Loading...
HomeMy WebLinkAboutMiscellaneous - 285 HOLT ROAD 4/30/2018 (7)! \, c' MASSACHUSETTS REFUSETECH, INC. A WASTE MANAGEMENT COMPANY 285 Holt Road North Andover, MA 01845 (978) 688-9011 (978) 794-8058 Fax June 15, 1999 Mr. D. Robert Nicetta Building Commissioner Town of North Andover 27 Charles Street North Andover, MA 0 1845 Subject: Massachusetts REFUSETECH Inc. Construction Control Report #7 — Biweekly Period Ending 6/11/99 1. Progress and Schedule Effectiveness Project Start Date: 03/01/99 Project Complete Date: 11/19/00 Actual site mobilization by Phase I Contractor week of 4/5/99; Phase I completion expected 6/22/99. Preparation for Phase Il work started June 1, 1999 and the excavation contractor started work June 4, 1999. Phase 11 construction will end with mechanical completion of Unit No. 2 during October 2000. % Complete: 7% Weather Conditions: Hot, humid, dry: 11. Delays/Problems None this period. 111. Safely All subcontractors receive site specific safety orientation. The Phase I contractor Francis Harvey, Inc., is required to have a designated Safety Coordinator on site. To date: I recordable accident; 0 lost work or lost work days. Safety fencing was erected around foundation excavations. IV. Inspections, OA/OC Concrete sampling and rebar inspections were performed for concrete pours in metals bunker areas. U, & -/ 1, -�q Mr. D. Robert Nicetta June 15, 1999 Page 2 WAPC, W -T, S/D and MRI met to discuss QA/QC procedures/documentation relative to Chapter 17 of the MA State Building Code. V. Permit Complianc Building Permit No. 039A, Phase II was issued by the Building Commissioner for foundations, and ash building additions/gallery structures. Additional trailer permits were issued by the Building Commissioner. V1. Major Eguipmen Construction: Lull, front-end loader, excavator, welder, crane. Installation: none this period. V11. Subcontractors On Site No. of Employees I . ESB (Electrical) 2 2. Francis Harvey & Sons, Inc. 10 3. WT 4 4. D. W. White 5 V111. Construction Site Visitors None this period. IX Activities This Period 1. Foundation design is underway for the Contact Water Storage Tank. 2. Construction was started on the foundations/Ash Building structures work (Phase 11). 3. Loading ramp demolition and pavement removal started. 4. Metals Storage Bunkers structural steel erection was completed. 5. Additional erosion control measures added for new excavation areas. Mr. D. Robert Nicetta May 18,1999 Page 3 X. Activities Next Period I . Start roofing and siding of the -metals bunker structure. 2. Relocate storm drain line near Unit #1 foundations. 3. Excavate, form and pour Unit #1 SDA/FF footings. Respectfully submitted, �kJ David L. Raymond, P.E. Massachusetts Registration No. 40655 Attachments Site Photos I . Loading Ramp Demolition 2. Unit# I SDA/FF Excavation 3. Metals Collection Bunkers Structural Steel, looking southeast 4. Metals Storage Bunkers Structural Steel, looking northwest cc: S. Emerson R. McQuade J. Motte W. Pifer J. Williams/T. Shay S. Worster File 3.5 DLR/ns/75 C:\WfNDOWS\TEMP\6-08-99-05f.jpg (local) Page I of I Loading Ramp Demolition file: C:\WINDOWS\TEMP\6-08-99-05f.jpg 6/14/99 C:\WINDOWS\TEMP\6-10-99-Ols.jpg (local) Page I of I Unit# I SDA/FF Excavation file: C:\WINDOWS\TEMP\6-10-99-01 sjpg 6/14/99 C:\WlNDOWS\TEMP\6-08-99-04f.jpg (local) Page I of I Metals Collection Bunkers Structural Steel (looking southeast) file:C:\WINDOWS\TEMP\6-08-99-04f.jpg 6/14/99 C:\WINDOWS\TEMP\6-08-99-03f.jpg (local) Page I of I Metals Storage Bunkers Structural Steel (looking northwest) file:C:\WINDOWS\TEMP\6-08-99-03f.jpg 6/14/99 MASSACHUSEWS REFUSETECH, INC- A WASTE MANAGEMENT COMPANY 285 Holt Road North Andover, MA 01845 (978) 688-9011 (978) 794-8058 Fax June 7, 1999 RECEIVED Mr. D. Robert Nicetta JUN 0 9 1999 Building Commissioner Town of North Andover BUILDING DEPT. 27 Charles Street North Andover, MA 0 1845 Subject: Massachusetts REFUSETECH Inc. Construction Control Report #6 — Biweekly Period Ending 5/28/99 1. Prouess and Schedule'Effectiveness Project Start Date: 03/01/99 Project Complete Date: 11/19/00 Actual site mobilization by Phase I Contractor week of 4/5/99; Phase I completion expected 6/22/99. Phase 11 work is expected to start in June 1, 1999 and end with mechanical completion during August 2000. % Complete: 5% Weather Conditions: Seasonable., 11. Delays/Problems Rework of platform steel at drum magnet -required due to operational problems. 111. Safely All subcontractors receive site specific safety orientation. The Phase I contractor, Francis Harvey, Inc., is required to have a designated Safety Coordinator on site. To date: I recordable accident; 0 lost work or lost work days. An exploratory excavation was done near the north foundations to locate an electrical ductbank not shown on available drawings. IV. Inspections, QA/0C Concrete sampling and rebar inspections were performed for concrete pours in metals bunker areas. Daigle Engineers, Inc., of Methuen, the Independent Structural Engineer, provided its approval of structural design packages prepared in support of N Mr. D. Robert Nicetta May 18,1999 Page 2 Building Permit Application #2. A letter confirming this was sent to the Building Commissioner. WAPC, W -T, S/D and MRI met to: discuss. QA/QC procedures/documentation relative to Chapter 17 of the MA State Building Code. V. Permit Compliance ,Building Permit Application #2 was submitted for foundations, and ash building additions/gallery structures. Silt fencing damaged by a truck was repaired. V1. Major Eguipmen Construction: Lull, front-end loader, excavator, welder, crane. Installation: none this period. V11. Subcontractors On Site No. of Employees 1 . ESB (Electrical) 2 2. Francis Harvey & Sons, Inc. 12 3. WT I V111. Construction Site Visitors Prior to start of Phase 11 construction, a Pre -Job Conference was held with representatives of local trades. IX Activities This Period 1. The award was made for the Contact Water Storage Tank. 2. An award was made for the foundations/Ash Building structures work. 3. Drum magnet platforms were reworked. 4. Metal bunker areas were graded, compacted, formed and slabs were poured. 5. A bus was purchased and driver (Teamster) hired for shuttling craft personnel from the offsite parking area. 6. S. Emerson, W. Pifer and D. Raymond met with the Building Commissioner to submit Building Permit Application #2. Mr. D. Robert Nicetta May 18,1999 Page 3 X. Activities Next Period I . Complete erection of metals bunker steel. 2. Obtain MRI Building Permit #2. 3. Start Phase II construction, including foundations and ash building addition/gallery. Respectfully submitted, -D0'4:f . C?4rul--j David L. Raymond, P.E. Massachusetts Registration No. 40655 Attachments I . I Site Photos cc: S. Emerson R. McQuade I Motte W. Pifer J. Williams/T. Shay S. Worster File 3.5 DLR/ns/73 C:\WlNDOWS\TEMP\5-l9-99-04f.jpg (local) Page I of I Metals Bunker Area - Soils Compaction file:C:\WINDOWS\TEMP\5-19-99-04f.jpg 6/7/99 C:\WfNDOWS\TEMP\5-24-99-05f.jpg (local) Page I of I Metals Bunker Area - Slab Forms/Pouring file:C:\WINDOWS\TEMP\5-24-99-05f.jpg 6/7/99 MASSACHUSETTS REFUSETECH, IPJC- A WASTE MANAGEMENT COMPANY 285 Holt Road North Andover, MA 01845 (978) 688-9011 (978) 794-8058 Fax May 18,1999 Mr. D. Robert Nicetta Building Commissioner Town of North Andover 27 Charles Street North Andover, MA 0 1845 Subject: Massachusetts REFUSETECH Inc. Construction Control Report #5 — Biweeldy Period Ending 5/14/99 1. Progress and Schedule Effectiveness Project Start Date: 03/01/99 Project Complete Date: 11/19/00 Actual site mobilization by Phase I Contractor week of 4/5/99; Phase I completion expected 6/22/99. Phase II work is expected to start in June 1999 and end with mechanical completion during August 2000. % Complete Weather: 11. Delays/Problems None this period. 1.5% Temp.: 35/60 Rain: 0.0" Snow: 0.0" 111. Safeq All subcontractors receive site specific safety orientation. The Phase I contractor, Francis Harvey, Inc., is required to have a designated Safety Coordinator on site. To date: 0 recordable accidents; 0 lost work or lost work days IV. Inspections, OA/OC Concrete sampling performed for concrete pours in metals bunker areas. Daigle Engineers, Inc., of Methuen, the Independent Structural Engineer, is continuing its review of structural design packages prepared on MRI's behalf. N Mr. D. Robert Nicetta May 18,1999 Page 2 V. Permit Compliance All subcontractors receive site specific permit compliance orientation, including the Dust/Erosion Control Plan, and MRI Site Resource Area restrictions. These requirements were developed as part of the local Project approval process. Silt fencing was modified per Conservation Commission Representative's suggestion. V1. Ma*or Equipmen Construction: Lull, front-end loader, excavator, welder. Installation: none this period. V11. Subcontractors On Site No. of Employees I . ESB (Electrical) 2 2. Francis Harvey & Sons, Inc. 12 3. WT I V111. Construction Site Visitors None this period. IX Activities This Period 1. North bunker walls were demolished, formed and poured. 2. Embedded plates were installed.in ferrous bunker. 3. Drum magnet tested and returned to service. 4. Bids for Phase 11 are being evaluated. 5. Paving repairs performed at north gate. 6. D. Raymond met with the Building Commissioner to review report formats/frequency and arrange next meeting for Building Permit application. Mr. D. Robert Nicetta May 18,1999 Page 3 X. Activities Next Period 1 . Make modifications to catwalk near magnet. 2. Pour new slabs in north bunkers. 3. MRI to repair/replace ferrous conveyor belt while system is off-line. 4. Award of Contact Water Storage Tank contract. Respectfully submitted, David L. Raymond, P.E. Massachusetts Registration No. 40655 Attachments I Site Photos I Field QC Report #37 cc: S. Emerson J. Motte W. Pifer J. Williams/T. Shay S. Worster File 3.5 DLR/ns/70 C:\WfNDOWS\TEMP\5-13-99-02f.jpg (local) Page I of I SUBJECT: North Bunker Pushwall Forming file:C:\WINDOWS\TEMP\5-13-99-02f.jpg 5/20/99 C:\WfNDOWS\TEMP\5-l3-99-0l f.jpg (local) Page I of I SUBJECT: North Bunker Pushwall Forming file:CAWINDOWS\TEMP\5-l3-99-0l f.jpg 5/20/99 CAWINDOWS\TEMP\5-l3-99-04f.jpg (local) Page I of I SUBJECT: Wing Wallin Metal Bunker Looking East file:C:\WINDOWS\TEMP\5-13-99-04f.jpg 5/17/99 Job # 8226 Contractor FH&S Date 5/14/99 Qualiq Control Inspection Report #-37 Location N. Andover Drawing Reference NA Specification Reference —NA Submittal Reference NA ISSUE: (For example, material characteristics, item size, location, source, gauge, voltage, etc. Include as applicable equipment, material procedures being inspected, location of same and particular characteristics being reviewed.) Weekly inspection of Erosion Control for the MRI -APC Retrofit Project in North Andover, MA- Haybales and Siltfence are inspected on a weekly basis for cuts, rips, tears and basic deterioration. Haybales must be new, twine must be wrapped tight and each haybale must be butted together tight and have two stakes in each one. Silt fence must be erect and properly fastened to each stake. Row of stone in front of silt fence must be kept in good condition as to not let any silt beneath the haybale or silt fence. Erosion Control inspected on 5/14/99. All silt fence and haybales are in excellent condition. Row of stone is also in good Condition. FURTHER ACTION RECOMMENDED: (Include date to be completed by) None at this time Through this inspection, the item was found to be apparently in compliance with the drawings and specifications: BYES ONO Signature of Inspector Inspection of Corrective measures: Date: Compliance: (yes/no) 1�4 ipv i, gk Massachusetts REFUSETECH Inc. ,a, A Waste Management Company 285 Holt Road North Andover, MA OlB46 April 28, 1999 Mr. D. Robert Nicetta Building Commissioner Town of North Andover 27 Charles Street North Andover, MA 0 1845 Phone 978.688.9011 Fax 978.794.8058 Subject: Massachusetts REFUSETECH Inc. Construction Control Report #3 — Week of 4/19/99 1. Progress and Schedule Effectiveness Project Start Date: 03/01/99 Project Complete Date: 11/19/00 Actual-sii6'nio'bilization,by Pha`§&1.C6ntractOr'week of 4/5/99; Phase I co - mpletion expected -6/22/99'. Ph�*s'e­ 4-1" W i ork - '-is . e-.-xpected to start in June 1999 and end with mechanical completion during August 2000. % Complete: 1.0% Weather: Temp.: 35/56 Rain: 0.0" Snow: 0.0" 11. Delays/Problems None this period. 111. Safely All subcontractors receive site specific safety orientation. The Phase I contractor, Francis Harvey, Inc., is required to have a designated Safety Coordinator on site. To date: 0 recordable accidents; 0 lost work or lost work days IV. Inspectiofis,'OA/0C MRI and WAPC reviewed WT's Field QA/QC Inspection Log with field "Comments were made to record routine inspections, repairs and compliance "'Measures tal�en ftarding dust/erosiori control and wetlands resource - — ------ T7 areas. APR 2 9 _7 printed on recycled paper Mr. D. Robert Nicetta April 28, 1999 Page 2 Plumbing inspector onsite 4/21/99 and electrical inspector onsite 4/23/99 for construction trailer installations. Concrete sampling performed for concrete pours in metals bunker areas. Daigle Engineers Inc. of Methuen has nearly completed its first phase of work as the Independent Structural Engineer. Additional design packages are being prepared on MRI's behalf for Daigle's review. V. Permit Compliance All subcontractors receive site specific permit compliance orientation, including the Dust/Erosion Control Plan and MRI Site Resource Area restrictions. These requirements were developed as part of the local Project approval process. In accordance with No. Andover Planning Board Site Plan Approval -Special Condition 1.g., a truck turn warning sign was installed on Route 125 northbound. In accordance with No. Andover Planning Board Site Plan Approval- Special Condition Li., a Yield sign was installed for right turns from Holt Road onto Route 125. V1. Major Equipmen Construction: excavator, air compressor. Installation: none this period. V11. Subcontractors On Site No. of Employees I . ESB (Electrical) 3 2. Francis Harvey & Sons, Inc. 9 3. WT 4 V111. Construction Site Visitors None this period. IX Activities This Period 1. Preparations made for geotechnical/soils sampling. 2. Formed, installed rebar and placed concrete in area north of ash building and inside building. 3. Construction/Operations Team meeting onsite to review Execution Plan. 4. New magnet support steel erected. Mr. D. Robert Nicetta April 13, 1999 Page 3 X. Activities Next Period I . Relocate drum magnet. 2. MRI to make repairs to magnet during relocation. 3. MRI to repair/replace ferrous conveyor belt while system is off-line. 4. Complete erection of drum magnet support steel. 5. Conservation Commission representative expected. Respectfully submitted, David L. Raymond, P.E. Massachusetts Registration No. 40655 Attachments 1. Site Photos — None this period. cc: S. Emerson I Motte W. Pifer J. Williams/T. Shay S. Worster File 3.5 DLR/ns/066 MASSACHUSETTS REFUSETECH, 11VC- A WASTE MANAGEMENT COMPANY 285 Holt Road North Andover, MA 01845 (978) 688-9011 (978) 794-8058 Fax May 7,1999 Mr. D. Robert Nicetta Building Commissioner Town of North Andover 27 Charles Street North Andover, MA 0 1845 Subject: Massachusetts REFUSETECH Inc. Construction Control Report #4 — Week of 4/26/99 1. Progress and Schedule Effectiveness Project Start Date: 03/01/99 Project Complete Date: 11/19/00 Actual site mobilization by Phase I Contractor week of 4/5/99; Phase I completion expected 6/22/99. Phase 11 work is expected to start in June 1999 and end with mechanical completion during August 2000. % Complete: Weather: 11. Delays/Problems I None this period. 1.5% Temp.: 35/60 Rain: 0.0" Snow: 0.0" 111. Safely All subcontractors receive site specific safety orientation. The Phase I contractor, Francis Harvey, Inc., is required to have a designated Safety Coordinator on site. W -T field personnel enrolled in OSHA training courses. To date: 0 recordable accidents; 0 lost work or lost work days IV. Inspections 0A/QC Concrete sampling performed for concrete pours in metals bunker areas. Inspection of 480v feed for construction power was done. Erosion control measures inspection performed (see attached Report #22). L 5-1-0 &-5 y Mr. D. Robert Nicetta May 7,1999 Page 2 V. Permit Complianc All subcontractors receive site specific permit compliance orientation, including the Dust/Erosion Control Plan and MRI Site Resource Area restrictions. These requirements were developed as part of the local Project approval process. : Building Commissioner (Mr. Nicetta) was onsite 4/27/99 for observations. Construction trailer installations were reviewed with W -T. Conservation Commission representative (Ms. Martin) was onsite to 4/29/99 review Resource Area compliance. She stated that she was satisfied with the Project's compliance and noted that more than the required amount of erosion control was installed. She provided helpful suggestions to further improve the silt fence installations. A copy of MRI's document with guidelines for use of the Resource Area was given to her for information/comment. V1. Major Equipmen Construction: Lull, front-end loader. Installation: none this period. V11. Subcontractors On Site No. of Employees 1 . ESB (Electrical) 3 2. Francis Harvey & Sons, Inc. 9 3. WT 4 V111. Construction Site Visitors None this period. IX Activities This Period 1. Preparations made for demolition of north bunker walls. 2. Formed, installed rebar and placed concrete in area north of ash building and inside building; plans received for embedded plate ferrous bunker. 3. New magnet support steel erected; control panel relocation being evaluated by W -T; access steel erected. 4. Bids for Phase 11 are being evaluated. Mr. D. Robert Nicetta May 7,1999 Page 3 X. Activities Next Period I . Relocate, final positioning and wiring drum magnet. 2. MRI to make repairs to magnet during relocation. 3. MRI to repair/replace ferrous conveyor belt while system is off-line. 4. Complete installation of drum magnet. 5. Paving repairs at north gate. Respectfully submitted, Y. R7-19-4 David L. Raymond, P.E. Massachusetts Registration No. 4065 5 Attachments 1. Site Photos 2. Sample Field QC Report cc: S. Emerson J. Motte W. Pifer J. Williams/T. Shay S. Worster File 3.5 DLRJns/066 AAPictures\5-6-99-003f.jpg (local) Page I of I SUBJECT: Concrete Pushwalls for Ferrous Receiving and Grizzly—Overs Bunkers file:AAPictures\5-6-99-003f.jpg 5/7/99 AAPictures\5-6-99-005f.jpg (local) Page I of I SUBJECT: Druni Magnet for Ferrous Metal Recycling file:A:\Pictures\5-6-99-005f.jpg 5/7/99 04-3U-�� Ub:Z� �rcm- SUBJECT: Sample Field QC Report Job # 8226 Contractor FH&S Date 4/29/99 Quality Control Inspection Rej)ort # 22 1-444 r-UUU4 r-40 Location. N. Andover Drawing Reference NA Specification Reference NA Submittal Reference NA ISSUE: (For example, material characteristics, item size, location, source, gauge, voltage, etc. include as applicable equipment, materW procedures being inspected, location of same and particular characteristics being reviewed.) Weekly inspection of Erosion Control for the MIU-APC Rerrofit Prqjject in North Andover, MA. Haybales and Siltfence are inspected on a weekly basis for Cuts, rips, Tears and basic deterioration. Haybales must be new, twine must be wrapped tight and each haybale must be butted together tight and have two stakes in each one. Silt fence must be erect and properly fastened to each stake. Row of stone in front of silt fence must be kept in good condition as to not let any silt beneath the haybale or silt fence. Erosion Control inspected on 4/29/99. All silt fence and haybales are in excellent condition. Row of stone is also in good Condition. Richelle Martin, The Conservation Commission representative for this project was here and was also satisfied With The erosion control on site. FURTHER ACTION RECOMMENDED: (Include date to be completed by) Though not required, WAPOWT has decided to fasten the silt fence to the pavement with furring strips to further Prevent silt from running underneath the erosion control. This action will be performed by Whiting -Turner. Through this inspection, t&item was found to be app ently in compliance wi the drawings and specifications: L�'Ts 0 NO ;Zap Signature-�f IApector V Inspection of Corrective measures: Date: Compliance: (yes/no) (4 Z 0 CL :3 CL CL w IL z S2 U) CD - 0 U) (0) 0 0 a C.) 0 6- 10 a. 0 E 0 C0 w -41 ':' ,4 0 < :0 2 Cl) Cl) 0 0 0 Q 0 cam 0 'a % .1 %-, %-, %-� -6 CD 2 cm � -Y. 0 6 0 CL 2 CL 6 - CD "a 2 0 7, � E (D E 0 CM M 4) 0 0 E cm E cF 2 W '(D —M C 0 (D C E C.2 62 T cc E q .0 o -tic U) r to 0 0 (D r- o ME o 0 = KM M =0 mew E "0 r_ 0 tM 0 u cc 0 4) M 0%6-- E:g% M C m 00 tMor = I — U) 0 U) -0 4= U) r a) U) _,o 0. CL.LM r- CO >� E w co a m r-a 0 4) 0 -W Es ul E w o E:g — CL E 'E'O 0 > Z cc CL co o W (D 0 6- (M. CL r b M CL r- CO tM CL 0 (D m -0 Ln a) E w- d) 0-- M a M = o tM ) 2 0-- 0 CL 2 rr CL S 0 7a La- 30 .0 z CD 5- o w E 2 0 0 0 Q 0 cam 0 'a % .1 %-, %-, %-� -6 CD 2 cm � -Y. 0 6 0 CL 2 CL 6 - CD "a 2 0 7, � 0 z 0 V m 0 tM 0 c tM H -M tM V- 0 0 E m z 0 LU I -- a. w ui M 0 z z 0 a. IL LU -1 CL 2 0 L) z z CL 2 14.) LL MM 0 cm C (D 0 E "0 r_ 0 tM M L- *0 M rro 4) U) _,o 4) 0 "a 0- 2 E cc CL co o E .2 6- (M. M CL tM M U) I- r- - 0 (D L- 0 *§ L - 0 (D 0-- M 0 mm 0 = " .6-0 IX CL 2 C) co 0 0 0 z 0 V m 0 tM 0 c tM H -M tM V- 0 0 E m z 0 LU I -- a. w ui M 0 z z 0 a. IL LU -1 CL 2 0 L) z z CL 2 14.) LL �7�-A Fo --Q lz (16 L7- a I it z LLI 0 0 0 < z L) < -j IL CL F- < 0 z LL 0 W z CL z 0 - 0 tM.2) Cl) 0 0 0 CL L) 2.0 0 4) g t4 LU co Cl) X7,:: (D E E .2 = r 0 Z.5 w ii 0 E 2 0 0 CD 0 &- < 0 M 0 w1i w od a) a) 72 a) 0 -i CO 0 C-) V 0 CL 0 L - IL 4) CL %- r- 6 E :w w 3. a .2 cm 3: cc 44)) % r= -C 4) .0 E :� C o-ob E-1 r I = 0 0 1 ro=.GwQ=co>% cm — e Ch .F c -oc 8 4). a 0 52 CD 4) M w a a) W-00 M= o tM a 0 0. (D cx cL.LM r— u) co >- = E cum*@ a w 'E 0-0 0 M 0 E o a E 0 (D 0 4) Z S. E �ca tp C MM CD= CL Lft M 0 E a) r- . = 0 tp 0 CM CL "M .e c 0 IM 0 0 = 4) CL Z (D W 0- &-- 0 M E E Ij CT 0 E C4 4) CL %- r- 6 E :w w 3. a .2 cm 3: cc 44)) % r= -C 4) .0 E :� C o-ob E-1 r I = 0 0 1 ro=.GwQ=co>% cm — e Ch .F c -oc 8 4). a 0 52 CD 4) M w a a) W-00 M= o tM a 0 0. (D cx cL.LM r— u) co >- = E cum*@ a w 'E 0-0 0 M 0 E o a E 0 (D 0 4) Z S. E �ca tp C MM CD= CL Lft M 0 E a) r- . = 0 tp 0 CM CL "M .e c 0 IM 0 0 = 4) CL Z (D W 0- &-- 0 M E E Ij 0 E -62---o r- .9 1 ci O= E (D ZV a a) IM M C .! -- * ro (OD A C) C 2 a CL >, 4) CL %- r- 6 E :w w 3. a .2 cm 3: cc 44)) % r= -C 4) .0 E :� C o-ob E-1 r I = 0 0 1 ro=.GwQ=co>% cm — e Ch .F c -oc 8 4). a 0 52 CD 4) M w a a) W-00 M= o tM a 0 0. (D cx cL.LM r— u) co >- = E cum*@ a w 'E 0-0 0 M 0 E o a E 0 (D 0 4) Z S. E �ca tp C MM CD= CL Lft M 0 E a) r- . = 0 tp 0 CM CL "M .e c 0 IM 0 0 = 4) CL Z (D W 0- &-- 0 M a 0 z M 0 ,a M 0 2 CL M CP) a M 0 c E 4i w 2 CL 0 M CD 0 0 E co z ci (D M 6 LU a. LU 0 L) w aS 0 z z 0 IL CL w w CL 0 LL L) z z U) (D E a) IM M C .! -- * ro 4) C) C 2 a CL >, E CL — %` CL M o E tM.- q a. im w 4) 0 (D a 0 =0 4) ML- MW W10- a 0 a 0 z M 0 ,a M 0 2 CL M CP) a M 0 c E 4i w 2 CL 0 M CD 0 0 E co z ci (D M 6 LU a. LU 0 L) w aS 0 z z 0 IL CL w w CL 0 LL L) z z i -J 13 Qc= 4-'s- z I CL i rM.2) @ co 4- 0 0 0 CL L) 0 2 10 0- 0 4).9 u*M- CI) w :3 04- Z.G w E 0 0 0 CD 0 iT m 0�- 0 E cD E s- = >% L- 0.- cm m 0 w - E 0-0 4) C.9 E L 0. .0 CD CD 0 (D M 75 0. E -0 0 CL 0 4) tM:L- 4) .0 M 0,6 0 >, - 4) 4) -- -& 3: = .0 E CF -0 r- m m - M Lo- E 6-60 E -j w M %1.- -0 = 0 0 1 com.swv=au�l 4) m Mm c (LD 0.0 0 4) CD '§ 4) =1 = a o 0 a) o 0 cmco m 0 ca 0 0'a co -0 0 0 CL 07 ch 0 m 72 M 0 E w — 15 r ch 4) C o E 0 S m 'o C.) 4) 0 .0 4) M CL E ow aCD 0 tm E ,- 0 = 0 cm. M.0 0 C, -D r 05 a M - 4) CC -E CL 0 2 Im 0 t7 z 0 iz = " = = a CL 2 0 M Z- M 0 w cm 6 f ' V 0 < w 0 0 0 3: CL 0 :19 CD :le CD 0 &- IL :2 rr"O CD a) < 0 E cD E s- = >% L- 0.- cm m 0 w - E 0-0 4) C.9 E L 0. .0 CD CD 0 (D M 75 0. E -0 0 CL 0 4) tM:L- 4) .0 M 0,6 0 >, - 4) 4) -- -& 3: = .0 E CF -0 r- m m - M Lo- E 6-60 E -j w M %1.- -0 = 0 0 1 com.swv=au�l 4) m Mm c (LD 0.0 0 4) CD '§ 4) =1 = a o 0 a) o 0 cmco m 0 ca 0 0'a co -0 0 0 CL 07 ch 0 m 72 M 0 E w — 15 r ch 4) C o E 0 S m 'o C.) 4) 0 .0 4) M CL E ow aCD 0 tm E ,- 0 = 0 cm. M.0 0 C, -D r 05 a M - 4) CC -E CL 0 2 Im 0 t7 z 0 iz = " = = a CL 2 0 M Z- M I 4) i-,� CC 0 V m 0 0 r_ C-4 m U) .9 Z% m CL 0 CD 0 (D E cc z 0 0 LU (L LU U L) LU 0 z z 0 (L CL LU ui -j 0- 2 0 0 z z CL CL 0 MM w cm f ' c (D E cm c :2 rr"O CD a) < d: W o CD 0 — CL 0 - a 0 M s - — o.,.>, a.— 0 w o 4) E w .2 w w CL tm 0 Z- 4) 0. 0 (D :Cto:� 0: a. 2 L) OL 0 I 4) i-,� CC 0 V m 0 0 r_ C-4 m U) .9 Z% m CL 0 CD 0 (D E cc z 0 0 LU (L LU U L) LU 0 z z 0 (L CL LU ui -j 0- 2 0 0 z z CL CL 0 f -J) f ' I 4) i-,� CC 0 V m 0 0 r_ C-4 m U) .9 Z% m CL 0 CD 0 (D E cc z 0 0 LU (L LU U L) LU 0 z z 0 (L CL LU ui -j 0- 2 0 0 z z CL CL 0 I Ebl dg� C� r= FU L CA CA RIO FLn-n go 0) cD Qz ML ..... ..... , NO 1 .11011,1061. 1 ps, I Is U: : I I I I ..... SkU llsxffil i m ISR Sl s Ol APR i, Massachusetts R&LISETECH Inc. A Waste Management Company Phone 978.688.9011 285 Holt Road Fax 978.794.8058 North Andover, MA 0 1845 April 13, 1999 Mr. D. Robert Nicetta Building Commissioner Town of North Andover 27 Charles Street North Andover, MA 0 1845 Subject: Massachusetts REFUSETECH Inc. Construction Control Report #1 — Week of 4/5/99 I'miress and Schedule Effectiveness Project Start Date: 03/01/99 Project Complete Date: 12/31/00 Actual site mobilization by Phase I Contractor week of 4/5/99; Phase I completion expected 6/22/99. % Complete: 00.05% Weather: Temp.: 32/56 Rain: 0.0" Snow: 0.0" 11. Delqys/Problems Paperwork delays getting subcontractors certified under the National Maintenance Agreement. Certification process now worked out. Ill. Safety All subcontractors receive site specific safety orientation. The Phase I contractor, Francis Harvey, Inc., is required to have a designated Safety Coordinator on site. To date: 0 recordable accidents; 0 lost work or lost work days IV. Inspections Robert Heitz of Water Safety Services, Inc., was on site 4/7/99 under contract to the Town of North Andover to inspect the proposed modifications to the tie-in to the City water system. Discussions were held between MRI and the North Andover Fire�Deh �ar(, enk Po —T explain proposed modifications required to the onsite fire prote, �6n'7�sy stem. A representative of the NAFD performed an on-site inspection. i' APR 1 4 1 printed on recycled paper Mr. D. Robert Nicetta April 13, 1999 Page 2 Whiting-Tumer is monitoring excavation for bunker foundations, verifying proper placing and compaction of fill material. V. Permit Compliance All subcontractors receive site specific permit compliance orientation, including the Dust Control Plan and MRI Site Resource Area restrictions. These requirements were developed as part of the local Project approval process. Silt fences and hay bales were installed as one of the initial site activities. Construction permits were requested from the Town of North Andover including: building permit for trailers on site; installation of backflow preventors; project construction signs; and relocation of 10" fire line. VI. Major Equipment Construction: excavator, air compressor. Installation: none this period. VII. Subcontractors On Site No. of Employees A. ESB (Electrical) 3 B. North Andover Construction 4 C. Francis Harvey & Sons, Inc. 6 E. WT I VIII. Visitors None this period. IX. Activities This Period I . S/D engineers on site to verify survey data. 2. WT worked on Geo -Tech subcontract. 3. Excavated area north of ash building and inside building. 4. Installed silt fence and hay bails, north gate, east of cooling towers. 5. Set up to install back flow preventors on 4/10/99 6. Set up to install SS conveyor on 4/10/99 7. Installed craft shower trailer piping. Mr. D. Robert Nicetta April 13, 1999 Page 3 8. Met with NMAPC 4/7/99. 9. Installed crushed rock in laydown yard. 10. Removed existing CEM building power feed from 4" conduit, and installed construction power cable and CEM power cable. 11. Submitted Construction Control documentation to Town of North Andover attached . X. Activities Next Plqerti5��� (a) Form, re -bar and pour concrete inside ash building, and area north of ash building. (b) Coordinate with plant the relocation of drum magnet, temporary diverter chute, relocate vibrating conveyor. (c) Planning relocation of phosphoric acid and lime fill connections to avoid construction areas. Respectfully submitted, '-D"4 -Y. zr-4 David L. Raymond, P.E. Massachusetts Registration No. 40655 Attachments I . Site Photos 2. North Andover Construction Control Document for Building Commissioner. cc: S. Emerson J. Motte W. Pifer File 3.5. DLR/ns/058 A:\Mvc-003f.jpg (local) Page I of I Subj ect: Silt Fencing to East of Cooling Tower file:A:\Mvc-003fjpg 4/13/99 A:\Mvc-006f.jpg (local) Page I of 1 Subj ect: Metal Bunkers Excavation with Safety Barricades North of Ash Building. file:A:\Mvc-006f.jpg 4/13/99 A:\Mvc-0 I 8f.jpg (local) Page I of I Subj ect: Construction Management Office Trailer file:A:\Mvc-01 8f.jpg 4/13/99 A:\Mvc-0 I 4f.jpg (local) Page I of I Subj ect: Guard Trailer at North Plant Entrance. file:A:\Mvc-014f.jpg 4/13/99 OFFICE OF BUILDING INSPECTOR TOWN OF NORTH ANDOVER CONSTRUCTION CONTROL PROJECT NUMBER: NIA PROJECTTITLE: Massachusetts REFUSETECH-Inc. - Air Emissions Control Project PROJECT LOCATION: 285 Holt Road, North Andover, MA 01845 NAME OF BUILDING: N/A NATURE OF PROJECT: The retrofitting of new air emissions control systems, equipment and structures to an existing waste -to -energy plant. IN ACCORDANCE WITH ARTICLE 116 OF THE MASSACHUSETTS STATE BUILDING CODE, 1, David L. Raymond REGISTRATION NO. 40655 BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECH HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ENTIRE PROJECT ARCHITECTURAL 11 STRUC TURAL 11 MECHANICAL FIRE PROTECTION 0 ELECTRICAL 0 OTHER (SPECIFY) FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISION OF THE MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRATICES. AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND. OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR ANCY PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0 1. Review, for conformance to the design concept, shop drawings, samples and other submittals which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality control procedures for all code -required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become, generally familiar with, the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. PURSUANT TO SECTION 116.2.2 1 SHALL SUBMIT WEEKLY, A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE NORTH ANDOVER BUILDING INSPECTOR. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANCY. SUBSCRIBED BEFORE ME THIS r)VII'LOAY OF � SIG URE Kg-tARY PUBLIC 'MY COMMISSION EXPIRES RECEIVED APR 2 0 1999 Massachusetts REFUSETECH Inc. ,t& A Waste Management Company Phone 97B.68B.9011 286 Holt Road Fax 978.794.8058 North Andover, MA 0 1846 April 19, 1999 Mr. D. Robert Nicetta Building Commissioner Town of North Andover 27 Charles Street North Andover, MA 01845 Subj ect: Massachusetts REFUSETECH Inc. Construction Control Report #2 — Week of 4/12/99 BUILDING DEPT., 1. Progress and Schedule Effectiveness Project Start Date: 03/01/99 Project Complete Date: 11/19/00 Actual site mobilization by Phase I Contractor week of 4/5/99; Phase I completion expectdd�6/22/99-.' 6, Ph -a , s - C. I Il I Work". is 'i- e - xpected to start in June 1999 and end with mechanical completion during August 2000. % Complete: 00.10% Weather: Ternp.: 35/56 Rain: 0.5" Snow: 0.0" 11. Delays/Problems None this period. 111. Safely All subcontractors rece1ve site specific safety orientation. The Phase I contractor, Francis Harvey, Inc., is required to have a designated Safety Coordinator on site. To date: 0 recordable accidents; 0 lost work or lost work days IV. Inspections, OA/OC Soils compaction tests and concrete sampling was performed in the metals bunker &6A§trutti'6h'dtca- Pnnaed on recyclBd papet Mr. D. Robert Nicetta April 19, 1999 Page 2 Daigle Engineers Inc. of Methuen was awarded and has started work as the Independent Structural Engineer (Peer Review) in accordance with the Building Commissioner' -s requirements. V. Permit Compliance All subcontractors receive site specific permit compliance orientation, including the Dust Control Plan and MR1 Site Resource Area restrictions. These requirements were developed as part of the local Project approval process. V1. Major Eguipmen Construction: excavator, air compressor. Installation: none this period. V11. Subcontractors On Site No. of Employees 1 . ESB (Electrical) 3 2. Francis Harvey & Sons, Inc. 9 3. WT 6 V111. Construction Site Visitors None this period. IX. Activities This Period 1 . Geotechnical/soils evaluation subcontract awarded to Haley & Aldrich. 2. Formed, installed rebar and placed in concrete area north of ash building and inside building. 3. Inspected silt fence and hay bails... 4. Installed back flow preventors on 4/10/99. 5. Installed stainless steel conveyor section on 4/10/99. 6. Installed craft shower trailer piping. 7. Placed jersey barriers to protect fire protection valves. 8. Awarded "Peer Review" contract to Daigle Engineers, Inc. Mr. D. Robert Nicetta April 13, 1999 Page 3 X. Activities Next Period I Form, re -bar and pour concrete foundations inside ash building, and pushwalls in the area north of ash building. 2. Relocate drum magnet, temporary diverter chute, relocate vibrating conveyor. 3. Relocate phosphoric acid and lime fill connections to avoid construction areas. 4. Have inspection of craft shower trailer installation. 5. Evaluating bids for Phase 11 foundations. Respectfully submitted, David L. Raymond, P.E. Massachusetts Registration No. 40655 Attachments I . Site Photos —,None this period. cc: S. Emerson J. Motte W. Pifer J. Williams/T. Shay File 3.5 DLR/ns/063