Loading...
HomeMy WebLinkAboutMiscellaneous - 250 CLARK STREET 4/30/2018 (2)�' f �P�AhhING ablZ TOWN OF NORTH ANDOVER !IMASSACHUSETTS OCT i Any appeal shall be filed within (20) days after the date of filing of this Notice in the Office ofthe-Town Clerk. RECI'IV�`► JANI''L..l.��jG TOff' I +.'' tK NORik' ltd. i iVER NOTICE OF DECISION Date. octoheF. �i,. J-Ppp............. Date of Hearing ,September 21 . _1989 Petition of ;:,National Aerial... Advertising, .Inc ...... . ...... ... ........................ Premises affected � Lawrence Municipal. Airport:. North.Ramp, .Clark Street , , .. , .. . . ..... . ... .. ..... ... . . .. Referring; to the. above petition for a special permit from the requirements North Andover Zoning Bylaw, Section 8.3 Site plan Review of the....................................................................... the construction of an office/hanger:9,600.sq..ft..,. one story 80 a3 t0 permit. ,. . . . building . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . After a public hearing given on the above date, the Planning Board voted Conditionally to AP,prove......... the Site Plan Review......,..... ... . .. .. .......................... cc: Director of Public Works Board of Public Works Highway Surveyor Building Inspector Conservation Commission Board of Health Assessors Police Chief Fire Chief Applicant File Interested Part-i_.a_R based upon the following conditions: Signed Geprgp�P�rna�,Jr Chairman ,.,,. John.Simonss.Clerk.............. Erich Nitzsche ................................ Paul Hedstrom ................................ Of NORTH OFFICES OF: BUILDING CONSERVATIONTAr HEALTH CH PLANNING Town of NORTH ANDOVER DIVISION OF PLANNING & COMMUNITY DEVELOPMENT KAREN H.P. NELSON, DIRECTOR Mr. Daniel Long, Town Clerk Town Hall 120 Main Street North Andover, MA 01845 Dear Mr. Long:: 120 main Street North Andover Massachusetts 01845 (508) 682-6483 A..- thi,,-,uqh tAle 'Sped a.1 Ilermil, '1,r(_-)C!ess The North Andover Plannina, hold a public 11`. !.!-! LIP:[ 011 September 7, 1989 in the Town Hall, Selec.-tmerl'- Hectinq 14cot1t upr_,), the application of National Aerial Advertis incl, inc., Lawre—_­1 111unicil);--il Airport, North Ramp, North Andover, 11A. file hearing was duly advertised in the North Andover Citizen on August 24, and Auqusll- and all parties of interest were notified. The foliowinq members were present and voting: George Perna, Chairman; John Simons, C1ei.11,, Linct 11,i:ich Nitzsche. Jack Graham and Paul Hedstrom were absent. The petitioner seeks approjal c!L Site Plan t i o! I 8.3 of the North Andover Zoning bylaws. The purposf� of Review is to construct a a one story 9, O.10 oll ice and hanger, on a lot containing 404.77 on the :..;ootAi westerly side of Clark Street, in an Industrial --2 John Simons read the legal notice to open the pub1ic hearing. Christian Huntress gave an overview oL t1he pro -ie,_ -L L!-) thF Bo..rrt and all others present. Material which the Board had asl.ed for was presented by Ms. Kathy Egmont of National Aerial 111c. '!'IIis material included: revised site plan showing additional and -- a tree line buffer, both existing and i)*o i� o s e cl A motion was made by Erich !_o hearing to September 21, 1989 me -_,ting. I'lle Simons and voted unanimous of those present. 11 Page 2: On September 21, 19B9 Lho ]:,1�ancli.n(, t. ();ar.d 1,e-1 l In the `fowl Hall, Selectmen's M eetinq I;U(. Y;i. `I`he Loow 111',' ,ii (i, bE ;_ s. d( i P present: George Perna, Chairman; Jolla Paul Hedstrom. Jack Graham was absent. The applicant presented the L+o:_il:d 41i11 t:::.:it ;.t ;.J_c;r1-_lted 1-li no cut line. The Board reviewed the {trafL c{ : i .. :11 ;. { X1''.(.1. d _ Q 1 ..i t_. )11 rl::(1. prior to a Certificate of UCcup:incy b(='11.01 1;- '_I( -_d if_) illi;' :.x:11c1,!_1_"' �.hp applicant shall submit a certified 11 _ ;u i. ! r Plan. !,11 ! reviewed and approved by the Plannin<t A motion was made by Erich and approve the draft decision 3s am ell':"d . The Paul Hedstrom and voted unanimously by A list of those condition 1re / j 1 e CC: Director of Public Work, Board of Public Work-: Highway :surveyor Conservation Commission Building inspector Board of Health Assessors Police Chief Fire Chief Applicant Engineer File NATIONAL AERIAL, SPECIAL PERMIT - SITE PLAN REVIEW SPECIAL PERMIT APPROVAL, SECTION 8.3 OF THE NORTH ANDOVER ZONING BYLAW. The Planning Board makes the following findings regarding this Special Permit as required by section 8.3 of the Zoning Bylaws: 1. The proposed use and site design for this lot are appropriate, due to it's location in Town. 2. Adequate vehicular and pedestrian access into the surrounding site has been provided. 3. The landscaping plan as shown and revised, meets the requirements of section 8.4 of the Zoning Bylaws. 4. The site drainage system is designed in accordance with the Town Bylaw requirements. 5. The applicant has met the requirements of the Town for Site Plan Review as stated in Section 8.3 of the Zoning Bylaw. 6. Adequate and appropriate facilities will be provided for the proper operation of the proposed use. The Planning Board finds under Section 8.35 of the Zoning Bylaw that the proposed site plan generally complies with the Town Bylaw requirements but requires minor conditions in order to be completely in compliance with Town Bylaws. Finally, the Planning Board finds that this proposal complies with the Town of North Andover Bylaw requirements so long as the following conditions are complied with. Therefore, in order to fully comply with the approval necessary to construct the facility as specified in the Special Permit before us, the Planning Board hereby grants a Special Permit to the applicant provided the following conditions are met: 1. Any Plants, Trees or Shrubs that have been incorporated into the Landscape Plan approved in this decision, that die within one year from the date of their installation shall be replaced by the applicant. 2. All drainage facilities including detention basins, shall be constructed and erosion controlled prior to any building permit being issued on the site. 3. All Planning Board Order of Conditions are to be placed upon the recorded Definitive Plan, ( Cover Sheet ) prior to endorsement and filing with the Registry of Deeds. 4. The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 5. Gas, Telephone, Cable and Electric utilities shall be installed as specified by the respective utility companies. 6. All catch basins shall be protected and maintained with hay bales to prevent siltation into the drain lines during construction. 7. No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 8. No underground fuel storage shall be installed except as may be allowed by Town Regulations. 9. All buildings shall have fire sprinklers installed prior to the issuance of the Certificate of Occupancy, per order NAFD. 10. Prior to a Certificate of Occupancy being issued for any structures, this site shall have received all necessary permits and approvals from the North Andover Board of Health. 11. Prior to a Certificate of Occupancy being issued for the structure, the site shall be reviewed by the Planning Board. Any screening as may be reasonably required by the Planning Board shall be added at the owners expense. 12. Prior to endorsement of the plans, all off site utilities shall be submitted to and approved by the North Andover DPW. 13. Prior to a Certificate of Occupancy being issued for the structure on this site, the applicant shall submit a certified As -built plan. The plan shall be reveiwed and approved by the Planning Board Staff. The following plans shall be deemed as part of the decision• Plan Entitled: Site Plan of Land, North Andover, Massachusetts Dated: Dec. 20, 1988. Final Revision: Aug. 17, 1989. Plan Entitled: Proposed Septic System - North Andover Massachusetts. Site Plan - Plot Plan / Profile - Details. Dated: Jan. 6, 1989 Final Revision: Aug. 17, 1989. Plans prepared for: National Aerial Advertising Inc. cc: Director of Public Works Board of Public Works Highway Surveyor Building Inspector Board of Health Assessors Conservation Commission Police Chief Fire Chief Applicant Engineer File