HomeMy WebLinkAboutMiscellaneous - 28 MORNINGSIDE LANE 4/30/2018 (3)0
CONSERVATION DEPARTMENT
Community Development Division
December 17, 2015
David Evangelista
28 Morningsidc Lane
North Andover, MA 01845
28 Morningside Lane, North Andover
Construction of a deck and stairs on sono -tube supports
Conservation Conditions of Approval, NACC #167
Pursuant to section 4.4.2 (B) of the North Andover Wetlands Protection Regulations, David
Evangelista, owner, filed for a small project for work proposed at 28 Momingside Lane, North
Andover. The proposed work includes the removal of the existing 443 square foot deck and the
construction of a 351 square foot deck on sono -tube supports (16'4.5" x 20' plus 5' staircase). The
proposed deck is approximately 52 feet from the edge of Bordering Vegetated Wedand (BVXV) as
shown on the herein -referenced plan.
During the December 16, 2015 public meeting, the NACC voted unanimously to approve this
project. All work shall conform to the following:
RECORD DOCIL�NENTS: Small Project Filing Including:
Application Checldist;
Plan Titled: "Field Sketch Prepared for David Evangelista"
Dated: 12/11/15
Prepared by: John Dick PLS of Hancock Environmental
Filing received: December 4, 2015
The following conditions are hereby mandated:
CONDITIONS:
Prior to the start of construction the site contractor shall review the small project permit and be
aware of the wetland resource area and the limits of the proposed work.
1600 Osgood Street, Building 20, Suite 2-36, North Andover, Massachusetts 01845
Phone 978.688.9530 Fax 978.688.9542 Web www. http://w%vw.townofnortliandover.com/conservel.litm
2. Prior to the start of construction a silt sock (or other erosion controls as approved by the
Conservation Department) shall be placed between the work area and the wetlands and the
Conservation Department shall be contacted for a pre -construction site 'inspection.
3. Excess construction material shall be properly disposed of offsite and accepted engineering and
construction standards and procedures shall be followed 'in the completion of the project.
4. Upon completion of the approved project and site stabilization, please contact the Conservation
Department for a final inspection.
5. This pertnit shall ex.pire six months from the date of issuance.
Should you have any question or comments regarding the contents of this letter, please do not
hesitate to contact the undersigned at 978.688.9530 at your earliest convenience. Thanking you in
advance for your anticipated cooperation with this matter.
Respectfully,
NORTH ANDOVER CONSERVATION DEPARTMENT
Heidi Gaffney
Conservation Field Inspector
1600 Osgood Street, Building 20, Suite 2-36, North Andover, Massachusetts 01845
Phone 978.688.9530 Fax 978.688.9542 Web www. http://www.townofnorthandover.com/conservel.htrn