SUBJECT: Massachusetts REFUSETECH Inc. — Emissions Control Project
Application for Certificate of Use and Occupancy
Dear Sir:
This letter and its attachments are Massachusetts REFUSETECH Inc.'s formal
notification of the Emissions Control Project Completion on 11-19-00, and application
for the Certificate of Use and Occupancy.
Please find attached stamped letters from The Whiting 'Turner Contracting Company and
S/D Engineers, Inc. each certifying compliance withapplicable codes and standards as
required by the Massachusetts State Building. Code. Whiting Turner was the construction
contractor for the Project, and S/D was the engineer of record.
Additionally, the Project underwent a Structural Peer Review by Daigle Engineers, Inc.
in accordance with 780 CMR, 6`h Edition, Article i 10. 11. Certified reports documenting
their review were provided directly to you by Daigle Engineers, Inc.
As the responsible Construction Control Engineer for the Project, l also certify to the best
of my knowledge and belief that the Pro-ject was complet.cd in. substantial accordance
with approved construction docufne,rrts and aw),licable local. state and federal regulations.
There are no outstanding punchlist items or ortine it deviations to report.
Phone: 603-929-3198
F
BUILDING DEPT
Mr. D. Robert Nicetta
Page Two
June 13, 2001
SUBJECT: Massachusetts REFUSETECH Inc. — Emissions Control Project
Application for Certificate of Use and Occupancy
Please call me at 603-929-3227 if you
information. "OF Il7q
DAVID L.
C-3 RAYMOND
MECHANICAL
Very truly yours,
David L. Raymond, P.E.
Massachusetts Registration No. 40655
questions or require additional
No. 40655
ASO 9F�/STER��
Attachments: Whiting -Turner letter dated 4-18-01
S/D Engineers letter dated 6-11-01
cc: S. Emerson T. Shay
S. Worster J. Williams
D. Spencer/L. Peritz File: 1.11.11 & 2.1
M. Killeen
M. Hepp
SID Engineers, Inc.
June 11, 2001
Mr. D. Robert Nicetta
Building Commissioner, Town of North Andover
27 Charles Street
North Andover, MA 01845
Re: Massachusetts Refusetech, Inc.
APC - Retrofit Project
North Andover, Massachusetts
Dear Mr. Nicetta:
355 Fifth Avenue
Pittsburgh, PA 15222
Phone: 412-562-7500
Fax: 412-562-7501
I hereby certify, as the Structural Engineer of record for the above mentioned project,
that the structural plans, computations and specifications prepared by me or under my
direct supervision meet the applicable provisions of the Sixth Edition of the
Massachusetts State Building Code (780 CMR) and all accepted engineering practices.
In addition, I prepared a workplan for a program of structural tests and inspections to
be performed during the Project construction phase. I reviewed shop drawings and
structural tests and inspection field QA/QC Reports, in accordance with 780 CMR 1705.0,
and visited the site to become generally familiar with the progress and quality of the
work and to determine that the work was performed in a manner consistent with the
construction documents. The program of structural tests and inspections has been
satisfactorily completed.
Regards,
Eugene H. Gales, P.E.
ro-t/-loo/
If you have any questions regarding this site, please contact the undersigned at
(978) 465-1595.
Sincerely,
ENPR a ices, Inc.
Geoffrey A. Brown
Environmental Engineer/Project Manager
cc: Massachusetts Department of Environmental Protection
205A Lowell Street
Wilmington, MA
Gab%ldoc
Mr. Robert George, President
Northside Carting
210 Holt Road
North Andover, MA
Mr. Mark Rees, Town Manager
Town of North Andover
120 Main Street
North Andover, MA 01845
ENPRO Services, Inc.
12 Mulliken Way, Newburyport, MA 01950 44 Rigby Road, South Portland, ME 04106
(800) 966-1102 - 24 Hours FAX (978) 465-2050 (888) 367-6660 - 24 Hours FAX (207) 773-6693
May 31, 2001
Sandra Starr, Director
Town of North Andover Board of Health
27 Charles Street
North Andover, MA 01845
Reference: Availability of Response Action Outcome Statement
Immediate Response Action for Diesel Fuel Release
Rear of Innerstep Boston Facility
c-25: Commerce: Waw
North Andover, MA
RTN # 3-20502
Dear Ms. Starr:
ENPRO Services, Inc. (ENPRO) is sending you this notification on behalf of our
client, Northside Carting, pursuant to the Massachusetts Contingency, Plan
section 310 CMR 40.1400 (Public Involvement). A Class A-1 Response Action
Outcome" Statement has been submitted to the Massachusetts Department of
Environmental Protection for a release of diesel fuel at the above referenced
address. The Class A-1 Response Action Outcome indicates:
Diesel fuel levels have been reduced to a condition of no significant
risk of harm to health, public welfare, safety, and the environment;
A permanent solution has been achieved at the site;
The level of diesel fuel contamination at the site has been reduced to
background concentrations; and,
No Activity and Use Limitations are required to maintain a condition of
No Significant Risk.
Additional information regarding this site is available at the Massachusetts
Department of Environmental Protection, Northeast Regional Office, 205A Lowell
Street, Wilmington,- Massachusetts filed under Release Tracking Number 3-
20502.
ENPRO Services, Inc.
12 Mulliken Way, Newburyport, MA 01950 44 Rigby Road, South Portland, ME 04106
(800) 966-1102 - 24 Hours FAX (978) 465-2050 (888) 367-6660 - 24 Hours FAX (207) 773-6693
May 31, 2001
Mr. Mark Rees, Town Manager
Town of North Andover
120 Main Street
North Andover, MA 01845
Reference: Availability of Response Action Outcome Statement
Immediate Response Action for Diesel Fuel Release
Rear of Innerstep Boston Facility
25 Commerce Way
North Andover, MA
RTN # 3-20502
Dear Mr. Rees:
ENPRO Services, Inc. (ENPRO) is sending you this notification on behalf of our
client, Northside Carting, pursuant to the Massachusetts Contingency Plan
section 310 CMR 40.1400 (Public Involvement). A Class A-1 Response Action
Outcome Statement has been submitted to the Massachusetts Department of
Environmental Protection for a release of diesel fuel at the above referenced
address. The Class A-1 Response Action Outcome indicates:
- Diesel fuel levels have been reduced to a condition of no significant
risk of harm to health, public welfare, safety, and the environment;
- A permanent solution has been achieved at the site;
- The level of diesel fuel contamination at the site has been reduced to
background concentrations; and,
- No Activity and Use Limitations are required to maintain a condition of
No Significant Risk.
Additional information regarding this site is available at the Massachusetts
Department of Environmental Protection, Northeast Regional Office, 205A Lowell
Street, Wilmington, Massachusetts filed under Release Tracking Number 3-
20502.
ENPRO Services, Inc.
12 Mulliken Way, Newburyport, MA 01950 44 Rigby Road, South Portland, MF 04106
(800) 966-1102 - 24 Hours FAX (978) 465-2050 (888) 367-6660 - 24 Hours FAX (207) 773-6693
If you have any questions regarding this site, please contact the undersigned at
(978) 465-1595.
Sincerelv.
EN
Geoffrey A. Brown
Environmental Engineer/Project Manager
cc: Massachusetts Department of Environmental Protection
205A Lowell Street
Wilmington, MA
Gab993.doc
Mr. Robert George, President
Northside Carting
210 Holt Road
North Andover, MA
Sandra Starr, Director
Town of North Andover Board of Health
27 Charles Street
North Andover, MA 01845
ENPRO Services, Inc.
12 Mulliken Way, Newburyport, MA 01950 44 Rigby Road, South Portland, ME 04106
(800) 966-1102 - 24 Hours FAX (978) 465-2050 (888) 367-6660 - 24 Hours FAX (207) 773-6693
G. W. C. WHITING
(1883-1974)
FOUNDED 1909
THE WHITING -TURNER CONTRACTING COMPANY
CONSTRUCTION MANAGEMENT
GENERAL CONTRACTING
DESIGN -BUILD
SPECIALTY CONTRACTING
OFFICE/HEADQUARTERS
RETAIUSHOPPING CENTERS
HEALTH CARE
BIO-TECH/PHARMACEUTICAL
HIGH-TECH/CLEANROOM
WRITER'S DIRECT NUMBER IS
Town of North Andover
27 Charles Street
North Andover, MA 01845
Building Department
Attention: D. Robert Nicetta
(INCORPORATED)
ENGINEERS AND CONTRACTORS
TWO UNIVERSITY OFFICE PARK
51 SAWYER ROAD
WALTHAM, MASSACHUSETTS 02453-3448
781-642-1232
FAX 781-642-9412
www.whiting-turner.com
April 1.8, 2001
WILLARD HACKERMAN
PRESIDENT AND CEO
INSTITUTIONAL
DATA CENTERS
SPORTS AND ENTERTAINMENT
INDUSTRIAL
WAREHOUSE/DISTRIBUTION
MULTI -FAMILY RESIDENTIAL
ENVIRONMENTAL
BRIDGES, CONCRETE
RE: MRI -APC Retrofit Project
285 Holt Road, North Andover, MA 01845
Construction Compliance Affidavit
I hereby certify to the best of my knowledge, information and belief, that the above referenced project was
constructed in strict accordance with the plans and specifications issued by Wheelabrator Air Pollution Control and
S/D Engineering. In addition, all Massachusetts State Building Codes and all applicable local codes and regulations
were followed during the construction of the project.
Very Truly Yours,
THE WHITING -TU CONTRACTING COMPANY
KevinP. Shields
ice President
Massachusetts Construction Supervisor License # CS -070876
Then personally appeared the above named Ke. V; n S h ► e- la S and made the oath that the above
statement by him/her is true.
K, ��:� esa_� _,SS.
Notary Public: W i
My Commission Expires: 0
DATE: Ll I is ! of
blit
IRVINE, CA PLEASANTON, CA NEW HAVEN, CT NEWARK, DE CORPORATE HEADQUARTERS: FT LAUDERDALE, FL ORLANDO, FL ATLANTA, GA BETHESDA, MD
CHARLOTTE, NC SOMERSET, NJ LAS VEGAS, NV CLEVELAND, OH BALTIMORE, MD ALLENTOWN, PA DALLAS, TX CHANTILLY, VA RICHMOND, VA