Loading...
HomeMy WebLinkAboutMiscellaneous - 25 CARRIAGE CHASE 4/30/2018 (2)N Town of North Andover Office of the Planning Department Community Development and Services Division 27 Charles Street North Andover, Massachusetts 01845 Heidi Griffin Planning Director Any appeal shall be filed Within (20) days after the Date of filing tltis.Notice In the Office of the Town Clerk Notice Of Decision Telephone (978) 688-9535 Fax (978) 688-9542 _N -!-- C- M N rn M ZED Date: May 10, 2001 O° Date of Hearin: April 17,.2001.& May 1, 2001 Petition of �Iwncock Building Associates, 248 Mill Road Chelmsford, MA 01823 Premises Affected: '25 Carriage Chase Road, North Andover, MA 01845 Referring to the -above petition for a special Permit from the requirements of the North Andover Zoning Bylaw Section 4.136. So as to allow: the construction of a 16' x 22' deck within the Non -Disturbance Zone of the Watershed Protection District. After a public hearing.given on the above date, the Planning Board voted to APPROVE, the Special Permit for Watershed Protection District, based upon the following conditions: Cc: Applicant Engineer Abutters DPW Building DeparAnent Conservation Department_ Health Department ZBA Signed: wx Alison Lescarbeau, Chairman John Simons, Vice Chairman Alberto Angles, Clerk Richard Rowen Richard Nardella a.� . 7" TGAIN OF NORTH ANDOVER BOARD OF HEALTH MAY 14 2M + J BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 25 Carriage Ch#se Road Special Permit 1 Watershed Protection District The Planning Board makes the following findings regarding the application of Hancock Building Associates, 248 Mill -Road, Chelmsford, MA 0.1.823, .submitted .. on March . lS, 2001, requesting -a- Special. Permit under Section 4.136 of the Zoning By -Law to allow the construction of a 16' x 22' deck within the Non -Disturbance Zone of the Watershed Protection District. FINDINGS OF FACT:. In accordance with 4.133 the Planning Board makes the finding that the..intent of the Bylaw, as well as its specific criteria, are met. Specifically the Planning Board finds: 1. That as a result of the proposed construction in conjunction with other uses nearby, there will not be any significant degradation of the quality or quantity of water in or entering Lake Cochichewick. The Planning .Board bases. its .findings on the following facts., a) The existing dwelling is connected to the Town sewer system and the proposed deck have no impact on the sewer system itself; b) A deed restriction will be placed limiting the types of fertilizers that -can be used on the site. c) The topography of the site will not be altered substantially. d) The limit of -clearing is _ restricted .to the minimum necessary to construct the proposed desk; e) Certification has been provided by a registered professional engineer that the installation of,the deck will not have .an effect on the quality or quantity of runoff entering the watershed protection district. f) The construction of the deck will not result in the use of yard being increased, and the impervious surface of the lot will not increase. Furthermore, the limited amount of excavation required to install the sono tubes .for the _deck will not ppse an erosion hazard. 2. There is no reasonable alternative location outside the Non -Disturbance Buffer Zone for any discharge, structure or activity, associated with the. proposed project as almost the .entire lot is located within the Non Disturbance Zone and .the Non - Discharge Zone. In accordance with Section 10.31 of the North Andover Zoning Bylaw, the Planning Board makes the following findings: i a) The specific site. is an appropriate location for the proposed use as all feasible storm water and erosion controls have been placed on the site; b) The use will not adversely affect the neighborhood as the lot is located in a residential zone; c) There will no nuisance or serious hazard to vehicles or pedestrians; d) Adequate and appropriate facilities are provided for the proper operation of the proposed use; e) The Planning Board also makes a specific finding that the use. is in harmony with the g?neral purpose and intent of the North Andover Zoning Bylaw. Upon reaching the above findings, the Planning Board approves this Special Permit based upon the following conditions: SPECIAL CONDITIONS: 1) This decision must be filed with the North Essex Registry of Deeds. The following information is included as part of this decision: a) Plan titled: Site Development Plan 25 Carriage Chase Road North Andover, MA Prepared by: New England Engineering Services 60 Beechwood Drive North Andover, MA 01845 Scale: 1" T 20' Date: March 8, 2001, revised April 16, 2001 b) The Town Planner shall approve any changes made to these plans. Any changes deemed substantial by the Town. Planner would require a public hearing and modification by the Planning Board. 2) Prior to-*uance of a building permit: a) A performance guarantee of five hundred ($500) dollars in the form of a check made out to the Town of North Andover must be posted to insure that construction will take place in -accordance .with .the .plans-and..the. -conditions .-of this..dceision..and to ensure that the as -built Plan's will be submitted. r b) All erosion control measures as shown on the pian must be in place and reviewed by the Town Planner. c) No pesticides, fertilizers. or chemicals . shall be used in lawn .care .or _maintenance. The applicant shall incorporate this condition as a deed restriction, a copy of the deed shall be submitted to the Town Planner and included in the file. 3) Prior to release of the Performance Bond: a) The applicant shall submit an as -built plan stamped by a Registered Professional Engineer in Massachusetts that shows all construction, including storm water mitigation trenches and other pertinent site features. This as -built plan shall be submitted to the Town Planner for approval. The applicant must submit a certification fr(xn the .design engineer that the site was constructed as shown on the approved plo. b) The Planning Board must by a majority vote make a finding that the site is in conformance with the approved plan. 4) In no instange shall the applicant's proposed construction be allowed to further impact the site than �s proposed on the plan referenced in Condition # 1. 5) No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 6) The Contractor shall contact Dig Safe at least 72 hours prior "to commencing excavation. 7) The provisions of this conditional approval shall apply to and be binding upon the applicant, it's employees and all successors and assigns in interest or control. _8)_ This peunit-call be deemed to have lapsed after a two- (2) year period from the date May 10, 2003 on which the Special Permit was granted unless substantial use or construction has commenced. CC. Applicant- Engineer pplicantEngineer File Town of North Andover f NORTy Office of the Planning Department Community Development and Services Division + i 27 Charles Street 4 �--- �RATIo North Andover, Massachusetts 01845 4SsgCHUS�t Heidi Griffin Planning Director Any appeal shall be filed Within (20) days after the Date of filing tlos-Notice In the Office of the Town Clerk Notice Of Decision Telephone (978) 688-9535 Fax (978) 688-9542 Date: May 10, 2001 O° Date of Hearin: April 17,.2001.& May 1, 2001 Petition of. 14micock Building Associates, 248 NO Road Chelmsford, MA 01823 Premises Affected: '25 Carriage Chase Road, North Andover, MA 01845 Referring to the -above .petition for a .special .permit from the requirements of the North Andover Zoning Bylaw Section 4.136. So as to allow: the construction of a 16' x 22' deck within the Non -Disturbance Zone of the Watershed Protection District. After a public hearing given on the above date, the Planning Board voted to APPROVE, the Special Permit for Watershed Protection District, based upon the following conditions: Cc: Applicant Engineer Abutters DPW Building DeparAnent Conservation Dq ar_tment. Health Department ZBA Signed: Graz ���ir Alison Lescarbeau, Chairman John Simons, Vice Chairman Alberto Angles, Clerk Richard Rowen Richard Nardella BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 M C D C-- or-D� �ocn o N M > � Date: May 10, 2001 O° Date of Hearin: April 17,.2001.& May 1, 2001 Petition of. 14micock Building Associates, 248 NO Road Chelmsford, MA 01823 Premises Affected: '25 Carriage Chase Road, North Andover, MA 01845 Referring to the -above .petition for a .special .permit from the requirements of the North Andover Zoning Bylaw Section 4.136. So as to allow: the construction of a 16' x 22' deck within the Non -Disturbance Zone of the Watershed Protection District. After a public hearing given on the above date, the Planning Board voted to APPROVE, the Special Permit for Watershed Protection District, based upon the following conditions: Cc: Applicant Engineer Abutters DPW Building DeparAnent Conservation Dq ar_tment. Health Department ZBA Signed: Graz ���ir Alison Lescarbeau, Chairman John Simons, Vice Chairman Alberto Angles, Clerk Richard Rowen Richard Nardella BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 25 Carriage Ch9se Road Special Permit 1 Watershed Protection District The Planning Board makes the following findings regarding the application of Hancock Building Associates,.. 248 NO Road, Chelmsford, MA 0.1.823, submitted on March.15, 2001, requesting -. Special Permit under Section 4.136 of the Zoning By -Law to allow the construction of a 16' x 22' deck within the NoTDisturbance Zone of the Watershed Protection District. a1011.10 M1110i�L4 M In accordance with 4.133 the Planning, Board makes the finding that the intent of the Bylaw, as well as its specific criteria, are met. Specifically the Planning Board finds: 1. That as a result of the proposed construction in conjunction with other uses nearby, there will not be any significant degradation of the quality or quantity of water in or entering Lake Cochichewlck. The Planning Board bases.. its .findings on the following facts., a) The existing dwelling is connected to the Town sewer system and the proposed deck have no impact on the sewer system itself; b) A deed restrjction will be placed iinutmg the types of fertilizers that -can be used on the site. c) The topography of the site will not be altered substantially. d) The limit of: -clearing is_restricted .to the minimum necessary .to construct the proposed de9k; e) Certification has been provided by a registered professional engineer that the installation ofthe deck will not have an effect on the quality or quantity of runoff entering the watershed protection district. f) The construction of the deck will not result in the use of yard being increased, and the impervious surface of the lot will not increase. Furthermore, the limited amount of excavation required to install the sono tubes for the deck will not p9se an erosion hazard. 2. There is no reasonable alternative location outside the Non Disturbance Buffer Zone for any discharge, structure or activity, associated with the proposed project as almost the .entire lot is located within the Non Disturbance .Zone and the Non- Discharge onDischarge Zone. In accordance with Section 10.31 of the North Andover Zoning Bylaw, the Planning Board makes the following findings: r N a) The specific site is an appropriate location for the proposed use as all feasible storm water pnd erosion controls have been placed on the site; b) The use will not adversely affect the neighborhood as the lot is located in a residential zone; c) There will } no nuisance or serious hazard to vehicles or pedestrians; d) Adequate and appropriate facilities are provided for the proper operation of the proposed use; e) The Planning Board also makes a specific finding that the use. is in harmony with the gTmal purpose and intent of the North Andover Zoning Bylaw. Upon reaching the above findings, the Planning Board approves this Special Permit based upon the following conditions: SPECIAL CQNDITIONS: 1) This decision must be filed with the North Essex Registry of Deeds. The following information is included as part of this decision: a) Plan titled: Site Development Plan 25 Carriage Chase Road North Andover, MA Prepared by: New England Engineering Services 60 Beechwood Drive North Andover, MA 01845 Scale: 1" = 20' Date: March 8, 2001, revised April 16, 2001 b) The Town Planner shall approve any changes made to these plans. Any changes deemed substantial by the Town- Planner would require a public hearing and modification by the Planning Board. 2) Prior to.--�suance of a building permit: a) A performance guarantee of five hundred ($500) dollars in the form of a check made out to the Town of North Andover must be posted to insure that construction will take place iu.accordance .with _the .plans. and .the conditions. -of .this. decision .and to ensure that the as -built }plan§ will be submitted. b) All erosion cpntrol measures as shown on the plan must be in place and reviewed by the Town Planner. c) No pesticides, fertilizers or _chemicals shall be used in lawn .care or. maintenance. The applicant shall incorporate this condition as a deed restriction, a copy of the deed shall be submitted to the Town Planner and included in the file. 3) Prior to release of the Performance Bond: a) The applicant shall submit an as -built plan stamped by a Registered Professional Engineer in Massachusetts that shows all construction, including storm water mitigation trenches and other pertinent site features. This as -built plan shall be submitted to the Town Planner for approval. The applicant must submit a certification frrmn the design engineer that the site was constructed as shown on the approved pla. b) The Planning Board must by a majority vote make a finding that the site is in conformance with the approved plan. 4) In no instance shall the applicant's proposed construction be allowed to further impact the site than �s proposed on the plan referenced in Condition # 1. 5) No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 6) The Contractor shall contact Dig Safe at least 72 hours prior'to commencing excavation. 7) The provisions of this conditional approval shall apply to and be binding upon the applicant, it's employees and all successors and assigns in interest or control. 8). This .permit hall be deemed to have lapsed after a two- (2) year period from the date May 10, 2003 on which the Special Permit was granted unless substantial use or construction has commenced. CC. Applicant.. Engineer File