Loading...
HomeMy WebLinkAboutMiscellaneous - 32 BOSTON HILL ROAD 4/30/2018 -� 0/BOSTON HILL ROAD 210/107.&0071-0000.0 i+� ., �- j /� G D�a--�%cam. o �` �-�. SYS7��� % h e'`"._ .-''`�� s North Andover Community Blood Drive Monday _ Htli7 T'y � Pools & Septic Systems # HD-0Z Why do 1 need this approval? Unless the These setbacks include all parts of the pool, such Board of Health approves the location of the as fences, decks, cement walkways and grading. proposed pool, the Building Department will not How do I do this? To start the process you issue a building permit. The Board of Health must first go to the Building Department and reviews all applications for residential pools that apply for a permit to install a pool. You will pay are proposed for sites with septic systems to a fee and receive some paperwork. You will make sure that the pool is not being placed on have to go through the Conservation top of the septic system components, on or in Commission if you have wetlands on or near the leach area or on or in the reserve area. In your property. It is always wise to check with addition there are certain setbacks to the septic the Conservation Department whenever you system and any well on site that must be are planning an outside project that will result maintained. in excavation of soil or removal of trees. You can' at the same time you are working with What do I need? For the Health Department Conservation, submit your paperwork to the review you will need the following documents: Health Department for review and approval. If • Scaled plot plan with house and septic there is a problem with the application or if system accurately located; information is missing, you will be contacted • Plan location of your proposed pool at and asked to supply additional paperwork or the correct scale added to the plot plan clarify something on your application. A final If you do not have this information in your own approval and issuance of a building permit will files, the Board of Health may be able to help you depend on the approval of all pertinent by providing a copy of your septic As-Bui/tplan. departments. Who do I see? To obtain a copy of your As-Built (the plan that shows your lot, house and septic Other References: system as it was built,you may request a copy to be made at the Health Department if one is on file. If you cannot obtain a scaled copy,you may • 310 CMR 15.000 of the State want to request that your septic tank pumper Environmental Code, Title 5 come out and locate the septic system (Download a copy online at components. A Civil Engineer may also locate www.state.ma.us/dep/brWwwm/t the system and can then prepare a certified plot 5pubs.htm) plan. Once you have the plot plan and are ready to site the pool, there are a few rules you need to . Town of North Andover Minimum cep in mind. They are: Requirements for the Subsurface • In-ground pools must be at least 20 feet Disposal of Sanitary Sewage from the septic system leach area and at ast ]Of .the-septic-ta • Aboveground pools must be at least 10 • #CD-01 Notice of Intent (NOI) feet from both the leach area and the brochure � se tic tank. If there is a well on the property, regardless of . #PD-01 Watershed Permit brochure the well's use, then: • Both types of pools must be at least 15 feet from the well. Town of North Andover Health Department- Community Development &Services Division This brochure is intended as education of the local permitting process only. It does not cover a//jurisdictions or,e,:­, f. scenarios that your permit application maybe subject to: Permit applications are site specific.