Loading...
HomeMy WebLinkAboutMiscellaneous - 28 MORNINGSIDE LANE 4/30/2018 (3)0 CONSERVATION DEPARTMENT Community Development Division December 17, 2015 David Evangelista 28 Morningsidc Lane North Andover, MA 01845 28 Morningside Lane, North Andover Construction of a deck and stairs on sono -tube supports Conservation Conditions of Approval, NACC #167 Pursuant to section 4.4.2 (B) of the North Andover Wetlands Protection Regulations, David Evangelista, owner, filed for a small project for work proposed at 28 Momingside Lane, North Andover. The proposed work includes the removal of the existing 443 square foot deck and the construction of a 351 square foot deck on sono -tube supports (16'4.5" x 20' plus 5' staircase). The proposed deck is approximately 52 feet from the edge of Bordering Vegetated Wedand (BVXV) as shown on the herein -referenced plan. During the December 16, 2015 public meeting, the NACC voted unanimously to approve this project. All work shall conform to the following: RECORD DOCIL�NENTS: Small Project Filing Including: Application Checldist; Plan Titled: "Field Sketch Prepared for David Evangelista" Dated: 12/11/15 Prepared by: John Dick PLS of Hancock Environmental Filing received: December 4, 2015 The following conditions are hereby mandated: CONDITIONS: Prior to the start of construction the site contractor shall review the small project permit and be aware of the wetland resource area and the limits of the proposed work. 1600 Osgood Street, Building 20, Suite 2-36, North Andover, Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web www. http://w%vw.townofnortliandover.com/conservel.litm 2. Prior to the start of construction a silt sock (or other erosion controls as approved by the Conservation Department) shall be placed between the work area and the wetlands and the Conservation Department shall be contacted for a pre -construction site 'inspection. 3. Excess construction material shall be properly disposed of offsite and accepted engineering and construction standards and procedures shall be followed 'in the completion of the project. 4. Upon completion of the approved project and site stabilization, please contact the Conservation Department for a final inspection. 5. This pertnit shall ex.pire six months from the date of issuance. Should you have any question or comments regarding the contents of this letter, please do not hesitate to contact the undersigned at 978.688.9530 at your earliest convenience. Thanking you in advance for your anticipated cooperation with this matter. Respectfully, NORTH ANDOVER CONSERVATION DEPARTMENT Heidi Gaffney Conservation Field Inspector 1600 Osgood Street, Building 20, Suite 2-36, North Andover, Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web www. http://www.townofnorthandover.com/conservel.htrn