HomeMy WebLinkAboutMiscellaneous - 345 BERRY STREET 4/30/2018 (3)w
ON
Ir
�1
m
I
FMassachusetts department of Environmentai Protection DEP File Number
Bureau of Resource Protection - Wetlands
242-964
WPA Form 5 - Order of Conditions for DEP use only
and North Andover Wetland
Massachusetts Wetlands Protection Act M. G7. C. 131, 540 protection Bylaw.
J Applicant information
From:
NORTH ANDOVER
Consevation Commission
For:
242-964
Projea File NumGa-
To:
Daniel & Jeanmarie Goudreault
Applicant Name
345 Berry Street
Mailing Address
North Andover, MA 01845
CitylTown
State Zip Code
The project site is located at:
NORTH ANDOVER
City/(own
108C 5A
Assessors MaD/Pla-t f
ParcelAot A
and the property is recorded at the Registry of Deeds for:
Essex 1918 24
Couay Book faire
Cati(trte (ifregivffnJ land)
Findinas
Findings pursuant to the Massachusetts Wetlands
Protection Act:
Following the review of the above -referenced Notice of Intent
and based on the information provided in this application and
presented at the public hearing, this commission finds that the
area in which work is proposed is significant to the following
interests of the Wetlands Protection Act (check all that apply):
* Public Water Supply
Q Private Water Supply
9f Groundwater Supply
9 Flood Control
❑ Land Containing Shellfish
F—VFisheries
�LStorm Damage Prevention
2f Prevention of Pollution
L(Protection of Wildlife Habitat
The Notice of Intent for this project was filed on:
May 21, 1999
Date
The public hearing was closed on:
,June 2, 1999
Date
Title and Date of final Plans and Other Documents:
pey yyi + Si � P(a..r) -6r --� +5 fru Sf.
� a�?J^ 1-7, I c 1P re -D by
_� 6-n U t -K any . i� Ssec�a e S
Furthermore, this Commission hereby finds that the project, as
proposed, is:
(check one of the following boxes)
Approved subject to:
L/the following conditions which are necessary, in accordance
with the performance standards set forth in the wetlands
regulations, to protect those interests checked above. This
Commission orders that all the work shall be performed in
accordance with the Notice of Intent referenced above, the
following General Conditions, and any other special
conditions attached to this Order. To the extent that the
following conditions modify or differ from the plans,
specifications, or other proposals submitted with the Notice
of Intent, these conditions shall control.