Loading...
HomeMy WebLinkAboutMiscellaneous - 25 COMMERCE WAY 4/30/2018 (5)June 13, 2001 Mr. D. Robert Nicetta Halcyon Technologies, LLC 4 Liberty Lane West Hampton, New Hampshire 03842 Building Commissioner North Andover Div. of Community Development & Services 27 Charles Street North Andover, Massachusetts 01845 SUBJECT: Massachusetts REFUSETECH Inc. — Emissions Control Project Application for Certificate of Use and Occupancy Dear Sir: This letter and its attachments are Massachusetts REFUSETECH Inc.'s formal notification of the Emissions Control Project Completion on 11-19-00, and application for the Certificate of Use and Occupancy. Please find attached stamped letters from The Whiting 'Turner Contracting Company and S/D Engineers, Inc. each certifying compliance withapplicable codes and standards as required by the Massachusetts State Building. Code. Whiting Turner was the construction contractor for the Project, and S/D was the engineer of record. Additionally, the Project underwent a Structural Peer Review by Daigle Engineers, Inc. in accordance with 780 CMR, 6`h Edition, Article i 10. 11. Certified reports documenting their review were provided directly to you by Daigle Engineers, Inc. As the responsible Construction Control Engineer for the Project, l also certify to the best of my knowledge and belief that the Pro-ject was complet.cd in. substantial accordance with approved construction docufne,rrts and aw),licable local. state and federal regulations. There are no outstanding punchlist items or ortine it deviations to report. Phone: 603-929-3198 F BUILDING DEPT Mr. D. Robert Nicetta Page Two June 13, 2001 SUBJECT: Massachusetts REFUSETECH Inc. — Emissions Control Project Application for Certificate of Use and Occupancy Please call me at 603-929-3227 if you information. "OF Il7q DAVID L. C-3 RAYMOND MECHANICAL Very truly yours, David L. Raymond, P.E. Massachusetts Registration No. 40655 questions or require additional No. 40655 ASO 9F�/STER�� Attachments: Whiting -Turner letter dated 4-18-01 S/D Engineers letter dated 6-11-01 cc: S. Emerson T. Shay S. Worster J. Williams D. Spencer/L. Peritz File: 1.11.11 & 2.1 M. Killeen M. Hepp SID Engineers, Inc. June 11, 2001 Mr. D. Robert Nicetta Building Commissioner, Town of North Andover 27 Charles Street North Andover, MA 01845 Re: Massachusetts Refusetech, Inc. APC - Retrofit Project North Andover, Massachusetts Dear Mr. Nicetta: 355 Fifth Avenue Pittsburgh, PA 15222 Phone: 412-562-7500 Fax: 412-562-7501 I hereby certify, as the Structural Engineer of record for the above mentioned project, that the structural plans, computations and specifications prepared by me or under my direct supervision meet the applicable provisions of the Sixth Edition of the Massachusetts State Building Code (780 CMR) and all accepted engineering practices. In addition, I prepared a workplan for a program of structural tests and inspections to be performed during the Project construction phase. I reviewed shop drawings and structural tests and inspection field QA/QC Reports, in accordance with 780 CMR 1705.0, and visited the site to become generally familiar with the progress and quality of the work and to determine that the work was performed in a manner consistent with the construction documents. The program of structural tests and inspections has been satisfactorily completed. Regards, Eugene H. Gales, P.E. ro-t/-loo/ If you have any questions regarding this site, please contact the undersigned at (978) 465-1595. Sincerely, ENPR a ices, Inc. Geoffrey A. Brown Environmental Engineer/Project Manager cc: Massachusetts Department of Environmental Protection 205A Lowell Street Wilmington, MA Gab%ldoc Mr. Robert George, President Northside Carting 210 Holt Road North Andover, MA Mr. Mark Rees, Town Manager Town of North Andover 120 Main Street North Andover, MA 01845 ENPRO Services, Inc. 12 Mulliken Way, Newburyport, MA 01950 44 Rigby Road, South Portland, ME 04106 (800) 966-1102 - 24 Hours FAX (978) 465-2050 (888) 367-6660 - 24 Hours FAX (207) 773-6693 May 31, 2001 Sandra Starr, Director Town of North Andover Board of Health 27 Charles Street North Andover, MA 01845 Reference: Availability of Response Action Outcome Statement Immediate Response Action for Diesel Fuel Release Rear of Innerstep Boston Facility c-25: Commerce: Waw North Andover, MA RTN # 3-20502 Dear Ms. Starr: ENPRO Services, Inc. (ENPRO) is sending you this notification on behalf of our client, Northside Carting, pursuant to the Massachusetts Contingency, Plan section 310 CMR 40.1400 (Public Involvement). A Class A-1 Response Action Outcome" Statement has been submitted to the Massachusetts Department of Environmental Protection for a release of diesel fuel at the above referenced address. The Class A-1 Response Action Outcome indicates: Diesel fuel levels have been reduced to a condition of no significant risk of harm to health, public welfare, safety, and the environment; A permanent solution has been achieved at the site; The level of diesel fuel contamination at the site has been reduced to background concentrations; and, No Activity and Use Limitations are required to maintain a condition of No Significant Risk. Additional information regarding this site is available at the Massachusetts Department of Environmental Protection, Northeast Regional Office, 205A Lowell Street, Wilmington,- Massachusetts filed under Release Tracking Number 3- 20502. ENPRO Services, Inc. 12 Mulliken Way, Newburyport, MA 01950 44 Rigby Road, South Portland, ME 04106 (800) 966-1102 - 24 Hours FAX (978) 465-2050 (888) 367-6660 - 24 Hours FAX (207) 773-6693 May 31, 2001 Mr. Mark Rees, Town Manager Town of North Andover 120 Main Street North Andover, MA 01845 Reference: Availability of Response Action Outcome Statement Immediate Response Action for Diesel Fuel Release Rear of Innerstep Boston Facility 25 Commerce Way North Andover, MA RTN # 3-20502 Dear Mr. Rees: ENPRO Services, Inc. (ENPRO) is sending you this notification on behalf of our client, Northside Carting, pursuant to the Massachusetts Contingency Plan section 310 CMR 40.1400 (Public Involvement). A Class A-1 Response Action Outcome Statement has been submitted to the Massachusetts Department of Environmental Protection for a release of diesel fuel at the above referenced address. The Class A-1 Response Action Outcome indicates: - Diesel fuel levels have been reduced to a condition of no significant risk of harm to health, public welfare, safety, and the environment; - A permanent solution has been achieved at the site; - The level of diesel fuel contamination at the site has been reduced to background concentrations; and, - No Activity and Use Limitations are required to maintain a condition of No Significant Risk. Additional information regarding this site is available at the Massachusetts Department of Environmental Protection, Northeast Regional Office, 205A Lowell Street, Wilmington, Massachusetts filed under Release Tracking Number 3- 20502. ENPRO Services, Inc. 12 Mulliken Way, Newburyport, MA 01950 44 Rigby Road, South Portland, MF 04106 (800) 966-1102 - 24 Hours FAX (978) 465-2050 (888) 367-6660 - 24 Hours FAX (207) 773-6693 If you have any questions regarding this site, please contact the undersigned at (978) 465-1595. Sincerelv. EN Geoffrey A. Brown Environmental Engineer/Project Manager cc: Massachusetts Department of Environmental Protection 205A Lowell Street Wilmington, MA Gab993.doc Mr. Robert George, President Northside Carting 210 Holt Road North Andover, MA Sandra Starr, Director Town of North Andover Board of Health 27 Charles Street North Andover, MA 01845 ENPRO Services, Inc. 12 Mulliken Way, Newburyport, MA 01950 44 Rigby Road, South Portland, ME 04106 (800) 966-1102 - 24 Hours FAX (978) 465-2050 (888) 367-6660 - 24 Hours FAX (207) 773-6693 G. W. C. WHITING (1883-1974) FOUNDED 1909 THE WHITING -TURNER CONTRACTING COMPANY CONSTRUCTION MANAGEMENT GENERAL CONTRACTING DESIGN -BUILD SPECIALTY CONTRACTING OFFICE/HEADQUARTERS RETAIUSHOPPING CENTERS HEALTH CARE BIO-TECH/PHARMACEUTICAL HIGH-TECH/CLEANROOM WRITER'S DIRECT NUMBER IS Town of North Andover 27 Charles Street North Andover, MA 01845 Building Department Attention: D. Robert Nicetta (INCORPORATED) ENGINEERS AND CONTRACTORS TWO UNIVERSITY OFFICE PARK 51 SAWYER ROAD WALTHAM, MASSACHUSETTS 02453-3448 781-642-1232 FAX 781-642-9412 www.whiting-turner.com April 1.8, 2001 WILLARD HACKERMAN PRESIDENT AND CEO INSTITUTIONAL DATA CENTERS SPORTS AND ENTERTAINMENT INDUSTRIAL WAREHOUSE/DISTRIBUTION MULTI -FAMILY RESIDENTIAL ENVIRONMENTAL BRIDGES, CONCRETE RE: MRI -APC Retrofit Project 285 Holt Road, North Andover, MA 01845 Construction Compliance Affidavit I hereby certify to the best of my knowledge, information and belief, that the above referenced project was constructed in strict accordance with the plans and specifications issued by Wheelabrator Air Pollution Control and S/D Engineering. In addition, all Massachusetts State Building Codes and all applicable local codes and regulations were followed during the construction of the project. Very Truly Yours, THE WHITING -TU CONTRACTING COMPANY KevinP. Shields ice President Massachusetts Construction Supervisor License # CS -070876 Then personally appeared the above named Ke. V; n S h ► e- la S and made the oath that the above statement by him/her is true. K, ��:� esa_� _,SS. Notary Public: W i My Commission Expires: 0 DATE: Ll I is ! of blit IRVINE, CA PLEASANTON, CA NEW HAVEN, CT NEWARK, DE CORPORATE HEADQUARTERS: FT LAUDERDALE, FL ORLANDO, FL ATLANTA, GA BETHESDA, MD CHARLOTTE, NC SOMERSET, NJ LAS VEGAS, NV CLEVELAND, OH BALTIMORE, MD ALLENTOWN, PA DALLAS, TX CHANTILLY, VA RICHMOND, VA