Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miscellaneous - 40 COMPASS POINT ROAD 4/30/2018
�O Corn�RSS i I i I I Location No. Date /Z 14 zc/5 �, • • TOWN OF NORTH ANDOVER 4. Certificate of Occupancy $ Building/Frame Permit Fee $ L Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check#7 Building Inspector CommonweR101 of Massachusetts Sheet Metal Permit Date: //• n7 �� Permit-It 6 Estimated Job Cost: $ d p C2 , o Permit Pee: $ �_ Plans Submitted: YES NO Plans Reviewed: YES NO Business License if 196 Appli=at Lieerisc Business Information: Property Owner/Job Location Information: Name: J&J lleating. & Air Conditioning Name: 5 f-- 05T'(ic 17 Arlington St.: Sheet: Street: 0.55 Po..i y Dracut, MA OHM Cit North Andover, MA 01845 Cit /Town: City/Town: Telephone: .97.8-454-8197 Telephone: 51$ , ?5-1, 3 q Photo I.D. required / Copy of Photo I.D. attached: YIDS NO Stn[(iultinl J-1 /M-1-unrestricted license J-2 / M-27restric6ed to dwellings 3-stories or less wid conunercial tip to 10,000 sq. ft. /2-stories or less lZesicleiatiiil:"I"��'Yalivly _ "Multi-fanuly Condo /Tbwnhouscs Other Comiiicrcial. Office Retail Industrial Educational Institutional Othcr Square Footage: under 10,000 sq. ft. t/ over 10,000 sq. ft. Number of Stories: Sheet metal work to be coinpleted: New Work: i' Renovation: HVAC ✓ Metal Watershed Roofing Kitchen Exhaust System Metal Chimney /Vents Air Balancing ,. Provide detailed description of work to be clone: F,INSURANCIE COVERAGE: current IiabilitY insurance policy or its equivalentwhich meets the requirements of M.G.L. Ch. 112 Yes ONoave checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy [ Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the Insurance coverage required by Chapter 112 of the Massachusetts General Laws, and that my ;signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this boxEl, I hereby certify that all of the details and Information I have subnlltted(or entered)regarding this application ara truo and accurate issued for this application will be ccura to to the best of m knowledge and that all sheet motal work and installations performed under the permit Iss { { Y 0 p I in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO j Progress Inspections :Date Comments Final Inspection Date Comments Type of License: By ❑ Master Title ❑ Master-Restricted cilyrrown ❑Journeyperson �natureof Licensee Permit 11 ❑Journeyperson-Restricted License Nurnber: 15 &9'.. Fee$ ❑ Check at www.mass.povldpl Inspector Signature of Permit Approval i i The Commonwealth of Massachusetts = Department of Industrial Accidents I Congress Street,Suite 100 Boston,MA 02114-2017 " www mass.gov/dia Workers' Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name (Business/Organization/Individual): J & J Heating & Air Conditioning, Inc. Address: 17 Arlington Street City/State/Zip: Dracut, MA. 01826 Phone#: 978-454-8197 Are you an employer?Check the appropriate box: Type of project(required): 1.[3 I am a employer with 40 employees(full and/or part-time).* 7. ❑New construction 2.❑I am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling any capacity.[No workers'comp.insurance required.] 3.O i am a homeowner doing all work myself.[No workers'comp.insurance required.]t 9. ❑Demolition 4.❑I am a homeowner and will pe hiring contractors to conduct all work on my property. I will 10 F1 Building addition ensure that all contractors either have workers'compensation insurance or are sole i 1.❑Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 5.❑I am a general contractor and I have hired the sub-contractors listed on the attached sheet. These sub-contractors have employees and have workers'comp.insurance.t 13.E]Roof repairs 6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14.[:]Other 152,§1(4),and we have no employees.[No workers'comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. if the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: A.I.M. Mutual Insurance Policy#or Self-ins.Lic.#: WMZ7800-800655372016 Expiration Date: 6/2/17 Job Site Address: yr2 a, SS n City/State/Zip: i/�( � QLt Attach a copy`of the workers compensation policy declaration page(showing the policy number and expiration date). Failure to secure covera a as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-ye risonme ,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00a day againsl'ifhe violator.A c y of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverag verification. I do here nder the ai anfl pen o perju that the information provided above is true and correct. Si nature: Date: /�• �� Phone#: 7 — 197 Ofjitial use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issilling Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: AC RD " CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDD/YYYY) `- 1 6/2/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Laurence Hall, CIC NAME: I Sennott Insurance Agency (PHONE .�xt) (978)887_4900 h��J (918)887-2404 16 South Main Street E-MAIL enntti Tarr hall@sonsurance.com - P. O. BOX 457 ADDRESS: �'INSURERS AFFORDING COVERAGE NAIC If Topsfield MA 01983 INSURERA:Great American Alliance Ins.Co INSURED INSURERB:Safet Ins Co J&J Heating & Air Conditioning, Inc. INSURERCA.I.M. Mutual Ins Co _ 17 Arlington Street INSURER D: INSURER E Dracut MA 01826 INSURER F COVERAGES CERTIFICATE NUMBER:2016-2017 Renewal Certs REVISION NUMBER: THIS IS TO'CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUER POLICY EFF POLICY EXP LTR TYPE OF INSURANCEINSD WVDPOLICY NUMBER MM/DOIYYYY MMIDDIYYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A CLAIMS-MADE 7X OCCUR DAMAGE TO RENTED PREMISES Ea occurrence) $ _ 300,000 PAC6418906-10 6/1/2016 6/1/2017 MED EXP(Any one person) $ 10,000 PERSONAL 8 ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY a JECT n LOC PRODUCTS-COMP/OPAGG $ 2,000,000 OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT Ea accident)_ $ 1,000,000 BANY AUTO BODILY INJURY(Per person) $ ATOX SCHEDULED 2434550 6/1/2016 6/1/2017 BODILY $ AUL AUTOS ) X HIRED AUTOS X NON-OWNED PROPERTY DAMAGE AUTOS Per accident) $ a X UMBRELLA LIARX OCCUR EACH OCCURRENCE $ 2,000,000 EXCESS LIAB A CLAIMS-MADE AGGREGATE $ 2,000,000 DED RETENTION$ UlS6418958-09 6/1/2016 6/1/2017 $ WORKERS COMPENSATION _ AND EMPLOYERS'LIABILITY YIN X STATUTE OETRH ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ 1,000,000 C OFFICER/MEMBER EXCLUDED? - N NIA _ (Mandatory in NH) WMZ-800-8006553-2016 6/2/2016 6/2/2017 E.L.DISEASE-EA EMPLOYE $ 1,000,000 If yes,describe under DESCRIPTION Of OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS J LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space Is required) r i CERTIFICATEIHOLDER; CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIESBE CANCELLED BEFORE Evidence of Insurance THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN G' ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE L Hall, CIC/LH2 NCO& ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014101) The ACORD name and logo are registered marks of ACORD INS025On14011 COMMONWEALTH OF MASSACHUSETTS BOARD OF . SHEET METAL°WORKERS ISSUES THE FOLLOWING LICGNSC AS A MAS7lz-R-UNRESTRICTED W .ERIC R KLINE 17 ARLINGTON;ST:': .1 &J H: A TINC''&AC DRACUT, MA 01826t. 1568 Q5/28/201II.., 3 744 AS S`!►AC I p,UI) ' DRIVERS r r' pp, LIC I,'a � filly�^' ,, �r • ENSE rt ki 05-0 201 G NONE 411 NUMBER -V n,,EXP S99655871 05- : � a non "�''.2tinss n f m �5.2. 198 44JW1r �., DM NONC .iss�x M a4,Hcr�6�09 KLINL- k. ERIC R.) r t✓ n 106 MEADOW CREEK DR DRACUT,MA 01026 r51zh ipo 05 04 10161tev a 1.15.2009 1� �G��6�4dG`fl�D6�'llf%i, l��ll 0 6�9 rC�if In lh\''ti a HU)SIF , w Si IECI 6uIC- AI WORKI RS„ 1S SUM `�THE I-OL(OVUING LICLNSC AS A. > I�1IVARD T AY01 FE !2 ;,: JJ HCA TINO AIR .0ONDI1 IONING.INC 17 ARI INL,1`ON STREP t} DRACUT, MA 01826 I�... Q 196 11401 U�1s�a�l>tlir`:?!1Lt f I I .._:. I � tl tiy1,I��•!�fi��Y,t��!...,:_....:"....���1�VY!:1`;'�!?��,i�;��+� - - 9 o Load Short Form Job: 40 Compass Point wri htsoft Date: Nov 15,2016 Entire House By: J&J Heating and Air Conditioning 17 Alrington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com Or • e6tInformatibn For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 I §��:Tzj • • • Htg Clg Infiltration Outside db (°F) 14 82 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 56 7 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 46 38 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 1303 cfm Actual air flow 1303 cfm Air flow factor 0.032 cfm/Btuh Air flow factor 0.050 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.83 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Bedroom2 169 3462 2237 110 111 bedroom 3 144 3143 2594 100 129 bathl 80 1256 592 40 29 bath2 90 1399 609 45 30 W.I.C 50 1498 184 48 9 Master bed 180 3777 3184 120 158 Bedroom 4 120 1570 1538 50 77 Hall 42 507 60 16 3 kitchen 300 8180 5226 261 260 1/2 bath 60 1451 1020 46 51 wash 60 2390 1138 76 57 dinning 156 4622 2981 147 148 living room 195 5429 3675 173 183 entry 104 2177 1174 69 58 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft 2016-Dec-12 08:31:11 9 Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 1 /�iCl� ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N Entire House d 1750 40861 26211 1303 1303 Other equip loads 5116 4096 Equip. @ 0.87 RSM 26367 Latent cooling 6110 TOTALS 1750 45977 32477 1303 1303 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsaft� 2016-Dec-12 08:31:11 9 Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 2 ACCA ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N Building Anal sis Job: 40 Compass Point wrighfisoft� y Date: Nov 15,2016 Entire House By: J&J Heating and Air Conditioning 17 Alrington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com • • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 MIMMIIM i - • • • • Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 42°N Relative humidity (%) Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37..6 Dry bulb (°F) 14 82 Infiltration: Dally range °F) - 15 ( L ) Method Simplified Wet bulb (°F� - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) • Component Btuh/ft2 Btuh % of load Walls 3.6 6968 15.2 Glazing 16.8 3304 7.2 Doors 16.2 796 1.7 Ceilings 14.3 12471 27.1 Floors 6.2 5430 11.8 Infiltration 4.7 10078 21.9 Ducts 1814 3.9 Piping 0 0 Humidification 5116 11.1 Ventilation 0 0 Adjustments 0 Total 1 459771 100.0 Component Btuh/ft2 Btuh % of load w Walls 0.6 1219 4.0 Glazing 41.0 8058 26.6 r Doors 6.1 298 1.0 Ceilings 11.3 9910 32.7 Floors 0.8 679 2.2 t _t Infiltration 0.5 1164 3.8 Ducts 434 1.4 Ventilation 0 0 ,tr�� Internal gains 4450 14.7 Blower 4096 13.5 A Adjustments 0 Total 1 303071 100.0 Latent Cooling Load = 6110 Btuh Overall U-value= 0.174 Btuh/ft2-°F Data entries checked. 2016-Dec-12 08:31:11 wrightsoft, Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 1 ACCK ..Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MA Front Door faces: N Wrl htsoft- Component Constructions Job: 40 Compass Point 9 Date: Nov 15,2016 Entire House By: J&J Heating and Air Conditioning 17 Alrington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area 1.1-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-1F ft�-°F/Btuh ROM Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 450 0.065 21.0 3.64 1638 0.64 287 gypsum board int fnsh,2'x6"wood frm,16"o.c.stud a 505 0.065 21.0 3.64 1838 0.64 322 s 438 0.065 21.0 3.64 1594 0.64 279 w 521 0.065 21.0 3.64 1898 0.64 332 all 1914 0.065 21.0 3.64 6968 0.64 1219 Partitions (none) Windows 2 glazing,clr outr,air gas,vni frm mat,clr innr,1/4"gap,1/4"thk:2 e 36 0.300 0 16.8 605 26.7 962 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; a 40 0.300 0 16.8 672 51.3 2050 50%outdoor insect screen;foreground=green grass(0.23);6.67 ft s 12 0.300 0 16.8 202 25.5 306 head ht w 49 0.300 0 16.8 818 26.7 1301 w 60 0.300 0 16.8 1008 51.3 3075 all 197 0.300 0 16.8 3304 39.1 7695 Doors 11 P0:Door,mtl pur core type a 49 0.290 10.5 16.2 796 6.09 298 Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,10"thkns,1/2" 875 0.255 1.0 14.3 12471 11.3 9910 gypsum board int fnsh Floors 19A-Obswp: Part floor,hrd wd fir fnsh,frm fir,10"thkns 875 0.295 0 6.21 5430 0.78 679 ,g {d�."I wri htsoft� 2016-Dec-12 08:31:11 1" 9 Right-Suite®Universal 2015 15.0.23 RSU05790 ACCp. ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N Page 1 p wrightsoft- Component Constructions Job: 40 Compass Point p Date: Nov 15,2016 Bedro=2 By: J&J Heating and Air Conditioning 17 Airington st, Dracut,Ma 01826 Phone:978 4548197 Email:eric@ijheatac.com Web:jjheatac.com • * • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 "'DeSig6��,Conditions Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft, Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Firm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 117 0.065 21.0 3.64 426 0.64 75 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 93 0.065 21.0 3.64 339 0.64 59 all 210 0.065 21.0 3.64 764 0.64 134 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 e 24 0.300 0 16.8 403 51.3 1230 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23);6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor,hrd wd fir finish,frm fir,10"thkns 169 0.295 0 6.21 1049 0.78 131 2016-Dec-12 08:31:11 wrightSOW Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 2 ACCA ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 40 Compass Point wrightsoft� Date: Nov 15,2016 bedroom 3 By: J&J Heating and Air Conditioning 17 Alrington st, Dracut,Ma 01826 Phone:978 454 8197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 De:sigondlti6ns Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (OF) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ftz-°FBtuh Btuh/112 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 108 0.065 21.0 3.64 393 0.64 69 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud W 84 0.065 21.0 3.64 306 0.64 54 all 192 0.065 21.0 3.64 699 0.64 122 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 w 24 0.300 0 16.8 403 51.3 1230 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23);6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor,hrd wd flr fnsh,frm flr,10"thkns 144 0.295 0 6.21 894 0.78 112 2016-Dec-12 08:31:11 wrightsoft" Right-Suite®Universal 2015 15.0.23 RSU05790 Page 3 ACCA ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N wri htsoft' Component Constructions Job: 40 Compass Point g Date: Nov 15,2016 bath 1 By: J&J Heating and Air Conditioning 17 Alrington st, Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com • Oct Information For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 i Design C• • • Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/RMF ft2-°FBtuh Btuh/112 Btu Btuh/ftp Btu Walls 12F-Osw: Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" a 64 0.065 21.0 3.64 233 0.64 41 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 e 8 0.300 0 16.8 134 51.3 410 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23);6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor,hrd wd fir fnsh,frm flr,10"thkns 80 0.295 0 6.21 496 0.78 62 2016-Dec-12 08:31:11 wrightsoft' Right-SuiteO Universal 2015 15.0.23 RSU05790 Page 4 /�.� ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJB Front Door faces: N n Component Constructions- wrightsoft Compp CJob: 40 Compass PointDate: Nov 15,2016 bath2 By: J&J Heating and Air Conditioning 17 Airington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com - •MI • 0 For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� BtuhtV-°F ft2-°F/Btuh Btuh/ftp Btu NON Btu Walls 12F-Osw: Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" e 73 0.065 21.0 3.64 266 0.64 47 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 e 8 0.300 0 16.8 134 51.3 410 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap,1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23);6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-Obswp:Part floor,hrd wd fir fnsh,frm fir,10"thkns 90 0.295 0 6.21 559 0.78 70 2016-Dec-12 08:31:11 ,gz. wrightsoft' Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 5 RCCA ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 40 Compass Point wrightsoft p Date: Nov 15,2016 W.LC By: J&J Heating and Air Conditioning 17 Alrington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com 0 0 t For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 M - 0 0 1 0 • Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ft2-°F/%h Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" a 45 0.065 21.0 3.64 164 0.64 29 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 90 0.065 21.0 3.64 328 0.64 57 all 135 0.065 21.0 3.64 491 0.64 86 Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obswp:Part floor,hrd wd flr fnsh,frm fir,10"thkns 50 0.295 0 6.21 310 0.78 39 2016-Dec-12 08:31:11 „t wrightsofta Right-Suite®Universal 2015 15.0.23 RSU05790 Page 6 ACCP. ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 40 Compass Point - - wrightsoft' Date: Nov 15,2016 Master bed By: J&J Heating and Air Conditioning 17 Alrington st, Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/V Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" s 123 0.065 21.0 3.64 448 0.64 78 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud w 84 0.065 21.0 3.64 306 0.64 54 all 207 0.065 21.0 3.64 753 0.64 132 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 s 12 0.300 0 16.8 202 25.5 306 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23);6.67 ft w 24 0.300 0 16.8 403 51.3 1230 head ht all 36 0.300 0 16.8 605 42.7 1536 Doors (none) Ceilings (none) Floors 19A-Obswp:Part floor,hrd wd fir fnsh,frm fir,10"thkns 180 0.295 0 6.21 1117 0.78 140 2016-Dec-12 08:31:11 wrightsoft' Right-Suite®Universal 2015 15.0.23 RSU05790 Page 7 ACCK ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 40 Compass Point wrightsoft" Date: Nov 15,2016 Bedroom 4 By: J&J Heating and Air Conditioning 17 Alrington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh(ft2-°F ft2-°F/6tuh Btuhtft' Btu Btuhtft' Btu Walls 12F-Osw:Frm wall,vnl ext, 1/2"wood shth,r-21 cav ins,1/2" w 60 0.065 21.0 3.64 218 0.64 38 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 2 glazing,cir outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 w 12 0.300 0 16.8 202 51.3 615 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23);6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor,hrd wd fir fnsh,frm fir,10"thkns 120 0.295 0 6.21 745 0.78 93 wrightsoft' Right-Suite®Universal 2015 15.0.23 RSU05790 2016-Dec-12 08:31:11Page 6 �.C({ ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N wri htsoft Component Constructions Job: 40 Compass Point 9 Hall Date: Nov 15,2016 J&J Heating and Air Conditioning 17 Airington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com • - • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 ® - • • • • Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft, Btuh/ft2-°F ft2-°F/Btuh Bluh/ftz Btu BION Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" w 27 0.065 21.0 3.64 98 0.64 17 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings 9 (none) Floors 19A-Obswp: Part floor,hrd wd fir fnsh,firm fir,10"thkns 42 0.295 0 6.21 261 0.78 33 2016-Dec-12 08:31:11 ,z- rF wrightsofta Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 9 ACC14 ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 40 Compass Point wrightsoft� Date: Nov 15,2016 kitchen By: J&J Heating and Air Conditioning 17 Alrington st, Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 11 - • • • • Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft, Btuh/ft2-°F ftz-°FBtuh BION Btu 13tuh/ft2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 108 0.065 21.0 3.64 393 0.64 69 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 164 0.065 21.0 3.64 597 0.64 104 all 272 0.065 21.0 3.64 990 0.64 173 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 e 12 0.300 0 16.8 202 26.7 321 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23);6.67 ft head ht Doors 11 P0:Door,mtl pur core type a 49 0.290 10.5 16.2 796 6.09 298 Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,10"thkns,1/2" 300 0.255 1.0 14.3 4276 11.3 3398 gypsum board int fnsh Floors (none) 2016-Dec-12 08:31:11 „1 wrightsoft" Right-Suite®Universal 2015 15.0.23 RSU05790 Page 10 /�.C� ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 40 Compass Point - - wrightsoft Date: Nov 15,2016 1/2 bath By: J&J Heating and Air Conditioning 17 Alrington st, Dracut,Me 01826 Phone:978 454 8197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 10:s; :16onditions Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-01' ft2-°FBtuh Btuh/ft2 Btuh Btuh/kz Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" a 33 0.065 21.0 3.64 120 0.64 21 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 e 12 0.300 0 16.8 202 26.7 321 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23);6.67 ft head ht Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,10"thkns,1/2" 60 0.255 1.0 14.3 855 11.3 680 gypsum board int fnsh Floors (none) 2016-Dec-12 08:31:11 wrightsoft' Right-Suite®Universal 2015 15.0.23 RSU05790 Page 11 ACCA ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 40 Compass Point wrightsoft`� p Date: Nov 15,2016 wash By: J&J Heating and Air Conditioning 17 Alrington st, Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh Btuh/fta Btu Btuh/ft� Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" a 33 0.065 21.0 3.64 120 0.64 21 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 108 0.065 21.0 3.64 393 0.64 69 all 141 0.065 21.0 3.64 513 0.64 90 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 e 12 0.300 0 16.8 202 26.7 321 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23);6.67 ft head ht Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,10"thkns,1/2" 60 0.255 1.0 14.3 855 11.3 680 gypsum board int fnsh Floors (none) -ELL- 2016-Dec-12 08:31:11 wrightsoft°' Right-Suite(R)Universal 2015 15.0.23 RSU05790 Page 12 RCCA ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 40 Compass Point wrightsoft p Date: Nov 15,2016 dinning By: J&J Heating and Air Conditioning 17 Abington st,Dracut,Ma 01826 Phone:978 454 8197 Email:eric@jjheatac.com Web:jjheatac.com • • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 ® - • • • • Location: Indoor: Heating Cooling j East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (OF) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ft2-°F/Btuh Btuh/W Btu Btuh/ftz Btu Walls 12F-Osw:Frm wall,vnl ext, 1/2"wood shth,r-21 cav ins,1/2" n 117 0.065 21.0 3.64 426 0.64 75 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud w 83 0.065 21.0 3.64 303 0.64 53 all 200 0.065 21.0 3.64 729 0.64 128 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 w 25 0.300 0 16.8 414 26.7 659 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23);6.67 ft head ht Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm flr,10"thkns,1/2" 156 0.255 1.0 14.3 2223 11.3 1767 gypsum board int fnsh Floors (none) 2016-Dec-12 08:31:11 wrightsoft" Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 13 ACCK ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 40 Compass Point 9 Date: Nov 15,2016 living room By: J&J Heating and Air Conditioning 17 Alrington st,Dracut,Ma 01826 Phone:978 454 8197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptionsOr Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/V-°F ft?-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btuh Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" s 117 0.065 21.0 3.64 426 0.64 75 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud w 111 0.065 21.0 3.64 404 0.64 71 all 228 0.065 21.0 3.64 830 0.64 145 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 w 24 0.300 0 16.8 403 26.7 641 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23);6.67 ft head ht Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,10"thkns,1/2" 195 0.255 1.0 14.3 2779 11.3 2208 gypsum board int fnsh Floors (none) 2016-Dec-12 08:31:11 wrightsoft' Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 14 RCCA ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 40 Compass Point wrightsoft" p Date: Nov 15,2016 en try By: J&J Heating and Air Conditioning 17 Alrington st,Dracut, Ma 01826 Phone:978 454 8197 Email:eric@jjheatac.com Web:jjheatac.com • • - • IL • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area 1.1-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ftl-°F ft2-°F/Btuh Btuh/ftp Btuh Btuh/ftp Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" w 72 0.065 21.0 3.64 262 0.64 46 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh,frm fir,10"thkns,1/2" 104 0.255 1.0 14.3 1482 11.3 1178 gypsum board int fnsh Floors (none) 2016-Dec-12 08:31:11 wrightsoft" Right-Suites Universal 2015 15.0.23 RSU05790 Page 15 �� ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJB Front Door faces: N Project Summar Job: 40 Compass Point wrightsoft� y Date: Nov 15,2016 Entire House By: J&J Heating and Air Conditioning 17 Alrington st,Dracut. Ma 01826 Phone:978 454 8197 Email:eric@iiheatac.com Web:iiheatac.com • - • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Notes: Weather: East Falmouth, Otis Angb, MA, US Winter Design Conditions Summer Design Conditions Outside db 14 OF Outside db 82 OF Inside db 70 OF Inside db 75 OF Design TD 56 OF Design TD 7 OF Daily range L Relative humidity 50 % Moisture difference 38 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 39047 Btuh Structure 25778 Btuh Ducts 1814 Btuh Ducts 434 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 5116 Btuh Blower 4096 Btuh Piping 0 Btuh Equipment load 45977 Btuh Use manufacturer's data n Rate/swing multiplier 0.87 Infiltration Equipment sensible load 26367 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 4866 Btuh Ducts 1244 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 1750 1750 Equipment latent load 6110 Btuh Volume (W) 15750 15750 Air changes/hour 0.26 0.09 Equipment total load 32477 Btuh Equiv.AVF (cfm) 164 152 Req. total capacity at 0.80 SHR 2.7 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1303 cfm Actual air flow 1303 cfm Air flow factor 0.032 cfm/Btuh Air flow factor 0.050 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.83 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2016-Dec-12 08:31:12 ,;t wrightSoftm Right-Suite@O Universal 2015 15.0.23 RSU05790' Page 1 ACCII�l ...Desktop\M-J-Copy\crabtree kerrylynn lot40.rup Calc=MJ8 Front Door faces: N