HomeMy WebLinkAboutMiscellaneous - 38 COMPASS POINT ROAD 4/30/2018Qv
ci—
Location I fs --1 ,
No.
Datez�f.6
TOWN OF NORTH ANDOVER
Certificate of Occupancy $
Building/Frame Permit Fee $ 3C6
Foundation Permit Fee $
Other Permit Fee $
TOTAL $
Check #
Building Inspector
t Coil] Monwealth of Massachusetts
Sleet Metal Permit
Date: I I $ 1 Q
LstinatediJob Cost: }; 3 000, a_
Plans Submitted: YES NO
Business License 11 196
Business Information:
Name: J&J Beating. & Air Conditloning
Street: 17 Arlington St.;
city/Town: Dracut, MA 01826
Telephone: .97.13-454-13197
PhotoLID. required / Copy of Photo I.D. attaclicd
J-1 / M -1 -unrestricted license
Permit If /
Permit Fee:
Plans Reviewed: YES NO
Applicant License it
Property Owner / Job Location Information:
Namc: (_(v ry C 6 0
Stt'ect: IT
City/Town: North Andover, M& 011345
Telephone: _�e, 3 yS�d
YES NO
Stn rr III ilial
J-2 / M-27restrictcd to dwellings 3 -stories or less arid conunerclal up to 10,000 sq. ft. / 2 -stories or less
Res id ential:-T-2"f; lhily IvTiilti-fanuly Condo / TOwnhouses Other
Commercial: Office Retail Industrial Educational
Institutional Other
Square Footage: under 10,000 sq. ft-. t/' over 10,000 sq. ft. Number of Stories:
Sheet metal work to be completed: New Work: Y' Renovation:
HVAC ✓ Metal Watershed Roofing Kitchen Exhaust System
Metal Chimney / Vents Air Balancing
Provide detailed description of work to be done:
--� Rim i� /1I �7� l d ri �7`"1t7 0 r �� -Fe ✓ i7� UA c s
h � Cep s %,��� h �-�-,---�— •
a
INSURANCE COVERAGE:
I have a current habilit insurance policy or its equivalent which meets the requirements of M.G.L. C11.1 12 Yesz No ❑
If you have checked Yes, indicate the type of coverage by checking the appropriate box below:
A liability insurance policy Other type of indemnity ❑ Bond ❑
OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the
Massachusetts General Laws, and that my z.ignature on this permit application waives this requirement.
Check One Only
Owner ❑ Agent ❑
Signature of Owner or Owner's Agent
By checking this box[), I hereby certify that all of the details and Information I have subrnitted (or entered) regarding this appllcatlon are true and
accurate to the best of my knowledge and that all sheet rnotal work and Installations performed under the perrnit issued for this application will be
in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws.
Duct inspection required prior to insulation installation: YES NO
Prot,ress Inspections
Tate Comments
Final Inspection
Date ComillentS
By
Tille
cityrrown
Permit it
Fee $
Inspector Signature of Permit Approval
Type of License:
❑ Master
❑ Master -Restricted
❑Journeyperson
❑Journeyperson-Restricted
❑ - -- --
Signature of Licensee
License Number: I S AA
Check at vvwmas
w.s.cIov/dpi
-- The Commonwealth of Massachusetts
— Depaa•tment of IiulustriuLAcci.tlerats
I Con- rens Street, Sante 100
Boston, MA 02114-2017
www. mass., o v/ilia
1\ orkers' Compensation Insurance Affidavit: [31jil(lers/Contractors/Electricians/Plumbers.
'I'0 I31; 11LED WIT1-1 THE PERNII'1'TINC AUTHORITY.
Applicant Information Please, Print l e<*ibly
Name(13usincss/OrgLill i,tttionilrid ividual): J & J Beating & Air Conditioning, Inc.
Addl'ess: 17 Arlington. Street
City/State/Zip: llr_acut. 1�TA. 01826 Phone 9: 97
Are you an employer? Check the appropriate box:
I.13 1 am a employer will, 40 employees (full and/or part-time).*
2.❑ l am a sole proprietor or partnership and have no employees vvorlcing for me in
any capacity. [No workers' comp. insurance required]
3.0 1 am a homeowner doing all work myself. [No workers' comp. insurance required. I
4.F-1 1 am a homeowner and will be hiring contractors to conduct all work on my properly. I will
ensure that all contractors either have workers' compensation insurance or are sole
proprietors with no employees.
5.❑ I am a general contractor and I have hired the sub -contractors listed on the attached sheet.
These sub -contractors have employees and have \vorkers' comp. insurance.,
6.❑ We are a corporation and its officers have exercised their right ol'excmption per MGL, c.
152, § 10), and we have no employees. [No workers' comp. insurance required..)
Type of project (required):
7. El New construction
S. ❑ Remodeling
9. ❑ Demolition
10 ❑ Btiilding addition
I LFJ Electrical repairs or additions
12.❑ Plumbing repairs or additions
13.❑ Roof repairs
14.®Other
--- - 1 u� of un vur me secoon oeiow snowing their workers' compensation policy inm
foration.
1 I lomcowners who submit this alTidavil indicating they are doing all work and then hire outside contractors mist submit a neve affidavit indicating such.
tConuactors that check this box must attachecl an additional sheet showing the name of the sub -contractors and state wlicthcr or not those entities have
cmployccs. 11'01C sub -contractors have employees, they mus( provide their workers' comp, policy number.
/ am alt employer' that is pl•ovidinn Ivorke/s' compensation insrllr(rlee for my empl(�yees. Below is tl/e polio(,jiff job site
in%a/•n(atian.
Insurance Company Name: A.I.M. Mutual Insurance
PGlicy # or Seli=iii.s. Lic. #: WA1Z-800-8006553-2016 Expiration Date: 6/2/1.7
Job Site Address: S City/State/%ip: `�y��op� l 4,0 U (l1 S
Attach a copy of the workers' c mlgensation policy declaration pabe (showinti the policy number and expiration date).
( allure to secure coverage as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to $1,500.00
and/or one-ye�� imprisonmeiit, as well as civil penalties in the form of a STOP WORK ORDER and a Pine of up to $250.00 a
day against -Elie violator. f\ c; jay of this statement may be forwarded to the Office of Investigations of the DIA for insurance
coveragz%ecification. " �
pClq(IJt J (If pC'!f((l�)th(it the illlOP/11(11(O/t p/'OV!(IL'd abOVL' is t/'!lL' (!11 (I CO('1'G'Ct.
/ 4
=819
Of fl.ci.al c(se ,lily. Do not ),)l•ite i.n this area, to he conrplete(t by citl7 (1/• torvll oFJicial.
City or Town:
Permit/License it
Issuiind Authority (circle one):
I. 130ard of Health 2. Btiddinb Department 3. City/"I'owu Clcrl( 4. Electrical Inspector S. Plumbing hlspector
6. Other
Contact Person:
Phone #:
ACRO®
CERTIFICATE OF LIABILITY INSURANCE
DATE (MMIDDIYVW)6/2/2016
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER
CONTACT
NAME: Laurence Hall, CIC
PH[CO_NE Ext), (978) 887-4900 AIC No: (978)887-2404
Sennott Insurance Agency
16 South Main Street
E-MAIL ADDRESS: y Tarr hall@sennottinsurance.com
INSURERS AFFORDING COVERAGE
NAIC #
P. O. BOX 457
INSURERA:Great American Alliance Ins.Co
EACH OCCURRENCE $ 1,000,000
Topsfield MA 01983
INSURED
INSURERB:Safet Iris Co
INSURERcA.I.M. Mutual Ins Co
J&J Heating & Air Conditioning, Inc.
17 Arlington Street
INSURER D:
_
INSURER E :
INSURER F:
6/1/2016
Dracut MA 01826
COVERAGES CERTIFICATE NUMBER:2016-2017 Renewal Certs REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
TYPE OF INSURANCE
ADDL
SUBR
POLICY NUMBER
POLICY EFF
MM/DD/YYYY
POLICY EXP
MM/DDIYYYY
LIMITS
X COMMERCIAL GENERAL LIABILITY
EACH OCCURRENCE $ 1,000,000
A
CLAIMS -MADE OCCUR
DAMAGE TO RENTED 300,000
PREMISES Ea occurrence) __$___
MED EXP (Any one person) $ 10,000
PAC6418906-10
6/1/2016
6/1/2017
PERSONAL & ADV INJURY $ 1,000,000
GENT AGGREGATE LIMIT APPLIES PER:
GENERAL AGGREGATE $ 2,000,000
POLICY EO- LOC
2,000,000JCT
$
OTHER:
AUTOMOBILE
LIABILITY
Oa &NE(DSINGLE LIMIT
E $ 1', 000, 000
BODILY INJURY (Per person) $
B
ANY AUTO
ALL OWNED SCHEDULED
AUTOS AUTOS
2434550
6/1/2016
6/1/2017
BODILY INJURY (Per accident) $
HIRED AUTOSNON-OWNED
AUTOS
Ix
PROPERTY DAMAGE $
(Per accident)
X
UMBRELLA LIABX OCCUR
EACH OCCURRENCE $ 2,000,000
AGGREGATE $ 2,000,000
A
EXCESS LIAB El CLAIMS -MADE
$
DED I I RETENTION$
UME6418958-09
6/1/2016
6/1/2017
C
WORKERS COMPENSATIONP
AND EMPLOYERS' LIABILITY YIN N
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
If yes, describe under
N /A
WMZ-800-8006553-2016
"
6/2/2016
6/2/2017
OTH-
X ER STATUTE ER
E.L. EACH ACCIDENT $ 1f000,000
E.L. DISEASE - EA EMPLOYEE $ 1,000,000
E.L. DISEASE - POLICY LIMIT $ 1 000,000
DESCRIPTION OF OPERATIONS below
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
Evidence of Insurance
ACORD 25 (2014/01)
INS025 0014nn
UAVO-r-LLA I IUIV
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES'BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
L Hall, CIC/LH2
Cc 1988-2014 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
MONWEA"LTH O
fAS' ' "NEW)v,7[
F
I S;
w DRIVER'S
s
LICENSE
Iln
n;. 1ss
Oi END 41J NUMBER
tj 5-03-2616' NONE S9965�jQ
1; 05 22 198p
.° Rm
...DM NONE Is s. M 1G.HCTFGO9 •......,
..
.. � ... �
KLINE
2 ERIC RJ
' R tOG MEADOW CREEK DR
i':,,.... d5,2Z�1pgo.. .
DRACUT, MA 01826
/G(�/•�/'-
0 1)005-041016Rcv07.15,2009
Load Short Form Job: 38 Compass Point J4
wrightsoftm Date: Oct 14, 2016
Entire House By:
J&J Heating and Air Conditioning
17 Arlington st, Dracut, Ma 01826 Phone: 978 4548197 Email: eric@jjheatac.com Web: jjheatac.com
' •
For: Trust Construction
51 Mount Joy Drive, Tewksbury, Ma 01876
HEATING EQUIPMENT
Make
Trade
Model
AHRI ref
Efficiency
Heating input
Heating output
Temperature rise
Actual air flow
Air flow factor
Static pressure
Space thermostat
80 AFU E
0
Btuh
0
Btuh
0
OF
778
cfm
0.027
cfm/Btuh
0
in H2O
COOLING EQUIPMENT
Make
Trade
Cond
Coil
AHRI ref
Efficiency
Sensible cooling
Latent cooling
Total cooling
Actual air flow
Air flow factor
Static pressure
Load sensible heat ratio
0 SEER
0
Btuh
0
Btuh
0
Btuh
778
cfm
0.046
cfm/Btuh
0
in H2O
0.83
208
ROOM NAME
Area
(ft2)
Htg load
(Btuh)
Clg load
(Btuh)
Htg AVF
(cfm)
Clg AVF
(cfm)
Garage
286
0
1164
0
54
Family Room
208
4109
2044
110
94
Kitchen
294
5558
3702
149
170
Stair
84
1029
222
28
10
1/2 bath
42
1736
679
47
31
Entry
56
1683
706
45
32
master bath
96
2335
1355
63
62
master bedroom
290
4287
2758
115
127
bedroom 2
247
4301
1927
115
89
Full bath
91
2326
821
62
38
2nd floor stairs
84
836
632
22
29
closet
100
741
220
20
10
%mach/ rlrver
on
n-1
nc
ti oz)z7 i 3U
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wri htsoft, 2016 -Nov -23 06:34:40
9 Right -Suite@ Universal 2015 15.0.23 RSU05790 Page 1
%iCcp....-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
Entire House
1902
28982
16889
778
778
Other equip loads
0
2730
Equip. @ 0.93 RSM
18167
Latent cooling
3891
TOTALS
nnnrn
�vvVL GLVJU //o /to
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2016 -Nov -23 06:34:40
.� wrightsoft° Right -Suite® Universal 2015 15.0.23 RSU05790 Page 2
ACCP ...-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJB Front Door faces: N
a
Heating
Component
®- e
•r1r,4 Eel
% of load
Walls
Location:
Boston Logan Int'I AP, MA, US
6623
Indoor:
Indoor temperature (°F)
Heating
68
Cooling
75
Elevation: 30 ft
Latitude: 42°N
10.2
Design TD (°F)
Relative humidity (%)
56
50
13
50
Outdoor: Heating
Dry bulb (°F) 12
Cooling
Moisture difference (gr/Ib)
42.7
27.8
Dally range6 °F) -
Wet bulb
88
72 (L
Infiltration:
) Method
Simplified
Infiltration
(°-
Wind speed (mph) 15.0
7.5
Construction quality
Fireplaces
Ti ht
1 Average)
a
Heating
Component
Btuh/ft2
Btuh
% of load
Walls
2.8
6623
22.9
Glazing
16.7
2952
10.2
Doors
4.0
339
1.2
Ceilings
2.0
2074
7.2
Floors
3.5
4375
15.1
Infiltration
4.3
9912
34.2
Ducts
2708
9.3
Piping
0
0
Humidification
0
0
Ventilation
0
0
Adjustments
0
Total
289821
100.0
Coolin
Component
Btuh/ft2
Btuh
% of load
Walls
0.9
2050
10.4
Glazing
13.9
2467
12.6
Doors
7.7
646
3.3
Ceilings
1.9
1920
9.8
Floors
0.8
991
5.1
Infiltration
0.9
2105
10.7
Ducts
1821
9.3
Ventilation
0
0
Internal gains
4890
24.9
Blower
2730
13.9
Adjustments
0
Total
19619
100.0
Latent Cooling Load = 3891 Btuh
Overall U -value = 0.096 Btuh/ft2-°F
Data entries checked.
L. *wrightsoftW 2016 -Nov -23 06:34:40
�� Right -Suite® Universal 2015 15.0.23 RSU05790 Page t
..-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
wri htsoft
9
Component Constructions
Job: 38 Compass Point J4
21.0
Entire House
Date: Oct 14,
By:
2016
373
J&J Heating and Air Conditioning
525
0.065
17 Arlington st, Dracut, Ma 01826 Phone: 978 4548197 Email: eric@jjheatac.com Web: jjheatac.com
3.61
1897
0.99
522
s
315
0.065
21.0
3.61
For:
Trust Construction
313
W
504
51 Mount Joy Drive, Tewksbury, Ma 01876
21.0
3.61
1821
0.99
501
all
Location:
Indoor:
Heating
Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F)
68
75
Elevation: 30 ft
Design TD (°F)
56
13
Latitude: 42°N
Relative humidity (%)
50
50
Outdoor:
Heating Cooling Moisture difference (gr/Ib)
42.7
27.8
Dry bulb (°F)
12 88 Infiltration:
0.99
54
Daily range (°F)
Wet bulb (°F)
- 15 ( L ) Method
- 72
Simplified
21.0
Wind speed (mph)
Construction quality
15.0 7.5 Fireplaces
Tiht
1 Average)
197
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft' Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft' Btu
Walls
12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
12F-Osw: Frm wall, wd ext, 5/8" wood shth, r-21 cav ins, 5/8"
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall,
r-8 ins, 8" thk, 1/2" gypsum board int fnsh
Partitions
12C-Osw: 12C-Osw
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2
glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
6.67 ft head ht
Doors
11 P0: Door, mtl pur core type
Ceilings
1613-30ad: Attic ceiling, asphalt shingles roof mat, r-20 roof ins,
r-30 ceil ins
1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2"
gypsum board int fnsh
C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2"
gypsum board int fnsh
n
375
0.065
21.0
3.61
1355
0.99
373
e
525
0.065
21.0
3.61
1897
0.99
522
s
315
0.065
21.0
3.61
1138
0.99
313
W
504
0.065
21.0
3.61
1821
0.99
501
all
1719
0.065
21.0
3.61
6212
0.99
1710
e
54
0.065
21.0
0
0
0.99
54
s
54
0.065
21.0
0
0
0.99
54
w
198
0.065
21.0
0
0
0.99
197
all
306
0.065
21.0
0
0
0.99
304
e
90
0.073
8.0
4.56
410
0.40
36
261
0
0
0
0
0
0
n
111
0.300
0
16.7
1851
8.94
992
e
33
0.300
0
16.7
550
29.1
961
s
33
0.300
0
16.7
550
15.6
514
all
177
0.300
0
16.7
2952
13.9
2467
S
21
0.290
10.5
16.1
339
7.68
161
s
63
0.290
10.5
0
0
7.68
484
all
84
0.290
10.5
4.03
339
7.68
646
100
0.032
30.0
1.78
178
1.60
160
832
0.026
38.0
1.45
1203
1.30
1082
49
0.255
1.0
14.2
693
12.7
624
wri htsoft 2016 -Nov -23 06:34:40
9 Right-SuiteO Universal 2015 15.0.23 RSU05790 Page 1
ACCP.... -J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
C part ceiling,: C part ceiling, hrd wd fir fnsh, r-38 ins, frm fir, 12"
thkns, 5/8" gypsum board int fnsh
Floors
19A-Obswp: Part floor, hrd wd fir fnsh, frm fir, 10" thkns
19A-Obswp: Part floor, hrd wd fir fnsh, frm fir, 8" thkns
19C-19cscp:l9C-19cscp
21A -24t: Bg floor, heavy dry or light damp soil, 6' depth
39
0.028
38.0
0
0
1.40
55
684
0.295
0
6.16
4215
1.40
955
26
0.295
0
6.16
160
1.40
36
247
0
0
0
0
0
0
286
0.025
0
0
0
0
0
t wri htsoft� 2016 -Nov -23 06:34:40
9 Right -Suite p0 Universal 2015 15.0.23 RSU05790 Page 2
ACCK ...-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
wrightsoft- Component Constructions Job: 38 Compass Point J4
p Date: Oct 14, 2016
Garage By:
J&J Heating and Air Conditioning
17 Arlington st, Dracut, Ma 01826 Phone: 978 4548197 Email: eric@jjheatac.com Web: jjheatac.com
For: Trust Construction
51 Mount Joy Drive, Tewksbury, Ma 01876
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuhtt2-°F ftp-°F/Btuh Btuh/ft2 Btu MOM Btu
Walls
12F-Osw: Frm wall, wd ext, 5/8" wood shth, r-21 cav ins, 5/8"
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
Partitions
(none)
Windows
(none)
Doors
11 P0: Door, mtl pur core type
Ceilings
C part ceiling,: C part ceiling, hrd wd fir fnsh, r-38 ins, frm fir, 12"
thkns, 5/8" gypsum board int fnsh
Floors
21A -24t: Bg floor, heavy dry or light damp soil, 6' depth
e 54
Desi§hTconditions
21.0
0
0
Location:
54
Indoor:
Heating
Cooling
Boston Logan Int'I AP, MA, US
0
Indoor temperature (°F)
68
75
Elevation: 30 ft
21.0
Design TD (°F)
56
13
Latitude: 420N
all 306
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/Ib)
42.7
27.8
Dry bulb (°F) 12
88
Infiltration:
Daily range (°F) -
15 (L
) Method
Simplified
Wet bulb (°F) -
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Tiht
1 Average)
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuhtt2-°F ftp-°F/Btuh Btuh/ft2 Btu MOM Btu
Walls
12F-Osw: Frm wall, wd ext, 5/8" wood shth, r-21 cav ins, 5/8"
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
Partitions
(none)
Windows
(none)
Doors
11 P0: Door, mtl pur core type
Ceilings
C part ceiling,: C part ceiling, hrd wd fir fnsh, r-38 ins, frm fir, 12"
thkns, 5/8" gypsum board int fnsh
Floors
21A -24t: Bg floor, heavy dry or light damp soil, 6' depth
e 54
0.065
21.0
0
0
0.99
54
S 54
0.065
21.0
0
0
0.99
54
W 198
0.065
21.0
0
0
0.99
197
all 306
0.065
21.0
0
0
0.99
304
S 63
0.290
10.5
0
0
7.68
484
39
0.028
38.0
0
0
1.40
55
286
0.025
0
0
0
0
0
2016 -Nov -23 06:34:40
wrightsoft' Right -Suite@ Universal 2015 15.0.23 RSU05790 Page 3
ACCA ...-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
wri htsoft Component Constructions Job: 38 Compass Point J4
r 9 Date: Oct 14, 2016
Family Room By:
J&J Heating and Air Conditioning
17 Arlington st, Dracut, Ma 01826 Phone: 978 454 8197 Email: eric@jjheatac.com Web: iiheatac.com
•ectintormation
For: Trust Construction
51 Mount Joy Drive, Tewksbury, Ma 01876
Construction descriptions
Or
Area
U -value
Insul R
Location:
Boston Logan Int'I AP, MA, US
Loss
Indoor:
Indoor temperature (°F)
Heating
68
Cooling
75
Elevation: 30 ft
ft2
Design TD (°F)
56
13
Latitude: 420N
Btuh/112
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/Ib)
42.7
27.8
Dry bulb (°F) 12
Daily range (°F) -
88
15 (L
Infiltration:
)
n
87
Wet bulb (°F) -
72
Method
Construction quality
Simplified
Tiht
0.99
Wind speed (mph) 15.0
7.5
Fireplaces
1 Average)
0.065
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Clg HTM
Gain
ft2
Btuh/V-°F
ftz'F/fth
Btuh/ft2
Btu
Btuh/112
Btu
Walls
12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2"
n
87
0.065
21.0
3.61
314
0.99
87
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
w
144
0.065
21.0
3.61
520
0.99
143
all
231
0.065
21.0
3.61
835
0.99
230
Partitions
12C-Osw:12C-Osw 117 0 0
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 30 0.300 0
glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
6.67 ft head ht
Doors
(none)
Ceilings
(none)
Floors
19A-Obswp: Part floor, hrd wd fir fnsh, frm fir, 10" thkns 208 0.295 0
0 0 0
16.7 500 8.94
6.16 1282 1.40
0
268
290
,_EL 2016 -Nov -23 06:34:40
,'twri htsoft° Right -Suite@ Universal 2015
15.0.23 RSU05790 Page 4
ACOA ...-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 BtuhM2-°F ft2-°F/Btuh BLOW Btuh Btu h/ft2 Btu
Walls
12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
Partitions
12C-Osw: 1213-0sw
n 90
0.065
21.0
3.61
325
Location:
90
Indoor:
Heating
Cooling
Boston Logan Int'I AP, MA, US
640
Indoor temperature (°F)
68
75
Elevation: 30 ft
21.0
Design TD (°F)
56
13
Latitude: 42°N
all 285
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/Ib)
42.7
27.8
Dry bulb (°F) 12
88
Infiltration:
Daily range (°F) -
15 (L
) Method
Simplified
Wet bulb (°F) -
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Tiht
1 Average)
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 BtuhM2-°F ft2-°F/Btuh BLOW Btuh Btu h/ft2 Btu
Walls
12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
Partitions
12C-Osw: 1213-0sw
n 90
0.065
21.0
3.61
325
0.99
90
e 177
0.065
21.0
3.61
640
0.99
176
W 18
0.065
21.0
3.61
65
0.99
18
all 285
0.065
21.0
3.61
1030
0.99
283
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n
glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; e
6.67 ft head ht all
Doors
(none)
Ceilings
(none)
Floors
19A-Obswp: Part floor, hrd wd flr fnsh, frm flr, 10" thkns
27
0
0
0
0
0
0
36
0.300
0
16.7
600
8.94
322
12
0.300
0
16.7
200
29.1
349
48
0.300
0
16.7
801
14.0
671
294 0.295 0 6.16 1812 1.40 411
-ELL2016-Nov-23 06:34:40
wrightsoft" Right -Suite® Universal 2015 15.0.23 RSU05790 Page 5
/CCA ...-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain
ft, BtuhM-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu
Walls
12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" a 54 0.065 21.0 3.61 195 0.99 54
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
Partitions
12C-Osw:12C-Osw
Windows
(none)
Doors
(none)
Ceilings
(none)
Floors
19A-Obswp: Part floor, hrd wd fir fnsh, frm fir, 10" thkns
54 0 0 0 0 0 0
84 0.295
0 6.16
518 1.40 117
t wri htsofta 2016 -Nov -23 06:34:40
�..., � 9 Right-SuiteO Universal 2015 15.0.23 RSU05790
ACCP.... -J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N Page 6
Re o .
Location:
Indoor:
Heating
Cooling
Boston Logan Int'I AP, MA, US
Indoor temperature (°F)
68
75
Elevation: 30 ft
Design TD (°F)
56
13
Latitude: 42°N
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/Ib)
42.7
27.8
Dry bulb (°F) 12
88
Infiltration:
Daily range (°F) -
Wet bulb (°F) -
15 ( L
72
) Method
Simplified
Wind speed (mph) 15.0
7.5
Construction quality
Fireplaces
Tiht
1 Average)
Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain
ft, BtuhM-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu
Walls
12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" a 54 0.065 21.0 3.61 195 0.99 54
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
Partitions
12C-Osw:12C-Osw
Windows
(none)
Doors
(none)
Ceilings
(none)
Floors
19A-Obswp: Part floor, hrd wd fir fnsh, frm fir, 10" thkns
54 0 0 0 0 0 0
84 0.295
0 6.16
518 1.40 117
t wri htsofta 2016 -Nov -23 06:34:40
�..., � 9 Right-SuiteO Universal 2015 15.0.23 RSU05790
ACCP.... -J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N Page 6
Construction descriptions
Or
Area
U -value
Insul R
Location:
Loss
Indoor:
Heating
Cooling
Boston Logan Int'I AP, MA, US
ft,
Indoor temperature (°F)
68
75
Elevation: 30 ft
Btuh/ftz
Design TD (°F)
56
13
Latitude: 420N
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/Ib)
42.7
27.8
Dry bulb (°F) 12
88
Infiltration:
228
0.99
Daily range (°F) -
Wet bulb (°F) -
15 (L
72
) Method
Simplified
0.065
Wind speed (mph) 15.0
7.5
Construction quality
Fireplaces
Tiht
1 Average)
48
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Clg HTM
Gain
ft,
Btuh/ftl-°F
ftl-°FBtuh
BtuhM
Btu
Btuh/ftz
Btuh
Walls
1217-0sw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2"
a
63
0.065
21.0
3.61
228
0.99
63
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
s
48
0.065
21.0
3.61
173
0.99
48
all
111
0.065
21.0
3.61
401
0.99
110
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 6 0.300 0 16.7 100 15.6 93
glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
6.67 ft head ht
Doors
(none)
Ceilings
C part ceiling,: C part ceiling, hrd wd fl fnsh, frm fl r, 10" thkns, 1/2" 22 0.255 1.0 14.2 311 12.7 280
gypsum board int fnsh
Floors
19A-Obswp: Part floor, hrd wd fir fnsh, frm fir, 10" thkns 42 0.295 0 6.16 259 1.40 59
wri htsoft� 2016 -Nov -23 06:34:40
i.,_. 9 Right -Suite@ Universal 2015 15.0.23 RSU05790 Page 7
ACCP.... -J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
Construction descriptions
Or Area
U -value
Insul R Htg HTM
Loss
Location:
Gain
Indoor:
Heating
Cooling
Boston Logan Int'I AP, MA, US
Btu
Indoor temperature (°F)
68
75
Elevation: 30 ft
Design TD (°F)
56
13
Latitude: 420N
12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2"
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/Ib)
42.7
27.8
Dry bulb (°F) 12
88
Infiltration:
Daily range (°F) -
15 ( L
) Method
Simplified
Wet bulb (°F) -
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Tiht
1 Average)
0
Construction descriptions
Or Area
U -value
Insul R Htg HTM
Loss
Clg HTM
Gain
ft�
Btuh/ft�-°F
ft�-°FBtuh Btuh/ft2
Btu
BtuhN
Btu
Walls
12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2"
s 51
0.065
21.0 3.61
184
0.99
51
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
Partitions
12C-Osw:12C-Osw
63
0
0 0
0
0
0
Windows
(none)
Doors
11 P0: Door, mtl pur core type
Ceilings
C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2"
gypsum board int fnsh
Floors
19A-Obswp: Part floor, hrd wd flr fnsh, frm flr, 10" thkns
s 21 0.290 10.5
27 0.255 1.0
16.1 339 7.68 161
14.2 382 12.7 344
56 0.295 0 6.16 345 1.40 78
..p1" j �" 2016 -Nov -23 06:34:40
wrightsoft^ Right-Suite(Y) Universal 2015 15.0.23 RSU05790 Page 8
ACCP....-) - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
Construction descriptions
Or
Area
U -value
Insul R
Location:
Loss
Indoor:
Heating
Cooling
Boston Logan Int'I AP, MA, US
ft2
Indoor temperature (°F)
68
75
Elevation: 30 ft
Btuh/ft2
Design TD (°F)
56
13
Latitude: 420N
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/Ib)
42.7
27.8
Dry bulb (°F) 12
88
Infiltration:
358
0.99
Daily range (°F) -
15 ( L
) Method
Simplified
0.065
Wet bulb (°F) -
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Tiht
1 Average)
60
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Clg HTM
Gain
ft2
Btuh/ft2-°F
ft2-°FBtuh
MOM
Btu
Btuh/ft2
Btu
Walls
12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2"
n
99
0.065
21.0
3.61
358
0.99
98
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
a
60
0.065
21.0
3.61
217
0.99
60
all
159
0.065
21.0
3.61
575
0.99
158
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2
n
9
0.300
0
16.7
150
8.94
80
glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
a
12
0.300
0
16.7
200
29.1
349
6.67 ft head ht
all
21
0.300
0
16.7
350
20.5
430
Doors
(none)
Ceilings
16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2"
96
0.026
38.0
1.45
139
1.30
125
gypsum board int fnsh
Floors
(none)
_:
-{'�}" 2016 -Nov -23 06:34:40
r' wrightsoft* Right -Suite® Universal 2015 15.0.23 RSU05790 Page 9
ACCs\ ...-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
Construction descriptions
i - •
e • e
U -value
Insul R
Location:
Loss
Indoor:
Heating
Cooling
Boston Logan Int'I AP, MA, US
1`12
Indoor temperature (°F)
68
75
Elevation: 30 ft
MOM
Design TD (°F)
56
13
Latitude: 420N
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/Ib)
42.7
27.8
Dr bulb 12
85
Infiltration:
358
0.99
Dally range °F)
Wet bulb (°F) -
(L
72
) Method
Simplified
0.065
Wind speed (mph) 15.0
7.5
Construction quality
Fireplaces
Tiht
1 Average)
161
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Clg HTM
Gain
1`12
Btuh/ft2-°F
ft�-°FBtuh
Btu h/ftz
Btu
MOM
Btu
Wal I s
12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2"
n
99
0.065
21.0
3.61
358
0.99
98
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
w
162
0.065
21.0
3.61
585
0.99
161
all
261
0.065
21.0
3.61
943
0.99
260
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2
n
36
0.300
0
16.7
600
8.94
322
glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
6.67 ft head ht
Doors
(none)
Ceilings
16B-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceiI ins, 1/2" 290 0.026 38.0 1.45 419 1.30 377
gypsum board int fnsh
Floors
19A-Obswp: Part floor, hrd wd fir fnsh, frm flr, 8" thkns 26 0.295 0 6.16 160 1.40 36
2016 -Nov -23 06:34:40
wrightsoft' Right-SuiteOO Universal 2015 15.0.23 RSU05790 Page 10
ACOA ...-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
Component Constructions Job: 38 Compass Point J4
-- wrightsoft- Date: Oct 14, 2016
bedroom 2 By:
J&J Heating and Air Conditioning
17 Arlington st, Dracut, Ma 01826 Phone: 978 4548197 Email: eric@jjheatac.com Web: jjheatac.com
ma;kaect;intormatio
For: Trust Construction
51 Mount Joy Drive, Tewksbury, Ma 01876
Construction descriptions
Or
Area
U -value
Insul R
Location:
Loss
Indoor:
Heating
Cooling
Boston Logan Int'I AP, MA, US
ft2
Indoor temperature (°F)
68
75
Elevation: 30 ft
Btuh/ftP
Design TD (°F)
56
13
Latitude: 42°N
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/Ib)
42.7
27.8
Dry bulb (°F) 12
88
Infiltration:
228
0.99
Daily range (°F) -
15 (L
) Method
Simplified
0.065
Wet bulb (°F) -
72
Construction quality
Ti ht
98
Wind speed (mph) 15.0
7.5
Fireplaces
1 Average)
21.0
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Clg HTM
Gain
0
0
ft2
Bluh/112-°F
ft2-°F/Btuh
Btuh/ft2
Btuh
Btuh/ftP
Btu
Wal I s
12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2"
a
63
0.065
21.0
3.61
228
0.99
63
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
s
99
0.065
21.0
3.61
358
0.99
98
W
171
0.065
21.0
3.61
618
0.99
170
all
333
0.065
21.0
3.61
1203
0.99
331
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s
glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
6.67 ft head ht
Doors
(none)
Ceilings
1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2"
gypsum board int fnsh
Floors
19C-19cscp:19C-19cscp
18 0.300 0 16.7 300 15.6 280
247
0.026
38.0
1.45
357
1.30
321
247
0
0
0
0
0
0
2016 -Nov -23 06:34:40wri htsofT Right-SuiteUniversal 2015 15.0.23 RSU05790
Page 11
�C� ...-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
-- wrightsoft�
Component Constructions
P
Job: 38 Compass Point J4
U -value
Full bath
Date: Oct 14,
By:
2016
Clg HTM
J&J Heating and Air Conditioning
17 Arlington st, Dracut, Ma 01826 Phone: 978 4548197 Email: eric@jjheatac.com Web: jjheatac.com
Btuh/ft2-°F
ftz-°F/Btuh
MOM
Btu
BtuhV
Btu
• • •
For:
Trust Construction
51 Mount Joy Drive, Tewksbury, Ma 01876
12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2"
a
63
1111111111
Milli®- • • • •
21.0
3.61
Location:
Indoor:
Heating
Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F)
68
75
Elevation: 30 ft
Design TD (°F)
56
13
Latitude: 420N
Relative humidity (%)
50
50
Outdoor:
Heating Cooling Moisture difference (gr/Ib)
42.7
27.8
Dry bulb (°F)
12 88 Infiltration:
all
Daily range (°F)
- 15 ( L ) Method
Simplified
3.61
Wet bulb (°F)
Wind speed (mph)
- 72 Construction quality
15.0 7.5 Fireplaces
Tiht
1 Average)
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Clg HTM
Gain
ft�
Btuh/ft2-°F
ftz-°F/Btuh
MOM
Btu
BtuhV
Btu
Walls
12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2"
a
63
0.065
21.0
3.61
228
0.99
63
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
s
117
0.065
21.0
3.61
423
0.99
116
w
9
0.065
21.0
3.61
33
0.99
9
all
189
0.065
21.0
3.61
683
0.99
188
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s
glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
6.67 ft head ht
Doors
(none)
Ceilings
1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2"
gypsum board int fnsh
Floors
(none)
9 0.300 0
91 0.026 38.0
16.7 150 15.6 140
1.45 132 1.30 118
2016 -Nov -23 06:34:40
- l- wrightsoft9 Right -Suite® Universal 2015 15.0.23 RSU05790 Page 12
AC CA ...-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
1- wrightsoft�
Component Constructions
Job: 38 Compass Point J4
Htg HTM
2nd floor stairs
Date: Oct 14,
By:
2016
ftz
J&J Heating and Air Conditioning
f12-T/Btuh
Btuh/ft'
17 Arlington st, Dracut, Me 01826 Phone: 978 4548197 Email: eric@jjheatac.com Web: jjheatac.com
Btuh/ft2
Btu
e 45
0.065
21.0
3.61
163
0.99
45
For:
Trust Construction
51 Mount Joy Drive, Tewksbury, Ma 01876
Location: Indoor:
Boston Logan Int'l AP, MA, US Indoor temperature (°F)
Heating
68
Cooling
75
Elevation: 30 ft
Design TD (°F)
56
13
Latitude: 420N
Relative humidity (%)
50
50
Outdoor:
Heating Cooling Moisture difference (gr/Ib)
42.7
27.8
Dry bulb (°F)
12 88 Infiltration:
Daily range (°F)
Wet bulb (°F)
- 15 (L ) Method
- 72
Simplified
Wind speed (mph)
Construction quality
15.0 7.5 Fireplaces
Tiht
1 Average)
Construction descriptions
Walls
12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud
Partitions
(none)
Or Area
U -value
Insul R
Htg HTM
Loss
Clg HTM
Gain
ftz
Btuh/ft2-°F
f12-T/Btuh
Btuh/ft'
Btu
Btuh/ft2
Btu
e 45
0.065
21.0
3.61
163
0.99
45
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e
glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
6.67 ft head ht
Doors
(none)
Ceilings
1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2"
gypsum board int fnsh
Floors
(none)
9 0.300 0
84 0.026 38.0
16.7 150 29.1 262
1.45 121 1.30 109
AZL .}�+ Wrl htsoftp 2016 -Nov -23 06:34:40
�.- - r' � Right -Suite® Universal 2015 15.0.23 RSU05790 Page 13
/�C� ...-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/ft2-°F ftz-°F/Btuh Btu hV Btu %h/ft2 Btu
Walls
15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, a 90 0.073 8.0 4.56 410 0.40 36
r-8 ins, 8" thk, 1/2" gypsum board int fnsh
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
1613-30ad:Attic ceiling, asphalt shingles roof mat, r-20 roof ins, 100 0.032 30.0 1.78 178 1.60 160
r-30 ceil ins
Floors
(none)
2016 -Nov -23 06:34:40
,y r wrightsoft" Right -Suite® Universal 2015 15.0.23 RSU05790 Page 14
RCCA ...-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
®- e
70 "'*R'11611MN
Location:
Indoor:
Heating
Cooling
Boston Logan Int'I AP, MA, US
Indoor temperature (°F)
68
75
Elevation: 30 ft
Design TD (°F)
56
13
Latitude: 42°N
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/Ib)
42.7
27.8
Dry bulb (°F) 12
88
Infiltration:
Daily range (°F) -
15 (L
) Method
Simplified
Wet bulb (°F) -
72
Construction quality
Tiht
Wind speed (mph) 15.0
7.5
Fireplaces
1 Average)
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/ft2-°F ftz-°F/Btuh Btu hV Btu %h/ft2 Btu
Walls
15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, a 90 0.073 8.0 4.56 410 0.40 36
r-8 ins, 8" thk, 1/2" gypsum board int fnsh
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
1613-30ad:Attic ceiling, asphalt shingles roof mat, r-20 roof ins, 100 0.032 30.0 1.78 178 1.60 160
r-30 ceil ins
Floors
(none)
2016 -Nov -23 06:34:40
,y r wrightsoft" Right -Suite® Universal 2015 15.0.23 RSU05790 Page 14
RCCA ...-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
-- wrightsoft�
Component Constructions
Job: 38 Compass Point J4
Date: Oct
wash/ dryer
14,
By:
2016
J&J Heating and Air Conditioning
17 Arlington st, Dracut, Ma 01826 Phone: 978 454 8197 Email: eric@jjheatac.com Web: jjheatac.com
rojeCt•rmatio
For:
Trust Construction
51 Mount Joy Drive, Tewksbury, Ma 01876
Location:
Indoor:
Heating
Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F)
68
75
Elevation: 30 ft
Design TD (°F)
56
13
Latitude: 420N
Relative humidity (%)
50
50
Outdoor:
Heating Cooling Moisture difference (gr/Ib)
42.7
27.8
Dry bulb (°F)
12 88 Infiltration:
Daily range (°F)
- 15 ( L ) Method
Simplified
Wet bulb (°F)
- 72 Construction quality
Tiht
Wind speed (mph)
15.0 7.5 Fireplaces
1 Average)
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/112-°F ft2-0F/6tuh BtuhW Btu Btuh/112 Btu
Walls
(none)
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 24 0.026 38.0 1.45 35 1.30 31
gypsum board int fish
Floors
(none)
2016 -Nov -23 06:34:40
.t wrightsoW Right-Suite(R) Universal 2015 15.0.23 RSU05790 Page 15
ACCP. ...-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces: N
Project Summar Job: 38 Compass Point J4
Wrlght50ft® y Date: Oct 14, 2016
Entire House By:
J&J Heating and Air Conditioning
17 Arlington st, Dracut, Ma 01826 Phone: 978 4548197 Email: eric@jjheatac.com Web: jjheatac.com
For: Trust Construction
51 Mount Joy Drive, Tewksbury, Ma 01876
Notes:
:Design 'Information
Weather: Boston Logan Int'I AP, MA, US
Winter Design Conditions
Summer Design Conditions
Outside db 12 OF
Outside db
88
OF
Inside db 68 OF
Inside db
75
OF
Design TD 56 OF
Design TD
13
OF
Daily range
Relative humidity
L
50
%
Moisture difference
28
gr/Ib
Heating Summary
Sensible Cooling Equipment Load Sizing
Structure 26275 Btuh
Structure
15068
Btuh
Ducts 2708 Btuh
Ducts
1821
Btuh
Central vent (0 cfm) 0 Btuh
Central vent (0 cfm)
0
Btuh
Humidification 0 Btuh
Blower
2730
Btuh
Pi in Btuh
Equipment load 28982 Btuh
Use manufacturer's data
n
Rate/swing multiplier
0.93
Infiltration
Equipment sensible load
18167
Btuh
Method Simplified
Latent Cooling Equipment
Load Sizing
Construction quality Tight
Fireplaces 1 (Average)
Structure
3466
Btuh
Ducts
425
Btuh
Heating Cooling
Central vent (0 cfm)
0
Btuh
Area (ft2) 1616 1902
Equipment latent load
3891
Btuh
Volume W) 13944 16518
Air changes/hour 0.27 0.09
Equipment total load
22058
Btuh
Equiv. AVF (cfm) 162 152
Req. total capacity at 0.70 SHR
2.2
ton
Heating Equipment Summary
Cooling Equipment Summary
Make
Make
Trade
Trade
Model
Cond
AHRI ref
Coil
AHRI ref
Efficiency 80AFUE
Efficiency 0 SEER
Heating input 0 Btuh
Sensible cooling
0
Btuh
Heating output 0 Btuh
Latent cooling
0
Btuh
Temperature rise 0 OF
Total cooling
0
Btuh
Actual air flow 778 cfm
Actual air flow
778
cfm
Air flow factor 0.027 cfm/Btuh
Air flow factor
0.046
cfm/Btuh
Static pressure 0 in H2O
Static pressure
0
in H2O
Space thermostat
Load sensible heat ratio
0.83
Calculations approved by ACCA to meet
all requirements of Manual J 8th Ed.
,: Wr! htsoft
9 Right -Suite@ Universal 2015 15.0.23 RSU05790
2016 -Nov -23 06:34:40
14CCA ...-J - Copy\Bld 13-246 lake Williams Unit 120.rup Calc = MJ8 Front Door faces:
N
Page 1