Loading...
HomeMy WebLinkAboutMiscellaneous - 35 FERNVIEW AVENUE 4/30/2018 (2)ti� T N m w z Q < z c m h c I-tou�(X,)6 �t�vG ,�aYv�S S's It It 1 � rv�n 5 S ViTo �C pi 01 vie jo 15, ,3 - 15 -T[--)(SHOO -(e)- P I - 15 -Fl� U01T -/- vk?lr-b, Page -7- Order of Conditions Lots 2,3,4,5,6 and 12 Chestnut Street and Turnpike DEQE X1242-446 32. Upon completion of construction and grading, all disturbed areas located outside resource areas shall be stabilized permanently against erosion. This shall be done either by sodding, or by loaming, seeding, and mulching. according to Soil Conservation Service standards. If the latter course is chosen, stabilization will be considered once the surface shows complete vegetative cover has been achieved. 33. No exposed area shall remain unfinished for more than thirty (30) days, unless approved by the NACC or its agent. 34. After proper grading, all disturbed areas located within a resource area which will not remain as wetland areas, shall. be loamed and seeded with not less than four (4) inches of good quality loam. Before seeding, ground limestone shall be applied at a rate sufficient to bring the soil test to pH 6.5. In addition, 10-6-4 fertilizer, or its equivalent, shall be applied at a rate of fifteen (15) pounds per one -thousand square feet, in accordance with Soil Conservation Service guidelines. All disturbed areas located within wetland resource'areas which are to only temporarily disturbed during construction, shall be restored to their original grade using as topsoil the original wetland soil, soil removed from other permanently filled wetlands, or at least four (4) inches of good quality loam, and then be seeded or planted with compatible wetland species and mulched with hay. 35. All erosion prevention and sedimentation protection measures found necessary during construction by the NACC will be implemented at the direction of the NACC. 36. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of any resource area. 37. During and after work on this project, there shall be no discharge or spillage of fuel, oil, or other pollutants into any wetland resource area. If during ,any phase of site preparation, construction, or clean-up, there is an un- intentional spill or discharge of any fuel, oil, or other pollutant, the NACC shall be notified by the applicant as soon as practical. No vehicles are to be stored within 100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance is to be done within 100 feet of a resource area. 38. Washings from concrete trucks, or surplus concrete, shall not be directed to, or dumped in, any drainage system or wetland resource area. a) LL 4- 0 (1) i= C 0 N L ru 0 6 c f c a c O Q 0 u 0 w 0 m H °c. L a CL CL c O O � C m O `7 �GQ F- G Q O O U O D c , i, (U CL a� 0 Cn c m c O V) E O u C: O 5 L a� C: 0 U I ra O m