HomeMy WebLinkAboutMiscellaneous - 25 CARRIAGE CHASE 4/30/2018 (4)a "QE File No. 242-292
(To be provided by DI=OE)
_ orth. Andover
Commonwealth city/Town
of Massachusetts Applicant '-'
Order of Conditions
Massachusetts Wetlands Protection Act
C L, c. 131,.§40 _
and under the Town -of North Andover Bylaw, Chapter 3.5 A•& B''
From 1h. t>,n(lff;-
q
i'O1lanSl)ee
To
(Na a of Applicant) (Na ne of property owner)
333�.•:��-.�'�er P.O. Sox 398 ,
1;orti"i "�n<lc�ver, fii 01.845
Address Address
This Order is issued and delivered as follows:
O �by hand delivery to applicant or representative on (date)
❑ by certified mail, return receipt requested on Sr,t.^,,,1-,pr 1. R (date)
This project is located at 3.ot: 1 Carriage Chase 1ioo.c.1
The property is recorded at the Registry of North. Essex
Document ,14905 of 1.935
Book Page
Certificate (if registered)
The Notice of Intent for this project was filed on Augu.s L 2 0 , •, 19,95 (date)
The public hearing was closed on rii�,_us t 28, 1-985 (date)
• a
Findings
The NAC C has reviewed the above -referenced Notice of
Intent and plans and has held a public hearing on the project. Based orAhe information.available to the
at this time, the N`''�'C has determined that
the area on which the proposed work is to be done is significant t the.,ollowing interests in accordance witM-
the Presumptions of Significance set forth in'the regulations for each A. ,a Subject to Protection Under the
Act (check as appropriate):
Public water supply M Storm damage prevention
® Private water supply ® Prevention of pollution
Up Ground water supply ❑ Land containing shellfish
Q Flood control 11 Fisheries -