj UQ ca Ix WHCO O CL of p=� Q O Z 0 U0pE- JLL}Q co Z U_ 0 >: --� d J ~ F- d -i< =J Q U m HaC�Q Wa JU J Q W C) W w H w c oa O N U a� a W 0 0 0 w U) U a� iLLIU z� a' rq mU 0 m �cu U �70 Y� CL O D �0 00 3!E �w M Q U O cu Z 0 c U 0 a E� Oa) 06 U O ' 0 0 O Q LU J ~ Q.0 M O z H O V E U pp F- o a c b a _O >_ W c6 = U � : E f a (� O N W N c 0 N a� a 0 0 0 w � c a� rq mU m �cu �70 CL O D 3!E 0 M O cu c a E� Oa) U O ' 0 0 O Q 0 ~ Q.0 M O z t5 +� � O V E U pp o a c b a _O >_ Q c6 = U � : E f � (� O N W N x U O N E .� c C a) C -0 NU) E E c N a) rnN N c 'co � Z) O U in m C _ M `~ Q c O w, +; 0 U cv a "M moo (II c o N O U c C7 m >, >, .N a CO E > .= r_ 3 Q + o w 2 F— Z O cl w F— U) J LU O w CL 0 w w J 0- 2 O U Q w irO LL Z O Q 0 Z w U Z w w W LL W it >z O J J O LL LLj w CD 2 Q w D O Ow Ql� D� a- a - L Ot O= O O O= O= O O C O 0 t 0 o N L 0 0 O o .2 CL CL cnm � '� CL 0 2 cl-I W N F- F- a) F- F- a) F- 0 F� F- N H F- N H F- 00 a 3 �- c F- F- t 0 F- 3 3 o cuz m °z a �U U) �w w w o❑ °❑ U � J w 0 Q O C�. E � -CL U F- QL C 0 0 O U y Zc O OC O C O CO O C O CO O C O =O O C O CO C O C O O C O /O///�� O Oc E N C U O N •0 c_a N a c`a c > >co a' 0 O wa n CL as O a as O a (La a Mn. 0 a ad a s IL V U U V U U V U U V U U V U U V U U U 0 C C OO C C m C C � w C c+,o C � � C coo C a) C A p C o 0 0 C 0 0 0 C 0 0 0 C 0 0 0 C 0 O O C O O C O Z U U UU >_ U (-)o CL E U UU U (-)oV UU V U O L c L c c c 4) c Lm c L R) L L 0 27)L Q3 C O 0 U3 C Cl) m U3 C (1) (1) U3 c W a) U3 c U) (L) U3 C tl) (1)U Z 00 00 00 00 0 00 0 0 cr- Q Z w Z w Z Z w Z w Z a w c7 w w w(D w C7 w 0� w b� w 6� w 6� w b� w b3: w v U O o (D 0 0 (D 0 0 (D 0 0 (D 0 0 (D 0 o cD w J F- F- F - 0 w O w IL L L O C O 0 C O L U N L C O a) cnm � '� ca L C E 3 0 a 3 c 0 t 0 3 3 o cuz m °z �U U) �w w o❑ °❑ U � 0 Q O C�. E � -CL U QL C 0 0 O U y °� OLL cn0 O .� �cu s o zCN � O Oc E N C U O N •0 c_a N a c`a c > >co a' 0 O n 0 :3 -0 cm O w O N +� co 0 jL aci E OO m 0 C 0 L Lcn w cn 4 C: a� cn c 0 Q OO (p fn m M > U C)) W i- 0 N 0 O 0O O O a) m Q A p O0 N @ U N C O E L c t C U c N m � c v- a) O N O U N O > >_ c''d >1 = CL E O 0 d 12 UO Q) L O Q U w W z CD Q 2 0 �0 U)W F' U Uz W W 3 it2 a0 01 w �w O� UW z= J_ m0 Ow z= o Z LL QO 0 co z (4 W J J m � E- W Qw > W aQ 0 C) Z W Q = U_ F• Jz m0 D �- av J Q Q W H z () 0 71U rn � c o E t O U O o E :a o Y E U � � Q�?a L 0 .0 U W v H-0 CO N N W oo Z 2 Q(C = U J N' LL O r O�co� W — t� � •N � N >, ECN .c U W c N N o c Q MO Z) = O Q Z N o 0 Q(uE� MR C E 2 O U WE c a) w N 00 °w u. F- OJY�a aa) Y U) CD J Lu o o a) rn iu � CL ZQO31 s cm 2- 0 Q>z 3: Q c 0 U N CL— -N N a) 0 c � a) N W VJ z (D ., 0 Qco �a i .> 0o r_�a ti z >- W Y H ca 0 I� QOOaWX U' 101.0 >Wz0 U W oaW CO z2� �0 U QW U LO z a 0� UU o IT w 0=W cn L) �00w CIO Qzzf— � Q W Q YO »U W J z ~0 � Q UU O_j W OZ5 d rn � c o E t O U O o E :a o Y E U � � Q�?a L 0 .0 U W v H-0 CO N N W oo Z 2 Q(C = U J N' LL O r O�co� W — t� � •N � N >, ECN .c U W c N N o c Q MO Z) = O Q Z N o 0 Q(uE� MR C E 2 O U WE c a) aa) Y U) m a) rn iu � CL cm 2- 0 � U Q c 0 U N CL— -N N a) 0 c � a) N �a i .> .� r_�a ti w Z 0 0 LwL yJ J U w n 0 a w I— w J O z U w w 0 Z O Q O LLZ w Z w w LL w Of Z_ O J OLLj w0 = Q CO w Z) 00 0 w as c O LL o c O ocr-CcQr-Cc O O -C O c = Oc Q a CL L 0a p M L a sr apo fl -co a Q) a, q)- a) � a) a� o a� o ` C H F- O vi >, 3 ccu O s o 3 3 ,I- a �Z °Z .� �E c❑ �w cw w O ❑ ° ❑ U >� L J w O C Vj Q H N O C C L 7 U O O' 0//� O ° ° O O O O ° o o O O O 0 0 0 ° O / V/ L L L, ` L L L L L N L N N L N N L N wn ¢ CU as o +- CL as 3� a- Q - a -n- as ° C N a as a a L �- N 0 >� c c = E a N u°, N 0 ° 0)m .� r'�..� ` C CL � U c cc) C c0 >>- c c ca s ;� c c ca c ;U c CU c ca c M c m ca c m c m cu N U U U U U U U U U U U () U U U (j U U Z O c m = >_ . ° Lm ati N O 0 1- O Q 0 �' 0 L L C L L C L L C L C L C L C 2 c 2) N U� C N a) U C N a� U L C 3 Cl) a) U L C 3 N a) U L C 3 N a) U Q3 Z 00 0 00 00 00 0 00 (7 Q CK z z w w Of z z z w z w a w Z (D W (D W Z (D W Z () W Z V5 z 0� w U >Z w U� W U W U W U W U 00 0 (D 0 0 (D 0 0 (D 0 0 0 0 0 (D 0 0 0 W J F- F - U w n af CL L O rn o o c 0 L U M L C O R) � 0 c6 ` C 3 O vi >, 3 ccu O s o 3 3 ,I- 00 �Z °Z .� �E c❑ �w cw O ❑ ° ❑ U >� L O C Vj Q O U N O C C L 7 U O O' O= •3 L 0 Ncu 04 C p CD ch z 0 tC LC N C U N Q N N C C_ O > a) D p. co ° �°>, 'E c U ¢ CU o +- w 3� E a 0)m ca ° C N U L E o D t N a) L �- N 0 >� c c = E a N u°, N 0 ° 0)m .� r'�..� ` C CL � am w � C c0 >>- N O 0-0 O O C E N N :o Q cu N a) u)m m N ° m � C O U N E c c ° •�- a) O O O N L C C7 O c m = >_ . ° Lm ati N O 0 1- O Q 0 �' PART 3 - PROJECT PERFORMANCE For Parts 3 and 4, if you answer YES to any question, please provide on a separate page a complete explanation. Information you provide herein must supplement the Application for your most recently issued (not extended or amended) DCAM Certificate of Eligibility. You must report all requested information not previously reported on that DCAM Application for Prime/General Certificate of Eligibility. Include all details [project name(s) and location(s), names of all parties involved, relevant dates, etc.]. 1'A W. M rl 1. Has your firm been terminated on any contract prior to completing a project or has ❑ ❑ any officer, partner or principal of your firm been an officer, partner or principal of another firm that was terminated or failed to complete aproject? 2. Has your firm failed or refused either to perform or complete any of its work under ❑ ❑ any contract prior to substantial completion? 3. Has your firm failed or refused to complete any punch list work under any contract? ❑ 4. Has your firm filed for bankruptcy, or has any officer, principal or individual with a ❑ ❑ financial interest in your current firm been an officer, principal or individual with a financial interest in another firm that filed for bankruptcy? 5. Has your surety taken over or been asked to complete any of your work under any ❑ ❑ contract? 6. Has a payment or performance bond been invoked against your current firm, or has ❑ ❑ any officer, principal or individual with a financial interest in your current firm been an officer, principal or individual with a financial interest in another firm that hada payment or performance bond invoked? 7. Has your surety made payment to a materials supplier or other party under your ❑ ❑ payment bond on any contract? 8. Has any subcontractor filed a demand for direct payment with an awarding authority ❑ fora public project on any of your contracts? 9. Have any of your subcontractors or suppliers filed litigation to enforce a mechanic's ❑ ❑ lien against property in connection with work performed or materials supplied under any of your contracts? 10. Have there been any deaths of an employee or others occurring in connection with ❑ ❑ any of yourprojects? 11. Has any employee or other person suffered an injury in connection with any of ❑ ❑ your projects resulting in their inability to return to work for a period in excess of one year? Division of Capital Asset Management Prime/General Contractor Update Statement Effective March 30, 2010 January 25, 2012 Addendum No. 1 12284A Page 12 of 18 PART 4 - Legal or Administrative Proceedings; Compliance with Laws Please answer the following questions. Information must supplement all judicial and administrative proceedings involving bidder's firm, which were instituted or concluded (adversely or otherwise) since your firm's Application for your most recently issued (not extended or amended) Certificate of Eligibility. You must report all requested information not previously reported on that DCAM Application for Prime/General Certificate of Eligibility. The term "administrative proceeding" as used in this Prime/General Contractor Update Statement includes (i) any action taken or proceeding brought by a governmental agency, department or officer to enforce any law, regulation, code, legal, or contractual requirement, except for those brought in state or federal courts, or (ii) any action taken by a governmental agency, department or officer imposing penalties, fines or other sanctions for failure to comply with any such legal or contractual requirement. The term "anyone with a financial interest in your firm" as used in this Section "I", shall mean any person and/or entity with a 5% or greater ownership interest in the applicant's firm. If you answer YES to any question, on a separate page provide a complete explanation of each proceeding or action and any judgment, decision, fine or other sanction or result. Include all details (name of court or administrative agency, title of case or proceeding, case number, date action was commenced, date judgment or decision was entered, fines or penalties imposed, etc.). ►ij�� r.I 1. Have any civil, judicial or administrative proceedings involving your firm or a ❑~ ❑ principal or officer or anyone with a financial interest in your firm been brought, concluded, or settled relating to the procurement or performance of any construction contract, including but not limited to actions to obtain payment brought by subcontractors, suppliers or others? 2. Have any criminal proceedings involving your firm or a principal or officer or ❑ ❑ anyone with a financial interest in your firm been brought, concluded, or settled relating to the procurement or performance of any construction contract including, but not limited to, any of the following offenses: fraud, graft, embezzlement, forgery, bribery, falsification or destruction of records, or receipt of stolen property? 3. Have any judicial or administrative proceedings involving your firm or a principal ❑ ❑ or officer or anyone with a financial interest in your firm been brought, concluded, or settled relating to a violation of any state's or federal procurement laws arising out of the submission of bids or proposals? 4. Have any judicial or administrative proceedings involving your firm or a principal ❑ ❑ or officer or anyone with a financial interest in your firm been brought, concluded, or settled relating to a violation of M.G.L. Chapter 268A, the State Ethics Law? Division of Capital Asset Management Prime/General Contractor Update Statement Effective March 30, 2010 January 25, 2012 Addendum No. l 12284A Page 13 of 18 PART 4 - Legal or Administrative Proceedings; Compliance with Laws (continued) YES NO 5. Have any judicial or administrative proceedings involving your firm or a principal or officer or anyone with a financial interest in your firm been brought, concluded, or settled relating to a violation of any state or federal law regulating hours of labor, unemployment compensation, minimum wages, prevailing wages, overtime pay, equal pay, child labor or worker's compensation? 6. Have any judicial or administrative proceedings involving your firm or a principal ❑ ❑ or officer or anyone with a financial interest in your firm been brought, concluded, or settled relating to a violation of any state or federal law prohibiting discrimination in employment? 7. Have any judicial or administrative proceedings involving your firm or a principal ❑ ❑ or officer or anyone with a financial interest in your firm been brought, concluded, or settled relating to a claim of repeated or aggravated violation of any state or federal law regulating labor relations? 8. Have any proceedings by a municipal, state, or federal agency been brought, concluded, or settled relating to decertification, debarment, or suspension of your firm or any principal or officer or anyone with a financial interest in your firm from public contracting? 9. Have any judicial or administrative proceedings involving your firm or a principal ❑ ❑ or officer or anyone with a financial interest in your firm been brought, concluded, or settled relating to a violation of state or federal law regulating the environment? 10. Has your firm been fined by OSHA or any other state or federal agency for ❑ ❑ violations of any laws or regulations related to occupational health or safety? Note: this information may be obtained from OSHA's Web Site at www.osha.gov 11. Has your firm been sanctioned for failure to achieve DBE/MBE/WBE goals, ❑ ❑ workforce goals, or failure to file certified payrolls on any public projects? 12. Other than previously reported in the above paragraphs of this Section I, have any administrative proceedings or investigations involving your firm or a principal or officer or anyone with a financial interest in your firm been brought, concluded, or settled by any local, state or federal agency relating to the procurement or erformance of any construction contract? 13. Are there any other issues that you are aware which may affect your firm's El ❑ responsibility and integrity as a building contractor? Division of Capital Asset Management Prime/General Contractor Update Statement Effective March 30, 2010 January 25; 2012 Addendum No. 1 12284A Page 14 of 18 PART 5 - SUPERVISORY PERSONNEL List all supervisory personnel, such as project managers and superintendents, who will be assigned to the project if your firm is awarded the contract. Attach the resume of each person listed below. NAME TITLE OR FUNCTION PART 6 - CHANGES IN BUSINESS ORGANIZATION OR FINANCIAL CONDITION Have there been any changes in your firm's business organization, financial condition or bonding capacity since the date your current Certificate of Eligibility was issued? ❑ Yes ❑ No If YES, attach a separate page providing complete details. PART 7 — LIST OF COMPLETED CONSTRUCTION PROJECTS SUBMITTED TO THE DIVISION OF CAPITAL ASSET MANAGEMENT. Attach here a copy of the list of completed construction projects which was submitted with your firm's DCAM Application for your most recently issued (not extended or amended) DCAM Certificate of Eligibility. The Attachment must include a complete copy of the entire Section G — "Completed Projects" and the final page — "Certification" (Section J) containing the signature and date that the Completed Projects list (Section G) was submitted to the Division of Capital Asset Management. END OF SECTION Division of Capital Asset Management Prime/General Contractor Update Statement Effective March 30, 2010 January 25; 2012 Addendum No. 1 12284A Page 15 of 18 SECTION 02201 EXCAVATION AND BACKFILL PART 1 - GENERAL 02201-1 1.1 DESCRIPTION A. Perform the following items of work, as shown on the Drawings and specified herein: 1. Do all excavating and furnish all material necessary for embankment construction, as required to complete the work of this Contract, including the furnishing and compaction of additional material as needed. 2. Completely remove from the site all excavated material which is not approved by the Engineer for use as embankment material. This provision does not apply to topsoil which will remain the property of the Owner. 3. Establish subgrades as indicated on the Drawings and specified hereunder. 4. Perform cutting and removal of existing pavements to the extent indicated on the Drawings and as required for the work under this Contract. 5. Protect all trees, shrubs and plantings not designated on the Drawings to be removed, for the duration of the Contract. 6. Protect all utilities on the site for the duration of the work. 1.2 DEFINITIONS A. The work involved includes removal, haul and disposal of materials to prepare for construction and the placing and compaction of material to complete the subsurface electrical construction. B. Common excavation shall consist of removal of earth, of boulders, solid mortared stone masonry and concrete masonry when each is less than two cubic yard in volume and of rock which can be removed with ordinary excavating machinery. Grubbing shall be considered as common excavation. 1.3 QUALITY ASSURANCE A. Requirements of Regulatory Agencies: 1. All work shall be performed and completed in accordance with all local, state or federal regulations. 2. The General Contractor shall secure all necessary permits from, and furnish proof of acceptance by, the local and state departments having jurisdiction and shall pay for all such permits, except as specifically stated elsewhere in the Contract Documents. B. Grade and Elevations: 1. The Contractor shall establish the lines and grades in conformity with the Drawings and maintain same to properly perform the contract installation. C. Compaction: 1. The Contractor shall compact all materials backfilled into trenches created for electrical construction. January 25, 2012 Addendum No. 1 12284A Page 16 of 18 02201-2 EXCAVATION AND BACKFILL 1.4 JOB CONDITIONS A. Disposition of Utilities: 1. The locations of utilities shown on the plans are approximate as determined from physical evidence on or above the surface of the ground and from information supplied by the utilities. The Engineer in no way warranties that these locations are correct. It shall be the responsibility of the Contractor to determine the actual locations of any utilities within the project area. 2. Rules and regulations governing the respective utilities shall be observed in executing all work in this section. Active utilities shall be adequately protected from damage, and removed or relocated only as indicated or specified. Inactive and abandoned utilities encountered in excavation and grading operations shall be removed, plugged or capped. Report in writing to the Engineer, the locations of such abandoned utilities. Extreme care shall be taken when performing work in the vicinity of existing utility lines utilizing hand excavation in such areas as far as practicable . If, in the progress of excavation, any utility should become damaged and result in any damage to public or private property, the General Contractor shall restore to the original condition, at no additional cost to the Owner, anything which has been damaged or disturbed. PART 2 - PRODUCTS 2.1 SOIL MATERIALS A. Use of Excavated Material: 1. To the extent they are needed, all suitable materials from the specified excavation may be used in the construction. 2. Surplus excavated materials suitable for filling operations shall not be wasted, but will be stockpiled for future use as directed by the Engineer within the District's property. This specific location will be determined at the start of construction. PART 3 - EXECUTION 3.1 SAFETY A. Comply with applicable local, state or federal safety regulations or in the absence thereof, with the provisions of the Manual of Accident Prevention in Construction of the Associated General Contractors of America, Inc. 3.2 COMMON EXCAVATION A. The Contractor shall excavate material encountered to establish required grade elevations. 1. Unauthorized Excavation: a. Unauthorized excavation consists of removal of materials beyond indicated subgrade elevations or dimensions without specific direction of the Engineer. Unauthorized excavation, as well as remedial work directed by the Engineer, shall be at the Contractor's expense. January 25, 2012 Addendum No. 1 12284A Page 17 of 18 02201-3 EXCAVATION AND BACKFILL b. The Contractor shall backfill and compact unauthorized excavations as specified for authorized excavations of the same classification, unless otherwise directed by the Engineer. 3.3 GRADING A. General: Uniformly grade areas within limits of construction. Smooth finished surface within specified tolerances. 1. Lawn or Unpaved Areas: Finish areas to receive topsoil to within not more than 0.10 feet above or below the required subgrade elevations. 3.4 MAINTENANCE A. Protection of Graded Areas: Protect newly graded areas from traffic and erosion. Keep free of trash and debris. B. Repair and re-establish grades to specified tolerances in settled, eroded or rutted areas. C. Reconditioning Compacted Areas: Where completed compacted areas are disturbed by subsequent construction operations or adverse weather, reshape, and compact to required density prior to further construction. 3.5 DISPOSAL OF EXCESS AND WASTE MATERIALS A. Removal from Owner's Property: Remove waste materials, including unacceptable excavated material, trash and debris, and dispose of it off the Owner's property. END OF SECTION January 25, 2012 Addendum No. 1 12284A Page 18 of 18 .. , I 4 SANTTARY DISTRICT GREATER�� � � VS SV""" N� ADDENDUM NO.2 To THE P UINMENTS, BIDDIC DOC MENTU D CONTE TION MAN SPECIFICA FOR YSTEMP'OV EMENTS D AERATION S PRIMARY CLA�FIER AND 1 CwSRF M #3492 Z- PREP�D BY: WR1TT-P�RCE 99 Main Street Maine p4096 Topsham 20�) X25-8121 'Tel. (201) Fax (20') 122g4A Addendum No 2 --------------- p ----page l of 94 February 2, 2012 X;2 v ADDEND UM NO.2 Y DISTRICT ENT S SANIT k VEM GREATER LNWVX ERATION SYSTEM ITA YRI1vIARY CLARIFIER AND ONTRACT 1 indicated below. Only these Documents as declared null and supplements the Bid Docum hereby supe or responses are h id Form' Each holder amends and/orany verbal discussions ddenda on the B ddendum• This Addendum ocuments� t of all issued A of the A I receip SER shall receive a copy 1 items alter the Bid D ed with the O void. The Bidder shall e dsterte the of the Bid Documents g Greater Lawrence CLARIFICATIONS 2012 at 1.30 p•m at the n1eeting was to GENERAL held on January 21, The purpose of The Pre -Bid wash ents. sheet id Conference Andover, Massachusetts• Contract Docum 2 1 A Pre -B North An to the attendance Sanitary District in N otential bidders relatinfor potential bidders. An uestions from P a mandatory meeting answer questions NOT Addendum- Tanks No. 1 Conference D to the end of this A ed for Aeration is ATTACHE work to be perform o 2 can be isolated by odification T No l and ATN into een A introducing all the flowi piping For the stainless steel pipe ill el betty channel and in for the p P 2.2 ow in the chane el to work leak and No. 2, the fl head end of the chane totally ates at the will provide a dry the slide gates are ing that closing the slide and 2X• This arantee ent and pump Zone cannot guarantee leak containm T No. I and Selector ever, Owner el between A modifications. How onsible for any The chane their work• Perform all necessary Pipe Contractor shall to f perform shall p connections free, and thnecessary in order to once. . Contractor temporary pipe This work they deem be taken off-line provide tempoff-line. No 2 shall only el at one time and p to be taken in the channel NO 2 until that tank is ready interference. modificatioon legs m .th the Owner to minimize any o. 3 sN existing drop coordinated wi ed for Aeration Tank must be closely n work to be per closing the modification el which can be isolated b o work in for ess steel pipe m chane gates stall influent chane provide a dry are For the has its own This will p arantee that the slide g 2-3 and No. 4, each tank channel. ent and end of the Owner cannot leak contaim" slide gates at the head ever, onsible for any modifications. H°w ork. the Piping the Contractor shall be reform their w leak free, and . order top ara raph 2.1-D totally deem necessary the intent of P g pumping that they Controls, out of service from any 00 Temporary Facilities and that are Contractor's e existing structures It is the to the Specification 015 protect the freezing and thawing. 2-4in Contractor to P water f but not necessaries hie the is for the accumulated such freeze thaw, 40 degrees associated from structures from above damageto keep the temperature responsibility to protect the extent of covering the structure entire tank. 12284 A Addendum No. 2 Page 2 of 94 - February 2, 2p12 to the w all a all the way for all extending wall (tom. Tank set lateral from the -9 show only one diffu 5 -feet for all laterals in the ending wall ( reasons on ` ings M-5 and M ote indicating thn 14 fe t from the shoat for clarityv and all laterals ll 2 5 Draw a dimensional n and 3) and ends g Nvn to be cu from the w with , 2, sh0 d to 5 -feet Tates res of the laterals and 3 eaten laterals 1nThe rc in Tacks 1 , 11 (new and existing) the table N° n All laterals _feet from the `va labeled ZONE i to indicate drawl g 4 the column heading notation The Grids in T aA 4 extend to anitalre s e A pV C endiA B; „A3" .. This is d 3 within Zon crate Sanitaire s quotation in 0 „ d Grid fed from a separate P one A and In P age 1 show s „ Grid 2 within Z° bu Aea h gid is tai of 4 glids 7,0111 i 2-6 provided on Zone A, drawings, and 2 for a to Grid I within the Contract their of labeled 017 M-12, Sections 1 shows are n on Drawing Provide on Page 1 dropleg as shne B last row � the table prod � This is not a column 2 grids in Zo endix 8 they 1a sets per G for a grand total of in App New Diffu heading listed the rows above, uotation in Samtaire s q e column secs 2-7 2,612 total)„ unddl ion the new ds.f u �� ,612 ( to but is in ad four tank total, diffusers for all 5,232 new PLACE Section SC_20-h SpECIF1CATi�Ns to the Specifications the end of this ` n es are made tai Conditions, � at 1 The following Cha age Supple da d wage nates A Section with the up SC -24-1, 8 In Specific efts W age Rates, PLACE Section 2" mass onditions, � at the end of this C TTACKED addendum• p0800 Supplem wage rates A ! Section the updated Specification Rates, with MM). from the 2-9 Bacon Wag A13 and Building LETS the fo1145 day „ Heavy, of Wornd E�Ewith" s. Davis ( ary O101OA, Sumn'�30 days„ a from the Section h 3 1 B.5.a: DELETE the following „ In Specification o f P aragrap 45 day 2"10 orad sentence Summary of �N°rka with' s. a h sec OIOIOAI S „21 daysI" an paragr p Section h 3 1 B 5 b: merit, details on In Specificatio e of p aragrap Sludge Collecti CE wu „the 2-11 d sentenc $econ 11351A, Circular Type „and gEY- _ the words, "Section 05500, Section D the following 2-12 In SpecificadLETE AD exits 8 3 , Rubble Aeration systems, te! g uirem 1.1 req 4. Drawing 113'188, Fine 8 aired for startup ! n Specification GENE1�'L _Clean water req I „ 2-13 paragraph 3 12294A Nadendum 10.2 ------------- 1) age 3 of 94 - - ! ' pebruary 2, 212 y can be from the nearby plant water hydrants. Contractor is responsible for any hoses, piping and fittings necessary." 2-14 In Specification Section 11378B, Fine Bubble Aeration Systems, ADD the following sentence to the end of Paragraph 3.1.B.1: "Storage area must be provided by the Contractor and shall keep the diffusers safe from weather, sunlight, and all construction activities." 2-15 In Specification Section 11378B, Fine Bubble Aeration Systems, ADD the following to the end of the first sentence in Paragraph 3.1.B.1: "(for a total of 1,306 existing membranes per tank)." 2-16 In Specification Section 11378B, Fine Bubble Aeration System, DELETE the last sentence from Paragraph 3.1.B.2, and REPLACE with "Existing diffuser retainer rings and subplates shall be used with the new membranes on the existing holders." 2-17 In Specification Section 11378B, Fine Bubble Aeration System, DELETE the first sentence in Paragraph 3.1.B.3 and REPLACE with "The Contractor shall install all existing membranes removed from Aeration Tanks No. 1 and No. 2 on the new diffuser holders in Aeration Tanks No. 3 and No. 4 (for a total of 1,306 existing membranes per tank)." 2-18 In Specification Section 15050, Pipe and Pipe Fittings - General, ADD the following to the chart in Paragraph 3.4: 2-19 ADD Specification "15062, Ductile Iron Pipe and Fittings" to the Table of Contents and Division 15. Specification is attached to the end of this addendum. 2-20 In Specification 15124, Slide Gates and Guide Frames, ADD the following to Paragraph 2.2: "C. Primary Effluent Slide Gate No. 1 and Primary Effluent Slide Gate No. 2 shall be provided with a double stem operator with two gearboxes connected by an interconnecting shaft for simultaneous operation. 1. Interconnecting shafting shall be constructed of aluminum or stainless steel. 2. Flexible couplings shall be provided at each end of the interconnecting shaft. 3. One crank shall be provided to mount on the pinion shaft of one of the gearboxes. 4. The moving portion of the interconnecting shaft shall be covered with stainless steel cover." February 2, 2012 Addendum No. 2 Page 4 of 94 12284A INTERIOR CLASS 53 CLASS SC SCUM (SUBMERGED) - DI FLANGED IV 2-19 ADD Specification "15062, Ductile Iron Pipe and Fittings" to the Table of Contents and Division 15. Specification is attached to the end of this addendum. 2-20 In Specification 15124, Slide Gates and Guide Frames, ADD the following to Paragraph 2.2: "C. Primary Effluent Slide Gate No. 1 and Primary Effluent Slide Gate No. 2 shall be provided with a double stem operator with two gearboxes connected by an interconnecting shaft for simultaneous operation. 1. Interconnecting shafting shall be constructed of aluminum or stainless steel. 2. Flexible couplings shall be provided at each end of the interconnecting shaft. 3. One crank shall be provided to mount on the pinion shaft of one of the gearboxes. 4. The moving portion of the interconnecting shaft shall be covered with stainless steel cover." February 2, 2012 Addendum No. 2 Page 4 of 94 12284A DRAWINGS The following changes are made to the Drawings: 2-21 On Drawing M-3, Note No. 10, DELETE the words, "Bid Item No. 5," and REPLACE with "Bid Item No. 6." 2-22 On Drawing M-3, ADD the following note: "11. This Drawing is not to scale. The total length of 1" Plant Water piping is approximately 25 feet per clarifier." 2-23 On Drawing M-3, DELETE all references to the SS Hose Rack. 2-24 On Drawing M-3, ADD the following Note: "12. Existing 12 -inch Primary Sludge Line penetrates the clarifier wall at centerline elevation 69.0"' 2-25 On Drawing M-9, DELETE the Diffuser Schedule table in its entirety and REPLACE with the following table: 2-26 On Drawing M-10, ADD the following Note: "5. The new 12" SS droplegs, replacing the existing 6" SS droplegs, will require new concrete cores in two locations per tank for a total of 8 cores. Core drill as required for pipe penetration. Centerline of piping is at 75.33'. Concrete wall is F-0" thick with a 1:1 increase on one side of the wall starting at elevation 75.5." 2-27 On Drawing M-11, ADD the following Note: "6. The new 8" SS droplegs, replacing the existing 6" SS droplegs, will require new concrete cores in two locations per tank for a total of 8 cores. Core drill as required for pipe penetration. Centerline of piping is at 75.33'. Concrete wall is F-0" thick with a 1:1 increase on one side of the wall starting at elevation 75.5." 2-28 On Drawing M-13, DELETE the 12 -inch Butterfly Valves (BFV-323-05 and BFV-323- 03) shown in the vertical. These valves are shown correctly in the horizontal on Drawing M-12. February 2, 2012 Addendum No. 2 Page 5 of 94 12284A TANK 1 TANK 2 TANK 3 TANK 4 ZONE ZONE A B ZONE IZONE A I B ZONE ZONE A B ZONE ZONE A B TOTAL EXISTING LATERALS 26 20 26 20 26 20 26 20 EXISTING DIFFUSERS /LATERAL 31 25 31 25 31 25 31 25 TOTAL EXISTING DIFFUSERS 806 500 806 500 806 500 806 500 5224 ADDITIONAL NEW LATERALS 20 12 20 1 12 20 12 21 12 DIFFUSERS I NEW LATERALS 51 24 51 24 51 24 48149 24 TOTAL NEW DIFFUSERS 1020 288 1020 288 1020 288 1020 1 288 5232 2-26 On Drawing M-10, ADD the following Note: "5. The new 12" SS droplegs, replacing the existing 6" SS droplegs, will require new concrete cores in two locations per tank for a total of 8 cores. Core drill as required for pipe penetration. Centerline of piping is at 75.33'. Concrete wall is F-0" thick with a 1:1 increase on one side of the wall starting at elevation 75.5." 2-27 On Drawing M-11, ADD the following Note: "6. The new 8" SS droplegs, replacing the existing 6" SS droplegs, will require new concrete cores in two locations per tank for a total of 8 cores. Core drill as required for pipe penetration. Centerline of piping is at 75.33'. Concrete wall is F-0" thick with a 1:1 increase on one side of the wall starting at elevation 75.5." 2-28 On Drawing M-13, DELETE the 12 -inch Butterfly Valves (BFV-323-05 and BFV-323- 03) shown in the vertical. These valves are shown correctly in the horizontal on Drawing M-12. February 2, 2012 Addendum No. 2 Page 5 of 94 12284A I Ib QUESTIONS AND ANSWERS FROM PRE-BID CONFERENCE AND FOLLOW-UP CORRESPONDENCE 2-29 Q: Is there any slope to the floors of the existing aeration tanks? A: There is no slope. 2-30 Q: Will the diffuser assemblies in Sanitaire's delivery be shipped fully assembled or are the membranes and diffuser holders shipped separately, requiring field assembly? A: Membranes and diffuser holders are shipped separately, requiring field assembly. 2-31 Q: What is the water level in the aeration basin influent channels? A: Water elevation varies between 71.75' to 73.75' depending on the influent flows. However, Owner can redirect aeration basin influent flows such that aeration pipe modification work within the channel can be performed in a dry channel. Refer to General Clarification section of this Addendum for further clarification. 2-32 Q: Are the existing duct banks encased in concrete? A: Yes. 2-33 Q: What is the elevation of the duct banks? A: Duct banks generally are 30 -inches below grade except where they enter the two Primary Pump Stations. The conduits are at elevation 68.5' leaving the Primary Pump Stations, with a grade elevation of approximately 76'. 2-34 Q: What is the operating pressure of the existing air piping leading to the aeration basins? A: Approximately 7 to 9 psi. 2-35 Q: What is the anticipated operating temperature of the air inside the existing air piping leading to the aeration basins? A: Temperature can be as high as 250 degrees. 2-36 Q: Does the new plant water piping need to be insulated? A: No. 2-37 Q: Please provide a pipe spec for the existing aeration piping. Will field welding be allowed for the installation of the proposed SS tees in the headers? A: The existing SS pipe spec is the same as the spec provided for this job. Yes, field welding will be allowed. 2-38 Q: Has a lead paint inspection been undertaken for this project? A: A lead paint inspection has not been undertaken. However, the 1972 specs called for a bitumastic paint equivalent to Koppers Co. 300M for the clarifier equipment and specifically called out that no lead base paints would be permitted. The District has used a two part epoxy coating in the past for touch-up paint. February 2, 2012 Addendum No. 2 Page 6 of 94 12284A GREATER LAWRENCE SANITARY DISTRICT PRIMARY CLARIFIER AND AERATION SYSTEM IMPROVEMENTS CONTRACTI PRE-BID CONFERENCE 1:30 PM January 27, 2012 ATTENDEES NAME (PLEASE PRINT) REPRESENTING (PLEASE PRINT) I. Pkv 1-6 l�►cgkT- 2. L i qLIQ L �h NAL C t,crt= LL'S scw' S. "'�' c-� { `�F l f Ete 6. is t A t -- 7. 8. 9. jn 1 �t � i �C I�crvl�f' 10. cf-Qls be -e -S Wql!% (tC f ^ 11. J d 1a ti 1.3 c-,. Y Ate S L* -e S ry n* Sex pKP s c C/'117 12. / L�Q(�t�-Qv� i 13. t�1 KG rAC-C I 6>30 `Z. j—�. 1'rF 14. 1 r�tr ;� D'S QA t � 15. mer( 16.E �.—rrt°7' Cs L 17. 18. Addendum No. 2 February 2, 2012 Page 7 of 94 12284A ATTENDEES NAME (PLEASE PRINT) REPRESENTING (PLEASE PRINT) 19, OrA-i F' I vt. (n Ct. 6,c Co C k`P wt, 68 14- (� e ✓ 20. 510 (-4-1�{ �� X �s� 22.fL c.�l c� C S wzC k V'"t trema v S� � .66 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43, Addendum No. 2 February 2, 2012 Page 8 of 94 12284A This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 1 of 58 Addendum No. 2 February 2, 2012 Page 9 of 94 12284A THE COMMONWEALTH OF IVIASSACI-IUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Go, e or As determined by the Director under the provisions of the JoANVESF. GOLDSTEIN INlassachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P.',IURRAY HEATHER E. ROME LI. Goae Director Awarding Authority: Greater Lawrence Sanitar; District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system; and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Construction (2 AXLE) DRIVER - EQUIPMENT 12/01/2011 $29.85 -� $8.56 $7.27 $0.00 $45.68 TEAMSTERS JOINT COUNCIL NO. 10 7.ONE B 06/01/2012 $30.15 $8.56 $7.27 $0.00 $45.98 08/01/2012 $30.15 $8.91 $7.27 $0.00 $46.33 12/01/2012 $30.45 $8.91 $8.00 $0.00 $47.36 (3 AXLE) DRIVER - EQUIPMENT 12/01/2011 $29.92 $8.56 $7.27 $0.00 $45.75 TEAMSTERSJOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.22 $8.56 $7.27 $0.00 $46.05 08/01/2012 $30.22 $8.91 $7.27 $0.00 $46.40 12/01/2012 $30.52 $8.91 $8.00 $0.00 $47.43 (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2011 $30.04 $8.56 $7.27 $0.00 $45.87 TEAMSTERS JOINT COUNCIL NO. lOZONE B 06/01/2012 $30.34 $8.56 $7.27 $0.00 $46.17 08/01/2012 $30.34 $8.91 $7.27 $0.00 $46.52 _..__..._._..._......._._......._ 12/01/2012 $30.64 $9.07 $8.00 $0.00 $47.71 ......... _.._........_.._..._.........................._..........._........_...._................._..._._........._.._.........._.............._. ADS/SUBMERSIBLE PILOT ........... _..............._....._-- ...------__.-..._......__... 08/01/2011 ------ -- $82.60 ...__..__...-- - $8.08 --- ._._._.....__.....__._..... $17.12 ---....... $0.00 �..___.. $107.80 PILE DRIVER LOCAL 56 (ZONE 1) AIR TRACK OPERATOR 12/01/2011 $30.10 $7.10 $11.55 $0.00 $48.75 LABORERS - ZONE 2 ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2011 $28.40 $9.90 $5.95 $0.00 $44.25 ASBESTOS WORKERS LOCAL 6 (BOSTON) ASPHALT RAKER 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 ...... ------- --------------------- ................._._......----_---.-........_.._........_........................------..._._...._..._...._...... ...-- ------... ........... ...._....... -------------_..... ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2011 ......... ... -------._ $39.52 .... ............. $10.00 ------- $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 1 of 58 Addendum No. 2 February 2, 2012 Page 9 of 94 12284A Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 THE COMMONWEALTH OF MASSACHUSETTS r �+ EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT Apprentice Base Wage SVV,I 1�. DEPARTMENT OF LABOR STANDARDS Effective Date Base Wage 4_ Prevailing Wage Rates Supplemental Total Rate DEVAL L. PATRICK Govemor Asdetermined by the Director under the provisions of the JOANNE F. GOLDSTEIN $6.97 Massachusetts General Laws, Chapter 149, Sections 26 to 27H TINIOTHP P. MURRAY Lt. Govemor HEATHER E. ROWT Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Supplemental Apprentice Base Wage Health Classification Effective Date Base Wage Health Pension Supplemental Total Rate $42.66 $24.51 $6.97 $11.18 $0.00 Unemployment $26.39 BACKHOE/FRONT-END LOADER 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING EA[GINEERS LOCAL J $46.43 $30.16 $6.97 $11.18 $0.00 $48.31 $32.05 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 $11.18 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 $53.97 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 _ 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 _......._... ..... ... ....... ._..._.....__._._.._..._._.._._._.......... --... .... ._...... -- ._...---.-... --- -----... _..._..... BARCO-TYPE JUMPING TAMPER ---- -- - --- 12/01/2011 -- ...-- $29.60 ---- - $7.10 -----.._._._..-- $11.55 - _......_..._....----._.... $0.00 $48.25 LABORERS - ZONE 2 BLOCK PAVER, RAMMER / CURB SETTER 12/01/2011 $30.10 $7.10 $11.55 $0.00 $48.75 LABORERS - ZONE 2 BOILER MAKER BOILERMAKERS LOCAL 29 Apprentice- BOILERMAKER -Local 29 Effective Date - 01/01/2010 Step percent .......... _...... -.... ................... ..... ............ ............. _......... _...._.._ 1 65 2 65 3 70 4 75 5 80 6 85 7 90 8 95 JNotes: Apprentice to Journeyworker Ratio:1:5 01/01/2010 $37.70 $6.97 $11.18 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 10 of 94 12284A $55.85 Page 2 of 58 Supplemental Apprentice Base Wage Health Pension Unemployment Total Rate $24.51 $6.97 $11.18 $0.00 $42.66 $24.51 $6.97 $11.18 $0.00 $42.66 $26.39 $6.97 $11.18 $0.00 $44.54 $28.28 $6.97 $11.18 $0.00 $46.43 $30.16 $6.97 $11.18 $0.00 $48.31 $32.05 $6.97 $11.18 $0.00 $50.20 $33.93 $6.97 $11.18 $0.00 $52.08 $35.82 $6.97 $11.18 $0.00 $53.97 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 10 of 94 12284A $55.85 Page 2 of 58 Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification THE COMfMONWEALTH OF MASSACHUSETTS $9.93 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 08/01/2011 $46.56 $9.93 $16.51 $0.00 $73.00 y ; , r !, 4 , %, jL'7 DEPARTMENT OF LABOR STANDARDS my Prevailing Wage Rates DEVA,L L. PATRICK As determined b the Director under the provisions of the JDANME E. GOLDSTEIN Y P Govemor s' -1 - 3 70 Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. HURRAY Lt. Govemor HEATHER E. RONVE Dimcror Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $9.93 Unemployment ...... ......................................._..._._.._....._.__............................_...................................-_._......._._............_......._.....__..___......___................... BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 08/01/2011 $46.56 $9.93 $16.51 $0.00 $73.00 WATERPROOFING) 2 60 $27.94 02/01/2012 $47.55 $9.93 $16.51 50.00 $73.99 BRICKLAYERS LOCAL 3 (LYNN) $16.51 Apprentice- BRICKIPLASTER/CEMENT MASON -Local 3 Lynn Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.28 $9.93 $16.51 $16.51 $0.00 $49.72 2 60 $27.94 $9.93 $0.00 $16.51 $0.00 $54.38 3 70 $32.59 $9.93 $59.73 $16.51 $0.00 $59.03 4 80 $37.25 $9.93 5 90 $16.51 $0.00 $63.69 5 90 $41.90 $9.93 $16.51 $0.00 $68.34 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.78 $9.93 $16.51 $0.00 $50.22 2 60 $28.53 $9.93 $16.51 $0.00 $54.97 3 70 $33.29 $9.93 $16.51 $0.00 $59.73 4 80 $38.04 $9.93 $16.51 $0.00 $64.48 5 90 $42.80 $9.93 $16.51 $0.00 $69.24 tNotes: Apprentice to Journey worker Rat oo:l:5 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 11 of 94 12284A Page 3 of 58 E s , THE CONWN-IONWEALTH OF bIASSACHUSETTS 't EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT i It�, DEPARTMENT OF LABOR STANDARDS %Eu Classification Effective Date Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Stt Lo TIMOTHY P. NnJRRAv Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E ROVE LI. Gocemor D-1., Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unempl�ment BULLDOZER/GRADER/SCRAPER 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL a 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 _........ _._......... _..._.. ---------....__.._..__._.._.._...._...__............ --._...._............ ._..._........ _....................-.... -....... ........... ............... CAISSON & UNDERPINNING BOTTOM MAN ......_....._..----..__..._..................... 12/01/2011 _....... _........ $32.80 .... .......... ........................... $7.10 ................... $12.60 ._..........................._...... _.......... .................... $0.00 ----- ......... ...... ............ _ $52.50 LABORERS - FOUNDATIONAND MARINE, CAISSON & UNDERPINNING LABORER 12/01/2011 $31.65 $7.10 $12.60 $0.00 $51.35 LABORERS - FOUNDATION AND MARINE CAISSON & UNDERPINNING TOP MAN 12/01/2011 $31.65 $7.10 $12.60 $0.00 $51.35 LABORERS - FOUNDATION AND MARINE_ CARBIDE CORE DRILL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS -ZONE 2 ......... _........ ....._.._.......... ................ _..................... _.._...... .......... ........ ........................ _...... .................... .......................... _.... ........................ ....._. CARPENTER 09/01/2011 $32.05 $9.80 $15.51 $0.00 $57.36 CARPENTERS -ZONE 2 (Eastern Massachusetts) 03/01/2012 $33.17 $9.80 $15.51 $0.00 $58.48 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 4 of 58 Addendum No. 2 February 2, 2012 Page 12 of 94 12284A JOANNE F. GOLDSTEIN secret - HEATHER E. RONVE Di,ector Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Apprentice - CARPENTER - Zone 2 Eastern M4 Effective Date - 09/01/2011 Step percent Apprentice Base Wage THE COMMONWEALTH OF MASSACHUSETTS Pension Supplemental Unemployment ,� r= EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT ' DEPARTMENT OF LABOR STANDARDS $1.57 $0.00 $27.40 Prevailing Wage Rates $19.23 $9.80 DEVAL L. PATRICK Govcmor As determined by the Director under the provisions of the $30.60 Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. MURRAY $9.80 Lt. Go%'emor $0.00 JOANNE F. GOLDSTEIN secret - HEATHER E. RONVE Di,ector Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Apprentice - CARPENTER - Zone 2 Eastern M4 Effective Date - 09/01/2011 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50� $16.03 $9.80 $1.57 $0.00 $27.40 2 60 $19.23 $9.80 $1.57 $0.00 $30.60 3 70 $22.44 $9.80 $10.80 $0.00 $43.04 4 75 $24.04 $9.80 $10.80 $0.00 $44.64 5 80 $25.64 $9.80 $12.37 $0.00 $47.81 6 80 $25.64 $9.80 $12.37 $0.00 $47.81 7 90 $28.85 $9.80 $13.94 $0.00 $52.59 8 90 $28.85 $9.80 $13.94 $0.00 $52.59 Effective Date - 03/01/2012 Supplemental Step percent .... . ..........................50....._............................................................. .._.......... ... Apprentice Base Wage .........$16.59._..._................. Health Pension Unemployment Total Rate ........ .$9.80 _ -.... -...... ............. ..............._..._....................... $1.57 ................... $0. 00 ......... ........ $27.96 2 60 $19.90 $9.80 $1.57 $0.00 $31.27 3 70 $23.22 $9.80 $10.80 $0.00 $43.82 4 75 $24.88 $9.80 $10.80 $0.00 $45.48 5 80 $26.54 $9.80 $12.37 $0.00 $48.71 6 80 $26.54 $9.80 $12.37 $0.00 $48.71 7 90 $29.85 $9.80 $13.94 $0.00 $53.59 8 90 $29.85 $9.80 $13.94 $0.00 $53.59 =Notes: s Apprentice to Journeyworker Ratio: 1:5 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Nvage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page I3 of 94 12284A Total Rate Page 5 of 58 r t THE COMMONWEALTH OF MASSACHUSETTS LL EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT �ty DEPARTMENT OF LABOR STANDARDS ,Tt ` Prevailing Wage Rates DEVAL L. PATRICK Go -or As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN 08/01/2011 S -lm TIMOTHY P. IMURR Y Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RO\VE Lt. Go-., Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification CEMENT MASONRY/PLASTERING BRICKUA ERS LOCAL 3 (LYNN) CHAIN SAW OPERATOR LABORERS - ZONE 2 Effective Date Base Wage Health Pension Supplemental Total Rate _..._.._...._-----._._._........._. OPERATING ENGINEERS LOCAL a Unemployment 08/01/2011 $44.33 $9.93 $16.51 $0.00 $70.77 02/01/2012 $45.10 $9.93 $16.51 $0.00 $71.54 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES 12/01/2011 $40.52 $10.00 $12.40 $0.00 $62.92 OPERATING ENGINEERS LOCAL a 06/01/2012 $41.09 $10.00 $12.40 $0.00 $63.49 12/01/2012 $41.71 $10.00 $12.40 $0.00 $64.11 06/01/2013 $42.49 $10.00 $12.40 $0.00 $64.89 12/01/2013 $43.27 $10.00 $12.40 $0.00 $65.67 COMPRESSOR OPERATOR 12/01/2011 $27.95 $10.00 $12.40 $0.00 $50.35 OPERATING ENGINEERS LOCAL 4 06/01/2012 $28.34 $10.00 $12.40 $0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 $0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 $0.00 $51.74 ......... _... ....._............ ..........._.__..............._..................._....._....._............._.............__.._............_......_... _......_....__....._......__......................................__ 12/01/2013 $29.89 $10.00 $12.40 $0.00 $52.29 DELEADER (BRIDGE) ..... __......_..........-.............._......_._... 01/01/2012 ....... .... __._....._.._.._._...... $44.01 ........_..._..._..........- $7.80 $14.60 $0.00 $66.41 PAINTERS LOCAL 35 - ZONE 2 07/01/2012 $45.01 $7.80 $14.60 $0.00 $67.41 01/01/2013 $46.01 $7.80 $14.60 $0.00 $68.41 This wage schedule must be posted by the contractor at the work site in accordance with 1Vi.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 14 of 94 12284A Page 6 of 58 ry" THE COMMONWEALTH OF MASSACHUSETTS y EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT - - DEPARTMENT OF LABOR STANDARDS $29.81 2 55 Prevailing Wage Rates DEVAGo, PATRICK Gocem°r As determined by the Director under the provisions of the JOANNE GOLDSTEIN TIMOTHY P. bIIJRRAY c Sccrctary Massachusetts General Laws, Chapter 149, Sections 26 to 27H LI. Govem°r HEATHER E.RO\VE Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.01 $7.80 $0.00 $0.00 $29.81 2 55 $24.21 $7.80 $3.25 $0.00 $35.26 3 60 $26.41 $7.80 $3.54 $0.00 $37.75 4 65 $28.61 $7.80 $3.84 $0.00 $40.25 5 70 $30.81 $7.80 $12.83 $0.00 $51.44 6 75 $33.01 $7.80 $13.13 $0.00 $53.94 7 80 $35.21 $7.80 $13.42 $0.00 $56.43 8 90 $39.61 $7.80 $14.01 $0.00 $61.42 Effective Date - 07/01/2012 Supplemental Step .. ...............................................__._.._._...._....._.._........._.._._._.....__._......._..................................._...__........_ percent Apprentice Base Health Pension Unemployment Total Rate 1 50 .._. ...Wage _.................... $22.51 $7.80 $0.00 $0.00 $30.31 2 55 $24.76 $7.80 $3.25 $0.00 $35.81 3 60 $27.01 $7.80 $3.54 $0.00 $38.35 4 65 $29.26 $7.80 $3.84 $0.00 $40.90 5 70 $31.51 $7.80 $12.83 $0.00 $52.14 6 75 $33.76 $7.80 $13.13 $0.00 $54.69 7 80 $36.01 $7.80 $13.42 $0.00 $57.23 8 90 $40.51 $7.80 $14.01 $0.00 $62.32 =Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 7 of 58 Addendum No. 2 February 2, 2012 Page 15 of 94 12284A s THE COMMONWEALTH OF MASSACHUSETTS t 4f EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT Description of Work: DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Go, e-, As determined by the Director under the provisions of the JOANNE F.GOLDSTEIN Classification Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. MURRAY HEATHER E. ROIk`E Lt. Govemnr Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate ...._..----....__......._.......__.....-_.........._..........._.._...__._........ Unemployment _.................._..._........._...._................. ........ .............. ..... __._...... ....... .............__......._........__.._._._..... _........ -................... _...._.__--..___._........ ...__......._--.......___............._...._._........_.................._......_..............._..._...._.................._................................_.._.. DEMO: ADZEMAN 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS - ZO,Vr: 2 1 60 DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS - ZONE 2 Apprentice- LABORER Demo Backhoe/Loader/Hammer Operator Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate .� 1 60 $19.68 $7.10 $12.45 $0.00 $39.23 2 70 $22.96 $7.10 $12.45 $0.00 $42.51 3 80 $26.24 $7.10 $12.45 $0.00 $45.79 4 90 $29.52 $7.10 $12.45 $0.00 $49.07 ;Notes: Apprentice to Journeyworker Ratio: 1:5 3 DEMO: BURNERS 12/01/2011 $32.55 $7.10 _ $12.45 $0.00 $52.10 LABORERS - ZONE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, NIA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 16 of 94 12284A Page 8 of 58 _• THE COMMONWEALTH OF MASSACHUSETTS $7.10 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 70 $22.79 $7.10 Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN 3 80 Secreian TIMOTHY P. MURRAY. Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Go-tor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice - LABORER Demo Burners Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.53 $7.10 $12.45 $0.00 $39.08 2 70 $22.79 $7.10 $12.45 $0.00 $42.34 3 80 $26.04 $7.10 $12.45 $0.00 $45.59 4 90 $29.30 $7.10 $12.45 $0.00 $48.85 ?Notes: I i Arentice to Journeyworker Ratio: 1:5 DEMO: CONCRETE CUTTER/SAWYER 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS - ZONE 2 DEMO: JACKHAMMER OPERATOR 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 LABORERS - ZONE 2 DEMO: WRECKING LABORER 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS - ZONE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dois or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 9 of 58 Addendum No. 2 February 2, 2012 Page 17 of 94 12284A Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street. North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- LABORER Demo Wrecking Laborer THE COMMONWEALTH OF MASSACHUSETTS ,41 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEV.AL L. PATRICK Go-ior As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN secreiare TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H. HEATHER E. ROWE LI. G., - Dimctor Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street. North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- LABORER Demo Wrecking Laborer Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.08 $7.10 $12.45 $0.00 $38.63 2 70 $22.26 $7.10 $12.45 $0.00 $41.81 3 80 $25.44 $7.10 $12.45 $0.00 $44.99 4 90 $28.62 $7.10 $12.45 $0.00 $48.17 ;Notes: z Apprentice to Journeyworker Ratio:1:5 {I DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL J 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 _ 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 DIVER 08/01/2011 � $55.07 $8.08 $17.12 ��$0.00 $80.27 PILE DRIVER LOCAL 56 (ZONE l) _..............._.................................................._.......... -..._. DIVER TENDER 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32 PILE DRIVER LOCAL 56 (ZONE 1) DIVER TENDER (EFFLUENT) 08/01/2011 $60.18 $8.08 $17.12 $0.00 $85.38 PILE DRIVER LOCAL 56 (70NE 1) DIVER/SLURRY (EFFLUENT) 08/01/2011 $82.60 $8.08 $17.12 $0.00 $107.80 PILE DRIVER LOCAL 56 (ZONE 1) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 10 of 58 Addendum No. 2 February 2, 2012 Page 18 of 94 12284A y c 5 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Gocemor S -(- TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWS LI. G-- Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street. North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment ELECTRICIAN 09/01/2011 $41.89 $13.00 $13.86 $0.00 $68.75 ELECTPIGANS LOCAL 103 03/01/2012 $42.37 $13.00 $13.87 $0.00 $69.24 09/01/2012 $43.05 $13.00 $13.89 $0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 $0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 $0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 $0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 $0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 $0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 $0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 $0.00 $75.52 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page I1 of 58 Addendum No. 2 February 2, 2012 Page 19 of 94 12284A a 4 THE COMMONWEALTH OF MASSACHUSETTS a EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT I �g DEPARTMENT OF LABOR STANDARDS v Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN G--, Secretan TIMOTHY P. rvf JRRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HE.ATI4ER E. ROWE Lt. Govemor Dimcior Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 Citv/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELECTRICIAN- Local 103 Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.76 $13.00 $7.80 $0.00 $37.56 2 40 $16.76 $13.00 $7.80 $0.00 $37.56 3 45 $18.85 $13.00 $10.26 $0.00 $42.11 4 45 $18.85 $13.00 $10.26 $0.00 $42.11 5 50 $20.95 $13.00 $10.58 $0.00 $44.53 6 55 $23.04 $13.00 $10.91 $0.00 $46.95 7 60 $25.13 $13.00 $11.23 $0.00 $49.36 8 65 $27.23 $13.00 $11.57 $0.00 $51.80 9 70 $29.32 $13.00 $11.89 $0.00 $54.21 10 75 $31.42 $13.00 $12.22 $0.00 $56.64 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.95 $13.00 $7.81 $0.00 $37.76 2 40 $16.95 $13.00 $7.81 $0.00 $37.76 3 45 $19.07 $13.00 $10.26 $0.00 $42.33 4 45 $19.07 $13.00 $10.26 $0.00 $42.33 5 50 $21.19 $13.00 $10.59 $0.00 $44.78 6 55 $23.30 $13.00 $10.92 $0.00 $47.22 7 60 $25.42 $13.00 $11.24 $0.00 $49.66 8 65 $27.54 $13.00 $11.58 $0.00 $52.12 9 70 $29.66 $13.00 $11.90 $0.00 $54.56 10 75 $31.78 $13.00 $12.23 $0.00 $57.01 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 20 of 94 Page 12 of 58 12284A A # THE COMikIONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT n. i' it 1 rk DEPARTMENT OF LABOR STANDARDS 11 M11 iXf Y�,�F Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor $ecrCl1n' THMOTHv P. MURRAY INIassachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROME Lr. Gocenior Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment 'Notes: App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80 Apprentice to Journeyworker Ratio.2:3*** ELEVATOR CONSTRUCTOR ELEVATOR CONSTRUCTORS LOCAL 4 01/01/2012 $52.45 $8.78 $6.96 $0.00 Apprentice- ELEVATOR CONSTRUCTOR -Local 4 Effective Date- 01/01/2012 Supplemental Step percent ... .... .......... .-.... . . . ..----_...._...._.-....... - Apprentice Base Wage Health Pension Unemployment Total Rate ......_..._...._._...._..__............._....---.... . 5..- - ._ .._ ._.....................__._......._._....__. $26.23 ..-_--..._. $8.78 _._.....-...._......-.....-..._............_.._...._.............._._..._.....................__.._.__.. $0.00 .._._. $0.00 _......_. $35.01 2 55 $28.85 $8.78 $6.96 $0.00 $44.59 3 65 $34.09 $8.78 $6.96 $0.00 $49.83 4 70 $36.72 $8.78 $6.96 $0.00 $52.46 5 80 $41.96 $8.78 $6.96 $0.00 $57.70 Notes: I Steps 1-2 are 6 mos.; Steps 3-5 are 1 year I Apprentice to Journeyworker Ratio:]:I ...................................._. _..... .... ...... ...... -__ .. ....._.................. ....... ........... _.._........ _............. ............. ......... ................... ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 $6.96 $0.00 ELEVATOR CONSTRUCTORS LOCAL 4 FENCE & GUARD RAIL ERECTOR 12/01/2011 $29.60 $7.10 $11.55 $0.00WW w� LABORERS - ZONE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of NI.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 21 of 94 $68.19 $54.33 $48.25 Page 13 of 58 12284A N ' THE COiv t%,1ON«1EALTH OF MASSACHUSETTS r EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT 31 t' DEPARTMENT OF LABOR STANDARDS ,11 Classification Effective Date Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Supplemental Secrctan $13.00 Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. `NRRAY. Lt. Gocemor HEATHER E. R01VE Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 11/01/2011 $38.88 $10.00 $12.20 $0.00 $61.08 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $13.00 05/01/2012 $39.49 $10.00 $12.20 Unemployment $61.69 FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2011 $37.49 $10.00 $12.20 $0.00 $59.69 OPERATING ENGINEERS LOCAL t 05/01/2013 $40.73 $10.00 $12.20 $0.00 $62.93 $72.12 05/01/2012 $38.10 $10.00 $12.20 $0.00 $60.30 03/01/2015 11/01/2012 $38.71 $10.00 $12.20 $0.00 $60.91 FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 05/01/2013 $39.32 $10.00 $12.20 $0.00 $61.52 OPERATING ENGINEERS LOCAL J 11/01/2013 $40.08 $10.00 $12.20 $0.00 $62.28 05/01/2014 $40.85 $10.00 $12.20 $0.00 $63.05 FIELD ENGTARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2011 $38.88 $10.00 $12.20 $0.00 $61.08 OPERATING ENGINEERS LOCAL 4 $13.00 $13.87 $0.00 $69.24 09/01/2012 $43.05 $13.00 05/01/2012 $39.49 $10.00 $12.20 $0.00 $61.69 $13.91 11/01/2012 $40.11 $10.00 $12.20 $0.00 $62.31 $0.00 05/01/2013 $40.73 $10.00 $12.20 $0.00 $62.93 $72.12 11/01/2013 $41.50 $10.00 $12.20 $0.00 $63.70 03/01/2015 05/01/2014 $42.27 $10.00 $12.20 $0.00 $64.47 FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 11/01/2011 $20.91 $10.00 $12.20 $0.00 $43.11 OPERATING ENGINEERS LOCAL J $14.05 $0.00 $75.52 05/01/2012 $21.27 $10.00 $12.20 $0.00 $43.47 11/01/2012 $21.63 $10.00 $12.20 $0.00 $43.83 05/01/2013 $21.99 $10.00 $12.20 $0.00 $44.19 11/01/2013 $22.45 $10.00 $12.20 $0.00 $44.65 05/01/2014 $22.90 $10.00 $12.20 $0.00 $45.10 FIRE ALARM INSTALLER ELECTRICIANS LOCAL 103 09/01/2011 $41.89 $13.00 $13.86 $0.00 $68.75 03/01/2012 $42.37 $13.00 $13.87 $0.00 $69.24 09/01/2012 $43.05 $13.00 $13.89 $0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 $0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 $0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 $0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 $0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 $0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 $0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 $0.00 $75.52 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 22 of 94 Page 14 of 58 12284A THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPIMENT hi4q r r DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICKAS determined b the Director under the provisions Of the JOANNE F. GOLDSTEIN Go, error Secreman TIMOTHY P. NfURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE I.1. Goccmor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate ._................... .............._..__._._._.......__....................._._..._....._......_.............._.......__._.......... _...._......_._.............__...__.........._......._._.... ..........._....... -----............... _._......._........ -...... .._......_....._..._.__...._..._._.............._._..._......_..........._.. Unemployment ....... _.._......_......_._.__.... ........ ..._.....-._._.....-__...__....__. FIRE ALARM REPAIR / MAINTENANCE 09/01/2011 $31.42 $13.00 $12.22 $0.00 $56.64 / COMMISSIONINGELECTRICIANS 03/01/2012 $31.78 $13.00 $12.23 $0.00 $57.01 LOC. -1L 103 09/01/2012 $32.29 $13.00 $12.25 $0.00 $57.54 03/01/2013 $32.83 $13.00 $12.26 $0.00 $58.09 09/01/2013 $33.34 $13.00 $12.28 $0.00 $58.62 03/01/2014 $33.88 $13.00 $12.30 $0.00 $59.18 09/01/2014 $34.38 $13.00 $12.31 $0.00 $59.69 03/01/2015 $34.91 $13.00 $12.33 $0.00 $60.24 09/01/2015 $35.63 $13.00 $12.35 $0.00 $60.98 03/01/2016 $36.35 $13.00 $12.37 $0.00 $61.72 FIREMAN (ASST. ENGINEER) 12/01/2011 $33.23 $10.00 $12.40 $0.00 $55.63 OPERATING ENGINEERS LOCAL a 06/01/2012 $33.70 $10.00 $12.40 $0.00 $56.10 12/01/2012 $34.23 $10.00 $12.40 $0.00 $56.63 06/01/2013 $34.88 $10.00 $12.40 $0.00 $57.28 12/01/2013 $35.54 $10.00 $12.40 $0.00 $57.94 .............. _..--............... .... ... ............................... ._.._ ........._.._...._. FLAGGER &SIGNALER 12/01/2011 ._......_......._._......_._.._......_..._......_...-................._.__...._..__.._.._........_...... $20.50 $7.10 $11.55 .......... ......... .... _._._............................. $0.00 _ $39.15 LABORERS - ZONE 2 FLOORCOVERER FLOORCOVERERS LOCAL 2168 ZONE I 09/01/2011 $35.95 $9.80 $16.61 $0.00 03/01/2012 $37.20 $9.80 $16.61 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 23 of 94 $62.36 $63.61 Page 15 of 58 12284A ' ► THE CONIMONWEALTH OF MASSACHUSETTS $17.98 $9.80 $1.79 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT tit DEPARTMENT OF LABOR STANDARDS t,y�1 $19.77 $9.80 Prevailing Wage Rates DEVAL L. PATRICK Got emor As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Y P Secretary 3 Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. MURRAY HEATHER E. ROWE U. Governor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- FLOORCOVERER -Local 2168 Zone I Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.98 $9.80 $1.79 $0.00 $29.57 2 55 $19.77 $9.80 $1.79 $0.00 $31.36 3 60 $21.57 $9.80 $11.24 $0.00 $42.61 4 65 $23.37 $9.80 $11.24 $0.00 $44.41 5 70 $25.17 $9.80 $13.03 $0.00 $48.00 6 75 $26.96 $9.80 $13.03 $0.00 $49.79 7 80 $28.76 $9.80 $14.82 $0.00 $53.38 8 85 $30.56 $9.80 $14.82 $0.00 $55.18 Effective Date - 03/01/2012 Supplemental Step ..............._.._...... percent .......... ............................... _......_...._._.... __.._........... .............. Apprentice Base Wage .....-- Health Pension Unemployment Total Rate 1 50 $18.60 $9.80 $1.79 $0.00 $30.19 2 55 $20.46 $9.80 $1.79 $0.00 $32.05 3 60 $22.32 $9.80 $11.24 $0.00 $43.36 4 65 $24.18 $9.80 $11.24 $0.00 $45.22 5 70 $26.04 $9.80 $13.03 $0.00 $48.87 6 75 $27.90 $9.80 $13.03 $0.00 $50.73 7 80 $29.76 $9.80 $14.82 $0.00 $54.38 8 85 $31.62 $9.80 $14.82 $0.00 $56.24 ��.. _... ......._,.._ JNotes: _ j Steps are 750 hrs. Apprentice to Jo rrneyworker R,atw:l:l This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 16 of 58 Addendum No. 2 February 2, 2012 Page 24 of 94 12284A a � THE COMMONWEALTH OF MASSACHUSETTS Health EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT Supplemental DEPARTMENT OF LABOR STANDARDS Unemployment Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secreiary TIMOTHY P. NfURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E�RORrE Lt. Go, error Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification FORK LIFT/CHERRY PICKER OPER4TING ENGINEERS LOCAL 4 GENERATOR/LIGHTING PLANTMEATERS OPERATING ENGINEERS LOCAL 4 GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS) GLAZIERS LOCAL 35 (ZONE 2) Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 12/01/2011 $27.95 $10.00 $12.40 $0.00 $50.35 06/01/2012 $28.34 $10.00 $12.40 $0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 $0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 $0.00 $51.74 12/01/2013 $29.89 $10.00 $12.40 $0.00 $52.29 01/01/2012 $33.51 $7.80 $14.60 $0.00 $55.91 07/01/2012 $34.51 $7.80 $14.60 $0.00 $56.91 01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 25 of 94 Page 17 of 58 12284A s _ THE COMMONWEALTH OF MASSACHUSETTS F� EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS $24.56 2 55 Prevailing Wage Rates $7.80 $3.25 DEV.AL L. PATRICK As determined by y the Director under the p rovisions of the JOANNE F. GOLDSTEIN Gocemor S-Iwy $20.11 Nlassachusetts General Laws, Chapter 149, Sections 26 to 27H TI'MOTHv P. NIURP-W HEATHER E. ROVE LI. Gocemor Dimuor Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- GLAZIER - Local 3.i Zone 2 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.76 $7.80 $0.00 $0.00 $24.56 2 55 $18.43 $7.80 $3.25 $0.00 $29.48 3 60 $20.11 $7.80 $3.54 $0.00 $31.45 4 65 $21.78 $7.80 $3.84 $0.00 $33.42 5 70 $23.46 $7.80 $12.83 $0.00 $44.09 6 75 $25.13 $7.80 $13.13 $0.00 $46.06 7 80 $26.81 $7.80 $13.42 $0.00 $48.03 8 90 $30.16 $7.80 $14.01 $0.00 $51.97 Effective Date - 07/01/2012 Supplemental Step percent ................................................................ Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.26 $7.80 $0.00 $0.00 $25.06 2 55 $18.98 $7.80 $3.25 $0.00 $30.03 3 60 $20.71 $7.80 $3.54 $0.00 $32.05 4 65 $22.43 $7.80 $3.84 $0.00 $34.07 5 70 $24.16 $7.80 $12.83 $0.00 $44.79 6 75 $25.88 $7.80 $13.13 $0.00 $46.81 7 80 $27.61 $7.80 $13.42 $0.00 $48.83 8 90 $31.06 $7.80 $14.01 $0.00 $52.87 Notes:. I Steps are 750 hrs. Apprentice to Jon rneyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 18 of 58 Addendum No. 2 February 2, 2012 Page 26 of 94 12284A a THE C01MMONWEALTH OF MASSACHUSETTS 1 j EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT I�h" rely DEPARTMENT OF .LABOR STANDARDS Prevailing Wage Rates DEVAPATRICK TRICK determined by the Director under the provisions of the JOANNEF. GOLDSTEIN Goce PA As Secrelnn TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. Rou'E Lr, Governor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification ........... ...I..._ ...... ....... ...._............._....._....._.........__...__....................._............_._....._._..._........_._._._............._..__.........................._..._._..........__.---- HOISTING ENGINEER/CRANES/GRADALLS OPERATING ENG1,VF.EXS LOCAL a Effective Date Base Wage Health Pension Supplemental Total Rate ....... .................... ... ..... _... ..... ................... Unemployment 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 27 of 94 Page 19 of 58 12284A ' THE COMMONWEALTH OF tMASSACHUSE"CTS percent --......... ..... ................... ................... _...... ._............ _..... EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT 55 2 60 DEPARTMENT OF LABOR STANDARDS 65 4 , Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the of the JOANNE F. GOLDSTEIN Go, -or provisions Secret - 85 Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. MURRAY Lt. Govemor HEATHER E. ROWE Dirccwor Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- HOIST/PORT. ENG.- Local 4 Effective Date - 12/01/2011 Step percent 1 �D 2 60 3 65 4 70 5 75 6 80 7 85 8 90 Effective Date- 06/01/2012 Step ........ _... percent --......... ..... ................... ................... _...... ._............ _..... 1 55 2 60 3 65 4 70 5 75 6 80 7 85 8 90 €Notes: Apprentice to Journey -worker Ratio:1:6 Supplemental Apprentice Base Wage Health Pension Unemployment Total Rate $21.74 $10.00 $0.00 $0.00 $31.74 $23.71 $10.00 $12.40 $0.00 $46.11 $25.69 $10.00 $12.40 $0.00 $48.09 $27.66 $10.00 $12.40 $0.00 $50.06 $29.64 $10.00 $12.40 $0.00 $52.04 $31.62 $10.00 $12.40 $0.00 $54.02 $33.59 $10.00 $12.40 $0.00 $55.99 $35.57 $10.00 $12.40 $0.00 $57.97 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 28 of 94 Page 20 of 58 12284A Supplemental Apprentice Base Wage Health Pension Unemployment Total Rate $22.05 $10.00 $0.00 $0.00 $32.05 $24.05 $10.00 $12.40 $0.00 $46.45 $26.06 $10.00 $12.40 $0.00 $48.46 $28.06 $10.00 $12.40 $0.00 $50.46 $30.07 $10.00 $12.40 $0.00 $52.47 $32.07 $10.00 $12.40 $0.00 $54.47 $34.08 $10.00 $12.40 $0.00 $56.48 $36.08 $10.00 $12.40 $0.00 $58.48 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 28 of 94 Page 20 of 58 12284A a THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT kk DEPARTMENT OF LABOR I STANDARDS Effective Date Base Wage e{ Prevailing Wage Rates DEVAL L. PATRICK Govemor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secrcutn TIMOTHY P. NfuRRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E� ROWE Lt. Gocemor Dircaor Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 Cit -*,/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate _........................_......_...._.......................... ........ _.......... ................._............._...._........__.... .........._. Unemployment HVAC (DUCTWORK) 08/01/2011 $39.83 $9.82 $17.09 $0.00 $66.74 SHEET METAL WORKERS LOCAL 17- A 02/01/2012 $41.08 $9.82 $17.09 $0.00 $67.99 08/01/2012 $42.33 $9.82 $17.09 $0.00 $69.24 02/01/2013 $43.58 $9.82 $17.09 $0.00 $70.49 HVAC (ELECTRICAL CONTROLS) 09/01/2011 $41.89 $13.00 $13.86 $0.00 $68.75 ELECTRICIANS LOCAL 103 03/01/2012 $42.37 $13.00 $13.87 $0.00 $69.24 09/01/2012 $43.05 $13.00 $13.89 $0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 $0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 $0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 $0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 $0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 $0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 $0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 $0.00 $75.52 HVAC (TESTING AND BALANCING - AIR) 08/01/2011 $39.83 $9.82 m $17.09 $0.00 $66.74 SHEETMETAL WORKERS LOCAL 17 -A 02/01/2012 $41.08 $9.82 $17.09 $0.00 $67.99 08/01/2012 $42.33 $9.82 $17.09 $0.00 $69.24 _ ............................... 02/01/2013 $43.58 $9.82 $17.09 $0.00 $70.49 ..........._......._.-....._..._._.................__.. HVAC (TESTING AND BALANCING -WATER) 09/01/2011 ............_..........._......._...............I............_.. $43.76 $8.75 $12.39 .................... $0.00 $64.90 PIPEFITTERS LOCAL .i37 (local 138) 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 HVAC MECHANIC 09/01/2011 _ $43.76 $8.75 $12.39 $0.00 $64.90 PIPEFITTERS LOCAL 537 (Local 138) 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 HYDRAULIC DRILLS ~ 12/01/2011 $30.10 $7.10 $11.55 $0.00 _~ „u $48.75 LABORERS - ZONE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 29 of 94 Page 21 of 58 12284A ' THE COMMONWEALTH OF MASSACHUSETTS r�� f EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT kIt OF LABOR STANDARDS 1=�t IPDEPARTMENT yy' 171 (°0§,A' Effective Date Base Wage Health Prevailing Wage Rates DEVAL L. PATRICK Go%emor As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Y P SeerelNV ...._.._....................._........._..... Massachusetts General Laws, Chapter 149, Sections 26 to 27H TiNIOTHYP. MURRAY HEATHER E. RONVE LI. Gov Dlmctor Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system; and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate __........__............................._.........---....._..........._....__...........__.._..........._..................................._....................._........._................._..._................................... ...._.._....................._........._..... -......._.........._......................................................_._.._._........_.........................................__.....__..............._......................................_--.._..._._._......_.. Unemployment INSULATOR (PIPES & TANKS) 09/01/2011 $40.66 $10.40 $11.20 $0.00 $62.26 ASBESTOS WORKERS LOCAL G (BOSTON) 09/01/2012 $.42.06 $10.40 $11.20 $0.00 $63.66 09/01/2013 $43.66 $10.40 $11.20 $0.00 $65.26 09/01/2014 $45.66 $10.40 $11.20 $0.00 $67.26 Apprentice - ASBESTOS INSULATOR (Pipes & Tanks) - Local 6 Boston Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.33 $10.40 $8.30 $0.00 $39.03 2 60 $24.40 $10.40 $8.88 $0.00 $43.68 3 70 $28.46 $10.40 $9.46 $0.00 $48.32 4 80 $32.53 $10.40 $10.04 $0.00 $52.97 Effective Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.03 $10.40 $8.30 $0.00 $39.73 2 60 $25.24 $10.40 $8.88 $0.00 $44.52 3 70 $29.44 $10.40 $9.46 $0.00 $49.30 4 80 $33.65 $10.40 $10.04 $0.00 $54.09 INotes: Steps are 1 year I t Apprentice to Journeyworker Ratio:IA IRONWORKER/WELDER 09/16/2011 $32.87 $7.70 $17.95 $0.00 $58.52 IRONWORKERS LOCAL 7 (LAWRENCE AREA) 03/16/2012 $33.87 $7.70 $17.95 $0.00 $59.52 09/16/2012 $34.87 $7.70 $17.95 $0.00 560.52 03/16/2013 $36.12 $7.70 $17.95 $0.00 $61.77 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 22 of 58 Addendum No. 2 February 2, 2012 Page 30 of 94 12284A �N, THE COMMONWEALTH OF MASSACHUSETTS uj 1 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 70 $23.01 $7.70 $17.95 $0.00 Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE E. GOLDSTEIN Governor Sec 1- $0.00 Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. MURRAY HEATHER E. ROWE Ll. Govemor Dt=lor Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- IRONWORKER -Local 7 Lmvrence Effective Date - 09/16/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.72 $7.70 $17.95 $0.00 $45.37 2 70 $23.01 $7.70 $17.95 $0.00 $48.66 3 75 $24.65 $7.70 $17.95 $0.00 $50.30 4 80 $26.30 $7.70 $17.95 $0.00 $51.95 5 85 $27.94 $7.70 $17.95 $0.00 $53.59 6 90 $29.58 $7.70 $17.95 $0.00 $55.23 Effective Date - 03/16/2012 Step percent 1 60 2 70 3 75 4 80 5 85 6 90 ;Notes: Structural 1:6; Ornamental 1:4 Apprentice to Journeyworker Ratio: ....... ............ ............. -_.......... _..... .._..... ..........._....................-............ ..............- ........ _.... .............-.............................._............. ........ JACKHAMMER & PAVING BREAKER OPERATOR LABORERS - ZONE 2 LABORER LABORERS -ZONF_2 Apprentice Base Wage Health $20.32 $7.70 $23.71 $7.70 $25.40 $7.70 $27.10 $7.70 $28.79 $7.70 $30.48 $7.70 12/01/2011 $29.60 $7.10 $11.55 $0.00 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.25 $48.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 23 of 58 Addendum No. 2 February 2, 2012 Page 31 of 94 12284A Supplemental Pension Unemployment Total Rate $17.95 $0.00 $45.97 $17.95 $0.00 $49.36 $17.95 $0.00 $51.05 $17.95 $0.00 $52.75 $17.95 $0.00 $54.44 $17.95 $0.00 $56.13 12/01/2011 $29.60 $7.10 $11.55 $0.00 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.25 $48.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 23 of 58 Addendum No. 2 February 2, 2012 Page 31 of 94 12284A " THE COMMONWEALTH OF l4ASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates Deva L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Goeemor S-= TIMOTHY R NtURPAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. Rows: LI. Gocemor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 Citv/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER - Zone 2 Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.61 $7.10 $11.55 $0.00 $36.26 2 70 $20.55 $7.10 $11.55 $0.00 $39.20 3 80 $23.48 $7.10 $11.55 $0.00 $42.13 4 90 $26.42 $7.10 $11.55 $0.00 $45.07 JNotes: i Apprentice to Journeyworker Ratio: 1:5 LABORER: CARPENTER TENDER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS - ZONE 2 LABORER: CEMENT FINISHER TENDER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS - ZONE 2 LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2011 $29.35 $7.10�T $11.55 $0.00 $48.00 LABORERS - ZONE 2 ...... ............... ........._............_........... ........... ....._............... ..... ..........................._........ .... ... ..._..._....._........ .... .._......_.................. ._._...... LABORER: MASON TENDER __....... ................ .......... ............................. ._....... . 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS -ZONE2 LABORER: MULTI -TRADE TENDER 12/01/2011 $29.35 $7.10 $1155 $0.00 $48.00 LABORERS - ZONE 2 LABORER: TREE REMOVER 12/01/2011 $29.35 $7.10 $1155 $0.00 $48.00 LABORERS - ZONE 2 This classification applies to the wholesale removal of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches at locations not on or around utility lines. LASER BEAM OPERATOR 12/01/2011 $29.60 $7.10 $1155 $0.00 $48.25 LABORERS- ZONE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of NI.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 32 of 94 Page 24 of 58 12284A Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile THE COMMONWEALTH OF 1A1ASSACI-(USETTS $9.93 ss EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT Effective Date - 08/01/2011 �� l �x DEPARTMENT OF LABOR STANDARDS $9.93 Supplemental Prevailing Wage Rates Step percent DEVAL. L. PATRICK Gocemor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Unemployment Total Rate secrel, n $17.76 1INIassachusetts General Laws, Chapter 149, Sections 26 to 27H $15.50 TIMOTHY P. MURRAY U. Gocemor $43.19 HEATHER E. RONVE $21.31 $9.93 Dimclor Awarding Authority: Greater Lawrence Sanitary District 3 70 Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the 4 80 number of diffusers in the aeration system, and replace two primary clarifier effluent gates. $9.93 Job Location: 240 Main Street, North Andover MA 01845 $53.85 Classification Effective Date Base Wage Health Pension Supplemental Total Rate ...... ................... ........._.... _...... ......... .......... __....._.._.. _...._._.._............................................... __.._......................................... ._._._ 1.Unemployment $57.40 MARBLE & TILE FINISHERS 08/01/2011 $35.52 $9.93 $15.50 $0.00 $60.95 BRICKLAYERS LOCAL 3 - AIARBLE & TILE 02/01/2012 $36.31 $9.93 $15.50 $0.00 $61.74 Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile $18.16 $9.93 $15.50 $0.00 Effective Date - 08/01/2011 2 60 $21.79 $9.93 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.76 $9.93 $15.50 $0.00 $43.19 2 60 $21.31 $9.93 $15.50 $0.00 $46.74 3 70 $24.86 $9.93 $15.50 $0.00 $50.29 4 80 $28.42 $9.93 $15.50 $0.00 $53.85 5 90 $31.97 $9.93 $15.50 $0.00 $57.40 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.16 $9.93 $15.50 $0.00 $43.59 2 60 $21.79 $9.93 $15.50 $0.00 $47.22 3 70 $25.42 $9.93 $15.50 $0.00 $50.85 4 80 $29.05 $9.93 $15.50 $0.00 $54.48 5 90 $32.68 $9.93 $15.50 $0.00- $58.11 - - __ _ ___ _- __ ___ - __ .. _ Notes: _ _ _._ _._ - -_ .- __ - .._,. _,_,. .,-_ _ ,__ ,_,.. .._.._....�... _. .< Steps are 800 hrs. Apprentice to Journeyworker Ratio:1:3 MARBLE MASONS,TILELAYERS & TERRAZZO MECH 08/01/2011 $46.60 $9.93 $16.51 $0.00 $73.04 BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2012 $47.59 $9.93 $16.51 $0.00 $74.03 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 25 of 58 Addendum No. 2 February 2, 2012 Page 33 of 94 12284A Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & Tile Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 THE COMMONWEALTH OF MASSACI-fUSETTS a� EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT s DEPARTMENT OF LABOR STANDARDS $49.74 2 60 $27.96 Prevailing Wage Rates DEVAL L. PATRICK Goccmor As determined by the Director under the provisions of the JOANNE E. GOLDSTEIN 3 70 Sccrcian' TIMOTHY P. NflJRRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROVE Lr. Gocemor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & Tile Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.30 $9.93 $16.51 $0.00 $50.24 $49.74 2 60 $27.96 $9.93 $16.51 $0.00 3 70 $54.40 3 70 $32.62 $9.93 $16.51 $0.00 $38.07 $59.06 4 80 $37.28 $9.93 $16.51 $0.00 $9.93 $63.72 5 90 $41.94 $9.93 $16.51 $0.00 $68.38 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.80 $9.93 $16.51 $0.00 $50.24 2 60 $28.55 $9.93 $16.51 $0.00 $54.99 3 70 $33.31 $9.93 $16.51 $0.00 $59.75 4 80 $38.07 $9.93 $16.51 $0.00 $64.51 5 90 $42.83 $9.93 $16.51 $0.00 $69.27 ;Notes: .. "_ ..__-..__-._-.._._-_.- Apprentice_ . _ _ to Journeyworker___ _ _Rati-_o:l:3 MECH. SWEEPER OPERATOR (NON -CONSTRUCTION) 07/01/2011 $24.80 $5.49 $0.00 $0.00 SWEEPER LOCAL 25 (NON -CONSTRUCTION) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 34 of 94 $30.29 Page 26 of 58 12284A Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification THE COMMONWEALTH OF MASSACHUSETTS Base Wage .EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT Pension DEPARTMENT OF LABOR STANDARDS }� Prevailing Wage Rates DEVAL L PATRICK Gor r erro As determined by the Director under the provisions of the JOANNE F.OLDSTEIN $10.00 Massachusetts General Laws, Chapter 149, Sections 26 to 27H TINIOTHY P. HURRAY Lr G.-nr HEATHER E. ROWE Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental . Unemployment Total Rate MECH. SWEEPER OPERATOR (ON CONST. SITES) 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPER=ATING EAGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 _ ............. ......_................... .._..................... _.._.............................. -...-..-......................................._.............._.._.................. ........_........._.._......_._.__....----.................. MECHANICS MAINTENANCE ............_.._._....----............... 12/01/2011 - - - - $39.16 --..__._..._._.._.._.._ $10.00 ..... ._..._.._._.^_.... $12.40 $0.00 --_.._.. - .... $61.56 OPERATING ENGINEERS LOCAL. l 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 MILLWRIGHT (Zone 2) 04/01/2011 $31.71 $8.67 $15.61 $0.00 $55.99 MILLWRIGHTS LOCAL 1111- Zone 1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 35 of 94 Page 27 of 58 12284A A THE COMMONWEALTH OF MASSACHUSETTS $8.67 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT {ly DEPARTMENT OF LABOR STANDARDS TY $17.44 $8.67 Prevailing Wage Rates DEv.AL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor S-wn $8.67 Massachusetts General Laws, Chapter 149, Sections 26 to 27H. TIMOTHY P. MURRAY. U. Go, -or HEATHER E. ROME Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- :L11LLl+RlGHT- Local 1121 Zone 2 Effective Date - 04/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $15.86 $8.67 $11.64 $0.00 $36.17 2 55 $17.44 $8.67 $11.64 $0.00 $37.75 3 60 $19.03 $8.67 $13.23 $0.00 $40.93 4 65 $20.61 $8.67 $13.23 $0.00 $42.51 5 70 $22.20 $8.67 $14.02 $0.00 $44.89 6 75 $23.78 $8.67 $14.02 $0.00 $46.47 7 80 $25.37 $8.67 $14.82 $0.00 $48.86 8 85 $26.95 $8.67 $14.82 $0.00 $50.44 Notes: Apprentice to Journeyworker Ratio:1:5 _........... ..... .........................-_..... ..................... -......... _....... ._........... ._.................................. -._..__.... _...... ........ _._.........-......_..._-_._....................... .... ...... --------- ................. -.......... ------............... _... _._...._._._ MORTAR MIXER 12/01/2011 $29.60 $7.10 LABORERS - ZONE 2 OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2011 $21.28 $10.00 OPERATING ENGINEERS LOCAL l 06/01/2012 $21.56 $10.00 12/01/2012 $21.90 $10.00 06/01/2013 $22.32 $10.00 12/01/2013 $22.74 $10.00 $11.55 $0.00 $48.25 $12.40 $0.00 $43.68 $12.40 $0.00 $43.96 $12.40 $0.00 $44.30 $12.40 $0.00 $44.72 $12.40 $0.00 $45.14 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 36 of 94 Page 28 of 58 12284A Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 THE COMMONWEALTH OF MASSACHUSETTS a�x „ EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPNIENT J DEPARTMENT OF LABOR STANDARDS Effective Date Base Wage Health Prevailing Wage Rates DEVAL, , PATRICK Goccmor As determined by the Director under the provisions of the JOANNE E. GOLDSTEW TIMOTHY P. MURRAY Secretan Massachusetts General Laws, Chapter 149, Sections 26 to 27H Lr Go-or HEATHER E. RowE HEATHER Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplo ment OILER (TRUCK CRANES, GRADALLS) 12/01/2011 $24.51 $10.00 $12.40 $0.00 $46.91 OPERATING ENGINLERSLOCAL -1 06/01/2012 $24.85 $10.00 $12.40 $0.00 $47.25 12/01/2012 $25.24 $10.00 $12.40 $0.00 $47.64 06/01/2013 $25.72 $10.00 $12.40 $0.00 $48.12 _........-......._......_............. ---....... ............_............ ---.._........ ............ _... ..... ---.._..__...... ... ....... ..__._..._...- .._..._..-......_...--- 12/01/2013 $26.21 $10.00 $12.40 $0.00 $48.61 OTHER POWER DRIVEN EQUIPMENT - CLASS II -----..._......_........... 12/01/2011 ......... -- ---............_.._..._.....__...__._._.....-_.......I...._._._...-- $39.16 $10.00 . $12.40 ---.......---.._.........._........._........._._......._.. $0.00 .-......... ............ . $61.56 OPERATING ENGINEERS LOCAL -I 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 PAINTER (BRIDGES/TANKS) 01/01/2012 $44.01 $7.80 $14.60 $0.00 $66.41 PAINTERS LOCAL 35 - TONE 2 07/01/2012 $45.01 $7.80 $14.60 $0.00 $67.41 01/01/2013 $46.01 $7.80 $14.60 $0.00 $68.41 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 37 of 94 Page 29 of 58 12284A Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - P,4INTER Local 3S THE COMNIONWEALTH OF MASSACHUSETTS a� 1 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT .. DEPARTMENT OF LABOR STANDARDS rk Prevailing Wage Rates DEVAL L. PATRICK Gove nor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secmtan TINfOTHYP. NfURRAY 1'fassachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROwE LI. Governor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - P,4INTER Local 3S - BRlDGES1T4iVKS Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.01 $7.80 $0.00 $0.00 $29.81 2 55 $24.21 $7.80 $3.25 $0.00 $35.26 3 60 $26.41 $7.80 $3.54 $0.00 $37.75 4 65 $28.61 $7.80 $3.84 $0.00 $40.25 5 70 $30.81 $7.80 $12.83 $0.00 $51.44 6 75 $33.01 $7.80 $13.13 $0.00 $53.94 7 80 $35.21 $7.80 $13.42 $0.00 $56.43 8 90 $39.61 $7.80 $14.01 $0.00 $61.42 Effective Date - 07/01/2012 Supplemental Step percent _...._..._.... ..... ...... _................_.......... ..... ........ .... ..._....... ............................ Apprentice Base Wage ............. _...... __............. ............ .... ......... _.... ..._._...._ Health _...... .... ---- _.............................................. Pension _.._..__ Unemployment ........ .._........... _............ ......................... Total Rate 1 50 $22.51 $7.80 $0.00 $0.00 $30.31 2 55 $24.76 $7.80 $3.25 $0.00 $35.81 3 60 $27.01 $7.80 $3.54 $0.00 $38.35 4 65 $29.26 $7.80 $3.84 $0.00 $40.90 5 70 $31.51 $7.80 $12.83 $0.00 $52.14 6 75 $33.76 $7.80 $13.13 $0.00 $54.69 7 80 $36.01 $7.80 $13.42 $0.00 $57.23 8 90 $40.51 $7.80 $14.01 $0.00 $62.32 ..._._... ......_. iNotes: Steps are 7,50 hrs. 1 Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with NI.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 38 of 94 Page 30 of 58 12284A z THE COMMONWEALTH OF MASSACHUSETTS til EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT j DEPARTMENT OF LABOR STANDARDS k.,`f '? Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Gm emor Secreian TliviDTHl' P. Ml1RR.4Y Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RoWE LL Govemor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2012 $34.91 $7.80 $14.60 * If 30% or more of surfaces to be painted are new construction. 07/01/2012 $35.91 $7.80 $14.60 NEW paint rate shall be used.PA/NTERS LOCAL 35 - ZONE 2 01/01/2013 $36.91 $7.80 $14.60 Supplemental Total Rate Unemployment $0.00 $0.00 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 39 of 94 $57.31 $58.31 $59.31 Page 31 of 58 12284A ' ?:'•, THE COMMONWEALTH OF MASSACHUSETTS j EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT p Ips fl DEPARTMENT OF LABOR STANDARDS s• Prevailing Wage Rates 55 $19.20 DEV.AL L. PATRICK Gocemor As determined by the Director under the provisions of the JOANNE E. GOLDSTEiv $0.00 S-tny TI%, 4OTHY P. MURR.AY Nt tassachusettS General Laws, Chapter 149, Sections 26 to 27H HEATHER E. R0N1'E HEATHER LL Go-- $7.80 Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 Citv/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 0 184 5 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - New Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $17.46 $7.80 $0.00 $0.00 $25.26 2 55 $19.20 $7.80 $3.25 $0.00 $30.25 3 60 $20.95 $7.80 $3.54 $0.00 $32.29 4 65 $22.69 $7.80 $3.84 $0.00 $34.33 5 70 $24.44 $7.80 $12.83 $0.00 $45.07 6 75 $26.18 $7.80 $13.13 $0.00 $47.11 7 80 $27.93 $7.80 $13.42 $0.00 $49.15 8 90 $31.42 $7.80 $14.01 $0.00 $53.23 Effective Date - 07/01/2012 Supplemental Step percent _........._.._......_ ................. .......__..... _............... ............... Apprentice Base Wage Health Pension Unemployment Total Rate 1 .._..._......_._ 50 ........... .._...._...._....._...._..._... ............ ... ... __......._...._........... ..... $17.96 ._...._._... .... .... ...... $7.80 _............................ _._............................ $0.00 --- _.... _............ _...... ..... $0.00 _... -.._..... _................. __. $25.76 2 55 $19.75 $7.80 $3.25 $0.00 $30.80 3 60 $21.55 $7.80 $3.54 $0.00 $32.89 4 65 $23.34 $7.80 $3.84 $0.00 $34.98 5 70 $25.14 $7.80 $12.83 $0.00 $45.77 6 75 $26.93 $7.80 $13.13 $0.00 $47.86 7 80 $28.73 $7.80 $13.42 $0.00 $49.95 8 90 $32.32 $7.80 $14.01 $0.00 $54.13 _.. ........... jNotes: 1 i Apprentice to Journeyworker Ratio:I:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 40 of 94 Page 32 of 58 12284A ' c + THE COMMONWEALTH OF MASSACHUSETTS Health EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT Supplemental DEPARTMENT OF LABOR STANDARDS rw Prevailing Wage Rates 01/01/2012 $32.97 DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN y p secretan Govemor 07/01/2012 TIMOTHY P. NnJRRAY INfassachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RO\VE Lt. Go%emor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification .—.... ............................................. ............ ............. .... .... .... _....._....... ....... _...... _..... _... _.............. -- ................. -...._.. -- - ._._.................._.............._.....- PAINTER (SPRAY OR SANDBLAST, REPAINT) P.41VTERS LOCAL 35 - ZO,VE 2 Effective Date Base Wage Health Pension Supplemental Unemployment 01/01/2012 $32.97 $7.80 $14.60 $0.00 07/01/2012 $33.97 $7.80 $14.60 $0.00 01/01/2013 $34.97 $7.80 $14.60 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with NI.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, NIA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 41 of 94 Total Rate $55.37 $56.37 $57.37 Page 33 of 58 12284A r TILE COMNIONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPNIENT Jl# Its' DEPARTMENT OF LABOR STANDARDS Effective Date - 01/01/2012 Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN secret - TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWT Lt. Go,c ., Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 3i Zone 2 - Spray/Sandblast -Repaint Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.49 $7.80 _ $0.00 $0.00 $24.29 2 55 $18.13 $7.80 $3.25 $0.00 $29.18 3 60 $19.78 $7.80 $3.54 $0.00 $31.12 4 65 $21.43 $7.80 $3.84 $0.00 $33.07 5 70 $23.08 $7.80 $12.83 $0.00 $43.71 6 75 $24.73 $7.80 $13.13 $0.00 $45.66 7 80 $26.38 $7.80 $13.42 $0.00 $47.60 8 90 $29.67 $7.80 $14.01 $0.00 $51.48 Effective Date - 07/01/2012 Supplemental Step percent ... --- Apprentice Base Wage Health Pension Unemployment Total Rate ........ ...... _..._.._..._.._._.......... .._...... _._._.._.__...................... 1 50 -......_.... ..._............... ..... _...................._......___...._..._...____....._..._......................_......_.._...-_..___ $16.99 $7.80 __._........_ $0.00 .............. .............. .._.._................ .__................... $0.00 .... ............ ._..__._. $24.79 2 55 $18.68 $7.80 $3.25 $0.00 $29.73 3 60 $20.38 $7.80 $3.54 $0.00 $31.72 4 65 $22.08 $7.80 $3.84 $0.00 $33.72 5 70 $23.78 $7.80 $12.83 $0.00 $44.41 6 75 $25.48 $7.80 $13.13 $0.00 $46.41 7 80 $27.18 $7.80 $13.42 $0.00 $48.40 8 90 $30.57 $7.80 $14.01 $0.00 $52.38 Notes: Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 42 of 94 Page 34 of 58 12284A THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT i I DEPARTMENT OF LABOR STANDARDS r' Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE P. GOLDSTEIN Goremor S -1 - TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROVE U Gocemor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification .... ....... -.... _..... --- ...-..._............_......_.................. ._....._........_._............. _......... ----........ ...............-.-.-..__.....-................._.....---....._.._.............._........_...... PAINTER (TRAFFIC MARKINGS) LABORERS- ZONE 2 PAINTER / TAPER (BRUSH, NEW) * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PA1NTERSLOCAL 35 -ZONE2 Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 01/01/2012 $33.51 $7.80 $14.60 $0.00 $55.91 07/01/2012 $34.51 $7.80 $14.60 $0.00 $56.91 01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 43 of 94 Page 35 of 58 12284A a < THE CO v- MON WEALTH OF MASSACHUSETTS l l�A EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT ' Cs DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Gocemor Secroan' TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HFATHER E. ROWE LL Goccmor Dimctor Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER -Local 35 Zone 2 -BRUSH NEW Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.76 $7.80 $0.00 $0.00 $24.56 2 55 $18.43 $7.80 $3.25 $0.00 $29.48 3 60 $20.11 $7.80 $3.54 $0.00 $31.45 4 65 $21.78 $7.80 $3.84 $0.00 $33.42 5 70 $23.46 $7.80 $12.83 $0.00 $44.09 6 75 $25.13 $7.80 $13.13 $0.00 $46.06 7 80 $26.81 $7.80 $13.42 $0.00 $48.03 8 90 $30.16 $7.80 $14.01 $0.00 $51.97 Effective Date - 07/01/2012 Supplemental Step _...__.... percent ....._.......__..._.__......_........... -_____........ ................................._..._._..._......_.._......................._......._..._.....___.___....__........................_.......-----.......__.._......_...._ Apprentice Base Wage Health Pension ...__._... ............ Unemployment .... _.._.......... ._.... _.... _.................. Total Rate --.... .... ._........................ _...._...._._.... 1 50 $17.26 $7.80 $0.00 $0.00 .......... $25.06 2 55 $18.98 $7.80 $3.25 $0.00 $30.03 3 60 $20.71 $7.80 $3.54 $0.00 $32.05 4 65 $22.43 $7.80 $3.84 $0.00 $34.07 5 70 $24.16 $7.80 $12.83 $0.00 $44.79 6 75 $25.88 $7.80 $13.13 $0.00 $46.81 7 80 $27.61 $7.80 $13.42 $0.00 $48.83 8 90 $31.06 $7.80 $14.01 $0.00 $52.87 w__ 'Notes: Steps are 750 hrs. I € I Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 44 of 94 Page 36 of 58 12284A 0 .�_ THE COMMONWEALTH OF MASSACHUSETTS Health Pension rr, EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT lgn ' DEPARTMENT OF LABOR STANDARDS Unemployment 01/01/2012 Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE S . GOLDSTEIN Gove nor $53.97 07/01/2012 1INIassachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY R MURR.AY HEATHER E. ROWE D. Gox en,or Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification .... _.............. _......................... _....._...._............. ........._..._._._.._........_...........---- ----- .—............__.._..._._.... _......................... ._..._.... PAINTER / TAPER (BRUSH, REPAINT) PAWTERS LOCAL 35 - ZOrVE 2 Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment 01/01/2012 $31.57 $7.80 $14.60 $0.00 $53.97 07/01/2012 $32.57 $7.80 $14.60 $0.00 $54.97 01/01/2013 $33.57 $7.80 $14.60 $0.00 $55.97 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 45 of 94 Page 37 of 58 IlWrIllY1 Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 THE C01MMONW.EALTH OF MASSACHUSETTS $7.80 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT 1 DEPARTMENT OF LABOR STANDARDS 1 2 55 $17.36 $7.80 yif Prevailing Wage Rates i, $28.41 DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN secretan TIMOTHY P. HURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E ROWE LL Govemor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $15.79 $7.80 $0.00 $0.00 $23.59 2 55 $17.36 $7.80 Pension $3.25 $0.00 $28.41 3 60 $18.94 $7.80 $0.00 $3.54 $0.00 $30.28 4 65 $20.52 $7.80 $3.25 $3.84 $0.00 $32.16 5 70 $22.10 $7.80 $3.54 $12.83 $0.00 $42.73 6 75 $23.68 $7.80 $3.84 $13.13 $0.00 $44.61 7 80 $25.26 $7.80 $12.83 $13.42 $0.00 $46.48 8 90 $28.41 $7.80 $13.13 $14.01 $0.00 $50.22 Effective Date - 07/01/2012 Supplemental Step ............. .._....._.._...._ percent ... ........ ..._........ ........................ _. _ Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.29 $7.80 $0.00 $0.00 $24.09 2 55 $17.91 $7.80 $3.25 $0.00 $28.96 3 60 $19.54 $7.80 $3.54 $0.00 $30.88 4 65 $21.17 $7.80 $3.84 $0.00 $32.81 5 70 $22.80 $7.80 $12.83 $0.00 $43.43 6 75 $24.43 $7.80 $13.13 $0.00 $45.36 7 80 $26.06 $7.80 $13.42 $0.00 $47.28 8 90 $29.31 $7.80 $14.01 $0.00 $51.12 Steps are 750 hrs. Apprentice to Journeyworker Ratio:I:I This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 46 of 94 Page 38 of 58 12284A ' THE COMMONWEALTH OF NMASSACHUSETTS Health EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT j=} DEPARTMENT OF LABOR STANDARDS Effective Date - 08/01/2011 r Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. OLDSTEIN Gov-., $29.68 TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE U. Govemor Direnor Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification .... ..... .... ......................................._......_............... _..........._....... _................ ... ........_..........._..__........ ....... .................. ..--....._._....... _......._................. - ........... ... PANEL & PICKUP TRUCKS DRIVER TEA.LISTERSJOINT COUNCIL NO. 10 ZONE 8 Effective Date Base Wage Health Pension Supplemental Total Rate Effective Date - 08/01/2011 Unemployment 12/01/2011 $29.68 $8.56 $7.27 $0.00 $45.51 06/01/2012 $29.98 $8.56 $7.27 $0.00 $45.81 08/01/2012 $29.68 $8.91 $7.27 $0.00 $45.86 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32 DECK) PILE DRIVER LOCAL 56 (ZONE 1) PILE DRIVER PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32 Apprentice - PILE DRIVER - Local 56 Zone I Effective Date - 08/01/2011 Supplemental Step percent .. ........ ........ ............................ _.__...... ........ .......... ...... Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $24.07 $8.08 $17.12 $0.00 $49.27 2 65 $26.08 $8.08 $17.12 $0.00 $51.28 3 70 $28.08 $8.08 $17.12 $0.00 $53.28 4 75 $30.09 $8.08 $17.12 $0.00 $55.29 5 80 $32.10 $8.08 $17.12 $0.00 $57.30 6 85 $34.10 $8.08 $17.12 $0.00 $59.30 7 90 $36.11 $8.08 $17.12 $0.00 $61.31 8 95 $38.11 $8.08 $17.12 $0.00 $63.31 Notes: I F Apprentice to Journeyworker Ratio: 1:3 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 47 of 94 Page 39 of 58 12284A Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 THE COMN40NWEALTIJ OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT K�; DEPARTMENT OF LABOR STANDARDS Classification Effective Date Prevailing Wage Rates DEVAL L. PATRICK Go-ior As determined by the Director under the provisions of the JOANNESI I.GOLDSTEIN TINIOTHY P. NFURRAv Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROVE LI. Go%'nror Dimctor Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Effective Date- 09/01/2011 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Pension .. Unemployment Total Rate 1 40 $17.50 Unemplo ment $4.50 PIPEFITTER & STEAMFITTER 09/01/2011 $43.76 $8.75 $12.39 $0.00 $64.90 PIPEFI7TERSLOCAL 537 (Local 138) 3 60 $26.26 $8.75 $12.39 $0.00 $47.40 4 70 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 $35.01 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 Apprentice- PIPEFITTER Local 537 (Local 138) Effective Date- 09/01/2011 Supplemental Step percent ............... .._.................. ........ ... .........._.__ Apprentice Base Wage ........... _-.._....... ........................... _...... _ ..... _ Health Pension .. Unemployment Total Rate 1 40 $17.50 $8.75 $4.50 $0.00 $30.75 2 45 $19.69 $8.75 $12.39 $0.00 $40.83 3 60 $26.26 $8.75 $12.39 $0.00 $47.40 4 70 $30.63 $8.75 $12.39 $0.00 $51.77 5 80 $35.01 $8.75 $12.39 $0.00 $56.15 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.80 $8.75 $4.50 $0.00 $31.05 2 45 $20.03 $8.75 $12.39 $0.00 $41.17 3 60 $26.71 $8.75 $12.39 $0.00 $47.85 4 70 $31.16 $8.75 $12.39 $0.00 $52.30 5 80 $35.61 $8.75 $12.39 $0.00 $56.75 =Notes: ** 1:3; 3:15; 1:10 thereafter / Steps are I yr. Refrig/AC Mechanic **1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Mas) Apprentice to Journeyworker Ratio:* PIPELAYER LABORERS - ZONE 2 12/01/2011 $29.60 $7.10 $11.55 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 48 of 94 $48.25 Page 40 of 58 12284A Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification _..._........................................................._....._.........................._.................._....._...._......................_............... ...... ............ ......... __............ _.... _........ ._._.._..._... PLUMBER PLUVBERS & GASI-ITTERS LOCAL 12 (Local 138) Effective Date THE COMMONWEALTH OF MASSACFrUSETTS 11� EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT ^I /, DEPARTMENT OF LABOR STANDARDS Effective Date- 09/01/2011 Prevailing Wage Rates Unemployment DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNESF OLDSTEIN TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Go,-, Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification _..._........................................................._....._.........................._.................._....._...._......................_............... ...... ............ ......... __............ _.... _........ ._._.._..._... PLUMBER PLUVBERS & GASI-ITTERS LOCAL 12 (Local 138) Effective Date Base Wage Health Pension Supplemental Total Rate Effective Date- 09/01/2011 Unemployment 09/01/2011 $41.93 $9.32 $13.29 $0.00 $64.54 03/01/2012 $42.73 $9.32 $13.29 $0.00 $65.34 09/01/2012 $43.98 $9.32 $13.29 $0.00 $66.59 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 Apprentice- PLUMBERIGASFITTER - Local 12 (Local 138) Effective Date- 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $14.68 $9.32 $4.97 $0.00 $28.97 2 40 $16.77 $9.32 $5.61 $0.00 $31.70 3 55 $23.06 $9.32 $7.53 $0.00 $39.91 4 65 $27.25 $9.32 $8.81 $0.00 $45.38 5 75 $31.45 $9.32 $10.09 $0.00 $50.86 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $14.96 $9.32 $4.97 $0.00 $29.25 2 40 $17.09 $9.32 $5.61 $0.00 $32.02 3 55 $23.50 $9.32 $7.53 $0.00 $40.35 4 65 $27.77 $9.32 $8.81 $0.00 $45.90 5 75 $32.05 $9.32 $10.09 $0.00 $51.46 Notes: i Step 4 with lic$48.12 Step5 with lic$53.58 Apprentice to Journeyworker Ratio: 1:5 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 49 of 94 Page 41 of 58 12284A y THE COt%4MONWEALTH OF (MASSACHUSETTS ,j EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Y Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Gocemorse-t- TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LI. Gocemor Direclor Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 Classification Effective Date Base Wage Health Pension Supplemental Total Rate .. ......... ..... _.__........ _........ __..._.......__......._._..._.__..........._.........._.__._................. ............ -_... --.... .......... _._................_...._....._ POWDERMAN &BLASTER ............. _... 12/01/2011 _....... __...... _......... __.................. $30.35 _.._.......... _...........__ $7.10 ... _.... ............. .__.................... $11.55 Unemployment $49.00 PNEUMATIC CONTROLS (TEMP.) 09/01/2011 $43.76 $8.75 $12.39 $0.00 $64.90 PIPEFITTE-RS LOCOL 537 (Loco/ 134) 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 OPERATING ENGINEERS LOCAL 4 09/01/2012 $45.76 $8.75 $1239 $0.00 $66.90 PUMP OPERATOR (DEWATERING, OTHER) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PNEUMATIC DRILL/TOOL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 .. ......... ..... _.__........ _........ __..._.......__......._._..._.__..........._.........._.__._................. ............ -_... --.... .......... _._................_...._....._ POWDERMAN &BLASTER ............. _... 12/01/2011 _....... __...... _......... __.................. $30.35 _.._.......... _...........__ $7.10 ... _.... ............. .__.................... $11.55 ............ .._._................ . $0.00 $49.00 LABORERS -ZONE2 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2011 $39.52 _ $10.00 $12.40 $0.00 _ $61.92 OPERATING ENGINEERS LOCAL 4 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 PUMP OPERATOR (DEWATERING, OTHER) 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 OPERATING ENGINEERS LOCAL d 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 PUMP OPERATOR (CONCRETE) 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 PUMP OPERATOR (DEWATERING, OTHER) 12/01/2011 $27.95 $10.00 $12.40 $0.00 $50.35 OPERATING ENGINEERS LOCAL d 06/01/2012 $28.34 $10.00 $12.40 $0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 $0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 $0.00 $51.74 12/01/2013 $29.89 $10.00 $12.40 $0.00 $52.29 READY -MIX CONCRETE DRIVER TEAMSTERS LOCAL 42 04/30/2009 $25.80 $5.96 $5.34 $0.00 $37.10 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 42 of 58 Addendum No. 2 February 2, 2012 Page 50 of 94 12284A ' THE COIvtMONWEALTFI OF MASSACHUSETTS Health EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT Supplemental DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates Unem loyment DEVAL L. PATRICK Govemor As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Y P Secremn TIMOTHY P. HURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RO"T Lt. Govemor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unem loyment RECLAIMERS 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 CARPENTERS -ZONE 2 (Residential Wood) _... .__........._.._______-___.____.___.__�_.__ RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 ** The Residential Wood Frame Carpenter classification applies only to the construction of new, wood frame residences that do not exceed four stories including the basement. CARPENTERS -ZONE 2 (Residential Wood) As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 43 of 58 Addendum No. 2 February 2, 2012 Page 51 of 94 12284A 'y THE COMMONWEALTH OF MASSACHUSETTS is EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT I_ i' DEPARTMENT OF LABOR STANDARDS 1 60 w >n, Prevailing Wage Rates DEVAL L. PATRICK Gocemor As determined by the Director under thep rovisions of the JOANNE F. GOLDSTEIN secrelan TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE L1. Goecmor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- CARPENTER (Residential {Wood Frame) - Zone 2 Effective Date- 05/01/2011 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 60 w $14.54 $6.34 $0.00 $0.00 $20.88 2 60 $14.54 $6.34 $6.23 $0.00 $27.11 3 65 $15.76 $6.34 $6.23 $0.00 $28.33 4 70 $16.97 $6.34 $6.23 $0.00 $29.54 5 75 $18.18 $6.34 $6.23 $0.00 $30.75 6 80 $19.39 $6.34 $6.23 $0.00 $31.96 7 85 $20.60 $6.34 $6.23 $0.00 $33.17 8 90 $21.82 $6.34 $6.23 $0.00 $34.39 ROLLER/SPREADER/MULCHING MACHINE OPERATING ENGINEERS LOCAL a ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) ROOFERS LOCAL 33 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 08/01/2011 $35.56 $10.50 $9.80 $0.00 $55.86 02/01/2012 $36.56 $10.50 $9.80 $0.00 $56.86 08/01/2012 $37.56 $10.50 $9.80 $0.00 $57.86 02/01/2013 $38.56 $10.50 $9.80 $0.00 $58.86 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 NN'age Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 52 of 94 Page 44 of 58 12284A r THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor S-1- TIMOTHY P. MIJRRAY. Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ROOFER - Loca133 Effective Date - 08/01/2011 Supplemental Step percent _ Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.78 $10,50 $2.93 $0.00 $31.21 2 60 $21.34 $10.50 $9.80 $0.00 $41.64 3 65 $23.11 $10.50 $9.80 $0.00 $43.41 4 75 $26.67 $10.50 $9.80 $0.00 $46.97 5 85 $30.23 $10.50 $9.80 $0.00 $50.53 Effective Date - 02/01/2012 Supplemental Step percent � � Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.28 $10.50 $2.93 $0.00 $31.71 2 60 $21.94 $10.50 $9.80 $0.00 $42.24 3 65 $23.76 $10.50 $9.80 $0.00 $44.06 4 75 $27.42 $10.50 $9.80 $0.00 $47.72 5 85 $31.08 $10.50 $9.80 $0.00 $51.38 Notes: * L5. 2:6-10. the 1:10; Reroofing: 1:4, then 1:1 Step I is 2000 hrs.; Steps 2-5 are 1000 hrs. Apprentice to Journeyworker Ratio:** ROOFER SLATE / TILE / PRECAST CONCRETE 08/01/2011 $35.81 $10.50 $9.80 $0.00 $56.11 ROOFERS LOCAL 33 02/01/2012 $36.81 $10.50 $9.80 $0.00 $57.11 08/01/2012 $37.81 $10.50 $9.80 $0.00 $58.11 02/01/2013 $38.81 $10.50 $9.80 $0.00 $59.11 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 53 of 94 Page 45 of 58 12284A s THE COMMONWEALTH OF MASSACHUSETTS ,(EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 $31.34 , ri DEPARTMENT OF LABOR STANDARDS tai, $9.80 $0.00 Prevailing Wage Rates DEc.AL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Y P Gacemor $ecretan' $0.00 i fassachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. MURRAY LL Gocemor HEATHER E. ROVE Director Awarding Authority, : Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street- North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ROOFER (SlateiTile%Precast Concrete) - Local 33 Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.91 $10.50 $2.93 $0.00 $31.34 2 60 $21.49 $10.50 $9.80 $0.00 $41.79 3 65 $23.28 $10.50 $9.80 $0.00 $43.58 4 75 $26.86 $10.50 $9.80 $0.00 $47.16 5 85 $30.44 $10.50 $9.80 $0.00 $50.74 Effective Date - 02/01/2012 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1�50� $18.41 $10.50 $2.93 $0.00 $31.84 2 60 $22.09 $10.50 $9.80 $0.00 $42.39 3 65 $23.93 $10.50 $9.80 $0.00 $44.23 4 75 $27.61 $10.50 $9.80 $0.00 $47.91 5 85 $31.29 $10.50 $9.80 $0.00 $51.59 'Notes: Apprentice to Journeyworker Ratio.** SHEETMETAL WORKER 08/01/2011 $39.83 $9.82 $17.09 $0.00 $66.74 SHEETMETAL WORKERS LOCAL 17 -A 02/01/2012 $41.08 $9.82 $17.09 $0.00 $67.99 08/01/2012 $42.33 $9.82 $17.09 $0.00 $69.24 02/01/2013 $43.58 $9.82 $17.09 $0.00 $70.49 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 46 of 58 Addendum No. 2 February 2, 2012 Page 54 of 94 12284A Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: THE C01%,11V10NWEALTH OF 11%4ASSACRUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT l�hr DEPARTMENT OF LABOR STANDARDS Classification Effective Date Prevailing Wage Rates DEVAL L PATRICK As determined by the Director under the of the JOANNE F. GOLDSTEIN Go-or provisions S Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. MURRAY HEATHER E. ROWE LL Go% mor Dircclor Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SKEET METAL lVORKER -Local 17-A Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage � � Health Pension Unemployment ✓$0.00 Total Rate 1 40 $15.93 $9.82 $3.74 $29.49 2 45 $17.92 $9.82 $7.45 $0.00 $35.19 3 50 $19.92 $9.82 $8.42 $0.00 $38.16 4 60 $23.90 $9.82 $9.60 $0.00 $43.32 5 65 $25.89 $9.82 $10.32 $0.00 $46.03 6 75 $29.87 $9.82 $11.76 $0.00 $51.45 7 85 $33.86 $9.82 $12.69 $0.00 $56.37 ....,.- ....._.... ..,,._... ,.:_..... ........ ........... ..__,_, .....-,.. .. ....,.. ....�,... �,. .......... ., .,,,..,. .,,......,,. .-.,...,,,, .......... .,..,,,.... .......,.. ..,..... .....,,_... ,_... ..,.,..... msµ. ...,.,,,.. ..,.......... ....«,.,.. ...,,,.3 €Notes: Steps 1-3 are 1 year; Steps 4-7 are 6 mos. .... _.. _.__ Apprentice to Journeyworker Ratio: 1:4 .............. ........ -... _....._..... _......... .................. _...---.._-..... ........ ............ __........ ............ __..... ---._................._........ --...._... .......... ........._....._............... ......... -._..__._...__.._..........._................................ ----.-._.._......... ............................... .................... ............-............ _................ ...................... ............... _.... SIGN ERECTOR 06/01/2009 $24.81 $7.07 $5.90 $0.00 $37.78 PAINTERS LOCAL 35 - 70NE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 55 of 94 Page 47 of 58 12284A • . get THE COMMONWEALTH OF \MASSACHUSETTS Pension EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT C 1 iQ4 � DEPARTMENT OF LABOR STANDARDS t $12.41 $7.07 Prevailing Wage Rates DEVAL L. PATRICK Govemor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN $19.48 se -1 - TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Gocemor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH .ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- SIGN ERECTOR -Local 35 Zone 2 Effective Date - 06/01/2009 Step percent Apprentice Base Wage _1 m Health Pension Supplemental Unemployment Total Rate 50_____._ $12.41 $7.07 $0.00 $0.00 $19.48 2 55 $13.65 $7.07 $2.40 $0.00 $23.12 3 60 $14.89 $7.07 $2.40 $0.00 $24.36 4 65 $16.13 $7.07 $2.40 $0.00 $25.60 5 70 $17.37 $7.07 $5.90 $0.00 $30.34 6 75 $18.61 $7.07 $5.90 $0.00 $31.58 7 80 $19.85 $7.07 $5.90 $0.00 $32.82 8 85 $21.09 $7.07 $5.90 $0.00 $34.06 9 90 $22.33 $7.07 $5.90 $0.00 $35.30 ,Notes: I Steps are 4 mos. i Apprentice to Journeyworker Ratio:1:1 SPECIALIZED EARTH MOVING EQUIP < 35 TONS �mm 12/01/2011 $30.14 $8.56 $7.27$0.00 _ $45.97 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.44 $8.56 $7.27 $0.00 $46.27 08/01/2012 $30.44 $8.91 $7.27 $0.00 $46.62 --------....__......._._...._..............._..._._......__.........._.._.._._....._._......._..___........_.._._._.__._..............._......._..._......................._..........................._..............-.................................._.................___........._-....._._.._.............................._......._......_-..._......_....................................... 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2011 $30.43 $8.56 _._.. $7.27 .._..._.__......... $0.00 ..... .................._........_....._......._........................ $46.26 TEAMSTERS.JOINT COUNCIL NO. l l/ ZONE B 06/01/2012 $30.73 $8.56 $7.27 $0.00 $46.56 08/01/2012 $30.73 $8.91 $7.27 $0.00 $46.91 12/01/2012 $31.03 $8.91 $8.00 $0.00 $47.94 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 56 of 94 Page 48 of 58 12284A ' t THE COMMONWEALTH OF MASSACHUSETTS �j tN1 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT til ,* 'r° DEPARTMENT OF LABOR STANDARDS N m �1"' V! $49.60 $8.10 Prevailing Wage Rates DEV:\L L. CK Go errorntor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN TIMOTHY P. MURRAY $ecretan Massachusetts General Laws, Chapter 149, Sections 26 to 27H LI. Gocemor HEATHER E. ROR'E Director Awarding .authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment SPRINKLER FITTER SPRINKLER FITTERS LOC',4L 550 - (Section e) 01/01/2012 $46.85 $8.10 $11.60 $0.00 $66.55 03/01/2012 $47.60 $8.10 $11.60 $0.00 $6730 09/01/2012 $48.60 $8.10 01/01/2013 $48.60 $8.10 03/01/2013 $49.60 $8.10 $11.60 $0.00 $68.30 $11.75 $0.00 $68.45 $11.75 $0.00 $69.45 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 57 of 94 Page 49 of 58 12284A `# THE COMMONWEALTH OF MASSACHUSETTS ,p 2 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $7.85 DEPARTMENT OF LABOR STANDARDS X, 2 3y Prevailing Wage Rates DEVAL L. PATRICK Gocemor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN TI6tOTHv P. MURRAY Secrcmn Massachusetts General Laws, Chapter 149, Sections 26 to 27H Lt. Gocemor xE.arxER E. RowE Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 Citv/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SPRINKLER FITTER -Local 550 (Section R) Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.40 $8.10 $7.85 $0.00 $32.35 2 40 $18.74 $8.10 $7.85 $0.00 $34.69 3 45 $21.08 $8.10 $7.85 $0.00 $37.03 4 50 $23.43 $8.10 $7.85 $0.00 $39.38 5 55 $25.77 $8.10 $7.85 $0.00 $41.72 6 60 $28.11 $8.10 $7.85 $0.00 $44.06 7 65 $30.45 $8.10 $7.85 $0.00 $46.40 8 70 $32.80 $8.10 $7.85 $0.00 $48.75 9 75 $35.14 $8.10 $7.85 $0.00 $51.09 10 80 $37.48 $8.10 $7.85 $0.00 $53.43 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.66 $8.10 $7.85 $0.00 $32.61 2 40 $19.04 $8.10 $7.85 $0.00 $34.99 3 45 $21.42 $8.10 $7.85 $0.00 $37.37 4 50 $23.80 $8.10 $7.85 $0.00 $39.75 5 55 $26.18 $8.10 $7.85 $0.00 $42.13 6 60 $28.56 $8.10 $7.85 $0.00 $44.51 7 65 $30.94 $8.10 $7.85 $0.00 $46.89 8 70 $33.32 $8.10 $7.85 $0.00 $49.27 9 75 $35.70 $8.10 $7.85 $0.00 $51.65 10 80 $38.08 $8.10 $7.85 $0.00 $54.03 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 58 of 94 Page 50 of 58 12284A THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT 4 €; DEPARTMENT OF LABOR STANDARDS T' Prevailing Wage Rates DEVAL L PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Gocemor Secrctlrn Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. MURRAY Massachusetts E. RO\3'E Lr_ Go, emor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension supplemental Total Rate Unemployment `Notes: Apprentice to Journeyworker Ratio: 1:1 STEAM BOILER OPERATOR 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL a 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 ....---._._._..._...._.._......._._........._...__..__._........_ 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 .........................__..._.......__._._._.....-.._.--.._........ ...__....._._.........._..._.._..........._...._...----._....._._._.._......_ TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2011 ------.._..-...._......_...__...... $39.16 .... .._-----------._._................._.........._....._... $10.00 $12.40 ........ -...... $0.00 ._._...........I ............ . ._....- ... $61.56 OPERATING ENGINEERS LOCAL a 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 TELECOMMUNICATION TECHNICIAN09/01/2011 $31.42 $13.00 $12.22 $0.00 $56.64 ELECTRICIANS LOCAL 103 03/01/2012 $31.78 $13.00 $12.23 $0.00 $57.01 09/01/2012 $32.29 $13.00 $12.25 $0.00 $57.54 03/01/2013 $32.83 $13.00 $12.26 $0.00 $58.09 09/01/2013 $33.34 $13.00 $12.28 $0.00 $58.62 03/01/2014 $33.88 $13.00 $12.30 $0.00 $59.18 09/01/2014 $34.38 $13.00 $12.31 $0.00 $59.69 03/01/2015 $34.91 $13.00 $12.33 $0.00 $60.24 09/01/2015 $35.63 $13.00 $12.35 $0.00 $60.98 03/01/2016 $36.35 $13.00 $12.37 $0.00 $61.72 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 59 of 94 Page 51 of 58 12284A Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemviovment Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 THE COMMONWEALTH OF MASSACHUSETTS $12.57 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT V` DEPARTMENT OF LABOR STANDARDS $34.84 2 40 Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the p rovisions of the JOANNE F. GOLDSTEIN Secretarc Govemor $34.84 TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROME Lt. Go%emor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemviovment Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $12.57 $13.00 $9.27 $0.00 $34.84 2 40 $12.57 $13.00 $9.27 $0.00 $34.84 3 45 $14.14 $13.00 $9.51 $0.00 $36.65 4 45 $14.14 $13.00 $9.51 $0.00 $36.65 5 50 $15.71 $13.00 $9.76 $0.00 $38.47 6 55 $17.28 $13.00 $10.01 $0.00 $40.29 7 60 $18.85 $13.00 $10.26 $0.00 $42.11 8 65 $20.42 $13.00 $10.50 $0.00 $43.92 9 70 $21.99 $13.00 $10.75 $0.00 $45.74 10 75 $23.57 $13.00 $11.00 $0.00 $47.57 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $12.71 $13.00 $9.27 $0.00 $34.98 2 40 $12.71 $13.00 $9.27 $0.00 $34.98 3 45 $14.30 $13.00 $9.51 $0.00 $36.81 4 45 $14.30 $13.00 $9.51 $0.00 $36.81 5 50 $15.89 $13.00 $9.76 $0.00 $38.65 6 55 $17.48 $13.00 $10.01 $0.00 $40.49 7 60 $19.07 $13.00 $10.26 $0.00 $42.33 8 65 $20.66 $13.00 $10.50 $0.00 $44.16 9 70 $22.25 $13.00 $10.75 $0.00 $46.00 10 75 $23.84 $13.00 $11.00 $0.00 $47.84 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 60 of 94 Page 52 of 58 12284A .awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment ';Notes: Apprentice to Journeyworker Ratio: 1:1 TERRAZZO FINISHERS BRICKLAYERS LOCAL 3 - MARBLE & TILE 08/01/2011 $45.50 $9.93 $16.51 $0.00 $71.94 02/01/2012 $46.49 $9.93 $16.51 $0.00 $72.93 Apprentice- TERRAZZO FINISHER THE COMMONWEALTH OF \4ASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT ,. F DEPARTMENT OF LABOR STANDARDS Effective Date - 08/01/2011 Prevailing Wage Rates DEVAL L. PATRICK Go -tor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN secroarc TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Gocemor Director .awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment ';Notes: Apprentice to Journeyworker Ratio: 1:1 TERRAZZO FINISHERS BRICKLAYERS LOCAL 3 - MARBLE & TILE 08/01/2011 $45.50 $9.93 $16.51 $0.00 $71.94 02/01/2012 $46.49 $9.93 $16.51 $0.00 $72.93 Apprentice- TERRAZZO FINISHER -Local 3 Marble & Tile Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.75 $9.93 $16.51 $0.00 $49.19 2 60 $27.30 $9.93 $16.51 $0.00 $53.74 3 70 $31.85 $9.93 $16.51 $0.00 $58.29 4 80 $36.40 $9.93 $16.51 $0.00 $62.84 5 90 $40.95 $9.93 $16.51 $0.00 $67.39 Effective Date - 02/01/2012 Supplemental Step percent .--��- Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.25 $9.93 $16.51 $0.00 $49.69 2 60 $27.89 $9.93 $16.51 $0.00 $54.33 3 70 $32.54 $9.93 $16.51 $0.00 $58.98 4 80 $37.19 $9.93 $16.51 $0.00 $63.63 5 90 $41.84 $9.93 $16.51 $0.00 $68.28 lNotes: Steps are 800 hrs. Apprentice to Journeyworker Ratio: 1:3 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Addendum No. 2 February 2, 2012 Page 61 of 94 Page 53 of 58 12284A t x < THE COMMONWEALTH OF MASSACHUSETTS $7.10 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT "s �F DEPARTMENT OF LABOR STANDARDS 2 70 $23.14 $7.10 Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the of the JOANNE F. GOLDSTEIN Gocemor provisions S -1 - $7.10 lJNrlassachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. NrURR.AY Ll. Gocemor HEATHER E. ROWE Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate _......................._..........._._.........................._... ...__.......__...._. Unemployment ._.._...._..._.._................._......_.._..._........._.........__._.._._................._......__.-..__.._.....__._.._._....__.._..-.........._......_..........__.........._..........._._......._..._.........__..__.._........__...._...............__........._............_.....----...__...... TEST BORING DRILLER 12/01/2011 $33.05 $7.10 $12.60 $0.00 $52.75 L4 BORE. RS - FO UNDATIOA` A,ND A1A R!A'E- Apprentice - TEST BORING DRILLER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.83 $7.10 $12.60 $0.00 $39.53 2 70 $23.14 $7.10 $12.60 $0.00 $42.84 3 80 $26.44 $7.10 $12.60 $0.00 $46.14 4 90 $29.75 $7.10 $12.60 $0.00 $49.45 _ , ......, lNotes: 1 i l Apprentice to Journeyworker Ratio: 1:3 [ I TEST BORING DRILLER HELPER 12/01/2011 $31.77 $7.10 $12.60 $0.00 $51.47 LABORERS- FOUNDATIONAND MARINE TEST BORING LABORER LABORERS - FOUNDATIONAND MARINE. 12/01/2011 $31.65 $7.10 $12.60 $0.00 $51.35 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, see. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, NIA 02108; Tel: Issue Date: 01/03/2012 NIVage Request Number: 20120103-006 Page 54 of 58 Addendum No. 2 February 2, 2012 Page 62 of 94 12284A z a THE COMMONWEALTH OF tt MASSACHUSETTS �IIp EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT r� DEPARTMENT OF LABOR STANDARDS '= Prevailing Wage Rates DEv.aG PJCK Goce.0, mor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN TIMOTHY P. \4URRAY Secretan Massachusetts General Laws, Chapter 149, Sections 26 to 27H Li. Govern°r HEATHER E�aou�E Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TEST BORING LABORER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Step percent Apprentice Base Wage Health _i W�60 Pension Supplemental Unemployment Total Rate $18.99 $7.10 $12.60 _ $0.00�� $38.69 2 70 $22.16 $7.10 $12.60 $0.00 $41.86 3 80 $25.32 $7.10 $12.60 $0.00 $45.02 4 90 $28.49 $7.10 $12.60 $0.00 $48.19 'Notes: r Apprentice to Journeyworker Ratio: 1:3 TRACTORS/PORTABLE STEAM GENERATORS 12/01/2011 $39.16 $10.00 $12.40 $0.00 $6156 OPERd TING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2011 _ $30.72 $8.56 $7.27 $0.00 $46.55 TEAMSTERS JOINT COUNCIL NO. 10 70NE B 06/01/2012 $31.02 $8.56 $7.27 $0.00 $46.85 08/01/2012 $31.02 $8.91 $7.27 $0.00 $47.20 ._....._..._................. .... .......... ...._....................._.........._.__..__.... 12/01/2012 $31.32 $8.91 $8.00 $0.00 $48.23 _.__...__......... TUNNEL WORK - COMPRESSED AIR .......__...._...._......._..._._..... ..-..._..._.-........... 12/01/2011 -.......... ......._._._..--................ $44.08 _...... .........-..._.._...._ $7.10 .... --..--- ........_..._..._......_..__.._--__..._......_..__ $13.00 $0.00 .................... - ........ _... .._.... $64.18 LABORERS (COMPRESSED AIR) TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 12/01/2011 $46.08 $7.10 $13.00 rr $0.00 $66.18 J LABORERS (COMPRESSED AIR) TUNNEL WORK - FREE AIR 12/01/2011 $36.15 $7.10 $13.00 $0.00 $56.25 LABORERS (FREE AIR TUNNEL) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 55 of 58 Addendum No. 2 February 2, 2012 Page 63 of 94 12284A THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS ,4�r,1 i k' Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNESF OLDSTEIN Go%emor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification Effective Date Base Wage Health Pension Supplemental Total Rate . .Unemplo........... ...... ....... ............... .. ............ ..............._......................-- -- --._... TUNNEL WORK - FREE AIR (HAZ. WASTE) 12/01/2011 $38.15 $7.10 $13.00 $0.00 $58.25 L9 BORERS (FREEAIR TUNNEL) VAC -HAUL 12/01/2011 $30.14 $8.56 $7.27 $0.00 $45.97 TEAMSTERS JOINT COUNCIL NO. 10 7.ONE B 06/01/2012 $30.44 $8.56 $7.27 $0.00 $46.27 $9.32 08/01/2012 $30.44 $8.91 $7.27 $0.00 $46.62 $13.29 12/01/2012 $30.74 $8.91 $8.00 $0.00 _ _ $47.65 WAGON DRILL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 WASTE WATER PUMP OPERATOR 12/01/2011 _ $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 EQUIPMENT OPERATOR (Class A CDL) 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 WATER METER INSTALLER PLUMBERS & GASFITTERS LOCAL 12 (Local 138) Outside Electrical - East 09/01/2011 $41.93 $9.32 $13.29 $0.00 $64.54 03/01/2012 $42.73 $9.32 $13.29 $0.00 $65.34 09/01/2012 $43.98 $9.32 $13.29 $0.00 $66.59 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 CABLE TECHNICIAN (Power Zone) 08/29/2011 $27.11 $6.70 $1.50 $0.00 $35.31 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 ......................... .............. .-.... .............. ....... ..... .. _ ............................. _...... _ CABLEMAN (Underground Ducts & Cables) ...... ........................ ............... 08/29/2011 ........_ _ $38.41 $6.70 $1.00 ........... $0.00 ............... ._............... $46.11 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 DRIVER / GROUNDMAN CDL 08/29/2011 $31.63 $6.70 $2.50 $0.00 $40.83 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 DRIVER / GROUNDMAN -Inexperienced (<2000 Hrs) 08/29/2011 $24.85 $6.70 $1.50 $0.00 $33.05 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 EQUIPMENT OPERATOR (Class A CDL) _ 08/29/2011 $38.41 $6.70 $5.00 $0.00 $50.11 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 56 of 58 Addendum No. 2 February 2, 2012 Page 64 of 94 12284A Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 THE COMMONWEALTH OF MASSACHUSETTS 10 Health (# EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT 1�, (a� DEPARTMENT OF :LABOR STANDARDS ,V Base Wage v' Pension Supplemental Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the 1OANNEsF. GOLDSTEIN Goccmor 75 $33.89 Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. MLlitRAl' HEATHER E. ROWE U. Goccmor Dilor Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 City/Town: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 percent Apprentice Base Wage �. Health 1 60- $27.11 Classification Effective Date Base Wage Health Pension Supplemental Total Rate ......................... .............. .......__._...._......._........_........_._._................._._..........._...__.....__._........._.........................._.._.._.._................._.........._.-........_..................-.._...._._...__........_.................................._..._....._....._...._.................................................._._..._....__...._......._.............................._......._._....._...._............_................ $6.70 4 75 $33.89 Unemployment 5 EQUIPMENT OPERATOR (Class B CDL) 08/29/2011 $33.89 $6.70 $2.75 $0.00 $43.34 OUTSIDE ELECTRICAL WORKERS- EASTLOCAL 104 90 $40.67 $6.70 GROUNDMAN 08/29/2011 $24.85 ___..._.__.....___._................. $6.70 $1.00 ..... $0.00 $32.55 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 GROUNDMAN -Inexperienced (<2000 Hrs.) 08/29/2011 $20.34 $6.70 $0.75 $0.00 $27.79 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 JOURNEYMAN LINEMAN OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 08/29/2011 $45.19 $6.70 $7.86 $0.00 $59.75 Apprentice - LINEMAN (Outside Electrical) - East Local 104 Effective Date - 08/29/2011 Step percent Apprentice Base Wage �. Health 1 60- $27.11 $6.70 2 65 $29.37 $6.70 3 70 $31.63 $6.70 4 75 $33.89 $6.70 5 80 $36.15 $6.70 6 85 $38.41 $6.70 7 90 $40.67 $6.70 ' Notes: i Apprentice to Journeyworker Ratio:1:2 ...... ....... .......................................... ........... .......... ................................... .................. _.........._................. ................. .................. ................................... .... TELEDATA CABLE SPLICER OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 TELEDATA LINEMAN/EQUIPMENT OPERATOR OUTSIDE ELECTRICAL E9"ORKERS - EAST LOCAL 104 Pension Supplemental Unemployment Total Rate $2.11 $0.00 $35.92 $2.36 $0.00 $38.43 $2.86 $0.00 $41.19 $3.36 $0.00 $43.95 $3.86 $0.00 $46.71 $4.36 $0.00 $49.47 $5.36 $0.00 $52.73 07/18/2011 $25.94 $4.18 $2.78 $0.00 $32.90 07/16/2012 $26.33 $4.18 $2.79 $0.00 $33.30 07/18/2011 $24.42 $4.18 $2.73 $0.00 $31.33 07/16/2012 $24.78 $4.18 $2.74 $0.00 $31.70 This wage schedule must be posted by the contractor at the work site in accordance with N1.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 65 of 94 Page 57 of 58 12284A . A*- . -rHE CONINIONWEALTH OF MASSACHUSETTS a1, EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS t�1 ,fir f��31 r,1 Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor TIMOTHY P. NIURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Gocentor Director Awarding Authority: Greater Lawrence Sanitary District Contract Number: 12284 Citylfown: NORTH ANDOVER Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the number of diffusers in the aeration system, and replace two primary clarifier effluent gates. Job Location: 240 Main Street, North Andover MA 01845 Classification TELEDATA WIREMAN/INSTALLER/TECHNICIAN OUTSIDE_ ELECTRICAL ;I'ORKERS- FAST LOCAL 104 _.. TREE TRIMMER OUTSIDE ELECTRICAL WORKERS- EAST LOCAL 104 This classification applies only to the trimming of branches on and around utility lines. _ ........_...._............._......._..._.........- _.........._........ .-................. _... _...... ._........-......_........._....... _..... TREE TRIMMER GROUNDMAN OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This classification applies only to the trimming of branches on and around utility lines. Additional Apprentice Information Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment 07/18/2011 $24.42 $4.18 $2.73 $0.00 $31.33 07/16/2012 ........ .. $24.78 ......... $4.18 __. $2.74 ........ $0.00 ............... ...... $31.70 ................... 02/01/2009 $16.59 $2.42 $0.00 $0.00 $19.01 02/01/2009 $14.64 $2.42 $0.00 $0.00 $17.06 Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L c. 23, ss. 11 E-11 L. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. 11 E-1 IL All steps are six months (1000 hours) unless otherwise specified. * Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof. ** Multiple ratios are listed in the comment field. ** * APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13. 10:13, 10:14, etc. **** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/03/2012 February 2, 2012 Wage Request Number: 20120103-006 Addendum No. 2 Page 66 of 94 Page 58 of 58 12284A ,_.._.:_ __.,inion i=ce Superso:Hed General Decision `>um.ber: 14L73010'0�i1 State: Massachusetts Construction Type: Building Counties: Barnstable, Bristol, Dukes, Essex, Middlesex-:, Nantucket, Norfolk and Suffolk Counties in bassachusetts. BUILDING CONSTRUCTION PROUECTS does not include single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 01/066/2012 ASBE0006-001 09/01/2010 BARNSTABLE (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet and Yarmouth); BRISTOL (Easton); ESSEX; MIDDLESEX; AND NORFOLK (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Holbrook, Hull, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon, Stoughton, Walpole, Welleslev, Westwood, and Weymouth); AND SUFFOLK COUNTIES Rates Fringes Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems .......... $ 40.66 21.18 ---------------------------------------------------------------- ASBE0006-002 12/02/2011 BARNSTA.BLE (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet and Yarmouth); BRISTOL (Easton); ESSEX; MIDDLESEX; NORFOLK (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Holbrook, Hull, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon Stoughton, Walpole, Wellesley, Westwood, and Weymouth) AND SUFFOLK COUNTIES Rates Fringes HAZARDOUS MATERIAL HANDLER (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not) .... $ 26.70 15.75 ASBE0006-010 09/01/2010 BAR14STABLE (Barnstable, Bourne, Falmouth, Mashpee and Sandwich); BRISTOL (A.cushnet, Attleboro city, Berkeley, Dartmouth, Dighton, Fairhaven, Fall river City, Freetown, Marion, Mansfield, New Bedford City, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton City and Westport); DUKES; NANTUCKET; NORFOLK (Bellingham, Franklin, Plainville, and Wrentham); PLYMOUTH (Lakeville, Mattapoisett, Middleboro, Rochester and Wareham) Rates Fringes Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.) .... $ 40.66 21.18 BOIL0029-001 10/01/2009 Rates Fringes BOILERMP.KER......................$ 38-25 17.04 Addendum No.2 February 2. 2012 Page 67 of 94 12284A ---------------------------------------------------------------- BRM•:%Oco1-308 03/I_,201_ -O.'KBOR�, CHAPTER BRISTOL (Attleboro, Berkley, Dighton, 'Mansfield, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Taunton) AND NORFOLK (Bellingham, Canton, Dedham, Foxboro, Franklin, Norfolk, Norwood, Plainville, Sharon, 'Walpole, T.Aestreood, Wrentham) COUNTIES Rates Fringes Bricklayer, Cement Mason, Plasterer ........................$ 43.86 24.15 ---------------------------------------------------------------- BRMA0001-009 03/01/2010 LOWELL CHAPTER MIDDLESEX (Acton, Asby, Ayer, Bedford, Billerica, Boxboro, Carlisle, Chemsford, Dracut, Dunstble, Ft. Denvens, Groton, Littleton, Lowell, North Acton, Pepperell, Shirley, South Acton, Tewksbury, Townsend, Tyngsboro, Priest Acton, Westford, Wilmington) Rates Fringes Bricklayer and plasterer ......... $ 43.86 24.15 ---------------------------------------------------------------- BRMA0001-010 03/01/2010 LOWELL CHAPTER MIDDLESEX (Ashland, Framingham, Holliston, Hopkinton, Hudson, Maynard, Natick, Sherbvorn, Stow); and NORFOLK (Medfield, Medway,Millis) Rates Fringes BRICKLAYER .......................$ 43.86 24.15 ---------------------------------------------------------------- BRMA0003-001 08/01/2011 Rates Fringes Marble & Tile Finisher ........... $ 35.52 25.47 Marble, Tile & Terrazzo Workers ..........................$ 46.60 22.66 TERRAZZO FINISHER ................$ 45.50 26.49 BRMA0003-003 08/01/2011 BOSTON CHAPTER MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford, Melrose, Somerville); NORFOLK (Brookline, Milton); and SUFFOLK Rates Fringes BRICKLAYER .......................$ 46.56 26.88 ---------------------------------------------------------------- BRMA0003-006 08/01/2011 LYNN CHAPTER ESSEX (Amesbury, Andover, Beverly, Boxford, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipsewich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuen, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salisbury, Salem, Saugus, Swampscott, Topsfield Wakefield, Wenham, West Newbury); and MIDDLESEX (Reading, North Reading, Wakefield) Rates Fringes Bricklayer, cement mason and plasterer ........................$ 46.56 26.88 --------------------------------------------------------- BRMA0003-007 08/01/2011 WALTHAM CHAPTER MIDDLESEX (Belmont, Burlington, Concord, Lexington, Lincoln, Stoneham, Sudbury, Waltham, Watertown, Wayland, Weston, Winchester, Woburn) Rates Fringes Addendum No. 2 Bricklayer andFiebTalarV .-2012....$ 46.56 26.88 Page 68 of 94 12284A ---------------------------------------------------------------- BRi-_x.3003- 9g 03, ,., x.^,11 NEWTON '.;H?.PTE9. MIDDLESEX (Ne:a on) and NORFOLK (Dover, Needham, Wellesley; Rates Fringes Bricklayer, cement mason and plasterer ........................$ 46.56 26.86 ---------------------------------------------------------------- BRM 0003-009 08/01/2011 NEW BEDFORD BARNSTABLE; BRISTOL (Acushnet, Darmouth, Farhaven, Fall River, Freetown, New Bedford, Somerset, Swansea, Westport); DUKES; and NANTUCKET COUNTIES Rates Fringes Bricklayer, cement mason and plasterer ........................$ 46.56 26.88 ---------------------------------------------------------------- BRMA0003-010 08/01/2011 QUINCY CHAPTER NORFOLK COUNTY (Avon, Braintree, Cohasset, Holbrook, Quincy, Randolph, Soughton, Weymouth) Rates Fringes Bricklayer, cement mason and plasterer ........................$ 46.56 26.88 ---------------------------------------------------------------- CARP0026-001 03/01/2011 BRISTOL (Attleborough, North Attleborough); ESSEX; MIDDLESEEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); AND NORFOLK (Bellingham, Canton, Foxboro, Franklin, Medfield, Medway, Millis, Needham, Norfolk, Norwood, Plainville, Sharon, Walpole, Wellesley, Westwood, Wrentham) Rates Fringes CARPENTER ........................$ 32.05 24.68 ---------------------------------------------------------------- CARP0033-001 03/01/2011 MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK Rates Fringes CARPENTER ........................$ 37.25 25.18 --------------------------------------------------------- CARP0056-011 08/01/2011 SUFFOLK (All of County); and those areas of BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX & NORFOLK COUNTIES situated inside Boston Beltway (I-495) and North of Cape Cod Canal. ALL of DUKES AND NANTUCKET COUNTIES Rates Fringes PILEDRIVERMAN ....................$ 38.30 27.52 ---------------------------------------------------------------- CARPOO56-012 08/01/2011 The areas of BARNSTABLE, BRISTOL, and NORFOLK COUNTIES situated OUTSIDE Boston Beltway (I-495) and South of Cape Cod Canal Rates Fringes PILEDRIVERMAN ....................$ 38.30 27.52 ---------------------------------------------------------------- CARP0056-013 08/01/2011 Those areas of ESSEX and MIDDLESEX COUNTIES situated OUTSIDE Boston Beltway (I-495) Rates Fringes Addendum No. 2 February 2, 2012 Page 69 of 94 12284A PI LE DRI-:ERr1-,�r....................= __. -;.5_ ---------------------------------------------------------------- CARPO42 -003 03/01/2011 NORFOLK COUNTY (Braintree, Cohassett, Scituate, Weymouth, Quincy) Rates Fringes CARPENTER ........................$ 32.05 24.68 ---------------------------------------------------------------- C.RP0624-005 03/01/2011 BARNSTABLE; BRISTOL (Except Attleboro & North Attleboro); DUKES; NANTUCKET; AND NORFOLK (Avon, Holbrook, Randolph, Stoughton) COUNTIES Rates Fringes CARPENTER ........................$ 32.05 24.68 ---------------------------------------------------------------- CARP1121-001 05/02/2010 Rates Fringes MILLWRIGHT .......................$ 29.78 18.61 ---------------------------------------------------------------- CARP2168-001 09/01/2011 MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK Rates Fringes FLOOR LAYER: Carpet .............$ 35.95 23.46 ---------------------------------------------------------------- CARP2168-004 09/01/2011 BRISTOL; ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); Remainder of Norfolk County Rates Fringes FLOOR LAYER: Carpet .............$ 35.95 23.46 ---------------------------------------------------------------- CAR22168-005 09/01/2011 BARNSTABALE; DUKES; AND NANTUCKET Rates Fringes FLOOR LAYER: Carpet .............$ 35.95 23.46 ---------------------------------------------------------------- * ELECO096-001 12/01/2011 MIDDLESEX (Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend) Rates Fringes ELECTRICIAN ......................$ 36.75 14%+14.91 Teledata System Installer ........ $ 25.86 16.38 ---------------------------------------------------------------- ELECO099-001 06/01/2011 BRISTOL (Attleboro, North Attleboro, Seekonk) Rates Fringes ELECTRICIAN ......................$ 34.08 20.17 Teledata System Installer ........ $ 25.56 15.97 ---------------------------------------------------------------- ELECO103-001 09/01/2011 ESSEX; MIDDLESEX (Excluding Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend); NORFOLK (Excluding Avon, Holbrook, Plainville, Randolph, Stoughton) SUFFOLK Rates Fringes Teledata System Installer ........ $ 31.42 21.62 ------------------------------------------------------------A.ddendum No. 2 ELECO103-002 WT912. 2012 Page 70 of 94 12284A ESS E`. cesbu r_ 3- o er, 'crd, _ Sr ---:eland, e,,.. 3a�e_hil La::rence, _ierrima,, ..__.�.,, .bury, i=_a:burypor=, ,forth 4.ndo-7er, Royale_;, Sallsbur.:, ::est MIDDLESEX Bed."ord,B'_ilerica, Boxboro, Burlington, �arlisle, Chelmsford, Dracut, Dunstable littleton, Lowell, North Reading, Tewksbury, Tyngsboro, Westford, Wilmington! Rates Fringes ELECTRICIAN ......................$ 41.39 22.06 ---------------------------------------------------------------- ELEC0103-004 09/01/2011 ESSEX (Beverly, Danvers, Esse:, Gloucester, Hamilton, Ipswich, Manchester, Marblehead, Middleton, Peabod_-, Rockport, Salem, Topsfield, Wenham) Rates Fringes ELECTRICIAN ......................$ 41.89 22.06 ---------------------------------------------------------------- ELECO103-005 09/01/2011 ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott); MIDDLESEX (Acton, Arlinaton, Belmont, Cambridge, Concord, Everett, Framinaham, Holliston, Lexington, Lincoln, Malden, Maynard, Redford, i(elrose, Natick, Newton, Readina, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Frankloin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham and Hull);SUFFOLK Rates Fringes ELECTRICIAN ......................$ 41.89 22.06 ---------------------------------------------------------------- ELECO104-001 08/31/2009 Rates Fringes Line Construction: Cableman....................$ 34.89 7.50+A Equipment Operator .......... $ 34.89 11.50+A Groundman...................$ 22.58 7.50+A Lineman .....................$ 41.05 14.43+A A. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Christmas Day and Columbus Day, provided the employee has been employed 5 working days prior to any one of the listed holidays. ---------------------------------------------------------------- ELECO223-005 09/01/2011 BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton) Rates Fringes ELECTRICIA.N......................$ 35.13 17.01 ---------------------------------------------------------------- ELECO223-006 09/01/2011 BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton) Rates Fringes Teledata System Installer ........ $ 29.86 17.01 ---------------------------------------------------------------- ELEV0004-001 01/01/2011 Rates Fringes ELEVATOR MECHANIC ................$ 49.63 21.785+a FOOTNOTE FOR ELEVATOR MECHANICS; A. Employer Contributes 5% of basic hourly rate for 5 year Addendum No.2 or more cf s' rce a d��.or 6 months to 5 years of service as a'21?5Y°'.- Page 71 of 94 12284A E ght , -z _, ho' iida, e3� � � D --131 Independence Day, Labor Da veteran's D3;, Thanksgi-:ing Da„ "'"'he t -id_- .L___ 7han'-:3,i in_ - , _n I D'r.-i,tmas ---------------------------------------------------------------- ENGIO004-001 12/01/2011 FOOTNOTE FOR POWER EQUIPMENT OPERATORS A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Labor Day, Memorial Day, Independence Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib): Over 150 ft. +2.12 Over 185 ft. +3.72 Over 210 ft. +5.23 Over 250 ft. +7.92 Over 295 ft. +10.97 Over 350 ft. +12.76 POWER EQUIPMENT OPERATORS CLASSIFICATIONS Group 1: Crane; shovel; truck crane; cherry picker; dragline; trench hoe; backhoe; three drum machine; derrick; pile driver; elevator tower; hoist; gradall; shovel dozer; front end loader; fork lift; suger; boring machine; rotaryu drill; post hole hammer; post hole digger; pumperete machine; asphalt plant (on site); concrete batching and/or mixing plant (on site); crusher plant (on site); paving concrete mixer; timber jack Group 2: Sonic or vibratory hammer; grader; scraper; tandem scraper; concrete pump; bulldozer; tractor; york rake; mulching machine; portable steam boiler; portable steam generator; roller; spreader; tamper (self propelled or tractor drawn); asphalt paver; mechanic - maintenance; paving screed machine; stationary steam boiler; paving concrete finishing machine; cal truck; ballast regulator; switch tamper; rail anchor machine; tire truck Group 3: Pumps (1-3 grouped); compressor; welding machine (1-3 grouped); generator; concrete vibrator; heater (power driven 1- 5); well point system (operating); syphon -pulsometer; concrete mixer; valves controlling permanent plant air or steam; conveyor; Jackson type tamper; single diaphragm pump; lighting plant Group 4: Assistant engineer (fireman) Group 5: Oiler (other than truck cranes and gradalls) Group 6: Oiler (on truck cranes and gradalls) stant engineer (on truck crane and gradall) ---------------------------------------------------------------- IRON0007-006 03/16/2011 AREA 1: BRISTOL (Easton); ESSEX (Beverly Gloucester, Lynn,Lynnfield, Manchester, Marblehead Nahant, Salem, Saugus, Swampscott); MIDDLESEX (Arlington, Bedford, Belmont, Burlington, Cambridge, Concord, Everett, Framingham, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Except Medway); SUFFOLK AREA 2: ESSEX (Amesbury, Andover, Boxford, Danvers, Essex, Georgetown, Hamilton, Haverhill, Ipswich, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rockport, Rowley, Salisbury, Topsfield, Wenham, West Newbury); MIDDLESEX (Action, Billericia, Carlisle, Chelmsford, Dracut, Dunstable, Groton, Groveland, Littleton, Lowell, Middleton, North Reading, Pepperell, Tewksbury, Tyngsboro, Westford, Wilmington) Rates Fringes Ironworkers: AREA 1 ......................$ 36.28 26.41 Addendum No.2 AREA 2 ... February •2•, 2012 • . • • $ 31.87 26. 41 Page 72 of 94 12284A Rates Fringes Power equipment operators: Group 1 .....................$ 39.52 23.24 Group 2 .....................5 39.16 23.24 Group 3 .....................5 27.95 23.24 Group 4 .....................$ 33.23 23.24 Group 5 .....................5 21.28 23.24 Group 6 .....................5 24.51 23.24 FOOTNOTE FOR POWER EQUIPMENT OPERATORS A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Labor Day, Memorial Day, Independence Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib): Over 150 ft. +2.12 Over 185 ft. +3.72 Over 210 ft. +5.23 Over 250 ft. +7.92 Over 295 ft. +10.97 Over 350 ft. +12.76 POWER EQUIPMENT OPERATORS CLASSIFICATIONS Group 1: Crane; shovel; truck crane; cherry picker; dragline; trench hoe; backhoe; three drum machine; derrick; pile driver; elevator tower; hoist; gradall; shovel dozer; front end loader; fork lift; suger; boring machine; rotaryu drill; post hole hammer; post hole digger; pumperete machine; asphalt plant (on site); concrete batching and/or mixing plant (on site); crusher plant (on site); paving concrete mixer; timber jack Group 2: Sonic or vibratory hammer; grader; scraper; tandem scraper; concrete pump; bulldozer; tractor; york rake; mulching machine; portable steam boiler; portable steam generator; roller; spreader; tamper (self propelled or tractor drawn); asphalt paver; mechanic - maintenance; paving screed machine; stationary steam boiler; paving concrete finishing machine; cal truck; ballast regulator; switch tamper; rail anchor machine; tire truck Group 3: Pumps (1-3 grouped); compressor; welding machine (1-3 grouped); generator; concrete vibrator; heater (power driven 1- 5); well point system (operating); syphon -pulsometer; concrete mixer; valves controlling permanent plant air or steam; conveyor; Jackson type tamper; single diaphragm pump; lighting plant Group 4: Assistant engineer (fireman) Group 5: Oiler (other than truck cranes and gradalls) Group 6: Oiler (on truck cranes and gradalls) stant engineer (on truck crane and gradall) ---------------------------------------------------------------- IRON0007-006 03/16/2011 AREA 1: BRISTOL (Easton); ESSEX (Beverly Gloucester, Lynn,Lynnfield, Manchester, Marblehead Nahant, Salem, Saugus, Swampscott); MIDDLESEX (Arlington, Bedford, Belmont, Burlington, Cambridge, Concord, Everett, Framingham, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Except Medway); SUFFOLK AREA 2: ESSEX (Amesbury, Andover, Boxford, Danvers, Essex, Georgetown, Hamilton, Haverhill, Ipswich, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rockport, Rowley, Salisbury, Topsfield, Wenham, West Newbury); MIDDLESEX (Action, Billericia, Carlisle, Chelmsford, Dracut, Dunstable, Groton, Groveland, Littleton, Lowell, Middleton, North Reading, Pepperell, Tewksbury, Tyngsboro, Westford, Wilmington) Rates Fringes Ironworkers: AREA 1 ......................$ 36.28 26.41 Addendum No.2 AREA 2 ... February •2•, 2012 • . • • $ 31.87 26. 41 Page 72 of 94 12284A ---------------------------------------------------------------- _E.D,!Doo�-o 1c o3.�l�,�011 [!IDDLE!EX (Ashby, Ashland, D_er, Roxboro, Holliston, Hcokin_on, Hudson, Marlboro, Shirley, Stow, To>msend); NORFOLK (Hedwa i) Rates Fringes IRONWORKER .......................$ 36.28 26.41 ---------------------------------------------------------------- IRON0037-005 05/30/2011 BARNSTABLE; BRISTOL (Acushnet, Attleboro, Berkley, Dartmouth, Diahton, Fairhaven, Fall River, Freetown, Mansfield, New Bedford, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton, Westport); DUKES; NANTUCKET; NORFOLK (Billingham, Franklin, Plainville, Wrentham) Rates Fringes IRONWORKER .......................$ 52.58 19.22 ---------------------------------------------------------------- LAB00014-001 06/01/2011 Rates Fringes Plasterer tender BARNSTABLE, BRISTOL, DUKES, ESSEX, NANTUCKET, MIDDLESEX (with the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn); NORFOLK (with the exception of Brookline Dedham and Milton) COUNTIES.$ 28.60 19.00 SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer Island, Nut Island); MIDDLESEX COUNTY (Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only) .... $ 31.05 19.90 LAB00022-009 06/01/2010 SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer & Nut Islands); MIDDLESEX COUNTY (Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop, and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only) Rates Fringes Laborers: Group 1 .....................$ 29.80 18.75 Group 2 .....................$ 30.05 18.75 Group 3 .....................$ 30.55 18.75 Group 4 .....................$ 30.80 18.75 Group 5 .....................$ 30.55 18.75 Group 6 .....................$ 31.80 18.75 Group 7 .....................$ 23.15 18.75 LABORERS CLASSIFICATIONS GROUP 1: Laborers; Carpenter Tenders GROUP 2: Jackhammer operator; pavement breaker; asphalt raker carbide core drilling machine; chain saw operator; pipelayer; barco type jumping tampers; laser beam; concrete pump; mason tender; motorized mortar miner; ride -on motorized buggy; fence and beam rail erector GROUP 3: Air track, block paver; rammer; curb setter, hydraulic and similar self -powered drills Addendum No. 2 February 2. 2012 Page 73 of 94 12284A GROUP 4: Blaster, oo;;derman GROUP 5: Pre -cast f'_oor and roof plank erector 0 GROUP 6: Asbestos removal laborers/haz-mac laborers GROUP 7: Flaggers ---------------------------------------------------------------- LAB00022-010 06/01/2010 Counties of BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; MIDDLESEX (oath the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakfield, Winchester, Winthrop and Woburn); NORFOLK (with the exception of Brookline, Dedham and Milton) Rates Frinoes Laborers: Group 1 .....................$ 27.85 17.35 Group 2 .....................$ 28.10 17.35 Group 3 .....................$ 28.60 17.35 Group 4 .....................$ 28.85 17.35 Group 5 .....................$ 28.60 17.35 Group 6 .....................$ 29.85 17.335 LABORERS CLASSIFICATIONS ROUP l: Laborers; Carpenter Tenders GROUP 2: Jackhammer operator; pavement breaker; asphalt raker carbide core drilling machine; chain saw operator; pipelayer; barco type jumping tampers; laser beam; concrete pump; mason tender; motorized mortar mixer; ride -on motorized buggy; fence and beam rail erector GROUP 3: Air track, block paver; hammer; curb setter, hydraulic and similar self -powered drills GROUP 4: Blaster; powderman GROUP 5: Pre -cast floor and roof plank erector GROUP 6: Asbestos removal laborers/haz-mat laborers ---------------------------------------------------------------- LABO1421-004 06/01/2011 BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET NORFOLK AND SUFFOLK COUNTIES Rates Fringes Laborers: (Wrecking) Group 1 .....................$ 31.05 19.75 Group 2 .....................$ 31.80 19.75 Group 3 .....................$ 32.05 19.75 Group 4 .....................$ 27.05 19.75 Group 5 .....................$ 30.15 19.75 Group 6 .....................$ 31.05 19.75 Group 1: Adzeman, Wrecking Laborer. Group 2: Burners, Jackhammers. Group 3: Small Backhoes, Loaders on tracks, Bobcat Type Loaders, Hydraulic "Brock" Type Hammer Operators, Concrete Cutting Saws. Group 4: Yardman (Salvage Yard Only). Group 5: Yardman, Burners, Sawyers. Group 6: Asbestos, Lead Paint, Toxic ---------------------------------------------------------------- and Hazardous Waste. PAIN0011-007 06/01/2010 BARNSTABLE, BRISTOL, DUKES, AND NANTUCKET COUNTIES Rates Fringes GLAZIER ..........................$ 32.03 15.40+A FOOTNOTE: A. PAID HOLIDAY: LABOR DAY (provided employee has worked any part of the week prior to Labor Day and any part of the week after Labor Day) ---------------------------------------------------------------- PAIN0035-004 07/01/2011 BARNSTABLE; BRISTOL; ESSEX; NANTUCKET; DUKES; COUNTIES; REMAINDER OF NORFOLK; MIDDLESEX AND SUFFOLK COUNTIES Addendum No.2 February 2, 2012 Page 74 of 94 12284A Rates Fringes Painters: Rates Fri-,__ Painte2s: NEW CONSTRUCTION: 39.30 21.40 Brush, Taper ...............$ 33.01 39.70 21.90 Spray, Sandblast ........... $ 34.41 21.90 REPAINT: 36.36 21.40 Brush, Taper ...............$ 31.0' 37.76 21.90 Spray, Sandblast ........... $ 32.47 21.90 ---------------------------------------------------------------- PAIN0035-013 01/01/2011 SUFFOLK MIDDLESEX (Cambridge, Everett, Malden, Medford, Somerville) SUFFOLK COUNTY (Boston, Chelsea) NORFOLK COUNTY (Brookline) Rates Fringes Painters: NEW CONSTRUCTION: Brush, Taper ...............$ 39.30 21.40 Spray, Sandblast ........... $ 39.70 21.40 REPAINT: Brush, Taper ...............$ 36.36 21.40 Spray, Sandblast ........... $ 37.76 21.40 --------------------------------------------------------- PAIN0035-020 07/01/2011 ESSEX; MIDDLESEX; NORFOLK; SUFFOLK Rates Fringes GLAZIER ..........................$ 38.80 21.90 ---------------------------------------------------------------- PLAS0534-001 07/01/2011 ESSEX; MIDDLESEX; NORFOLK AND SUFFOLK COUNTY Rates Fringes CEMENT MASON/CONCRETE FINISHER ... $ 35.00 29.66 ---------------------------------------------------------------- PLAS0534-004 07/01/2011 MIDDLESEX; NORFOLK AND SUFFOLK COUNTIES Rates Fringes PLASTERER ........................$ 35.00 29.66 -------------------------------------------------------------- PLUM0004-001 09/01/2011 MIDDLESEX (Ashby, Ayer -West of Greenville branch of Boston and Maine Railroad, Ft. Devens, Groton, Shirley, Townsend) Rates Fringes Plumbers and Pipefitters......... $ 39.14 23.36 --------------------------------------------------------- PLUM0012-005 09/01/2011 ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuem, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Saugus, Swampscott,Topsfield, Wenham, West Newbury); MIDDLESEX (Acton, Arlington, Ashford, Ayer -except west of Greenville Branch of Boston & Maine Rail Road, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlise, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliiston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Watham, Watertown, Wayland, Westford, Wilmington, Winchester and Woburnl, NORFOLK (Bellinaham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Franklin, Medford, Medway, Millis, Milton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth and Wrentham); PLYMOUTH (Hingham, Hull, Scituate); SUFFOLK; WORCHESTER (Hopedale and Southboro) Rates Fringes PLUMBER ..........................$ 46.01 2-3.31 Addendum No.2 February 2, 2012 Page 75 of 94 12284A S=.Rz1S'1!=-BLE, B I3'_'nt., rr:.ES; _j-' _ E =tiD i•?L- , Holbrook, Randolph, Stoughton; ZOUNTIES Rates _ring es Plumbers and Pipefitters......... $ 34.51 25.57 ---------------------------------------------------------------- PLUM0537-005 09/01/2011 ESSEX (Ames, .=.ndover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuem, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Saugus, Swampscott,Topsfield, Wenham, West Newbury); MIDDLESEX (Acton, Arlinaton, Ashford, Ayer -except west of Greenville Branch of Boston & Maine Rail Road, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlise, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliiston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Watham, Watertown, Wayland, Westford, Wilmington, Winchester and Woburn!, !NORFOLK 'Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Do-:er, Foxboro, Franklin, Medford, Medway, Millis, Hilton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth and Wrentham); PLYMOUTH (Hingham, Hull, Scituate); SUFFOLK; WORCHESTER (Hopedale and Southboro) Rates Fringes PIPEFITTER .......................$ 46.09 24.06 ---------------------------------------------------------------- ROOF0033-001 08/01/2011 Rates Fringes Roofers: All Tear -off and/or removal of any types of roofing and all spudding, sweeping, vacuuming and/or cleanup of any and all areas of any type where a roof is to be relaid ........ $ 35.56 20.87 ---------------------------------------------------------------- SFMA0550-001 09/16/2011 BRISTOL (Portion within 35 mile radius from Boston City Hall; ESSEX; MIDDLESEX (Except Ashby, Townsend, and portions of Pepperell and Shirley beyond 35 mile radius from Boston City Hall); NORFOLK; PLYMOUTH (Portion within 35 mile radius of Boston City Hall); SUFFOLK Rates Fringes SPRINKLER FITTER .................$ 51.30 20.11 ---------------------------------------------------------------- SFMA0669-001 04/01/2011 BARNSTABLE; BRISTOL (Beyond 35 mile radius of Boston City Hall); DUKES; MIDDLESEX (Ashby, Townsend, portions of Pepperell and Shirley beyond 35 mile radius of Boston City Hall); NANTUCKET; PLYMOUTH (Beyond 35 mile radius of Boston City Hall) Rates Fringes SPRINKLER FITTER .................$ 36.13 18.65 ---------------------------------------------------------------- SFMA0676-001 01/01/2010 BRISTOL (Seekonk, Swansea, and Somerset) Rates Fringes SPRINKLER FITTER .................$ 39.50 17.85 a. PAID HOLIDAYS: Memorial Day, July 4th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 20 working days Addendum No.2 prior to anyFzkUaFgil M2day. Page 76 of 94 12284A ---------------------------------------------------------------- SHEE001 -003 ,.'x'/201,, BP.ISTO►, 'A= tleboro, Berkle, Easton, [Lns=i2ld, north Attleboro, Norton, Rainham, Taunton); ESSEX; MIDDLESEX; NORFOLK; PLYMOUTH (except except Marion, Mattapoisett, Rochester, Wareham); SUFFOLK Rates Fringes Sheet metal worker ...............$ 39.37 27.65 ---------------------------------------------------------------- SHEE0017-007 04/01/2010 BARNSTABLE; BRISTOL (Acushnet, Assonet, Dartmouth, Dighton, Fairhaven, Fall River, Freetown, Ne.. Bedford, Rehoboth, Seeekonk, Somerset, Swansea, Westport); DUKES; A14D NANTUCKET Rates Fringes Sheet metal worker ...............$ 32.61 21.90 ---------------------------------------------------------------- TEAM0379-001 06/01/2010 Rates Fringes Truck drivers: Group 1 .....................$ 29.23 14.98+A+B Group 2 .....................$ 29.45 14.98+A+B Group 3 .....................$ 29.52 14.98+A+B Group 4 .....................$ 29.64 14.98+A+B Group 5 .....................$ 29.74 14.98+A+B Group 6 .....................$ 30.03 14.98+A+B Group 7 .....................$ 30.32 14.98+A+B POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM TRUCK DRIVERS CLASSIFICATIONS Group 1: Station wagons; panel trucks; and pickup trucks Group 2: Two axle equipment; & forklift operator Group 3: Three axle equipment and tireman Group 4: Four and Five Axle equipment Group 5: Specialized earth moving equipment under 35 tons other than conventional type trucks; low bed; vachual; mechanics, paving restoration equipment Group 6: Specialized earth moving equipment over 35 tons Group 7: Trailers for earth moving equipment (double hookup) FOOTNOTES A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day B. PAID VACATION: Employees with 4 months to 1 year of service receive 1/2 day's pay per month; 1 week vacation for 1 - 5 years of service; 2 weeks vacation for 5 - 10 years of service; and 3 weeks vacation for more than 10 years of service ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. -------------- Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). -- -- ---------------------------------- Addendum No. 2 February 2. 2012 Page 77 of 94 12284A The 'body of each wage determination 1_sts the classification ::ace rates -ha' ha._ been found ,_..ailing fo_ the �_-ed type(s) of construction in the area covered by the viage " de_erm.'_nation. The classifica*ions Listed in alchabetica'_ order of "identifiers" that indicate :.hether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning .with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLU',10198-005 0%/01/2011. The first four letters , PLUM, indicate the international union and the four -digit number, 0198, that follows indicates the local union number or district council number where applicable i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective baraaining agreements governing the rate. Non -Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: an existing published wage determination a survey underlying a wage determination a Wage and Hour Division letter setting forth a position on a wage determination matter a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration, from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. Addendum No.2 February 2, 2012 Page 78 of 94 12284A the decision of the Administrarcr is not favorable, an int rested oar= na_- appeal dir_- -he=.9mirisEra __se Re-:iew Board ,formerly the Nage�.ppeals 3oard?. cdrite `o: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washinaton, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION Addendum No. 2 February 2. 2012 Page 79 of 94 12284A i_,-„ - --- ..umbe_. .?.1'-D-' . 1 ?71I _s-ioe_ .._..__al Decisio,. Numb=_-. State. Massachusetts Construction T},pes: Heavy (Heav}' and Marine) Counties: Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk, Plymouth and Suffolk Counties in Massachusetts. HEAVY AND MARINE CONTRUCTION PROJECTS Modification Number Publication Date 0 01/06/2012 BOIL0029-001 10/01/2009 Rates Fringes BOILERMAKER ......................$ 38.25 17.04 --------------------------------------------------------- BRMA0001-011 03/01/2010 FOXBORO CHAPTER BRISTOL (Attleboro, Berkley, Dion -on, Mansfield, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Taunton); NORFOLK, (Bellingham, Canton, Dedham, Foxboro, Franklin, Norfolk, Norwood, Plainville, Sharon, Walpole, Westrwood, Wrentham); and PLYMOUTH (Lakeville) Rates Fringes Bricklaver/Cement Mason .......... $ 43.86 24.15 --------------------------------------------------------- BRMAOOOI-012 03/01/2010 LOWELL CHAPTER MIDDLESEX (Acton, Ashby, Ayer, Bedford, Billerica, Boxboro, Carlisle, Chemsford, Dracut, Dunstabale, Ft Devens, Groton, Littleton, Lowell, North Acton, Pepperell, Shirley, South Acton, Tewksbury, Townsend, Tyngsboro, West Acton, Westford, Wilmington) Rates Fringes BRICKLAYER .......................5 43.86 24.15 ---------------------------------------------------------------- BRMA0001-013 03/01/2010 LOWELL CHAPTER MIDDLESEX (Ashland, Framingham, Holliston, Hopkinton, Hudson, Maynard, Natick, Sherbvorn, Stow); and NORFOLK (Medfield, Medway, Millis) Rates Frinoes BRICKLAYER .......................$ 43.86 24.15 ---------------------------------------------------------------- BRMA0003-001 08/01/2011 Rates Fringes Marble & Tile Finisher ........... $ 35.52 25.47 Marble, Tile & Terrazzo Workers ..........................$ 46.60 22.66 TERRAZZO FINISHER ................$ 45.50 26.49 ---------------------------------------------------------------- BRRP0003-003 08/01/2011 BOSTON CHAPTER MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford, Melrose, Somerville); NORFOLK (Brookline, Milton); and SUFFOLK Rates Fringes BRICKLAYER .......................$ 46.56 26.88 ---------------------------------------------------------------- BRMA0003-011 06/01/2011 Addendum No. 2 LYNN CHAPTER February 2, 2012 Page 80 of 94 12284A ESSEX. (2mesbur'y, Andover, _r'_'_ 3r:fcEJ, D_n-rers, Ess -x, Georgetown, Gloucester, rove;and, ...,. on, Haverhill, Ipswich, Las:rence, Lynn, fi _d, iianchescer, i,iar'clehead, ierrimac, iiethue,,, Middle. _nt, ^la.;b _- .:e:;0ur700r7, North Andover, Peabody, Rockpor-, Rowley, Salisbury, Salem, Saugus, Swampscott, Topsfield, Wakefield, Wenham, 4iest Newbury); and MIDDLESEX (North Reading, Reading, Vaakefield) Rates Fringes Bricklaver/Cement Mason .......... S '-6.56 26.89 ---------------------------------------------------------------- BRMA0003-012 08/01/2011 Rates Fringes BRICKLAYER WALTHAM CHAPTER - MIDDLESEX (Belmont, Burlington, Concord, Lexington, Lincoln, Stoneham, Sudbury, Waltham, Watertown, Wayland, Weston, Winchester, Woburn) ......... $ 46.56 26.88 ---------------------------------------------------------------- BRMA0003-014 08/01/2011 QUINCY CHAPTER PLYMOUTH COUNTY (Abington, Bridgewater, Brockton, Carver, Duxbury, East Bridgewater, Halifax, Hanover, Hanson, Hingham, Hull, Kingston, Marshfield, Middleboro, Norwell, Pembroke, Plymouth, Rockland, Scituate, West Bridgewater, Whitman) Rates Fringes Bricklayer/Cement Mason .......... $ 46.56 26.88 ---------------------------------------------------------------- BRMA0003-025 08/01/2011 NEW BEDFORD CHAPTER BARNSTABLE; BRISTOL (Acushnet, Darmouth, Fairhaven, Fall River, Freetown, New Bedford, Somerset, Swansea, Westport); DUKES; NANTUCKET; PLYMOUTH (Marion, Mattapoisett, Rochester, Wareham) Rates Fringes Bricklayer/Cement Mason..... ..... $ 46.56 26.88 ---------------------------------------------------------------- BRMA0003-033 08/01/2011 NEWTON CHAPTER MIDDLESEX (Newton); NORFOLK (Dover, Needham, Wellesley) Rates Fringes Bricklayer, Plasterer ............ $ 46.56 26.88 --------------------------------------------------------- CARP0026-003 03/01/2011 BRISTOL (Attleborough, North Attleborough); ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); AND NORFOLK (Bellingham, Braintree, Canton, Cohassett, Foxboro, Franklin, Medfield, Medway, Millis, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham) COUNTIES Rates Fringes CARPENTER ........................$ 32.05 24.68 ---------------------------------------------------------------- CARP0033-003 03/01/2011 MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); AND SUFFOLK COUNTIES Rates Fringes CARPENTER ........................$ 37.25 25.18 Addendum No.2 ---------------------------------------------------------------- CARP0056-001 kjpk pff, -2012 Page 81 of 94 12284A All -' SUFFCLK COUNTI; ani =.._ = araas of BAB.?iST BLE, BRISTOL, ESSEX, !dIDDLESE.{, NORFOLK, and PLYMOFTH COUNTIES situated i INSIDE,Boston Beltway -495 and Borth of Cape Cad -ana_. ALL of DUKES and NANTUCKET COUNITIES Rates Fringes PILEDRIVERMAN ....................$ 38.30 27.52 ---------------------------------------------------------------- CARP0056-002 08/01/2011 The areas of BARNSTABLE, BRISTOL, PLYMOUTH, and NORFOLK COUNTIES situated OUTSIDE Boston Beltway (I-495) and South of Cape Cod Canal Rates Fringes PILEDRIVERMAN ....................$ 38.30 27.52 ---------------------------------------------------------------- CARP0056-003 08/01/2011 Those areas of ESSEX and MIDDLESEX COUNTIES situated OUTSIDE Boston Beltway (I-495) Rates Fringes PILEDRIVERM_AN....................$ 38.30 27.52 ---------------------------------------------------------------- CARP0056-004 08/01/2011 Rates Fringes DIVER TENDER .....................$ 38.30 27.52 DIVER ............................$ 53.62 27.52 ---------------------------------------------------------------- CARP0424-001 03/01/2011 NORFOLK (Braintree, Quincy, Cohasset, Weymouth, etc.) PLYMOUTH (Duxbury, Hanover, Hull, Hingham, Marshfield, Norwell, Pembroke Rockland, Scituate) Rates Fringes CARPENTER ........................$ 32.05 24.68 ---------------------------------------------------------------- CARP0624-002 03/01/2011 BARNSTABLE; BRISTOL (Except Attleboro & North Attleboro); DUKES; NANTUCKET; NORFOLK (Avon, Holbrook, Randolph, Stoughton); PLYMOUTH (Bridgewater, Kingston, Lakeville, Middleboro, Plymouth, S. Hanover, Whitman) Rates Fringes CARPENTER ........................$ 32.05 24.68 ------------------------------------------------------------- CARP1121-001 05/02/2010 Rates Fringes MILLWRIGHT .......................$ 29.78 18.61 ---------------------------------------------------------------- * ELECO096-001 12/01/2011 MIDDLESEX (Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend) Rates Fringes ELECTRICIAN ......................$ 36.75 14%+14.91 Teledata System installer ........ $ 25.86 16.38 ---------------------------------------------------------------- ELEC0099-001 06/01/2011 BRISTOL (Attleboro, North Attleboro, Seekonk) Rates Fringes ELECTRICIAN ......................$ 34.08 20.17 Teledata System Installer ........ $ 25.56 15.97 --------------- --- -- ELEC0103-002 09/01/2011 Addendum No. 2 February 2. 2012 Page 82 of 94 12284A ESSEX (Amesbury;, Ando.-er, 3oxford, Georgetown, Groveland, Ha';erhill, Lawrenca, ::erri-,ac, PIethuen, Ne;.;bur , J--wburrport, North Andover, P.o:le Salisbur', West Newbur v , MIDDLESEX ' 3edfctd, 3__ler- a, ___, 3urlir.aton, Car_is1 , Chelmsford, Dracut, Dunstable Littleton, Lowell, North Reading, Tewksbury, Tyngsboro, Westford, Wilmington) Rates Fringes ELECTRICIAN ......................$ 41.89 22.06 ---------------------------------------------------------------- ELECO103-004 09/01/2011 ESSEX (Beverly, Danvers, Essex., Gloucester, Hamilton, Ipswich, Manchester, Marblehead, Middleton, Peabodv, Rockport, Salem, Topsfield, iVenham; Rates Fringes ELECTRICIAN ......................$ 41.89 22.06 ---------------------------------------------------------------- ELECO103-005 09/01/2011 ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott); MIDDLESEX (Acton, Arlington, Belmont, Cambridge, Concord, Everett, Framingham, Holliston, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Nei -ton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn!; NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Frankloin, Medfield, Medway, Millis, Milton, Needham, Norfolk,. Norwood, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham and Hull);SUFFOLK Rates Fringes ELECTRICIAN ......................$ 41.89 22.06 ---------------------------------------------------------------- ELEC0104-001 08/31/2009 Rates Fringes Line Construction: Group 1 .....................$ Cableman....................$ 39.52 34.89 7.50+A Equipment Operator .......... $ 34.89 11.50+A Groundman...................$ 22.58 7.50+A Lineman .....................$ 21.28 41.05 14.43+A A. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Christmas Day and Columbus Day, provided the employee has been employed 5 working days prior to any one of the listed holidays. ------------------------------------------------------------ ELECO223-002 09/01/2011 BARNSTABLE, BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET; PLYMOUTH (Except Hingham and Hull Twps); NORFOLK (Avon, Halbrook, Randolph, Sloughton) Rates Fringes ELECTRICIAN ......................$ 35.13 17.01 ---------------------------------------------------------------- * ENGIO004-009 12/01/2011 Rates Fringes Power equipment operators: Group 1 .....................$ 39.52 Group 2 .....................$ 39.16 Group 3 .....................$ 27.95 Group 4 .....................$ 33.23 Group 5 .....................$ 21.28 Group 6 .....................$ 24.51 HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib): Over 150 ft. +2.12 Over 185 ft. +3.72 Over 210 ft. +5.23 Over 250 ft. +7.92 Over 295 ft. +10.97 Over 350 ft. +12.76 23.24+A 23.24+A 23.24+A 23.24+A 23.2-^+A 23.24+A Addendum No. 2 February 2, 2012 Page 83 of 94 12284A F004p10TE FOR PO-!ER EQUIPMENT OPERATORS: PAID H0LID_l New Bear's � _ ..Iash4,gton,s rthda;, Labor Day, Memorial Dav, Independence Day, Patriot's Day, a � -DIu bus Day, .- Da., Thanksgiving Day, Christmas POWER EQUIPMENT OPERATORS CLASSIFICATIONS (HEAVY CONSTRUCTION] GROUP 1: Power shovel; crane; truck crane; derrick; pile driver; trenching machine; mechanical hoist pavement breaker; cement concrete oa-;er; dragline; hoisting engine; three drum machine; pumperete machine; loaders; shovel dozer; front end loader; mucking machine; shaft hoist; steam engine; backhoe; gradall; cable way; fork lift; cherry Dicker; boring machine; rotary drill; post hole hammer; post hole digger; asphalt plant on job site; concrete batching and/or mixing plant on job site; crusher plant on job site; paving concrete mixer; timber jack GROUP 2: Sonic or vibratory hammer; grader; scraper; tandem scraper; bulldozer; tractor; mechanic - maintenance; York rake; mulching machine; paving screed machine;stationary steam boiler; paving concrete finishing machine; grout pump; portable steam boiler; portable steam generator; roller; spreader; asphalt paver; locomotives or machines used in place thereof; tamper (self propelled or tractor -draw); cal tracks; ballast regulator;rail anchor machine; switch tamper; tire truck GROUP 3: Pumps (1-3 grouped); compressor; welding machines (1-3 grouped); generator; sighting plant; heaters (power driven, 1- 5); syphon -pulsometer; concrete mixer; valves controlling permanent plant air steam, conveyor, wellpoint system (operating) GROUP 4: Assitant engineer (fireman) GROUP 5: Oiler (other than truck cranes and gradalls) GROUP 6: Oiler (on truck cranes and gradalls) POWER EQUIPMENT OPERATORS CASSIFICATIONS [MARINE CONSTRUCTION] Group 1: Shovel; crane; truck crane; cherry picker; derrick; pile driver; two or more drum machines; lighters; derrick boats; trenching machines; mechanic hoist pavement breakers; cement concrete pavers; draglines; hoisting engines; pumperete machines; elevating graders; shovel dozer; front end loader; backhoe; gradall; cable ways; boring machine; rotary drill; post hole hammer; post hole digger; fork lift; timber jack; asphalt plant (on site); concrete batching and/or mixing plant (on site); crusher plant (on site); paving concrete mixer Group 2: Portable steam boiler; portable steam generator; sonic or vibratory hammer; grader; scraper; tandem scraper; concrete pump; bulldozer; tractor; York rake; mulching machine; roller; spreader; tamper (self-propelled or tractor -drawn); asphalt paver; concrete miner with side loader; mechanic - maintenance; cal tracks; ballast regulator; switch tamper; rail anchor machine; tire truck Group 3: Pumps (1-3 grouped); comressor; welding machines (1-3 grouped); generator; lighting plant; heaters (power driven 1-5); syphon -pulsometer; concrete mixer; valves controlling permanent plant air or steam; conveyor; well point systems; auger (powered by independent engines and attached to pile drivers); hydraulic saws Group 4: Fireman Group 5: Assistant engineer (other than truck crane and gradall) Group 6: Assistant engineer (on truck crane and gradall) ---------------------------------------------------------------- IRON000'7-001 03/16/2011 AREA 1: BRISTOL (Easton); ESSEX (Beverly,Gloucester,Lynn, Lynnfield, Manchester, Marblehead, Nahant, Salem, Saugus, Swampscott); MIDDLESEX (Arlington, Bedford, Belmont, Burlington, Cambridge, Concord, Everett, Framingham, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Except Medway); PLYMOUTH (Abington, Bridgewater, Brocton, Duxbury, East Bridgewater, Halifax„ Hanover, Hanson, Hingham, Hull, Kingston, Marshfield, Norwell, Pembroke, Addendum No.2 Plymouth, PiymFhATLiaTyQk11H2 Scituate, west Bridgewater, Page 84 of 94 12284A Whitman+ SUFFOL{ AREA 2. ESSEX ..:-mesburv, Ando"er, Boxford, Dan'%ers, Esse;:, :DS',:1 Methuen, Newbury, Newburyport, tIor`h Andovar, Rockport, Ro:a e„ Salisbury, Tops -field, Wenham, -,lest Newbury); MIDDLESEX (Action,Billerica, Carlisle, Chelmsford, Dracut, Dunstable, Groton, Groveiand, Littleton, Lowell, Middleton, North Reading, Pepperell, Tewksbury, Tyngsborc, Westford, Wilminton) Rates Fringes IRONWORKER AREA 1 ......................$ 36.28 26.41 AREA 2 ......................$ 31.87 26.41 ---------------------------------------------------------------- IRON0007-010 03/16/2011 MIDDLESEX (Ashby, Ashland, Ayer, Boxboro, Holliston, Hopkinton, Hudson, Marlboro, Shirley, Stow, Townsend); NORFOLK (Medway) Rates Fringes IRONWORKER .......................$ 36.28 26.41 ---------------------------------------------------------------- IRON0037-002 05/30/2011 BARNSTABLE; BRISTOL ;Acushnet, Attleboro, Berkley, Dartmouth, Dighton, Fairhaven, Fall River, Freetown, Mansfield, New Bedford, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton, Westport); DUKES; NANTUCKET; NORFOLK (Billingham, Franklin, Plainville, Wrentham); PLYMOUTH (Lakeville, Marion, Mattapoisett, Middleboro, Rochester, Wareham) Rates Fringes IRONWORKER .......................$ 52.58 19.22 ---------------------------------------------------------------- LAB00022-006 06/01/2010 SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer & Nut Islands); MIDDLESEX COUNTY (Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only) Rates Fringes Laborers: GROUP 1 .....................5 29.80 18.75 GROUP 2 .....................$ 30.05 18.75 GROUP 3 .....................5 30.55 18.75 GROUP 4 .....................$ 30.80 18.75 GROUP 5 .....................$ 30.05 18.75 GROUP 6 .....................5 31.80 16.75 LABORERS CLASSIFICATIONS GROUP 1: Laborers; carpenter tenders; cement finisher tenders GROUP 2: Asphalt raker; fence and guard rail erector; laser beam operator; mason tender; pipelayer; pneumatic drill operator; pneumatic tool operator; wagon drill operator GROUP 3: Air track operator; block paver; rammer; curb setter GROUP 4: Blaster; powderman GROUP 5: Flagger GROUP 6: Asbestos Abatement; Toxic and Hazardous Waste Laborers ---------------------------------------------------------------- LAB00022-012 06/01/2010 Counties of BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (With the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn); NORFOLK (With the exception of Brookline, Dedham, and Milton) Addendum No. 2 February 2, 2012 Page 85 of 94 12284A Labcre`s: UNDERPINNING WORK & BORING GROUP 1 .....................$ 27.85 CREW 17.35 GROUP 2 .....................$ 28.10 30.80 17.35 GROUP 3 .....................$ Laborers; Top man .......... $ 28.60 18.90+A 17.35 GROUP 4 .....................$ 28.85 17.35 GROUP 5 .....................$ 21.70 COMPRESSED AIR) 17.35 GROUP 6 .....................$ 29.85 30.35 11.35 LABORERS CLASSIFICATIONS GROUP 1: Laborers; carpenter tenders; cement finisher tenders GROUP 2: Asphalt raker; fence and guard rail erector; laser beam operator; mason tender; pipelayer; pneumatic drill operator; pneumatic tool operator; wagon drillperator GROUP 3: Air track operator; block paver; rammer; curb setter; hydraulic & similar self powere drills GROUP 4: Blaster; powderman GROUP 5: Flagger GROUP 6: Asbestos Abatement; Toxic and Hazardous Waste Laborers ---------------------------------------------------------------- LAB00022-013 06/01/2010 Rates Fringes Laborers: (FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR) GROUP 1 ....................$ 32.90 20.30+A GROUP 2 ....................$ 32.90 20.30+A (OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES): TEST BORING & WELL DRILLING Driller ....................$ 31.05 18.90+A Laborer ....................$ 29.65 18.90+A (OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES): OPEN AIR CASSON, UNDERPINNING WORK & BORING CREW Bottom man .................$ 30.80 18.90+A Laborers; Top man .......... $ 29.65 18.90+A (TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR) GROUP 1 ....................$ 30.35 20.30+A GROUP 2 ....................$ 40.83 20.30+A GROUP 3 ....................$ 40.83 20.30+A GROUP 4 ....................$ 40.83 20.30+A. GROUP 5 ....................$ 40.83 20.30+A GROUP 6 ....................$ 42.83 20.30+A CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing) GROUP 1 ....................$ 32.90 20.30+A GROUP 2 ....................$ 32.90 20.30+A ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR GROUP 1 ....................$ 30.35 20.30+A GROUP 2 ....................$ 32.90 20.30+A GROUP 3 ....................$ 32.90 20.30+A GROUP 4 ....................$ 32.90 20.30+A GROUP 5 ....................$ 34.90 20.30+A LABORERS CLASSIFICATIONS for TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR GROUP 1: Powder watchman; Top man on iron bolt; change house attendant Addendum No. 2 February 2, 2012 Page 86 of 94 12284A SRC`iP Brakeman; trackman; groutman; tunnel laborer; o3ia- I cck t-nde lock tnn-de r; guage __nder I SR.PuP 8: ?ctorman, miner GROUP 4: Blaster GROUP 5: Mucking machine operator GROUP 6: Hazardous Waste work within the "HOT" zone. (A premium of two dollars $2.00 per hour over the basic Nage rate. LABORERS CLASSIFICATIONS for (FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR GROUP 1: Miner; miner welder; conveyor operator; motorman; mucking machine operator; nozzle man; grout man-; pumps, shaft and tunnel steel and rodman; shield and erector arm operators, mole nipper, outside motorman, burner, IBM operator, safety miner; laborer topside; heading motormen; erecting operators; top signal men GROUP 2: Brakeman; trackman LABORERS CLASSIFICATIONS FOR CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing) GROUP 1: Concrete workers; strippers and form mov=rs (wood & steel), cement finisher GROUP 2: Form erector (wood & steel and all accessories) LABORERS CLASSIFICATIONS for ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNE IN FREE AIR GROUP 1: Change house attendants GROUP 2: Laborers, topside, bottom men (when heading is 50 ft. from shaft) and all other laborers GROUP 3: Brakeman; trackman; tunnel laborers; shaft laborers GROUP 4: Miner; cage tender; bellman GROUP 5: Hazardous Waste work within the "HOT" zone. (A premium of two dollars $2.00 per hour over the basic wage rate) FOOTNOTE FOR LABORERS: A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Patriot's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, and Christmas Day ---------------------------------------------------------------- LABO1421-001 06/01/2011 WRECKING LABORERS: Rates Fringes Laborers: (Wrecking) Group 1 .....................$ 31.05 19.75 Group 2 .....................$ 31.80 19.75 Group 3 .....................$ 32.05 19.75 Group 4 .....................$ 27.05 19.15 Group 5 .....................$ 30.15 19.75 Group 6 .....................$ 31.05 19.75 Group 1: Adzeman, Wrecking Laborer. Group 2: Burners, Jackhammers. Group 3: Small Backhoes, Loaders on tracks, Bobcat Type Loaders, Hydraulic "Brock" Type Hammer Operators, Concrete Cutting Saws. Group 4: Yardman (Salvage Yard Only). Group 5: Yardman, Burners, Sawyers. Group 6: Asbestos, Lead Paint, Toxic and Hazardous Waste. ---------------------------------------------------------------- PAIN0035-001 07/01/2011 BARNSTABLE BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH (Remainder of NORFOLK; MIDDLESEX AND SUFFOLK COUNTIES) Addendum No.2 February 2; 2012 Page 87 of 94 12284A MIDDLESEX (Cambridge, Everett, Malden, Medford, Sommerville) SUFFOLK COUNTY ,Boston, Chelsea) NORFOLK COUNTY (Brookline) Rates Fringes Painters: R=_tes NEW CONSTRUCTION: Fringes P�air�t�s: 38.30 21.40 Spray, Sandblast ........... $ 39.70 21.40 iiE:^; COhiSTRUCT1OPi: Bridge .....................$ 43.01 21.40 Bridge .....................$ 36.36 43.51 Spray, Sandblast ........... ---------------------------------------------------------------- 21.90 21.40 Brush, Taper ...............$ 33.01 21.90 Spray, Sandblast ........... $ 34.41 21.90 REP_INT: Bridge .....................$ -3.51 21.90 Brush, Taper ...............$ 31.07 21.90 Spray, Sandblast ........... $ 32.47 21.90 ---------------------------------------------------------------- PAIN0035-015 01/01/2011 MIDDLESEX (Cambridge, Everett, Malden, Medford, Sommerville) SUFFOLK COUNTY ,Boston, Chelsea) NORFOLK COUNTY (Brookline) Rates Fringes Painters: NEW CONSTRUCTION: Brush, Taper ...............$ 38.30 21.40 Spray, Sandblast ........... $ 39.70 21.40 REPAINT: Bridge .....................$ 43.01 21.40 Brush, Taper ...............$ 36.36 21.40 Spray, Sandblast ........... ---------------------------------------------------------------- $ 37.76 21.40 PLAS0534-001 07/01/2011 ESSEX; MIDDLESEX; NORFOLK AND SUFFOLK COUNTY Rates Fringes CEMENT MASON/CONCRETE FINISHER ... $ 35.00 29.66 ---------------------------------------------------------------- PLUM0004-001 09/01/2011 MIDDLESEX (Ashby, Ayer -West of Greenville branch of Boston and Maine Railroad, Ft. Devens, Groton, Shirley, Townsend) Rates Fringes Plumbers and Pipefitters......... $ 39.14 23.36 ---------------------------------------------------------------- PLUM0012-001 09/01/2011 ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Esser., Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence,Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuem, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Saugus, Swampscott, Topsfieild, Wenham, West Newbury); MIDDLESEX (Acton, Arlington, Ashland, Ayer - except W. of Greenville Branch of Boston 6 Maine RR, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlisle, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Waltham, Watertown, Wayland, Westford, Wilmington, Winchester, Woburn); NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover,Foxboro, Franklin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham, Hull, Scituate); SUFFOLK Rates Fringes PLUMBER ..........................$ 46.01 23.31 ---------------------------------------------------------------- PLUM0051-005 09/01/2011 BARNSTABLE; BRISTOL; DUKES; NANTUCKET; NORFOLK (Avon, Holbrook, Randolph, Stoughton) PLYMOUTH(Remainder of County) Rates Fringes Plumbers and Pipefitters......... $ 34.51 25.57 ---------------------------------------------------------------- PLUM0138-001 04/01/2010 Addendum No. 2 ESSEX (Ames, Afibj7iTuaiyqA012, Boxford, Byfield, Danvers, Page 88 of 94 12284A Essex, _eorget:)wn, Gloucester, S_. .eland, Ha-,ilton, Ha-;erhill, -,:i.h, awrence, i-fanchastor, .'srbleh_a-, ..errimac, 14ethuen, _ddl=_ton, Nat -bur , 'Ne::tur;po.:t, North Ando-;er, Peabody, 4 R_f-C r, Ro'wle:', Salem, Sallsbur:, _cos=_elc, �. _....:, , „_�� Newbury Rates Fringes Plumber, Pipe fitt__, Steamfitter ......................$ 41.14 22.98 ---------------------------------------------------------------- PLUH0537-001 09/01/2011 MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Wakefield, Winchester and Woburn); NORFOLK (Bellingham, Braintree, Brookline, Canton Cashasset, Dedham, Foxboro, Franklin, Millis, Milton, Sharon, Walpole, Westwood, and Wrenthan); PLYMOUTH (Hingham, Hull, Scituate); ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence,Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuem, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Saugus, Swampscott, Topsfieild, Wenham, West Newbury) Rates Fringes =1...FITTER.......................$ 46.09 24.06 ---------------------------------------------------------------- TEAM0379-001 06/01/2010 Rates Fringes Truck drivers: Group 1 .....................$ 29.28 14.98+A+B Group 2 .....................$ 29.45 14.98+A+B Group 3 .....................$ 29.52 14.98+A+B Group 4 ..............:......$ 29.64 14.98+A+B Group 5 .....................$ 29.74 14.98+A+B Group 6 .....................$ 30.03 14.98+A+B Group 7 .....................$ 30.32 14.98+A+B POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM TRUCK DRIVERS CLASSIFICATIONS Group 1: Station wagons; panel trucks; and pickup trucks Group 2: Two axle equipment; & forklift operator Group 3: Three axle equipment and tireman Group 4: Four and Five Axle equipment Group 5: Specialized earth moving equipment under 35 tons other than conventional type trucks; low bed; vachual; mechanics, paving restoration equipment Group 6: Specialized earth moving equipment over 35 tons Group 7: Trailers for earth moving equipment (double hookup) FOOTNOTES: A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day B. PAID VACATION: Employees with 4 months to 1 year of service receive 1/2 day's pay per month; 1 week vacation for 1 - 5 years of service; 2 weeks vacation for 5 - 10 years of service; and 3 weeks vacation for more than 10 years of service ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. Unlisted classifications needed for work not included within Addendum No.2 the scope of tFe1-baEyiZiNt2ons listed may be added after Page 89 of 94 12284A a.,Grd only as provided in the labor standards ._..tract ..-aures r19CER 5.5 (a) ;'; ;ii) r The body of each wage determination lists the classification and '.gage rates that have been found t, be pr_vailinq for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning �•;ith characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four -digit number, 0198, that follows indicates the local union number or district council number where applicable i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate. Non -Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS l.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not vet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in l.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor Addendum No.2 February 2. 2012 Page 90 of 94 12284A 200 Constitution Avenue, N.. Washinoron, DSC 20210 Tj.a rgWuest should be accompanied by _ fill statement _f tha interested party's position and b; any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION Addendum No. 2 February 2. 2012 Page 91 of 94 12284A '* II SECTION 15062 DUCTILE IRON PIPE & FITTINGS (INTERIOR APPLICATIONS) PART 1 - GENERAL 15062-1 1.1 DESCRIPTION A. Work Included: Provide and install ductile iron pipe and fittings of the type(s) and size(s) in the location(s) shown on the Drawings and as specified herein. B. Related Work Specified Elsewhere: 1. Pipe and Pipe Fittings - General is specified in Section 15050. 2. Surface Preparation and Shop Coatings are specified in Section 09905. 1.2 QUALITY ASSURANCE A. Standards (As Applicable): 1. Cement -mortar lining for water: ANSI A21.4 (AWWA C104). 2. Rubber gasket joints: ANSI A21.11 (AWWA Cl 11). 3. Ductile iron pipe thickness: ANSI A21.50 (AWWA C150). 4. Ductile iron pipe centrifugally cast in metal or sand lined molds: ANSI A21.51 (AWWA C 151). 5. Pipe flanges and fittings: ANSI B16.1 and ANSI A21.10 (AWWA C110). 6. Threaded, flanged pipe: ANSI A21.15 (AWWA C115). 7. Cast and ductile iron fittings: ANSI A21.10 (AWWA C110). B. Acceptable Manufacturers: 1. Tyler 2. Griffin 3. Union 4. US Pipe 5. Or equivalent. 1.3 DELIVERY. STORAGE & HANDLING A. Exercise extra care when handling cement lined pipe because damage to the lining will render it unfit for use. B. Protect the spherical spigot ends and the plain ends of all pipe during shipment by wood lagging securely fastened in place. PART 2 - PRODUCTS 2.1 PIPE MATERIALS A. General: 1. Unless otherwise shown on the Drawings, the minimum thickness of ductile iron pipe shall be Class 53. February 2, 2012 Addendum No. 2 Page 92 of 94 12284A ti I , X 2. Pipe for use with sleeve type couplings shall have plain ends (without bells or beads) cast or machined at right angles to the axis. 3. Pipe for use with split type couplings shall have ends with cast or machined shoulders or grooves that meet the requirements of the manufacturer of the couplings. 4. The outside of all interior pipe shall be coated in accordance with Section 15050. B. Pipe Interior Lining: 1. Pipe shall be double thickness cement lined and seal coated unless noted otherwise on the Drawings and except for air piping lines which shall be completely unlined. C. Joints (as shown on Drawings or as specified): 1. Flanged: a. Provide specially drilled flanges when required for connection to existing piping or special equipment. b. Flanges shall be flat face, long -hub screwed tightly on pipe by machine at the foundry prior to facing and drilling. c. Gaskets: (1) Full face gaskets only. (2) Thickness of gaskets - Use standard 1/8 -inch thickness gaskets, unless thinner gaskets are required for tight retrofit installations. d. Fasteners: (1) Make joints with bolt, studs with a nut on each end, or one tapped flanged with a stud and nut. (2) The number and size of bolts shall meet the requirements of the applicable ANSI standard. (3) Nuts, bolts, and studs shall be Grade B meeting the requirements of ASTM A307. 2. Grooved split ring couplings, sleeve couplings, flexible joints and couplings, shall be supplied as specified in "Couplings and Connectors" Section. 2.2 FITTINGS A. Standard Fittings: 1. Either gray cast iron or ductile iron fittings may be furnished. 2. Pressure rating of 250 psi unless indicated otherwise on the Drawings or as specified. 3. Flange fittings shall be ANSI B16.1, Class 125 unless indicated otherwise. Flanges shall be flat faced, with full face gaskets. 4. Joints the same as the pipe with which they are used or as shown on the Drawings. 5. Provide fittings with standard bases where shown on the Drawings. 6. Cement lining and seal coat unless noted otherwise on the Drawings, and except for air piping applications where the fittings shall be unlined. 7. All interior fittings shall receive coating in accordance with Section 15050. February 2; 2012 Addendum No. 2 Page 93 of 94 12284A PART 3 - EXECUTION 3.1 INSPECTION A. Provide all labor necessary to assist the Engineer to inspect pipe, fittings, gaskets, and other materials. B. Carefully inspect all materials at the time of delivery and just prior to installation. C. Carefully inspect all pipe and fittings for: 1. Defects, such as weak structural components, that adversely affect the execution and quality of work. 2. Deviations beyond allowable tolerances for pipe clearances. D. Immediately remove all rejected materials from the project site. 3.2 INSTALLATION A. General: 1. Install in strict accordance with the pipe and fitting manufacturer's instructions and recommendations and as specified or as shown on the Drawings. 2. Acceptable thrust resistant system is required at all fittings on pressure pipe. B. Assembling Joints: 1. Flanged Joints: a. Insert the nuts and bolts (or studs), finger tighten, and progressively tighten diametrically opposite bolts uniformly around the flange to the proper tension. b. Execute care when tightening joints to prevent undue strain upon valves, pumps, and other equipment. 2. Bolted Joints: a. Remove rust preventive coatings from machined surfaces prior to assembly. b. Thoroughly clean and carefully smooth all burrs and other defects from pipe ends, sockets, sleeves, housings and gaskets. END OF SECTION Addendum No. 2 February 2, 2012 Page 94 of 94 12284A