Loading...
HomeMy WebLinkAboutMiscellaneous - 276 RALEIGH TAVERN LANE 4/30/2018 (2)G-) mi .t 2 6\ L4,.T- x IE7 V, A to I hly- pjpE OUT oF Hsr=- G -7- Imy- PIPE It'ITOT"V-- a i, I% j CA op /,)I rr"IC7 -r&mv WV PIVE I= 12, INV, np;-:- no -r O.Psny. IbL)I_ V., -r * - t k i 16> As 5UIL:T --7 -Z -3 Fr MA, k V- C- (rV EA -1 P -J A4) 154X-- A, -r CES P. v I m A BO aPd 'le North A 38* SEMC Sn.TEK 11;SILUJUTION K LIST AA L OK 1. Distance Tot' a. Wetlands b. Drains 0 0 well 2. Water Line Location No PVC Pipe Septic Tank-' a Tees -!.-Length & To Clean Out Covers b. Cement Pipe to Tank - On Both Sides of Tank Distribution Box a. Covers & Box - No Cra(�ks b. All Lines Flo-Amg Equal Amounts c. No Back Flow Leach Field 0 Trench a. DimensioW" b Stone th A, 0: CaPP6, Ends d. qX&an Double Washed Stone 7. Leach Pits a.. Dimensions b. Stone Depth a. Splash Pads d. Tees e. Cement Pipe to Pit Both Sides f , Clean Double Washed Stone ell, 8. No Garbage DisWsal 9. Final Grading Inspection 10. Barricading Covered System 32. As Built Submitted a. Lot Location b. Dimensions of System c. Location with Regard -to Pere Test d. Elevations es' Water Table Boaxd-of APFIROVED DATE 7— / 3 Provided: SUB'"UFFACE DMIOUL DI-iIGN CME LIST LOT DIUPPROVED, DATE R Title V FAIL CK Reg 2.5 kThe submitted plan must show as a mWimim: I._. - I/W the lot to be serred-area., dimensions lot # abutters Ab) cation and log deep observation gles-disstance to ties location and results percolation tests -distance to ties design calculations & calculations showing required leaching area location and dimensions of system -including veserve area =TP-rexiating and proposed contours T—F,7KgYlocation any r3t areas Athin 1001 of sewage disposal system or disclaimer -check wetlands mapping surface and subsurface drains within 100, of sevage disposal system or disclaimer i), location any drainage easer.-ints idtldn 100 v of ac v3ge dl tpo� ql system or disclaixmr-Planning Board files knoin sources of rater supply within 2001 of so -,Me disposal system or disclaimer 0�location of my proposed well to serve lot -1001 from leaching 1) location of water lines on property -100 from leaching facility m) location of benchmark rkY driveways ej garbage disposals p) no PVC to be used in construction q) profile of system -elevations of basement., plumb., pipe., septic distribution box inlets and outlets,, distalbution field piping etter elevations f) rkvdmm ground vater elevation in area sewne disposal system s) plan mist be prepared by a Professional Raggireer or other professional authorized by law to prcpare such plans Reg 6 Septic Tanks CaPacities-150% Of flow., vater table, teasj, d,�pth of tees., access., putping ,(b) cleanout V (c) 101 from cellar mn or inground. svi=ing pool (d) 251 from subourface drains Reg 10.2 Distribution Boxes I'/ (a) slope greater than 0.08 Reg 10.4 1- V_ Kb) surp facility tank ar, d Sj'a'su.rw:a�6e D:)si I FAIL Reg 1.1. 2 12.4 n.lo 11.11 Reg 15.1 15.4 15.8 3.7 Reg 14.1 14.3 14.4 14.6 14.7 14-10 Reg 9. 1 9.6 P Lidt Paze 2 Lc,,-chj!!g Pits Leaching pits are proferred ubere the installation is possible 4calculations of leaching area-udniruam 560 eq ft b) spacing c�.uurface drainage 2% d) cover material 'e) IIx2Ix4" splash pad f) tee at elbow no bends in pipe from d -box to pipe Leaching Fields LO a) no greaterr gt2O mi=tes/inch b) area -rd ni =,n aq ft c) constructi. of field d) suurface e 2. % ellar V e) 201 fftrom vall or inground evinzdng pool FF'oeaching area-rdn 500 eq ft ft idn 6 ft, with reserve betvaen C e) stone / f) surfa6e drainage 2% Domhi4/Slope a) slope x = (to be shoun) b) y/x X 50 = (to be shown) Pumar a) b) 78= power FRANK C. GELINAS AND ASSOCIATES IENGINEERS & ARCHITECTS - LAND PLANNERS FRANK C. GELINAS, R.P.E., R.L.S. NORTH ANDOVER OFFICE PARK SCOTT L. GILES, R.L.S. NORTH ANDOVER, MASS. 01845 JOSEPH D. LA GRASSE, A.I.A. TELEPHONE 687-1483 October 16, 1980 Mr. Thomas Murphy North Andover Board of Health North Andover Town Hall Main Street North Andover, MA 01845 Re: Lot 3, Winter Street, Revision of Plan Dear Mr. Murphy: Enclosed you will find a copy of the revised plan for the subsurface disposal system of lot 3, Winter Street. In the course of submitting a Notice of Intent to the North Andover Conservation Commission, it was determined that less environmental damage would be done to the wetlands associated with this parcel if the plan were revised in the manner shown. Of course, all of the Title V and local regulations have been followed in designing this system. It would be very -helpful if you could expeditethe approval process of this plan so that I can satisfy the requirements of the Conservation Commission within the prescribed time period. If I can be of further service in this matter, please do not hesitate to contact me. XSince ly yours, "Y sepb ;. �os beg Enclosure cc: Dick,Perkins, North Andover Associates j t TOWN OF NORTH ANDOVER. MASSACHUSETTS OFFICE OF CONSERVATION COMMISSION TO: Board of Health FROM: Conservation Commission DATE: January 2, 1981 SUBJECT: Lots 1 and 3 Winter Street TELEPHONE 683-7105 Enclosed is a copy of the Order of Conditions for Lots 1 and 3 Winter Street. The Order of Conditions reflect the Conservation Commissions concerns adequately. James Lafond Chairman, NACC FORM 4 ORDER OF CONDITIONS L cE W E T L A N D S P R 0 T.E-C-T.. 1 0 N A C T G.L. C. 131, s. 40 ------------------------------ CITY/TOWN NORTH ANDOVER NAME North Andover Associates CERTIFIED MAIL NUMBER PROJECT LOCATION: Address Lot 3 Winter Street FILE NUMBER 242- 103 ADDRESS 14 Kilby -Street Boston, MA 02109 R6corded at Registry of' North Essex Book 1360 Certificate (if registered) REGARDING: Notice of Intent'Dated - October 10, 1980 and plans titled and dated see condition 11 THIS ORDER IS ISSUED ON (date) December 4 `1980 V — V I Page 708 --------------------------------------------------------------------------------- Pursuant to the authority of G.L. c. 131, s. 40 the North Andover Conservation Commission has reviewed your Notice of Intent anod Pla_ns­_17_d_en_t_1r_Ti_ed above, and Fias dete ' rmined that the arjea on which the proposed work is to be done is significant to one or more of the interests listed in G.L. c, 131, s. 40. Town of North Andover bylaws, Section 3.5 A & B Wetlands Protection. The North Andover Conservation Commission hereby orders that the following conditio s are necessary to protect sa—la—interests and all work shall be performed in strict accordance with them and with the Notice of Intent and plans identified above -except_�yb�E� _ �IiSt_21ans-are_modif ied-by- said -conditions. CONDITIONS 1. Failure to comply with all conditions stated herein, . and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this order. 2. This order does not grant any property rights or any exclusi e privileges; it does not authorize any injury to proviate property or-invvasion of private rights. 3. Th'is order does not relieve the permittee or any other person of the - necessity of complying with all other applicable federalp state or local statutes, ordinances, by-laws and/or regulations. 4. The work authorized hereunder shall be completed within one (1) year from the date of this order)unless it is for a maintenance dredging project subject to Section 5(9 - This order may be extended by the issuing authority for one or more additional one-year eriods uper application to the said issuing authority at least thirty 30) days prior to the expiration date of the order or its extension. i D L I I (",,'S I N U F D 2 R OF FILF No. 242- 5. Any fill used in connection with this project shall be clean fill, containing no trash,' refuse, rubbish or debris, including without limiting the generality of the foregoing, lumber, bricks plaster, wire,lath, paper, carboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. 6. No work may be commenced until all appeal periods have elapsed from the order of the Conservation Commission or from a final order by the Department of Environmental Quality Engineering. 7. N , p work shall be undertaken until the final order, with respect to the proposed proJect, has been recorded in the Registry of Deeds for the district in which the land is located within the chain of title of the affected property. Thk:-% Document number indicating such recording shall be submitted on the form at the end of this order to the issuer of this order prior to commencement of work. A sign shall be displayed at the site not less that two square feet or more than three square feet bearing the works, "Massachusetts Department of Environmental Quality Egnineering. Number 242- 103 9. Where the Department of Environmental Quality Engineering is requested to make a determination and to issue a superseding order, the Conser- vation Commission shall be a party to all agency proceedings and hearings before the Department. 10. Upon c ,ompletion of the work described herein, theaDplir-pant shall forthwith request, in writing, that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. H. The work shall conform to the following described plans and additional conditions: "Subsurface Disposal System Design for Lot 3, Winter Street, North Andover, MA" dated 7/10/80, rev. 10/10/80 by Frank C. Gelinas and Associates. 12. All work shall be completed in accordance with the plans submitted with this Notice of Intent. Any changes in the submitted plans or Notice of Intent or.changes resulting from the aforementioned conditions must be submitted to the NACC for approval prior to implementation. If the NACC, finds, by majority vote, said changes to be significant and/or to �eviate from the -original plans, Notice of Intent, or this Order of Conditions to such an extent that the interests of the Wetlands Protection Act can not be protected by this Order of Conditions and would best be served by the issuance of additional conditions, then the NACC will call for another public hearing within 21 days, at the expense of the applicant, in order -to take testimony from all interested parties. Wit1fi-n- 21 days of the close of said public hearing, the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes and the procedures outlined for changes will be followed. 13. A row of staked hay bales must be placed betwTeen all construction areas and wetlands, and must be maintained untill all construction ��.7ork is coiiiiipleted Jhese hay bales inust be placed using the method 11V HnP -�oi r.nnQn-rxT_q f- i nn qf.3-1-XTi f- n i ORDER OF CONDITiONS '.1 -2a- 242-103 All additional erosion prevention measures, and sedimentation protection measures found necessary during construction by the NACC, will be implemented at the direction of the NACC, including, but not limited to, the placement of hay bales at potential sedimentation points. 14. All accumulated sediments must be removed from Wetland areas, and from the hay bale check dams, before a Certificate of Compliance is issued. 15. Upon completion of work, all altered areas must be immediately stabilized to prevent erosion and sedimentation of wetland areas. 16. In addition to the requirements of Condition No. 10, the applicant must submit a letter, from the professional who prepared the plans, certifying compliance with this Order of Conditions. Said letter will certify, but not be limited to, the following: a, "As -Built" elevations of all drainage ways construcfed within 100 feet of any area subject to the Wetlands Protection Act. b. "As -Built" elevations and grades of all filled or altered Wetland Areas. C* Distances to all structures and alterations within 100 -feet of any areas subject to the Wetlands Protection Act. An "As -Built" topographic plan of all areas within the jurisdiction of the Wetlands Protection Act must be submittedwhen a Certificate of Compliance is requested. 17. The provisions of this Order the applicant, its employees, interest or control. shall apply to and be binding upon and all successors and assigns in t OP�DER Of C(,NDITIONS CONTINUED 3 FILE NO. 242- 103 The A licant, any person aggrieved by this order, any owner of land abutting tRe land upon which the proposed work is to be done, or any ten residents of the city or town in which such land i's located, are hereby notified of their right to appeal this order of the Department of'Environ- mental Quality Egnineering provided the request is made in writing and by certified mail to the Department within ten (10) days from the issuance of this order. ISSUED BY NORTH ANDOVER CONSERVATION COMMISSION ,On this Fourth day Of December 1980 . before me personally appeared James Lafond to me known to Be the person described in, and w--ho-executed, the - toregoing' instrument 'and acknowledged that he executed the same as his free act and. deed. MY Commission expires DETACH ON DOTTED LINE AND SUBMIT TO THE ISSUER OF TH . IS ORDER PRIOR TO COMMENCEMENT OF WORK. To NORTH ANDOVER CONSERVATION COMMISSION (Issuing Authority) PLEASE BE ADVISED THAT THE ORDER OF CONDITIONS FOR THE PROJECT AT REGISTRY�OF FILE NUMBER 242- HAS BEEN RECORDED AT THE .ON (DATE) If recorded land, the instrument number which identifies this transaction is If registered: aTd,­tH-e—document number which identifies this transaction is Signed Applic�in't TO: FROM: '('jz4QtL G61-1 W As NORTHANDOVER, 'MASS.\JOL-�� BOARD OF HEALTH DESIGN ENGINEER Re: Soil Absorption .Sewage Disposal System This is to certify that I have inspected the construction materials of said disposal system at L—C)-r 9E> Site Location North Andover, Mass. The grades and construction materials are as specified in my plans and specifications dated MA-( IZ e>1 and ZZ 19,91 Reg. Prof. EngineWr/Reg. Sanitarian