Loading...
HomeMy WebLinkAboutMiscellaneous - 29 ANNE ROAD 4/30/2018 (3)309 WGIE File No. 242-339 (To be provided by DECIE) :)rth Andoy-ex--JIVI CityrTown Commonwealth ano R�al st, Of Massachusetts ApplicRnt Order of Conditions ds Protection Act M6ssachusetts Wetlan c. 131 §40. and' under the T . own -of North Andove-r Bylaw, Chapter 3.5-A & B.. ation CoTm�sio�n����� I A - A rnnsery To Paisano Realty_Trust (Name of Applicant) 436 South�Un;Lon Ste, A Ad d r e s s Albert & Gloria KnueDf-er IN erty owner) ge%y Prop 370 Sa # MA 01845 North Andovert Address eliveredasfollOws: This Order Ir issued and d (date) C3 Jby hand d . elivery to applicant or representative on r (date) 91 by certified mall, . return receipt requested on Anne Road of f Saleni -Street Sider'L—Plar-P— This project is located a North Essex The property is recorded at the RegistrY Of 393 939 Page—_-Z-1-::�. Book ---- Certificate (if registered). -2/21/86. (date) The Notice of Intent for this project was filed on 3/19/86 (date) The public hearing was ciosed on Findings va tion Com. has reviewed the above -referenced Notice of Nort;h Andover Conser 'the'information available to the The '. Based or a public'hearing on the project has determined that .Intent and plans and has held e NACC NACC at this time, th o the I;bllowing interests in accordance with the area on which the proposed work is to be done is significant t gulations for.each X?rala Subject to Protection Under the the Presumptions of Significance set forth in the re Act (check as appropriate): -vention rm damage prL Public water supply Prevention of pollution Private wat . er supply, 0' Land containing shellfish Groun . d wat6r su.PP.] . Y Fisheries Flood control. - A — 1% ILIMassachusetts Department of Environmental Protection ur au of Resource Protection - Wetlands WPA Form 8B — Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 06D A. Project Information 1. This Certificate of Compliance is issued to: 4 Robert Duffy Name P. 0. Box 221 DEP File Number: 9A9 -19 -'AR r-1Uv1UVU L)y LJL--r Mailing Address Pride Crossing MA 01965 City/Town State Zip Code This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to: Robert & Anne Duffy Name April 21, 2004 242-1238 Dated DEP File Number 3. The project site is located at: 29 Anne Road Street Address Map 37B Assessors Map/Plat Number North Andover City/Town Parcel 67 Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: Property Owner (if different) Essex North County R7Qr% A7 UVVN r-.Ivr Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: 8/10/11 wpafrm8b.doc - rev. 12/23109 Date WPA Form 8B, Certificate of Compliance - Page I of 3 L11Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 242-1238 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 -Provided by DEP_ B. Certification Check all that apply: Complete Certification: It is hereby certified that the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. El Partial Certification: It is hereby certified that only the following portions of work regulated by the above -referenced Order of Conditions have been satisfactorily completed. The project areas or work subject to this partial certification that have been completed and are released from this Order are: El Invalid Order of Conditions: It is hereby certified that the work regulated by the above -referenced Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new Notice of Intent and receiving a new Order of Conditions. Z Ongoing Conditions: The following conditions of the Order shall continue: (include any conditions contained in the Final Order, such as maintenance or monitoring, that should continue for a longer period). Condition Numbers: 65 C. Authorization Issued by: North Andover Conservation Commission wpafrm8b.doc - rev. 12123/09 Date of4ssuance This Certificate must be signed by a majority of the Conservation Commission and a copy sent to the applicant and appropriate DEP Regional Office (See http://www.mass.gov/deplabout/region/findyour.htm). Signatures: lona 4 ------------ WPA Form 813, Certificate of Compliance - Page 2 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 242-1238 L, i Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 -Provided by DEP D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. t6-: ---------------------------------------------------------------------------------------------------- North Andover Conservation Commission Please be advised that the Certificate of Compliance for the project at: 29 Anne Road Project Location Has been recorded at the Registry of Deeds of: Essex North County for: Property Owner 242-1238 DEP File Number and has been noted in the chain of title of the affected property on: Date Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: wpafrm8b.doc - rev. 12/23109 Document Number Signature of Applicant WPA Form 8B, Certificate of Compliance - Page 3 of 3 CONSERVATION DEPARTMENT Community Development Division MODIFICATION TO ORDER OF CONDITIONS 29 Anne Road, North Andover At the July 13, 2011 public hearing the North Andover Conservation Commission (NACC) voted to issue a minor modification (after the fact) to DEP File #242-1238. The Modification shaft conform to the plans and documents referenced below. Applicant: Robert & Elizabeth Duffy 29 Anne Road North Andover, MA Record Plans: Plan to Accompany Modification to Order of Conditions in North Andover, MA 0 1845, prepared for Robert Duffy, 29 Anne Road. Prepared by: Merrimack Engineering Services 66 Park Street Stamped by: Vladimir L. Nemchenok Dated: June 23,2011 Revised: July 6, 2011 Other Record Documents: Infiltration System Drainage Calculations Prepared by: Merrimack Engineering Services, Inc. Dated: June 23, 2011 — (stamped received July 7, 2011) Approved Modifications Changes to the proposed plan include construction of a boulder retaining wall and associated grading changes, construction of a settee wall, and additional patio and cabana roof areas. As mi'tigation for these after the fact changes to the plan, the NACC requires the removal of a portion of the patio which is currently located within the 50 -foot No Build Zone and infiltration of the entire roof area associated with the cabana with the installation of gutters and necessary trenching to route the roof runoff from the cabana 'into an existing infiltration system. Additional Conditions All disturbed areas shall be immediately stabilized with sod. 1600 Osgood Street, Building 20, Suite 2-36, North Andover, Massachusetts 01845 Phone 978.688.9530 Fax 978.688.9542 Web: http://-v"vxv.to-vvnofnorthandover.com/Pages/NAndo-,,erN4A—Conservation/index U VkORTH 0 0 # CONSERVATION DEPARTMENT (ommunity Development Division Modification to Order of Conditions The NORTH ANDOVER CONSERVATION COMMISSION agreed to accept Applicant: iq o � Axowe 7) o .29 14WAje, ea4d N6ka,2�;� A21-jdjveV-, n114- LjjTqs'- as a Modification to the Order of Conditions issued in File 242-) a IF dated Y recorded in Book 017 9k and page 47 — �Lllo and qSERVATION COMMISSION: -0 '064-6 of Jo -/ .2ell before me personally appeared Louis Napoli to me day m6n'th/yr known to be the person described in and who executed the forgoing instrument and acknowledged that he/she executed the same as his/her free act and deed. Notary Public wrMYPUBW COMMOMEMN OF MAMACHUSMS MYCMME*WJU�15,2016 1600 Osgood Street, North Andover, Massachusetts 01845 Phone 978.688.9530 Fox 978.688.9542 Web www.townofnorthandover.com 1 9 L11Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the retu m key. A. General Information From: -North Andover uonservation commission , This issuance if for (check one): Z Order of Conditions [] Amended Order of Conditions To: Applicant: Robert & Elizabeth Duffy Name 29 Anne Road Mailing Address North Andover MA. 01845 DEP File Number: n- A- Property Owner (if different from applicant): Same Name Mailing Address (from Appendix B: Wetland Fee Transmittal Form) Wpaform5.doc - rev. 12/15/00 Page I of 7 Cityrrown State Zip Code Cityrrown State Zip Code I . Project Location: 29 Anne Road North Andover Street Address City[Town Map 37B Parcel 67 Assessors Map/Plat Number Parcel/Lot Number 2. Property recorded at the Registry of Deeds for: Essex North 6261 219 County Book Page Certificate (if registered land) 3. Dates: 3/11/04 4/14/04 4/21/04 - Date Notice of Intent Filed Date Public Hearing Closed Date of Issuance 4. Final Approved Plans and Other Documents (attach additional plan references as needed): NOI March 2004 Title Date Site Development Plan of Land 6/30/03 last Title revised 4/5/04 Swimming Pool, Duffy Residence 10/17/03 last Title revised 4/2/04 5. Final Plans and Documents Signed and Stamped by: Daniel Koravos, P. E. Name 6. Total Fee: $55 (from Appendix B: Wetland Fee Transmittal Form) Wpaform5.doc - rev. 12/15/00 Page I of 7 L11 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings Findings pursuant to the Massachusetts Wetlands Protection Act: DEP File Number: 242-1238 Provided by DEP Following the review of the above -referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: Z Public Water Supply Z Private Water Supply Z Groundwater Supply F� Land Containing Shellfish 0 Fisheries Z Storm Damage Prevention Z Prevention of Pollution a Z Protection of Wildlife Habitat Z Flood Control Furthermore, this Commission hereby finds the project, as proposed, is: (check one of the following boxes) Approved subject to: Z the following conditions which are necessary, in accordance with the performance standards set forth in the wetlands regulations, to protect those interests checked above. This Commission orders that all work shall be performed in accordance with the Notice of Intent. referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: F� the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations to protect those interests checked above. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. F_� the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CIVIR 10.05(6)(c). General Conditions (only applicable to approved. projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. Wpaform5,doc - rev. 12/15/00 Page 2 of 7 L11Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 242-1238 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Findings (cont.) 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, WA DEP"] "File Number 242-1238 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A) to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition #12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. Wpaform5.doc - rev. 12/15/00 Page 3 of 7 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 242-1238 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Findings (cont.) 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. ' 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. Findings as to municipal bylaw or ordinance Furthermore, the North Andover Conservation Commission hereby finds (check one that applies): that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: Municipal Ordinance or Bylaw Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. Z that the following additional conditions are necessary to comply with a municipal ordinance or bylaw, specifically: -North Andover Wetland Protection Bylaw Chapter 178 Municipal Ordinance or Bylaw Citation The Commission orders that all work shall be performed in accordance with the said additional conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. Wpaform5.doc - rev. 12/15/00 Page 4 �f 7 DEP FILE # 242 - 1238 Therefore, the North Andover Conservation Commission (hereafter the "NACC") hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced below. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. GENERAL CONDITIONS 18. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 19. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of property rights. However, the NACC, agent of the NACC or the Department of Environmental Protection (DEP) reserves the right to enter and inspect the property at all reasonable times until a Certificate of Compliance is issued, to evaluate compliance with this Order of Conditions, the Act (310 CMR 10.00), the North Andover Wetland ByLaw. and Regulations, and may require any information, measurements, photographs, observations, and/or materials, or may require the submittal of any data or information deemed necessary by the NACC for that evaluation. Further, work shall be halted on the site if the NACC, agent or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the NACC is satisfied that the work will comply and has so notified the applicant in writing. 20. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by- laws or regulations. 21. The work authorized hereunder shall be completed within three years from the date of this order. 22. This Order may be extended by the issuing authority for one or more periods of up to one year each upon application to the issuing authority at least thirty days (30) prior to the expiration date of the Order (Refer to Section 8.3 of the North Andover Wetland Regulations). C:\Winword\OOC\242-1238/29AnneRd.doc NACC 4/21/04 DEP FILE # 242 - 1238 23. The NACC reserves the right to amend this Order of Conditions after a legally advertised public hearing if plans or circumstances are changed or if new conditions or information so warrant. 24. Where the Department of Environmental Protection (DEP) is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 25. The conditions of this decision shall apply to, and be binding upon, the applicant, owner, its employees and all successors and assigns in interest or control. These obligations shall be expressed in covenants in all deeds to succeeding owners of portions of the property. 26. The term "Applicant" as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The NACC shall be notified in writing within 30 days of all transfers of title of any portion of property that takes place prior to the issuance of a Certificate of Compliance. 27. The proposed work includes: Construction of an inground pool, associated patio, walls, cabana, fencing, and grading and utilities within the buffer zone to a bordering vegetated wetland. 28. The work shall conform to the following (except as noted in the remainder of this document where revisions may be required): Notice of Intent filed by: Prepared by: Robert & Elizabeth Duffy 29 Anne Road North Andover, MA 01845 Dated March 2004 Merrimack Engineering Services, Inc. 66 Park Street Andover, MA 01810 Site Plans Entitled: Site Development Plan of Land Dated June 31, 2003, Last Revised 4-5-04 Stamped and signed by Daniel Koravos, P.E. Prepared by: Supplemental Landscaping Plans Merrimack Engineering Services 66 Park Street Andover, MA 01810 C:\Winword\OOC\242-1238/29AnneRd.doc NACC 4/21/04 DEP FILE # 242 - 1238 Prepared by: Additional record documents: Frank Todd & Associates 303 Main Street, Box 326 Rowley, MA 01969 Entitled "Swimming Pool, Duffy Residence" Dated 10/17/03, last Revised 4/02/2004 Stamped and signed by Frank P. Todd Pool filter system description and specifications — System: 3 Modular Media Model #SSM450 by Sta-Rite. 29. The following wetland resource areas are affected by the proposed work: Buffer zone to a bordering vegetated wetland. These resource areas are significant to the interests of the Act and Town ByLaw as noted above and therein. The applicant has not attempted to overcome the presumption of significance of these resource areas - to the identified interests. 30. The NACC agrees with the applicant's delineation of the wetland resource areas on the site as shown on the plans dated referenced herein. Off property wetland flags 9A, 10A, 11A, 12A, & 13A are not approved under this filing. These flags were added to the record plan following wetland confirmation. 31. The NACC finds that the intensive use of the upland areas and buffer zone proposed on this site will cause.further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas a twenty-five foot (25') No -Disturbance Zone and a fifty -f oot (501 No -Construction Zone shall be established from the edge of the adjacent wetland resource area. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established tinder the local bylaw. No disturbance of existing grade, soils or vegetation is permitted in the No -Disturbance zone. (See Section 3.4 & Appendix F of the local Regulations). 32. This document shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors, and other personnel performing the permitting work are fully aware of the permits terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order resulting from failure to comply with its conditions. 33. Issuance of these Conditions does not in any way imply or certify that the site or downstream areas will not be subject to flooding, storm damage or any other form of water damage. C:\Winword\OOC\242-1238/29AnneRd;doc 3 NACC 4/21/04 DEP FILE # 242 - 1238 11 PRIOR TO CONSTRUCTION 34. No work shall be undertaken until all administrative ' appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department or Court have been completed. 35. This Order shall be recorded by the applicant at the Registry of Deeds immediately after the expiration of all appeal periods. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the North Andover Conservation Commission on the form at the end of this Order prior to commencement of the work. Any Order not recorded by the applicant before work commences may be recorded by the NACC at the applicant's expense. 36. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words "Massachusetts DEP, File Number 242-1238. 37. Any changes in the submitted plans caused by the applicant, another Board's decision or resulting from this Order of Conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds said changes to be significant, the NACC will call for another public hearing (at the expense of the applicant). Within 21 days of the close of said public hearing the NACC will issue an amended or new Order of Conditions. Any errors found in the plans or information submitted by the applicant shall be considered as changes. The proposed project may be still under review by other local or state boards or agencies. This may result in changes to the project plans or wetland impacts. If any such changes occur a revised plan and an explanation of the revisions shall be submitted to the NACC for review and approval prior to the start of construction. No work shall begin on a project until written approval has been granted by the NACC. 38. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all conditions of this Order of Conditions are complied with. The project engineer and contractors are to be provided with a copy of this Order of Conditions and referenced documents before commencement of construction. 39. Prior to any work commencing on-site, the applicant shall submit to the NACC for approval, a detailed sequence of construction, including the construction of C:\Winword\OOC\242-1238/29AnneRd.doc 4 NACC 4/21/04 .DEP FILE # 242 - 1238 compensation and retention areas, installation of sedimentation/ erosion control devices and re -vegetation to be completed before other work begins on-site. 40. Wetland flagging shall be checked prior to start of construction and shall be re- established where missing. All wetland flagging shall remain visible and enumerated per the approved plan(s) throughout the life of the project and until a Certificate of Compliance is issued so that erosion control measures can be properly placed and wetland impacts can be monitored. The proposed limit of work shall be shall be clearly marked and shall be confirmed by the NACC. Wetland flagging shall be checked and replaced as, necessary and shall be maintained until all construction is complete. Workers should be informed that no use of machinery, storage of machinery or materials, stockpiling of soil, or construction activity is to occur beyond the approved erosion control limit at any time. 41. A row of staked hay bales backed by trenched siltation fence shall be placed between all construction areas and wetlands. The erosion control barrier will be properly installed and placed as shown on the plans approved and referenced herein and shall be inspected and approved by the NACC prior to the start of construction. Said erosion controls shall remain intact until all disturbed areas have been permanently stabilized to prevent erosion. All erosion prevention and sedimentation protection measures found necessary during construction shall be implemented at the direction of the NACC. The NACC reserves the right to impose additional conditions on. portions of this project to mitigate any impacts which could result from site erosion, or any noticeable degradation of surface water quality discharging from the site. For example, installation of erosion control measures may be required in areas not shown on the plan(s) referenced in this Order of Conditions. Should such installation be required by the NACC, they shall be installed within 48 hours of the Commission's request. 42. The 50-f oot No -Construction boundary shall be staked and clearly marked by a surveyor every 30 feet. The applicant shall be responsible for ensuring that the hired contractor is fully aware of the 50 -foot No -construction setback. 43. The applicant shall have on hand at the start of any soil disturbance, removal or stockpiling, a minimum of 15 hay bales and sufficient stakes for staking these bales (or an equivalent amount of silt fence). Said bales shall be used only for the control of emergency erosion problems and shall not be used for the normal control of erosion. 44. A check payable to the Town of North Andover shall be provided in the amount of $2000, which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the NACC, and shall be posted with the North Andover Town Treasurer through the NACC before commencement of work. Said deposit of money shall be C:\Winword\OOC\242-1238/29AnneRd.doc NACC 4/21/04 DEP FILE # 242 - 1238 conditioned on the completion of all conditions hereof, shall be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall be released after completion of the project, provided that provisions, satisfactory to the NACC, have been made for performance of any conditions which are of continuing nature. The applicant may propose a monetary release schedule keyed to completion of specific portions of the project for the NACC's review and approval. This condition is issued under the authority of the local ByLaw. 45. The applicant shall designate a Wetland Scientist as an "Erosion Control Monitor" to oversee any emergency placement of controls and regular inspection or replacement of sedimentation control devices. The name and phone number of the erosion control monitor must be provided to the NACC in the event that this person has to be contacted, due to an emergency at the site, during any 24-hour period, including weekends. Proof of the retained monitor must be submitted to the Conservation Department on letterhead by the retained consulting firm. This person shall be given the authority to stop construction for erosion control purposes. The erosion control monitor will be required to inspect all such devices and oversee cleaning and the proper disposal of waste products. Cleaning shall include removal of any entrapped silt. At least once during each week in which construction activities occurs on-site and for as long thereafter as ground remains unstabilized, the applicant shall submit a written report from the "Erosion Control Monitor" to the NACC certifying that, to the best of his/her knowledge and belief based on a careful site inspection, all work is being performed in compliance with this Order of Conditions and that approved setbacks are being adhered to. The erosion control monitor must visually inspect all sedimentation/erosion control measures and assume responsibility for their maintenance on a weekly basis and that they are functioning as intended. In addition, all wetland resource areas must be visually inspected for siltation, turbidity, and/or other water quality impacts. 46. Prior to construction, the applicant shall permanently mark the edge of the "25' No - Disturbance Zone" with signs or markers spaced evenly every 25 feet incorporating the following text- "'Protected Wetland Resource Area". This will designate their sensitivity and assure no further inadvertent encroachment into the wetland. These permanent markers are available at the Conservation Office for $2 apiece and are subject to review and approval by the NACC. The applicant shall instruct all agents to explain these markers to buyers/ lessees/ landscapers and all persons taking over the property from the applicant. 47. The applicant and/or the legal owner of that portion of land upon which these Orders of Conditions have been placed shall provide to the NACC prior to transferring, or assigning any portion of said land to another party, subject to said Orders of Conditions, the "Compliance Certification Form Affidavit" attached via "Appendix A" signed under the pains and penalties of perjury, statirig that said C:\Winword\OOC\242-1238/29AnneRd.doc NACC 4/21/04 DEP FILE # 242 - 1238 applicant and/or owner has read these Orders of Conditions and is in compliance with each and every condition. This document shall apply to each of the conditions referenced herein and shall be provided to the Conservation Department at least five (5) business days prior to the closing of said land transaction. 48. Once these above mentioned pre -construction requirements are complete, the applicant shall contact the Conservation Office prior to site preparation or construction to arrange an on-site conference with an NACC representative, the contractor, the engineer, wetland scientist and the applicant to ensure that all of the Conditions of this Order are understood and all pre -construction conditions have been satisfied. This Order shall be included in all construction contracts, subcontracts, and specifications dealing with the work proposed and shall supersede any conflicting contract requirements. The applicant shall assure that all contractors, subcontractors and other personnel performing the permitted work are fully aware of the permit's terms and conditions. Thereafter, the contractor will be held jointly liable for any violation of this Order of Conditions resulting from failure to comply with its conditions. The applicant or contractor shall notify the NACC in writing of the identity of the on-site construction supervisor hired to coordinate construction and to ensure compliance with this Order. A reasonable period of time shall be provided as notice of the pre -construction meeting (e.g. 72 hours) DURING CONSTRUCTION 49. Upon beginning work, the applicant shall submit written progress reports every month detailing what work has been done in or near resource areas, and what work is anticipated to be done over the next period. This will update the construction sequence. 50. Any de -watering activities anticipated for the pool excavation shall be supervised and witnessed by the designated erosion control monitor. This designee must be on-site while work specific to dewatering is complete. De -watering activities shall be monitored daily by the erosion control monitor to ensure that sediment laden water is appropriately settled prior to discharge toward the wetland resource areas. No discharge of water is allowed directly into an area subject to jurisdiction of the Wetlands Protection Act and/or the North Andover Wetland ByLaw. If emergency de -watering requirements arise, the applicant shall submit a contingency plan to the Commission for approval, which provides for the pumped water to be contained in a settling basin, to reduce turbidity prior to discharge.into a resource area. 51. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire C:\Winword\OOC\242-1238/29AnneRd.doc 7 NACC 4/21/04 0 1 DEP FILE # 242 - 1238 ,lath , paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts on any of the foregoing. 52. No exposed area shall remain unfinished for more than thirty (30) days, unless approved by the NACC. 53. No re -grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical). Slopes of steeper grade shall be rip -rapped to provide permanent stabilization. 54. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of any resource area. Soil materials shall be stockpiled in the location as depicted on the approved plan unless otherwise approved by the Conservation Administrator. 55. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage system, or wetland resource area. 56. Pool water shall not be discharged towards wetland resource areas. If discharging is necessary, the applicant must install a drywell greater than 50 feet from the wetland resource area to handle the discharged waters. 57. All waste generated by, or associated with, the construction activity shall be contained within the construction area, and away from any wetland resource area. There shall be no burying of spent construction materials or disposal of waste on the site by any other means. The applicant shall maintain dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials off-site. However, no trash dumpsters will be allowed within 50' of areas subject to protection under the Act or local ByLaw. 58. Accepted engineering and construction standards and procedures shall be followed in the completion of the project. 59. During and after work on this project, there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. If there is a spill or discharge of any pollutant during any phase of construction the NACC shall be notified by the applicant within one (1) business day. No construction vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. 11 AFTER CONSTRUCTION I C:\Winword\OOC\242-1238/29AnneRd.doc NACC 4/21/04 . 4 DEP FILE # 242 - 1238 60. No underground storage of fuel oils shall be allowed on any lot within one -hundred (100) feet of any wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the' Town's Wetland protection ByLaw. 61. Fertilizers utilized for landscaping and lawn care shall be slow release, low -nitrogen types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides and herbicides shall not be used within 100 feet of a wetland resource area. This condition shall survive this Order of Conditions and shall run with the title of the property. This condition is issued under the authority of the Town's Wetland Protection ByLaw and shall remain in perpetuity. 62. Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done either by loaming and seeding according to SCS standards. If the latter course is chosen, stabilization will be considered complete once vegetative cover has been achieved. 63. Upon complete stabilization of the site, erosion controls shall be removed and disposed off properly. All unstabilized areas under the erosion controls shall be seeded immediately. 64. Upon completion of the project the applicant shall submit the following to the Conservation Commission as part of a request for a Certificate of Compliance: a. WPA Form 8A — "Request for a Certificate of Compliance." b. A letter from the applicant requesting a Certificate of Compliance. c. The name and address of the current landowner. d. Signed statements from the individual property owners shall be submitted with the request for a Certificate of Compliance indicating that they read and understood the recorded Order of Conditions prior to purchasing their property. e. The name and address of the individual/ trust or corporation to whom the compliance is to be granted. f. The street address and assessor's map /parcel number for the project. g. The DEP file number. h. A written statement from a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth certifying that the work has been conducted as shown on the plan(s) and documents referenced above, and as conditioned by the Commission. i,. An "As -Built" plan prepared and signed and stamped by a Registered Professional Civil Engineer (and/or Registered Professional Land Surveyor) of the Commonwealth, for the public record. This plan will include: C:\Winword\OOC\242-1238/29AnneRd.doe NACC 4/21/04 DEP FILE # 242 - 1238 > "As -Built" post -development elevations and grades of all filled or altered wetland resource areas including the encompassing buffer zone, which is regulated as a resource area under the local Wetland Protection Bylaw. Distances from structures to wetland resource areas. Structures include (but are not limited to) septic systems, additions, fences, sheds, stonewalls, pools, retaining walls, subsurface utilities and decks. A line showing the limit of work and the extent of existing erosion control devices. "Work" includes �Lny disturbance of soils or vegetation. 65. The following special conditions shall survive the issuance of a Certificate of Compliance (COC) for this project: 25' No -Disturbance Zone and a 50' No -Construction Zone shall be established from the edge of adjacent wetland resource areas. Future work within 100' of existing wetland resource areas will require a separate filing with the NACC. The Conservation Administrator and/or other agents of the NACC do not have the authority to waive these setbacks as established under the local ByLaw; Pool waters shall not be discharged towards wetland resource areas (Condition #56) )�> Discharge or spillage of pollutants (Condition #59); );;� Prohibition of underground fuels (Condition #60); Limitations on the use of fertilizers, herbicides and pesticides (Conditions #61). C:\Winword\OOC\242-1238/29AnneRd.doc 10 NACC 4/21/04 1 6 DEP FILE # 242 - 1238 APPENDIX A - AFFIDAVIT 1, on oath do hereby depose and state: (authorized agent applicant and/or current owner) (PLEASE CHECK AT LEAST ONE BLOCK) I am the (position with applicant) (applicant name or company name) the applicant upon whom Order of Conditions have been placed upon by (DEP or NACC number) the North Andover Conservation Commission. 2. 1 am the Wor of (position with owner) (owner name) the owner upon whose land Order of Conditions have been placed up by (DEP or NACC number) the North Andover Conservation Commission. 3. 1 hereby affirm and acknowledge that I have received said Order of Conditions and have read the same and understand each WEP File #) and every condition which has been set forth in said Order of Conditions. 4. 1 hereby affirm and acknowledge that on this day of - 19 1 inspected said property together with any and all improvements which have been made to the same and hereby certify that each and every condition set forth in Order of Conditions are presently in compliance. WEP File #) 5. 1 hereby affirm and acknowledge that this document will be relied upon by the North Andover Conservation Commission as well as any potential buyers of said property which is subject to said Order of Conditions (DEP File #) Signed under the pains and penalties of perjury this - day of 19 (Signature - authorized agent of applicant or owner) C:\Winword\OOC\242-1238/29AnneRd.doc I I NACC 4/21/04 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 242-1238 LI I Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Findings (cont.) Additional conditions relating to municipal ordinance or bylaw: See attached This Order is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions #4 from the date of issuance. h" Date" This Order must be signed by a majority of the Conservation Commission. The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office (see Appendix A) and the property owner (if differe Sigi On Iq Day before me personally appeared 1- 4! Of A �) r j, I Month afid Year to me known to be the person described in and who executed the acknow dged that he/she executed the same as his/her free act d D ARY G - Ai*7-20 14otary Public My commi 0 This Order is issued to the applicant as follows: E] by hand delivery on Date by certified mail, return receipt requested, on V/9 I Date Wpaform5,doc - rev. 12115/00 Page 5 of 7 % 4 I Massachusetts Department of Environmental Protection .L) J Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 5 - Order of Conditions 242-1238 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP C. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Appendix E: Request of Departmental Action Fee Transmittal Form, as provided in 310 CIVIR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131, § 40) and is inconsistent with the wetlands regulations (310 CIVIR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. D. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of Form 5 shall be submitted to the Conservation Commission listed below. North Andover Conservation Commission Wpaform5:doc - rev. 12/15100 Page 6 of 7 4 L a L11Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 242-1238 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP U. Recording Information (cont.) Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. --------------------------------------------------------------------------------------------------------------------------- To: North Andover Conservation Commission Please be advised that the Order of Conditions for the Project at: 242-1238 Project Location DEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant Wpaform5.doc - rev. 12/15/00 Page 7 of 7 a , A L11Massachusetts Department of Environmental Pro tection Bureau of Resource Protection - Wetlands WPA Appendix E — Request for Departmental Action Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 00----h VSLII—b4i A. Request Information 1. Person or party making request (if appropriate, namo the citizen group's representative): Name Mailing Address City/Town State Zip Code Phone Number Fax Number (if applicable) Project Location Mailing Address Cityrrown State Zip Code 2. Applicant (as shown on Notice of Intent (Form 3), Abbreviated Notice of Resource Area Delineation (Form 4A); or Request for Determination of Applicability (Form 1)): Name Mailing Address City/Town State Zip Code Phone Number Fax Number (if applicable) 3. DEP File Number: B. Instructions 1 . When the Departmental action request is for (check one): F� Superseding Order of Conditions [—] Superseding Determination of Applicability E] Superseding Order of Resource Area Delineation Send this form and check or money order for $50.00, payable to the Commonwealth of Massachusetts to: Department of Environmental Protection Box 4062 Boston, MA 02211 wpaform5.doc - Appendix E - rev. 3/24/04 Page I of 2 " 4% L11 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Appendix E — Request for Departmental Action Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Instructions (cont.) 2. On a separate sheet attached to this form, state clearly and concisely the objections to the Determination or Order which is being appealed. To the extent that the Determination or Order is based on a municipal bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. 3. Send a copy of this form and a copy of the check or money order with the Request for a Superseding Determination or Order by certified mail or hand delivery to the appropriate DEP Regional Office (see Appendix A). 4. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. wpaform5.doc - Appendix E - rev. 3/24/04 Page 2 of 2