Loading...
HomeMy WebLinkAboutMiscellaneous - 351 HOLT ROAD 4/30/2018rL I I It; hzocv� BOARD OF HEALTH NORTH ANDOVER, MA 01845 978-688-9540 APPLICATION FOR SOIL TESTS 35I Noun Ro'4'p DATE: 5 -11 - 01 MAP & PARCEL: 78 % 2 - LOCATION LOCATION OF SOIL TESTS: NORTH DF IvXIS-rLi-a , pyy-DyN& �sEV5 P OWNER: D 4 L AN DOS E tz , L L G TEL. NO.: l4 - 769-10 �✓G1'U (JoN C l R A�.Jt�o� ADDRESS: k5 5TF-\/FNS 5-r. VA L.PALLA , NY 01595 JOSSPld D . PE Z No(.Il, �E ENGINEER: HOWE SOK YE` 1"G ASSOC. TEL. NO.: 978• Z51 313 2 CERTIFIED SOIL EVALUATOR: J05EFH D. PF-Z4NOt.A Intended Use of Land: Residential Subdivision Single Family Home Commercial Is This: Repair Testing: ES Undeveloped lot testing: In the Lake Cochichewick Watershed? Yes N. THE FOLLOWING MUST BE INCLUDED WITH THIS FORM NA 1. Proof of land ownership (Tax bill, or letter from owner permitting test) 2. Plot.plan & Location of Testing 3. Fee of $275.00 per lot for new construction. This covers the minimum two deep holes and two percolation tests required for each disposal area. Fee of $75.00 per lot for repairs or upgrades. GENERAL INFORMATION 1. Only Certified Soil Evaluators may perform deep hole inspections. 2. Only Mass. Registered Sanitarians and Professional Engineers can design septic plans. 3. At least two deep holes and two percolation tests are required for each septic system disposal area. 4. Repairs require at least two deep holes and at least one percolation test, at the discretion of the BOH representative. 5. Full payment will be required for all additional tests within two weeks of testing. 6. Within 45 days of testing, a scaled plan (no smaller than 1"-100') shall besubmitteA.;N d to-the,Board ,1-, O� 111 9 tsF NORTH Di,1,lE-0 of Health showing the location of all tests (including aborted tests).c � �F �a 7. Within 60 days of testing soil evaluation forms shall be submitted. ��� { - �" Please Do Not Write Below This Line MAY 14- 2001 i N.A. Conservation Commission Approval:��- Date Received: Check Amount: Check Date: x s lig, -\N EXIST. SMH BOLTED RIM=32.00-\ SU F X • ao TP x it. Js WLF-3\ la 3?J7 x Jf.JO 1.63 a CB RA CP JI.JJ x ° ST up _31. 0 O O o — to U 3L71 �' S J2 x C R=32.21 I=28.66 STEP 5�1=28.71 MC) 8"CI DOW EZEV M58 PROPOSED DUPLEX PUMP CHAMBER 12'-0" DIAMETER 12'-0" DEEP RIM=32.40 INV(SMH2)= 24.12 INV SMH3 =28.34 INV SMH4 =25.96 INV(3"FM out)=27.0 SEE DETAIL FOR PUMP SPECIFICATIONS AND FLOAT LEVELS N/F MASSACHUSETTS BAY TRAN ©UM .... - J� TATION AUTHOP EXISTING' EXIST. SMH (BOLTED SHUT) PUMP CH' PRECAST VALVE BOX RIM=32.5: RIM=32.34 TOP WATT 99 $ SFM 2 8 HPDE LINE%FM $ EENT 18"CONE$FM sFM— - _3" 0 A YY 78 5 �8 50- 70 in FM x �T CONC �x 39 x 32+a J2, S 2428 52 243 LF 6"PVC SEWER S=0.010 S BIT CONC p ABOVE GRODUD-4NDHSTRIAL PIPE CP $1T--COPdG eTMel — ----- — 3 OR PROPOSED 3"HDPE SEWER FORCE MAIN TO LEACH FIELD NO. 1 MANIFOLD FLOOR ELEV=36.61 `-'EXISTING SEPTIC TANK R=34.30 TW=29.10 REPLACE WITH SMH 3 RIM=34.30 CORE 4" HOLE FOR EXIST. 4" PVC AT APPROX. 29.10 INV.(out)=29.00� REMOVE PUMP CHAMBER AND INSTALL (2) 16.000 SEPTIC TANKSR!IM=32.45 INV(in)=30.90(FIELD SET; INV((out)=30.70 ry a n Q W LLJ n V) v J N x_ IIS--F�7 W W �1 Fo W O 1 zi \ NMS I I a x I � � i11 W II "x b 1 x rn 0 W F Q U_ Q CD W 4. U 00. W d N a O CL N O j tn J; N a}Ma O O 'H' 0- O. n �W m>W NNN.�,R°j C3 oII II II p J I- WO'd NMd iQ-O O V) W.� CL O M CL, w --ZZ VIX WjQ C �o tr� hI �x o x \.wx O �9 2Z N W Q �o °° N xm '� I I,z ti o 0 1- rn 111) to �n0 �UI W In J r L 00 0'W._N- . rn 0 W F Q U_ Q CD W 4. U 00. W d N a O CL N O j tn J; N a}Ma O O 'H' 0- O. n �W m>W NNN.�,R°j C3 oII II II p J I- WO'd NMd iQ-O O V) W.� CL O M CL, w --ZZ VIX WjQ 14 CL 0 N x OJ N O N 0 N DnJ (n DW Q Q J x \ WO \ x O_ -j- C �o tr� hI o x \.wx O �9 2Z N W Q ORZ 0 1- W J r 0'W._N- . �:p0= LIJ LL. O x W); I II I I ' C) Q 41rXN W = II x O II �> JN n v, W ma y 00 ( :in } o z o�,, I �o oa- ' ;Da>MO JN0-0 Jvk II o�Z0. "P 4 fl, c N >" a m Ox Z W�Wmo j I: CC OZ c� v v^i• F- I Na I N N O � Z��J�O(`W a 2 P (L 7 3 111 II I J U 3 W ' 0 Z U Ff N m o. loo 0 07 Q I O NN W L. I Q W II �aJ �Q _ Q I W '� (n0. : Z II o IQ 0.. II o I to . Z + V) = I W) Z I O _.. w . U I N Vl N IIIp r N II'O Un M' O -1 ,A m t Q I N L) II SUO 212 CN Q a. m H II N r CV II WZW» O Ox N �) FN— F— N O x III u') N U W wm "� w o. (n° I, I 11 U z :Dm > J _ M O U Q d I III Q $ U F - 2NM Nw I 21Q m N �v III II _ x W Z Q x� C) o X W CL � J a LL. O =oo N LL- .Zti Z I� oQZ mQ 14 CL 0 N x OJ N O N 0 N DnJ (n DW Q Q J x \ WO \ x O_ -j- ~ 0, 0 �o tr� hI o x \.wx O �9 - -o J N W Q ~ �o m (io ORZ W 0'W._N- . �:p0= Y `• y �o oa- ;Da>MO JN0-0 o�Z0. Ox Z W�Wmo Z��J�O(`W a J U 3 W ' 0 Z �N:3?N o I` WON N V V) at�Ge70 Z _.. w . 0O :t CL(f)�,O {?} 2JY0O FSMII CO WW t�>ZV'c� CO ,4 WZW» N �) 5Qvz'Zz U M Q o W Z � W W C) o X CL � J a Q O =oo LL- .Zti oQZ mQ -11(1-WL U n. II t MRZ w .r W ►- N ~ O Z M W '00. O p O C-4 d J O" Ip D D 1 e O D e I1� Cf V) °XN N►- II M=O W Of00 U t Q it Z 0 Q w J W LL N LLl 0 �F HUIV"E GALL) FO M. DATE 1:7--TIM � . �.P.M. M .PMO E OF PHONE RETURN YOUR CALL ASE CALL AREA COOE NUMBER EXTENSION M SAGE A �-�- WILL CALL AGAIN CAME TO SEE-YOU WANTS TO SIGNED./11VElSO/' SEE YOU 48003 Town of North Andover, Massachusetts Form No. 1 BOARD OF HEALTH 'EO , \Ao° APPLICATION FOR SITE TESTING/INSPECTION Applicant 19 Site Location�� Engineer Test/I nspection Date and Time CHAIRMAN, BOARD OF HEALTH Fee /33 - Test No. S.S. Permit No. D.W.C. No. C.C. Date Plbg. Permit No. Town of North Andover, Massachusetts BOARD OF HEALTH APPLICATION FOR SITE TESTING/INSPECTION Form No. 1 19 Applicant NAME ADDRESS TELEPHONE Site Location Engineer NAME ADDRESS TELEPHONE Test/Inspection Date and Time Fee CHAIRMAN, BOARD OF HEALTH Test No, S.S. Permit No. D.W.C. No. C.C. Date Plbg. Permit No. BOARD OF HEALTH NORTH ANDOVER, MA 01845 is w, C 978-688-9540 t c, APPLICATION FOR SOIL TESTS 1 PAY 10 4 2001 35, Hour 90AP DATE: 5-11,01 MAP & PARCEL: 78 / Z LOCATION OF SOIL TESTS: ISI ORT'I-t OF IBX IST 11.1 a f5U v-oi Nb Ser P(.,A, -41 OWNER: D 4 L. ANDOS! ER , LLG TEL. NO.: "D14 - 7CPd)-&500 0014 6 1 AfJKo) ADDRESS: 165 5TEVENS ST. VALHALLA , NY 01595 JoSEQId D . PE Z IhJOLA', PE ENGINEER: HowF Sur, VE (I N G ASSOC. TEL. NO.: 9-76. Z51 .313 2 CERTIFIED SOIL EVALUATOR: j05,,PPH D. PEZNOLA Intended Use of Land: Residential Subdivision Single Family Home Commercial Is This: Repair Testing: YE5 Undeveloped lot testing: In the Lake Cochichewick Watershed? Yes N NA THE FOLLOWING MUST BE INCLUDED WITH THIS FORM 1. Proof of land ownership (Tax bill, or letter from owner permitting test) 2. Plot plan & Location of Testing 3. Fee of $275.00 per lot for new construction. This covers the minimum two deep holes and two percolation tests required for each disposal area. Fee of $75.00 per lot for repairs or upgrades. GENERAL INFORMATION 1. Only Certified Soil Evaluators may perform deep hole inspections. 2. Only Mass. Registered Sanitarians and Professional Engineers can design septic plans. 3. At least two deep holes and two percolation tests are required for each septic system disposal area. 4. Repairs require at least two deep holes and at least one percolation test, at the discretion of the BOH representative. 5. Full payment will be required for all additional tests within two weeks of testing. 6. Within 45 days of testing, a scaled plan (no smaller than 1"-100') shall be.submitted to the Board of Health showing the location of all tests(including aborted tests). T0w14b9lf n ! r -- 7. Within 60 days of testing soil evaluation forms shall be submitted. - -p— Please Do Not Write Below This Line MAY 16 N.A. Conservation Commission Approval: Date Received: Check Amount: Check Date: 11 MIO HOWE SURVEYING 40 ASSOCIATES, INC. CIVIL ENGINEERS & LAND SURVEYORS 73 PRINCETON STREET 94 JACKSON ROAD N. CHELMSFORD, MA 01863 DEVENS, MA 01432 (978) 251-3132 (978) 772-1200 Email - hsaChowesurveying.com To: North Andover Board of Health 27 Charles Street North Andover, MA. 01845 LETTER OF TRANSMITTAL Date: 5/11 /01 Job No: 00-011 Attention: Susan Ford Re: 351 Holt Road Testing Application for System Upgrade WE ARE SENDING YOU ® Attached ❑ Under separate cover via the following items: ❑ Original Mylar ❑ Prints ❑ Invoice COPIES DATE NO. DESCRIPTION 1 5/11/01 H4390 Upgrade Plan showing proposed testing 1 5/11/01 --- check for $75.00 1 5/11/01 ---- application THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ For your use ❑ As requested ❑ For review & comment ❑ Approved as submitted ® schedule testing REMARKS: Susan, As we discussed yesterday, please find the application material. A letter from the owner is forethcoming from New York, 1 will fax this to you as soon as I get it. CC: SIGNATURE: SIGNED BY: Joseph Peznola Vii{ Or r .. I't/ C : OF -i 1/ 1 4 2001 D&L Andover, LLC 115 Stevens Avenue Valhalla, New York 10595 914-769-6500 Fax: 914-769-6283 VIA FACSIMILE & Hardcopy Attention: Susan Robin Town of North Andover Health Department 27 Charles Street North Andover, Massachusetts 01845 978-688-9540 Fax: 978-688-9542 Dear Susan: Subject: Permission to Conduct Soils Tests at 351 Holt Road, N. Andover, Mass Per our telephone conversation of this afternoon. We, D&L Andover, LLC. are the owners of record of the property at 351 Holt Road. It is my understanding that the Town of North Andover Health Department requires the permission of the property owner before conducting certain soil tests on that property. Please accept this letter as permission for such testing as required by your department. Joseph Peznola of Howe Surveying Associates, Inc. is designing a septic system upgrade for our property located at the above address. This letter should be attached to the Howe Surveying permit application and remain in the Town of North Andover's files as a record of the property owners permission to conduct such tests as are required. Should you require anything further, please advise. Thank you for your cooperation and assistance. Sincerely, Jon L. Ciranko Director D&L Andover, LLC cc: Joe Peznola / Howe Surveying Larry Gumb / Sweetheart Cup Zvi 8 OF VO'Tfrl i : t- BOARIJ OF H %L: ;-, \\lrc\sysvon\cappelllfuller dev\d&I4nass\01.05.11 health dept soils testing.doc MAY 14 2001 Cappelli Enterprises, Inc. Sent By: dex 855; Date: 5/11/01 Time: 4:20:26 PM Page 2 of 2 1; 11 May 01 3:31PM;Job 450;Page 1/1 DSL Andover, LLC 115 Stevens Avenue Valhalla, New York 10595 914769-6500 Fox: 914-76"283 VIA FACSIMILE & Hardcopy Attention: Susan Robin Town of North Andover Health Department 27 Charles Street North Andover, Massachusetts 01845 978-688-9540 Fax: 978-68B-9542 Dear Susan: Subject: Pernfission to Conduct Sods Tests at 351 Holt Road, N. Andover, Mass Per our telephone conversation of this afternoon. We, D&L Andover, LLC. are the owners of record of the property at 351 Holt Road. It is my understanding that the Town of North Andover Health Department requires the permission of the property owner before conducting certain soil tests on that property. Please accept this letter as permission for such testing as required by your department. Joseph Peznola of Howe Surveying Associates, Inc. is designing a septic system upgrade for our property located at the above address. This letter should be attached to the Howe Surveying permit application and remain in the Town of North Andover's files as a record of the property owners permission to conduct such tests as are required. Should you require anything further, please advise. Thank you for your cooperation and assistance. Jon L. Ciranko Director D&L Andover, LLC cc: Joe Peznola / Howe Surveying Larry Gumb / Sweetheart Cup 1Nrclsys\1onlcaWerI devW&J mass101.05.11 heath dept soils tesring.doc Cappelli Enterprises, Inc. Date: 5/11/01 Time: 4:20:26 PM Page 1 oft CA PPEL L / ENTERPR/SES, INC. Date: 5/11/01 Time : 4:20:22 PM To : Susan Robin Fax Number: 1-978-6889542 Company: Town of North Andover Health 115 Stevens Avenue Valhalla, New York 10595 From : Jon L. Ciranko Voice: 914-769-6500 x 125 Fax Number: 914-769.6283 Pages : 2 (including cover) Subject : FW: Permission to Test Soil at 351 Holt Rd, North Andover, Mass Attention: Susan Robin / Town of North Andover, Mass Health Department Cc: Joseph Peznola / Howe Surveying Associates, Inc. Attached please find letter of permission from D&L Andover, LLC; the property owners of 351 Holt Road. Hard copy to arrive at Health Department, Monday AM. Regards, Jon ___ �w`�,r,cr,t[i i7 rirLv 7rG r�teec�i NO. 555 P.2 OFFICE OF BUILDING INSPECTOR . TOWN OF NORTH ANDOVER CONSTRUCTION CONTROL PROJECT NUMBER: Architectural Project No. 6-600-145 PROJECT TITLE: Sweetheart Cup Compan PROJECT LOCATION: 351 Holt Road, North Andover NAME OF BUILDING: NATURE OF PROJECT: Renovation _ Phases r II, III IN ACCORDANCE WITH ARTICLE 116 OF THE MASSACHUSETTS STATE BUILDING CODE, I_Paul T. Merrill REGISfRATIONNO. 42997 BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECI-1 HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPAR, TION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ENTIRE PROJECT ARCHITECTURAL n STRUCTURAL D MECHANICAL FIRE PROTECTION © ELECTRICAL Q OTHER (SPECIFY) FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISION OF THE MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRATICES. AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND B EPRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0 1. Review, for conformance to the design concept, shop drawings, samples and other submiffals which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality control procedures for all code -required controlled material 3. Be present at intervals appropriate to the stage of construction to become, generally familiLPAUL withSthe progress and quity of the work and to determine, in general, if the,work is bein Performed in a manner consistent with the construction documents. LL PURSUANT TO SECTION 116.2.2 1 SHALL SUBMIT WEEKLY, A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE NORTH ANDOVER BUILDING INSPE UPON COMPLETION OF THE WORK, I SHALL SUSMiT A FINAL REPORT AS TO THE SATiS--FACTORY COMPLETION AND READINESS OF THE PROJECT FO CUP Cy. SAND SW R ZXRE ME THIS 1:2J�OF 0 ELICNO� �,u,/ MY COMMISSION EXPIRES q-13- CERTIFICATE OF SUBSTANTIAL COMPLETION _ AIA DOCUMENT G704 Distribution to: OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Renovations to 351 Holt rd, ARCHITECT: Forum Studio Inc. (name, address) North Andover, Ma TO (Owner) : Sweetheart Cup Company 351 'Holt Road North Andover, MA L J DATE OF ISSUANCE: October 26, 2001 PROJECT OR DESIGNATED PORTION SHALL INCLUDE: ARCHITECT'S PROJECT NUMBER: 6-600-145 CONTRACTOR CONTRACT FOR: CHyco Construction Co. Renovation to 351 Holt Rd Phase Two and Three CONTRACT DATE: November 1, 2000 Phase Two and Three The Work performed under this Contract -has been reviewed and found to be substantially complete. The Date of Substantial Completion of the Project or portion thereof designated above is hereby established as October 26, 2001 which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below. DEFINITION OF DATE OF SUBSTANTIAL COMPLETION The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Architect when construction is sufficiently complete, in accordance with the Contract Documents, so the Owner can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents. A list of items to be completed or corrected, prepared by the Contractor and verified and amended by the Architect, is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work' in accordance with the Contract Documents. The date of commencement of warranties for items on the attached list will be the date of final payment unless otherwise agreed to in writing. _ Forum Studio Inc. ARCHITECT DATE The Contractor will complete or correct the Work on the list of items attached hereto within zero days from the above Date of Substantial Completion. Clayco Construction Company CONTRACTOR BY DATE The Owner accepts the Work or designated portion thereof as substantially complete and will assume full possession thereof at (time) on (date). Sweetheart Cup Company OWNER BY DAf E The responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: (Note—Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage; Contractor shall secure consent of surety company, if any.) AIA DOCUMENT G704 • CERTIFICATE OF SUBSTANTIAL COMPLETION • APRIL 1978 EDITION • AIA® 0 1978 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 6704 — 1978 CONTROL CONSTRUCTION - SECTION 116.0 M.S.B.C. CERTIFICATE OF ENGINEERING/ARCHITECTURE BUILDING INSPECTOR TOWN OF NORTH ANDOVER 27 CHARLES STREET NORTH ANDOVER, MA 01845 I, Edward H. Moll II HERBY CERTIFY THAT THE WORK DESCRIBED IN Sweetheart Cup Company Relocation Project, 351 Holt Road, Structures North Consulting Engineers Structural Drawings SRI to SR -5, dated 1-12-01 IS COMPLETE AND THAT TO THE BEST OF MY KNOWLEDGE, INFORMATION AND BELIEF THE WORK HAS BEEN DONE IN CONFORMANCE WITH THE PERMIT AND PLANS APPROVED BY THE TOWN OF ANDOVER AND WITH THE PROVISIONS OF THE 6T11 EDITION OF THE MASSACHUSETTS STATE -BUILDING CODE. AUTHORIZED SIGNATURE: N OF DATE: 12-12-01 KVNENC G MOLLREGISTRATION: MA 33718 (Structural) S zi .o NM 33718 FAL NOTE: ENGINEER "WET STAMP" MUST BE AFFIXED TO THIS FORM. CONTROL CONSTRUCTION —SECTION 116.0 M.S.B.C. CERTIFICATE OF ENGINEERING/ARCHITECTURE BUILDING INSPECTOR TOWN OF NORTH ANDOVER 27 CHARLES STREET NORTH ANDOVER MA 01846 GENTLEMEN: I, Paul Todd Merrill HEREBY,CERTIFY THAT THE BUILDING CONSTRUCTED AT 351 Holt Road, North Andover DOES CONFORM IN ALL RESPECTS TO THE MASSACHUSETTS STATE BUILDING CODE AND APPLICABLE FEDERAL REGULATIONS FOR THE FOLLOWING: Mechanical, Electrical, Plumbing Engineering AUTHORIZED SIGNATURE: DATE: 1411 _ T REGISTRATION: 42997 NOTE: ENGINEER "WET STAMP" MUST BE AFFIXED TO THIS FORM. PAUL TODD MERRILL 42997 St. Loins, mo COM(fOICoWl 60M doe misad 2001 CONTROL CONSTRUCTION —SECTION 116.0 M.S.B.C. CERTIFICATE OF ENGINEERINGIARCHITECTURE BUILDING INSPECTOR TOWN OF NORTH ANDOVER 27 CHARLES STREET NORTH ANDOVER MA 01846 GENTLEMEN: I, Christopher Jon _ Cedarareen HEREBY, CERTIFY THAT THE BUILDING CONSTRUCTED AT 351 Holt Road, North Andover DOES CONFORM IN ALL RESPECTS TO THE MASSACHUSETTS STATE BUILDING CODE AND APPLICABLE FEDERAL REGULATIONS FOR THE FOLLOWING: Architechure AUTHORIZED SIGNATURE: DATE: REGISTRATION: 11006 NOTE: ENGINEER "WET STAMP" MUST BE AFFIXED TO THIS FORM. JON No.11006 ST. LOUIS, Mo Of ControfConstructiort doc reAsod 2001 CONTROL CONSTRUCTION -SECTION 118.0 M.S.B.C. CERTIFICATE OF F ENGINEERING/ RCHtTECTURE BUILDING INSPECTOR TOWN OF NORTH ANDOVER 27 CHARLES STREET NORTH ANDOVER MA 01846 GENTLEMEN: I. f avoid Jam_ Burkhart HEREBY:CERTIFY THAT THE BUILDING CONSTRUCTED AT 351 Holt Road, North Andover, . MA (11 A.4 5 ' r DOES CONFORM IN ALL RESPECTS TO THE MASSACHUSETTS STATE BUILDING CODE AND APPLICABLE FEDERAL REGULATIONS FOR THE FOLLOWING; Fire Sprinkler Systems AUTHORIZED SIGNATURE: DATE: ; _ REGISTRATION: F1 ft Pd20TECT701\J NOTE: ENGINEER VET -STAMP' MUST BE AFFIXED THIS FORM. Oz— "Till Town of North Andover F ttORTy q 0 Lao Building Department?t6 °�O 6 � �h i 27 Charles Street ti i North Andover, Massachusetts 01845 (978) 688-9545 Fax (978) 688-9542 4 COC NILNt WKK 1' AGHUs���h APPLICATION FOR CERTIFICATE OF OCCUPANCY / INSPECTION ADDRESS -351 "01'� Ac. Swce'+A- r, -f LOT NUMBER SUBDIVISION DATE REQUEST FILED DATE READY FOR INSPECTION FIVE (5) DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED ALL WORK AND SIGN -OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A RE -INSPECTION FEE OF TWENTY-FIVE ($25.) DOLLARS WILL BE CHARGED IF THE STRUCTURE DOES NOT MEET ALL APPLICABLE CODES. SIGNATURE OFFICIAL USE ONLY ROUTING CONSERVATION PLANNING DATE DATE D.P.W. -WATER METER OL' IZ_k) DATE D.P.W. MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR SPECTION REQUEST DATE. SIGNA "11YW AUTHORIZATION Feb 13 01 08:18a Bob O'Dell 978-738-9866 p.2 OFFICE OF BUILDING INSPECTOR TOWN OF NORTH ANDOVER •'� CONSTRUCTION CONTROL' PROJECT NUMBER: -..Architectural.Project No. 6-600-145 PROJECT TITLE: Sweetheart Cup Company PROJECT LOCATION: 351 Holt _:Road, North Andover NAME OF BUILDING: NATURE OF PROJECT: .Renovation IN ACCORDANCE WITH ARTICLE 116 OF THE MASSACHUSETTS STATE BUILDING CODE, I, Chri saophe_r- •••,T _ C_ end. rr reen REGISTRATION NO. 1 .r 006 BEING A REGISTERED PROFESSIONAL ENGINEERIARCHITECH HEREBY CERTIFY THAT I HAVE PREPARED OR OIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGNPLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ENTIRE PROJECT ❑ ARCHITECTURAL 0 STRUCTURAL ❑ MECHANICAL ❑ FIRE PROTECTION ❑ ELECTRICAL ❑ OTHER (SPECIFY) FOR THE ABOVE NAMED PFOOMT AND THAT, TO THE BEST OF MY KNOWLEGE, SUCH PLANS, COMPUTATIONS AND SPEaFf,6A-nONS`MEET THE APPLICABLE PROVISION OF THE MASSACHUSETTS STATE BUILDING CODE. ALLACEEPTASLE ENGINEERING PRATICEES. AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR ANO' PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEEDING Il l ACtPiRDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT ANO SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0 1. 2. Review, for conformance to the design concept, shop drawings, samples and other submittals which are submitted by the contractor in accordance with the requirements of the construction documents. Review and apprcval of the gfrality control- procedures for all code -required controlled material 3. Be present at intervals appropriate to the.stage of construction to become, generally familiar with- the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. PURSUANT TO SECTION 116.2.2 1 SHALL SUBMIT WEEKLY, A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE. NORTH ANDOVER BUILDING INSPECTC U L ORK, I SHALL SUBMIT A FINAL REPORT AS TO THE v S 715 �� _=4ka 1011 AND READINESS OF THE PROJECT FOR OCCUPANCY. STATE OF MISSOURI Sr. tOM MYC9MYwMONIV�V.15,2M .may, 51 NATURE SUBSCRIBED AND SWORN TO BEFORE ME THIS SD ' DAY OF Ai/'1TACl/ Of 10i it 8AY r'r1M�A(C�Ir'1N �XAiRrr� l �� �CJ D3 /D.3o.oJ C L A Y C 0 C 0 N S T R U C T 1 0 N C 0 M P A N Y • 2 19 9 INNERBELT BUSINESS CENTER OR. SAINT LOUIS MISSOURI 63114 TELEPHONE 3 1 4 . 4 2 9 . 5 1 0 0 FACSIMILE 314.429.3137 November 12, 2001 Mr. Robert Nicetta Town of North Andover 27 Charles Street North Andover, MA 01845 RE: Sweetheart Cup - North Andover Facility Final Completion Project #1-100-034 Dear Robert: Clayco Construction Company has completed all the work in renovating the Sweetheart Cup Plastics Plant at 351 Holt Road and we are substantially complete with the punch list items. Please see the attached Punch List identifying which items are complete along with a signature from Sweetheart Cup. To the best of my knowledge, all work was completed compliant with the Massachusetts State Building Code. Please let me know if there any other outstanding issues that need to be completed before you can issue an Occupancy Permit. Sincerely, Gregg Ernst Project Manager GE/kl Attachment C o n s t r u c t i o n S u c C e s $ 08/24/2001 12:32 FAX FORUM STUDIO 10002 ✓ �8�� ` EMuch Us[ I r, Rto B A71VE O W ♦..!Dt flY t♦i D. To: Mr. Gregg Ernst Date: July 30, 2001 Clayco Construction Company 2199 Innerbelt Business Center Drive Report Number. Twenty Two St, Louis, Missourl 63114 Phone: (314) 429-5100 Project Name: Phase Two Sweetheart Fax: (314) 429-3137 Cup — North Andover From: Mark G. Bender Project No.: 6-600-145.06 Remarks: The following observations were made at the Job site visit on August 21, 2001. Present were Bob Jones of Sweetheart Cup, Gregg Ernst of Clayco Construction and Mark Bender of Forum Studio. The description applies to Phases Two — Process Areas and Phase Three — Office Area. Phase Three — Office Areas General Notes 1. Door hardware locksets are only installed in areas / offices that are currently being used, the remaining offices that are not occupied need to have the Finish locksets installed. Several common areas, such as the Fire Sprinkler Valve closet and Lounge do not have the locksets installed. VCCarpeting of offices not currently occupied need to be cleaned and vacuumed. Construction debris from drywall needs to be cleaned. Vinyl Base throughout the office areas need to be Leaned of the construction adhesive and drywall dust. The installation should be reviewed with the installation contractor, the base appears to be �wavy, in particular on the long hallway. -4. The acoustical lay -in ceiling tiles throughout the Office Area need to be C6refiiy reviewed. In general the tiles at the Sprinkler heads have not been cut and installed and.nafnerous tiles have been scuffed or otherwise damaged. Damaged tiles should be painted or rePige' s as needed. The locations listed below are not the limits of damaged tiles. All damaged tilgs�4ed to be repaired or replaced. 5. Horizontal blinds are not installed in any of the offices. 6. Numerous light fixtures have are making a buzzing sound and should be reviewed with the electrical contractor. K7. The H.V.A.C. System should balanced by a testing`professional. Wet Bar 037 1. The Cabinets need to be cleaned of the Construction adhesive, and sawdust within the cabinets. 2. The exposed piping in the lower left cabinet should be covered with a removable plastic laminate panel. A shelf should be installed within this unit. 3. The electrical wire to the pump should be shortened. (S) The VCT flooring near the pump needs to be patched in, there should not be any exposed concrete floor. )1;5. The cabinet doors above the sink need to be adjusted to be level. Office 029 The east light fixture hums ano�ound be verified with the Electrical Contractor. The Vinyl Base should be wipers down and cleaned. The tape used to mask off for painting located behind the door needs to be removed and the paint �over spray on the ceiling grid 2bove the door should be removed. 4. Door 029 needs to be adjusted, it binds onto the frame at the bottom of the door. 08/24/2001 12:33 FAX FORUM STUDIO 0 003 Architectural Punch List T HPRELI L �ABS�@3er,r husePage 2NOT FOR COC5 Office030 X1. Two outlets have a gap between the outlet cover and the drywall. The gap should be filled with joint compound and/or cover plate adjusted. Qf%g 031 I.TTwo ceiling tiles are missing. 2. The Drywall at the comer near the ceiling, behind the door, is cracked and needs to be repaired. 3. The door needs to be adjusted within the frame the bottom edge is binding. 4. There is a gap between frame and the drywall that needs to be filled. Off'03 — boor lever handles do not operate smoothly and need to be adjusted. The door needs to be adjusted and leveled, it is binding at the lower edge. �2. Ceiling tile at the sprinkler head needs to be installed. Cordidor 035 1. The ceiling tile to the right of Office 036, above the fire alarm, is scuffed and needs to be repaired. Two other ceiling tiles need to be installed at the sprinkler heads. Corridor 040 )(1. Three ceiling tile need to be installed at the sprinkler heads. The ceiling tile near the door of Office 033 is scuffed. Cord or 038 1. The ceiling tiles near door 031 and near the drywall cloud do not set into the grid properly. Office 032 1. Ttta ceiling tiles along the north wall do not sit into the grid properly. Lounge 033 XI. No lockset is installed on the door to this space. This is a FireExit path and should only have a passage lockset, at the owner's request, a push/pull would be sufficient. j- 2. The ceiling tile at the sprinkler head needs to be installed. Office 034 1. The Drywall at the comer above the window is cracked and needs to be repaired. 2. Door #034 needs to be adjusted and leveled, the top is binding onto the frame and a door stop needs to be installed. CDQV 037 3. The ceiling tiles at the sprinkler heads need to be installed. 4. The I-IM.A.C. diffusers do not set into the grid properly. PThe vinyl base on the right side of the counter is peeling up and needs to be reinstalled. 6. The cabinet door of the upper left cabinet and the lower cabinet second from the right is damaged. The plastic laminate needs to be repaired. The vinyl base under the cabinets needs to be Installed and on the right side of the cabinets the vinyl base needs to be repaired. Dor 045 ...1. Door is missing and needs to be installed. Men's Toilet Room 045 2. The lighting of this room is too dark. The Electrical contractor should review the possibility of adding more light fixtures. t The cover of the clean out need to be cleaned and reinstalled to be flush with the ceramic tile flooring. 08/24/2001 12:33 FAX ,f Punch list Page 3 4 5. 7. FORUM STUDIO 10004 01 q W. ALR&,134 KOT FOR CONSTRUCTION The urinal water runs constantly and needs to be repa r o The drywall and paint is scuffed where the beam of the metal partition hits the wall. The ceramic file needs to be cleaned, this is particularly evident where the tile and wall meet. There is drywall joint compound and/or grout from the tile installation throughout the room. Signage is not installed. Corr'dor 045 Al. The wall across from door 045 is scuffed and dirty, approximately 18 inches above the floor. It needs t3. to be cleaned or repaired. 2. Door 045 is missing. The frame has a steel plate that needs to cut off. The abandoned fire alarm box just outside of door 045, if not used, needs to be reomved. Unisex Toilet 024 4. This is an accessible toilet room and will need to have grab bars installed. 5. The lighting in this room is too dark and needs to be reviewed to add additional light fixtures. Additionally the light above the counter should be reviewed to have egg create lens on the bottom to show light onto the counter. This condition Is typical throughout all toilet rooms and needs to be reviewed with the construction documents. 6. Additionally one of the recessed lighting fixtures needs to be adjusted, it does not ft up tight to the drywall ceiling. 7. The door stop on the wall needs to be replaced with a floor mounted door stop. The door currently hits the ceramic tile base and will damage the bottom of the door. 8. The drywall or paint ion the celing is scuffed near the sprinkler head. The ceramic tie needs to be cleaned, this is particularly evident where the tile and wall meet. There is drywall joint compound and/or grout from the tile installation throughout the room. 10. The paint overspray on the door frame needs to be removed or repainted. 11. The paint application does not appear correct. The room should be repainted with a second coat. Corridor 026 1. The wing wall leading is missing near the training room.. A piece vinyl base between Door 027A and Door 027B is missing. Office 023 P. The ceiling tile at the sprinkler head is missing. 2. Door 023 does not close. The frame will need to be adjusted. Trainina Room 028 IN1. The window needs to be cleaned, there is paint from the window frame on the glass. • 2, The drywall or paint on the west/northwest corner is scuffed and needs to be touched -up. 4/ 3. The light diffuser/ louver nearest the south door is damaged and needs to be replaced. 4. The ceiling the near the south sprinkler head is scuffed. 022 1. Numerous ceiling tiles are scuffed throughout the room, approximately 10 locations. Additionally the We next to the light fixture does not set into the grid properly and the file at the sprinkler head is missing and the tiles along the south wall are not cut to set into the grid. C idor 041 1. The ceiling tile near the sprinkler head is scuffed. There is a dimple in the VCT flooring near the training room. The floor the should be removed, the concrete floor leveled and tile replaced. Office 021 �1. TThe ceiling tile near the sprinkler head is missing and the the near the left window is scuffed. 08/24/2001 12:33 FAX FORUM STUDIO 1� 005 Punch List :rjilj T MART ELIMIN 8 e use Page 4 9 0-14 j NOT FOR CONSTRUCTION Office 020 X1. The ceiling tile near the sprinkler head is missing, and the tile near ed. Office 019 1. Door 019 needs to be adjusted and level within the frame, it binds at the bottom. Pa 15 7. The vinyl base is missing near the safe. Within the safe the Wall need to be painted. Office 016 71. The ceiling tile along the north wall is not cut to set into the grid. Corridor 043 1. The aluminum frame of the sliding doors need to be cleaned. Consult with the painting contractor to find out if the frames can be refinished or painted. The gap between the VCT Flooring and the aluminum frame needs to be caulked. President's Office 014 1. The junction of the exposed rock wall and the new drywall walls needs to be finished with a caulk to match the color of the rock, or paintabte caulk and paint to match the walls. 2. The light fixtures have a hum and should be reviewed by the electrical contractor. The two smaller closet on the east wall need to have vinyl base Installed. 4. There is an outlet cut into the south west wall that will need to be completed or a cover plate installed. 5. The Drywall near the east window needs to be repaired, sand smooth and repaint. 6. Door 0148 needs to be adjusted, it is binding into the frame. Wet Bar 014A 1. The west wall needs be completed. Install framing and drywall as needed to cover pipes and exposed rock wall. 2. The exposed pipes of the drain under the cabinets need to be covered, a shelf and cover panel made of matching plastic laminate should be installed. 3. Vinyl base under the cabinets needs to be installed. The carpet outside of the Wet Bar 014A needs to be trimmed. Reception 006 1. The ceiling the along the west wall Infront of the reception desk is scuffed and does not set into the grid. 7� 2. The 2x4 Light fixtures do not set into the grid. 3. The counter top is not installed on the two half high walls behind the reception desk. These walls were designed to go to the ceiling not as half walls. 4. The joints in the reception desk plastic laminate need to be caulked or filled, in particular where the counter top meets the half walls behind the desk. 5The ceiling tiles near the 2x4 light fixture is dirty and needs to be replaced. PThere is a gap between the ceramic the base and the Drywall on the west wall The ceramic tile base near the water fountains need to be completed. 8. The Drywall edge at the water fountain needs to be painted. . 9. The accent lights above the reception desk do not tum on. Wo en's Toitet 012 1. Door 012A needs to have the closer adjusted, it is too heavy. The upper corner of the inside face is chipped. The ceramic tile needs to be cleaned, the grout joint where the the meets the drywall needs to `(addressed. This joint should be cleaned up and any gaps need to be filled. 3. The plastic laminate counter needs to be cleaned, remove the construction adhesive. 08/24/2001 12:34 FAX FORUM STUDIO IA006 FRELIMI Architectural ® kP' pu®chfist N TAF QRuC0N-STAire0 l] qD1 Page S )�4. The Exhaust fans of all of the Toilet rooms need to be adjusted. It sounds like the fan is operational but no air is being removed. C> The cover of the cleanout needs to be raised to be flush with the finished floor, and cleaned. Mei 'sToilet 013 1. Door 013B will not lock and needs to be adjusted. The closer needs to be adjusted to door closes too softly. fc�The cover of the cleanout needs to be raised to be flush with the finished floor, and cleaned. The paint is scuffed with in the toilet stall. The ceramic We needs to be cleaned. Office 011 1. Door 011 the frame needs to be cut in, and the gap needs to be filled. Office 009 1. Door 009 the frame needs to be cut in, and the gap needs to be filled. Office 008 Door 008 the frame needs to be cut in, and the gap needs to be filled. Office needs carpet and vinyl base installed. �( 3. The plastic over the lights needs to be removed. Conference Room 007 1. The joint of the drywall and the aluminum frame needs to be caulked. The return of the drywall needs to be painted as it is visible from the outside of the building through the window. 2. The drywall is warped on the southeast comer and needs to be repaired. 3. The wood base needs to be mitered at the east wall. �4. The paint at the ceiling needs to be touched -up near the aluminum frame. Office 003 I. The light fixture does not set Into the grid and one of the diffusers / louvers is damaged. )(2. Drywall on the west wall is damage and needs to be repaired. &3. The paint needs to be touched up around the thermostat and near the door frame. 4. Door 003 binds into the frame at the bottom. Office 005 1. The plastic on the light fixtures needs to be removed. 2. A light fixture needs to be added to the vestibule into the telephone room. Tele ne / Com uter Room icyThese rooms need to be finished with lay -in ceiling, VCT Flooring and painted. This was not in the original design. Entry 1. Door 006 does not Gose and the door hardware is not installed. This will be coordinated with the installation of a card swipe access / security system. 2. The pass —thru does window will be receiving a lock. adof S 3. The Aluminum frame needs to be cleaned <4. Door 002 needs to be reviewed the workmanship of the installation of the new hinge has damaged the door frame. Repairs will be needed. The door closers need to be adjusted and new hardware needs to be installed, including new weatherstripping. 5. The Rubber gassket in the window above Door 002 is failing out and needs to be repaired. 6. There is a white (tape) line inbetween the panes of glass of the window above the pass-thru window that needs to be address by the installer. This white line is not visible on other windows. STATEMENT OF PROJECT COMPLETION 780 CMR 116.0 - Construction Control Massachusetts State Building Code CERTIFICATE OF ARCHITECTURAL DESIGN Date: 28 December 2001 To: Office of the Building Inspector Town of North Andover Building Department 27 Charles Street North Andover, MA 01845 Project: Selective Demolition & Structural Repairs for the relocation of SWEETHEART CUP COMPANY located at 351 Holt Road North Andover, MA I, Daniel H. Pierce hereby certify that I have visited the project site, have sent other appropriately qualified design professionals to visit the site during the construction process, and have determined to the best of my knowledge, information and belief that the work has been completed in accordance with the Construction Documents dated 31 October 2000 and revised 01 December 2000 prepared by Pierce Architects, and the plans and permits approved by the Town of North Andover Building Department for the Selective Demolition work at the subject Project. I also certify that the Selective Demolition work complies with the applicable provisions of the 6th Edition of the Massachusetts State Building Code. Authorized Signature: Daniel H. Pierce, AIA Architect D. H. Pierce Design Associates, Inc. d/b/a Pierce Architects Company o\S e*D Aq�y/ o No. 6401 �o SALEM, MA �J �LF9lTH 0 MP`'SP 6401 Massachusetts Registration No. 1kLPER AUDI, INC. STRUCTURAL ENGINEERS January 9, 2002 Bob Nicetca Town of North Andover 27 Charles Street North Andover, MA 01845 Re: Sweetheart Cup Company Mezzanine Acceptance :•• I hereby certify that I am the structural engineer of record for the above referenced project. We designed the framing, bearing walls and foundations and prepared the structural plans and specifications for the mezzanine addition now completed within the existing Sweetheart Cup facility. Based upon our review of submitted material's test reports, shop drawings and intermittent site visits by an independent testing lab, we can state that to the best of our knowledge and belief the mezzanine was constructed to be in conformance with the project's plans and specifications, and the applicable sections of the Massachusetts State Building Code, - 6th edition, and meets the accepted standard of quality and care of the construction industry. Respectfully, * e Marc H. Alper, P. . MHA;esm A01002 MHA Sweetheart Cup Mezzanine Accept. 1-9-02 1804 Borman Circle Drive • St. Louis, Missouri 63146 • 314/432-8600 • Fax: 314/432-8630 E-mail: aai@alperaudi.com • Website: www.alperaudi.com