HomeMy WebLinkAboutMiscellaneous - 240 CHARLES STREET 4/30/2018 (5)6
GREATER LAWRENCE SANITARY DISTRICT
240 CHARLES STREET
NORTH ANDOVER, MASSACHUSETTS
ADDENDUM NO. 1
TO
THE PLANS
BIDDING REQUIREMENTS,
CONTRACT DOCUMENTS AND
SPECIFICATION MANUAL
FOR THE
PRIMARY CLARIFIER AND AERATION SYSTEM IMPROVEMENTS
CONTRACT 1
CWSRF ID 43492
.- -
PREPARED BY:
WRIGHT-PIERCE
99 Main Street
Topsham, Maine 04086
Tel. (207) 725-8721
Fax(207)729-8414
January 25; 2012 Addendum No. 1 12284A
Page 1 of 18
ADDENDUM NO. 1
GREATER LAWRENCE SANITARY DISTRICT
PRIMARY CLARIFIER AND AERATION SYSTEM IMPROVEMENTS
CONTRACTI
This Addendum amends and/or supplements the Bid Documents as indicated below. Only these
items alter the Bid Documents; any verbal discussions or responses are hereby declared null and
void. The Bidder shall indicate the receipt of all issued Addenda on the Bid Form. Each holder
of the Bid Documents registered with the OWNER shall receive a copy of the Addendum.
GENERAL CLARIFICATIONS
1-1 Specification Section 00020, Page 00020-2 lists the Department of Environmental
Protection (MassDEP) DBE Requirements and the associated forms (EEO -DEP -190 &
EEO -DEP -191) to be submitted with the Bid. Refer to Specification 00800, Page SC -20-
3 for more information regarding the MassDEP DBE Requirements.
1-2 Specification Section 00100, Paragraph 27.07.E lists the Commonwealth of
Massachusetts MBE/WBE goals for Minority and Women Workforce Participation.
Refer to Specification 00800, Page SC -20-21 for more information regarding the
Commonwealth of Massachusetts MBE/WBE Minority and Women Workforce
Participation goals.
SPECIFICATIONS
The following changes are made to the Specifications:
1-3 In Specification 00020, Bid Advertisement, ADD the following sentence at the end of the
second paragraph: "General Contractors shall include a Division of Capital Asset
Management (DCAM) certificate of eligibility in the category of Sewage and Water
Treatment Plants and a DCAM Update Statement with the bid."
1-4 In Specification 00020, Bid Advertisement, ADD the following paragraph after the fourth
paragraph: "Bids will be valid only when accompanied by; (1) a current certificate of
eligibility issued by the Division of Capital Asset Management (DCAM), showing that
the General Bidder has the classification of Sewage and Water Treatment Plants and a
capacity to perform this work and (2) an update statement summarizing the General
Bidder's record for the period between the latest DCAM certification and the date the bid
is submitted."
1-5 In Specification 00100, Instructions to Bidders, ADD the following paragraph to the end
of ARTICLE 3:
"3.03 General Bids will be valid only when accompanied by (1) a current
certificate of eligibility issued by the Division of Capital Asset Management
(DCAM), showing that the General Bidder has the classification of Sewage and
Water Treatment Plants and a capacity to perform this work and (2) an update
January 25; 2012 Addendum No. l 12284A
Page 2 of 18
statement summarizing the General Bidder's record for the period between the latest
DCAM certification and the date the bid is submitted."
1-6 In Specification 00100, Instructions to Bidders, DELETE the first sentence of Article
7.01, and REPLACE with the following: "All questions about the meaning or intent of
the Bidding Documents are to be submitted to the Engineer in writing."
1-7 In Specification 00100, Instructions to Bidders, ADD the following sentence at the end of
Article 15.01: "G. Required DCAM paperwork including (1) a current certificate of
eligibility issued by the Division of Capital Asset Management (DCAM), showing that
the General Bidder has the classification of Sewage and Water Treatment Plants and a
capacity to perform this work and (2) an update statement summarizing the General
Bidder's record for the period between the latest DCAM certification and the date the bid
is submitted."
1-8 In Specification 00300, Form for General Bid, ADD the following to the list of documents
attached to and made a condition of the Bid on Page 00300-5:
"(h) Signed Compliance Statement (Section 00406)
(i) Certification of Eligibility from Division of Capital Asset Management
0) Update Statement with supporting data."
1-9 In Specification 00300, Form for General Bid, ADD Pages 6 through 15 of this Addendum
to the end of Specification 00300.
1-10 In Specification 01800, Equipment Start-up Certification and Operator Training, DELETE
Paragraph 3.3.E in its entirety, and REPLACE with the following: "E. At the Owner's
discretion, the training sessions may be video recorded by the Owner for Owner's future
use. If available, a DVD of operation and maintenance instructions shall be provided by
the manufacturer."
1-11 In Specification 02050A, Demolition, DELETE Paragraphs 3.1.1.1, 3.1.1.2, and 3.1.I.3 in
their entirety and REPLACE with the following paragraphs:
1. Contractor shall give Owner 14 days minimum notice prior to beginning work in
tanks requiring draining and cleaning; which are to be renovated as part of this
project. The Owner will be responsible for removal and disposal of the liquid
contents, and any accumulated grit and sludge of the existing tanks, with the
exception of the center sump in the primary sedimentation tanks. The Owner will
do a "hose down" cleaning of the walls and floors of existing tanks (once), after
being notified by the Contractor of the intent to begin demolition work.
2. If the demolition work does not commence within the Contractor's approved
project schedule, the tank(s) may be placed back in operation by the Owner. If the
tanks are required to be drained and hosed down beyond the initial draining and
cleaning, the Owner will perform the work and reserves the right to back -charge
the Contractor for this repeated effort.
3. When the existing tank(s) are empty (drained and "hosed down" by the Owner), the
Contractor shall perform any cleaning that he deems necessary to perform the
work."
1-12 In Division 2, ADD Specification 02201, Excavation and Backfill (Attached to the end of
this Addendum).
1-13 In Specification 02756, Monolithic Pipelining, DELETE the words "Owner's
representative" in the first sentence of Paragraph 3.5.E, and REPLACE with
"Contractor."
January 25, 2012 Addendum No. 1 12284A
Page 3 of 18
DRAWINGS
The following changes are made to the Drawings:
1-14
1-15
1-18
1-19
1-20
1-21
1-22
1-23
1-24
1-25
1-26
On Drawing S-1, ADD the following Duct Bank Detail and notes:
4" (am)
ELECTRICAL
CONDUIT
/4 O 36-
NOTE: SEE ELECTRICAL DRAWINGS
FOR ADDITIONAL DETAILS.
ELECTRICAL DUCT BANK
REINFORCING STEEL DETAIL
SMLI NTS
4 O 18'
ONRNUOUS
On Drawing M-1, DELETE Process General Note 4 in its entirety, and REPLACE with,
"All process and plant water hose bibs shall be provided with a sign indicating NOT
SUITABLE FOR DRINKING."'
On Drawing M-3, DELETE the following from Note No. 9: "Bid Item Notes 5, 6, & 7,"
and REPLACE with "Bid Item Notes 6, 7, & 8."
On Drawing M-14, Primary Effluent Slide Gate No. I and No. 2 are to be Channel
Bottom Mount type per Section B -B.
On Drawing E-4, Ductbank Section A -A, DELETE Conduits P5 and C4.
On Drawing E-4, Ductbank Section C -C, DELETE Conduits P2 and C2.
On Drawing E-7, Demolition Notes, ADD the following sentence to the end of
Demolition Note No. 5: "The existing conduit inside the Sludge and Grit Pumping
Station No. 2 shall remain and be re -used for new conductors (P3) from Lighting Panel
LD to the pull box OO shown on Drawing E-8"
On Drawing E-7, Demolition Notes, ADD the following sentence to the end of
Demolition Note No. 6: "The existing conduit inside the Sludge and Grit Pumping
Station No. 1 shall remain and be re -used for new conductors (P6) from Lighting Panel
LC to the pull box 21 shown on Drawing E-9"
On Drawing E-7, Demolition Notes, ADD the following sentence to the end of
Demolition Note No. 7: "The existing conduit inside the Sludge and Grit Pumping
Station No. 2 shall remain and be re -used for new control wires (Cl) from MCC -213 to
the pull box 29 shown on Drawing E-8"
On Drawing E-7, Demolition Notes, ADD the following sentence to the end of
Demolition Note No. 9: "The existing conduit inside the Sludge and Grit Pumping
Station No. 1 shall remain and be re -used for new control wires (0) from MCC -2C to
the pull box 19 shown on Drawing E-9"
On Drawing E-8, Sludge and Grit Pumping Station No. 2 Modifications, DELETE
Conduits P2 and C2 in their entirety.
On Drawing E-9, Sludge and Grit Pumping Station No. 1 Modifications, DELETE
Conduits P5 and C4 in their entirety.
On Drawing E-11, Sludge and Primary Sedimentation Tanks No. 1 and No. 2
Modifications, DELETE Conduits P2, P5, C2 and C4 in their entirety.
January 25, 2012 Addendum No. 1 12284A
Page 4 of 18
1-27 On Drawing E-13, Conduit and Wire Schedule, DELETE Conduits P2, P5, C2 and C4 in
their entirety.
1-28 On Drawing E-13, Conduit and Wire Schedule, ADD the following Note at the bottom of
the table: "1. Conduit P3 shall utilize the existing 1" conduit inside the Sludge and Grit
Pumping Station No. 2 from Lighting Panel LD to the pull box OO shown on Drawing E-
8."
1-29 On Drawing E-13, Conduit and Wire Schedule, ADD the following Note at the bottom of
the table: "2. Conduit P6 shall utilize the existing 1" conduit inside the Sludge and Grit
Pumping Station No. 1 from Lighting Panel LC to the pull box 21 shown on Drawing E-
9.11
1-30 On Drawing E-13, Conduit and Wire Schedule, ADD the following Note at the bottom of
the table: "3. Conduit C1 shall utilize the existing 1-1/4" conduit inside the Sludge and
Grit Pumping Station No. 2 from MCC -213 to the pull box 29 shown on Drawing E-8."
1-31 On Drawing E-13, Conduit and Wire Schedule, ADD the following Note at the bottom of
the table: "4. Conduit C3 shall utilize the existing 1-1/4" conduit inside the Sludge and
Grit Pumping Station No. 1 from MCC -2C to the pull box 19 shown on Drawing E-9."
January 25, 2012 Addendum No. 1 12284A
Page 5 of 18
EFFECTIVE MARCH 30, 2010
Commonwealth of Massachusetts
Division of Capital Asset Management
PRIME/GENERAL CONTRA C TOR
UPDATE STATEMENT
TO ALL BIDDERS AND AWARDING AUTHORITIES
A COMPLETED AND SIGNED PRIME/GENERAL CONTRACTOR UPDATE
STATEMENT MUST BE SUBMITTED WITH EVERY PRIME/GENERAL BID FOR A
CONTRACT PURSUANT TO M.G.L. c.149, §44A AND M.G.L. c. 149A. ANY
PRIME/GENERAL BID SUBMITTED WITHOUT AN APPROPRIATE UPDATE
STATEMENT IS INVALID AND MUST BE REJECTED.
Caution: This form is to be used for submitting Prime/Genera/ Contract bids. It is
not to be used for submitting Filed Sub -Bids or Trade Sub -Bids.
AWARDING AUTHORITIES
If the Awarding Authority determines that the bidder does not demonstrably possess the skill,
ability, and integrity necessary to perform the work on the project, it must reject the bid.
BIDDER'S AFFIDAVIT
I swear under the pains and penalties of perjury that I am duly authorized by the bidder named below
to sign and submit this Prime/General Contractor Update Statement on behalf of the bidder named
below, that I have read this Prime/General Contractor Update Statement, and that all of the
information provided by the bidder in this Prime/General Contractor Update Statement is true,
accurate, and complete as of the bid date.
Bid Date Print Name of Prime/General Contractor
Project Number (or Business Address
name if no number)
Awarding Authority Telephone Number
SIGNATUREb
Bidder's Authorized Representative
January 25; 2012 Addendum No. 1 12284A
Page 6 of 18
INSTRUCTIONS
INSTRUCTIONS TO BIDDERS
This form must be completed and submitted by all
Prime/General contractors bidding on projects pursuant
to M.G.L. c. 149, §44A and M.G.L. c. 149A
You must give complete and accurate answers to all
questions and provide all of the information requested.
MAKING A MATERIALLY FALSE STATEMENT IN THIS
UPDATE STATEMENT IS GROUNDS FOR
REJECTING YOUR BID AND FOR DEBARRING YOU
FROM ALL PUBLIC CONTRACTING.
This Update Statement must include all requested
information that was not previously reported on the
Application used for your firm's most recently
issued (not extended or amended) Prime/General
Contractor Certificate of Eligibility. The Update
Statement must cover the entire period since the
date of your Application, NOT since the date of your
Certification.
You must use this official form of Update Statement.
Copies of this form may be obtained from the awarding
authority and from the Asset Management Web Site:
www.mass.-gov/deam.
If additional space is needed, please copy the
appropriate page of this Update Statement and attach it
as an additional sheet.
See the section entitled "Bidding Limits" in the
Instructions to Awarding Authorities for important
information concerning your bidding limits.
INSTRUCTIONS TO AWARDING
AUTHORITIES
Determination of Bidder Qualifications
It is the awarding authority's responsibility to determine
who is the lowest eligible and responsible bidder. You
must consider all of the information in the low bidder's
Update Statement in making this determination.
Remember: this information was not available to the
Division of Capital Asset Management at the time of
certification.
The bidder's performance on the projects listed in Parts
1 and 2 must be part of your review. Contact the project
references.
AWARDING AUTHORITIES ARE STRONGLY
ENCOURAGED TO REVIEW THE LOW BIDDER'S
ENTIRE CERTIFICATION FILE AT THE DIVISION OF
CAPITAL ASSET MANAGEMENT. Telephone (617)
727-9320 for an appointment.
Bidding Limits
Single Project Limit: The total amount of the bid, including all
alternates, may not exceed the bidder's Single Project Limit.
Division of Capital Asset Management
Prime/ General Contractor Update Statement Effective March 30, 2010
Aggregate Work Limit: The annual value of the work to be
performed on the contract for which the bid is submitted,
when added to the annual cost to complete the bidder's other
currently held contracts, may not exceed the bidder's
Aggregate Work Limit. Use the following procedure to
determine whether the low bidder is within its Aggregate
Work Limit:
Step 1 Review Update Statement Question #2 to
make sure that all requested information is
provided and that the bidder has accurately
calculated and totaled the annualized value of
all incomplete work on its currently held
contracts (column 9).
Step 2 Determine the annual dollar value of the work
to be performed on your project. This is done
as follows:
(i) If the project is to be completed in less
than 12 months, the annual dollar value of the
work is equal to the full amount of the bid.
(ii) If the project will take more than 12 months
to complete, calculate the number of years
given to complete the project by dividing
the total number of months in the project
schedule by 12 (calculate to 3 decimal
places), then divide the amount of the bid
by the calculated number of years to find
the annual dollar value of the work.
Step 3 Add the annualized value of all of the bidder's
incomplete contract work (the total of column 9
on page 5) to the annual dollar value of the
work to be performed on your project. The
total may not exceed the bidder's
Aggregate Work Limit.
Correction of Errors and Omissions in Update
Statements
Matters of Form: An awarding authority shall not reject a
contractor's bid because there are mistakes or omissions of
form in the Update Statement submitted with the bid,
provided the contractor promptly corrects those mistakes or
omissions upon request of the awarding authority. [810 CMR
8.05(1)].
Correction of Other Defects: An awarding authority may, in
its discretion, give a contractor notice of defects, other than
mistakes or omissions of form, in the contractor's Update
Statement, and an opportunity to correct such defects,
provided the correction of such defects is not prejudicial to
fair competition. An awarding authority may reject a corrected
Update Statement if it contains unfavorable information about
the contractor that was omitted from the Update Statement
filed with the contractor's bid. [810 CMR 8.05(2)].
January 25, 2012 Addendum No. 1 12284A
Page 7 of 18
LL LL
OOQ
LU W F-
< z Qz
COO
wLLp
W F-
W
VUO
Z2W
U)
pp}
LIJ
WCO
W D
Jp0
mww
w
OQa-
(1)WH
Q00
=pz
2 W Z
p
Iwo
LLQ
owW
o }�O
U) ZZ
LIjpW
W
COD
Z
Ouj
UQ
ca
Ix
WHCO O
CL
of
p=�
Q O Z
0
U0pE-
JLL}Q
co
Z U_
0 >: --�
d
J ~ F- d
-i< =J
Q U m
HaC�Q
Wa JU
J Q W C)
W
w H
w
c
oa
O
N
U
a�
a
W
0
0
0
w
U)
U
a�
iLLIU
z�
a'
rq
mU
0
m
�cu
U
�70
Y�
CL
O D
�0
00
3!E
�w
M
Q
U
O cu
Z
0
c
U
0
a
E�
Oa)
06
U
O '
0
0
O Q
LU
J
~
Q.0
M
O
z
H
O
V
E
U
pp
F-
o
a c
b a
_O
>_
W
c6 =
U
�
: E f
a
(�
O N
W
N
c
0
N
a�
a
0
0
0
w
� c
a�
rq
mU
m
�cu
�70
CL
O D
3!E
0
M
O cu
c
a
E�
Oa)
U
O '
0
0
O Q
0
~
Q.0
M
O
z
t5 +�
�
O
V
E
U
pp
o
a c
b a
_O
>_
Q
c6 =
U
�
: E f
�
(�
O N
W
N
x
U
O N
E
.� c
C
a)
C
-0 NU)
E
E
c
N
a)
rnN
N
c 'co
� Z)
O U
in m
C
_
M `~
Q c
O
w,
+;
0
U
cv
a
"M
moo
(II
c
o
N
O U
c C7
m
>, >,
.N a
CO
E
> .=
r_
3
Q
+
o
w
2
F—
Z
O
cl
w
F—
U)
J
LU
O
w
CL
0
w
w
J
0-
2 O
U
Q
w
irO
LL
Z
O
Q
0
Z
w
U
Z
w
w
W
LL
W
it
>z
O
J
J
O
LL LLj
w CD
2 Q
w D
O
Ow
Ql� D�
a- a -
L
Ot
O=
O
O
O=
O=
O
O
C
O
0
t
0
o
N
L
0
0
O
o
.2
CL
CL
cnm
�
'�
CL
0
2
cl-I
W
N
F-
F-
a)
F-
F-
a)
F-
0
F�
F-
N
H
F-
N
H
F-
00
a
3
�-
c
F-
F-
t
0
F-
3
3
o
cuz
m
°z
a
�U
U)
�w
w
w
o❑
°❑
U
�
J
w
0
Q
O
C�.
E
� -CL
U
F-
QL
C 0
0
O
U y
Zc
O
OC
O
C
O
CO
O
C
O
CO
O
C
O
=O
O
C
O
CO
C
O
C
O
O
C
O
/O///��
O Oc
E
N
C
U
O
N
•0
c_a
N
a
c`a
c
>
>co
a'
0
O
wa
n
CL
as
O
a
as
O
a
(La
a
Mn.
0
a
ad
a
s
IL
V
U
U
V
U
U
V
U
U
V
U
U
V
U
U
V
U
U
U
0
C
C
OO
C
C
m
C
C
�
w
C
c+,o
C
�
�
C
coo
C
a)
C
A p
C
o
0
0
C
0
0
0
C
0
0
0
C
0
0
0
C
0
O
O
C
O
O
C
O
Z
U
U
UU
>_
U
(-)o
CL
E
U
UU
U
(-)oV
UU
V
U
O
L
c
L
c
c
c
4)
c
Lm
c
L
R)
L
L
0
27)L
Q3
C
O
0
U3
C
Cl)
m
U3
C
(1)
(1)
U3
c
W
a)
U3
c
U)
(L)
U3
C
tl)
(1)U
Z
00
00
00
00
0
00
0
0
cr-
Q
Z
w
Z
w
Z
Z
w
Z
w
Z
a
w
c7
w
w
w(D
w
C7
w
0�
w
b�
w
6�
w
6�
w
b�
w
b3:
w
v
U
O
o
(D
0
0
(D
0
0
(D
0
0
(D
0
0
(D
0
o
cD
w
J
F-
F-
F -
0
w
O
w
IL
L
L
O
C
O
0
C
O
L
U
N
L
C
O
a)
cnm
�
'�
ca
L
C
E
3
0
a
3
c
0
t
0
3
3
o
cuz
m
°z
�U
U)
�w
w
o❑
°❑
U
�
0
Q
O
C�.
E
� -CL
U
QL
C 0
0
O
U y
°�
OLL
cn0
O
.�
�cu s
o
zCN �
O Oc
E
N
C
U
O
N
•0
c_a
N
a
c`a
c
>
>co
a'
0
O
n
0 :3
-0
cm
O
w
O
N
+�
co
0
jL
aci
E
OO
m 0
C 0
L
Lcn
w
cn
4
C:
a�
cn
c
0
Q
OO
(p
fn
m
M >
U C))
W
i-
0
N
0
O 0O
O O
a)
m
Q
A p
O0
N
@ U
N
C O
E
L
c t
C
U
c
N
m
� c
v- a)
O
N
O
U
N
O
>
>_
c''d
>1 =
CL
E
O
0 d
12 UO
Q)
L
O
Q U
w
W
z
CD
Q
2
0
�0
U)W
F' U
Uz
W W
3
it2
a0
01
w
�w
O�
UW
z=
J_
m0
Ow
z=
o
Z LL
QO
0 co
z (4
W
J J
m �
E- W
Qw
> W
aQ
0 C)
Z W
Q =
U_ F•
Jz
m0
D �-
av
J Q
Q W
H z
() 0
71U
rn �
c o
E
t
O
U O
o E
:a o
Y E
U � �
Q�?a
L
0 .0 U
W v
H-0 CO N
N
W
oo
Z 2
Q(C = U
J N'
LL O r
O�co�
W — t�
� •N � N
>, ECN .c
U
W c N
N o c
Q MO
Z) = O Q
Z N o 0
Q(uE�
MR
C
E
2
O
U
WE
c
a)
w
N 00
°w u. F-
OJY�a
aa)
Y
U)
CD
J Lu o
o
a)
rn iu
�
CL
ZQO31 s
cm
2-
0
Q>z 3:
Q c
0
U
N
CL—
-N
N
a)
0 c
� a)
N
W VJ z (D .,
0
Qco
�a
i
.>
0o
r_�a
ti
z >- W
Y H ca
0
I�
QOOaWX
U'
101.0
>Wz0
U
W
oaW
CO
z2�
�0
U
QW
U
LO
z a
0�
UU
o
IT
w 0=W cn
L)
�00w
CIO
Qzzf—
� Q W Q
YO
»U
W
J z
~0
� Q
UU
O_j
W OZ5
d
rn �
c o
E
t
O
U O
o E
:a o
Y E
U � �
Q�?a
L
0 .0 U
W v
H-0 CO N
N
W
oo
Z 2
Q(C = U
J N'
LL O r
O�co�
W — t�
� •N � N
>, ECN .c
U
W c N
N o c
Q MO
Z) = O Q
Z N o 0
Q(uE�
MR
C
E
2
O
U
WE
c
a)
aa)
Y
U)
m
a)
rn iu
�
CL
cm
2-
0
� U
Q c
0
U
N
CL—
-N
N
a)
0 c
� a)
N
�a
i
.>
.�
r_�a
ti
w
Z
0
0
LwL
yJ
J
U
w
n
0
a
w
I—
w
J
O
z
U
w
w
0
Z
O
Q
O
LLZ
w
Z
w
w
LL
w
Of
Z_
O
J
OLLj
w0
= Q
CO
w Z)
00
0 w
as
c
O
LL
o
c
O
ocr-CcQr-Cc
O
O
-C
O
c
=
Oc
Q
a
CL
L
0a
p
M
L
a
sr
apo
fl
-co
a
Q)
a,
q)-
a)
�
a)
a�
o
a�
o
`
C
H
F-
O
vi
>,
3
ccu
O
s
o
3
3
,I-
a
�Z
°Z
.�
�E
c❑
�w
cw
w
O ❑
° ❑
U
>�
L
J
w
O
C
Vj Q
H
N
O
C C
L
7
U O
O'
0//�
O
°
°
O
O
O
O
°
o
o
O
O
O
0
0
0
°
O
/
V/
L
L
L,
`
L
L
L
L
L
N
L
N
N
L
N
N
L
N
wn
¢
CU
as
o
+-
CL
as
3�
a-
Q -
a -n-
as
°
C N
a
as
a
a
L
�-
N 0
>�
c c
=
E
a N
u°, N
0
°
0)m
.� r'�..�
`
C CL
�
U
c
cc)
C
c0 >>-
c
c
ca
s
;�
c
c
ca
c
;U
c
CU
c
ca
c
M
c
m
ca
c
m
c
m
cu N
U
U
U
U
U
U
U
U
U
U
U
()
U
U
U
(j
U
U
Z
O
c m
=
>_ .
° Lm
ati
N O
0
1- O
Q 0
�'
0
L
L
C
L
L
C
L
L
C
L
C
L
C
L
C
2
c
2)
N
U�
C
N
a)
U
C
N
a�
U
L
C
3
Cl)
a)
U
L
C
3
N
a)
U
L
C
3
N
a)
U
Q3
Z
00
0
00
00
00
0
00
(7
Q
CK
z
z
w
w
Of
z
z
z
w
z
w
a
w
Z
(D
W
(D
W
Z
(D
W
Z
()
W
Z
V5
z
0�
w
U
>Z
w
U�
W
U
W
U
W
U
W
U
00
0
(D
0
0
(D
0
0
(D
0
0
0
0
0
(D
0
0
0
W
J
F-
F -
U
w
n
af
CL
L
O
rn
o
o
c
0
L
U
M
L
C
O
R)
�
0
c6
`
C
3
O
vi
>,
3
ccu
O
s
o
3
3
,I-
00
�Z
°Z
.�
�E
c❑
�w
cw
O ❑
° ❑
U
>�
L
O
C
Vj Q
O
U
N
O
C C
L
7
U O
O'
O=
•3
L
0
Ncu
04
C
p
CD
ch
z 0
tC LC
N
C
U
N
Q
N N
C C_
O
>
a)
D
p.
co
°
�°>,
'E
c
U
¢
CU
o
+-
w
3�
E
a
0)m
ca
°
C N
U
L
E
o
D t
N a)
L
�-
N 0
>�
c c
=
E
a N
u°, N
0
°
0)m
.� r'�..�
`
C CL
�
am
w
�
C
c0 >>-
N
O
0-0
O O
C E
N
N :o
Q
cu N
a)
u)m
m
N
° m
�
C
O
U N
E c
c
°
•�- a)
O
O
O
N
L
C C7
O
c m
=
>_ .
° Lm
ati
N O
0
1- O
Q 0
�'
PART 3 - PROJECT PERFORMANCE
For Parts 3 and 4, if you answer YES to any question, please provide on a separate page a
complete explanation. Information you provide herein must supplement the Application for
your most recently issued (not extended or amended) DCAM Certificate of Eligibility. You must
report all requested information not previously reported on that DCAM Application for
Prime/General Certificate of Eligibility. Include all details [project name(s) and location(s),
names of all parties involved, relevant dates, etc.].
1'A W. M rl
1.
Has your firm been terminated on any contract prior to completing a project or has
❑ ❑
any officer, partner or principal of your firm been an officer, partner or principal of
another firm that was terminated or failed to complete aproject?
2.
Has your firm failed or refused either to perform or complete any of its work under
❑ ❑
any contract prior to substantial completion?
3.
Has your firm failed or refused to complete any punch list work under any contract?
❑
4.
Has your firm filed for bankruptcy, or has any officer, principal or individual with a
❑ ❑
financial interest in your current firm been an officer, principal or individual with a
financial interest in another firm that filed for bankruptcy?
5.
Has your surety taken over or been asked to complete any of your work under any
❑ ❑
contract?
6.
Has a payment or performance bond been invoked against your current firm, or has
❑ ❑
any officer, principal or individual with a financial interest in your current firm
been an officer, principal or individual with a financial interest in another firm that
hada payment or performance bond invoked?
7.
Has your surety made payment to a materials supplier or other party under your
❑ ❑
payment bond on any contract?
8.
Has any subcontractor filed a demand for direct payment with an awarding authority
❑
fora public project on any of your contracts?
9.
Have any of your subcontractors or suppliers filed litigation to enforce a mechanic's ❑ ❑
lien against property in connection with work performed or materials supplied
under any of your contracts?
10.
Have there been any deaths of an employee or others occurring in connection with ❑ ❑
any of yourprojects?
11.
Has any employee or other person suffered an injury in connection with any of ❑ ❑
your projects resulting in their inability to return to work for a period in excess of
one year?
Division of Capital Asset Management
Prime/General Contractor Update Statement Effective March 30, 2010
January 25, 2012 Addendum No. 1 12284A
Page 12 of 18
PART 4 - Legal or Administrative Proceedings; Compliance with Laws
Please answer the following questions. Information must supplement all judicial and
administrative proceedings involving bidder's firm, which were instituted or concluded
(adversely or otherwise) since your firm's Application for your most recently issued (not
extended or amended) Certificate of Eligibility. You must report all requested information not
previously reported on that DCAM Application for Prime/General Certificate of Eligibility.
The term "administrative proceeding" as used in this Prime/General Contractor Update
Statement includes (i) any action taken or proceeding brought by a governmental agency,
department or officer to enforce any law, regulation, code, legal, or contractual requirement,
except for those brought in state or federal courts, or (ii) any action taken by a
governmental agency, department or officer imposing penalties, fines or other sanctions for
failure to comply with any such legal or contractual requirement.
The term "anyone with a financial interest in your firm" as used in this Section "I", shall
mean any person and/or entity with a 5% or greater ownership interest in the applicant's
firm.
If you answer YES to any question, on a separate page provide a complete explanation
of each proceeding or action and any judgment, decision, fine or other sanction or
result. Include all details (name of court or administrative agency, title of case or
proceeding, case number, date action was commenced, date judgment or decision was
entered, fines or penalties imposed, etc.).
►ij�� r.I
1. Have any civil, judicial or administrative proceedings involving your firm or a
❑~ ❑
principal or officer or anyone with a financial interest in your firm been brought,
concluded, or settled relating to the procurement or performance of any
construction contract, including but not limited to actions to obtain payment
brought by subcontractors, suppliers or others?
2. Have any criminal proceedings involving your firm or a principal or officer or
❑ ❑
anyone with a financial interest in your firm been brought, concluded, or settled
relating to the procurement or performance of any construction contract including,
but not limited to, any of the following offenses: fraud, graft, embezzlement,
forgery, bribery, falsification or destruction of records, or receipt of stolen
property?
3. Have any judicial or administrative proceedings involving your firm or a principal
❑ ❑
or officer or anyone with a financial interest in your firm been brought, concluded,
or settled relating to a violation of any state's or federal procurement laws arising
out of the submission of bids or proposals?
4. Have any judicial or administrative proceedings involving your firm or a principal
❑ ❑
or officer or anyone with a financial interest in your firm been brought, concluded,
or settled relating to a violation of M.G.L. Chapter 268A, the State Ethics Law?
Division of Capital Asset Management
Prime/General Contractor Update Statement Effective March 30, 2010
January 25, 2012 Addendum No. l 12284A
Page 13 of 18
PART 4 - Legal or Administrative Proceedings; Compliance with Laws (continued)
YES NO
5.
Have any judicial or administrative proceedings involving your firm or a principal
or officer or anyone with a financial interest in your firm been brought, concluded,
or settled relating to a violation of any state or federal law regulating hours of labor,
unemployment compensation, minimum wages, prevailing wages, overtime pay,
equal pay, child labor or worker's compensation?
6.
Have any judicial or administrative proceedings involving your firm or a principal
❑ ❑
or officer or anyone with a financial interest in your firm been brought, concluded,
or settled relating to a violation of any state or federal law prohibiting
discrimination in employment?
7.
Have any judicial or administrative proceedings involving your firm or a principal
❑ ❑
or officer or anyone with a financial interest in your firm been brought, concluded,
or settled relating to a claim of repeated or aggravated violation of any state or
federal law regulating labor relations?
8.
Have any proceedings by a municipal, state, or federal agency been brought,
concluded, or settled relating to decertification, debarment, or suspension of your
firm or any principal or officer or anyone with a financial interest in your firm from
public contracting?
9.
Have any judicial or administrative proceedings involving your firm or a principal
❑ ❑
or officer or anyone with a financial interest in your firm been brought, concluded,
or settled relating to a violation of state or federal law regulating the environment?
10.
Has your firm been fined by OSHA or any other state or federal agency for
❑ ❑
violations of any laws or regulations related to occupational health or safety? Note:
this information may be obtained from OSHA's Web Site at www.osha.gov
11.
Has your firm been sanctioned for failure to achieve DBE/MBE/WBE goals,
❑ ❑
workforce goals, or failure to file certified payrolls on any public projects?
12.
Other than previously reported in the above paragraphs of this Section I, have any
administrative proceedings or investigations involving your firm or a principal or
officer or anyone with a financial interest in your firm been brought, concluded, or
settled by any local, state or federal agency relating to the procurement or
erformance of any construction contract?
13.
Are there any other issues that you are aware which may affect your firm's
El ❑
responsibility and integrity as a building contractor?
Division of Capital Asset Management
Prime/General Contractor Update Statement Effective March 30, 2010
January 25; 2012 Addendum No. 1 12284A
Page 14 of 18
PART 5 - SUPERVISORY PERSONNEL
List all supervisory personnel, such as project managers and superintendents, who will be assigned to
the project if your firm is awarded the contract. Attach the resume of each person listed below.
NAME TITLE OR FUNCTION
PART 6 - CHANGES IN BUSINESS ORGANIZATION OR FINANCIAL CONDITION
Have there been any changes in your firm's business organization, financial condition or bonding
capacity since the date your current Certificate of Eligibility was issued?
❑ Yes ❑ No
If YES, attach a separate page providing complete details.
PART 7 — LIST OF COMPLETED CONSTRUCTION PROJECTS SUBMITTED TO
THE DIVISION OF CAPITAL ASSET MANAGEMENT.
Attach here a copy of the list of completed construction projects which was
submitted with your firm's DCAM Application for your most recently issued
(not extended or amended) DCAM Certificate of Eligibility. The Attachment
must include a complete copy of the entire Section G — "Completed Projects"
and the final page — "Certification" (Section J) containing the signature and
date that the Completed Projects list (Section G) was submitted to the Division
of Capital Asset Management.
END OF SECTION
Division of Capital Asset Management
Prime/General Contractor Update Statement Effective March 30, 2010
January 25; 2012 Addendum No. 1 12284A
Page 15 of 18
SECTION 02201
EXCAVATION AND BACKFILL
PART 1 - GENERAL
02201-1
1.1 DESCRIPTION
A. Perform the following items of work, as shown on the Drawings and specified
herein:
1. Do all excavating and furnish all material necessary for embankment
construction, as required to complete the work of this Contract, including the
furnishing and compaction of additional material as needed.
2. Completely remove from the site all excavated material which is not approved
by the Engineer for use as embankment material. This provision does not
apply to topsoil which will remain the property of the Owner.
3. Establish subgrades as indicated on the Drawings and specified hereunder.
4. Perform cutting and removal of existing pavements to the extent indicated on
the Drawings and as required for the work under this Contract.
5. Protect all trees, shrubs and plantings not designated on the Drawings to be
removed, for the duration of the Contract.
6. Protect all utilities on the site for the duration of the work.
1.2 DEFINITIONS
A. The work involved includes removal, haul and disposal of materials to prepare for
construction and the placing and compaction of material to complete the
subsurface electrical construction.
B. Common excavation shall consist of removal of earth, of boulders, solid mortared
stone masonry and concrete masonry when each is less than two cubic yard in
volume and of rock which can be removed with ordinary excavating machinery.
Grubbing shall be considered as common excavation.
1.3 QUALITY ASSURANCE
A. Requirements of Regulatory Agencies:
1. All work shall be performed and completed in accordance with all local, state
or federal regulations.
2. The General Contractor shall secure all necessary permits from, and furnish
proof of acceptance by, the local and state departments having jurisdiction and
shall pay for all such permits, except as specifically stated elsewhere in the
Contract Documents.
B. Grade and Elevations:
1. The Contractor shall establish the lines and grades in conformity with the
Drawings and maintain same to properly perform the contract installation.
C. Compaction:
1. The Contractor shall compact all materials backfilled into trenches created for
electrical construction.
January 25, 2012 Addendum No. 1 12284A
Page 16 of 18
02201-2
EXCAVATION AND BACKFILL
1.4 JOB CONDITIONS
A. Disposition of Utilities:
1. The locations of utilities shown on the plans are approximate as determined
from physical evidence on or above the surface of the ground and from
information supplied by the utilities. The Engineer in no way warranties that
these locations are correct. It shall be the responsibility of the Contractor to
determine the actual locations of any utilities within the project area.
2. Rules and regulations governing the respective utilities shall be observed in
executing all work in this section. Active utilities shall be adequately
protected from damage, and removed or relocated only as indicated or
specified. Inactive and abandoned utilities encountered in excavation and
grading operations shall be removed, plugged or capped. Report in writing to
the Engineer, the locations of such abandoned utilities. Extreme care shall be
taken when performing work in the vicinity of existing utility lines utilizing
hand excavation in such areas as far as practicable . If, in the progress of
excavation, any utility should become damaged and result in any damage to
public or private property, the General Contractor shall restore to the original
condition, at no additional cost to the Owner, anything which has been
damaged or disturbed.
PART 2 - PRODUCTS
2.1 SOIL MATERIALS
A. Use of Excavated Material:
1. To the extent they are needed, all suitable materials from the specified
excavation may be used in the construction.
2. Surplus excavated materials suitable for filling operations shall not be wasted,
but will be stockpiled for future use as directed by the Engineer within the
District's property. This specific location will be determined at the start of
construction.
PART 3 - EXECUTION
3.1 SAFETY
A. Comply with applicable local, state or federal safety regulations or in the absence
thereof, with the provisions of the Manual of Accident Prevention in Construction
of the Associated General Contractors of America, Inc.
3.2 COMMON EXCAVATION
A. The Contractor shall excavate material encountered to establish required grade
elevations.
1. Unauthorized Excavation:
a. Unauthorized excavation consists of removal of materials beyond
indicated subgrade elevations or dimensions without specific direction of
the Engineer. Unauthorized excavation, as well as remedial work
directed by the Engineer, shall be at the Contractor's expense.
January 25, 2012 Addendum No. 1 12284A
Page 17 of 18
02201-3
EXCAVATION AND BACKFILL
b. The Contractor shall backfill and compact unauthorized excavations as
specified for authorized excavations of the same classification, unless
otherwise directed by the Engineer.
3.3 GRADING
A. General: Uniformly grade areas within limits of construction. Smooth finished
surface within specified tolerances.
1. Lawn or Unpaved Areas: Finish areas to receive topsoil to within not more
than 0.10 feet above or below the required subgrade elevations.
3.4 MAINTENANCE
A. Protection of Graded Areas: Protect newly graded areas from traffic and erosion.
Keep free of trash and debris.
B. Repair and re-establish grades to specified tolerances in settled, eroded or rutted
areas.
C. Reconditioning Compacted Areas: Where completed compacted areas are
disturbed by subsequent construction operations or adverse weather, reshape, and
compact to required density prior to further construction.
3.5 DISPOSAL OF EXCESS AND WASTE MATERIALS
A. Removal from Owner's Property: Remove waste materials, including unacceptable
excavated material, trash and debris, and dispose of it off the Owner's property.
END OF SECTION
January 25, 2012 Addendum No. 1 12284A
Page 18 of 18
.. ,
I
4 SANTTARY DISTRICT
GREATER�� � � VS SV"""
N�
ADDENDUM NO.2
To
THE P UINMENTS,
BIDDIC DOC MENTU D
CONTE TION
MAN
SPECIFICA
FOR
YSTEMP'OV EMENTS
D AERATION S
PRIMARY CLA�FIER AND 1
CwSRF M #3492
Z-
PREP�D BY:
WR1TT-P�RCE
99 Main Street
Maine p4096
Topsham 20�) X25-8121
'Tel. (201)
Fax (20')
122g4A
Addendum No 2
---------------
p
----page l of 94
February 2, 2012
X;2 v
ADDEND
UM NO.2
Y DISTRICT
ENT
S
SANIT k VEM
GREATER LNWVX ERATION SYSTEM ITA
YRI1vIARY CLARIFIER AND ONTRACT 1
indicated below. Only these
Documents as declared null and
supplements the Bid Docum hereby
supe or responses are h id Form'
Each holder
amends
and/orany verbal discussions ddenda on the B ddendum•
This Addendum ocuments� t of all issued A of the A
I receip SER shall receive a copy
1 items alter the Bid D ed with the O
void. The Bidder shall
e dsterte the
of the Bid Documents g
Greater Lawrence
CLARIFICATIONS 2012 at 1.30 p•m at the n1eeting was to
GENERAL
held on January 21, The purpose of The Pre -Bid
wash ents. sheet
id Conference Andover, Massachusetts• Contract Docum
2 1 A Pre -B North An to the attendance
Sanitary District in N otential bidders relatinfor potential bidders. An
uestions from P a mandatory meeting
answer
questions
NOT Addendum- Tanks No. 1
Conference D to the end of this A ed for Aeration
is ATTACHE work to be perform o 2 can be isolated by
odification T No l and ATN into
een A introducing all the flowi piping
For the stainless steel pipe ill el betty channel and in for the p P
2.2 ow in the chane el to work leak
and No. 2, the fl head end of the chane totally
ates at the will provide a dry
the slide gates are ing that
closing the slide and 2X• This arantee ent and pump
Zone cannot guarantee leak containm T No. I and
Selector ever, Owner el between A
modifications. How onsible for any The chane
their work• Perform all necessary Pipe
Contractor shall to f perform shall p connections
free, and thnecessary in order to once.
. Contractor temporary pipe This work
they deem be taken off-line provide tempoff-line.
No 2 shall only el at one time and p to be taken
in the channel
NO 2 until that tank is ready interference.
modificatioon legs m .th the Owner to minimize any o. 3
sN
existing drop coordinated wi ed for Aeration Tank
must be closely n work to be per
closing the
modification el which can be isolated b o work in for
ess steel pipe m chane gates stall influent chane provide a dry are
For the has its own This will p arantee that the slide g
2-3 and No. 4, each tank channel. ent and
end of the Owner cannot leak contaim"
slide gates at the head ever, onsible for any
modifications. H°w ork.
the Piping the Contractor shall be reform their w
leak free, and . order top ara raph 2.1-D
totally deem necessary the intent of P g
pumping that they Controls, out of service from any
00 Temporary Facilities and that are Contractor's
e existing structures It is the to the
Specification 015 protect the freezing and thawing.
2-4in Contractor to P water f but not necessaries hie the
is for the accumulated such freeze thaw, 40 degrees
associated from structures from above
damageto keep the temperature
responsibility to protect the
extent of
covering the structure
entire tank.
12284 A
Addendum No. 2
Page 2 of 94 -
February 2, 2p12
to the w all
a all the way for all
extending wall (tom. Tank
set lateral from the
-9 show only one diffu 5 -feet for all laterals in the
ending wall ( reasons on `
ings
M-5 and M ote indicating thn 14 fe t from the shoat for clarityv and all laterals ll
2 5 Draw a dimensional n and 3) and ends g Nvn to be cu from the w
with , 2, sh0 d to 5 -feet
Tates res of the laterals and 3 eaten
laterals 1nThe rc in Tacks 1 , 11 (new and existing) the table
N° n All laterals _feet from the `va labeled ZONE i to indicate
drawl g 4 the column heading notation The Grids
in T aA 4 extend to anitalre s e A pV C
endiA B; „A3" .. This is d 3 within Zon crate
Sanitaire s quotation in 0 „ d Grid fed from a separate P one A and
In P age 1 show s „ Grid 2 within Z° bu Aea h gid is
tai of 4 glids 7,0111
i
2-6 provided on Zone A, drawings, and 2 for a to
Grid I within the Contract
their of labeled 017 M-12, Sections 1 shows
are n on Drawing Provide
on Page 1
dropleg as shne B last row � the table prod � This is not a column
2 grids in Zo endix 8 they 1a sets per G for a grand total of
in App New Diffu
heading listed the rows above,
uotation in
Samtaire s q e column secs
2-7 2,612 total)„ unddl ion the new ds.f u
�� ,612 ( to
but is in ad four tank
total, diffusers for all
5,232 new
PLACE Section SC_20-h
SpECIF1CATi�Ns to the Specifications the end of this `
n es are made tai Conditions, � at 1
The following Cha
age
Supple da d wage nates A
Section with the up SC -24-1,
8 In
Specific efts W age Rates, PLACE Section
2"
mass onditions, � at the end of this
C TTACKED
addendum• p0800 Supplem wage rates A
! Section the updated
Specification Rates, with MM). from the
2-9 Bacon Wag A13 and Building LETS the fo1145 day „
Heavy, of Wornd E�Ewith" s.
Davis
( ary
O101OA, Sumn'�30 days„ a from the
Section h 3 1 B.5.a: DELETE the following „
In Specification o f P aragrap 45 day
2"10 orad sentence Summary of �N°rka with' s. a h
sec OIOIOAI S „21 daysI" an paragr p
Section h 3 1 B 5 b: merit, details on
In Specificatio e of p aragrap Sludge Collecti CE wu „the
2-11 d sentenc
$econ 11351A, Circular Type „and gEY-
_ the words, "Section 05500,
Section D the following
2-12 In SpecificadLETE AD exits
8 3 , Rubble Aeration systems, te! g uirem
1.1 req
4.
Drawing 113'188, Fine 8 aired for startup
! n Specification GENE1�'L _Clean water req
I „
2-13 paragraph 3
12294A
Nadendum 10.2 -------------
1) age 3 of 94 - -
!
' pebruary 2, 212
y
can be from the nearby plant water hydrants. Contractor is responsible for any hoses,
piping and fittings necessary."
2-14 In Specification Section 11378B, Fine Bubble Aeration Systems, ADD the following
sentence to the end of Paragraph 3.1.B.1: "Storage area must be provided by the
Contractor and shall keep the diffusers safe from weather, sunlight, and all construction
activities."
2-15 In Specification Section 11378B, Fine Bubble Aeration Systems, ADD the following to
the end of the first sentence in Paragraph 3.1.B.1: "(for a total of 1,306 existing
membranes per tank)."
2-16 In Specification Section 11378B, Fine Bubble Aeration System, DELETE the last
sentence from Paragraph 3.1.B.2, and REPLACE with "Existing diffuser retainer rings
and subplates shall be used with the new membranes on the existing holders."
2-17 In Specification Section 11378B, Fine Bubble Aeration System, DELETE the first
sentence in Paragraph 3.1.B.3 and REPLACE with "The Contractor shall install all
existing membranes removed from Aeration Tanks No. 1 and No. 2 on the new diffuser
holders in Aeration Tanks No. 3 and No. 4 (for a total of 1,306 existing membranes per
tank)."
2-18 In Specification Section 15050, Pipe and Pipe Fittings - General, ADD the following to
the chart in Paragraph 3.4:
2-19 ADD Specification "15062, Ductile Iron Pipe and Fittings" to the Table of Contents and
Division 15. Specification is attached to the end of this addendum.
2-20 In Specification 15124, Slide Gates and Guide Frames, ADD the following to Paragraph
2.2:
"C. Primary Effluent Slide Gate No. 1 and Primary Effluent Slide Gate No. 2 shall be
provided with a double stem operator with two gearboxes connected by an
interconnecting shaft for simultaneous operation.
1. Interconnecting shafting shall be constructed of aluminum or stainless steel.
2. Flexible couplings shall be provided at each end of the interconnecting
shaft.
3. One crank shall be provided to mount on the pinion shaft of one of the
gearboxes.
4. The moving portion of the interconnecting shaft shall be covered with
stainless steel cover."
February 2, 2012
Addendum No. 2
Page 4 of 94 12284A
INTERIOR
CLASS 53
CLASS
SC
SCUM
(SUBMERGED)
-
DI
FLANGED
IV
2-19 ADD Specification "15062, Ductile Iron Pipe and Fittings" to the Table of Contents and
Division 15. Specification is attached to the end of this addendum.
2-20 In Specification 15124, Slide Gates and Guide Frames, ADD the following to Paragraph
2.2:
"C. Primary Effluent Slide Gate No. 1 and Primary Effluent Slide Gate No. 2 shall be
provided with a double stem operator with two gearboxes connected by an
interconnecting shaft for simultaneous operation.
1. Interconnecting shafting shall be constructed of aluminum or stainless steel.
2. Flexible couplings shall be provided at each end of the interconnecting
shaft.
3. One crank shall be provided to mount on the pinion shaft of one of the
gearboxes.
4. The moving portion of the interconnecting shaft shall be covered with
stainless steel cover."
February 2, 2012
Addendum No. 2
Page 4 of 94 12284A
DRAWINGS
The following changes are made to the Drawings:
2-21 On Drawing M-3, Note No. 10, DELETE the words, "Bid Item No. 5," and REPLACE
with "Bid Item No. 6."
2-22 On Drawing M-3, ADD the following note: "11. This Drawing is not to scale. The total
length of 1" Plant Water piping is approximately 25 feet per clarifier."
2-23 On Drawing M-3, DELETE all references to the SS Hose Rack.
2-24 On Drawing M-3, ADD the following Note: "12. Existing 12 -inch Primary Sludge Line
penetrates the clarifier wall at centerline elevation 69.0"'
2-25 On Drawing M-9, DELETE the Diffuser Schedule table in its entirety and REPLACE
with the following table:
2-26 On Drawing M-10, ADD the following Note: "5. The new 12" SS droplegs, replacing the
existing 6" SS droplegs, will require new concrete cores in two locations per tank for a
total of 8 cores. Core drill as required for pipe penetration. Centerline of piping is at
75.33'. Concrete wall is F-0" thick with a 1:1 increase on one side of the wall starting at
elevation 75.5."
2-27 On Drawing M-11, ADD the following Note: "6. The new 8" SS droplegs, replacing the
existing 6" SS droplegs, will require new concrete cores in two locations per tank for a
total of 8 cores. Core drill as required for pipe penetration. Centerline of piping is at
75.33'. Concrete wall is F-0" thick with a 1:1 increase on one side of the wall starting at
elevation 75.5."
2-28 On Drawing M-13, DELETE the 12 -inch Butterfly Valves (BFV-323-05 and BFV-323-
03) shown in the vertical. These valves are shown correctly in the horizontal on Drawing
M-12.
February 2, 2012
Addendum No. 2
Page 5 of 94 12284A
TANK 1
TANK 2
TANK 3
TANK 4
ZONE ZONE
A B
ZONE IZONE
A I B
ZONE ZONE
A B
ZONE ZONE
A B
TOTAL
EXISTING LATERALS
26 20
26 20
26 20
26 20
EXISTING DIFFUSERS /LATERAL
31 25
31 25
31 25
31 25
TOTAL EXISTING DIFFUSERS
806 500
806 500
806 500
806 500
5224
ADDITIONAL NEW LATERALS
20 12
20 1 12
20 12
21 12
DIFFUSERS I NEW LATERALS
51 24
51 24
51 24
48149 24
TOTAL NEW DIFFUSERS
1020 288
1020 288
1020 288
1020 1 288
5232
2-26 On Drawing M-10, ADD the following Note: "5. The new 12" SS droplegs, replacing the
existing 6" SS droplegs, will require new concrete cores in two locations per tank for a
total of 8 cores. Core drill as required for pipe penetration. Centerline of piping is at
75.33'. Concrete wall is F-0" thick with a 1:1 increase on one side of the wall starting at
elevation 75.5."
2-27 On Drawing M-11, ADD the following Note: "6. The new 8" SS droplegs, replacing the
existing 6" SS droplegs, will require new concrete cores in two locations per tank for a
total of 8 cores. Core drill as required for pipe penetration. Centerline of piping is at
75.33'. Concrete wall is F-0" thick with a 1:1 increase on one side of the wall starting at
elevation 75.5."
2-28 On Drawing M-13, DELETE the 12 -inch Butterfly Valves (BFV-323-05 and BFV-323-
03) shown in the vertical. These valves are shown correctly in the horizontal on Drawing
M-12.
February 2, 2012
Addendum No. 2
Page 5 of 94 12284A
I Ib
QUESTIONS AND ANSWERS FROM PRE-BID CONFERENCE AND FOLLOW-UP
CORRESPONDENCE
2-29 Q: Is there any slope to the floors of the existing aeration tanks?
A: There is no slope.
2-30 Q: Will the diffuser assemblies in Sanitaire's delivery be shipped fully assembled or are
the membranes and diffuser holders shipped separately, requiring field assembly?
A: Membranes and diffuser holders are shipped separately, requiring field assembly.
2-31 Q: What is the water level in the aeration basin influent channels?
A: Water elevation varies between 71.75' to 73.75' depending on the influent flows.
However, Owner can redirect aeration basin influent flows such that aeration pipe
modification work within the channel can be performed in a dry channel. Refer to
General Clarification section of this Addendum for further clarification.
2-32 Q: Are the existing duct banks encased in concrete?
A: Yes.
2-33 Q: What is the elevation of the duct banks?
A: Duct banks generally are 30 -inches below grade except where they enter the two
Primary Pump Stations. The conduits are at elevation 68.5' leaving the Primary Pump
Stations, with a grade elevation of approximately 76'.
2-34 Q: What is the operating pressure of the existing air piping leading to the aeration
basins?
A: Approximately 7 to 9 psi.
2-35 Q: What is the anticipated operating temperature of the air inside the existing air piping
leading to the aeration basins?
A: Temperature can be as high as 250 degrees.
2-36 Q: Does the new plant water piping need to be insulated?
A: No.
2-37 Q: Please provide a pipe spec for the existing aeration piping. Will field welding be
allowed for the installation of the proposed SS tees in the headers?
A: The existing SS pipe spec is the same as the spec provided for this job. Yes, field
welding will be allowed.
2-38 Q: Has a lead paint inspection been undertaken for this project?
A: A lead paint inspection has not been undertaken. However, the 1972 specs called for
a bitumastic paint equivalent to Koppers Co. 300M for the clarifier equipment and
specifically called out that no lead base paints would be permitted. The District has
used a two part epoxy coating in the past for touch-up paint.
February 2, 2012
Addendum No. 2
Page 6 of 94 12284A
GREATER LAWRENCE SANITARY DISTRICT
PRIMARY CLARIFIER AND AERATION SYSTEM IMPROVEMENTS
CONTRACTI
PRE-BID CONFERENCE
1:30 PM
January 27, 2012
ATTENDEES
NAME (PLEASE PRINT)
REPRESENTING (PLEASE PRINT)
I. Pkv 1-6 l�►cgkT-
2. L i qLIQ L �h NAL C t,crt= LL'S scw'
S. "'�' c-� { `�F l f Ete
6. is t A
t --
7.
8.
9.
jn 1 �t � i �C I�crvl�f'
10. cf-Qls
be -e -S
Wql!%
(tC f ^
11. J d 1a ti
1.3 c-,. Y Ate S
L* -e S ry n*
Sex pKP s c C/'117
12. / L�Q(�t�-Qv� i
13. t�1 KG rAC-C I 6>30 `Z. j—�. 1'rF
14. 1 r�tr ;� D'S QA
t �
15. mer(
16.E �.—rrt°7' Cs L
17.
18.
Addendum No. 2
February 2, 2012 Page 7 of 94 12284A
ATTENDEES
NAME (PLEASE PRINT) REPRESENTING (PLEASE PRINT)
19, OrA-i F' I vt. (n Ct. 6,c Co C k`P wt, 68 14- (� e ✓
20. 510 (-4-1�{ �� X �s�
22.fL c.�l c� C S wzC k
V'"t trema v S� � .66
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43,
Addendum No. 2
February 2, 2012 Page 8 of 94 12284A
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 1 of 58
Addendum No. 2
February 2, 2012 Page 9 of 94 12284A
THE COMMONWEALTH OF IVIASSACI-IUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK
Go, e or
As determined by the Director under the provisions of
the
JoANVESF. GOLDSTEIN
INlassachusetts General Laws, Chapter 149, Sections 26
to 27H
TIMOTHY P.',IURRAY
HEATHER E. ROME
LI. Goae
Director
Awarding Authority: Greater Lawrence
Sanitar; District
Contract Number: 12284
City/Town: NORTH
ANDOVER
Description of Work: Primary Clarifier
& Aeration System Improvements - A new machanism in the primary clarifier
increasing the
number of diffusers in the aeration system; and replace two primary clarifier effluent
gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
Construction
(2 AXLE) DRIVER - EQUIPMENT
12/01/2011
$29.85 -�
$8.56
$7.27
$0.00
$45.68
TEAMSTERS JOINT COUNCIL NO. 10 7.ONE B
06/01/2012
$30.15
$8.56
$7.27
$0.00
$45.98
08/01/2012
$30.15
$8.91
$7.27
$0.00
$46.33
12/01/2012
$30.45
$8.91
$8.00
$0.00
$47.36
(3 AXLE) DRIVER - EQUIPMENT
12/01/2011
$29.92
$8.56
$7.27
$0.00
$45.75
TEAMSTERSJOINT COUNCIL NO. 10 ZONE B
06/01/2012
$30.22
$8.56
$7.27
$0.00
$46.05
08/01/2012
$30.22
$8.91
$7.27
$0.00
$46.40
12/01/2012
$30.52
$8.91
$8.00
$0.00
$47.43
(4 & 5 AXLE) DRIVER - EQUIPMENT
12/01/2011
$30.04
$8.56
$7.27
$0.00
$45.87
TEAMSTERS JOINT COUNCIL NO. lOZONE B
06/01/2012
$30.34
$8.56
$7.27
$0.00
$46.17
08/01/2012
$30.34
$8.91
$7.27
$0.00
$46.52
_..__..._._..._......._._......._
12/01/2012
$30.64
$9.07
$8.00
$0.00
$47.71
......... _.._........_.._..._.........................._..........._........_...._................._..._._........._.._.........._.............._.
ADS/SUBMERSIBLE PILOT
........... _..............._....._-- ...------__.-..._......__...
08/01/2011
------ --
$82.60
...__..__...-- -
$8.08
--- ._._._.....__.....__._.....
$17.12
---.......
$0.00
�..___..
$107.80
PILE DRIVER LOCAL 56 (ZONE 1)
AIR TRACK OPERATOR
12/01/2011
$30.10
$7.10
$11.55
$0.00
$48.75
LABORERS - ZONE 2
ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2011
$28.40
$9.90
$5.95
$0.00
$44.25
ASBESTOS WORKERS LOCAL 6 (BOSTON)
ASPHALT RAKER
12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
LABORERS - ZONE 2
...... ------- --------------------- ................._._......----_---.-........_.._........_........................------..._._...._..._...._...... ...-- ------... ........... ...._....... -------------_.....
ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2011
......... ... -------._
$39.52
.... .............
$10.00
-------
$12.40
$0.00
$61.92
OPERATING ENGINEERS LOCAL 4
06/01/2012
$40.09
$10.00
$12.40
$0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
$0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
$0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
$0.00
$64.67
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 1 of 58
Addendum No. 2
February 2, 2012 Page 9 of 94 12284A
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
THE COMMONWEALTH OF MASSACHUSETTS
r �+
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
Apprentice Base Wage
SVV,I 1�.
DEPARTMENT OF LABOR STANDARDS
Effective Date
Base Wage
4_
Prevailing Wage Rates
Supplemental
Total Rate
DEVAL L. PATRICK
Govemor
Asdetermined by the Director under the provisions of the JOANNE F. GOLDSTEIN
$6.97
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TINIOTHP P. MURRAY
Lt. Govemor
HEATHER E. ROWT
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Supplemental
Apprentice Base Wage
Health
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$42.66
$24.51
$6.97
$11.18
$0.00
Unemployment
$26.39
BACKHOE/FRONT-END LOADER
12/01/2011
$39.52
$10.00
$12.40
$0.00
$61.92
OPERATING EA[GINEERS LOCAL J
$46.43
$30.16
$6.97
$11.18
$0.00
$48.31
$32.05
06/01/2012
$40.09
$10.00
$12.40
$0.00
$62.49
$11.18
12/01/2012
$40.71
$10.00
$12.40
$0.00
$63.11
$53.97
06/01/2013
$41.49
$10.00
$12.40
$0.00
$63.89
_
12/01/2013
$42.27
$10.00
$12.40
$0.00
$64.67
_......._...
..... ... ....... ._..._.....__._._.._..._._.._._._.......... --... .... ._...... -- ._...---.-... --- -----... _..._.....
BARCO-TYPE JUMPING TAMPER
---- -- - ---
12/01/2011
-- ...--
$29.60
---- -
$7.10
-----.._._._..--
$11.55
- _......_..._....----._....
$0.00
$48.25
LABORERS - ZONE 2
BLOCK PAVER, RAMMER / CURB SETTER 12/01/2011 $30.10 $7.10 $11.55 $0.00 $48.75
LABORERS - ZONE 2
BOILER MAKER
BOILERMAKERS LOCAL 29
Apprentice- BOILERMAKER -Local 29
Effective Date - 01/01/2010
Step percent
.......... _...... -.... ................... ..... ............ ............. _......... _...._.._
1 65
2 65
3 70
4 75
5 80
6 85
7 90
8 95
JNotes:
Apprentice to Journeyworker Ratio:1:5
01/01/2010 $37.70 $6.97 $11.18 $0.00
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 10 of 94
12284A
$55.85
Page 2 of 58
Supplemental
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
$24.51
$6.97
$11.18
$0.00
$42.66
$24.51
$6.97
$11.18
$0.00
$42.66
$26.39
$6.97
$11.18
$0.00
$44.54
$28.28
$6.97
$11.18
$0.00
$46.43
$30.16
$6.97
$11.18
$0.00
$48.31
$32.05
$6.97
$11.18
$0.00
$50.20
$33.93
$6.97
$11.18
$0.00
$52.08
$35.82
$6.97
$11.18
$0.00
$53.97
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 10 of 94
12284A
$55.85
Page 2 of 58
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
THE COMfMONWEALTH OF MASSACHUSETTS
$9.93
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY
08/01/2011 $46.56 $9.93 $16.51 $0.00 $73.00
y ; , r
!, 4
, %, jL'7
DEPARTMENT OF LABOR STANDARDS
my
Prevailing Wage Rates
DEVA,L L. PATRICK
As determined b the Director under the provisions of the JDANME E. GOLDSTEIN
Y P
Govemor
s' -1 -
3 70
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. HURRAY
Lt. Govemor
HEATHER E. RONVE
Dimcror
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
$9.93
Unemployment
...... ......................................._..._._.._....._.__............................_...................................-_._......._._............_......._.....__..___......___...................
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY
08/01/2011 $46.56 $9.93 $16.51 $0.00 $73.00
WATERPROOFING)
2 60
$27.94
02/01/2012 $47.55 $9.93 $16.51 50.00 $73.99
BRICKLAYERS LOCAL 3 (LYNN)
$16.51
Apprentice- BRICKIPLASTER/CEMENT MASON -Local 3 Lynn
Effective Date - 08/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$23.28
$9.93
$16.51
$16.51
$0.00
$49.72
2 60
$27.94
$9.93
$0.00
$16.51
$0.00
$54.38
3 70
$32.59
$9.93
$59.73
$16.51
$0.00
$59.03
4 80
$37.25
$9.93
5 90
$16.51
$0.00
$63.69
5 90
$41.90
$9.93
$16.51
$0.00
$68.34
Effective Date - 02/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$23.78
$9.93
$16.51
$0.00
$50.22
2 60
$28.53
$9.93
$16.51
$0.00
$54.97
3 70
$33.29
$9.93
$16.51
$0.00
$59.73
4 80
$38.04
$9.93
$16.51
$0.00
$64.48
5 90
$42.80
$9.93
$16.51
$0.00
$69.24
tNotes:
Apprentice to Journey worker Rat oo:l:5
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 11 of 94
12284A
Page 3 of 58
E
s ,
THE CONWN-IONWEALTH OF bIASSACHUSETTS
't
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
i It�,
DEPARTMENT OF LABOR STANDARDS
%Eu
Classification
Effective Date
Prevailing Wage Rates
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Stt Lo
TIMOTHY P. NnJRRAv
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E ROVE
LI. Gocemor
D-1.,
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unempl�ment
BULLDOZER/GRADER/SCRAPER
12/01/2011
$39.16
$10.00
$12.40
$0.00
$61.56
OPERATING ENGINEERS LOCAL a
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
_........ _._......... _..._.. ---------....__.._..__._.._.._...._...__............ --._...._............ ._..._........ _....................-.... -....... ........... ...............
CAISSON & UNDERPINNING BOTTOM MAN
......_....._..----..__..._.....................
12/01/2011
_....... _........
$32.80
.... .......... ...........................
$7.10
...................
$12.60
._..........................._...... _.......... ....................
$0.00
----- ......... ...... ............ _
$52.50
LABORERS - FOUNDATIONAND MARINE,
CAISSON & UNDERPINNING LABORER
12/01/2011
$31.65
$7.10
$12.60
$0.00
$51.35
LABORERS - FOUNDATION AND MARINE
CAISSON & UNDERPINNING TOP MAN
12/01/2011
$31.65
$7.10
$12.60
$0.00
$51.35
LABORERS - FOUNDATION AND MARINE_
CARBIDE CORE DRILL OPERATOR
12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
LABORERS -ZONE 2
......... _........ ....._.._.......... ................ _..................... _.._...... .......... ........ ........................ _...... .................... .......................... _.... ........................ ....._.
CARPENTER
09/01/2011
$32.05
$9.80
$15.51
$0.00
$57.36
CARPENTERS -ZONE 2 (Eastern Massachusetts)
03/01/2012
$33.17
$9.80
$15.51
$0.00
$58.48
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 4 of 58
Addendum No. 2
February 2, 2012 Page 12 of 94 12284A
JOANNE F. GOLDSTEIN
secret -
HEATHER E. RONVE
Di,ector
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental
Unemployment
Apprentice - CARPENTER - Zone 2 Eastern M4
Effective Date - 09/01/2011
Step percent Apprentice Base Wage
THE COMMONWEALTH OF MASSACHUSETTS
Pension
Supplemental
Unemployment
,� r=
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
'
DEPARTMENT OF LABOR STANDARDS
$1.57
$0.00
$27.40
Prevailing Wage Rates
$19.23
$9.80
DEVAL L. PATRICK
Govcmor
As determined by the Director under the provisions of the
$30.60
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. MURRAY
$9.80
Lt. Go%'emor
$0.00
JOANNE F. GOLDSTEIN
secret -
HEATHER E. RONVE
Di,ector
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental
Unemployment
Apprentice - CARPENTER - Zone 2 Eastern M4
Effective Date - 09/01/2011
Step percent Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1 50�
$16.03
$9.80
$1.57
$0.00
$27.40
2 60
$19.23
$9.80
$1.57
$0.00
$30.60
3 70
$22.44
$9.80
$10.80
$0.00
$43.04
4 75
$24.04
$9.80
$10.80
$0.00
$44.64
5 80
$25.64
$9.80
$12.37
$0.00
$47.81
6 80
$25.64
$9.80
$12.37
$0.00
$47.81
7 90
$28.85
$9.80
$13.94
$0.00
$52.59
8 90
$28.85
$9.80
$13.94
$0.00
$52.59
Effective Date - 03/01/2012
Supplemental
Step percent
.... .
..........................50....._............................................................. .._.......... ...
Apprentice Base Wage
.........$16.59._..._.................
Health
Pension
Unemployment
Total Rate
........
.$9.80 _
-.... -...... ............. ..............._..._.......................
$1.57
...................
$0. 00
......... ........
$27.96
2 60
$19.90
$9.80
$1.57
$0.00
$31.27
3 70
$23.22
$9.80
$10.80
$0.00
$43.82
4 75
$24.88
$9.80
$10.80
$0.00
$45.48
5 80
$26.54
$9.80
$12.37
$0.00
$48.71
6 80
$26.54
$9.80
$12.37
$0.00
$48.71
7 90
$29.85
$9.80
$13.94
$0.00
$53.59
8 90
$29.85
$9.80
$13.94
$0.00
$53.59
=Notes:
s
Apprentice to Journeyworker Ratio: 1:5
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Nvage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page I3 of 94
12284A
Total Rate
Page 5 of 58
r t
THE COMMONWEALTH OF MASSACHUSETTS
LL
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
�ty
DEPARTMENT OF LABOR STANDARDS
,Tt `
Prevailing Wage Rates
DEVAL L. PATRICK
Go -or
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
08/01/2011
S -lm
TIMOTHY P. IMURR Y
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RO\VE
Lt. Go-.,
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
CEMENT MASONRY/PLASTERING
BRICKUA ERS LOCAL 3 (LYNN)
CHAIN SAW OPERATOR
LABORERS - ZONE 2
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
_..._.._...._-----._._._........._.
OPERATING ENGINEERS LOCAL a
Unemployment
08/01/2011
$44.33
$9.93
$16.51
$0.00
$70.77
02/01/2012
$45.10
$9.93
$16.51
$0.00
$71.54
12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES
12/01/2011
$40.52
$10.00
$12.40
$0.00
$62.92
OPERATING ENGINEERS LOCAL a
06/01/2012
$41.09
$10.00
$12.40
$0.00
$63.49
12/01/2012
$41.71
$10.00
$12.40
$0.00
$64.11
06/01/2013
$42.49
$10.00
$12.40
$0.00
$64.89
12/01/2013
$43.27
$10.00
$12.40
$0.00
$65.67
COMPRESSOR OPERATOR
12/01/2011
$27.95
$10.00
$12.40
$0.00
$50.35
OPERATING ENGINEERS LOCAL 4
06/01/2012
$28.34
$10.00
$12.40
$0.00
$50.74
12/01/2012
$28.79
$10.00
$12.40
$0.00
$51.19
06/01/2013
$29.34
$10.00
$12.40
$0.00
$51.74
......... _... ....._............ ..........._.__..............._..................._....._....._............._.............__.._............_......_... _......_....__....._......__......................................__
12/01/2013
$29.89
$10.00
$12.40
$0.00
$52.29
DELEADER (BRIDGE)
..... __......_..........-.............._......_._...
01/01/2012
....... .... __._....._.._.._._......
$44.01
........_..._..._..........-
$7.80
$14.60
$0.00
$66.41
PAINTERS LOCAL 35 - ZONE 2
07/01/2012
$45.01
$7.80
$14.60
$0.00
$67.41
01/01/2013
$46.01
$7.80
$14.60
$0.00
$68.41
This wage schedule must be posted by the contractor at the work site in accordance with 1Vi.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 14 of 94
12284A
Page 6 of 58
ry"
THE COMMONWEALTH OF MASSACHUSETTS
y
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
- -
DEPARTMENT OF LABOR STANDARDS
$29.81
2
55
Prevailing Wage Rates
DEVAGo, PATRICK
Gocem°r
As determined by the Director under the provisions of the JOANNE GOLDSTEIN
TIMOTHY P. bIIJRRAY
c
Sccrctary
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
LI. Govem°r
HEATHER E.RO\VE
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 - BRIDGES/TANKS
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
50
$22.01
$7.80
$0.00
$0.00
$29.81
2
55
$24.21
$7.80
$3.25
$0.00
$35.26
3
60
$26.41
$7.80
$3.54
$0.00
$37.75
4
65
$28.61
$7.80
$3.84
$0.00
$40.25
5
70
$30.81
$7.80
$12.83
$0.00
$51.44
6
75
$33.01
$7.80
$13.13
$0.00
$53.94
7
80
$35.21
$7.80
$13.42
$0.00
$56.43
8
90
$39.61
$7.80
$14.01
$0.00
$61.42
Effective Date - 07/01/2012
Supplemental
Step
..
...............................................__._.._._...._....._.._........._.._._._.....__._......._..................................._...__........_
percent
Apprentice Base
Health
Pension
Unemployment
Total Rate
1
50
.._. ...Wage
_....................
$22.51
$7.80
$0.00
$0.00
$30.31
2
55
$24.76
$7.80
$3.25
$0.00
$35.81
3
60
$27.01
$7.80
$3.54
$0.00
$38.35
4
65
$29.26
$7.80
$3.84
$0.00
$40.90
5
70
$31.51
$7.80
$12.83
$0.00
$52.14
6
75
$33.76
$7.80
$13.13
$0.00
$54.69
7
80
$36.01
$7.80
$13.42
$0.00
$57.23
8
90
$40.51
$7.80
$14.01
$0.00
$62.32
=Notes:
Steps are 750 hrs.
Apprentice to Journeyworker Ratio: 1:1
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 7 of 58
Addendum No. 2
February 2, 2012 Page 15 of 94 12284A
s
THE COMMONWEALTH OF MASSACHUSETTS
t 4f
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
Description of Work:
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK
Go, e-,
As determined by the Director under the provisions of the JOANNE F.GOLDSTEIN
Classification
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. MURRAY
HEATHER E. ROIk`E
Lt. Govemnr
Director
Awarding Authority:
Greater Lawrence Sanitary District
Contract Number:
12284 City/Town: NORTH ANDOVER
Description of Work:
Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location:
240 Main Street, North Andover MA 01845
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
...._..----....__......._.......__.....-_.........._..........._.._...__._........
Unemployment
_.................._..._........._...._................. ........ .............. ..... __._...... ....... .............__......._........__.._._._..... _........ -................... _...._.__--..___._........ ...__......._--.......___............._...._._........_.................._......_..............._..._...._.................._................................_.._..
DEMO: ADZEMAN
12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35
LABORERS - ZO,Vr: 2
1 60
DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35
LABORERS - ZONE 2
Apprentice- LABORER Demo Backhoe/Loader/Hammer Operator
Effective Date - 12/01/2011
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
.�
1 60
$19.68
$7.10
$12.45
$0.00
$39.23
2 70
$22.96
$7.10
$12.45
$0.00
$42.51
3 80
$26.24
$7.10
$12.45
$0.00
$45.79
4 90
$29.52
$7.10
$12.45
$0.00
$49.07
;Notes:
Apprentice to Journeyworker Ratio: 1:5
3
DEMO: BURNERS
12/01/2011
$32.55
$7.10
_ $12.45
$0.00 $52.10
LABORERS - ZONE 2
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, NIA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 16 of 94
12284A
Page 8 of 58
_•
THE COMMONWEALTH OF MASSACHUSETTS
$7.10
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
$0.00
DEPARTMENT OF LABOR STANDARDS
2 70
$22.79
$7.10
Prevailing Wage Rates
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
3 80
Secreian
TIMOTHY P. MURRAY.
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Go-tor
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice - LABORER Demo Burners
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$19.53
$7.10
$12.45
$0.00
$39.08
2 70
$22.79
$7.10
$12.45
$0.00
$42.34
3 80
$26.04
$7.10
$12.45
$0.00
$45.59
4 90
$29.30
$7.10
$12.45
$0.00
$48.85
?Notes:
I
i
Arentice to Journeyworker Ratio: 1:5
DEMO: CONCRETE CUTTER/SAWYER 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35
LABORERS - ZONE 2
DEMO: JACKHAMMER OPERATOR 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10
LABORERS - ZONE 2
DEMO: WRECKING LABORER 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35
LABORERS - ZONE 2
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dois or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 9 of 58
Addendum No. 2
February 2, 2012 Page 17 of 94 12284A
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street. North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- LABORER Demo Wrecking Laborer
THE COMMONWEALTH OF MASSACHUSETTS
,41
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEV.AL L. PATRICK
Go-ior
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
secreiare
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H. HEATHER E. ROWE
LI. G., -
Dimctor
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street. North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- LABORER Demo Wrecking Laborer
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$19.08
$7.10
$12.45
$0.00
$38.63
2 70
$22.26
$7.10
$12.45
$0.00
$41.81
3 80
$25.44
$7.10
$12.45
$0.00
$44.99
4 90
$28.62
$7.10
$12.45
$0.00
$48.17
;Notes:
z
Apprentice to Journeyworker Ratio:1:5
{I
DIRECTIONAL DRILL MACHINE OPERATOR
12/01/2011
$39.16
$10.00
$12.40
$0.00
$61.56
OPERATING ENGINEERS LOCAL J
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
_
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
DIVER
08/01/2011
� $55.07
$8.08
$17.12 ��$0.00
$80.27
PILE DRIVER LOCAL 56 (ZONE l)
_..............._.................................................._.......... -..._.
DIVER TENDER
08/01/2011
$40.12
$8.08
$17.12
$0.00
$65.32
PILE DRIVER LOCAL 56 (ZONE 1)
DIVER TENDER (EFFLUENT)
08/01/2011
$60.18
$8.08
$17.12
$0.00
$85.38
PILE DRIVER LOCAL 56 (70NE 1)
DIVER/SLURRY (EFFLUENT)
08/01/2011
$82.60
$8.08
$17.12
$0.00
$107.80
PILE DRIVER LOCAL 56 (ZONE 1)
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 10 of 58
Addendum No. 2
February 2, 2012 Page 18 of 94 12284A
y c 5 THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Gocemor S -(-
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWS
LI. G-- Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street. North Andover MA 01845
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
ELECTRICIAN 09/01/2011
$41.89
$13.00
$13.86
$0.00
$68.75
ELECTPIGANS LOCAL 103
03/01/2012
$42.37
$13.00
$13.87
$0.00
$69.24
09/01/2012
$43.05
$13.00
$13.89
$0.00
$69.94
03/01/2013
$43.77
$13.00
$13.91
$0.00
$70.68
09/01/2013
$44.45
$13.00
$13.93
$0.00
$71.38
03/01/2014
$45.17
$13.00
$13.95
$0.00
$72.12
09/01/2014
$45.84
$13.00
$13.97
$0.00
$72.81
03/01/2015
$46.55
$13.00
$14.00
$0.00
$73.55
09/01/2015
$47.51
$13.00
$14.03
$0.00
$74.54
03/01/2016
$48.47
$13.00
$14.05
$0.00
$75.52
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
Wage Request Number: 20120103-006
Page I1 of 58
Addendum No. 2
February 2, 2012 Page 19 of 94 12284A
a 4 THE COMMONWEALTH OF MASSACHUSETTS
a EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
I �g DEPARTMENT OF LABOR STANDARDS
v Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
G--,
Secretan
TIMOTHY P. rvf JRRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HE.ATI4ER E. ROWE
Lt. Govemor Dimcior
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 Citv/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- ELECTRICIAN- Local 103
Effective Date - 09/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 40
$16.76
$13.00
$7.80
$0.00
$37.56
2 40
$16.76
$13.00
$7.80
$0.00
$37.56
3 45
$18.85
$13.00
$10.26
$0.00
$42.11
4 45
$18.85
$13.00
$10.26
$0.00
$42.11
5 50
$20.95
$13.00
$10.58
$0.00
$44.53
6 55
$23.04
$13.00
$10.91
$0.00
$46.95
7 60
$25.13
$13.00
$11.23
$0.00
$49.36
8 65
$27.23
$13.00
$11.57
$0.00
$51.80
9 70
$29.32
$13.00
$11.89
$0.00
$54.21
10 75
$31.42
$13.00
$12.22
$0.00
$56.64
Effective Date - 03/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$16.95
$13.00
$7.81
$0.00
$37.76
2
40
$16.95
$13.00
$7.81
$0.00
$37.76
3
45
$19.07
$13.00
$10.26
$0.00
$42.33
4
45
$19.07
$13.00
$10.26
$0.00
$42.33
5
50
$21.19
$13.00
$10.59
$0.00
$44.78
6
55
$23.30
$13.00
$10.92
$0.00
$47.22
7
60
$25.42
$13.00
$11.24
$0.00
$49.66
8
65
$27.54
$13.00
$11.58
$0.00
$52.12
9
70
$29.66
$13.00
$11.90
$0.00
$54.56
10
75
$31.78
$13.00
$12.23
$0.00
$57.01
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 20 of 94
Page 12 of 58
12284A
A
# THE COMikIONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
n.
i' it 1 rk DEPARTMENT OF LABOR STANDARDS
11 M11 iXf
Y�,�F
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Governor
$ecrCl1n'
THMOTHv P. MURRAY INIassachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROME
Lr. Gocenior
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
'Notes:
App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80
Apprentice to Journeyworker Ratio.2:3***
ELEVATOR CONSTRUCTOR
ELEVATOR CONSTRUCTORS LOCAL 4
01/01/2012 $52.45 $8.78 $6.96 $0.00
Apprentice- ELEVATOR CONSTRUCTOR
-Local 4
Effective Date- 01/01/2012
Supplemental
Step percent
... .... .......... .-.... . . .
..----_...._...._.-....... -
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
......_..._...._._...._..__............._....---....
.
5..-
- ._ .._
._.....................__._......._._....__.
$26.23
..-_--..._.
$8.78
_._.....-...._......-.....-..._............_.._...._.............._._..._.....................__.._.__..
$0.00
.._._.
$0.00
_......_.
$35.01
2 55
$28.85
$8.78
$6.96
$0.00
$44.59
3 65
$34.09
$8.78
$6.96
$0.00
$49.83
4 70
$36.72
$8.78
$6.96
$0.00
$52.46
5 80
$41.96
$8.78
$6.96
$0.00
$57.70
Notes:
I
Steps 1-2 are 6 mos.; Steps 3-5 are 1 year
I
Apprentice to Journeyworker Ratio:]:I
...................................._. _..... .... ...... ...... -__ .. ....._.................. ....... ........... _.._........ _............. ............. ......... ...................
ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 $6.96 $0.00
ELEVATOR CONSTRUCTORS LOCAL 4
FENCE & GUARD RAIL ERECTOR 12/01/2011 $29.60 $7.10 $11.55 $0.00WW w�
LABORERS - ZONE 2
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of NI.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 21 of 94
$68.19
$54.33
$48.25
Page 13 of 58
12284A
N '
THE COiv t%,1ON«1EALTH OF MASSACHUSETTS
r
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
31 t'
DEPARTMENT OF LABOR STANDARDS
,11
Classification
Effective Date
Prevailing Wage Rates
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Supplemental
Secrctan
$13.00
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. `NRRAY.
Lt. Gocemor
HEATHER E. R01VE
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
11/01/2011
$38.88
$10.00
$12.20
$0.00
$61.08
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$13.00
05/01/2012
$39.49
$10.00
$12.20
Unemployment
$61.69
FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY
11/01/2011
$37.49
$10.00
$12.20
$0.00
$59.69
OPERATING ENGINEERS LOCAL t
05/01/2013
$40.73
$10.00
$12.20
$0.00
$62.93
$72.12
05/01/2012
$38.10
$10.00
$12.20
$0.00
$60.30
03/01/2015
11/01/2012
$38.71
$10.00
$12.20
$0.00
$60.91
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
05/01/2013
$39.32
$10.00
$12.20
$0.00
$61.52
OPERATING ENGINEERS LOCAL J
11/01/2013
$40.08
$10.00
$12.20
$0.00
$62.28
05/01/2014
$40.85
$10.00
$12.20
$0.00
$63.05
FIELD ENGTARTY CHIEF-BLDG,SITE,HVY/HWY
11/01/2011
$38.88
$10.00
$12.20
$0.00
$61.08
OPERATING ENGINEERS LOCAL 4
$13.00
$13.87
$0.00
$69.24
09/01/2012
$43.05
$13.00
05/01/2012
$39.49
$10.00
$12.20
$0.00
$61.69
$13.91
11/01/2012
$40.11
$10.00
$12.20
$0.00
$62.31
$0.00
05/01/2013
$40.73
$10.00
$12.20
$0.00
$62.93
$72.12
11/01/2013
$41.50
$10.00
$12.20
$0.00
$63.70
03/01/2015
05/01/2014
$42.27
$10.00
$12.20
$0.00
$64.47
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
11/01/2011
$20.91
$10.00
$12.20
$0.00
$43.11
OPERATING ENGINEERS LOCAL J
$14.05
$0.00
$75.52
05/01/2012
$21.27
$10.00
$12.20
$0.00
$43.47
11/01/2012
$21.63
$10.00
$12.20
$0.00
$43.83
05/01/2013
$21.99
$10.00
$12.20
$0.00
$44.19
11/01/2013
$22.45
$10.00
$12.20
$0.00
$44.65
05/01/2014
$22.90
$10.00
$12.20
$0.00
$45.10
FIRE ALARM INSTALLER
ELECTRICIANS LOCAL 103
09/01/2011
$41.89
$13.00
$13.86
$0.00
$68.75
03/01/2012
$42.37
$13.00
$13.87
$0.00
$69.24
09/01/2012
$43.05
$13.00
$13.89
$0.00
$69.94
03/01/2013
$43.77
$13.00
$13.91
$0.00
$70.68
09/01/2013
$44.45
$13.00
$13.93
$0.00
$71.38
03/01/2014
$45.17
$13.00
$13.95
$0.00
$72.12
09/01/2014
$45.84
$13.00
$13.97
$0.00
$72.81
03/01/2015
$46.55
$13.00
$14.00
$0.00
$73.55
09/01/2015
$47.51
$13.00
$14.03
$0.00
$74.54
03/01/2016
$48.47
$13.00
$14.05
$0.00
$75.52
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 22 of 94
Page 14 of 58
12284A
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPIMENT
hi4q r r DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICKAS determined b the Director under the provisions Of the JOANNE F. GOLDSTEIN
Go, error Secreman
TIMOTHY P. NfURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
I.1. Goccmor Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
._................... .............._..__._._._.......__....................._._..._....._......_.............._.......__._.......... _...._......_._.............__...__.........._......._._.... ..........._.......
-----...............
_._......._........ -......
.._......_....._..._.__...._..._._.............._._..._......_..........._..
Unemployment
....... _.._......_......_._.__....
........ ..._.....-._._.....-__...__....__.
FIRE ALARM REPAIR / MAINTENANCE
09/01/2011
$31.42
$13.00
$12.22
$0.00
$56.64
/ COMMISSIONINGELECTRICIANS
03/01/2012
$31.78
$13.00
$12.23
$0.00
$57.01
LOC. -1L 103
09/01/2012
$32.29
$13.00
$12.25
$0.00
$57.54
03/01/2013
$32.83
$13.00
$12.26
$0.00
$58.09
09/01/2013
$33.34
$13.00
$12.28
$0.00
$58.62
03/01/2014
$33.88
$13.00
$12.30
$0.00
$59.18
09/01/2014
$34.38
$13.00
$12.31
$0.00
$59.69
03/01/2015
$34.91
$13.00
$12.33
$0.00
$60.24
09/01/2015
$35.63
$13.00
$12.35
$0.00
$60.98
03/01/2016
$36.35
$13.00
$12.37
$0.00
$61.72
FIREMAN (ASST. ENGINEER)
12/01/2011
$33.23
$10.00
$12.40
$0.00
$55.63
OPERATING ENGINEERS LOCAL a
06/01/2012
$33.70
$10.00
$12.40
$0.00
$56.10
12/01/2012
$34.23
$10.00
$12.40
$0.00
$56.63
06/01/2013
$34.88
$10.00
$12.40
$0.00
$57.28
12/01/2013
$35.54
$10.00
$12.40
$0.00
$57.94
.............. _..--...............
.... ... ............................... ._.._ ........._.._...._.
FLAGGER &SIGNALER
12/01/2011
._......_......._._......_._.._......_..._......_...-................._.__...._..__.._.._........_......
$20.50
$7.10
$11.55
.......... ......... .... _._._.............................
$0.00
_
$39.15
LABORERS - ZONE 2
FLOORCOVERER
FLOORCOVERERS LOCAL 2168 ZONE I
09/01/2011 $35.95 $9.80 $16.61 $0.00
03/01/2012 $37.20 $9.80 $16.61 $0.00
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 23 of 94
$62.36
$63.61
Page 15 of 58
12284A
' ►
THE CONIMONWEALTH OF MASSACHUSETTS
$17.98
$9.80
$1.79
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
tit
DEPARTMENT OF LABOR STANDARDS
t,y�1
$19.77
$9.80
Prevailing Wage Rates
DEVAL L. PATRICK
Got emor
As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN
Y P Secretary
3
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. MURRAY
HEATHER E. ROWE
U. Governor
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- FLOORCOVERER -Local 2168 Zone I
Effective Date - 09/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
50
$17.98
$9.80
$1.79
$0.00
$29.57
2
55
$19.77
$9.80
$1.79
$0.00
$31.36
3
60
$21.57
$9.80
$11.24
$0.00
$42.61
4
65
$23.37
$9.80
$11.24
$0.00
$44.41
5
70
$25.17
$9.80
$13.03
$0.00
$48.00
6
75
$26.96
$9.80
$13.03
$0.00
$49.79
7
80
$28.76
$9.80
$14.82
$0.00
$53.38
8
85
$30.56
$9.80
$14.82
$0.00
$55.18
Effective Date - 03/01/2012
Supplemental
Step
..............._.._......
percent
.......... ............................... _......_...._._.... __.._........... ..............
Apprentice Base Wage
.....--
Health
Pension
Unemployment
Total Rate
1
50
$18.60
$9.80
$1.79
$0.00
$30.19
2
55
$20.46
$9.80
$1.79
$0.00
$32.05
3
60
$22.32
$9.80
$11.24
$0.00
$43.36
4
65
$24.18
$9.80
$11.24
$0.00
$45.22
5
70
$26.04
$9.80
$13.03
$0.00
$48.87
6
75
$27.90
$9.80
$13.03
$0.00
$50.73
7
80
$29.76
$9.80
$14.82
$0.00
$54.38
8
85
$31.62
$9.80
$14.82
$0.00
$56.24
��.. _... ......._,.._
JNotes: _ j
Steps are 750 hrs.
Apprentice to Jo rrneyworker R,atw:l:l
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 16 of 58
Addendum No. 2
February 2, 2012 Page 24 of 94 12284A
a �
THE COMMONWEALTH OF MASSACHUSETTS
Health
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
Supplemental
DEPARTMENT OF LABOR STANDARDS
Unemployment
Prevailing Wage Rates
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Secreiary
TIMOTHY P. NfURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E�RORrE
Lt. Go, error
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
FORK LIFT/CHERRY PICKER
OPER4TING ENGINEERS LOCAL 4
GENERATOR/LIGHTING PLANTMEATERS
OPERATING ENGINEERS LOCAL 4
GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR
SYSTEMS)
GLAZIERS LOCAL 35 (ZONE 2)
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
12/01/2011
$39.52
$10.00
$12.40
$0.00
$61.92
06/01/2012
$40.09
$10.00
$12.40
$0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
$0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
$0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
$0.00
$64.67
12/01/2011
$27.95
$10.00
$12.40
$0.00
$50.35
06/01/2012
$28.34
$10.00
$12.40
$0.00
$50.74
12/01/2012
$28.79
$10.00
$12.40
$0.00
$51.19
06/01/2013
$29.34
$10.00
$12.40
$0.00
$51.74
12/01/2013
$29.89
$10.00
$12.40
$0.00
$52.29
01/01/2012
$33.51
$7.80
$14.60
$0.00
$55.91
07/01/2012
$34.51
$7.80
$14.60
$0.00
$56.91
01/01/2013
$35.51
$7.80
$14.60
$0.00
$57.91
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 25 of 94
Page 17 of 58
12284A
s _
THE COMMONWEALTH OF MASSACHUSETTS
F�
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
$0.00
DEPARTMENT OF LABOR STANDARDS
$24.56
2
55
Prevailing Wage Rates
$7.80
$3.25
DEV.AL L. PATRICK
As determined by y the Director under the p rovisions of the JOANNE F. GOLDSTEIN
Gocemor
S-Iwy
$20.11
Nlassachusetts General Laws, Chapter 149, Sections 26 to 27H
TI'MOTHv P. NIURP-W
HEATHER E. ROVE
LI. Gocemor
Dimuor
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice- GLAZIER - Local 3.i Zone 2
Effective Date - 01/01/2012 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
50
$16.76
$7.80
$0.00
$0.00
$24.56
2
55
$18.43
$7.80
$3.25
$0.00
$29.48
3
60
$20.11
$7.80
$3.54
$0.00
$31.45
4
65
$21.78
$7.80
$3.84
$0.00
$33.42
5
70
$23.46
$7.80
$12.83
$0.00
$44.09
6
75
$25.13
$7.80
$13.13
$0.00
$46.06
7
80
$26.81
$7.80
$13.42
$0.00
$48.03
8
90
$30.16
$7.80
$14.01
$0.00
$51.97
Effective
Date - 07/01/2012
Supplemental
Step
percent
................................................................
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
50
$17.26
$7.80
$0.00
$0.00
$25.06
2
55
$18.98
$7.80
$3.25
$0.00
$30.03
3
60
$20.71
$7.80
$3.54
$0.00
$32.05
4
65
$22.43
$7.80
$3.84
$0.00
$34.07
5
70
$24.16
$7.80
$12.83
$0.00
$44.79
6
75
$25.88
$7.80
$13.13
$0.00
$46.81
7
80
$27.61
$7.80
$13.42
$0.00
$48.83
8
90
$31.06
$7.80
$14.01
$0.00
$52.87
Notes:.
I
Steps are 750 hrs.
Apprentice to Jon rneyworker Ratio: 1:1
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 18 of 58
Addendum No. 2
February 2, 2012 Page 26 of 94 12284A
a THE C01MMONWEALTH OF MASSACHUSETTS
1 j EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
I�h" rely DEPARTMENT OF .LABOR STANDARDS
Prevailing Wage Rates
DEVAPATRICK TRICK determined by the Director under the provisions of the JOANNEF. GOLDSTEIN
Goce PA As
Secrelnn
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. Rou'E
Lr, Governor
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
........... ...I..._ ...... ....... ...._............._....._....._.........__...__....................._............_._....._._..._........_._._._............._..__.........................._..._._..........__.----
HOISTING ENGINEER/CRANES/GRADALLS
OPERATING ENG1,VF.EXS LOCAL a
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
....... .................... ... ..... _... .....
...................
Unemployment
12/01/2011
$39.52
$10.00
$12.40
$0.00
$61.92
06/01/2012
$40.09
$10.00
$12.40
$0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
$0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
$0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
$0.00
$64.67
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 27 of 94
Page 19 of 58
12284A
'
THE COMMONWEALTH OF tMASSACHUSE"CTS
percent
--......... ..... ................... ................... _...... ._............ _.....
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
55
2
60
DEPARTMENT OF LABOR STANDARDS
65
4
,
Prevailing Wage Rates
DEVAL L. PATRICK
As determined by the Director under the of the JOANNE F. GOLDSTEIN
Go, -or
provisions Secret -
85
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. MURRAY
Lt. Govemor
HEATHER E. ROWE
Dirccwor
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- HOIST/PORT. ENG.- Local 4
Effective Date - 12/01/2011
Step percent
1 �D
2 60
3 65
4 70
5 75
6 80
7 85
8 90
Effective Date- 06/01/2012
Step
........ _...
percent
--......... ..... ................... ................... _...... ._............ _.....
1
55
2
60
3
65
4
70
5
75
6
80
7
85
8
90
€Notes:
Apprentice to Journey -worker Ratio:1:6
Supplemental
Apprentice Base Wage Health Pension Unemployment Total Rate
$21.74
$10.00
$0.00
$0.00
$31.74
$23.71
$10.00
$12.40
$0.00
$46.11
$25.69
$10.00
$12.40
$0.00
$48.09
$27.66
$10.00
$12.40
$0.00
$50.06
$29.64
$10.00
$12.40
$0.00
$52.04
$31.62
$10.00
$12.40
$0.00
$54.02
$33.59
$10.00
$12.40
$0.00
$55.99
$35.57
$10.00
$12.40
$0.00
$57.97
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 28 of 94
Page 20 of 58
12284A
Supplemental
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
$22.05
$10.00
$0.00
$0.00
$32.05
$24.05
$10.00
$12.40
$0.00
$46.45
$26.06
$10.00
$12.40
$0.00
$48.46
$28.06
$10.00
$12.40
$0.00
$50.46
$30.07
$10.00
$12.40
$0.00
$52.47
$32.07
$10.00
$12.40
$0.00
$54.47
$34.08
$10.00
$12.40
$0.00
$56.48
$36.08
$10.00
$12.40
$0.00
$58.48
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 28 of 94
Page 20 of 58
12284A
a
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
kk
DEPARTMENT OF LABOR
I
STANDARDS
Effective Date
Base Wage
e{
Prevailing Wage Rates
DEVAL L. PATRICK
Govemor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Secrcutn
TIMOTHY P. NfuRRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E� ROWE
Lt. Gocemor
Dircaor
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 Cit -*,/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
_........................_......_...._.......................... ........ _.......... ................._............._...._........__.... .........._.
Unemployment
HVAC (DUCTWORK)
08/01/2011
$39.83
$9.82
$17.09
$0.00
$66.74
SHEET METAL WORKERS LOCAL 17- A
02/01/2012
$41.08
$9.82
$17.09
$0.00
$67.99
08/01/2012
$42.33
$9.82
$17.09
$0.00
$69.24
02/01/2013
$43.58
$9.82
$17.09
$0.00
$70.49
HVAC (ELECTRICAL CONTROLS)
09/01/2011
$41.89
$13.00
$13.86
$0.00
$68.75
ELECTRICIANS LOCAL 103
03/01/2012
$42.37
$13.00
$13.87
$0.00
$69.24
09/01/2012
$43.05
$13.00
$13.89
$0.00
$69.94
03/01/2013
$43.77
$13.00
$13.91
$0.00
$70.68
09/01/2013
$44.45
$13.00
$13.93
$0.00
$71.38
03/01/2014
$45.17
$13.00
$13.95
$0.00
$72.12
09/01/2014
$45.84
$13.00
$13.97
$0.00
$72.81
03/01/2015
$46.55
$13.00
$14.00
$0.00
$73.55
09/01/2015
$47.51
$13.00
$14.03
$0.00
$74.54
03/01/2016
$48.47
$13.00
$14.05
$0.00
$75.52
HVAC (TESTING AND BALANCING - AIR)
08/01/2011
$39.83
$9.82
m $17.09
$0.00
$66.74
SHEETMETAL WORKERS LOCAL 17 -A
02/01/2012
$41.08
$9.82
$17.09
$0.00
$67.99
08/01/2012
$42.33
$9.82
$17.09
$0.00
$69.24
_ ...............................
02/01/2013
$43.58
$9.82
$17.09
$0.00
$70.49
..........._......._.-....._..._._.................__..
HVAC (TESTING AND BALANCING -WATER)
09/01/2011
............_..........._......._...............I............_..
$43.76
$8.75
$12.39
....................
$0.00
$64.90
PIPEFITTERS LOCAL .i37 (local 138)
03/01/2012
$44.51
$8.75
$12.39
$0.00
$65.65
09/01/2012
$45.76
$8.75
$12.39
$0.00
$66.90
03/01/2013
$47.01
$8.75
$12.39
$0.00
$68.15
HVAC MECHANIC
09/01/2011 _
$43.76
$8.75
$12.39
$0.00
$64.90
PIPEFITTERS LOCAL 537 (Local 138)
03/01/2012
$44.51
$8.75
$12.39
$0.00
$65.65
09/01/2012
$45.76
$8.75
$12.39
$0.00
$66.90
03/01/2013
$47.01
$8.75
$12.39
$0.00
$68.15
HYDRAULIC DRILLS
~ 12/01/2011
$30.10
$7.10
$11.55
$0.00 _~
„u $48.75
LABORERS - ZONE 2
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 29 of 94
Page 21 of 58
12284A
'
THE COMMONWEALTH OF MASSACHUSETTS
r�� f
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
kIt
OF LABOR STANDARDS
1=�t IPDEPARTMENT
yy' 171 (°0§,A'
Effective Date Base Wage
Health
Prevailing Wage Rates
DEVAL L. PATRICK
Go%emor
As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN
Y P SeerelNV
...._.._....................._........._.....
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TiNIOTHYP. MURRAY
HEATHER E. RONVE
LI. Gov
Dlmctor
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system; and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
Effective Date Base Wage
Health
Pension Supplemental
Total Rate
__........__............................._.........---....._..........._....__...........__.._..........._..................................._....................._........._................._..._...................................
...._.._....................._........._.....
-......._.........._......................................................_._.._._........_.........................................__.....__..............._......................................_--.._..._._._......_..
Unemployment
INSULATOR (PIPES & TANKS)
09/01/2011
$40.66
$10.40
$11.20
$0.00
$62.26
ASBESTOS WORKERS LOCAL G (BOSTON)
09/01/2012
$.42.06
$10.40
$11.20
$0.00
$63.66
09/01/2013
$43.66
$10.40
$11.20
$0.00
$65.26
09/01/2014
$45.66
$10.40
$11.20
$0.00
$67.26
Apprentice - ASBESTOS INSULATOR (Pipes & Tanks) - Local 6 Boston
Effective Date - 09/01/2011
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$20.33
$10.40
$8.30
$0.00
$39.03
2 60
$24.40
$10.40
$8.88
$0.00
$43.68
3 70
$28.46
$10.40
$9.46
$0.00
$48.32
4 80
$32.53
$10.40
$10.04
$0.00
$52.97
Effective Date - 09/01/2012
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$21.03
$10.40
$8.30
$0.00
$39.73
2 60
$25.24
$10.40
$8.88
$0.00
$44.52
3 70
$29.44
$10.40
$9.46
$0.00
$49.30
4 80
$33.65
$10.40
$10.04
$0.00
$54.09
INotes:
Steps are 1 year
I
t
Apprentice to Journeyworker Ratio:IA
IRONWORKER/WELDER
09/16/2011
$32.87
$7.70
$17.95
$0.00
$58.52
IRONWORKERS LOCAL 7 (LAWRENCE AREA)
03/16/2012
$33.87
$7.70
$17.95
$0.00
$59.52
09/16/2012
$34.87
$7.70
$17.95
$0.00
560.52
03/16/2013
$36.12
$7.70
$17.95
$0.00
$61.77
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 22 of 58
Addendum No. 2
February 2, 2012 Page 30 of 94 12284A
�N,
THE COMMONWEALTH OF MASSACHUSETTS
uj 1
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
$0.00
DEPARTMENT OF LABOR STANDARDS
2 70
$23.01
$7.70
$17.95
$0.00
Prevailing Wage Rates
DEVAL L. PATRICK
As determined by the Director under the provisions of the JOANNE E. GOLDSTEIN
Governor
Sec 1-
$0.00
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. MURRAY
HEATHER E. ROWE
Ll. Govemor
Dt=lor
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- IRONWORKER -Local 7 Lmvrence
Effective Date - 09/16/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$19.72
$7.70
$17.95
$0.00
$45.37
2 70
$23.01
$7.70
$17.95
$0.00
$48.66
3 75
$24.65
$7.70
$17.95
$0.00
$50.30
4 80
$26.30
$7.70
$17.95
$0.00
$51.95
5 85
$27.94
$7.70
$17.95
$0.00
$53.59
6 90
$29.58
$7.70
$17.95
$0.00
$55.23
Effective Date - 03/16/2012
Step percent
1 60
2 70
3 75
4 80
5 85
6 90
;Notes:
Structural 1:6; Ornamental 1:4
Apprentice to Journeyworker Ratio:
....... ............ ............. -_.......... _..... .._..... ..........._....................-............ ..............- ........ _.... .............-.............................._.............
........
JACKHAMMER & PAVING BREAKER OPERATOR
LABORERS - ZONE 2
LABORER
LABORERS -ZONF_2
Apprentice Base Wage Health
$20.32
$7.70
$23.71
$7.70
$25.40
$7.70
$27.10
$7.70
$28.79
$7.70
$30.48
$7.70
12/01/2011 $29.60 $7.10 $11.55 $0.00
12/01/2011 $29.35 $7.10 $11.55 $0.00
$48.25
$48.00
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 23 of 58
Addendum No. 2
February 2, 2012 Page 31 of 94 12284A
Supplemental
Pension
Unemployment
Total Rate
$17.95
$0.00
$45.97
$17.95
$0.00
$49.36
$17.95
$0.00
$51.05
$17.95
$0.00
$52.75
$17.95
$0.00
$54.44
$17.95
$0.00
$56.13
12/01/2011 $29.60 $7.10 $11.55 $0.00
12/01/2011 $29.35 $7.10 $11.55 $0.00
$48.25
$48.00
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 23 of 58
Addendum No. 2
February 2, 2012 Page 31 of 94 12284A
" THE COMMONWEALTH OF l4ASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
Deva L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Goeemor S-=
TIMOTHY R NtURPAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. Rows:
LI. Gocemor Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 Citv/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - LABORER - Zone 2
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$17.61
$7.10
$11.55
$0.00
$36.26
2 70
$20.55
$7.10
$11.55
$0.00
$39.20
3 80
$23.48
$7.10
$11.55
$0.00
$42.13
4 90
$26.42
$7.10
$11.55
$0.00
$45.07
JNotes:
i
Apprentice to Journeyworker Ratio: 1:5
LABORER: CARPENTER TENDER
12/01/2011
$29.35
$7.10
$11.55
$0.00
$48.00
LABORERS - ZONE 2
LABORER: CEMENT FINISHER TENDER
12/01/2011
$29.35
$7.10
$11.55
$0.00
$48.00
LABORERS - ZONE 2
LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER
12/01/2011
$29.35
$7.10�T
$11.55
$0.00
$48.00
LABORERS - ZONE 2
...... ............... ........._............_........... ........... ....._............... ..... ..........................._........ .... ... ..._..._....._........ .... .._......_.................. ._._......
LABORER: MASON TENDER
__....... ................ .......... ............................. ._....... .
12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
LABORERS -ZONE2
LABORER: MULTI -TRADE TENDER
12/01/2011
$29.35
$7.10
$1155
$0.00
$48.00
LABORERS - ZONE 2
LABORER: TREE REMOVER
12/01/2011
$29.35
$7.10
$1155
$0.00
$48.00
LABORERS - ZONE 2
This classification applies to the wholesale removal
of standing trees including all associated trimming of branches and limbs, and
applies to the removal of branches
at locations
not on or around utility
lines.
LASER BEAM OPERATOR
12/01/2011
$29.60
$7.10
$1155
$0.00
$48.25
LABORERS- ZONE 2
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of NI.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 32 of 94
Page 24 of 58
12284A
Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile
THE COMMONWEALTH OF 1A1ASSACI-(USETTS
$9.93
ss
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
Effective Date - 08/01/2011
�� l �x
DEPARTMENT OF LABOR STANDARDS
$9.93
Supplemental
Prevailing Wage Rates
Step percent
DEVAL. L. PATRICK
Gocemor
As determined by the Director under the provisions of the
JOANNE F. GOLDSTEIN
Unemployment
Total Rate
secrel, n
$17.76
1INIassachusetts General Laws, Chapter 149, Sections 26 to 27H
$15.50
TIMOTHY P. MURRAY
U. Gocemor
$43.19
HEATHER E. RONVE
$21.31
$9.93
Dimclor
Awarding Authority:
Greater Lawrence Sanitary District
3 70
Contract Number:
12284 City/Town: NORTH ANDOVER
Description of Work:
Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier
increasing the
4 80
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
$9.93
Job Location:
240 Main Street, North Andover MA 01845
$53.85
Classification
Effective Date Base Wage Health Pension
Supplemental Total Rate
...... ................... ........._.... _...... ......... .......... __....._.._..
_...._._.._............................................... __.._......................................... ._._._ 1.Unemployment
$57.40
MARBLE & TILE FINISHERS 08/01/2011 $35.52 $9.93 $15.50
$0.00 $60.95
BRICKLAYERS LOCAL 3 - AIARBLE & TILE
02/01/2012 $36.31 $9.93 $15.50
$0.00 $61.74
Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile
$18.16
$9.93
$15.50
$0.00
Effective Date - 08/01/2011
2 60
$21.79
$9.93
Supplemental
$0.00
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$17.76
$9.93
$15.50
$0.00
$43.19
2 60
$21.31
$9.93
$15.50
$0.00
$46.74
3 70
$24.86
$9.93
$15.50
$0.00
$50.29
4 80
$28.42
$9.93
$15.50
$0.00
$53.85
5 90
$31.97
$9.93
$15.50
$0.00
$57.40
Effective Date - 02/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$18.16
$9.93
$15.50
$0.00
$43.59
2 60
$21.79
$9.93
$15.50
$0.00
$47.22
3 70
$25.42
$9.93
$15.50
$0.00
$50.85
4 80
$29.05
$9.93
$15.50
$0.00
$54.48
5 90
$32.68
$9.93
$15.50
$0.00-
$58.11
- - __ _ ___ _- __ ___ - __ .. _
Notes:
_ _ _._ _._ -
-_ .-
__ - .._,. _,_,.
.,-_ _ ,__ ,_,.. .._.._....�...
_. .<
Steps are 800 hrs.
Apprentice to Journeyworker Ratio:1:3
MARBLE MASONS,TILELAYERS & TERRAZZO MECH 08/01/2011 $46.60 $9.93 $16.51 $0.00 $73.04
BRICKLAYERS LOCAL 3 - MARBLE & TILE
02/01/2012 $47.59 $9.93 $16.51 $0.00 $74.03
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 25 of 58
Addendum No. 2
February 2, 2012 Page 33 of 94 12284A
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & Tile
Effective Date - 08/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
THE COMMONWEALTH OF MASSACI-fUSETTS
a�
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
s
DEPARTMENT OF LABOR STANDARDS
$49.74
2 60
$27.96
Prevailing Wage Rates
DEVAL L. PATRICK
Goccmor
As determined by the Director under the provisions of the JOANNE E. GOLDSTEIN
3 70
Sccrcian'
TIMOTHY P. NflJRRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROVE
Lr. Gocemor
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & Tile
Effective Date - 08/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$23.30
$9.93
$16.51
$0.00
$50.24
$49.74
2 60
$27.96
$9.93
$16.51
$0.00
3 70
$54.40
3 70
$32.62
$9.93
$16.51
$0.00
$38.07
$59.06
4 80
$37.28
$9.93
$16.51
$0.00
$9.93
$63.72
5 90
$41.94
$9.93
$16.51
$0.00
$68.38
Effective Date - 02/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$23.80
$9.93
$16.51
$0.00
$50.24
2 60
$28.55
$9.93
$16.51
$0.00
$54.99
3 70
$33.31
$9.93
$16.51
$0.00
$59.75
4 80
$38.07
$9.93
$16.51
$0.00
$64.51
5 90
$42.83
$9.93
$16.51
$0.00
$69.27
;Notes:
.. "_ ..__-..__-._-.._._-_.-
Apprentice_ . _ _ to Journeyworker___ _ _Rati-_o:l:3
MECH. SWEEPER OPERATOR (NON -CONSTRUCTION) 07/01/2011 $24.80 $5.49 $0.00 $0.00
SWEEPER LOCAL 25 (NON -CONSTRUCTION)
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 34 of 94
$30.29
Page 26 of 58
12284A
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
THE COMMONWEALTH OF MASSACHUSETTS
Base Wage
.EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
Pension
DEPARTMENT OF LABOR STANDARDS
}�
Prevailing Wage Rates
DEVAL L PATRICK
Gor r
erro
As determined by the Director under the provisions of the JOANNE F.OLDSTEIN
$10.00
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TINIOTHY P. HURRAY
Lr G.-nr
HEATHER E. ROWE
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
. Unemployment
Total Rate
MECH. SWEEPER OPERATOR (ON CONST. SITES)
12/01/2011
$39.16
$10.00
$12.40
$0.00
$61.56
OPER=ATING EAGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
_ ............. ......_................... .._..................... _.._.............................. -...-..-......................................._.............._.._.................. ........_........._.._......_._.__....----..................
MECHANICS MAINTENANCE
............_.._._....----...............
12/01/2011
- - - -
$39.16
--..__._..._._.._.._.._
$10.00
..... ._..._.._._.^_....
$12.40
$0.00
--_.._.. - ....
$61.56
OPERATING ENGINEERS LOCAL. l
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
MILLWRIGHT (Zone 2)
04/01/2011
$31.71
$8.67
$15.61
$0.00
$55.99
MILLWRIGHTS LOCAL 1111- Zone 1
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 35 of 94
Page 27 of 58
12284A
A
THE COMMONWEALTH OF MASSACHUSETTS
$8.67
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
{ly
DEPARTMENT OF LABOR STANDARDS
TY
$17.44
$8.67
Prevailing Wage Rates
DEv.AL L. PATRICK
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Governor
S-wn
$8.67
Massachusetts General Laws, Chapter 149, Sections 26 to 27H.
TIMOTHY P. MURRAY.
U. Go, -or
HEATHER E. ROME
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- :L11LLl+RlGHT- Local 1121 Zone 2
Effective Date - 04/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$15.86
$8.67
$11.64
$0.00
$36.17
2 55
$17.44
$8.67
$11.64
$0.00
$37.75
3 60
$19.03
$8.67
$13.23
$0.00
$40.93
4 65
$20.61
$8.67
$13.23
$0.00
$42.51
5 70
$22.20
$8.67
$14.02
$0.00
$44.89
6 75
$23.78
$8.67
$14.02
$0.00
$46.47
7 80
$25.37
$8.67
$14.82
$0.00
$48.86
8 85
$26.95
$8.67
$14.82
$0.00
$50.44
Notes:
Apprentice to Journeyworker Ratio:1:5
_........... ..... .........................-_..... ..................... -......... _....... ._........... ._.................................. -._..__.... _...... ........ _._.........-......_..._-_._....................... .... ...... --------- ................. -.......... ------............... _... _._...._._._
MORTAR MIXER 12/01/2011 $29.60 $7.10
LABORERS - ZONE 2
OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2011 $21.28 $10.00
OPERATING ENGINEERS LOCAL l
06/01/2012
$21.56
$10.00
12/01/2012
$21.90
$10.00
06/01/2013
$22.32
$10.00
12/01/2013
$22.74
$10.00
$11.55
$0.00
$48.25
$12.40
$0.00
$43.68
$12.40
$0.00
$43.96
$12.40
$0.00
$44.30
$12.40
$0.00
$44.72
$12.40
$0.00
$45.14
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 36 of 94
Page 28 of 58
12284A
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
THE COMMONWEALTH OF MASSACHUSETTS
a�x „
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPNIENT
J
DEPARTMENT OF LABOR STANDARDS
Effective Date
Base Wage
Health
Prevailing Wage Rates
DEVAL, , PATRICK
Goccmor
As determined by the Director under the provisions of the JOANNE E. GOLDSTEW
TIMOTHY P. MURRAY
Secretan
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
Lr Go-or
HEATHER E. RowE
HEATHER
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemplo ment
OILER (TRUCK CRANES, GRADALLS)
12/01/2011
$24.51
$10.00
$12.40
$0.00
$46.91
OPERATING ENGINLERSLOCAL -1
06/01/2012
$24.85
$10.00
$12.40
$0.00
$47.25
12/01/2012
$25.24
$10.00
$12.40
$0.00
$47.64
06/01/2013
$25.72
$10.00
$12.40
$0.00
$48.12
_........-......._......_............. ---....... ............_............ ---.._........ ............ _... ..... ---.._..__...... ... ....... ..__._..._...- .._..._..-......_...---
12/01/2013
$26.21
$10.00
$12.40
$0.00
$48.61
OTHER POWER DRIVEN EQUIPMENT - CLASS II
-----..._......_...........
12/01/2011
......... -- ---............_.._..._.....__...__._._.....-_.......I...._._._...--
$39.16
$10.00
.
$12.40
---.......---.._.........._........._........._._......._..
$0.00
.-......... ............ .
$61.56
OPERATING ENGINEERS LOCAL -I
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
PAINTER (BRIDGES/TANKS)
01/01/2012
$44.01
$7.80
$14.60
$0.00
$66.41
PAINTERS LOCAL 35 - TONE 2
07/01/2012
$45.01
$7.80
$14.60
$0.00
$67.41
01/01/2013
$46.01
$7.80
$14.60
$0.00
$68.41
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 37 of 94
Page 29 of 58
12284A
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - P,4INTER Local 3S
THE COMNIONWEALTH OF MASSACHUSETTS
a� 1
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
..
DEPARTMENT OF LABOR STANDARDS
rk
Prevailing Wage Rates
DEVAL L. PATRICK
Gove nor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Secmtan
TINfOTHYP. NfURRAY
1'fassachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROwE
LI. Governor
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - P,4INTER Local 3S
- BRlDGES1T4iVKS
Effective Date - 01/01/2012
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$22.01
$7.80
$0.00
$0.00
$29.81
2 55
$24.21
$7.80
$3.25
$0.00
$35.26
3 60
$26.41
$7.80
$3.54
$0.00
$37.75
4 65
$28.61
$7.80
$3.84
$0.00
$40.25
5 70
$30.81
$7.80
$12.83
$0.00
$51.44
6 75
$33.01
$7.80
$13.13
$0.00
$53.94
7 80
$35.21
$7.80
$13.42
$0.00
$56.43
8 90
$39.61
$7.80
$14.01
$0.00
$61.42
Effective Date - 07/01/2012
Supplemental
Step percent
_...._..._.... ..... ...... _................_.......... ..... ........ .... ..._....... ............................
Apprentice Base Wage
............. _...... __............. ............ .... ......... _.... ..._._...._
Health
_...... .... ---- _..............................................
Pension
_.._..__
Unemployment
........ .._........... _............ .........................
Total Rate
1 50
$22.51
$7.80
$0.00
$0.00
$30.31
2 55
$24.76
$7.80
$3.25
$0.00
$35.81
3 60
$27.01
$7.80
$3.54
$0.00
$38.35
4 65
$29.26
$7.80
$3.84
$0.00
$40.90
5 70
$31.51
$7.80
$12.83
$0.00
$52.14
6 75
$33.76
$7.80
$13.13
$0.00
$54.69
7 80
$36.01
$7.80
$13.42
$0.00
$57.23
8 90
$40.51
$7.80
$14.01
$0.00
$62.32
..._._... ......_.
iNotes:
Steps are 7,50 hrs. 1
Apprentice to Journeyworker Ratio: 1:1
This wage schedule must be posted by the contractor at the work site in accordance with NI.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 38 of 94
Page 30 of 58
12284A
z THE COMMONWEALTH OF MASSACHUSETTS
til EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
j DEPARTMENT OF LABOR STANDARDS
k.,`f
'? Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Gm emor
Secreian
TliviDTHl' P. Ml1RR.4Y Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RoWE
LL Govemor Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension
PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2012 $34.91 $7.80 $14.60
* If 30% or more of surfaces to be painted are new construction. 07/01/2012 $35.91 $7.80 $14.60
NEW paint rate shall be used.PA/NTERS LOCAL 35 - ZONE 2
01/01/2013 $36.91 $7.80 $14.60
Supplemental Total Rate
Unemployment
$0.00
$0.00
$0.00
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 39 of 94
$57.31
$58.31
$59.31
Page 31 of 58
12284A
' ?:'•,
THE COMMONWEALTH OF MASSACHUSETTS
j
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
p
Ips fl
DEPARTMENT OF LABOR STANDARDS
s•
Prevailing Wage Rates
55
$19.20
DEV.AL L. PATRICK
Gocemor
As determined by the Director under the provisions of the JOANNE E. GOLDSTEiv
$0.00
S-tny
TI%, 4OTHY P. MURR.AY
Nt tassachusettS General Laws, Chapter 149, Sections 26 to 27H HEATHER E. R0N1'E
HEATHER
LL Go--
$7.80
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 Citv/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 0 184 5
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - New
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension unemployment Total Rate
1
50
$17.46
$7.80
$0.00
$0.00
$25.26
2
55
$19.20
$7.80
$3.25
$0.00
$30.25
3
60
$20.95
$7.80
$3.54
$0.00
$32.29
4
65
$22.69
$7.80
$3.84
$0.00
$34.33
5
70
$24.44
$7.80
$12.83
$0.00
$45.07
6
75
$26.18
$7.80
$13.13
$0.00
$47.11
7
80
$27.93
$7.80
$13.42
$0.00
$49.15
8
90
$31.42
$7.80
$14.01
$0.00
$53.23
Effective Date - 07/01/2012
Supplemental
Step
percent
_........._.._......_ ................. .......__..... _............... ...............
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
.._..._......_._
50
........... .._...._...._....._...._..._... ............ ... ... __......._...._........... .....
$17.96
._...._._... .... .... ......
$7.80
_............................ _._............................
$0.00
--- _.... _............ _...... .....
$0.00
_... -.._..... _................. __.
$25.76
2
55
$19.75
$7.80
$3.25
$0.00
$30.80
3
60
$21.55
$7.80
$3.54
$0.00
$32.89
4
65
$23.34
$7.80
$3.84
$0.00
$34.98
5
70
$25.14
$7.80
$12.83
$0.00
$45.77
6
75
$26.93
$7.80
$13.13
$0.00
$47.86
7
80
$28.73
$7.80
$13.42
$0.00
$49.95
8
90
$32.32
$7.80
$14.01
$0.00
$54.13
_.. ...........
jNotes:
1
i
Apprentice to Journeyworker Ratio:I:1
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 40 of 94
Page 32 of 58
12284A
' c +
THE COMMONWEALTH OF MASSACHUSETTS
Health
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
Supplemental
DEPARTMENT OF LABOR STANDARDS
rw
Prevailing Wage Rates
01/01/2012
$32.97
DEVAL L. PATRICK
As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN
y p secretan
Govemor
07/01/2012
TIMOTHY P. NnJRRAY
INfassachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RO\VE
Lt. Go%emor
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
.—.... ............................................. ............ ............. .... .... .... _....._....... ....... _...... _..... _... _.............. -- ................. -...._.. -- - ._._.................._.............._.....-
PAINTER (SPRAY OR SANDBLAST, REPAINT)
P.41VTERS LOCAL 35 - ZO,VE 2
Effective Date
Base Wage
Health
Pension
Supplemental
Unemployment
01/01/2012
$32.97
$7.80
$14.60
$0.00
07/01/2012
$33.97
$7.80
$14.60
$0.00
01/01/2013
$34.97
$7.80
$14.60
$0.00
This wage schedule must be posted by the contractor at the work site in accordance with NI.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, NIA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 41 of 94
Total Rate
$55.37
$56.37
$57.37
Page 33 of 58
12284A
r
TILE COMNIONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPNIENT
Jl#
Its'
DEPARTMENT OF LABOR STANDARDS
Effective Date - 01/01/2012
Prevailing Wage Rates
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
secret -
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWT
Lt. Go,c .,
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- PAINTER Local 3i Zone 2
- Spray/Sandblast -Repaint
Effective Date - 01/01/2012
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$16.49
$7.80
_ $0.00
$0.00
$24.29
2 55
$18.13
$7.80
$3.25
$0.00
$29.18
3 60
$19.78
$7.80
$3.54
$0.00
$31.12
4 65
$21.43
$7.80
$3.84
$0.00
$33.07
5 70
$23.08
$7.80
$12.83
$0.00
$43.71
6 75
$24.73
$7.80
$13.13
$0.00
$45.66
7 80
$26.38
$7.80
$13.42
$0.00
$47.60
8 90
$29.67
$7.80
$14.01
$0.00
$51.48
Effective Date - 07/01/2012
Supplemental
Step percent
... ---
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
........ ...... _..._.._..._.._._.......... .._...... _._._.._.__......................
1 50
-......_.... ..._............... ..... _...................._......___...._..._...____....._..._......................_......_.._...-_..___
$16.99
$7.80
__._........_
$0.00
.............. .............. .._.._................ .__...................
$0.00
.... ............ ._..__._.
$24.79
2 55
$18.68
$7.80
$3.25
$0.00
$29.73
3 60
$20.38
$7.80
$3.54
$0.00
$31.72
4 65
$22.08
$7.80
$3.84
$0.00
$33.72
5 70
$23.78
$7.80
$12.83
$0.00
$44.41
6 75
$25.48
$7.80
$13.13
$0.00
$46.41
7 80
$27.18
$7.80
$13.42
$0.00
$48.40
8 90
$30.57
$7.80
$14.01
$0.00
$52.38
Notes:
Apprentice to Journeyworker Ratio: 1:1
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 42 of 94
Page 34 of 58
12284A
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
i I DEPARTMENT OF LABOR STANDARDS
r' Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE P. GOLDSTEIN
Goremor S -1 -
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROVE
U Gocemor Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
.... ....... -.... _..... --- ...-..._............_......_.................. ._....._........_._............. _......... ----........ ...............-.-.-..__.....-................._.....---....._.._.............._........_......
PAINTER (TRAFFIC MARKINGS)
LABORERS- ZONE 2
PAINTER / TAPER (BRUSH, NEW)
* If 30% or more of surfaces to be painted are new construction,
NEW paint rate shall be used.PA1NTERSLOCAL 35 -ZONE2
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
12/01/2011
$29.35
$7.10
$11.55
$0.00
$48.00
01/01/2012
$33.51
$7.80
$14.60
$0.00
$55.91
07/01/2012
$34.51
$7.80
$14.60
$0.00
$56.91
01/01/2013
$35.51
$7.80
$14.60
$0.00
$57.91
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 43 of 94
Page 35 of 58
12284A
a < THE CO v- MON WEALTH OF MASSACHUSETTS
l l�A EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
' Cs DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Gocemor
Secroan'
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HFATHER E. ROWE
LL Goccmor Dimctor
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location:
240 Main Street, North Andover MA 01845
Classification
Effective Date
Base Wage
Health
Pension Supplemental
Total Rate
Unemployment
Apprentice-
PAINTER -Local 35 Zone 2 -BRUSH
NEW
Effective Date - 01/01/2012
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
50
$16.76
$7.80
$0.00
$0.00
$24.56
2
55
$18.43
$7.80
$3.25
$0.00
$29.48
3
60
$20.11
$7.80
$3.54
$0.00
$31.45
4
65
$21.78
$7.80
$3.84
$0.00
$33.42
5
70
$23.46
$7.80
$12.83
$0.00
$44.09
6
75
$25.13
$7.80
$13.13
$0.00
$46.06
7
80
$26.81
$7.80
$13.42
$0.00
$48.03
8
90
$30.16
$7.80
$14.01
$0.00
$51.97
Effective
Date - 07/01/2012
Supplemental
Step
_...__....
percent
....._.......__..._.__......_........... -_____........ ................................._..._._..._......_.._......................._......._..._.....___.___....__........................_.......-----.......__.._......_...._
Apprentice Base Wage
Health
Pension
...__._... ............
Unemployment
.... _.._.......... ._.... _.... _..................
Total Rate
--.... .... ._........................ _...._...._._....
1
50
$17.26
$7.80
$0.00
$0.00
..........
$25.06
2
55
$18.98
$7.80
$3.25
$0.00
$30.03
3
60
$20.71
$7.80
$3.54
$0.00
$32.05
4
65
$22.43
$7.80
$3.84
$0.00
$34.07
5
70
$24.16
$7.80
$12.83
$0.00
$44.79
6
75
$25.88
$7.80
$13.13
$0.00
$46.81
7
80
$27.61
$7.80
$13.42
$0.00
$48.83
8
90
$31.06
$7.80
$14.01
$0.00
$52.87
w__
'Notes:
Steps are 750 hrs.
I €
I
Apprentice to Journeyworker Ratio: 1:1
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 44 of 94
Page 36 of 58
12284A
0
.�_
THE COMMONWEALTH OF MASSACHUSETTS
Health
Pension
rr,
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
lgn '
DEPARTMENT OF LABOR STANDARDS
Unemployment
01/01/2012
Prevailing Wage Rates
DEVAL L. PATRICK
As determined by the Director under the provisions of the JOANNE S . GOLDSTEIN
Gove nor
$53.97
07/01/2012
1INIassachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY R MURR.AY
HEATHER E. ROWE
D. Gox en,or
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
.... _.............. _......................... _....._...._............. ........._..._._._.._........_...........---- ----- .—............__.._..._._.... _.........................
._..._....
PAINTER / TAPER (BRUSH, REPAINT)
PAWTERS LOCAL 35 - ZOrVE 2
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
01/01/2012
$31.57
$7.80
$14.60
$0.00
$53.97
07/01/2012
$32.57
$7.80
$14.60
$0.00
$54.97
01/01/2013
$33.57
$7.80
$14.60
$0.00
$55.97
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 45 of 94
Page 37 of 58
IlWrIllY1
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT
Effective Date - 01/01/2012 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
THE C01MMONW.EALTH OF MASSACHUSETTS
$7.80
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
1
DEPARTMENT OF LABOR STANDARDS
1
2 55
$17.36
$7.80
yif
Prevailing Wage Rates
i,
$28.41
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
secretan
TIMOTHY P. HURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E ROWE
LL Govemor
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT
Effective Date - 01/01/2012 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$15.79
$7.80
$0.00
$0.00
$23.59
2 55
$17.36
$7.80
Pension
$3.25
$0.00
$28.41
3 60
$18.94
$7.80
$0.00
$3.54
$0.00
$30.28
4 65
$20.52
$7.80
$3.25
$3.84
$0.00
$32.16
5 70
$22.10
$7.80
$3.54
$12.83
$0.00
$42.73
6 75
$23.68
$7.80
$3.84
$13.13
$0.00
$44.61
7 80
$25.26
$7.80
$12.83
$13.42
$0.00
$46.48
8 90
$28.41
$7.80
$13.13
$14.01
$0.00
$50.22
Effective Date - 07/01/2012
Supplemental
Step
............. .._....._.._...._
percent
... ........ ..._........ ........................ _. _
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
50
$16.29
$7.80
$0.00
$0.00
$24.09
2
55
$17.91
$7.80
$3.25
$0.00
$28.96
3
60
$19.54
$7.80
$3.54
$0.00
$30.88
4
65
$21.17
$7.80
$3.84
$0.00
$32.81
5
70
$22.80
$7.80
$12.83
$0.00
$43.43
6
75
$24.43
$7.80
$13.13
$0.00
$45.36
7
80
$26.06
$7.80
$13.42
$0.00
$47.28
8
90
$29.31
$7.80
$14.01
$0.00
$51.12
Steps are 750 hrs.
Apprentice to Journeyworker Ratio:I:I
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 46 of 94
Page 38 of 58
12284A
'
THE COMMONWEALTH OF NMASSACHUSETTS
Health
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
j=}
DEPARTMENT OF LABOR STANDARDS
Effective Date - 08/01/2011
r
Prevailing Wage Rates
DEVAL L. PATRICK
As determined by the Director under the provisions of the JOANNE F. OLDSTEIN
Gov-.,
$29.68
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
U. Govemor
Direnor
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
.... ..... .... ......................................._......_............... _..........._....... _................ ... ........_..........._..__........ ....... .................. ..--....._._....... _......._................. - ........... ...
PANEL & PICKUP TRUCKS DRIVER
TEA.LISTERSJOINT COUNCIL NO. 10 ZONE 8
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Effective Date - 08/01/2011
Unemployment
12/01/2011
$29.68
$8.56
$7.27
$0.00
$45.51
06/01/2012
$29.98
$8.56
$7.27
$0.00
$45.81
08/01/2012
$29.68
$8.91
$7.27
$0.00
$45.86
12/01/2012
$30.28
$9.07
$8.00
$0.00
$47.35
PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32
DECK)
PILE DRIVER LOCAL 56 (ZONE 1)
PILE DRIVER
PILE DRIVER LOCAL 56 (ZONE 1)
08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32
Apprentice - PILE DRIVER -
Local 56 Zone I
Effective Date - 08/01/2011
Supplemental
Step percent
.. ........ ........ ............................ _.__...... ........ ..........
...... Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$24.07
$8.08
$17.12
$0.00
$49.27
2 65
$26.08
$8.08
$17.12
$0.00
$51.28
3 70
$28.08
$8.08
$17.12
$0.00
$53.28
4 75
$30.09
$8.08
$17.12
$0.00
$55.29
5 80
$32.10
$8.08
$17.12
$0.00
$57.30
6 85
$34.10
$8.08
$17.12
$0.00
$59.30
7 90
$36.11
$8.08
$17.12
$0.00
$61.31
8 95
$38.11
$8.08
$17.12
$0.00
$63.31
Notes:
I F
Apprentice to Journeyworker Ratio: 1:3
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 47 of 94
Page 39 of 58
12284A
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
THE COMN40NWEALTIJ OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
K�;
DEPARTMENT OF LABOR STANDARDS
Classification
Effective Date
Prevailing Wage Rates
DEVAL L. PATRICK
Go-ior
As determined by the Director under the provisions of the JOANNESI I.GOLDSTEIN
TINIOTHY P. NFURRAv
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROVE
LI. Go%'nror
Dimctor
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Effective Date- 09/01/2011
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Pension
..
Unemployment
Total Rate
1 40
$17.50
Unemplo ment
$4.50
PIPEFITTER & STEAMFITTER
09/01/2011
$43.76
$8.75
$12.39
$0.00
$64.90
PIPEFI7TERSLOCAL 537 (Local 138)
3 60
$26.26
$8.75
$12.39
$0.00
$47.40
4 70
03/01/2012
$44.51
$8.75
$12.39
$0.00
$65.65
$35.01
09/01/2012
$45.76
$8.75
$12.39
$0.00
$66.90
03/01/2013
$47.01
$8.75
$12.39
$0.00
$68.15
Apprentice- PIPEFITTER Local 537 (Local 138)
Effective Date- 09/01/2011
Supplemental
Step percent
............... .._.................. ........ ... .........._.__
Apprentice Base Wage
........... _-.._....... ........................... _...... _ ..... _
Health
Pension
..
Unemployment
Total Rate
1 40
$17.50
$8.75
$4.50
$0.00
$30.75
2 45
$19.69
$8.75
$12.39
$0.00
$40.83
3 60
$26.26
$8.75
$12.39
$0.00
$47.40
4 70
$30.63
$8.75
$12.39
$0.00
$51.77
5 80
$35.01
$8.75
$12.39
$0.00
$56.15
Effective Date - 03/01/2012
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 40
$17.80
$8.75
$4.50
$0.00
$31.05
2 45
$20.03
$8.75
$12.39
$0.00
$41.17
3 60
$26.71
$8.75
$12.39
$0.00
$47.85
4 70
$31.16
$8.75
$12.39
$0.00
$52.30
5 80
$35.61
$8.75
$12.39
$0.00
$56.75
=Notes:
** 1:3; 3:15; 1:10 thereafter / Steps are I yr.
Refrig/AC Mechanic **1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Mas)
Apprentice to Journeyworker Ratio:*
PIPELAYER
LABORERS - ZONE 2
12/01/2011 $29.60 $7.10 $11.55 $0.00
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 48 of 94
$48.25
Page 40 of 58
12284A
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
_..._........................................................._....._.........................._.................._....._...._......................_............... ...... ............ ......... __............ _.... _........ ._._.._..._...
PLUMBER
PLUVBERS & GASI-ITTERS LOCAL 12 (Local 138)
Effective Date
THE COMMONWEALTH OF MASSACFrUSETTS
11�
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
^I /,
DEPARTMENT OF LABOR STANDARDS
Effective Date- 09/01/2011
Prevailing Wage Rates
Unemployment
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the JOANNESF OLDSTEIN
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Go,-,
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
_..._........................................................._....._.........................._.................._....._...._......................_............... ...... ............ ......... __............ _.... _........ ._._.._..._...
PLUMBER
PLUVBERS & GASI-ITTERS LOCAL 12 (Local 138)
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Effective Date- 09/01/2011
Unemployment
09/01/2011
$41.93
$9.32
$13.29
$0.00
$64.54
03/01/2012
$42.73
$9.32
$13.29
$0.00
$65.34
09/01/2012
$43.98
$9.32
$13.29
$0.00
$66.59
03/01/2013
$45.23
$9.32
$13.29
$0.00
$67.84
Apprentice- PLUMBERIGASFITTER
- Local 12 (Local 138)
Effective Date- 09/01/2011
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 35
$14.68
$9.32
$4.97
$0.00
$28.97
2 40
$16.77
$9.32
$5.61
$0.00
$31.70
3 55
$23.06
$9.32
$7.53
$0.00
$39.91
4 65
$27.25
$9.32
$8.81
$0.00
$45.38
5 75
$31.45
$9.32
$10.09
$0.00
$50.86
Effective Date - 03/01/2012
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 35
$14.96
$9.32
$4.97
$0.00
$29.25
2 40
$17.09
$9.32
$5.61
$0.00
$32.02
3 55
$23.50
$9.32
$7.53
$0.00
$40.35
4 65
$27.77
$9.32
$8.81
$0.00
$45.90
5 75
$32.05
$9.32
$10.09
$0.00
$51.46
Notes:
i Step 4 with lic$48.12 Step5 with lic$53.58
Apprentice to Journeyworker Ratio: 1:5
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 49 of 94
Page 41 of 58
12284A
y THE COt%4MONWEALTH OF (MASSACHUSETTS
,j EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Y Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Gocemorse-t-
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
LI. Gocemor Direclor
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
.. ......... ..... _.__........ _........ __..._.......__......._._..._.__..........._.........._.__._................. ............ -_... --.... .......... _._................_...._....._
POWDERMAN &BLASTER
............. _...
12/01/2011
_....... __...... _......... __..................
$30.35
_.._.......... _...........__
$7.10
... _.... ............. .__....................
$11.55
Unemployment
$49.00
PNEUMATIC CONTROLS (TEMP.)
09/01/2011
$43.76
$8.75
$12.39
$0.00
$64.90
PIPEFITTE-RS LOCOL 537 (Loco/ 134)
03/01/2012
$44.51
$8.75
$12.39
$0.00
$65.65
OPERATING ENGINEERS LOCAL 4
09/01/2012
$45.76
$8.75
$1239
$0.00
$66.90
PUMP OPERATOR (DEWATERING, OTHER)
03/01/2013
$47.01
$8.75
$12.39
$0.00
$68.15
PNEUMATIC DRILL/TOOL OPERATOR
12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
LABORERS - ZONE 2
.. ......... ..... _.__........ _........ __..._.......__......._._..._.__..........._.........._.__._................. ............ -_... --.... .......... _._................_...._....._
POWDERMAN &BLASTER
............. _...
12/01/2011
_....... __...... _......... __..................
$30.35
_.._.......... _...........__
$7.10
... _.... ............. .__....................
$11.55
............ .._._................ .
$0.00
$49.00
LABORERS -ZONE2
12/01/2012
$40.71
$10.00
$12.40
$0.00
$63.11
POWER SHOVEL/DERRICK/TRENCHING MACHINE
12/01/2011
$39.52 _
$10.00
$12.40
$0.00 _
$61.92
OPERATING ENGINEERS LOCAL 4
12/01/2013
$42.27
$10.00
$12.40
$0.00
$64.67
PUMP OPERATOR (DEWATERING, OTHER)
06/01/2012
$40.09
$10.00
$12.40
$0.00
$62.49
OPERATING ENGINEERS LOCAL d
12/01/2012
$40.71
$10.00
$12.40
$0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
$0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
$0.00
$64.67
PUMP OPERATOR (CONCRETE)
12/01/2011
$39.52
$10.00
$12.40
$0.00
$61.92
OPERATING ENGINEERS LOCAL 4
06/01/2012
$40.09
$10.00
$12.40
$0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
$0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
$0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
$0.00
$64.67
PUMP OPERATOR (DEWATERING, OTHER)
12/01/2011
$27.95
$10.00
$12.40
$0.00
$50.35
OPERATING ENGINEERS LOCAL d
06/01/2012
$28.34
$10.00
$12.40
$0.00
$50.74
12/01/2012
$28.79
$10.00
$12.40
$0.00
$51.19
06/01/2013
$29.34
$10.00
$12.40
$0.00
$51.74
12/01/2013
$29.89
$10.00
$12.40
$0.00
$52.29
READY -MIX CONCRETE DRIVER
TEAMSTERS LOCAL 42
04/30/2009 $25.80 $5.96 $5.34 $0.00 $37.10
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 42 of 58
Addendum No. 2
February 2, 2012 Page 50 of 94 12284A
'
THE COIvtMONWEALTFI OF MASSACHUSETTS
Health
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
Supplemental
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
Unem loyment
DEVAL L. PATRICK
Govemor
As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN
Y P Secremn
TIMOTHY P. HURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RO"T
Lt. Govemor
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unem loyment
RECLAIMERS 12/01/2011
$39.16
$10.00
$12.40
$0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42
CARPENTERS -ZONE 2 (Residential Wood)
_... .__........._.._______-___.____.___.__�_.__
RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81
** The Residential Wood Frame Carpenter classification applies
only to the construction of new, wood frame residences that do
not exceed four stories including the basement. CARPENTERS -ZONE
2 (Residential Wood)
As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate.
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
Wage Request Number: 20120103-006
Page 43 of 58
Addendum No. 2
February 2, 2012 Page 51 of 94 12284A
'y
THE COMMONWEALTH OF MASSACHUSETTS
is
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
I_ i'
DEPARTMENT OF LABOR STANDARDS
1
60 w
>n,
Prevailing Wage Rates
DEVAL L. PATRICK
Gocemor
As determined by the Director under thep rovisions of the JOANNE F. GOLDSTEIN
secrelan
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
L1. Goecmor
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- CARPENTER (Residential {Wood Frame) - Zone 2
Effective Date- 05/01/2011
Step percent
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1
60 w
$14.54
$6.34
$0.00
$0.00
$20.88
2
60
$14.54
$6.34
$6.23
$0.00
$27.11
3
65
$15.76
$6.34
$6.23
$0.00
$28.33
4
70
$16.97
$6.34
$6.23
$0.00
$29.54
5
75
$18.18
$6.34
$6.23
$0.00
$30.75
6
80
$19.39
$6.34
$6.23
$0.00
$31.96
7
85
$20.60
$6.34
$6.23
$0.00
$33.17
8
90
$21.82
$6.34
$6.23
$0.00
$34.39
ROLLER/SPREADER/MULCHING MACHINE
OPERATING ENGINEERS LOCAL a
ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg)
ROOFERS LOCAL 33
12/01/2011
$39.16
$10.00
$12.40
$0.00
$61.56
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
08/01/2011
$35.56
$10.50
$9.80
$0.00
$55.86
02/01/2012
$36.56
$10.50
$9.80
$0.00
$56.86
08/01/2012
$37.56
$10.50
$9.80
$0.00
$57.86
02/01/2013
$38.56
$10.50
$9.80
$0.00
$58.86
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 NN'age Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 52 of 94
Page 44 of 58
12284A
r THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Governor S-1-
TIMOTHY P. MIJRRAY. Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Governor Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- ROOFER - Loca133
Effective Date - 08/01/2011
Supplemental
Step percent
_
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$17.78
$10,50
$2.93
$0.00
$31.21
2 60
$21.34
$10.50
$9.80
$0.00
$41.64
3 65
$23.11
$10.50
$9.80
$0.00
$43.41
4 75
$26.67
$10.50
$9.80
$0.00
$46.97
5 85
$30.23
$10.50
$9.80
$0.00
$50.53
Effective Date - 02/01/2012
Supplemental
Step percent
� �
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$18.28
$10.50
$2.93
$0.00
$31.71
2 60
$21.94
$10.50
$9.80
$0.00
$42.24
3 65
$23.76
$10.50
$9.80
$0.00
$44.06
4 75
$27.42
$10.50
$9.80
$0.00
$47.72
5 85
$31.08
$10.50
$9.80
$0.00
$51.38
Notes: * L5. 2:6-10. the 1:10; Reroofing:
1:4, then 1:1
Step I is 2000 hrs.; Steps 2-5 are 1000 hrs.
Apprentice to Journeyworker Ratio:**
ROOFER SLATE / TILE / PRECAST CONCRETE
08/01/2011
$35.81
$10.50
$9.80
$0.00
$56.11
ROOFERS LOCAL 33
02/01/2012
$36.81
$10.50
$9.80
$0.00
$57.11
08/01/2012
$37.81
$10.50
$9.80
$0.00
$58.11
02/01/2013
$38.81
$10.50
$9.80
$0.00
$59.11
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 53 of 94
Page 45 of 58
12284A
s
THE COMMONWEALTH OF MASSACHUSETTS
,(EXECUTIVE
OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
$0.00
$31.34
, ri
DEPARTMENT OF LABOR STANDARDS
tai,
$9.80
$0.00
Prevailing Wage Rates
DEc.AL L. PATRICK
As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN
Y P
Gacemor
$ecretan'
$0.00
i fassachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. MURRAY
LL Gocemor
HEATHER E. ROVE
Director
Awarding Authority, : Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street- North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - ROOFER (SlateiTile%Precast Concrete) - Local 33
Effective Date - 08/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.91
$10.50
$2.93
$0.00
$31.34
2 60
$21.49
$10.50
$9.80
$0.00
$41.79
3 65
$23.28
$10.50
$9.80
$0.00
$43.58
4 75
$26.86
$10.50
$9.80
$0.00
$47.16
5 85
$30.44
$10.50
$9.80
$0.00
$50.74
Effective Date - 02/01/2012
Step percent
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1�50�
$18.41
$10.50
$2.93
$0.00
$31.84
2 60
$22.09
$10.50
$9.80
$0.00
$42.39
3 65
$23.93
$10.50
$9.80
$0.00
$44.23
4 75
$27.61
$10.50
$9.80
$0.00
$47.91
5 85
$31.29
$10.50
$9.80
$0.00
$51.59
'Notes:
Apprentice to Journeyworker Ratio.**
SHEETMETAL WORKER
08/01/2011
$39.83
$9.82
$17.09
$0.00
$66.74
SHEETMETAL WORKERS LOCAL 17 -A
02/01/2012
$41.08
$9.82
$17.09
$0.00
$67.99
08/01/2012
$42.33
$9.82
$17.09
$0.00
$69.24
02/01/2013
$43.58
$9.82
$17.09
$0.00
$70.49
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 46 of 58
Addendum No. 2
February 2, 2012 Page 54 of 94 12284A
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location:
THE C01%,11V10NWEALTH OF 11%4ASSACRUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
l�hr
DEPARTMENT OF LABOR STANDARDS
Classification
Effective Date
Prevailing Wage Rates
DEVAL L PATRICK
As determined by the Director under the of the JOANNE F. GOLDSTEIN
Go-or
provisions
S
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. MURRAY
HEATHER E. ROWE
LL Go% mor
Dircclor
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location:
240 Main Street, North Andover MA 01845
Classification
Effective Date
Base Wage
Health
Pension Supplemental Total Rate
Unemployment
Apprentice-
SKEET METAL lVORKER -Local 17-A
Effective
Date - 08/01/2011
Supplemental
Step
percent
Apprentice Base Wage
� �
Health
Pension
Unemployment
✓$0.00
Total Rate
1
40
$15.93
$9.82
$3.74
$29.49
2
45
$17.92
$9.82
$7.45
$0.00
$35.19
3
50
$19.92
$9.82
$8.42
$0.00
$38.16
4
60
$23.90
$9.82
$9.60
$0.00
$43.32
5
65
$25.89
$9.82
$10.32
$0.00
$46.03
6
75
$29.87
$9.82
$11.76
$0.00
$51.45
7
85
$33.86
$9.82
$12.69
$0.00
$56.37
....,.- ....._.... ..,,._... ,.:_..... ........ ........... ..__,_, .....-,.. .. ....,.. ....�,... �,. .......... ., .,,,..,. .,,......,,. .-.,...,,,, .......... .,..,,,.... .......,.. ..,..... .....,,_... ,_... ..,.,..... msµ. ...,.,,,.. ..,.......... ....«,.,.. ...,,,.3
€Notes:
Steps 1-3 are 1 year; Steps 4-7 are 6 mos.
.... _.. _.__
Apprentice to Journeyworker Ratio: 1:4
.............. ........ -... _....._..... _......... .................. _...---.._-..... ........ ............ __........ ............ __..... ---._................._........ --...._... .......... ........._....._............... ......... -._..__._...__.._..........._................................ ----.-._.._......... ............................... .................... ............-............ _................ ...................... ............... _....
SIGN ERECTOR 06/01/2009 $24.81 $7.07 $5.90 $0.00 $37.78
PAINTERS LOCAL 35 - 70NE 2
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 55 of 94
Page 47 of 58
12284A
• . get
THE COMMONWEALTH OF \MASSACHUSETTS
Pension
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
C 1 iQ4
�
DEPARTMENT OF LABOR STANDARDS
t
$12.41
$7.07
Prevailing Wage Rates
DEVAL L. PATRICK
Govemor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
$19.48
se -1 -
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
LL Gocemor
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH .ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice- SIGN ERECTOR -Local 35 Zone 2
Effective Date - 06/01/2009
Step percent Apprentice Base Wage
_1 m
Health
Pension
Supplemental
Unemployment
Total Rate
50_____._
$12.41
$7.07
$0.00
$0.00
$19.48
2 55
$13.65
$7.07
$2.40
$0.00
$23.12
3 60
$14.89
$7.07
$2.40
$0.00
$24.36
4 65
$16.13
$7.07
$2.40
$0.00
$25.60
5 70
$17.37
$7.07
$5.90
$0.00
$30.34
6 75
$18.61
$7.07
$5.90
$0.00
$31.58
7 80
$19.85
$7.07
$5.90
$0.00
$32.82
8 85
$21.09
$7.07
$5.90
$0.00
$34.06
9 90
$22.33
$7.07
$5.90
$0.00
$35.30
,Notes:
I
Steps are 4 mos.
i
Apprentice to Journeyworker Ratio:1:1
SPECIALIZED EARTH MOVING EQUIP < 35 TONS
�mm 12/01/2011
$30.14
$8.56
$7.27$0.00
_
$45.97
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
06/01/2012
$30.44
$8.56
$7.27
$0.00
$46.27
08/01/2012
$30.44
$8.91
$7.27
$0.00
$46.62
--------....__......._._...._..............._..._._......__.........._.._.._._....._._......._..___........_.._._._.__._..............._......._..._......................._..........................._..............-.................................._.................___........._-....._._.._.............................._......._......_-..._......_.......................................
12/01/2012
$30.74
$8.91
$8.00
$0.00
$47.65
SPECIALIZED EARTH MOVING EQUIP > 35 TONS
12/01/2011
$30.43
$8.56
_._..
$7.27
.._..._.__.........
$0.00
..... .................._........_....._......._........................
$46.26
TEAMSTERS.JOINT COUNCIL NO. l l/ ZONE B
06/01/2012
$30.73
$8.56
$7.27
$0.00
$46.56
08/01/2012
$30.73
$8.91
$7.27
$0.00
$46.91
12/01/2012
$31.03
$8.91
$8.00
$0.00
$47.94
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 56 of 94
Page 48 of 58
12284A
' t
THE COMMONWEALTH OF MASSACHUSETTS
�j tN1
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
til
,* 'r°
DEPARTMENT OF LABOR STANDARDS
N
m �1"' V!
$49.60
$8.10
Prevailing Wage Rates
DEV:\L L. CK
Go errorntor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
TIMOTHY P. MURRAY
$ecretan
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
LI. Gocemor
HEATHER E. ROR'E
Director
Awarding .authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
SPRINKLER FITTER
SPRINKLER FITTERS LOC',4L 550 - (Section e) 01/01/2012 $46.85 $8.10 $11.60 $0.00 $66.55
03/01/2012 $47.60 $8.10 $11.60 $0.00 $6730
09/01/2012
$48.60
$8.10
01/01/2013
$48.60
$8.10
03/01/2013
$49.60
$8.10
$11.60
$0.00
$68.30
$11.75
$0.00
$68.45
$11.75
$0.00
$69.45
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 57 of 94
Page 49 of 58
12284A
`#
THE COMMONWEALTH OF MASSACHUSETTS
,p 2
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
$7.85
DEPARTMENT OF LABOR STANDARDS
X,
2
3y
Prevailing Wage Rates
DEVAL L. PATRICK
Gocemor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
TI6tOTHv P. MURRAY
Secrcmn
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
Lt. Gocemor
xE.arxER E. RowE
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 Citv/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- SPRINKLER FITTER -Local 550 (Section R)
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
35
$16.40
$8.10
$7.85
$0.00
$32.35
2
40
$18.74
$8.10
$7.85
$0.00
$34.69
3
45
$21.08
$8.10
$7.85
$0.00
$37.03
4
50
$23.43
$8.10
$7.85
$0.00
$39.38
5
55
$25.77
$8.10
$7.85
$0.00
$41.72
6
60
$28.11
$8.10
$7.85
$0.00
$44.06
7
65
$30.45
$8.10
$7.85
$0.00
$46.40
8
70
$32.80
$8.10
$7.85
$0.00
$48.75
9
75
$35.14
$8.10
$7.85
$0.00
$51.09
10
80
$37.48
$8.10
$7.85
$0.00
$53.43
Effective Date - 03/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 35
$16.66
$8.10
$7.85
$0.00
$32.61
2 40
$19.04
$8.10
$7.85
$0.00
$34.99
3 45
$21.42
$8.10
$7.85
$0.00
$37.37
4 50
$23.80
$8.10
$7.85
$0.00
$39.75
5 55
$26.18
$8.10
$7.85
$0.00
$42.13
6 60
$28.56
$8.10
$7.85
$0.00
$44.51
7 65
$30.94
$8.10
$7.85
$0.00
$46.89
8 70
$33.32
$8.10
$7.85
$0.00
$49.27
9 75
$35.70
$8.10
$7.85
$0.00
$51.65
10 80
$38.08
$8.10
$7.85
$0.00
$54.03
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 58 of 94
Page 50 of 58
12284A
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
4 €;
DEPARTMENT OF LABOR STANDARDS
T'
Prevailing Wage Rates
DEVAL L PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Gocemor
Secrctlrn
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. MURRAY Massachusetts
E. RO\3'E
Lr_ Go, emor Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new mechanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension supplemental Total Rate
Unemployment
`Notes:
Apprentice to Journeyworker Ratio: 1:1
STEAM BOILER OPERATOR
12/01/2011
$39.16
$10.00
$12.40
$0.00
$61.56
OPERATING ENGINEERS LOCAL a
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
....---._._._..._...._.._......._._........._...__..__._........_
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
.........................__..._.......__._._._.....-.._.--.._........ ...__....._._.........._..._.._..........._...._...----._....._._._.._......_
TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN
12/01/2011
------.._..-...._......_...__......
$39.16
.... .._-----------._._................._.........._....._...
$10.00
$12.40
........ -......
$0.00
._._...........I ............ . ._....- ...
$61.56
OPERATING ENGINEERS LOCAL a
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
TELECOMMUNICATION TECHNICIAN09/01/2011
$31.42
$13.00
$12.22
$0.00
$56.64
ELECTRICIANS LOCAL 103
03/01/2012
$31.78
$13.00
$12.23
$0.00
$57.01
09/01/2012
$32.29
$13.00
$12.25
$0.00
$57.54
03/01/2013
$32.83
$13.00
$12.26
$0.00
$58.09
09/01/2013
$33.34
$13.00
$12.28
$0.00
$58.62
03/01/2014
$33.88
$13.00
$12.30
$0.00
$59.18
09/01/2014
$34.38
$13.00
$12.31
$0.00
$59.69
03/01/2015
$34.91
$13.00
$12.33
$0.00
$60.24
09/01/2015
$35.63
$13.00
$12.35
$0.00
$60.98
03/01/2016
$36.35
$13.00
$12.37
$0.00
$61.72
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 59 of 94
Page 51 of 58
12284A
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension
Supplemental Total Rate
Unemviovment
Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103
Effective Date - 09/01/2011 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
THE COMMONWEALTH OF MASSACHUSETTS
$12.57
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
V`
DEPARTMENT OF LABOR STANDARDS
$34.84
2
40
Prevailing Wage Rates
DEVAL L. PATRICK
As determined by the Director under the p rovisions of the JOANNE F. GOLDSTEIN
Secretarc
Govemor
$34.84
TIMOTHY P MURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROME
Lt. Go%emor
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension
Supplemental Total Rate
Unemviovment
Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103
Effective Date - 09/01/2011 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$12.57
$13.00
$9.27
$0.00
$34.84
2
40
$12.57
$13.00
$9.27
$0.00
$34.84
3
45
$14.14
$13.00
$9.51
$0.00
$36.65
4
45
$14.14
$13.00
$9.51
$0.00
$36.65
5
50
$15.71
$13.00
$9.76
$0.00
$38.47
6
55
$17.28
$13.00
$10.01
$0.00
$40.29
7
60
$18.85
$13.00
$10.26
$0.00
$42.11
8
65
$20.42
$13.00
$10.50
$0.00
$43.92
9
70
$21.99
$13.00
$10.75
$0.00
$45.74
10
75
$23.57
$13.00
$11.00
$0.00
$47.57
Effective Date - 03/01/2012
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
40
$12.71
$13.00
$9.27
$0.00
$34.98
2
40
$12.71
$13.00
$9.27
$0.00
$34.98
3
45
$14.30
$13.00
$9.51
$0.00
$36.81
4
45
$14.30
$13.00
$9.51
$0.00
$36.81
5
50
$15.89
$13.00
$9.76
$0.00
$38.65
6
55
$17.48
$13.00
$10.01
$0.00
$40.49
7
60
$19.07
$13.00
$10.26
$0.00
$42.33
8
65
$20.66
$13.00
$10.50
$0.00
$44.16
9
70
$22.25
$13.00
$10.75
$0.00
$46.00
10
75
$23.84
$13.00
$11.00
$0.00
$47.84
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 60 of 94
Page 52 of 58
12284A
.awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
';Notes:
Apprentice to Journeyworker Ratio: 1:1
TERRAZZO FINISHERS
BRICKLAYERS LOCAL 3 - MARBLE & TILE
08/01/2011 $45.50 $9.93 $16.51 $0.00 $71.94
02/01/2012 $46.49 $9.93 $16.51 $0.00 $72.93
Apprentice- TERRAZZO FINISHER
THE COMMONWEALTH OF \4ASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
,.
F
DEPARTMENT OF LABOR STANDARDS
Effective Date - 08/01/2011
Prevailing Wage Rates
DEVAL L. PATRICK
Go -tor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
secroarc
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Gocemor
Director
.awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
';Notes:
Apprentice to Journeyworker Ratio: 1:1
TERRAZZO FINISHERS
BRICKLAYERS LOCAL 3 - MARBLE & TILE
08/01/2011 $45.50 $9.93 $16.51 $0.00 $71.94
02/01/2012 $46.49 $9.93 $16.51 $0.00 $72.93
Apprentice- TERRAZZO FINISHER
-Local 3 Marble & Tile
Effective Date - 08/01/2011
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$22.75
$9.93
$16.51
$0.00
$49.19
2 60
$27.30
$9.93
$16.51
$0.00
$53.74
3 70
$31.85
$9.93
$16.51
$0.00
$58.29
4 80
$36.40
$9.93
$16.51
$0.00
$62.84
5 90
$40.95
$9.93
$16.51
$0.00
$67.39
Effective Date - 02/01/2012
Supplemental
Step percent
.--��-
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$23.25
$9.93
$16.51
$0.00
$49.69
2 60
$27.89
$9.93
$16.51
$0.00
$54.33
3 70
$32.54
$9.93
$16.51
$0.00
$58.98
4 80
$37.19
$9.93
$16.51
$0.00
$63.63
5 90
$41.84
$9.93
$16.51
$0.00
$68.28
lNotes:
Steps are 800 hrs.
Apprentice to Journeyworker Ratio: 1:3
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006
Addendum No. 2
February 2, 2012 Page 61 of 94
Page 53 of 58
12284A
t x <
THE COMMONWEALTH OF MASSACHUSETTS
$7.10
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
"s �F
DEPARTMENT OF LABOR STANDARDS
2 70
$23.14
$7.10
Prevailing Wage Rates
DEVAL L. PATRICK
As determined by the Director under the of the JOANNE F. GOLDSTEIN
Gocemor
provisions S -1 -
$7.10
lJNrlassachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. NrURR.AY
Ll. Gocemor
HEATHER E. ROWE
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
_......................._..........._._.........................._... ...__.......__...._. Unemployment
._.._...._..._.._................._......_.._..._........._.........__._.._._................._......__.-..__.._.....__._.._._....__.._..-.........._......_..........__.........._..........._._......._..._.........__..__.._........__...._...............__........._............_.....----...__......
TEST BORING DRILLER 12/01/2011 $33.05 $7.10 $12.60 $0.00 $52.75
L4 BORE. RS - FO UNDATIOA` A,ND A1A R!A'E-
Apprentice - TEST BORING DRILLER (Laborers Foundation & Marine)
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$19.83
$7.10
$12.60
$0.00
$39.53
2 70
$23.14
$7.10
$12.60
$0.00
$42.84
3 80
$26.44
$7.10
$12.60
$0.00
$46.14
4 90
$29.75
$7.10
$12.60
$0.00
$49.45
_ , ......,
lNotes:
1
i
l
Apprentice to Journeyworker Ratio: 1:3
[
I
TEST BORING DRILLER HELPER
12/01/2011
$31.77
$7.10
$12.60
$0.00 $51.47
LABORERS- FOUNDATIONAND MARINE
TEST BORING LABORER
LABORERS - FOUNDATIONAND MARINE.
12/01/2011 $31.65 $7.10 $12.60 $0.00 $51.35
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, see. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, NIA 02108; Tel:
Issue Date: 01/03/2012 NIVage Request Number: 20120103-006 Page 54 of 58
Addendum No. 2
February 2, 2012 Page 62 of 94 12284A
z a
THE COMMONWEALTH OF tt MASSACHUSETTS
�IIp
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
r�
DEPARTMENT OF LABOR STANDARDS
'=
Prevailing Wage Rates
DEv.aG PJCK
Goce.0, mor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
TIMOTHY P. \4URRAY
Secretan
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
Li. Govern°r
HEATHER E�aou�E
Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- TEST BORING LABORER (Laborers Foundation & Marine)
Effective Date - 12/01/2011
Step percent Apprentice Base Wage Health
_i W�60
Pension
Supplemental
Unemployment
Total Rate
$18.99
$7.10
$12.60
_ $0.00��
$38.69
2 70
$22.16
$7.10
$12.60
$0.00
$41.86
3 80
$25.32
$7.10
$12.60
$0.00
$45.02
4 90
$28.49
$7.10
$12.60
$0.00
$48.19
'Notes:
r
Apprentice to Journeyworker Ratio: 1:3
TRACTORS/PORTABLE STEAM GENERATORS
12/01/2011
$39.16
$10.00
$12.40
$0.00
$6156
OPERd TING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
TRAILERS FOR EARTH MOVING EQUIPMENT
12/01/2011
_ $30.72
$8.56
$7.27
$0.00
$46.55
TEAMSTERS JOINT COUNCIL NO. 10 70NE B
06/01/2012
$31.02
$8.56
$7.27
$0.00
$46.85
08/01/2012
$31.02
$8.91
$7.27
$0.00
$47.20
._....._..._................. .... .......... ...._....................._.........._.__..__....
12/01/2012
$31.32
$8.91
$8.00
$0.00
$48.23
_.__...__.........
TUNNEL WORK - COMPRESSED AIR
.......__...._...._......._..._._..... ..-..._..._.-...........
12/01/2011
-.......... ......._._._..--................
$44.08
_...... .........-..._.._...._
$7.10
.... --..--- ........_..._..._......_..__.._--__..._......_..__
$13.00
$0.00
.................... - ........ _... .._....
$64.18
LABORERS (COMPRESSED AIR)
TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE)
12/01/2011
$46.08
$7.10
$13.00 rr
$0.00
$66.18 J
LABORERS (COMPRESSED AIR)
TUNNEL WORK - FREE AIR
12/01/2011
$36.15
$7.10
$13.00
$0.00
$56.25
LABORERS (FREE AIR TUNNEL)
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 55 of 58
Addendum No. 2
February 2, 2012 Page 63 of 94 12284A
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
,4�r,1 i
k'
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNESF OLDSTEIN
Go%emor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Governor Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
.
.Unemplo........... ...... ....... ............... .. ............ ..............._......................-- -- --._...
TUNNEL WORK - FREE AIR (HAZ. WASTE) 12/01/2011 $38.15 $7.10 $13.00 $0.00 $58.25
L9 BORERS (FREEAIR TUNNEL)
VAC -HAUL
12/01/2011
$30.14
$8.56
$7.27
$0.00
$45.97
TEAMSTERS JOINT COUNCIL NO. 10 7.ONE B
06/01/2012
$30.44
$8.56
$7.27
$0.00
$46.27
$9.32
08/01/2012
$30.44
$8.91
$7.27
$0.00
$46.62
$13.29
12/01/2012
$30.74
$8.91
$8.00
$0.00
_ _
$47.65
WAGON DRILL OPERATOR
12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
LABORERS - ZONE 2
WASTE WATER PUMP OPERATOR
12/01/2011
_ $39.52
$10.00
$12.40
$0.00
$61.92
OPERATING ENGINEERS LOCAL 4
EQUIPMENT OPERATOR (Class A CDL)
06/01/2012
$40.09
$10.00
$12.40
$0.00
$62.49
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
12/01/2012
$40.71
$10.00
$12.40
$0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
$0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
$0.00
$64.67
WATER METER INSTALLER
PLUMBERS & GASFITTERS LOCAL 12 (Local 138)
Outside Electrical - East
09/01/2011
$41.93
$9.32
$13.29
$0.00
$64.54
03/01/2012
$42.73
$9.32
$13.29
$0.00
$65.34
09/01/2012
$43.98
$9.32
$13.29
$0.00
$66.59
03/01/2013
$45.23
$9.32
$13.29
$0.00
$67.84
CABLE TECHNICIAN (Power Zone)
08/29/2011
$27.11
$6.70
$1.50
$0.00
$35.31
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
......................... .............. .-.... .............. ....... ..... .. _ ............................. _...... _
CABLEMAN (Underground Ducts & Cables)
...... ........................ ...............
08/29/2011
........_ _
$38.41
$6.70
$1.00
...........
$0.00
............... ._...............
$46.11
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
DRIVER / GROUNDMAN CDL
08/29/2011
$31.63
$6.70
$2.50
$0.00
$40.83
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
DRIVER / GROUNDMAN -Inexperienced (<2000 Hrs)
08/29/2011
$24.85
$6.70
$1.50
$0.00
$33.05
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
EQUIPMENT OPERATOR (Class A CDL)
_ 08/29/2011
$38.41
$6.70
$5.00
$0.00
$50.11
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012 Wage Request Number: 20120103-006 Page 56 of 58
Addendum No. 2
February 2, 2012 Page 64 of 94 12284A
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
THE COMMONWEALTH OF MASSACHUSETTS
10
Health
(#
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
1�, (a�
DEPARTMENT OF :LABOR STANDARDS
,V
Base Wage
v'
Pension
Supplemental
Prevailing Wage Rates
DEVAL L. PATRICK
As determined by the Director under the provisions of the 1OANNEsF. GOLDSTEIN
Goccmor
75
$33.89
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. MLlitRAl'
HEATHER E. ROWE
U. Goccmor
Dilor
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 City/Town: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
percent
Apprentice Base Wage
�.
Health
1
60-
$27.11
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
......................... .............. .......__._...._......._........_........_._._................._._..........._...__.....__._........._.........................._.._.._.._................._.........._.-........_..................-.._...._._...__........_.................................._..._....._....._...._.................................................._._..._....__...._......._.............................._......._._....._...._............_................
$6.70
4
75
$33.89
Unemployment
5
EQUIPMENT OPERATOR (Class B CDL)
08/29/2011
$33.89
$6.70
$2.75
$0.00
$43.34
OUTSIDE ELECTRICAL WORKERS- EASTLOCAL 104
90
$40.67
$6.70
GROUNDMAN
08/29/2011
$24.85
___..._.__.....___._.................
$6.70
$1.00
.....
$0.00
$32.55
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
GROUNDMAN -Inexperienced (<2000 Hrs.)
08/29/2011
$20.34
$6.70
$0.75
$0.00
$27.79
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
JOURNEYMAN LINEMAN
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
08/29/2011 $45.19 $6.70 $7.86 $0.00 $59.75
Apprentice - LINEMAN (Outside Electrical) - East Local 104
Effective Date - 08/29/2011
Step
percent
Apprentice Base Wage
�.
Health
1
60-
$27.11
$6.70
2
65
$29.37
$6.70
3
70
$31.63
$6.70
4
75
$33.89
$6.70
5
80
$36.15
$6.70
6
85
$38.41
$6.70
7
90
$40.67
$6.70
' Notes:
i
Apprentice to Journeyworker Ratio:1:2
...... ....... .......................................... ........... .......... ................................... .................. _.........._................. ................. .................. ...................................
....
TELEDATA CABLE SPLICER
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
TELEDATA LINEMAN/EQUIPMENT OPERATOR
OUTSIDE ELECTRICAL E9"ORKERS - EAST LOCAL 104
Pension
Supplemental
Unemployment
Total Rate
$2.11
$0.00
$35.92
$2.36
$0.00
$38.43
$2.86
$0.00
$41.19
$3.36
$0.00
$43.95
$3.86
$0.00
$46.71
$4.36
$0.00
$49.47
$5.36
$0.00
$52.73
07/18/2011
$25.94
$4.18
$2.78
$0.00
$32.90
07/16/2012
$26.33
$4.18
$2.79
$0.00
$33.30
07/18/2011
$24.42
$4.18
$2.73
$0.00
$31.33
07/16/2012
$24.78
$4.18
$2.74
$0.00
$31.70
This wage schedule must be posted by the contractor at the work site in accordance with N1.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 65 of 94
Page 57 of 58
12284A
. A*- . -rHE CONINIONWEALTH OF MASSACHUSETTS
a1, EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
t�1 ,fir
f��31 r,1
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F.
GOLDSTEIN
Governor
TIMOTHY P. NIURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Gocentor Director
Awarding Authority: Greater Lawrence Sanitary District
Contract Number: 12284 Citylfown: NORTH ANDOVER
Description of Work: Primary Clarifier & Aeration System Improvements - A new machanism in the primary clarifier increasing the
number of diffusers in the aeration system, and replace two primary clarifier effluent gates.
Job Location: 240 Main Street, North Andover MA 01845
Classification
TELEDATA WIREMAN/INSTALLER/TECHNICIAN
OUTSIDE_ ELECTRICAL ;I'ORKERS- FAST LOCAL 104
_..
TREE TRIMMER
OUTSIDE ELECTRICAL WORKERS- EAST LOCAL 104
This classification applies only to the trimming of branches on
and around utility lines.
_
........_...._............._......._..._.........- _.........._........ .-................. _... _...... ._........-......_........._....... _.....
TREE TRIMMER GROUNDMAN
OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104
This classification applies only to the trimming of branches on
and around utility lines.
Additional Apprentice Information
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
07/18/2011
$24.42
$4.18
$2.73
$0.00
$31.33
07/16/2012
........ ..
$24.78
.........
$4.18
__.
$2.74
........
$0.00
............... ......
$31.70
...................
02/01/2009
$16.59
$2.42
$0.00
$0.00
$19.01
02/01/2009 $14.64 $2.42 $0.00 $0.00 $17.06
Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the
Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L
c. 23, ss. 11 E-11 L.
All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. 11 E-1 IL
All steps are six months (1000 hours) unless otherwise specified.
* Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof.
** Multiple ratios are listed in the comment field.
** * APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13. 10:13, 10:14, etc.
**** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc.
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/03/2012
February 2, 2012
Wage Request Number: 20120103-006
Addendum No. 2
Page 66 of 94
Page 58 of 58
12284A
,_.._.:_ __.,inion i=ce
Superso:Hed General Decision `>um.ber: 14L73010'0�i1
State: Massachusetts
Construction Type: Building
Counties: Barnstable, Bristol, Dukes, Essex, Middlesex-:,
Nantucket, Norfolk and Suffolk Counties in bassachusetts.
BUILDING CONSTRUCTION PROUECTS does not include single family
homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 01/066/2012
ASBE0006-001 09/01/2010
BARNSTABLE (Brewster, Chatham, Dennis, Eastham, Harwich,
Orleans, Provincetown, Truro, Wellfleet and Yarmouth); BRISTOL
(Easton); ESSEX; MIDDLESEX; AND NORFOLK (Avon, Braintree,
Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Holbrook,
Hull, Medfield, Medway, Millis, Milton, Needham, Norfolk,
Norwood, Quincy, Randolph, Sharon, Stoughton, Walpole,
Welleslev, Westwood, and Weymouth); AND SUFFOLK COUNTIES
Rates Fringes
Insulator/asbestos worker
Includes the application
of all insulating
materials, protective
coverings, coatings, and
finishes to all types of
mechanical systems .......... $ 40.66 21.18
----------------------------------------------------------------
ASBE0006-002 12/02/2011
BARNSTA.BLE (Brewster, Chatham, Dennis, Eastham, Harwich,
Orleans, Provincetown, Truro, Wellfleet and Yarmouth); BRISTOL
(Easton); ESSEX; MIDDLESEX; NORFOLK (Avon, Braintree,
Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Holbrook,
Hull, Medfield, Medway, Millis, Milton, Needham, Norfolk,
Norwood, Quincy, Randolph, Sharon Stoughton, Walpole,
Wellesley, Westwood, and Weymouth) AND SUFFOLK COUNTIES
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation,
wetting, stripping, removal,
scrapping, vacuuming,
bagging and disposing of all
insulation materials from
mechanical systems whether
they contain asbestos or not) .... $ 26.70 15.75
ASBE0006-010 09/01/2010
BAR14STABLE (Barnstable, Bourne, Falmouth, Mashpee and
Sandwich); BRISTOL (A.cushnet, Attleboro city, Berkeley,
Dartmouth, Dighton, Fairhaven, Fall river City, Freetown,
Marion, Mansfield, New Bedford City, North Attleboro, Norton,
Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton City and
Westport); DUKES; NANTUCKET; NORFOLK (Bellingham, Franklin,
Plainville, and Wrentham); PLYMOUTH (Lakeville, Mattapoisett,
Middleboro, Rochester and Wareham)
Rates Fringes
Insulator/asbestos worker
(Includes the application of
all insulating materials,
protective coverings,
coatings and finishes to all
types of mechanical systems.) .... $ 40.66 21.18
BOIL0029-001 10/01/2009
Rates Fringes
BOILERMP.KER......................$ 38-25 17.04 Addendum No.2
February 2. 2012 Page 67 of 94
12284A
----------------------------------------------------------------
BRM•:%Oco1-308 03/I_,201_
-O.'KBOR�, CHAPTER
BRISTOL (Attleboro, Berkley, Dighton, 'Mansfield, North
Attleboro, Norton, Raynham, Rehoboth, Seekonk, Taunton) AND
NORFOLK (Bellingham, Canton, Dedham, Foxboro, Franklin,
Norfolk, Norwood, Plainville, Sharon, 'Walpole, T.Aestreood,
Wrentham) COUNTIES
Rates Fringes
Bricklayer, Cement Mason,
Plasterer ........................$ 43.86 24.15
----------------------------------------------------------------
BRMA0001-009 03/01/2010
LOWELL CHAPTER
MIDDLESEX (Acton, Asby, Ayer, Bedford, Billerica, Boxboro,
Carlisle, Chemsford, Dracut, Dunstble, Ft. Denvens, Groton,
Littleton, Lowell, North Acton, Pepperell, Shirley, South
Acton, Tewksbury, Townsend, Tyngsboro, Priest Acton, Westford,
Wilmington)
Rates Fringes
Bricklayer and plasterer ......... $ 43.86 24.15
----------------------------------------------------------------
BRMA0001-010 03/01/2010
LOWELL CHAPTER
MIDDLESEX (Ashland, Framingham, Holliston, Hopkinton, Hudson,
Maynard, Natick, Sherbvorn, Stow); and NORFOLK (Medfield,
Medway,Millis)
Rates Fringes
BRICKLAYER .......................$ 43.86 24.15
----------------------------------------------------------------
BRMA0003-001 08/01/2011
Rates Fringes
Marble & Tile Finisher ........... $ 35.52 25.47
Marble, Tile & Terrazzo
Workers ..........................$ 46.60 22.66
TERRAZZO FINISHER ................$ 45.50 26.49
BRMA0003-003 08/01/2011
BOSTON CHAPTER
MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford,
Melrose, Somerville); NORFOLK (Brookline, Milton); and SUFFOLK
Rates Fringes
BRICKLAYER .......................$ 46.56 26.88
----------------------------------------------------------------
BRMA0003-006 08/01/2011
LYNN CHAPTER
ESSEX (Amesbury, Andover, Beverly, Boxford, Danvers, Essex,
Georgetown, Gloucester, Groveland, Hamilton, Haverhill,
Ipsewich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead,
Merrimac, Methuen, Middleton, Nahant, Newbury, Newburyport,
North Andover, Peabody, Rockport, Rowley, Salisbury, Salem,
Saugus, Swampscott, Topsfield Wakefield, Wenham, West Newbury);
and MIDDLESEX (Reading, North Reading, Wakefield)
Rates Fringes
Bricklayer, cement mason and
plasterer ........................$ 46.56 26.88
---------------------------------------------------------
BRMA0003-007 08/01/2011
WALTHAM CHAPTER
MIDDLESEX (Belmont, Burlington, Concord, Lexington, Lincoln,
Stoneham, Sudbury, Waltham, Watertown, Wayland, Weston,
Winchester, Woburn)
Rates Fringes
Addendum No. 2
Bricklayer andFiebTalarV .-2012....$ 46.56 26.88 Page 68 of 94 12284A
----------------------------------------------------------------
BRi-_x.3003- 9g 03, ,., x.^,11
NEWTON '.;H?.PTE9.
MIDDLESEX (Ne:a on) and NORFOLK (Dover, Needham, Wellesley;
Rates Fringes
Bricklayer, cement mason and
plasterer ........................$ 46.56 26.86
----------------------------------------------------------------
BRM 0003-009 08/01/2011
NEW BEDFORD
BARNSTABLE; BRISTOL (Acushnet, Darmouth, Farhaven, Fall River,
Freetown, New Bedford, Somerset, Swansea, Westport); DUKES; and
NANTUCKET COUNTIES
Rates Fringes
Bricklayer, cement mason and
plasterer ........................$ 46.56 26.88
----------------------------------------------------------------
BRMA0003-010 08/01/2011
QUINCY CHAPTER
NORFOLK COUNTY (Avon, Braintree, Cohasset, Holbrook, Quincy,
Randolph, Soughton, Weymouth)
Rates Fringes
Bricklayer, cement mason and
plasterer ........................$ 46.56 26.88
----------------------------------------------------------------
CARP0026-001 03/01/2011
BRISTOL (Attleborough, North Attleborough); ESSEX; MIDDLESEEX
(Except Belmont, Cambridge, Everett, Malden, Medford,
Somerville); AND NORFOLK (Bellingham, Canton, Foxboro,
Franklin, Medfield, Medway, Millis, Needham, Norfolk, Norwood,
Plainville, Sharon, Walpole, Wellesley, Westwood, Wrentham)
Rates Fringes
CARPENTER ........................$ 32.05 24.68
----------------------------------------------------------------
CARP0033-001 03/01/2011
MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford,
Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK
Rates Fringes
CARPENTER ........................$ 37.25 25.18
---------------------------------------------------------
CARP0056-011 08/01/2011
SUFFOLK (All of County); and those areas of BARNSTABLE,
BRISTOL, ESSEX, MIDDLESEX & NORFOLK COUNTIES situated inside
Boston Beltway (I-495) and North of Cape Cod Canal. ALL of
DUKES AND NANTUCKET COUNTIES
Rates Fringes
PILEDRIVERMAN ....................$ 38.30 27.52
----------------------------------------------------------------
CARPOO56-012 08/01/2011
The areas of BARNSTABLE, BRISTOL, and NORFOLK COUNTIES situated
OUTSIDE Boston Beltway (I-495) and South of Cape Cod Canal
Rates Fringes
PILEDRIVERMAN ....................$ 38.30 27.52
----------------------------------------------------------------
CARP0056-013 08/01/2011
Those areas of ESSEX and MIDDLESEX COUNTIES situated OUTSIDE
Boston Beltway (I-495)
Rates Fringes Addendum No. 2
February 2, 2012 Page 69 of 94 12284A
PI LE DRI-:ERr1-,�r....................= __. -;.5_
----------------------------------------------------------------
CARPO42 -003 03/01/2011
NORFOLK COUNTY (Braintree, Cohassett, Scituate, Weymouth,
Quincy)
Rates Fringes
CARPENTER ........................$ 32.05 24.68
----------------------------------------------------------------
C.RP0624-005 03/01/2011
BARNSTABLE; BRISTOL (Except Attleboro & North Attleboro);
DUKES; NANTUCKET; AND NORFOLK (Avon, Holbrook, Randolph,
Stoughton) COUNTIES
Rates Fringes
CARPENTER ........................$ 32.05 24.68
----------------------------------------------------------------
CARP1121-001 05/02/2010
Rates Fringes
MILLWRIGHT .......................$ 29.78 18.61
----------------------------------------------------------------
CARP2168-001 09/01/2011
MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford,
Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK
Rates Fringes
FLOOR LAYER: Carpet .............$ 35.95 23.46
----------------------------------------------------------------
CARP2168-004 09/01/2011
BRISTOL; ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett,
Malden, Medford, Somerville); Remainder of Norfolk County
Rates Fringes
FLOOR LAYER: Carpet .............$ 35.95 23.46
----------------------------------------------------------------
CAR22168-005 09/01/2011
BARNSTABALE; DUKES; AND NANTUCKET
Rates Fringes
FLOOR LAYER: Carpet .............$ 35.95 23.46
----------------------------------------------------------------
* ELECO096-001 12/01/2011
MIDDLESEX (Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton,
Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend)
Rates Fringes
ELECTRICIAN ......................$ 36.75 14%+14.91
Teledata System Installer ........ $ 25.86 16.38
----------------------------------------------------------------
ELECO099-001 06/01/2011
BRISTOL (Attleboro, North Attleboro, Seekonk)
Rates Fringes
ELECTRICIAN ......................$ 34.08 20.17
Teledata System Installer ........ $ 25.56 15.97
----------------------------------------------------------------
ELECO103-001 09/01/2011
ESSEX; MIDDLESEX (Excluding Ashby, Ashland, Ayer, Ft. Devens,
Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow,
Townsend); NORFOLK (Excluding Avon, Holbrook, Plainville,
Randolph, Stoughton) SUFFOLK
Rates Fringes
Teledata System Installer ........ $ 31.42 21.62
------------------------------------------------------------A.ddendum No. 2
ELECO103-002 WT912. 2012 Page 70 of 94 12284A
ESS E`. cesbu r_ 3- o er, 'crd, _ Sr ---:eland,
e,,..
3a�e_hil La::rence, _ierrima,, ..__.�.,, .bury, i=_a:burypor=,
,forth 4.ndo-7er, Royale_;, Sallsbur.:, ::est MIDDLESEX
Bed."ord,B'_ilerica, Boxboro, Burlington, �arlisle, Chelmsford,
Dracut, Dunstable littleton, Lowell, North Reading, Tewksbury,
Tyngsboro, Westford, Wilmington!
Rates Fringes
ELECTRICIAN ......................$ 41.39 22.06
----------------------------------------------------------------
ELEC0103-004 09/01/2011
ESSEX (Beverly, Danvers, Esse:, Gloucester, Hamilton, Ipswich,
Manchester, Marblehead, Middleton, Peabod_-, Rockport, Salem,
Topsfield, Wenham)
Rates Fringes
ELECTRICIAN ......................$ 41.89 22.06
----------------------------------------------------------------
ELECO103-005 09/01/2011
ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott); MIDDLESEX
(Acton, Arlinaton, Belmont, Cambridge, Concord, Everett,
Framinaham, Holliston, Lexington, Lincoln, Malden, Maynard,
Redford, i(elrose, Natick, Newton, Readina, Sherborn,
Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown,
Wayland, Weston, Winchester, Woburn); NORFOLK (Bellingham,
Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro,
Frankloin, Medfield, Medway, Millis, Milton, Needham, Norfolk,
Norwood, Quincy, Sharon, Walpole, Wellesley, Westwood,
Weymouth, Wrentham); PLYMOUTH (Hingham and Hull);SUFFOLK
Rates Fringes
ELECTRICIAN ......................$ 41.89 22.06
----------------------------------------------------------------
ELECO104-001 08/31/2009
Rates Fringes
Line Construction:
Cableman....................$
34.89
7.50+A
Equipment Operator ..........
$
34.89
11.50+A
Groundman...................$
22.58
7.50+A
Lineman .....................$
41.05
14.43+A
A. PAID HOLIDAYS: New Year's Day; Memorial Day;
Independence Day; Labor Day; Thanksgiving Day; Christmas
Day and Columbus Day, provided the employee has been
employed 5 working days prior to any one of the listed
holidays.
----------------------------------------------------------------
ELECO223-005 09/01/2011
BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro,
Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook,
Plainville, Randolph, Stoughton)
Rates Fringes
ELECTRICIA.N......................$ 35.13 17.01
----------------------------------------------------------------
ELECO223-006 09/01/2011
BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro,
Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook,
Plainville, Randolph, Stoughton)
Rates Fringes
Teledata System Installer ........ $ 29.86 17.01
----------------------------------------------------------------
ELEV0004-001 01/01/2011
Rates Fringes
ELEVATOR MECHANIC ................$ 49.63 21.785+a
FOOTNOTE FOR ELEVATOR MECHANICS;
A. Employer Contributes 5% of basic hourly rate for 5 year Addendum No.2
or more cf s' rce a d��.or 6 months to 5 years of
service as a'21?5Y°'.- Page 71 of 94 12284A
E ght , -z _, ho' iida, e3� � � D --131
Independence Day, Labor Da veteran's D3;, Thanksgi-:ing
Da„ "'"'he t -id_- .L___ 7han'-:3,i in_ - , _n I D'r.-i,tmas
----------------------------------------------------------------
ENGIO004-001 12/01/2011
FOOTNOTE FOR POWER EQUIPMENT OPERATORS
A. PAID HOLIDAYS: New Year's Day, Washington's Birthday,
Labor Day, Memorial Day, Independence Day, Patriot's Day,
Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day
HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib):
Over 150 ft. +2.12
Over 185 ft. +3.72
Over 210 ft. +5.23
Over 250 ft. +7.92
Over 295 ft. +10.97
Over 350 ft. +12.76
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
Group 1: Crane; shovel; truck crane; cherry picker;
dragline; trench hoe; backhoe; three drum machine; derrick;
pile driver; elevator tower; hoist; gradall; shovel dozer;
front end loader; fork lift; suger; boring machine; rotaryu
drill; post hole hammer; post hole digger; pumperete
machine; asphalt plant (on site); concrete batching and/or
mixing plant (on site); crusher plant (on site); paving
concrete mixer; timber jack
Group 2: Sonic or vibratory hammer; grader; scraper; tandem
scraper; concrete pump; bulldozer; tractor; york rake;
mulching machine; portable steam boiler; portable steam
generator; roller; spreader; tamper (self propelled or
tractor drawn); asphalt paver; mechanic - maintenance;
paving screed machine; stationary steam boiler; paving
concrete finishing machine; cal truck; ballast regulator;
switch tamper; rail anchor machine; tire truck
Group 3: Pumps (1-3 grouped); compressor; welding machine
(1-3 grouped); generator; concrete vibrator; heater (power
driven 1- 5); well point system (operating);
syphon -pulsometer; concrete mixer; valves controlling
permanent plant air or steam; conveyor; Jackson type
tamper; single diaphragm pump; lighting plant
Group 4: Assistant engineer (fireman)
Group 5: Oiler (other than truck cranes and gradalls)
Group 6: Oiler (on truck cranes and gradalls) stant engineer
(on truck crane and gradall)
----------------------------------------------------------------
IRON0007-006 03/16/2011
AREA 1: BRISTOL (Easton); ESSEX (Beverly Gloucester,
Lynn,Lynnfield, Manchester, Marblehead Nahant, Salem, Saugus,
Swampscott); MIDDLESEX (Arlington, Bedford, Belmont,
Burlington, Cambridge, Concord, Everett, Framingham, Lexington,
Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton,
Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield,
Waltham, Watertown, Wayland, Weston, Winchester, Woburn);
NORFOLK (Except Medway); SUFFOLK
AREA 2: ESSEX (Amesbury, Andover, Boxford, Danvers, Essex,
Georgetown, Hamilton, Haverhill, Ipswich, Lawrence, Merrimac,
Methuen, Newbury, Newburyport, North Andover, Rockport, Rowley,
Salisbury, Topsfield, Wenham, West Newbury); MIDDLESEX (Action,
Billericia, Carlisle, Chelmsford, Dracut, Dunstable, Groton,
Groveland, Littleton, Lowell, Middleton, North Reading,
Pepperell, Tewksbury, Tyngsboro, Westford, Wilmington)
Rates Fringes
Ironworkers:
AREA 1 ......................$ 36.28 26.41 Addendum No.2
AREA 2 ... February •2•, 2012 • . • • $ 31.87 26. 41 Page 72 of 94 12284A
Rates
Fringes
Power equipment operators:
Group 1 .....................$
39.52
23.24
Group 2 .....................5
39.16
23.24
Group 3 .....................5
27.95
23.24
Group 4 .....................$
33.23
23.24
Group 5 .....................5
21.28
23.24
Group 6 .....................5
24.51
23.24
FOOTNOTE FOR POWER EQUIPMENT OPERATORS
A. PAID HOLIDAYS: New Year's Day, Washington's Birthday,
Labor Day, Memorial Day, Independence Day, Patriot's Day,
Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day
HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib):
Over 150 ft. +2.12
Over 185 ft. +3.72
Over 210 ft. +5.23
Over 250 ft. +7.92
Over 295 ft. +10.97
Over 350 ft. +12.76
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
Group 1: Crane; shovel; truck crane; cherry picker;
dragline; trench hoe; backhoe; three drum machine; derrick;
pile driver; elevator tower; hoist; gradall; shovel dozer;
front end loader; fork lift; suger; boring machine; rotaryu
drill; post hole hammer; post hole digger; pumperete
machine; asphalt plant (on site); concrete batching and/or
mixing plant (on site); crusher plant (on site); paving
concrete mixer; timber jack
Group 2: Sonic or vibratory hammer; grader; scraper; tandem
scraper; concrete pump; bulldozer; tractor; york rake;
mulching machine; portable steam boiler; portable steam
generator; roller; spreader; tamper (self propelled or
tractor drawn); asphalt paver; mechanic - maintenance;
paving screed machine; stationary steam boiler; paving
concrete finishing machine; cal truck; ballast regulator;
switch tamper; rail anchor machine; tire truck
Group 3: Pumps (1-3 grouped); compressor; welding machine
(1-3 grouped); generator; concrete vibrator; heater (power
driven 1- 5); well point system (operating);
syphon -pulsometer; concrete mixer; valves controlling
permanent plant air or steam; conveyor; Jackson type
tamper; single diaphragm pump; lighting plant
Group 4: Assistant engineer (fireman)
Group 5: Oiler (other than truck cranes and gradalls)
Group 6: Oiler (on truck cranes and gradalls) stant engineer
(on truck crane and gradall)
----------------------------------------------------------------
IRON0007-006 03/16/2011
AREA 1: BRISTOL (Easton); ESSEX (Beverly Gloucester,
Lynn,Lynnfield, Manchester, Marblehead Nahant, Salem, Saugus,
Swampscott); MIDDLESEX (Arlington, Bedford, Belmont,
Burlington, Cambridge, Concord, Everett, Framingham, Lexington,
Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton,
Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield,
Waltham, Watertown, Wayland, Weston, Winchester, Woburn);
NORFOLK (Except Medway); SUFFOLK
AREA 2: ESSEX (Amesbury, Andover, Boxford, Danvers, Essex,
Georgetown, Hamilton, Haverhill, Ipswich, Lawrence, Merrimac,
Methuen, Newbury, Newburyport, North Andover, Rockport, Rowley,
Salisbury, Topsfield, Wenham, West Newbury); MIDDLESEX (Action,
Billericia, Carlisle, Chelmsford, Dracut, Dunstable, Groton,
Groveland, Littleton, Lowell, Middleton, North Reading,
Pepperell, Tewksbury, Tyngsboro, Westford, Wilmington)
Rates Fringes
Ironworkers:
AREA 1 ......................$ 36.28 26.41 Addendum No.2
AREA 2 ... February •2•, 2012 • . • • $ 31.87 26. 41 Page 72 of 94 12284A
----------------------------------------------------------------
_E.D,!Doo�-o 1c o3.�l�,�011
[!IDDLE!EX (Ashby, Ashland, D_er, Roxboro, Holliston, Hcokin_on,
Hudson, Marlboro, Shirley, Stow, To>msend); NORFOLK (Hedwa i)
Rates Fringes
IRONWORKER .......................$ 36.28 26.41
----------------------------------------------------------------
IRON0037-005 05/30/2011
BARNSTABLE; BRISTOL (Acushnet, Attleboro, Berkley, Dartmouth,
Diahton, Fairhaven, Fall River, Freetown, Mansfield, New
Bedford, North Attleboro, Norton, Raynham, Rehoboth, Seekonk,
Somerset, Swansea, Taunton, Westport); DUKES; NANTUCKET;
NORFOLK (Billingham, Franklin, Plainville, Wrentham)
Rates Fringes
IRONWORKER .......................$ 52.58 19.22
----------------------------------------------------------------
LAB00014-001 06/01/2011
Rates Fringes
Plasterer tender
BARNSTABLE, BRISTOL,
DUKES, ESSEX, NANTUCKET,
MIDDLESEX (with the
exception of Arlington,
Belmont, Burlington,
Cambridge, Everett,
Malden, Medford, Melrose,
Reading, Somerville,
Stoneham, Wakefield,
Winchester, Winthrop and
Woburn); NORFOLK (with the
exception of Brookline
Dedham and Milton) COUNTIES.$ 28.60 19.00
SUFFOLK COUNTY (Boston,
Chelsea, Revere, Winthrop,
Deer Island, Nut Island);
MIDDLESEX COUNTY
(Arlington, Belmont,
Burlington, Cambridge,
Everett, Malden, Medford,
Melrose, Reading,
Somerville, Stoneham,
Wakefield, Winchester,
Winthrop and Woburn only);
NORFOLK COUNTY (Brookline,
Dedham, and Milton only) .... $ 31.05 19.90
LAB00022-009 06/01/2010
SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer & Nut
Islands); MIDDLESEX COUNTY (Arlington, Belmont, Burlington,
Cambridge, Everett, Malden, Medford, Melrose, Reading,
Somerville, Stoneham, Wakefield, Winchester, Winthrop, and
Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton
only)
Rates Fringes
Laborers:
Group
1 .....................$
29.80
18.75
Group
2 .....................$
30.05
18.75
Group
3 .....................$
30.55
18.75
Group
4 .....................$
30.80
18.75
Group
5 .....................$
30.55
18.75
Group
6 .....................$
31.80
18.75
Group
7 .....................$
23.15
18.75
LABORERS CLASSIFICATIONS
GROUP 1: Laborers; Carpenter Tenders
GROUP 2: Jackhammer operator; pavement breaker; asphalt
raker carbide core drilling machine; chain saw operator;
pipelayer; barco type jumping tampers; laser beam; concrete
pump; mason tender; motorized mortar miner; ride -on
motorized buggy; fence and beam rail erector
GROUP 3: Air track, block paver; rammer; curb setter,
hydraulic and similar self -powered drills Addendum No. 2
February 2. 2012 Page 73 of 94 12284A
GROUP 4: Blaster, oo;;derman
GROUP 5: Pre -cast f'_oor and roof plank erector
0
GROUP 6: Asbestos removal laborers/haz-mac laborers
GROUP 7: Flaggers
----------------------------------------------------------------
LAB00022-010 06/01/2010
Counties of BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET;
MIDDLESEX (oath the exception of Arlington, Belmont,
Burlington, Cambridge, Everett, Malden, Medford, Melrose,
Reading, Somerville, Stoneham, Wakfield, Winchester, Winthrop
and Woburn); NORFOLK (with the exception of Brookline, Dedham
and Milton)
Rates Frinoes
Laborers:
Group 1 .....................$ 27.85 17.35
Group 2 .....................$ 28.10 17.35
Group 3 .....................$ 28.60 17.35
Group 4 .....................$ 28.85 17.35
Group 5 .....................$ 28.60 17.35
Group 6 .....................$ 29.85 17.335
LABORERS CLASSIFICATIONS
ROUP l: Laborers; Carpenter Tenders
GROUP 2: Jackhammer operator; pavement breaker; asphalt
raker carbide core drilling machine; chain saw operator;
pipelayer; barco type jumping tampers; laser beam; concrete
pump; mason tender; motorized mortar mixer; ride -on
motorized buggy; fence and beam rail erector
GROUP 3: Air track, block paver; hammer; curb setter,
hydraulic and similar self -powered drills
GROUP 4: Blaster; powderman
GROUP 5: Pre -cast floor and roof plank erector
GROUP 6: Asbestos removal laborers/haz-mat laborers
----------------------------------------------------------------
LABO1421-004 06/01/2011
BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET NORFOLK
AND SUFFOLK COUNTIES
Rates Fringes
Laborers: (Wrecking)
Group 1 .....................$ 31.05
19.75
Group 2 .....................$ 31.80
19.75
Group 3 .....................$ 32.05
19.75
Group 4 .....................$ 27.05
19.75
Group 5 .....................$ 30.15
19.75
Group 6 .....................$ 31.05
19.75
Group 1: Adzeman, Wrecking Laborer.
Group 2: Burners, Jackhammers.
Group 3: Small Backhoes, Loaders on
tracks, Bobcat Type
Loaders, Hydraulic "Brock" Type Hammer
Operators, Concrete
Cutting Saws.
Group 4: Yardman (Salvage Yard Only).
Group 5: Yardman, Burners, Sawyers.
Group 6: Asbestos, Lead Paint, Toxic
----------------------------------------------------------------
and
Hazardous Waste.
PAIN0011-007 06/01/2010
BARNSTABLE, BRISTOL, DUKES, AND NANTUCKET COUNTIES
Rates Fringes
GLAZIER ..........................$ 32.03 15.40+A
FOOTNOTE:
A. PAID HOLIDAY: LABOR DAY (provided employee has worked any
part of the week prior to Labor Day and any part of the
week after Labor Day)
----------------------------------------------------------------
PAIN0035-004 07/01/2011
BARNSTABLE; BRISTOL; ESSEX; NANTUCKET; DUKES; COUNTIES;
REMAINDER OF NORFOLK; MIDDLESEX AND SUFFOLK COUNTIES Addendum No.2
February 2, 2012 Page 74 of 94 12284A
Rates Fringes
Painters:
Rates
Fri-,__
Painte2s:
NEW CONSTRUCTION:
39.30
21.40
Brush, Taper ...............$
33.01
39.70
21.90
Spray, Sandblast ...........
$ 34.41
21.90
REPAINT:
36.36
21.40
Brush, Taper ...............$
31.0'
37.76
21.90
Spray, Sandblast ...........
$ 32.47
21.90
----------------------------------------------------------------
PAIN0035-013 01/01/2011
SUFFOLK
MIDDLESEX (Cambridge, Everett, Malden,
Medford,
Somerville)
SUFFOLK COUNTY (Boston, Chelsea)
NORFOLK COUNTY
(Brookline)
Rates Fringes
Painters:
NEW CONSTRUCTION:
Brush, Taper ...............$
39.30
21.40
Spray, Sandblast ...........
$
39.70
21.40
REPAINT:
Brush, Taper ...............$
36.36
21.40
Spray, Sandblast ...........
$
37.76
21.40
---------------------------------------------------------
PAIN0035-020 07/01/2011
ESSEX; MIDDLESEX; NORFOLK;
SUFFOLK
Rates Fringes
GLAZIER ..........................$ 38.80 21.90
----------------------------------------------------------------
PLAS0534-001 07/01/2011
ESSEX; MIDDLESEX; NORFOLK AND SUFFOLK COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER ... $ 35.00 29.66
----------------------------------------------------------------
PLAS0534-004 07/01/2011
MIDDLESEX; NORFOLK AND SUFFOLK COUNTIES
Rates Fringes
PLASTERER ........................$ 35.00 29.66
--------------------------------------------------------------
PLUM0004-001 09/01/2011
MIDDLESEX (Ashby, Ayer -West of Greenville branch of Boston and
Maine Railroad, Ft. Devens, Groton, Shirley, Townsend)
Rates Fringes
Plumbers and Pipefitters......... $ 39.14 23.36
---------------------------------------------------------
PLUM0012-005 09/01/2011
ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers,
Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill,
Ipswich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead,
Merrimac, Methuem, Middleton, Nahant, Newbury, Newburyport,
North Andover, Peabody, Rockport, Rowley, Salem, Salisbury,
Saugus, Swampscott,Topsfield, Wenham, West Newbury); MIDDLESEX
(Acton, Arlington, Ashford, Ayer -except west of Greenville
Branch of Boston & Maine Rail Road, Bedford, Belmont,
Billerica, Boxboro, Burlington, Cambridge, Carlise,
Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham,
Hudson, Holliiston, Hopkinton, Lexington, Lincoln, Littleton,
Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick,
Newton, North Reading, Pepperell, Reading, Sherborn,
Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro,
Wakefield, Watham, Watertown, Wayland, Westford, Wilmington,
Winchester and Woburnl, NORFOLK (Bellinaham, Braintree,
Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Franklin,
Medford, Medway, Millis, Milton, Needham, Norfolk, Norwood,
Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood,
Weymouth and Wrentham); PLYMOUTH (Hingham, Hull, Scituate);
SUFFOLK; WORCHESTER (Hopedale and Southboro)
Rates Fringes
PLUMBER ..........................$ 46.01 2-3.31 Addendum No.2
February 2, 2012 Page 75 of 94
12284A
S=.Rz1S'1!=-BLE, B I3'_'nt., rr:.ES; _j-' _ E =tiD i•?L- ,
Holbrook, Randolph, Stoughton; ZOUNTIES
Rates _ring es
Plumbers and Pipefitters......... $ 34.51 25.57
----------------------------------------------------------------
PLUM0537-005 09/01/2011
ESSEX (Ames, .=.ndover, Beverly, Boxford, Byfield, Danvers,
Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill,
Ipswich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead,
Merrimac, Methuem, Middleton, Nahant, Newbury, Newburyport,
North Andover, Peabody, Rockport, Rowley, Salem, Salisbury,
Saugus, Swampscott,Topsfield, Wenham, West Newbury); MIDDLESEX
(Acton, Arlinaton, Ashford, Ayer -except west of Greenville
Branch of Boston & Maine Rail Road, Bedford, Belmont,
Billerica, Boxboro, Burlington, Cambridge, Carlise,
Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham,
Hudson, Holliiston, Hopkinton, Lexington, Lincoln, Littleton,
Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick,
Newton, North Reading, Pepperell, Reading, Sherborn,
Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro,
Wakefield, Watham, Watertown, Wayland, Westford, Wilmington,
Winchester and Woburn!, !NORFOLK 'Bellingham, Braintree,
Brookline, Canton, Cohasset, Dedham, Do-:er, Foxboro, Franklin,
Medford, Medway, Millis, Hilton, Needham, Norfolk, Norwood,
Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood,
Weymouth and Wrentham); PLYMOUTH (Hingham, Hull, Scituate);
SUFFOLK; WORCHESTER (Hopedale and Southboro)
Rates Fringes
PIPEFITTER .......................$ 46.09 24.06
----------------------------------------------------------------
ROOF0033-001 08/01/2011
Rates Fringes
Roofers:
All Tear -off and/or
removal of any types of
roofing and all spudding,
sweeping, vacuuming and/or
cleanup of any and all
areas of any type where a
roof is to be relaid ........ $ 35.56 20.87
----------------------------------------------------------------
SFMA0550-001 09/16/2011
BRISTOL (Portion within 35 mile radius from Boston City Hall;
ESSEX; MIDDLESEX (Except Ashby, Townsend, and portions of
Pepperell and Shirley beyond 35 mile radius from Boston City
Hall); NORFOLK; PLYMOUTH (Portion within 35 mile radius of
Boston City Hall); SUFFOLK
Rates Fringes
SPRINKLER FITTER .................$ 51.30 20.11
----------------------------------------------------------------
SFMA0669-001 04/01/2011
BARNSTABLE; BRISTOL (Beyond 35 mile radius of Boston City
Hall); DUKES; MIDDLESEX (Ashby, Townsend, portions of Pepperell
and Shirley beyond 35 mile radius of Boston City Hall);
NANTUCKET; PLYMOUTH (Beyond 35 mile radius of Boston City Hall)
Rates Fringes
SPRINKLER FITTER .................$ 36.13 18.65
----------------------------------------------------------------
SFMA0676-001 01/01/2010
BRISTOL (Seekonk, Swansea, and Somerset)
Rates Fringes
SPRINKLER FITTER .................$ 39.50 17.85
a. PAID HOLIDAYS: Memorial Day, July 4th, Labor Day,
Thanksgiving Day and Christmas Day, provided the employee
has been in the employment of a contractor 20 working days Addendum No.2
prior to anyFzkUaFgil M2day. Page 76 of 94 12284A
----------------------------------------------------------------
SHEE001 -003 ,.'x'/201,,
BP.ISTO►, 'A= tleboro, Berkle, Easton, [Lns=i2ld, north
Attleboro, Norton, Rainham, Taunton); ESSEX; MIDDLESEX;
NORFOLK; PLYMOUTH (except except Marion, Mattapoisett,
Rochester, Wareham); SUFFOLK
Rates Fringes
Sheet metal worker ...............$ 39.37 27.65
----------------------------------------------------------------
SHEE0017-007 04/01/2010
BARNSTABLE; BRISTOL (Acushnet, Assonet, Dartmouth, Dighton,
Fairhaven, Fall River, Freetown, Ne.. Bedford, Rehoboth,
Seeekonk, Somerset, Swansea, Westport); DUKES; A14D NANTUCKET
Rates Fringes
Sheet metal worker ...............$ 32.61 21.90
----------------------------------------------------------------
TEAM0379-001 06/01/2010
Rates Fringes
Truck drivers:
Group 1 .....................$
29.23
14.98+A+B
Group 2 .....................$
29.45
14.98+A+B
Group 3 .....................$
29.52
14.98+A+B
Group 4 .....................$
29.64
14.98+A+B
Group 5 .....................$
29.74
14.98+A+B
Group 6 .....................$
30.03
14.98+A+B
Group 7 .....................$
30.32
14.98+A+B
POWER TRUCKS $.25 DIFFERENTIAL
BY AXLE
TUNNEL WORK (UNDERGROUND ONLY)
$.40
DIFFERENTIAL BY AXLE
HAZARDOUS MATERIALS (IN HOT
ZONE
ONLY) $2.00
PREMIUM
TRUCK DRIVERS CLASSIFICATIONS
Group 1: Station wagons; panel trucks; and pickup trucks
Group 2: Two axle equipment; & forklift operator
Group 3: Three axle equipment and tireman
Group 4: Four and Five Axle equipment
Group 5: Specialized earth moving equipment under 35 tons
other than conventional type trucks; low bed; vachual;
mechanics, paving restoration equipment
Group 6: Specialized earth moving equipment over 35 tons
Group 7: Trailers for earth moving equipment (double hookup)
FOOTNOTES
A. PAID HOLIDAYS: New Year's Day, Washington's Birthday,
Memorial Day, Independence Day, Labor Day, Patriot's Day,
Columbus Day, Veteran's Day, Thanksgiving Day and Christmas
Day
B. PAID VACATION: Employees with 4 months to 1 year of
service receive 1/2 day's pay per month; 1 week vacation
for 1 - 5 years of service; 2 weeks vacation for 5 - 10
years of service; and 3 weeks vacation for more than 10
years of service
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
--------------
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
-- -- ----------------------------------
Addendum No. 2
February 2. 2012 Page 77 of 94 12284A
The 'body of each wage determination 1_sts the classification
::ace rates -ha' ha._ been found ,_..ailing fo_ the
�_-ed type(s) of construction in the area covered by the viage
" de_erm.'_nation. The classifica*ions Listed in alchabetica'_
order of "identifiers" that indicate :.hether the particular
rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning .with
characters other than "SU" denotes that the union
classification and rate have found to be prevailing for that
classification. Example: PLU',10198-005 0%/01/2011. The
first four letters , PLUM, indicate the international union and
the four -digit number, 0198, that follows indicates the local
union number or district council number where applicable
i.e., Plumbers Local 0198. The next number, 005 in the
example, is an internal number used in processing the wage
determination. The date, 07/01/2011, following these
characters is the effective date of the most current
negotiated rate/collective bargaining agreement which would be
July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any
changes in the collective baraaining agreements governing the
rate.
Non -Union Identifiers
Classifications listed under an "SU" identifier were derived
from survey data by computing average rates and are not union
rates; however, the data used in computing these rates may
include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union rates, LA
indicates the State of Louisiana; 2004 is the year of the
survey; and 007 is an internal number used in producing the
wage determination. A 1993 or later date, 5/13/2010, indicates
the classifications and rates under that identifier were issued
as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change
until a new survey is conducted.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
be:
an existing published wage determination
a survey underlying a wage determination
a Wage and Hour Division letter setting forth a position on
a wage determination matter
a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the wage and Hour
Regional Office for the area in which the survey was conducted
because those Regional Offices have responsibility for the
Davis -Bacon survey program. If the response from this initial
contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration, from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue. Addendum No.2
February 2, 2012 Page 78 of 94 12284A
the decision of the Administrarcr is not favorable, an
int rested oar= na_- appeal dir_- -he=.9mirisEra __se
Re-:iew Board ,formerly the Nage�.ppeals 3oard?. cdrite `o:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washinaton, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Addendum No. 2
February 2. 2012 Page 79 of 94 12284A
i_,-„ - --- ..umbe_. .?.1'-D-' . 1 ?71I
_s-ioe_ .._..__al Decisio,. Numb=_-.
State. Massachusetts
Construction T},pes: Heavy (Heav}' and Marine)
Counties: Barnstable, Bristol, Dukes, Essex, Middlesex,
Nantucket, Norfolk, Plymouth and Suffolk Counties in
Massachusetts.
HEAVY AND MARINE CONTRUCTION PROJECTS
Modification Number Publication Date
0 01/06/2012
BOIL0029-001 10/01/2009
Rates Fringes
BOILERMAKER ......................$ 38.25 17.04
---------------------------------------------------------
BRMA0001-011 03/01/2010
FOXBORO CHAPTER
BRISTOL (Attleboro, Berkley, Dion -on, Mansfield, North
Attleboro, Norton, Raynham, Rehoboth, Seekonk, Taunton);
NORFOLK, (Bellingham, Canton, Dedham, Foxboro, Franklin,
Norfolk, Norwood, Plainville, Sharon, Walpole, Westrwood,
Wrentham); and PLYMOUTH (Lakeville)
Rates Fringes
Bricklaver/Cement Mason .......... $ 43.86 24.15
---------------------------------------------------------
BRMAOOOI-012 03/01/2010
LOWELL CHAPTER
MIDDLESEX (Acton, Ashby, Ayer, Bedford, Billerica, Boxboro,
Carlisle, Chemsford, Dracut, Dunstabale, Ft Devens, Groton,
Littleton, Lowell, North Acton, Pepperell, Shirley, South
Acton, Tewksbury, Townsend, Tyngsboro, West Acton, Westford,
Wilmington)
Rates Fringes
BRICKLAYER .......................5 43.86 24.15
----------------------------------------------------------------
BRMA0001-013 03/01/2010
LOWELL CHAPTER
MIDDLESEX (Ashland, Framingham, Holliston, Hopkinton, Hudson,
Maynard, Natick, Sherbvorn, Stow); and NORFOLK (Medfield,
Medway, Millis)
Rates Frinoes
BRICKLAYER .......................$ 43.86 24.15
----------------------------------------------------------------
BRMA0003-001 08/01/2011
Rates Fringes
Marble & Tile Finisher ........... $ 35.52 25.47
Marble, Tile & Terrazzo
Workers ..........................$ 46.60 22.66
TERRAZZO FINISHER ................$ 45.50 26.49
----------------------------------------------------------------
BRRP0003-003 08/01/2011
BOSTON CHAPTER
MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford,
Melrose, Somerville); NORFOLK (Brookline, Milton); and SUFFOLK
Rates Fringes
BRICKLAYER .......................$ 46.56 26.88
----------------------------------------------------------------
BRMA0003-011 06/01/2011
Addendum No. 2
LYNN CHAPTER February 2, 2012 Page 80 of 94 12284A
ESSEX. (2mesbur'y, Andover, _r'_'_ 3r:fcEJ, D_n-rers, Ess -x,
Georgetown, Gloucester, rove;and, ...,. on, Haverhill,
Ipswich, Las:rence, Lynn, fi _d, iianchescer, i,iar'clehead,
ierrimac, iiethue,,, Middle. _nt, ^la.;b _- .:e:;0ur700r7,
North Andover, Peabody, Rockpor-, Rowley, Salisbury, Salem,
Saugus, Swampscott, Topsfield, Wakefield, Wenham, 4iest
Newbury); and MIDDLESEX (North Reading, Reading, Vaakefield)
Rates Fringes
Bricklaver/Cement Mason .......... S '-6.56 26.89
----------------------------------------------------------------
BRMA0003-012 08/01/2011
Rates Fringes
BRICKLAYER
WALTHAM CHAPTER -
MIDDLESEX (Belmont,
Burlington, Concord,
Lexington, Lincoln,
Stoneham, Sudbury,
Waltham, Watertown,
Wayland, Weston,
Winchester, Woburn) ......... $ 46.56 26.88
----------------------------------------------------------------
BRMA0003-014 08/01/2011
QUINCY CHAPTER
PLYMOUTH COUNTY (Abington, Bridgewater, Brockton, Carver,
Duxbury, East Bridgewater, Halifax, Hanover, Hanson, Hingham,
Hull, Kingston, Marshfield, Middleboro, Norwell, Pembroke,
Plymouth, Rockland, Scituate, West Bridgewater, Whitman)
Rates Fringes
Bricklayer/Cement Mason .......... $ 46.56 26.88
----------------------------------------------------------------
BRMA0003-025 08/01/2011
NEW BEDFORD CHAPTER
BARNSTABLE; BRISTOL (Acushnet, Darmouth, Fairhaven, Fall River,
Freetown, New Bedford, Somerset, Swansea, Westport); DUKES;
NANTUCKET; PLYMOUTH (Marion, Mattapoisett, Rochester, Wareham)
Rates Fringes
Bricklayer/Cement Mason..... ..... $ 46.56 26.88
----------------------------------------------------------------
BRMA0003-033 08/01/2011
NEWTON CHAPTER
MIDDLESEX (Newton); NORFOLK (Dover, Needham, Wellesley)
Rates Fringes
Bricklayer, Plasterer ............ $ 46.56 26.88
---------------------------------------------------------
CARP0026-003 03/01/2011
BRISTOL (Attleborough, North Attleborough); ESSEX; MIDDLESEX
(Except Belmont, Cambridge, Everett, Malden, Medford,
Somerville); AND NORFOLK (Bellingham, Braintree, Canton,
Cohassett, Foxboro, Franklin, Medfield, Medway, Millis,
Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole,
Wellesley, Westwood, Weymouth, Wrentham) COUNTIES
Rates Fringes
CARPENTER ........................$ 32.05 24.68
----------------------------------------------------------------
CARP0033-003 03/01/2011
MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford,
Somerville); NORFOLK (Brookline, Dedham, Milton); AND SUFFOLK
COUNTIES
Rates Fringes
CARPENTER ........................$ 37.25 25.18 Addendum No.2
----------------------------------------------------------------
CARP0056-001 kjpk pff, -2012 Page 81 of 94 12284A
All -' SUFFCLK COUNTI; ani =.._ = araas of BAB.?iST BLE, BRISTOL,
ESSEX, !dIDDLESE.{, NORFOLK, and PLYMOFTH COUNTIES situated
i INSIDE,Boston Beltway -495 and Borth of Cape Cad -ana_. ALL
of DUKES and NANTUCKET COUNITIES
Rates Fringes
PILEDRIVERMAN ....................$ 38.30 27.52
----------------------------------------------------------------
CARP0056-002 08/01/2011
The areas of BARNSTABLE, BRISTOL, PLYMOUTH, and NORFOLK
COUNTIES situated OUTSIDE Boston Beltway (I-495) and South of
Cape Cod Canal
Rates Fringes
PILEDRIVERMAN ....................$ 38.30 27.52
----------------------------------------------------------------
CARP0056-003 08/01/2011
Those areas of ESSEX and MIDDLESEX COUNTIES situated OUTSIDE
Boston Beltway (I-495)
Rates Fringes
PILEDRIVERM_AN....................$ 38.30 27.52
----------------------------------------------------------------
CARP0056-004 08/01/2011
Rates Fringes
DIVER TENDER .....................$ 38.30 27.52
DIVER ............................$ 53.62 27.52
----------------------------------------------------------------
CARP0424-001 03/01/2011
NORFOLK (Braintree, Quincy, Cohasset, Weymouth, etc.) PLYMOUTH
(Duxbury, Hanover, Hull, Hingham, Marshfield, Norwell, Pembroke
Rockland, Scituate)
Rates Fringes
CARPENTER ........................$ 32.05 24.68
----------------------------------------------------------------
CARP0624-002 03/01/2011
BARNSTABLE; BRISTOL (Except Attleboro & North Attleboro);
DUKES; NANTUCKET; NORFOLK (Avon, Holbrook, Randolph,
Stoughton); PLYMOUTH (Bridgewater, Kingston, Lakeville,
Middleboro, Plymouth, S. Hanover, Whitman)
Rates Fringes
CARPENTER ........................$ 32.05 24.68
-------------------------------------------------------------
CARP1121-001 05/02/2010
Rates Fringes
MILLWRIGHT .......................$ 29.78 18.61
----------------------------------------------------------------
* ELECO096-001 12/01/2011
MIDDLESEX (Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton,
Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend)
Rates Fringes
ELECTRICIAN ......................$ 36.75 14%+14.91
Teledata System installer ........ $ 25.86 16.38
----------------------------------------------------------------
ELEC0099-001 06/01/2011
BRISTOL (Attleboro, North Attleboro, Seekonk)
Rates Fringes
ELECTRICIAN ......................$ 34.08 20.17
Teledata System Installer ........ $ 25.56 15.97
--------------- --- --
ELEC0103-002 09/01/2011 Addendum No. 2
February 2. 2012 Page 82 of 94 12284A
ESSEX (Amesbury;, Ando.-er, 3oxford, Georgetown, Groveland,
Ha';erhill, Lawrenca, ::erri-,ac, PIethuen, Ne;.;bur , J--wburrport,
North Andover, P.o:le Salisbur', West Newbur v , MIDDLESEX
' 3edfctd, 3__ler- a, ___, 3urlir.aton, Car_is1 , Chelmsford,
Dracut, Dunstable Littleton, Lowell, North Reading, Tewksbury,
Tyngsboro, Westford, Wilmington)
Rates Fringes
ELECTRICIAN ......................$ 41.89 22.06
----------------------------------------------------------------
ELECO103-004 09/01/2011
ESSEX (Beverly, Danvers, Essex., Gloucester, Hamilton, Ipswich,
Manchester, Marblehead, Middleton, Peabodv, Rockport, Salem,
Topsfield, iVenham;
Rates Fringes
ELECTRICIAN ......................$ 41.89 22.06
----------------------------------------------------------------
ELECO103-005 09/01/2011
ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott); MIDDLESEX
(Acton, Arlington, Belmont, Cambridge, Concord, Everett,
Framingham, Holliston, Lexington, Lincoln, Malden, Maynard,
Medford, Melrose, Natick, Nei -ton, Reading, Sherborn,
Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown,
Wayland, Weston, Winchester, Woburn!; NORFOLK (Bellingham,
Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro,
Frankloin, Medfield, Medway, Millis, Milton, Needham, Norfolk,.
Norwood, Quincy, Sharon, Walpole, Wellesley, Westwood,
Weymouth, Wrentham); PLYMOUTH (Hingham and Hull);SUFFOLK
Rates Fringes
ELECTRICIAN ......................$ 41.89 22.06
----------------------------------------------------------------
ELEC0104-001 08/31/2009
Rates Fringes
Line Construction:
Group 1 .....................$
Cableman....................$
39.52
34.89
7.50+A
Equipment Operator ..........
$
34.89
11.50+A
Groundman...................$
22.58
7.50+A
Lineman .....................$
21.28
41.05
14.43+A
A. PAID HOLIDAYS: New Year's Day; Memorial Day;
Independence Day; Labor Day; Thanksgiving Day; Christmas
Day and Columbus Day, provided the employee has been
employed 5 working days prior to any one of the listed
holidays.
------------------------------------------------------------
ELECO223-002 09/01/2011
BARNSTABLE, BRISTOL (Except Attleboro, North Attleboro,
Seekonk); DUKES; NANTUCKET; PLYMOUTH (Except Hingham and Hull
Twps); NORFOLK (Avon, Halbrook, Randolph, Sloughton)
Rates Fringes
ELECTRICIAN ......................$ 35.13 17.01
----------------------------------------------------------------
* ENGIO004-009 12/01/2011
Rates Fringes
Power equipment operators:
Group 1 .....................$
39.52
Group 2 .....................$
39.16
Group 3 .....................$
27.95
Group 4 .....................$
33.23
Group 5 .....................$
21.28
Group 6 .....................$
24.51
HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib):
Over 150 ft. +2.12
Over 185 ft. +3.72
Over 210 ft. +5.23
Over 250 ft. +7.92
Over 295 ft. +10.97
Over 350 ft. +12.76
23.24+A
23.24+A
23.24+A
23.24+A
23.2-^+A
23.24+A
Addendum No. 2
February 2, 2012 Page 83 of 94 12284A
F004p10TE FOR PO-!ER EQUIPMENT OPERATORS:
PAID H0LID_l New Bear's � _ ..Iash4,gton,s rthda;,
Labor Day, Memorial Dav, Independence Day, Patriot's Day,
a �
-DIu bus Day, .- Da., Thanksgiving Day, Christmas
POWER EQUIPMENT OPERATORS CLASSIFICATIONS (HEAVY
CONSTRUCTION]
GROUP 1: Power shovel; crane; truck crane; derrick; pile
driver; trenching machine; mechanical hoist pavement
breaker; cement concrete oa-;er; dragline; hoisting engine;
three drum machine; pumperete machine; loaders; shovel
dozer; front end loader; mucking machine; shaft hoist;
steam engine; backhoe; gradall; cable way; fork lift;
cherry Dicker; boring machine; rotary drill; post hole
hammer; post hole digger; asphalt plant on job site;
concrete batching and/or mixing plant on job site; crusher
plant on job site; paving concrete mixer; timber jack
GROUP 2: Sonic or vibratory hammer; grader; scraper; tandem
scraper; bulldozer; tractor; mechanic - maintenance; York
rake; mulching machine; paving screed machine;stationary
steam boiler; paving concrete finishing machine; grout
pump; portable steam boiler; portable steam generator;
roller; spreader; asphalt paver; locomotives or machines
used in place thereof; tamper (self propelled or
tractor -draw); cal tracks; ballast regulator;rail anchor
machine; switch tamper; tire truck
GROUP 3: Pumps (1-3 grouped); compressor; welding machines
(1-3 grouped); generator; sighting plant; heaters (power
driven, 1- 5); syphon -pulsometer; concrete mixer; valves
controlling permanent plant air steam, conveyor, wellpoint
system (operating)
GROUP 4: Assitant engineer (fireman)
GROUP 5: Oiler (other than truck cranes and gradalls)
GROUP 6: Oiler (on truck cranes and gradalls)
POWER EQUIPMENT OPERATORS CASSIFICATIONS [MARINE
CONSTRUCTION]
Group 1: Shovel; crane; truck crane; cherry picker; derrick;
pile driver; two or more drum machines; lighters; derrick
boats; trenching machines; mechanic hoist pavement
breakers; cement concrete pavers; draglines; hoisting
engines; pumperete machines; elevating graders; shovel
dozer; front end loader; backhoe; gradall; cable ways;
boring machine; rotary drill; post hole hammer; post hole
digger; fork lift; timber jack; asphalt plant (on site);
concrete batching and/or mixing plant (on site); crusher
plant (on site); paving concrete mixer
Group 2: Portable steam boiler; portable steam generator;
sonic or vibratory hammer; grader; scraper; tandem scraper;
concrete pump; bulldozer; tractor; York rake; mulching
machine; roller; spreader; tamper (self-propelled or
tractor -drawn); asphalt paver; concrete miner with side
loader; mechanic - maintenance; cal tracks; ballast
regulator; switch tamper; rail anchor machine; tire truck
Group 3: Pumps (1-3 grouped); comressor; welding machines
(1-3 grouped); generator; lighting plant; heaters (power
driven 1-5); syphon -pulsometer; concrete mixer; valves
controlling permanent plant air or steam; conveyor; well
point systems; auger (powered by independent engines and
attached to pile drivers); hydraulic saws
Group 4: Fireman
Group 5: Assistant engineer (other than truck crane and
gradall)
Group 6: Assistant engineer (on truck crane and gradall)
----------------------------------------------------------------
IRON000'7-001 03/16/2011
AREA 1: BRISTOL (Easton); ESSEX (Beverly,Gloucester,Lynn,
Lynnfield, Manchester, Marblehead, Nahant, Salem, Saugus,
Swampscott); MIDDLESEX (Arlington, Bedford, Belmont,
Burlington, Cambridge, Concord, Everett, Framingham, Lexington,
Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton,
Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield,
Waltham, Watertown, Wayland, Weston, Winchester, Woburn);
NORFOLK (Except Medway); PLYMOUTH (Abington, Bridgewater,
Brocton, Duxbury, East Bridgewater, Halifax„ Hanover, Hanson,
Hingham, Hull, Kingston, Marshfield, Norwell, Pembroke, Addendum No.2
Plymouth, PiymFhATLiaTyQk11H2 Scituate, west Bridgewater, Page 84 of 94 12284A
Whitman+ SUFFOL{
AREA 2. ESSEX ..:-mesburv, Ando"er, Boxford, Dan'%ers, Esse;:,
:DS',:1
Methuen, Newbury, Newburyport, tIor`h Andovar, Rockport, Ro:a e„
Salisbury, Tops -field, Wenham, -,lest Newbury); MIDDLESEX
(Action,Billerica, Carlisle, Chelmsford, Dracut, Dunstable,
Groton, Groveiand, Littleton, Lowell, Middleton, North Reading,
Pepperell, Tewksbury, Tyngsborc, Westford, Wilminton)
Rates Fringes
IRONWORKER
AREA 1 ......................$ 36.28 26.41
AREA 2 ......................$ 31.87 26.41
----------------------------------------------------------------
IRON0007-010 03/16/2011
MIDDLESEX (Ashby, Ashland, Ayer, Boxboro, Holliston, Hopkinton,
Hudson, Marlboro, Shirley, Stow, Townsend); NORFOLK (Medway)
Rates Fringes
IRONWORKER .......................$ 36.28 26.41
----------------------------------------------------------------
IRON0037-002 05/30/2011
BARNSTABLE; BRISTOL ;Acushnet, Attleboro, Berkley, Dartmouth,
Dighton, Fairhaven, Fall River, Freetown, Mansfield, New
Bedford, North Attleboro, Norton, Raynham, Rehoboth, Seekonk,
Somerset, Swansea, Taunton, Westport); DUKES; NANTUCKET;
NORFOLK (Billingham, Franklin, Plainville, Wrentham); PLYMOUTH
(Lakeville, Marion, Mattapoisett, Middleboro, Rochester,
Wareham)
Rates Fringes
IRONWORKER .......................$ 52.58 19.22
----------------------------------------------------------------
LAB00022-006 06/01/2010
SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer & Nut
Islands); MIDDLESEX COUNTY (Arlington, Belmont, Burlington,
Cambridge, Everett, Malden, Medford, Melrose, Reading,
Somerville, Stoneham, Wakefield, Winchester, Winthrop and
Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton
only)
Rates Fringes
Laborers:
GROUP
1 .....................5
29.80
18.75
GROUP
2 .....................$
30.05
18.75
GROUP
3 .....................5
30.55
18.75
GROUP
4 .....................$
30.80
18.75
GROUP
5 .....................$
30.05
18.75
GROUP
6 .....................5
31.80
16.75
LABORERS CLASSIFICATIONS
GROUP 1: Laborers; carpenter tenders; cement finisher
tenders
GROUP 2: Asphalt raker; fence and guard rail erector; laser
beam operator; mason tender; pipelayer; pneumatic drill
operator; pneumatic tool operator; wagon drill operator
GROUP 3: Air track operator; block paver; rammer; curb
setter
GROUP 4: Blaster; powderman
GROUP 5: Flagger
GROUP 6: Asbestos Abatement; Toxic and Hazardous Waste
Laborers
----------------------------------------------------------------
LAB00022-012 06/01/2010
Counties of BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET;
PLYMOUTH; MIDDLESEX (With the exception of Arlington, Belmont,
Burlington, Cambridge, Everett, Malden, Melrose, Reading,
Somerville, Stoneham, Wakefield, Winchester, Winthrop and
Woburn); NORFOLK (With the exception of Brookline, Dedham, and
Milton) Addendum No. 2
February 2, 2012 Page 85 of 94 12284A
Labcre`s:
UNDERPINNING WORK & BORING
GROUP 1 .....................$
27.85
CREW
17.35
GROUP 2 .....................$
28.10
30.80
17.35
GROUP 3 .....................$
Laborers; Top man .......... $
28.60
18.90+A
17.35
GROUP 4 .....................$
28.85
17.35
GROUP 5 .....................$
21.70
COMPRESSED AIR)
17.35
GROUP 6 .....................$
29.85
30.35
11.35
LABORERS CLASSIFICATIONS
GROUP 1: Laborers; carpenter tenders; cement finisher
tenders
GROUP 2: Asphalt raker; fence and guard rail erector; laser
beam operator; mason tender; pipelayer; pneumatic drill
operator; pneumatic tool operator; wagon drillperator
GROUP 3: Air track operator; block paver; rammer; curb
setter; hydraulic & similar self powere drills
GROUP 4: Blaster; powderman
GROUP 5: Flagger
GROUP 6: Asbestos Abatement; Toxic and Hazardous Waste
Laborers
----------------------------------------------------------------
LAB00022-013 06/01/2010
Rates Fringes
Laborers:
(FREE AIR OPERATION):
SHIELD DRIVEN AND LINER
PLATE IN FREE AIR)
GROUP 1 ....................$ 32.90 20.30+A
GROUP 2 ....................$ 32.90 20.30+A
(OPEN AIR CASSONS,
UNDERPINNING AND TEST
BORING INDUSTRIES):
TEST BORING & WELL DRILLING
Driller ....................$ 31.05 18.90+A
Laborer ....................$ 29.65 18.90+A
(OPEN AIR CASSONS,
UNDERPINNING AND TEST
BORING INDUSTRIES):
OPEN AIR CASSON,
UNDERPINNING WORK & BORING
CREW
Bottom man .................$
30.80
18.90+A
Laborers; Top man .......... $
29.65
18.90+A
(TUNNELS, CAISSON &
CYLINDER WORK IN
COMPRESSED AIR)
GROUP 1 ....................$
30.35
20.30+A
GROUP 2 ....................$
40.83
20.30+A
GROUP 3 ....................$
40.83
20.30+A
GROUP 4 ....................$
40.83
20.30+A.
GROUP 5 ....................$
40.83
20.30+A
GROUP 6 ....................$
42.83
20.30+A
CLEANING CONCRETE AND
CAULKING TUNNEL (Both New
& Existing)
GROUP 1 ....................$
32.90
20.30+A
GROUP 2 ....................$
32.90
20.30+A
ROCK SHAFT, CONCRETE
LINING OF SAME AND TUNNEL
IN FREE AIR
GROUP 1 ....................$
30.35
20.30+A
GROUP 2 ....................$
32.90
20.30+A
GROUP 3 ....................$
32.90
20.30+A
GROUP 4 ....................$
32.90
20.30+A
GROUP 5 ....................$
34.90
20.30+A
LABORERS CLASSIFICATIONS for TUNNELS, CAISSON &
CYLINDER
WORK
IN COMPRESSED AIR
GROUP 1: Powder watchman; Top man on iron bolt;
change
house
attendant
Addendum No. 2
February 2, 2012
Page 86 of 94 12284A
SRC`iP Brakeman; trackman; groutman; tunnel laborer;
o3ia- I cck t-nde lock tnn-de r; guage __nder
I SR.PuP 8: ?ctorman, miner
GROUP 4: Blaster
GROUP 5: Mucking machine operator
GROUP 6: Hazardous Waste work within the "HOT" zone. (A
premium of two dollars $2.00 per hour over the basic Nage
rate.
LABORERS CLASSIFICATIONS for (FREE AIR OPERATION): SHIELD
DRIVEN AND LINER PLATE IN FREE AIR
GROUP 1: Miner; miner welder; conveyor operator; motorman;
mucking machine operator; nozzle man; grout man-; pumps,
shaft and tunnel steel and rodman; shield and erector arm
operators, mole nipper, outside motorman, burner, IBM
operator, safety miner; laborer topside; heading motormen;
erecting operators; top signal men
GROUP 2: Brakeman; trackman
LABORERS CLASSIFICATIONS FOR CLEANING CONCRETE AND CAULKING
TUNNEL (Both New & Existing)
GROUP 1: Concrete workers; strippers and form mov=rs (wood &
steel), cement finisher
GROUP 2: Form erector (wood & steel and all accessories)
LABORERS CLASSIFICATIONS for ROCK SHAFT, CONCRETE LINING OF
SAME AND TUNNE IN FREE AIR
GROUP 1: Change house attendants
GROUP 2: Laborers, topside, bottom men (when heading is 50
ft. from shaft) and all other laborers
GROUP 3: Brakeman; trackman; tunnel laborers; shaft laborers
GROUP 4: Miner; cage tender; bellman
GROUP 5: Hazardous Waste work within the "HOT" zone. (A
premium of two dollars $2.00 per hour over the basic wage
rate)
FOOTNOTE FOR LABORERS:
A. PAID HOLIDAYS: New Year's Day, Washington's Birthday,
Patriot's Day, Memorial Day, Independence Day, Labor Day,
Columbus Day, Veteran's Day, Thanksgiving Day, and
Christmas Day
----------------------------------------------------------------
LABO1421-001 06/01/2011
WRECKING LABORERS:
Rates Fringes
Laborers: (Wrecking)
Group 1 .....................$
31.05
19.75
Group 2 .....................$
31.80
19.75
Group 3 .....................$
32.05
19.75
Group 4 .....................$
27.05
19.15
Group 5 .....................$
30.15
19.75
Group 6 .....................$
31.05
19.75
Group 1: Adzeman, Wrecking Laborer.
Group 2: Burners, Jackhammers.
Group 3: Small Backhoes, Loaders
on
tracks, Bobcat Type
Loaders, Hydraulic "Brock" Type
Hammer Operators,
Concrete
Cutting Saws.
Group 4: Yardman (Salvage Yard Only).
Group 5: Yardman, Burners, Sawyers.
Group 6: Asbestos, Lead Paint, Toxic
and Hazardous
Waste.
----------------------------------------------------------------
PAIN0035-001 07/01/2011
BARNSTABLE BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH
(Remainder of NORFOLK; MIDDLESEX AND SUFFOLK COUNTIES) Addendum No.2
February 2; 2012 Page 87 of 94 12284A
MIDDLESEX (Cambridge, Everett, Malden, Medford, Sommerville)
SUFFOLK COUNTY ,Boston, Chelsea) NORFOLK COUNTY (Brookline)
Rates Fringes
Painters:
R=_tes
NEW CONSTRUCTION:
Fringes
P�air�t�s:
38.30
21.40
Spray, Sandblast ...........
$ 39.70
21.40
iiE:^; COhiSTRUCT1OPi:
Bridge .....................$
43.01
21.40
Bridge .....................$
36.36
43.51
Spray, Sandblast ...........
----------------------------------------------------------------
21.90
21.40
Brush,
Taper ...............$
33.01
21.90
Spray,
Sandblast ...........
$ 34.41
21.90
REP_INT:
Bridge .....................$
-3.51
21.90
Brush,
Taper ...............$
31.07
21.90
Spray,
Sandblast ...........
$ 32.47
21.90
----------------------------------------------------------------
PAIN0035-015
01/01/2011
MIDDLESEX (Cambridge, Everett, Malden, Medford, Sommerville)
SUFFOLK COUNTY ,Boston, Chelsea) NORFOLK COUNTY (Brookline)
Rates Fringes
Painters:
NEW CONSTRUCTION:
Brush, Taper ...............$
38.30
21.40
Spray, Sandblast ...........
$ 39.70
21.40
REPAINT:
Bridge .....................$
43.01
21.40
Brush, Taper ...............$
36.36
21.40
Spray, Sandblast ...........
----------------------------------------------------------------
$ 37.76
21.40
PLAS0534-001 07/01/2011
ESSEX; MIDDLESEX; NORFOLK AND SUFFOLK COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER ... $ 35.00 29.66
----------------------------------------------------------------
PLUM0004-001 09/01/2011
MIDDLESEX (Ashby, Ayer -West of Greenville branch of Boston and
Maine Railroad, Ft. Devens, Groton, Shirley, Townsend)
Rates Fringes
Plumbers and Pipefitters......... $ 39.14 23.36
----------------------------------------------------------------
PLUM0012-001 09/01/2011
ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers,
Esser., Georgetown, Gloucester, Groveland, Hamilton, Haverhill,
Ipswich, Lawrence,Lynn, Lynnfield, Manchester, Marblehead,
Merrimac, Methuem, Middleton, Nahant, Newbury, Newburyport,
North Andover, Peabody, Rockport, Rowley, Salem, Salisbury,
Saugus, Swampscott, Topsfieild, Wenham, West Newbury);
MIDDLESEX (Acton, Arlington, Ashland, Ayer - except W. of
Greenville Branch of Boston 6 Maine RR, Bedford, Belmont,
Billerica, Boxboro, Burlington, Cambridge, Carlisle,
Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham,
Hudson, Holliston, Hopkinton, Lexington, Lincoln, Littleton,
Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick,
Newton, North Reading, Pepperell, Reading, Sherborn,
Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro,
Wakefield, Waltham, Watertown, Wayland, Westford, Wilmington,
Winchester, Woburn); NORFOLK (Bellingham, Braintree,
Brookline, Canton, Cohasset, Dedham, Dover,Foxboro, Franklin,
Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood,
Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood,
Weymouth, Wrentham); PLYMOUTH (Hingham, Hull, Scituate);
SUFFOLK
Rates Fringes
PLUMBER ..........................$ 46.01 23.31
----------------------------------------------------------------
PLUM0051-005 09/01/2011
BARNSTABLE; BRISTOL; DUKES; NANTUCKET; NORFOLK (Avon, Holbrook,
Randolph, Stoughton) PLYMOUTH(Remainder of County)
Rates Fringes
Plumbers and Pipefitters......... $ 34.51 25.57
----------------------------------------------------------------
PLUM0138-001 04/01/2010
Addendum No. 2
ESSEX (Ames, Afibj7iTuaiyqA012, Boxford, Byfield, Danvers, Page 88 of 94 12284A
Essex, _eorget:)wn, Gloucester, S_. .eland, Ha-,ilton, Ha-;erhill,
-,:i.h, awrence, i-fanchastor, .'srbleh_a-, ..errimac, 14ethuen,
_ddl=_ton, Nat -bur , 'Ne::tur;po.:t, North Ando-;er, Peabody,
4 R_f-C r, Ro'wle:', Salem, Sallsbur:, _cos=_elc, �. _....:, , „_��
Newbury
Rates Fringes
Plumber, Pipe fitt__,
Steamfitter ......................$ 41.14 22.98
----------------------------------------------------------------
PLUH0537-001 09/01/2011
MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford,
Melrose, Reading, Wakefield, Winchester and Woburn); NORFOLK
(Bellingham, Braintree, Brookline, Canton Cashasset, Dedham,
Foxboro, Franklin, Millis, Milton, Sharon, Walpole, Westwood,
and Wrenthan); PLYMOUTH (Hingham, Hull, Scituate); ESSEX (Ames,
Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown,
Gloucester, Groveland, Hamilton, Haverhill, Ipswich,
Lawrence,Lynn, Lynnfield, Manchester, Marblehead, Merrimac,
Methuem, Middleton, Nahant, Newbury, Newburyport, North
Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Saugus,
Swampscott, Topsfieild, Wenham, West Newbury)
Rates Fringes
=1...FITTER.......................$ 46.09 24.06
----------------------------------------------------------------
TEAM0379-001 06/01/2010
Rates Fringes
Truck drivers:
Group
1 .....................$
29.28
14.98+A+B
Group
2 .....................$
29.45
14.98+A+B
Group
3 .....................$
29.52
14.98+A+B
Group
4 ..............:......$
29.64
14.98+A+B
Group
5 .....................$
29.74
14.98+A+B
Group
6 .....................$
30.03
14.98+A+B
Group
7 .....................$
30.32
14.98+A+B
POWER TRUCKS $.25 DIFFERENTIAL BY AXLE
TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE
HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
TRUCK DRIVERS CLASSIFICATIONS
Group 1: Station wagons; panel trucks; and pickup trucks
Group 2: Two axle equipment; & forklift operator
Group 3: Three axle equipment and tireman
Group 4: Four and Five Axle equipment
Group 5: Specialized earth moving equipment under 35 tons
other than conventional type trucks; low bed; vachual;
mechanics, paving restoration equipment
Group 6: Specialized earth moving equipment over 35 tons
Group 7: Trailers for earth moving equipment (double hookup)
FOOTNOTES:
A. PAID HOLIDAYS: New Year's Day, Washington's Birthday,
Memorial Day, Independence Day, Labor Day, Patriot's Day,
Columbus Day, Veteran's Day, Thanksgiving Day and Christmas
Day
B. PAID VACATION: Employees with 4 months to 1 year of
service receive 1/2 day's pay per month; 1 week vacation
for 1 - 5 years of service; 2 weeks vacation for 5 - 10
years of service; and 3 weeks vacation for more than 10
years of service
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
Unlisted classifications needed for work not included within Addendum No.2
the scope of tFe1-baEyiZiNt2ons listed may be added after Page 89 of 94 12284A
a.,Grd only as provided in the labor standards ._..tract ..-aures
r19CER 5.5 (a) ;'; ;ii)
r
The body of each wage determination lists the classification
and '.gage rates that have been found t, be pr_vailinq for the
cited type(s) of construction in the area covered by the wage
determination. The classifications are listed in alphabetical
order of "identifiers" that indicate whether the particular
rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning �•;ith
characters other than "SU" denotes that the union
classification and rate have found to be prevailing for that
classification. Example: PLUM0198-005 07/01/2011. The
first four letters , PLUM, indicate the international union and
the four -digit number, 0198, that follows indicates the local
union number or district council number where applicable
i.e., Plumbers Local 0198. The next number, 005 in the
example, is an internal number used in processing the wage
determination. The date, 07/01/2011, following these
characters is the effective date of the most current
negotiated rate/collective bargaining agreement which would be
July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any
changes in the collective bargaining agreements governing the
rate.
Non -Union Identifiers
Classifications listed under an "SU" identifier were derived
from survey data by computing average rates and are not union
rates; however, the data used in computing these rates may
include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union rates, LA
indicates the State of Louisiana; 2004 is the year of the
survey; and 007 is an internal number used in producing the
wage determination. A 1993 or later date, 5/13/2010, indicates
the classifications and rates under that identifier were issued
as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change
until a new survey is conducted.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
l.) Has there been an initial decision in the matter? This can
be:
* an existing published wage determination
* a survey underlying a wage determination
a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted
because those Regional Offices have responsibility for the
Davis -Bacon survey program. If the response from this initial
contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not vet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in l.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor Addendum No.2
February 2. 2012 Page 90 of 94 12284A
200 Constitution Avenue, N..
Washinoron, DSC 20210
Tj.a rgWuest should be accompanied by _ fill statement _f tha
interested party's position and b; any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Addendum No. 2
February 2. 2012 Page 91 of 94 12284A
'* II
SECTION 15062
DUCTILE IRON PIPE & FITTINGS
(INTERIOR APPLICATIONS)
PART 1 - GENERAL
15062-1
1.1 DESCRIPTION
A. Work Included: Provide and install ductile iron pipe and fittings of the type(s) and
size(s) in the location(s) shown on the Drawings and as specified herein.
B. Related Work Specified Elsewhere:
1. Pipe and Pipe Fittings - General is specified in Section 15050.
2. Surface Preparation and Shop Coatings are specified in Section 09905.
1.2 QUALITY ASSURANCE
A. Standards (As Applicable):
1. Cement -mortar lining for water: ANSI A21.4 (AWWA C104).
2. Rubber gasket joints: ANSI A21.11 (AWWA Cl 11).
3. Ductile iron pipe thickness: ANSI A21.50 (AWWA C150).
4. Ductile iron pipe centrifugally cast in metal or sand lined molds: ANSI A21.51
(AWWA C 151).
5. Pipe flanges and fittings: ANSI B16.1 and ANSI A21.10 (AWWA C110).
6. Threaded, flanged pipe: ANSI A21.15 (AWWA C115).
7. Cast and ductile iron fittings: ANSI A21.10 (AWWA C110).
B. Acceptable Manufacturers:
1. Tyler
2. Griffin
3. Union
4. US Pipe
5. Or equivalent.
1.3 DELIVERY. STORAGE & HANDLING
A. Exercise extra care when handling cement lined pipe because damage to the lining
will render it unfit for use.
B. Protect the spherical spigot ends and the plain ends of all pipe during shipment by
wood lagging securely fastened in place.
PART 2 - PRODUCTS
2.1 PIPE MATERIALS
A. General:
1. Unless otherwise shown on the Drawings, the minimum thickness of ductile
iron pipe shall be Class 53.
February 2, 2012
Addendum No. 2
Page 92 of 94 12284A
ti I , X
2. Pipe for use with sleeve type couplings shall have plain ends (without bells or
beads) cast or machined at right angles to the axis.
3. Pipe for use with split type couplings shall have ends with cast or machined
shoulders or grooves that meet the requirements of the manufacturer of the
couplings.
4. The outside of all interior pipe shall be coated in accordance with Section
15050.
B. Pipe Interior Lining:
1. Pipe shall be double thickness cement lined and seal coated unless noted
otherwise on the Drawings and except for air piping lines which shall be
completely unlined.
C. Joints (as shown on Drawings or as specified):
1. Flanged:
a. Provide specially drilled flanges when required for connection to existing
piping or special equipment.
b. Flanges shall be flat face, long -hub screwed tightly on pipe by machine at
the foundry prior to facing and drilling.
c. Gaskets:
(1) Full face gaskets only.
(2) Thickness of gaskets - Use standard 1/8 -inch thickness gaskets,
unless thinner gaskets are required for tight retrofit installations.
d. Fasteners:
(1) Make joints with bolt, studs with a nut on each end, or one tapped
flanged with a stud and nut.
(2) The number and size of bolts shall meet the requirements of the
applicable ANSI standard.
(3) Nuts, bolts, and studs shall be Grade B meeting the requirements of
ASTM A307.
2. Grooved split ring couplings, sleeve couplings, flexible joints and couplings,
shall be supplied as specified in "Couplings and Connectors" Section.
2.2 FITTINGS
A. Standard Fittings:
1. Either gray cast iron or ductile iron fittings may be furnished.
2. Pressure rating of 250 psi unless indicated otherwise on the Drawings or as
specified.
3. Flange fittings shall be ANSI B16.1, Class 125 unless indicated otherwise.
Flanges shall be flat faced, with full face gaskets.
4. Joints the same as the pipe with which they are used or as shown on the
Drawings.
5. Provide fittings with standard bases where shown on the Drawings.
6. Cement lining and seal coat unless noted otherwise on the Drawings, and
except for air piping applications where the fittings shall be unlined.
7. All interior fittings shall receive coating in accordance with Section 15050.
February 2; 2012
Addendum No. 2
Page 93 of 94 12284A
PART 3 - EXECUTION
3.1 INSPECTION
A. Provide all labor necessary to assist the Engineer to inspect pipe, fittings, gaskets,
and other materials.
B. Carefully inspect all materials at the time of delivery and just prior to installation.
C. Carefully inspect all pipe and fittings for:
1. Defects, such as weak structural components, that adversely affect the
execution and quality of work.
2. Deviations beyond allowable tolerances for pipe clearances.
D. Immediately remove all rejected materials from the project site.
3.2 INSTALLATION
A. General:
1. Install in strict accordance with the pipe and fitting manufacturer's instructions
and recommendations and as specified or as shown on the Drawings.
2. Acceptable thrust resistant system is required at all fittings on pressure pipe.
B. Assembling Joints:
1. Flanged Joints:
a. Insert the nuts and bolts (or studs), finger tighten, and progressively
tighten diametrically opposite bolts uniformly around the flange to the
proper tension.
b. Execute care when tightening joints to prevent undue strain upon valves,
pumps, and other equipment.
2. Bolted Joints:
a. Remove rust preventive coatings from machined surfaces prior to
assembly.
b. Thoroughly clean and carefully smooth all burrs and other defects from
pipe ends, sockets, sleeves, housings and gaskets.
END OF SECTION
Addendum No. 2