Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miscellaneous - 350 FOREST STREET 4/30/2018 (3)
Town of North Andover Office of the Zoning Board of Appeals Community Development and Services Division 27 Charles Street North Andover, Massachusetts 01845 D. Robert Nicetta Telephone (978) 688-9541 Fax (978) 688-9542 Building Commissioner H W �r Any appeal shall be filed Notice of Decision =-5- —� -: within (20) days after the Year 2003 = o date of filing of this notice NJ --' C: in the office of the Town Clerk. Property at: 350 Forest Street -0 `' > NAME: James M. & Anna B. Logan HEARING(S): March 11 & ApFM16, ,,, CD 2003 ^ T r ADDRESS: 350 Forest Street PETITION: 2003-010 - North Andover, MA 01845 TYPING DATE: April 23, 2003 The North Andover Board of Appeals held a public hearing at its regular meeting on Wednesday, at 7:30 PM upon the application of James M. & Anna B. Logan, 350 Forest Street, North Andover requesting a Variance from Section 7, Paragraph 7.3 and Table 2 for relief of right and left side setbacks on a pre-existing, non -conforming lot; and a Special Permit from Section 9, Paragraph 9.2 in order to build a proposed deck on the existing house and a proposed utility shed on a pre-existing, non- conforming lot. The said premise affected is property with frontage on the East side of Forest Street within the R-1 zoning district. The following members were present: Walter F. Soule, Robert P. Ford, John M. Pallone, Ellen P. McIntyre, George M. Earley, and Joseph D. LaGrasse. Upon a motion made by Ellen P. McIntyre and 2°d by Joseph D. LaGrasse, the Board voted to GRANT the request for a dimensional Variance from Section 7, Paragraph 7.3 and Table 2, for 2.5' from the West side setback and 13' from the East side setback; and a Special Permit from Section 9, Paragraph 9.2 in order to construct a deck on the existing house and a utility shed on a pre-existing, non- conforming lot per Plot Plan of 350 Forest Street, North Andover, MA land of James M Logan & Anna B. Logan by Peter J. Kane, Professional Land Surveyor #38381, Kane Land Surveyors, 72 Hamilton Avenue, South Hamilton, MA, dated Sept. 5, 2002, rev. no. 2 11.27.02 proposed deck & shed, and rev. no. 3 4.24.03. Voting in favor: Robert P. Ford, John M. Pallone, Ellen P. McIntyre, George M. Earley, and Joseph D. LaGrasse. The Board finds that the applicant has satisfied the provisions of Section 10, Paragraph 10.4 of the zoning bylaw and that the granting of this variance will not adversely affect the neighborhood or derogate from the intent and purpose of the zoning bylaw; and Section 9, Paragraph 9.2 of the zoning bylaw and that such change, extension or alteration shall not be substantially more detrimental than the existing structure to the neighborhood. Furthermore, if the rights authorized by the Variance are not exercised within one (1) year of the date of the grant, it shall lapse, and may be re-established only after notice, and a new hearing. Furthermore, if a Special Permit granted under the provisions contained herein shall. be deemed to have lapsed after a two (2) year period from the date on which the Special Permit was granted unless substantial use or construction has commenced, it shall lapse and may be re-established only after notice, and a new hearing. Town of North Andover Board of Appeals, Walter F. Soule, Vice Chairman Decision 2003-010 Board of Appeals 978-688-9541 Building 978-688-9545 Conservation 978-688-9530 Health 978-688-9540 Planning 978-688-9535 Town of North Andover Office of the Zoning Board of Appeals Community Development and Services Division 27 Charles Street . • --. 4 North Andover, Massachusetts 01845 'Ssgemus% D. Robert Nicetta Telephone (978) 688-9541 Building Commissioner Fax (978) 688-9542 w CZ11. Any appeal shall be filed Notice of DecisionCD —+ within (20) days after the Year 2003 date of filing of this notice lv :' G, in the office of the Town Clerk. Property at: 350 Forest Street -fl NAME: James M. & Anna B. Logan HEARINGS March 11 & A rj j16 `J HEARING(S): arcP � 2003 r r ADDRESS: 350 Forest Street PETITION: 2003-010 North Andover, MA 01845 TYPING DATE: April 23, 2003 - The North Andover Board of Appeals held a public hearing at its regular meeting on Wednesday, at 7:30 PM upon the application of James M. & Anna B. Logan, 350 Forest Street, North Andover requesting a Variance from Section 7, Paragraph 7.3 and Table 2 for relief of right and left side setbacks on a pre-existing, non -conforming lot; and a Special Permit from Section 9, Paragraph 9.2 in order to build a proposed deck on the existing house and a proposed utility shed on a pre-existing, non- conforming lot. The said premise affected is property with frontage on the East side of Forest Street within the R 1 zoning district. The following members were present: Walter F. Soule, Robert P. Ford, John M. Pallone, Ellen P. McIntyre, George M Earley, and Joseph D. LaGrasse. Upon a motion made by Ellen P. McIntyre and 2nd by Joseph D. LaGrasse, the Board voted to GRANT the request for a dimensional Variance from Section 7, Paragraph 7.3 and Table 2, for 2.5' from the West side setback and 13' from the East side setback; and a Special Permit from Section 9, Paragraph 9.2 in order to construct a deck on the existing house and a utility shed on a pre-existing, non- conforming lot per Plot Plan of 350 Forest Street, North Andover, MA land of James M. Logan & Anna B. Logan by Peter J. Kane, Professional Land Surveyor #38381, Kane Land Surveyors, 72 Hamilton Avenue, South Hamilton, MA, dated Sept. 5, 2002, rev. no. 2 11.27.02 proposed deck & shed, and rev. no. 3 4.24.03. Voting in favor: Robert P. Ford, John M. Pallone, Ellen P. McIntyre, George M. Earley, and Joseph D. LaGrasse. The Board finds that the applicant has satisfied the provisions of Section 10, Paragraph 10.4 of the zoning bylaw and that the granting of this variance will not adversely affect the neighborhood or derogate from the intent and purpose of the zoning bylaw; and Section 9, Paragraph 9.2 of the zoning bylaw and that such change, extension or alteration shall not be substantially more detrimental than the existing structure to the neighborhood. Furthermore, if the rights authorized by the Variance are not exercised within one (1) year of the date of the grant, it shall lapse, and may be re-established only after notice, and a new hearing. Furthermore, if a Special Permit granted under the provisions contained herein shall. be deemed to have lapsed after a two (2) year period from the date on which the Special Permit was granted unless substantial use or construction has commenced, it shall lapse and may be re-established only after notice, and a new hearing. Town of North Andover Board of Appeals, Walter F. Soule, Vice Chairman Decision 2003-010 Board of Appeals 978-688-9541 Building 978-688-9545 Conservation 978-688-9530 Health 978-688-9540 Planning 978-688-9535 +D CYO rd I l� z It 6 y CD M E O CLL a� Q Q Q cc CO) O CL COD C V Q 0 w co CL y C 0 co ev � 3� CD 0 Q L L O CL CL c4 4-0 C O O J .O O O Z CD O. H C C C c CO)CL E 0 U) U) CEW LU IrW LU U) Q C m G •O �' ~� CD ui W O +C2, c=+fitOa O 4 J ¢ G _ .S m•N Z O C.) a o�oc g i IV a m o� > �� y.. �y x l U A O o u U ... o p b x'. ►� ,.� a w w v �' � z o w v cn o w o rx G U w o G w otAco U) r. a4 u, Vn C/) It 6 y CD M E O CLL a� Q Q Q cc CO) O CL COD C V Q 0 w co CL y C 0 co ev � 3� CD 0 Q L L O CL CL c4 4-0 C O O J .O O O Z CD O. H C C C c CO)CL E 0 U) U) CEW LU IrW LU U) Q C m G •O �' ~� CD ui W c 7 +C2, c=+fitOa O 4 J ¢ G _ .S m•N Z O C.) a o�oc g i IV a m o� > �� y.. �y It 6 y CD M E O CLL a� Q Q Q cc CO) O CL COD C V Q 0 w co CL y C 0 co ev � 3� CD 0 Q L L O CL CL c4 4-0 C O O J .O O O Z CD O. H C C C c CO)CL E 0 U) U) CEW LU IrW LU U) ���s ern'District of Essex County Norte MA 01840 05/21/03 Fee 5O.0V # 18 Land Court Uoc*u��2O O0 C. P^ ^ R. D. 5.0V 75 OO # 19 Check . THANK YOU! Thomas J. We 7Hi§ 1§ t@ @@Olfy that twenty (20) days NOW '0150§6d"M date of decWon, filed Town of North Andover Of 40RT#j � 'wiihaut filing of an a al. ,, a f'=%ted Office of the Zoning Board of Appeals o� •`�' ToWn elm* aw Community Development and Services Division 27 Charles Street North Andover, Massachusetts 01845 9Ss USE D. Robert Nicetta Telephone (978) 688-9541 Fax (978) 688-9542 Building Commissioner �> Any appeal shall be filed Notice of Decision - - - within (20) days after the Year 2003_.�, _ _ _ ; , , -• date of filing of this notice ry - in the office of the Town Clerk. Property at: 350 Forest Street -0 - .,. �r-"(= NAME: James M. & Anna B. Logan HEARING(S): March 11 & Ap7j-� �) `.- 2003 _ ADDRESS: 350 Forest Street PETITION: 2003-010 I North Andover, MA 01845 1 TYPfING DA'I"E:. April 23, 2003 The North Andover Board of Appeals held a public hearing at its regular meeting on Wednesday, at 7:30 PM upon the application of James M. & Auna B. Logan, 350 Forest Street, North Andover requesting a Variance from Section 7, Paragraph 7.3 and Table 2 for relief of right and left side setbacks on a pre-existing, non -conforming lot; and a Special Permit from Section 9, Paragraph 9.2 in order to build a proposed deck on the existing house and a proposed utility shed on a pre-existing, non- conforming lot. The said premise affected is property with frontage on the East side of Forest Street within the R-1 zoning district. The following members were present: Walter F. Soule, Robert P. Ford, John M. Pallone, Ellen P. McIntyre, George M. Earley, and Joseph D. LaGrasse. Upon a motion made by Ellen P. McIntyre and 2°d by Joseph D. LaGrasse, the Board voted to GRANT the request for a dimensional Variance from Section 7, Paragraph 7.3 and Table 2, for 2.5' from the West side setback and 13' from the East side setback; and a Special Permit from Section 9, Paragraph 9.2 in order to construct a deck on the existing house and a utility shed on a pre-existing, non- conforming lot per Plot Plan of 350 Forest Street, North Andover, MA land of James M. Logan & Anna B. Logan by Peter J. Kane, Professional Land Surveyor #38381, Kane Land Surveyors, 72 Hamilton Avenue, South Hamilton, MA, dated Sept. 5, 2002; rev. no. 2 11.27.02 proposed deck & shed, and rev. no. 3 4.24.03. Voting in favor: Robert P. Ford, John M. Pallone, Ellen P. McIntyre, George M. Earley, and Joseph D. LaGrasse. The Board finds that the applicant has satisfied the provisions of Section 10, Paragraph 10.4 of the zoning bylaw and that the granting of this variance will rot adverse'_y affect t<he reighLortiood o. derogate from the intent and purpose of the zoning bylaw; and Section 9, Paragraph 9.2 of the zoning bylaw and that such change, extension or alteration shall not be substantially more detrimental than the existing structure to the neighborhood. Furthermore, if the rights authorized by the Variance are not exercised within one (1) year of the date of the grant, it shall lapse, and may be re-established only after notice, and a new hearing. Furthermore, if a Special Permit granted under the provisions contained herein shallbe deemed to have lapsed after a two (2) year period from the date on which the Special Permit was granted unless substantial use or construction has commenced, it shall lapse and may be re-established only after notice, and a new hearing. ATTEST: A True Copy Town Clerk Decision 2003-010 Town of North Andover Board of Appeals, Walter F. Soule, Vice Chairman Board of appeals 978-688-9541 Building 978-688-9545 Conservation 978-688-9530 Health 978-688-9540 Planning 978-688-9535 OF NORTH q h Q„wLnx '4°' $4$y�CHUS dig Zoning Bylaw Denial Town Of North Andover Building Department 27 Charles St. North Andover, MA. 01845 Phone 978488-9545 Fax 978-688-9542 Street:. r-iwaae ue auviiseu Mat aner review of your Application and Plans that your Application is DENIED for the following•Zoning Bylaw reasons: Zoning .3 Map/Lot: 10 to 14 1 Applicant: T vvi ti ('➢ R Request: oZ>c i cK Date: A I V _ _ _ • _ _ �. v _ r-iwaae ue auviiseu Mat aner review of your Application and Plans that your Application is DENIED for the following•Zoning Bylaw reasons: Zoning Remedy for the above is checked belnw Item # Special Permits Planning Board Item # Item Notes Setback Variance Item Notes A Lot Area Common Driveway Special Permit F Frontage Variance for Si n 1 Lot area Insufficient Independent Elderly Housing Special Permit 1 Frontage Insufficient Earth Removal Special Permit ZBA 2 Lot Area Preexisting Planned Residential S ecial Permit 2 Frontage Complies Special Permit preexisting nonconforming 3 4 Lot Area Complies Insufficient Information 3 4 Preexisting frontage Insufficient Information cj B use 5 No access over Frontage 1 Allowed G Contiguous Building Area 2 Not Allowed 1 Insufficient Area 3 Use Preexisting 2 Complies 4 5 Special Permit Required Insufficient Information t 3 4 Preexisting CBA Insufficient Information �(�u C Setback H Building Height 1 All setbacks comply 1 Height Exceeds Maximum 2 Front Insufficient 2 Complies 3 Left Side Insufficient 4e,-, Preexisting Height k\e S 4 Right Side Insufficient 4 Insufficient Information 5 Rear Insufficient I Building Coverage 6 Preexisting setback(s) 1 Coverage exceeds maximum 7 D 1 Insufficient Information Watershed Not in Watershed (-AV S 2 3 4 Coverage Complies Coverage Preexisting Insufficient Information e S 2 3 In Watershed Lot prior to 10/24/94 j 1 Sign Sign not allowed ti (9 4 5 Zone to be Determined Insufficient Information 2 3 Sign Complies Insufficient Information E 1 2 3 Historic District In District review required Not in district Insufficient Information `1 5 K 1 2 3 Parking More Parking Required Parking Complies - Insufficient Information 4 Pre-existing Parkin Remedy for the above is checked belnw Item # Special Permits Planning Board Item # Variance Site Plan Review Special Permit Setback Variance Access other than Frontage Special Permit Parkinq Variance Frontage Exception Lot Special Permit Lot Area Variance Common Driveway Special Permit Hei ht Variance Congregate Housin2 Special Permit Variance for Si n Continuing Care Retirement Special Permit Special Permits Zoning Board Independent Elderly Housing Special Permit Special Permit Non -Conforming Use213A Lar a Estate Condo Special Permit Earth Removal Special Permit ZBA Planned Development District Special Permit Special Permit Use not Listed but Similar Planned Residential S ecial Permit Special Permit for Sign R-6 Density Special Permit Special Permit preexisting nonconforming Watershed Special Permit The above review and attached explanation of such is based on the plans and information submitted. No definitive review and or advice shall be based on verbal explanations by the applicant nor shall such verbal explanations by the applicant serve to provide definitive answers to the above reasons for DENIAL. Any inaccuracies, misleading information, or other subsequent changes to the information submitted by the applicant shall be grounds for this review to be voided at the discretion of the Building Department. The attached document titled "Plan Review Narrative” shall be attached hereto and incorporated herein by reference. The building department will retain all plans and documentation for the above file. You must rile a new building permit application form and begin the permitting process. Building Department -Official Signature Ap cafion Received Ap icatio nied Denial Sent: If Faxed Phone Number/Date: Plan Review Narrative The following narrative is provided to further explain the reasons for denial for the application%; permit for the property indicated on the reverse side: Referred To: Fire Conservation Zon 3lannin �4ye artment of Public Works Other Historical Commission BUILDING DEPT Cf it Ow � NnaTk q 4F �* �4&SA04 Zoning Bylaw Denial Town Of North Andover Building Department 27 Charles St. North Andover, MA. 01845 Phone 978488-9545 Fax 978-688-9542 N -.Street!. Item Ma /Lot: i01 A licant: L7•awte_S- Request., I (o U P E.. (10 C (< Date: oZ 0 � Plaaca ho �rl..:�n.� +t�.�+ tea... -....:-•-- -r --- - •• -- - - - DENIED for the folio --• y%jul r.NNutduon ana dans inat your Application is Zoning Bylaw reasons: Remedy for the above is checked below. Item # Special Permits Planning Board Site Plan Review Special Permit Access other -than Frontage Special Permit Frontage Exception Lot Special Permit Common Drivewa S ecial Permit Congregate Housin2 Special Permit Continuing Care Retirement Special Permit Independent Elder l Housin . S ecial Permit Large Estate Condo Special Permit Planned Develo ment DistrictS ecialPermit Planned Residential Special Permit R-6 Density S ecial Permit. Watershed S ecial Permit Item # Parking Variance Lot Area Variance Height Variance Variance for Sion special Permits Zoning Board Special Permit Non-Conformin Use-ZBA Earth Remaval Specia! Permit ZBA Special Permit Use not Listed but Similar Special Permit for Sian The above review and attached explanation of such is based on the plans and information submitted. No definitive review and or advice shall be based on verbal explanations by the applicant nor shall such verbal explanations by the applicant serve to provide definitive answers to the above reasons for DENIAL. Any inaccuracies, misleading information, or other subsequent changes to the information submitted by the applicant shall be grounds for this review to be voided at the discretion of the Building Department. The attached document titled "Plan Review Narrative" shall be attached hereto and incorporated herein by reference. The building. department will retain all plans and documentation for the above file- You must file a new building permit application form and begin the permitting process. uil ing Department icial Signature Application eceived gt� � - Apio Denied Denial Sent : If Faxed Phone Number/Date: Item Notes Item Notes A Lot Area F Frontage 1 Lot area Insufficient �k q e5 1 Frontage Insufficient -4 `fie S 2 Lot Area Preexisting 2 Frontage Complies 3 Lot Area Complies 3 — Preexisting frontage V Li e.5 4 Insufficient Information 4 Insufficient Information R Use 5 No access over Frontage 1 Allowed G Contiguous Building Area 2 Not Allowed 1 Insufficient Area 3 Use Preexisting 2 Complies 4 Special Permit Required F. S 3 Preexisting CBA y 5 Insufficient Information 4 Insufficient Information C Setback H Building Height 1 All setbacks comply 1 Height Exceeds Maximum 2 Front Insufficient 2 Complies 3 Left Side Insufficient 3 Preexisting Height 1 S 4 Right Side Insufficient e 4 Insufficient Information 5 Rear Insufficient Building Coverage A 6 Preexistin setbacks g Setback(s) 1 Coverage exceeds maximum 7 Insufficient Information 2 Coverage Complies D Watershed 3 Coverage Preexisting 1 Not in Watershed a S. 4 Insufficient Information 2 In Watershed j Sign Lot prior to 10/24/94 1 Sign not allowed A.)3 14 4 Zone to be Determined 2 Sign Complies 5 Insufficient Information 3 Insufficient Information E Historic District K Parking 1 In District review required 1 More Parking Required =A)A 2 Not in district e S 2 Parking Complies 3 Insufficient Information 3 Insufficient Information 4 Pre-existing Parking Remedy for the above is checked below. Item # Special Permits Planning Board Site Plan Review Special Permit Access other -than Frontage Special Permit Frontage Exception Lot Special Permit Common Drivewa S ecial Permit Congregate Housin2 Special Permit Continuing Care Retirement Special Permit Independent Elder l Housin . S ecial Permit Large Estate Condo Special Permit Planned Develo ment DistrictS ecialPermit Planned Residential Special Permit R-6 Density S ecial Permit. Watershed S ecial Permit Item # Parking Variance Lot Area Variance Height Variance Variance for Sion special Permits Zoning Board Special Permit Non-Conformin Use-ZBA Earth Remaval Specia! Permit ZBA Special Permit Use not Listed but Similar Special Permit for Sian The above review and attached explanation of such is based on the plans and information submitted. No definitive review and or advice shall be based on verbal explanations by the applicant nor shall such verbal explanations by the applicant serve to provide definitive answers to the above reasons for DENIAL. Any inaccuracies, misleading information, or other subsequent changes to the information submitted by the applicant shall be grounds for this review to be voided at the discretion of the Building Department. The attached document titled "Plan Review Narrative" shall be attached hereto and incorporated herein by reference. The building. department will retain all plans and documentation for the above file- You must file a new building permit application form and begin the permitting process. uil ing Department icial Signature Application eceived gt� � - Apio Denied Denial Sent : If Faxed Phone Number/Date: Plan Review Narrative The following narrative is provided to further explain the reasons for denial for the applicationk. permit for the property indicated 'o6l.the reverse side: Referred To: Fire Police Conservation Other Health Zoning Eoard Department of Public Works Historical Commission TOWN OF NORTH ANDOVER BUILDING DEPARTMENT 1b APPLICATION TO CONSTRUCT REPAIR, RENOVATE, OR DEMOLISH A ONE OR TWO FAMILY DWELLING 7777777 BUILDING PERMIT NUMBER: DATE ISSUED: SIGNATURE: Building Commissioner/1for of Buildings Date SECTION 1- SITE INFORMATION 1.1 Property Address: 3So Forest St 1.2 Assessors Map and Parcel Number: ppb A LOT Iq 3 Map Number Parcel Number N o r'tyl Andover MA 1.3 Zoning Information: 12- x I b Deck on ho%A-5e Zoning District Proposed Use 1.4 Property Dimensions: 52, 343 (s. F 1.5o. 3 C fit) Lot Areas Frontage ft 1.6 BUILDING SETBACKS ft Front Yard Side Yard Rear Yard Required Provide Required Provided R aired Provided 1.7 Water Supply M.G.L.C.40. 54) 1.5. Flood Zone Information: Public ❑ Private a-,- Zone Outside Flood Zone [IY 1.8 Sewerage Disposal System: Municipal ❑ On Site Disposal System L9-*� SECTION 2 - PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record _Sarnes M. Logo -n 35c) Forest St N Av,\aoye-r MA Name (Print) Address for Service Signatua Telephone 01_716^ t11&41 2.2 OwnRecord: V Ihra- Logo -y) 350 ForesL- St N Andove_r MA Name Print IJ Address for Service: c6 ass 6 ic6+3 Signature tj Telephone SECTION 3 - CONSTRUCTION SERVICES 3.1 Licensed Construction Supervisor: Licensed Construction Supervisor: Address Signature Telephone Not Applicable ❑ License Number Expiration Date 3.2 Registered Home Improvement Contractor Not Applicable ❑ Company Name Registration Number Address Expiration Date Signature Telephone Ma rn X a_ Z O SECTION 4 - WORKERS COMPENSATION (M.G.L. C 152 § 25c(6) Workers Compensation Insurance affidavit m64t be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed affidavit Attached Yes .......❑ No ....... ❑ SECTION 5 Description of Proposed Work check all applicable) New Construction ❑ Existing Building ❑ Repair(s) ❑ Alterations(s) ❑ Addition ❑ Accessory Bldg. ❑ Demolition ❑ Other ❑ Specify Brief Description of Proposed Work: --l-a -"/-( 6 69 P�_& t7 K I SECTION 6 - ESTIMATED CONSTRUCTION CO -MR I Item Estimated Cost (Dollar) to be Completed bv applicant OFFICIAL USE ONLY 1. Building (a) Building Permit Fee Multiplier 2 Electrical (b) Estimated Total Cost of Construction 3 Plumbing Building Permit fee (e) X (b) 4 Mechanical HVAC 5 Fire Protection 6 Total 1+2+3+4+5 Check Number Jr.l, 11V1\ 14 V W IN LK AU 1r1.VK1GA11VP1 1 V 15h UUMYLE I ED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1, , as Owner/Authorized Agent of subject property Hereby authorize to act on My behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date SECTION 7b OWNER/AUTHORIZED AGENT DECLARATION 1, carne 5 Pt. Lo q a• n as Owner/Authorized Agent of subject Property Hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief 7a.mes_ N. /)Loa c v-% of Owner/ 9 f Z4/ Zoo 7 Date NO. OF STORIES SIZE BASEMENT OR SLAB as t ►� e ht SIZE OF FLOOR TIMBERS 1 ST 2 3RD SPAN DIMENSIONS OF SILLS DIMENSIONS OF POSTS DIMENSIONS OF GIRDERS HEIGHT OF FOUNDATION THICKNESS SIZE OF FOOTING X MATERIAL OF CHIMNEY r c k IS BUILDING ON SOLID OR FILLED LAND 5 01 i d IS BUILDING CONNECTED TO NATURAL GAS LINE hl n --CP — - TOWN OF NORTH ANDOVER BUILDING DEPARTMENT APPLICATION TO CONSTRUCT REPAIR, RENOVATE, OR DEMwOLISH AONE OR TWO FAMILY DWELLING BUILDING PERMIT NUMBER: DATE ISSUTED: SIGNATURE: Building Commissioner/In for of Buildings Date NEE I IUIN I- SI I P N V'UKMA I'IUN 1.1 Property Address: 350 Forest Street 1.2 Assessors Map and Parcel Number: to6A 193 Map Number Parcel Number fel o r i" Andover MA d$ 4 5 1.3 Zoning Information: Rte— _deck shed Zonin District Proposed Use 1.4 ft�' `si 5Z, 3/-3 i5o.13 I Lot Areas Frontage ft 1.6 BUILDING SETBACKS ft Front Yard Side Yard Rear Yard Required Provide Required Provided Re 'red Provided 30 3o 3o 1.7 Water Supply M.G.L.C.40. § 54) 1.5. Flood Zone Information: / Public ❑ Private @l� Zone Outside Flood Zone IS 1.8 Sewerage Disposal System: Municipal ❑ On Site Disposal System 9" SECTION 2 - PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record 'J'.lmes c nd Anna. Lo o -n 35o Foresi S-Ereet klorth Andover MA Name (Print)t�tAddress for Service ..c 'W 17 g 6 s6 tg43 Signa Telephone 2.2 6 wner of Record: Name Print Address for Service: Signature Telephone SECTION 3 - CONSTRUCTION SERVICES 3.1 Licensed Construction Supervisor: Licensed Construction Supervisor: Address Signature Telephone Not Applicable ❑ License Number Expiration Date 3.2 Registered Home Improvement Contractor Not Applicable ❑ Company Name Registration Number Address Expiration Date Signature Telephone T rn z O •✓— Q SECTION 4 - WORKERS COMPENSATION (M.G.L C 152 § 25c(6) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. -Signed affidavit Attached Yes .......❑ No ....... ❑ SECTION 5 Description of Proposed Work check all a livable New Construction [j/ Existing Building Repair(s) ❑ Alterations(s) ❑ Addition ❑ Accessory Bldg. Demolition ❑ Other ❑ Specify Brief Description of Proposed Work: hL SECTION 6 - ESTIMATED CONSTRUCTION COSTS Item Estimated Cost (Dollar) to be Completed by permit applicant OF"CIAL-USE:UNLY 1. Building (a) Building Permit Fee Multiplier 2 Electrical (b) Estimated Total Cost of Construction 3 Plumbing Building Permit fee (a) x (b) 4 Mechanical HVAC 5 Fire Protection 6 Total 1+2+3+4+5 Check Number SECTION 7a OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I> as Owner/Authorized Agent of subject property Hereby authorize to act on My behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date SECTION 7b OWNER/AUTHORIZED AGENT DECLARATION 1> .� �S -� as Owner/Authorized Agent of subject property Herebv declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief tP- -.l Print Name J / ` /D//D Z Sio ature of er ent Date NO. OF STORIES SIZE BASEMENT OR SLAB SIZE OF FLOOR TEvIBERS IST2 ND3 RD SPAN DIMENSIONS OF SILLS DIMENSIONS OF POSTS, DIMENSIONS OF GIRDERS HEIGIfF OF FOUNDATION THICKNESS SIZE OF FOOTING X MATERIAL OF CHIMNEY IS BUILDING ON SOLID OR FILLED LAND IS BUILDING CONNECTED TO NATURAL GAS LINE NOHTk � R 4SSA04US�'� Zoning Bylaw Denial Town Of North Andover Building Department 27 Charles St. North Andover, MA: 01845 Phone 978488-9545 Fax 978-688-9542 --.Street: Map/Lot: t 0 (a (4 lCi 7 Applicant: £7 n➢ Request: -1 aX- i IFIew c(z Date: PI b F ease a advises! that after review of your Application and Plans that your Application is DENIED for the following,,Zoning Bylaw reasons: Zoning Remedy for the above is checked below. Item # I Special Permits Planning Board Site Plan Review Special Permit Access other than Frontage Special Permit Frontage Exception Lot Special Permit congregate Housing Special Permit Continuing Care Retirement Special Permit Independent Elderly Housing Special Permit Large Estate Condo Special Permit Planned Development District Special Permit Planned Residential Special Permit R-6 Density Special Permit Watershed Special Permit Item # I variance � _ -Z*q I Sethack V Parking Variance Lot Area Variance Height Variance Variance for Sign Special Permits Zoning Board Special Permit Non -Conforming Use-ZBA Earth Removal Special Permit ZBA Special Permit Use not Listed but Similar Special Permit for Sign Special Permit breexistina nonrnnfnrminr- The above review and attached explanation of such is based on the plans and information submitted. No definitive review and or advice shall be based on verbal explanations by the applicant nor shall such verbal explanations by the applicant serve to provide definitive answers to the above reasons for DENIAL. Any inaccuracies, misleading information, or other subsequent changes to the information submitted by the applicant shall be grounds for this review to be voided at the discretion of the Building Department. The attached document titled "Plan Review Narrative' shall be attached hereto and incorporated herein by reference. The building department will retain all plans and documentation for the above file. You must file a new building permit application form and begin the permitting process. i Building Department -Official Si nature - i 9 ApAtjeceived Ap icatio Denied Denial Sent: If Faxed Phone Number/Date: Item Notes Item Notes A Lot Area F Frontage 1 Lot area Insufficient 1 Frontage Insufficient 2 Lot Area Preexisting �- S 2 Frontage Complies 3 Lot Area Complies 3 Preexisting frontage 4 Insufficient Information 4 Insufficient Information B Use 5 No access over Frontage 1 Allowed G Contiguous Building Area 2 Not Allowed 1 Insufficient Area 3 Use Preexisting 2 Complies 4 Special Permit Required 3 Preexisting CBA 5 Insufficient Information 4 Insufficient Information C Setback H Building Height 1 All setbacks comply 1 Height Exceeds Maximum 2 Front Insufficient 2 Complies 3 Left Side Insufficient qeS Inp 3 Preexisting Height S 4 Right Side Insufficient-in—sufficient g ��.K 4 Insufficient Information 5 Rear Insufficient I Building Coverage 6 Preexisting setbacks) 1 Coverage exceeds maximum 7 Insufficient Information 2 Coverage Complies D Watershed 3 Coverage Preexisting K e S 1 Not in Watershed -A S 4 Insufficient Information 2 In Watershed j Sign N i� 3 Lot prior to 10/24/94 1 Sign not allowed 4 Zone to be Determined 2 Sign Complies 5 Insufficient Information 3 Insufficient Information E Historic District K Parking 1 In District review required 1 More Parking Required �� 2 Not in district y 5 2 Parking Complies 3 Insufficient Information 3 Insufficient Information 4 Pre-existing Parkin Remedy for the above is checked below. Item # I Special Permits Planning Board Site Plan Review Special Permit Access other than Frontage Special Permit Frontage Exception Lot Special Permit congregate Housing Special Permit Continuing Care Retirement Special Permit Independent Elderly Housing Special Permit Large Estate Condo Special Permit Planned Development District Special Permit Planned Residential Special Permit R-6 Density Special Permit Watershed Special Permit Item # I variance � _ -Z*q I Sethack V Parking Variance Lot Area Variance Height Variance Variance for Sign Special Permits Zoning Board Special Permit Non -Conforming Use-ZBA Earth Removal Special Permit ZBA Special Permit Use not Listed but Similar Special Permit for Sign Special Permit breexistina nonrnnfnrminr- The above review and attached explanation of such is based on the plans and information submitted. No definitive review and or advice shall be based on verbal explanations by the applicant nor shall such verbal explanations by the applicant serve to provide definitive answers to the above reasons for DENIAL. Any inaccuracies, misleading information, or other subsequent changes to the information submitted by the applicant shall be grounds for this review to be voided at the discretion of the Building Department. The attached document titled "Plan Review Narrative' shall be attached hereto and incorporated herein by reference. The building department will retain all plans and documentation for the above file. You must file a new building permit application form and begin the permitting process. i Building Department -Official Si nature - i 9 ApAtjeceived Ap icatio Denied Denial Sent: If Faxed Phone Number/Date: Plan Review Narrative The following narrative is provided to further explain the reasons for denial for the applicationt. permit for the property indicated on the reverse side: Referred To: Fire Health Police Zonin Board Conservation De artment of Public Plannin Historical Commission Other BUILDING DEPT Location 33-0 No. (01;?, Fp rQs t S -i r e e`I Date TOWN OF NORTH ANDOVER Certificate of Occupancy $ CMUSEt�'' Do Building/Frame Permit Fee $7 -73, Foundation Permit Fee $ Other Permit Fee $ TOTAL $ 775, 00 Check # 6 �Q Building Inspector - TOWN OF NORTH ANDOVER BUILDING DEPARTMENT APPLICATION TO CONSTRUCT REPAIR, RENOVATE, OR DEMOLISH A ONE OR TWO FAMILY DWELLING r *�. BUILDING PERMIT NUMBER. � � a DATE ISSUED:. SIGNATURE: Building Commissioner/I for of Buildings Date SECTION 1- SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map and Parcel Number: ST ID N, (ANO av 1,1K-Map M� . Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: r IAki Zoning District Proposed Use Lot Areas Fronta e ft 1.6 BUILDING SETBACKS ft Front Yard Side Yard Rear Yard Required Provide Required Provided Re uin Provided 1.7 Water Supply M.G.L.C.40. 54) ].Flood ood Zone Information: Public < Private ❑ Zona Outside Flood Zone ❑ 1.8 Sewerage Disposal System: Municipal ❑ On Site Disposal System SECTION 2 - PROPERTY OWNERSIIIPIAUTHORIZED AGENT 2.1 Owner of Record J IPA (-DP-*-s-F ST- Name (Print) Address for Service Signature Telephone 2.2 Owner of Record: T". Name Pe P ,n Addre s for Service: `� �-?� Si nature Tele hone SECTION 3 - CONSTRUCTION SERVICES 3.1 Licensed Construction Supervisor: Not Applicable ❑ p S C v7— Licensed Construction Supervisor: V r� -7 4 R I D l r, 3 �,�� �v�, ov,s S T. 5. NAM\��N MR � 1 �I$ Z License Number Addre -7$ V g" G 1< 1Pg Expiration Date ignature Telephone 3.2 Registered Home Improvement Contractor Not Applicable ❑ R\jeN1n-• C`o,SvPr\JcTlu-J (u.,lnrc,. I Z ot p 3 3 Name rte_ � 5. �Mlv1�^1 Mf1. �Iqg Z — Registration Number _ Address 7 K _ Expiration Date i Snature Telephone SECTION 4 - WORKERS COMPENSATION (M.G.L C 152 25c(6) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. -Signed affidavit Attached Yes ...... No ....... 0 SECTION 5 Description of Proposed Work check all applicable) New Construction ❑ Existing Building ❑ Repair(s) ❑ [Alterations(s) Addition Accessory Bldg. ❑ Demolition ❑ Other ❑ Specify Brief Description of Proposed Work: z LA7, Gj\(ZA b E: 4- rIVA (7-D I>r-. � ���12-t C�n A& b\1 i__ a j` ((NiS�k jtirVJ b -z-, SECTION 6 - ESTIMATED CONSTRUCTION COSTS Item Estimated Cost (Dollar) to be Completed by permit applicant OFFICIAL USE ONLY 1. Buildingi 3 b > (a) Building Permit Fee Multiplier - L c v,,:T D j 2 Electrical ] 5 (J ♦ J (b) Estimated Total Cost of Construction T f� u l V J 3 Plumbing Building Permit fee (a) x (b) a I J 4 Mechanical HVAC $ V 5-D, 5 Fire Protection 6 Total 1+2+3+4+5 S D. 6 • `" Check Number SECTION 7a OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, as Owner/Authorized Agent of subject property Hereby authorize to act on My behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date SECTION 7b OWN(�ER/AUTHORIZ NT PELLARATION as Owner/Authorized Agent of subject property Hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief c, DIT 6 v R N N Rt-\ --Pr—int Nam Si e of Owner/A en-t'Date NO. OF STORIES Z SIZE BASEMENT OR<LL SIZE OF FLOOR TIMBERS IST 2ND Zx 11� 3 RD a SPAN IV DIMENSIONS OF SILLS Z x U DIMENSIONS OF POSTS k.9 x U DIMENSIONS OF GIRDERS HEIGHT OF FOUNDATION THICKNESS SIZE OF FOOTING X MATERIAL OF CHIMNEY S -tcK 11L+, D G LCMUof t, (,u L S.S. IS BUR,DING ON SOLID OR FILLED LAND IS BUILDING CONNECTED TO NATURAL GAS LINE FORM U - LOT RELEASE FORM INSTRUCTIONS: This form is used to verify that all necessary approvals/permits from Boards and Departments having jurisdiction have been obtained. This does not relieve the applicant and/or landowner from compliance with any applicable or requirements. *****************************APPLICANT FILLS OUT THIS SECTION*********************** APPLICANT &V9W%kPv-\-G 0rST(LVG-`1- _C6.00(-- PHONE LOCATION: Assessor's Map Number -109 —_— PARCEL 0l 3 ----- SUBDIVISION_ N AL LOT (S) — _Z STREET-31DS T,—s T ST. NUMBER SD **********************************OFFICIAL USE ONLY***************************** RECOMMENDATIONS OF TOWN AGENTS: ONSERVATION ADMII�,�bTRATOR DATE APPROVED //f/ DATE REJECTED_ �T OMMENTS k) (0,J UVVN VLANNLK COMMENTS U nvartt, I UK-HLALTH C INSPECTOR -HEALTH COMMENTS DATE APPROVED DATE REJECTED DATE APPROVED DATE REJECTED DATE APPROVED DATE REJECTED PUBLIC WORKS - SEWER/WATER CONNECTIONS DRIVEWAY PERMIT FIRE DEPARTMENT RECEIVED BY BUILDING INSPECTO Revised 9197 jm TE ' t FORM U - LOT RELEASE FORM INSTRUCTIONS: This form is used to verify that all necessary approvals/permits from Boards and Departments having jurisdiction have been obtained. This does not relieve the applicant and/or landowner from compliance with any applicable or requirements. *****************************APPLICANT FILLS OUT THIS SECTION*********************** APPLICANT &V9W%kPv-\-G 0rST(LVG-`1- _C6.00(-- PHONE LOCATION: Assessor's Map Number -109 —_— PARCEL 0l 3 ----- SUBDIVISION_ N AL LOT (S) — _Z STREET-31DS T,—s T ST. NUMBER SD **********************************OFFICIAL USE ONLY***************************** RECOMMENDATIONS OF TOWN AGENTS: ONSERVATION ADMII�,�bTRATOR DATE APPROVED //f/ DATE REJECTED_ �T OMMENTS k) (0,J UVVN VLANNLK COMMENTS U nvartt, I UK-HLALTH C INSPECTOR -HEALTH COMMENTS DATE APPROVED DATE REJECTED DATE APPROVED DATE REJECTED DATE APPROVED DATE REJECTED PUBLIC WORKS - SEWER/WATER CONNECTIONS DRIVEWAY PERMIT FIRE DEPARTMENT RECEIVED BY BUILDING INSPECTO Revised 9197 jm TE 'f Aal FORM U - LOT RELEASE FORM INSTRUCTIONS: This form is used to verify that all necessary approvals/permits from Boards and Departments having jurisdiction have been obtained. This does not relieve the applicant and/or landowner from compliance with any applicable or requirements. *****************************APPLICANT FILLS OUT THIS SECTION*********************** APPLICANT ! y\)9- tWA C D14ST(?-vC;T1b i C0.0'J(-. (f-b!z s►NM * ANNA I,obAN LOCATION: Assessor's Map Number DU SUBDIVISION STREET � S T S -F. PHONE j �A` DO (_$ PARCEL C) ( � -? LOT (S) Z ST. NUMBER !�S D *****************************************OFFICIAL USE ONLY*********************************** RECOMME,IVDATIONS OF TOWN AGENTS: I CONSERVATION ADMINISTRATOR DATE APPROVED `1 DATE REJECTED TOWN PLANNER COMMENTS DATE APPROVED DATE REJECTED PUBLIC WORKS - SEWER/WATER CONNECTIONS DRIVEWAY PERMIT FIRE DEPARTMENT E c rJ TE FOOD INSPECTOR -HEALTH DATE APPROVED I DATE REJECTED- ' �- ten..) SEPTIC INSPE OR -HEALTH DATE APPROVED DATE REJECTED - COMMENTS COMMENTS `� )A tJ5 mss, I f „Ifr,i < PUBLIC WORKS - SEWER/WATER CONNECTIONS DRIVEWAY PERMIT FIRE DEPARTMENT E c rJ TE 0 11� Town of Aorth Andover Building Department 27 Charles Street North Andover, Massachusetts 01845 (978) 688-9545 Fax. (978) 688-9542 DEBRIS DISPOSAL FORM In accordance with the provisions of MGL c 40 s 54, and.a condition of mit Building per-# the debris resulting from the work shall .be disposed of in a properly licensed solid waste disposal facility as defined by MGL cl 1, sI50a: The debris will be disposed of in /at: V+ Cut, �J oNDEjAN PAP Gvav4,ts Facility location .G /! 4 l Srgnature ofApplic .. Date NOTE: A demolition permit from the Town of North Andover must be obtained for this project through the Office of the Building Inspector. EXHIBIT "A �� WX Y RrEL B ` ti � A '' F = 3 � 14V ♦ p 0 0 r 9 :R St p p 3 r o � �a°f" Oyy LN p Y i O� 0.aP\Z� a:�a 2 \'sp , • Y 'OL\ w ��' c �3 � 2 N. �• S ov mis FL Q° ii r vi O m U R=2000' w a , L=3142 — $N T=20-00 gw W •V Z � pyyo � a i .? �• � -t-. NWS s y N O £ ( 1•� 60 0iD m it O� N m n4rry C74 y J O c U= c �4oF7 9� aQ 1y i W Q1 p O y O bCa w.QpO� v A In 00CL CL CL r CL ' N -�- w v r` (X 2 .A 1' 3 c N 00 OS ` t 0 i0t�i A `2 0 3 i1 a� v P r N w A O o• J O \ Q PD V O) u Y- O a a it 3 rn r4 m N a 0 o O m W D 2 0 Or O 7 0 ` .... N � p OD Lr u fit. a C w p t0 o c o � t 3 0$ l� O O jA a ma c � `; � IN G L w m? VV: r0 \ 0 R. N Name: Location: The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations Boston, Mass. 02 919 Workers'Compensation Insurance Affidavit Please Print City Phone # I am a homeowner performing all work myself. I am a sole proprietor and have no one working in any capacity I am an employer providing workers' compensation for my employees working on this job: Company name: F> (z -N ttAM C Vj ST(?- U e- -11 M4 C D. I N C., L�Wu- S. RAj Al6'w6h.lN6- Company. name. . Address City; Phone..#: andtm one underst that a I do hereb ify Signature Print name r7X oCIo Fl rider 'Section 25A or'MGL 152 can lead to the imposition of -criminal penalties of o fine up to $1,50( e civil.,penalties.�e2t�%rm���IQP::V_V.oRfS_DRDF�3.a�itl..aline_of�.$1DoDD��siay_againstm� I may be forwarded'to the Office of Investigations of the DIA for Coverage vetification. the pains peva . ry that the information provided above is true and correct. Official use only do not write in this area to be completed by city or town official' •!J City or Town Permit/Licensing Building Dept E]Check if immediate response is required E] Licensing Board E] Selectman's Office Contact person: Phone #: � Health Department F, Other 200IOPhILESLIE S. .AY IoNS•Bro.6526 P. 1A&u' ILITY I . E (MM/DD/YY)v&. PRODUCER (§,78)927_2600 FAX 08/29/2001 (978)927-8938 Letl ie S. Ray Insurance Agency, Inc. ONLYAND CONFERS NO RIGHTS UPON THE CERTIFICATE 129 Dodge Street HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR Beverly, MA 01915 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE INSURED Burnham Co, , Inc. INSURER A: Gen Star P.O. BOX 2642 INSURER B:y Safet Insurance Co. South Hamilton, MA 01982 INSURER C: TIG INSURER D: COVERAGES INSURER E: THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR TYPE OF INSURANCE POLICY NUMBER DATE (MM/DD/YY) GATE (MM/DD/YY) LIMITS GENERALLIABILITY X COMMERCIAL GENERAL LIABILITY BA 09/01/2001 09/01/2002 EACH OCCURRENCE $ 1,000,000 FIRE DAMAGE (Any one fire) $ 50,000 CLAIMS MADE OCCUR MED EXP (Any one person) $ A 5,000 PERSONAL & ADV INJURY $ 11000,000 GENERAL AGGREGATE $ 2,000,000 GENT AGGREGATE LIMIT APPLIES PER: POLICY PRO- JECT LOC PRODUCTS -COM 2,000,000 AUTOMOBILE LIABILITY ANY AUTO COMBINED SINGLE LIMIT $ (Ea accident) ALL OWNED AUTOS 2417279 04/18/2001 04/18/2002 X SCHEDULED AUTOS BODILY INJURY (Per person) $ B X HIRED AUTOS 2S0,000 X NON -OWNED AUTOS BODILY INJURY (Per accident) $ 500,000 PROPERTY DAMAGE (Per accident) $ GARAGE LIABILITY 100,000 AUTO ONLY - EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS LIABILITY F7OCCUR CLAIMS MAGE EACH OCCURRENCE $ AGGREGATE DEDUCTIBLE RETENTION S _R WORKERS COMPENSATION AND 090714809/1S/2001 EMPLOYERS' LIABILITY S 09/15/2002 TORY LIMITS ER C E.L. EACH ACCIDENT $ 100,000 E.L. DISEASE - EA EMPLOYEE $ 100,000 OTHER E.L. DISEASE -POLICY LIMIT $ 500,000 DESCRIPTION OF OPERATIONS/LOCA I IONSNEtilt; LESIEXCLUSIONS ADDED BY ENDORSEMENTISPECIAL PROVISIONS CERTIFICATE HOLDER ADDITIONAL INSURED; INSURER LETTER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL 7_ DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. • AUTHORIZE 0 c It Un;eu8ls an0q;lA% p118A 10 i 80IZ0'sW `uo;sOg IO£I mg aasld uolinggsd aup spaspusnS pus suollslnSaa Sulpling jo pasog :01 u.tn;aj punoj ji •alep uoijuldu aqj a tojaq �Cluo asn lnplAlpul Joj plleA a0148JINSa.t Jo asuaal-I g t ,:, :I,per ��e �om�riahuiea� a�✓�,Ciaaacia�� ,: Board of Building Regulations and Standards " HOME IMPROVEMENT CONTRACTOR Registratidw, _ 129033 ' Expiration: -66/252003 i 1. kvipe Private Corporation { Burnham Construction riparty.;hic tf Scott Burnham 203 WILLOW ST. S Hamilton,'MA 01982 Administrator i ;+ fie ipairvnr�uuea o�. /liaaaaa�uae�1`d BOARD OF BUILDING REGULATIONS License: CONSTRUCTION SUPERVISOR Numb9 j.jgp 074890 i t, Ml 74 We , &r . 3 Tr. no: 74890 d To: 00 SCOTT C BOUCiE� ; 13 SYLVAN ST AI*f y GLOUCESTER, MA 0190 Administrator AIA DocumentA107 ABBREVIATED FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR For CONSTRUCTION PROJECTS OF LIMITED SCOPE where the Basis of Payment is a STIPULATED SUM 1987 EDITION THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITHAN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. This document includes abbreviated General Conditions and should not be used with other general conditions. It has been approved and endorsed by The Associated General Contractors of America. -------------------------------------------------------------------------------------------------------------------- AGREEMENT made as of the 31 st day of July in the year Two Thousand One. BETWEEN the Owner: Jim & Anna Logan 350 Forest St. North Andover, Ma. 01845 and the Contractor: Burnham Construction Company, Inc. 203 Willow Street P.O. Box 2642 S. Hamilton, MA 01982 The Project is: Jim & Anna Logan 350 Forest St. North Andover, Ma. 01845 The Architect is: Taylor MacDougall Burns Architects 58 Winter St. Boston, Ma. 02108 The Owner and Contractor agree as set forth below. -------------------------------------------------------------------------------------------------------------------- ARTICLE 1 THE WORK OF THIS CONTRACT 1.1 The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others, or as follows: Provide labor and materials required to complete all work shown on drawings and specifications per Article 6 — Enumeration of Contract Documents, section 6.1.4, and Burnham Construction Company, Inc. proposal dated March 22, 2001 (attached hereto), and memorandum dated July 25, 2001. ARTICLE 2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 2.1 The date of commencement is the date from which the Contract Time of Paragraph 2.2 is measured, and shall be the date of this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed Issued by the Owner. September 1st, 2001 or issuing of Building Permit by the City of North Andover, whichever is last. 2.2The Contractor shall achieve Substantial Completion of the entire Work not later than December 21, 2001 or 16 weeks after project commencement is subject to adjustments of this Contract Time due to unforeseen conditions or Owner requested changes in the scope of work. ARTICLE 3 CONTRACT SUM 3.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of One Hundred Seventy Four Thousand Eight Hundred Thirty Three ($174,833.00) Dollars, subject to additions and deductions as provided in the Contract Documents. 3.2The Contract Sum is based upon the following alternates, If any, which are described in the Contract Documents and are hereby accepted by the Owner: N/A 3.3 Unit prices, if any; are as follows: Change Orders - Scope changes to the project will be billed as follows: Cost of Labor and materials plus 12% overhead and profit. ARTICLE 4 PROGRESS PAYMENTS 4.1 Based upon Applications for Payment submitted to the Owner by the Contractor, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. The period covered by each Application for Payment shall be Project Start up and Permit cost prior to job start. $ 17,000.00 Balance to be paid in biweekly progress payments on the 15th and 30th of each month against the schedule of values found on sheet G703 of the AIA requisition $ 157,833.00 4.2 Payments due and unpaid under the Contract shall bear Interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. Three percent (3%) over the prime rate at Fleet Bank. ARTICLE 5 FINAL PAYMENT 5.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when the Work has been completed, the Contract fully performed, and a final Certificate for Payment has been issued by the Architect. ARTICLE 6 ENUMERATION OF CONTRACT DOCUMENTS 6.1.1 The Agreement is this executed Abbreviated Form of Agreement Between Owner and Contractor, AIA Document Al 07, 1987 Edition. 6.1.2 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated N/A , and are as follows: N/A Document Title Pages 6.1.3 The Specifications are those contained in the Project Manual dated as in Subparagraph 6.1.2, and are as follows: 6.1.4 The Drawings are as follows, and are dated 04-27-01 unless a different date is shown below: Number Title Date A0.0 Site Plan/Index A0.1 Specifications A0.2 Specifications / Schedules A0.3 Demo Plans Al.1 Is' Floor proposed Addition A1.2 2nd Floor proposed Addition A1.3 3rd Floor proposed Remodeling A1.4 Framing Diagrams A2.1 Proposed Front Elevation A2.2 Proposed Side Elevation A2.3 Proposed Rear Elevation A3.1 Building Section A3.2 Wall Sections / Details 04-13-01 A4.1 RCP / Electrical Plan A5. I Interior Elevations Second Floor A5.2 Interior Elevations Third Floor 6.1.5 The Addenda, if any, are as follows: Number: N/A Date: Pages: Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 6. 6.1.6 Other documents, if any, forming part of the Contract Documents are as follows: This agreement is entered into as of the day and year first written above and is executed in at least two original copies of which one is to be delivered to the Contractor and one to the Owner. Signature Date Anvio,� Loq. a.r Print Name Signature Date Sc,,T Ru RN fVA to N4s i C)EN T - Print name and title S GENERAL CONDITIONS I ARTICLE 7 CO1. N TRACT DOCUMENTS 7.1 The Contract Documents coltsist of this Agreement with Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, addenda issued prior to the execution of`this Agreement, other documents listed In this Agreement and t ' Aficatlons issued after execution of this Agreement. The Intent of the Contract Documents is to Include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary, And what is required by one shall be as bind- ing as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Docu- ments and reasonably Inferable from them as being necessary to produce the Intended results. 7.2 The Contract Documents shall not be construed to create a contractual relationship of any kind (1) between the Architect and Contractor, (2) between the Owner and a Subcontractor or Sub-subcontractor•or.(3) between any persons or entities other than the Ownee.2nd Contractor. 7.3 Execution Qf :thc Contract by the Contractor is a represen- tation that the QefV[2ctor has visited the site and become famil lar with the 1 conditions under which the Work Is to be performed. ; 7.4 The term "Work" means the construction and services required by th�.,Contract Documents, whether completed or partially complyted, and Includes all other labor, materials, equipment and,.services provided or to be provided by the Contractor to fplfill the Contractor's obligations. The Work Mg. constitute t e whole or a part of the Project. ARTICLE 8 OWNER 8.1 The Owner shall furnish surveys and a legal description of the site. ' 8.2 Except for permits and fees which are the responsibility of the Contractor under the Contract Documents, the Owner shall secure and pay for necessary approvals, casements, assessments and charges required for the construction, use or occupancy of permanent structures or permanent changes In existing facilities. 8.3 if the Contractor fails to correct Work which Is not in accordance with the requirements of the Contract Documents or persistently '• fails to carry out the Work in accordance with the Contract Documents, the Owner, by a written order, may order the Contractor to stop the Work-, or ani portion thereof, until the cause' for such order has been eliminated; however, the right of the Owner to stop the Work shall not give rise to a duty on the part of the Owner to exercise this right for the benefit of the Contractor or any other person or entity. 1 ARTICLE 9 CONTRACTOR 9.1 The Contractor shall supervise and direct the Work, using the Conractdr's best skill and attention. The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract, unless Contract Documents give other specific instructions concerning these matters. 9.2 Unless otherwise provided In the Contract Documents, the Contractor shall provide and pay for labor, materials, equip- ment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution and completion of the Work, whether temporary or permanent and whether or not Incorporated or to be incorporated in the Work. 9.3 The Contractor shall enforce strict discipline and good order among the Contractor's employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit persons or persons not skilled In tasks assigned to them. ; 9.4 The Contractor warrants to the Owner and Architect that materials and equipment furnished under the Contract will be of good quality and new unless otherwise required or permit- ted by the Contract Documents, that the Work will be free from defects not inherent in the quality required or permitted, and that the Work.will conform with the requirements of the Contract Documents. Work not conforming to these require- ments, Including substitutions not properly approved and authorized, may be considered defective. The Contractor's warranty excludes remed- for damage or defect caused by abuse, modifications not extcuted by the Contractor, Improper or insufficient maintenance, improper operation, or normal wear and tear under normal usage. if required by the Architect, the Contractor shall furnish satisfactory evidence as to the kind. and quality of materials and equipment. 9.5 Unless otherwise provided In the Contract Documents, the Contractor shall pay sales, consumer, use, and other similar taxes which are legally enacted when bids are received or nego- tiations concluded, whether or not yet effective or merely scheduled to go into effect, and shall secure and pay for the building permit and other permits and governmental fees, licenses and inspections necessary for proper execution and completion of the Work. 9.6 The Contractor shall comply with and give notices required by laws, ordinances, rules, regulations, and lawful orders of public authorities bearing on performance of the Work. The Contractor shall promptly notify the Architect and Owner if the Drawings and Specifications arc observed by the Contractor to be at variance therewith. 9.7 The Contractor shall he resrnnsihic to the owner for the acts and omissions of the Contractor's employees, Subcontrac- tors and their agents and employees, and other persons per• foiming portions of the Work under a contract with the Contractor. AIA DOCUMENT A107 • ABBREVIATED OWNER•CONTRACTORAGREEMENT • NINT11 EDITION • AIAa • ID1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASiiINGTON, D.C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution. I A107-1987 6 9.$' The Contractor shall review, approve and submit to the Archlt�ct Shop Drawings, Product Data, Samples and similar submittals required by the Contract Documents with reason- able promptness. The Work shall be in accordance with 1::: -oved subrNttals. When professional certification of per- i—nance criteria of materials, systems or equipment is required by the Contract Documents, the Architect shall be entitled to rely upon the accuracy and completeness of such certifications. 9.9 The Contractor shall keep the premises and surrounding arca free from accumulation of route materials or rubbish caused by operations under the Contract. At completion of the Work the Contractor shall remove from and about the Project waste materials, rubbish, the Contractor's tools, construction equipment, machinery and surplus materials. 9.10 The Contractor shall provide the Owner and Architect access to the Work in preparation and progress wherever located. 9.11 The Contractor shall pay all royalties and license fees; shall defend sults or claims for infringement of patent rights and shall hold the Owner harmless from loss on account thereof, but shall not be responsible for such defense or loss when a particular design, process or product of a particular manufac- turer or manufacturea,B required by the Contract Documents unless the Contractor has reason to believe that there is an Infringement of patent: 9.12 To the fullest ekttnt permitted by law, the Contractor shall indemnify and hold.harmless the Owner, Architect, Archi- tect's consultants, and:4gents and employees of any of them from and against claims, damages, losses and expenses, Includ- Ing but not limited to lMomeys' fees, arising out of or resulting from performance of the. Work, provided that such claim, dam - loss or expense ls' attributable to bodily Injury, sickness, _ase or death, or to injury to or destruction of tangible prop- erty (other than the Work itself) including loss of use resulting therefrom, but only io i1Tc,'extent caused in whole or in part by negligent acts or omissioris of the Contractor, a Subcontractor, anyone directly or indJiircctiy employed by them or anyone for whose acts they ma ybe llabie, regardless of whether or not such claim, damage, loss or expense is caused In pact by a party indemnified hereunder. Such obligation shall not be construed to negate, abridge, of ;reduce other rights or obligations of Idemnity which would pthcrwisc exist as to a party or person described in this Paragraph 9.12. 9.12.1 In claims against any person or entity indemnified under this Paragraph 9.12 by an employee of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, the indcmnifica- tion obligation under this Paragraph 9.12 shall not be limited by a limitation on amount. or type of damages, compensation or benefits payable by orJor the Contractor or a Subcontractor under workers' or workmen's compensation acts, disability benefit acts or other employee benefit acts. 9.12.2 The obligations of the Contractor under this Paragraph 9.12 shall not extend to the liability of the Architect, the Archj- tect's consultants, and _pgents and employees of any of them arising out of (I) the preparation or approval of maps, drawings, opinions, reports, surveys, Change Orders, .Construction Change Directives, dc,5ign3,or specifications, or (?)"the giving of or the failure to give direct, Ions or instructions by the Architect, the Architect's consultants, and agents and employees of any of ( m provided such giving or failure to give Is the primary i...,lse of the Injury or_d�mage- ARTICLE 10 ADMINISTRATION OF THE CONTRACT 10.1 The Architect will provide administration of the Contract and will be the Owner's representative (1) during construction, (2) until final payment is due and (3) with the Owner's concur- rence, from time to time during the correction period described In Paragraph 18.1 10.2 The Architect will visit the Ve at Intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the completed Work and to determine in general If the Work Is being performed In a manner Indicat- ing that the Work, when completed, will be in accordance with the Contract Documents. However, the Architect will not be required to make exhaustive or continuous on-site inspections to check quality or quantity of the Work. On the basis of on- site observations as an architect, the Architect will keep the Owner informed of progress of the Work and will endeavor to guard the Owner against defects and deficiencies in the Work. 10.3 The Architect will not have control over or charge of and will not be responsible for construction means, methods, tech- niques, sequences or procedures, or for safety precautions and programs in connection with the Work, since these are solely the Contractor's responsibility as provided in Paragraphs 9.1 and 16.1. The Architect will not be responsible for the Contrac- tor's failure to carry out the Work in accordance with the Con- tract Documents. 10.4 Based on the Architect's observations and evaluations of the Contractor's Applications for Payment, the Architect will review and certify the amounts due the Contractor and will issue Certificates for Payment in such amounts. 10.5 The Architect will interpret and decide matters concern- ing performance under and requirements of the Contract Docu- ments on written request of either the Owner or Contractor. The Architect will make initial decisioris on all claims, disputes or other matters in question between the Owner and Contrac- tor, but will not be liable for results of any Interpretations or decisions rendered in good faith. The Architect's decisions In matters relating to aesthetic effect will.be final if consistent with the intent expressed in the Contract Documents. All other decl- sions of the Architect, except those which have been waived by making or acceptance of final payment, shall be subject to arbitration upon the written demand of either party. 10.6 The Architect will have authority to reject Work which does not conform to the Contract Documents. 10.7 The Architect will review and approve or take other appropriate action upon the Contractor's submittals *such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. 10.8 All claims or disputes between the Contractor and the Owner arising out or relating to the Contract, or the breach thereof, shall be decided by arbitration in accordance with the Construction Industry Arbitration Rules of the American Arbi- tration Association currently in effect unless the parties mutu- ally agree otherwise and subject to an initial presentation of the claim or dispute to the Architect as rcquired under Paragraph 10.5. Noticc of the demand for arbitration shall be filed in writ- ing with the other party to this Agreement and with the Amcri- can Arbitration Association and shall be matte within a reason- able time after the dispute has arisen. The award rendered by AIA DOCUMENT A107 - Ant)REVIA'rED OvcNER CONTRACTOR AGREEMENT • NINTII EDITION - AIA* • ©1987 7 A107-1987 THE AMERICAN INSTITUTE OF ARCIIITECI'S. 1735 NEW YORK AVENUE. N.W., WASHINGTON. D.C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution. thb arbitrator or arbitrators shall be final, and judgment may be entered upon It In accordance with applicable law In any court having jurisdiction thereof. Except by written consent of the person or entity sought to be joined, no arbitration arising out of or relating to the Contract Documents shall include, by con- solidation, Joinder or in any other manner, any person or entity not a party to the Agreement under which such arbitration arises, unless It is shown at the time the demand for arbitration is filed that (1) such person or entity is substantially Involved in a common question of fact or law, (2) the presence of such per- son or entity is required if complete relief is to be accorded in the arbitration, (3) the Interest or responsibility of such person or entity In the matter is not insubstantial, and (4) such person or entity is not the Architect or any of the Architect's employees or consultants. The agreement herein among the parties to the Agreement and any other written agreement to arbitrate referred to herein shall be specifically enforcnbic under applicable law In any court having jurisdiction thereof. ARTICLE 11 SUBCONTRACTS 11.1 A Subcontractor is a person or entity who has a direct contract with the (,ontractor to perform a portion of the Work at the site. 11.2 Unless otherwise stated in the Contract Documents or the bidding requirements, the Contractor, as soon as practicable after award of th6 Contract, shall furnish in writing to the Owner through the Architect the names of the Subcontractors for each of the principal portions of the Work. The Contractor shall not contract with any Subcontractor to whom the Owner or Architect has made reasonable and timely objection. The Contractor shall 'not be required to contract with anyone to whom the Contractor has made reasonable objection. Con- tracts between tlic'.Contractor and Subcontractors shall (1) require each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound to the Contrac- tor by the termt of'ihe Contract Docbments, and to assume toward the Coritr4etbr all the obligations and responsibilities which the Conth ictor, by the Contract Documents, assumes toward the Owner and Architect, and (2) allow to the Subcon- tractor the benefit of all rights, remedies and redress afforded to the Contractor by. these Contract Documents. ARTICLE 12 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 12.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner's own forces, and to award separate contracts in connection with other por- tions of the Project or other construction or operations on.the site under conditions of the contract identical or substantially similar to these, including those portions related to insurance and waiver of sgbrogation. If the Contractor claims that delay or additional cost is Involved because of such action by the Owner, the Contractor shall make such claim as provided else- where in the Contract Documents. 12.2 Thr. Contractor shall afford the Owner and separate con- tractors reasonable opportunity for the introduction and Stor- age of their materials and equipment and performance of their activities, and shall connect and coordinate the Contractor's construction and operations with theirs as required by the Con- tract Documents. 12.3 Costs caused by delays, improperly timed activities or defective construction shall be borne by the party responsibic therefor. ARTICLE 13 CHANGES IN THE WORK 13.1 The Owner, without Invalidating the Contract, may order changes In the Work consisting of additions, deletions or modi- fications, the Contract Sum and Contract Time being adjusted accordingly. Such changes in the Work shall be authorized by written Change Order signed by the Owner, Contractor and Architect, or by written Construction Change Directive signed by the Owner and Architect. 13.2 The Contract Sum and Contract Time shall be changed ortly by Change Order. 13.3 The cost or credit to the Owner from a change in the Work shall be determined by mutual agreement. ARTICLE 14 TIME 14.1 Time limits stated in the Contract Documents are of the essence of the Contract.* By executing the Agreement the Con- tractor confirms that the Contract Time is a reasonable period for performing the Work. 14.2 The date of Substantia! Completion is the date certified by the Architect in accordance with Paragraph 15.3• 14.3 if the Contractor is delayed at any time in progress of the Work by changes ordered in the Work, by labor disputes, fire, unusual delay in deliveries, abnormal adverse weather condi- tions not reasonably antic'patable, unavoidable casualties or any causes beyond the Contractor's control, or by other causes which the Architect determines may justify delay, then the Contract Time shall be extended by Change Order for such rea- sonable time as the Architect may determine. ARTICLE 15 PAYMENTS AND COMPLETION 15.1 Payments shall be made as provided in Articles 4 and 5 of this Agreement. 15.2 Payments may be withheld on account of (1) defective Work not remedied, (2) claims filed by third parties, (3) failure of the Contractor to make payments properly to Subcontrac- tors or for labor, materials or equipment, (4) reasonable evi- dence that the Work cannot be completed for the unpaid bal- ance of the Contract Sum, (5) damage to the Owner or another contractor, (6) reasonable evidence that the Work will not be completed within the Contract Time and that the unpaid bal- ance would not be adequate to cover actual or liquidated dam- ages for the anticipated delay, or (7) persistent failure to carry out the Work in accordance with the Contract Documents. 15.3 When the Architect agrees that the Work is substantially complete, the Architect will issue a Certificate of Substantial Completion. 15.4 Final payment shall not become due until the Cuntnrctor has delivered to the Owner a complete release of all liens arising out of this Contract or receipts in full covering all labor, mate- rials and equipment for which a lien could be filed, or a bond satisfactory to the Owner to indemnify the Owner against such AIA DOCUMENT A107 - ABBREVIATED OWNER CONTRACI OR AGREEMENT- NINTH EDITION - AIA° - ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20oo6 r WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution. A107-1987 8 lied. If -such lien remains uns2tisflcd after payments are made, the Contractor shall refund to the Owner all money that the Owner may be compelled to pay in discharging such lien, ( ding all costs and reasonable attorneys' fees. 1lo.5 The making of final payment shall constitute a waiver of claims by the Owner except those arising from: .1 (lens, claims, security interests or encumbrances aris- Ing out of the Contract and unsettled; .2 failure of the Work to comply with the requirements of the Contract Documents; or .3 terms of special warranties required by the Contract Documents. Acceptance of final payment by the Contractor, a Subcontr2c- tor or material supplier shall constitute a waiver of claims by that payee except those previously made In writing and identi- fied by that payee as unsettled at the time of final Application for Payment. ARTICLE 16 PROTECTION OF PERSONS AND PROPERTY 16.1 The Cootractorshall be responsible for initiating, main- taining, and supervising ail safety precautions and programs in connection with the performance of the Contract. The Con- tractor shall take reasonable precautions for safety of, and shall provide reasonable proicction to prevent damage, injury or loss to: .1 employees on the Work and other persons who may be affected thereby; A .2 the Work and materials and equipment to be incor- posted therein; and .3 other property at the site or adjacent thereto. The Contractor shall give notices and comply with applicable laws, ordinances, rules; regulations and lawful orders of public authorities bearing on safely of persons and property and their protection from damage, Injury or loss. The Contractor shall promptly remedy damage and loss to property at the site caused in whole or in part by the Contractor, a Subcontractor, a Sub -subcontractor, or anyone directly or Indirectly employed by any of them, or by.artyone for whose acts they may be liable and for which the Contractor is responsible under Subpara- graphs 16.1.2 and 16.4.x, except for damage or loss attributable to acts or omissions of the Owner or Architect or by anyone for whose acts either of them may be liable, and not attributable to the fault or negligence of the Contractor. The foregoing obliga- tions of the Contractor are in addition to the Contractor's obli- gations under Paragraph 9.12. 16.2 The Contractor shall not be required to perform without consent any Work relating to asbestos or polychlorinated biphenyl (PCB). ARTICLE 17 INSURANCE 17.1 The Contractor shall purchase from and maintain in a company or companles lawfully authorized to do business in the jurisdiction in whicli `the Project is located insurance for protection from claims under workers' or workmen's coml)cn- on acts and other chiployee benefit acts which are applic- e, claims for darn2ges because of bodily injury, Including death, and from claims. for damages, other than to the Work Itself, to property which may arise out of or result from the Contractor's operations tinder the Contract, whether such operations be by the Contractor or by a Subcontractor or any- one directly or indirectly employed by my of them. ThTs Insur- ance shall be written for not less than limits of liability specified in the Contract Documents or required by law, whichever coverage is grater, and shall include contractual liability insur- ance applicable to the Contractor's obligations under Paragraph 9.12. Ctrtiflc2tes of such Insurance shall be filed with the Owner prior to the commencement of the Work. 17.2 The Owner shall be responsible for purchasing and main- taining the Owner's usual liability Insurance. Optionally, the Owner may purchase and maintain other Insurance for self- protection against claims which may arise from operations under the Contract. The Contractor shall not be responsible for purchasing and maintaining this optional Owner's liability Insurance unless specifically required by the Contract Documents. 17.3 Unless otherwise provided, the Owner shall purchase and maintain, In a company or companies lawfully authorized to do business in the jurisdiction In which the Project is located, property Insurance upon the entire Work at the site to the full insurable value thereof. This Insurance shall be on an all- risk policy form and shall Include interests of the Owner, the Contractor, Subcontractors 'and Sub -subcontractors in the Work and shall Insure against the perils of fire and extended coverage and physical loss or damage including, withotlt dupli- cation of coverage, theft, vandalism and malicious mischief. 17.4' A loss Insured under Owner's property insurance shall be adjusted with the Owner and made payable to the Owner as fiduciary for the Insureds, as their interests may appear, subject to the requirements of any applicable mortgagee clause. 17.5 The Owner shall file a copy of each policy with the Con- tractor before an exposure to loss may occur. Each policy shall contain a provision that the policy will not be cancelled or allowed to expire until at least 30 days' prior written notice has been given to the Contractor. 17.6 The Owner and Contractor waive 211 rights against each other and the Architect, Architect's consultants, separate con- tractors described In Article 12, If any, and any of their subcon- tractors, sub -subcontractors, agents and employees, for dam- ages caused by fire or other perils to the extent covered by property Insurance obtained pursuant to this Article 17 or any other property insurance applicable to the Work, except such rights as they may have to the proceeds of such insurance held by the Owner as fiduciary. The Contractor shall require similar waivers in favor of the Owner and the Contractor by Subcon- tractors and Sub -subcontractors. The Owner shall require simi- lar waivers in favor of the Owner and Contractor by the Archi- tect, Architect's consultants, separate contractors described in Article 12, if any, and the subcontractors, sub -subcontractors, agents and employees of any of them. ARTICLE 18 CORRECTION OF WORK 18.1 The Contractor shall promptly correct Work rejected by the Architect or failing to confo-m to the rcquircmcnts of the Contract Documents, whether , bserved before or after Sub- stantial Completion and whether or not fabricated, Installed or completed, and shall correct any Work found to be not in accordance with the requirements of the Contract Documents within a period of one year from the date of Substantial Com - AIA DOCUMENT A107• ABBREVIATED OWNER -CONTRACTOR AGRF..F.MF.N'r•NINTIIEI)ITION•AIA• •01987 9 A107-1987 THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVENUE. N.W., WASIIINGTON. D.C. 20006 t . WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution. pietion of the Contract or by terms pf an applicable special war- ranty required by the Contract Documents. The provisions of r this Article 18 apply to Work done by Subcontractors as well as to Work done by direct employees of the Contractor. 18.2 Nothing contained in this Article 18 shall be construed to establish a period of limitation with respect to other obligations which the Contractor might have under the Contract Docu- ments. Establishment of the time period of one year as described in Paragraph 18.1 relates only to the specific obliga- tion of the Contractor to correct the Work, and has no rclation- ship to the time within which the obligation to comply with the Contract Documents may be sought to be enforced, nor to the time within which proceedings may be commenced to estab- lish the Contractor's liability with respect to the Contractor's obligations other than specifically to correct the Work. ARTICLE 19 MISCELLANEOUS PROVISIONS 19.1 The Contract shall be governed by the law of the place where the Project is located. 19.2 As between the Owner and the Contractor, any appli- cable statute of lig'itations shall commence to run and any alleged cause of act* shall be deemed to have accrued: .1 not later. than the date of Substantial Completion for acts or failures to act occurring prior to the relevant date of'So tantial Completion; .2 not later ihah the date of issuance of the final Certifi- cate for,Payment for acts or failures to act occurring subsegiueci( to the relevant date of Substantial Com- pietionlarid prior to issuance of the final Certificate for Payment-' and .3 not late t}tan the date of the relevant act or failure to act by the Contractor for acts or failures to act occur ring after the date of the final Certificate for Payment. ARTICLE 20 TERMINATION OF THE CONTRAQT 20.1 If the Architect fails to recommend payment for a period of 30 days through no fault of the Contractor, or if the Owner fails to make payment thereon for a period of 30 days, the Con- tractor may, upon seven additional days' written notice to the Owner and the Architect, terminate the Contract and recover from the Owner payment for Work executed and for proven loss with respect to materials, equipment, tools, and construc- tion equipment and machinery, including reasonable overhead, profit and damages applicable to the Project. 20.2 If the Contractor defaults or persistently fails or neglects to carry out the Work in accordance with the Contract Docu- ments or fails to perform a provision of the Contract, the Owner, after seven days' written notice to the Contractor and without prejudice to any other remedy the Owner may have, may make good such deficiencies and may deduct the cost thereof, including compensation for the Architect's services and expenses made neces;•rnl thereby, from the payment then or thereafter due the Contractor. Alternatively, at the Owner's option, and upon certification by the Architect that sufficient cause exists to justify such action, the Owner may terminate the Contract and take possession of the site and of all materials, equipment, tools, and construction equipment and machinery thereon owned by the Con factor and may finish the Work by whatever method the Owner may deem expedient. If the unpaid balance of the Contract Sum exceeds costs of finishing the Work, including compensation for the Architect's services and expenses made necessary thereby, such excess shall be paid to the Contractor, but if such costs exceed such unpaid balance, the Contractor shall pay the difference to the Owner. AIA DOCUMENT A107 • A1111RF.VIA111) OWNER CON1 RACTOR AGREENIENI • NIN'I I1 1:DITION • AIA'` • ©1987 1111'. AMERICAN INSI ITtll'E OF ARC111TECTS, 1715 NEW YORK AVENUE, N.W.. WASIIINGTON, D.C. 20006 A WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution. A107-1987 10 FROM : TRYLORMRCDOUGnLLBURNS T A Y t o i� ',, B 1- N N 30 August 2.,001 Logan Residelwc, 360 forest. Sheet North Andover. MA Massachusetts E?nccg TEL: 617 357 5654 SEP. 4,2001 8:19 AM p 1 71he NowhW datH we p,,,Vd V, H, dw6,1 !j III( 1, t the address abovo, ,: i ( of-Im, iind Anna lagan a it j 1 Ii j i f 1 i� I"'0110wing from 780 CV R Ow new addition and e6kAg dwellinp, uno (.I),! CO,wd(:!cd lopclh(." ond ;Is conIpli,1111. In HcamAance w1h llmgmph ) 1 1040scuJivu pa(:{ qvi is here employed. 11AVII ot'Noil-b Andover areunderstood i.is eclitival(!,11 fo 1,0�,�:: aimibwb:.-d @It Hic 11cighbolin)" 1mvi.) ofl,awronce: 6322 1-1131) The area calcuhiaionN l'o, ni(c fijflokit:,. Gross Area of twam, NVAk J)KAV W UVIDgI :4 4 M) N1, Glazing Arc.it Gross Atex ofl,,xicno, yh x.jj 1,1 6 According to inanuivow v, A dM, I vj,, , %Y&Mv N antl moi s] I hc mildoxy!" specified, which hin(y I A I MX J� I?) av ;:wl dlc� lolknwillp; 0-va I I I cs: Wood Awning, i),pv. 14 VHNV of RVI Wood Doli ldol lung rqw: mmucorR37 The Nvalues of WMAn aN sjnnvKj to; (xmjmjj,jiN, (Alnunis: Walls Ceiling Floor - ovel Thus, folio win)" fi-01 I I 'I I; It ;111' I C(I Lli I 1A I w I I Is of Prescriptive Design Pac.,itgc I! I AY 1 0 ff 1, li U RN `, I w D O b s.� x w a d oo u U 00 w v a chi U z z Q r� C w p rx Z U C w W `� a p cG C r i. W u W p rx chi C w O U a z O rx C ii d A m cn cn ui z o :U :W :T. oc�I� � a ea ev S: p m rr^^ ` a � Amca CL i o � •� E _ L 9 O (a ,y go'.o A. N Cf) o: �h� o w O Ems_ U T• 'W-zy: N o a x Cn -Coll os CMcim c T' o cm 06 �- x m m 3 N 2 ~ rr y = yo+ W0 � O h r L Hmti`vy C=vmm'Nom�c a c oZ pU Q£ £o g� L� x ca ` h.= u. 2 s 0 1 t£� GD O CD O O O H Co .E co L In O c O co 0 y O v .y C cc V .0 cc Cl) L V CD CL CO) c CD CM c CID m 0 LLJ crw W W 3;37 /I Date ........S i t �lORT1{ , � 'O,t,`` TOWN OF NORTH ANDOVER p PERMIT FOR WIRING s ':•� a This certifies that �) ( .....! ... .. . has permission to perform......//....................................................................... wiring in the building of ......... C.:..r..<.�t:::..I..(..................................... .,............. ° at ..........moi .:............. ...!...............:4......,..�!� ... , North Andover s. Fee ... ?.. �.... Lic. No/�.1.1 .,Yc..... a ...........ZSPE�C�TO:,R ........�..... ELECTRICAL.I Check # U (fommonwea& of ) a9eachwelb Official USC Onl 3-7 2eRarfntenf of im &rvicee Permit No. BOARD OF FIRE PREVENTIOu,p,N REGULATIONS Occupancy and Fee Checked [Rev. 11/99] APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code (NIEC), 527 CNIR 12.00 (PLE.ISEPRINTWINK ORTYPE,ILLINFORMATION) Date: -z- City or Town of: IVO, 111v7To the Inspector of Wires: By this application the undersigned gives notice of his or her intention to perform the electrical work described below. Location (Street & Number) 3SL? /-Ci2 L'-5 Owner or Tenant Z- Elf /"/ Owner's Address Telephone No. Is this permit in conjunction with a building permit? YesNo ❑ (Check Appropriate Box) Purpose of Building jZ L S�� Tla? L t Utility Authorization No. Existing Service 027 Amps / Zen l ZED volts Overhead Undgrd ❑ New Service Amps / Volts Overhead ❑ Undgrd ❑ Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work: No. of dieters No. of Nleters Completion of the %ll nvinQ ruble maybe it— l b / / No. of Recessed Fixtures. - No. of Ceil: Susp. (Paddle) Falls ec r t re ns ector o(IVtres. ty0• of 'Total Transformers KVA No. of Lighting Outlets No. of Ilot Tubs Generators KVA No. of Lighting Fixtures Swimming Pool Above ❑ In- ❑ b t o. o rnergency tg tt)ng acrid. rnd. Batte Units No. of Receptacle Outlets No. of Oil Burners FIRE ALARAIS No. of Zoites No. of SwitchesNo. of Gas Burners No. of lletection and Initiating Devices No. of Ranges Ranges Total No. of Air Cond. Tons No. of Devices o No. of Waste Disposers Heat Pun) P Number Tons K�V _ No. of Self -Contained Totals: Detectioi)/Alerting Devices No. of Dishwashers Space/Area Heating KW Local❑ "lu))icipal Connection ❑Other No. of Dryers Heating Appliances INV Security Systems: No. of Nater No. of No. of No. of Devices or Equivalent Heaters KW Signs Ballasts Data ti✓iriug: No. of Devices or Equivalent No. Hydromassage Bathtubs No. of illotors Total IIP Telecon)munications Wiring: No. of Devices or Equivalent OTHER: itttacn additional detail V desired, or as required by the Inspector of Wires. INSURANCE COVERAGE: Unless waived by the owner, no permit for the performance of electricalwork may issue unless the licensee provides proof of liability insurance including "completed operation" coverage or its substantial equivalent. The undersigned certifies that such cover ge is in force, and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE BOND ❑ OTHER ❑ (Specify:) 0. (Expiration Date) Estimated Value of Electrical Work: LW.�i vY� (When required by municipal policy.) Work to Start: ;7 -9 -O ?i Inspections to be requested in accordance with MEC Rule 10, and upon completion. I cerlif}•, corder the pains and penalties of perjttq• that the information on this application is trite and complete. Fff0l NAME: C eS LIC. NO � �5�� Licensee: S� p -p Signature LIC. NO.: �� 9 , - (If applicable, enter "et-cnrpt' n Me license number line.) a"'1BuS. Tel. No.:9�g �$-15Sr% Address:_3fi i�tc�c �%cvdl�t•, Rt�. I}�.e�b�..�y Mc o alq 1", Alt. Tel. No.: OWNER'S INSURANCE WAIVER: am aware that the License., does not have the liability insurance covera-e normally required by law. By my signature below, I hereby waive this requirement. I all, the (check onc) ❑ owner ❑ owner's avent. Owncr/Agent Signature 'Telephone No. PI'RJIIT FLE•: S cS co��