Loading...
HomeMy WebLinkAboutMiscellaneous - 41 SECOND STREET 4/30/2018 (5) I :5.e c I BUILDINIGFl i I I I f I i i f I Date ..� 1� ......... o�"SRT"'ti TOWN OF NORTH ANDOVER 0 p PERMIT FOR PLUMBING 8`4�►CHU9E This certifies that 1 �� 10� �` ..................................................................... .............................................. z-A has permission to perform...., :Q,� ?....� ..... ......\�.. ..u plumbing in the buildings of... ?,.Y*w�.�`r..................................................... at .t..... — '.�'... ..... �M A., North Andover, Mass. Fee..�.-�..�k..Lic. No. .�. .... .................................................................. s6 1 PLUMBING INSPECTOR Check# MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM PLUMBING WORK CITY t/ /9 c t c r1 i-A PAA DATE 3 PERMIT� JOBSITE ADDRESS fr ��� 4 C v�! �.i..,,L �A OWNERS NA4IE v!R OWNERADDRESS TEL FAX TYPE OR OCCUPANCY TYPE- COMMERCIAL❑ EDUCATIONAL ❑ RESID t PRINT c ��� RLPLACEmEN T:01PL��Ij SUSMI i fhb: YES❑ NO [—JCLEARLY I NEW.: I RENOVATION:❑ 1 2 j 3 4 i 5 0 7 i3 3 ! 1�i 11 12 FL"=JRES Z FLOOR BS S1 S , # # BATITUB CROSS CONNECTION DEVICE DEDICATED SPECIAL WASTE SYS I # # # # DEDICATED GASIOILISAND SYS # # I # 1 DEDICATED GREASE SYS DEDKCAT DURAY'•"J"TER SYS I t l I I # DEDICATED WA TIER RECYCLE SYS DRINKING FOUNTAIN # # DISHWASHER I I I I FOOD DISPOSER FLOOR I AP.EA DRAIN i INTERCEPTOR(INTERIOR.) i KITCHEN SINK # LAVATORY # I # I # # # # t I ROOF DRAIN I i SHOWER STALL SERVICE I IVIOP SINK I TOILET i I URINAL WASHING MACHINE CONNEC T fON I I I # ( # WATER HEATER AL.L T'PES t WATER PIPING # OTHER 3 INSURANCE COVERAGE: 1 have a current liability insurance policy or its substantial equivalent which,meets the requirements of MGL Ch-142 Yes�No El YOU CHECKED YES, PLEASE INDICATE THE TYPE OF COVERAGE BY CHECKING THE APPROPRIATE BOX BELOW LIABILITY INSURANCE POLICY OTHER TYPE OF INDEMNITY ❑ BOND ❑ OWNER'S INSUP-16NCE WAIVER i an aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws,and that my signature or,this permit application waives this requirement CHECK ONE BOX ONLY: OWNER ❑ AGENT ❑ Signature of Owner or Owners Agent I hereby certify that all of the details and information I have submitted(or entered) regarding this application ar=_true and accurate to the best of my Knowledge and that all plumbing work and installations performed under the permit issued for this application will be ir, compliance with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. r ` PLUMBER NAM_ �u ;,c� � �� SIGNATURE � 1 v 4- rf . ❑� L+.�- LIC� r© �/� Prt2( jP❑ coPaoPATfoN PARTNERSHIP ADDRESS: n 0COyPANY NAME W11W u 7 —� PAAIL _ L CITY J ro C ra e STATE V A40. Z+P�111� E TEL CELL FAX 9 � .................. TOWN OF NORTH ANDOVER PERMIT FOR GAS INSTALLATION HU This certifies'that ... C-" ........................ ................................................................... has permission for gas installation 2............................. in the buildings ofb�w,- at... 1Y.C.;n^f ......... Fee.....(.Mt... Lic. No. .Unll....... ..................................................................... GAS INSPECTOR Check# % MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK LLr^ CITY: MA DATE:J 3 l PERMIT# JOBSITE ADDRESS: �^� LLOWNER'S NAME: OWNER ADDRESS: TEL FAX. TYPE OR OCCUPANCY TYPE: COMMERCIAL❑ EDUCATIONAL ❑ RESIDENTIAL❑ PRLIT PLANS SUBMITTED: YES[I NO❑ CLEARLY NEW:❑ RENOVATION:❑ REPLACEMENT:F1 APPLIANCES-1 FLOOR Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BOILER BOOSTER CONVERSION BURNER COOK STOVE DIRECT VENT HEATER DRYER FIREPLACE FRYOLATOR FURNACE GENERATOR GRILLE INFRARED HEATER ORATORY COCK M UP AIR UNIT OVEN PMOL HEATER ROOM I SPACE HEATER ROOFTOP UNIT TEST UNIT HEATER UNVENTED ROOM HEATER WATER HEATER INSURANCE COVERAGE I have a current liabili insurance policy or its substantial equivalent which meets the requirements of MGL Ch.142 YES NO ❑ If you have checked YES,please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER:I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws,and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER ❑ AGENT ❑ SIGNATURE OF OWNER OR AGENT hereby certify that all of the details and information I have submitted(or entered)regarding this application are true and accurate to the best of my Knowledge and that all plumbing work and installations performed under the permit issued for this application will be in compriance with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBERIGASFITTER NAME I'�-f i br ILt rp r.ct t``L{CENSE# Ct SIGNATURE COMPANY NAME: ADDRESS: CITYSTATE: AtCg- ZIP. n r k Z, % FAX: TEL CELL-,�Z — 5= `i�J�! _EMAIL 7 a LLQ t 50 Ga c.-,%rte MASTER JOURNEYMAN❑ LP INSTALLER❑ CORPORATION❑# PARTNERSHIP❑# LLC❑# The Commonwealth of Massachusetts Department oflndustrial Accidents Office of Investigations 600 Washington Street Boston,MA 02111 www massgov/dia Workers' Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name(Business/Organization/Individual):- _ Cc')i n C� Address: et_-) �3 n K 76- City/State/Zip: 6- City/State/Zip: ig VoCc.P bQ&_ G t&A( .Phone#: 9, Y.2 VY Are you an employer?Check the appropriate box: Type of project(required): 1.f�l I am a employer with S 4. ❑ I am a-general contractor and I 6. ❑New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet.1 7. ❑Remodeling ship and have no employees These sub-contractors have 8. ❑Demolition working for me in any capacity, workers'comp.insurance. g, ❑Building addition [No workers'comp.insurance 5. ❑ We are a corporation and its ME]Electrical repairs or additions required.] officers have exercised their 3.❑ 1 am a homeowner doing all work right of exemption per MGL 11.©Plumbing repairs or additions myself. o workerscomp. c. 152,§1(4),and we have no Y (N ' P 12.❑Roof repairs insurance required.]t employees.[No workers' 13.❑Other comp,insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. =Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. Iain an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins.Lie.#: 14,-9 rfig^ ��! Expiration Date: r Job Site Address: Citylstate/zip: 44A&JWCW___R IV Attach a copy of the workerscompensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. Ido hereby certify under the pains and penalties ofpedury that the information provided above is true and correct Si ature: n Date: — �L Phone#: l� l� S-' 4`62 1f OjYw—&l use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one). 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing.Inspector 6.Other Contact Person: Phone#: '.COMMONWEALTH OF m""dFNSETTS PPAKL)Of PLUMBERSG AND ASF ,. ITTERS: ISSUES THE FOLLOWING L'FCENS E -1. REGI:STERE D AS A...P,LUMBING--7CORP:--:"';: A .'7Mj:C.HAJEL M MARCO. U "Co. :L-UMB 1', 1 NG-, L L Q NG & HEAT • 108 LAOS HbR'E b ui RACUT -MA 1008 3 05 :A;:COMMONWEALTH OF mAgs CHOSETTS -103wrolklims ;m:i:lol;i*1.9[elk,Fill a 4 rei:10 1,111V BOARWOF PLUMBERS -AND GASFITTERSl::::i'�` ISSUES THE FOLLOW ING -t-'fC.ENSE. uj LICENSED� ' ; AS A MASTER P.LUMBR:il:.: ,E :.-: : MI:CHA:EL MARCOUX 108 LAKIES'H-ORE DR, Lu AiC:6T' ---MA 01826 1008 . 10 9 o i/16, 199204 INN=[lrll:v'lllhTjl'-l:l:�*AQ101-11110100 IT-11 1�-JR r-11" /2,5-zlz' Date: 3/18/2014 Time: 10:13 AM To: Braley Idellington Page: 01 ® DATE(MMIDDIYYYY) CERTIFICATE OF LIABILITY INSURANCE3/5/2014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. ,TMS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Stephen Perry Braley & Wellington Insurance Agency Corp. PHONE 508.754.7255 x135 FAX 500.797.3507 A1C No Ext): A1C No): 44 Park Avenue E-MAILAnpgrss.sperry@braleywellingtongroup.com P.O. Box 15127 INSURER(S)AFFORDING COVERAGE NAIC 0 Worcester MA 016150127 INSURER AMerchants Mutual Ins INSURED Michael Marcoux INSURERB: DBA: MC Co Plumbing & Heating LLC INSURERC: 108 Lake Shore Dr INSURERD: PO Box 754 INSURERE: Dracut MA 01826 INSURER F: COVERAGES CERTIFICATE NUMBER:201:3 - 2014 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAYHAVE BEEN REDUCED BY PAID CLAIMS. ADDL SUER TR TYPE OF INSURANCE POLICY NUMBER MM DD YYY MMIDD YYYY LIMITS GENERAL LIABILITY OPI062862 1/01/2019 1/01/2015 EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED PREMISES Ea occurrence $ 50,000 A CLAIMS-MADE a OCCUR MED EXP(Any one person) $ 5,000 PERSONAL&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,000 POLICY[71 PRO- JECT LOC AUTOMOBILE LIABILITY KCA 7015019 2/28/2019 2/28/2015 0 aBd.ci EDtSINGLE LIMIT 1,000,000 A ANYAUTO BODILY INJURY(Per person) $ ALL OWNED X SCHEDULED AUTOS AUTOS BODILY INJURY(Per accident) $ X HIREDAUTOS X NON-OWNED PROPERTY DAMAGE AUTOS Per accident $ $ UMBRELLA LIAB OCCUR EACH OCCURRENCE EXCESS LIABCLAIMS-MADE AGGREGATE $ DED RETENTION$ $ .k WORKERS COMPENSATION 9098138 2/28/2019 2/28/2015WCSTATU- OTH- AND EMPLOYERS'LIABILITY Y/N X TORY LIMITS ER ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? NIA E.L.EACH ACCIDENT $ 500,000 (Mandatory in NH) If yes,describe under E.L.DISEASE-EA EMPLOYE $ 500,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 500,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) :ERTIFICATE HOLDER CANCELLATION 978)688-9542 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN TOWn of North Andover ACCORDANCE WITH THE POLICY PROVISIONS. Attn: Plumbing Department 1600 Osgood Street AUTHORIZED REPRESENTATIVE Building 20 North Andover, MA Stephen Perry/PERRY -� ,CORD 25(2010/05) ©1988-2010 ACORD CORPORATION. All rights reserved. IS025(201005).01 The ACORD name and logo are registered marks of ACORD 252 Date.. . . . �..��-! NORTH TOWN OF NORTH ANDOVER PERMIT FOR MECHANICAL INSTALLATION �D T h � I_ - 'ISS CH 5 This certifies that . . . . . .� . . . . _ . . t. . . has permission for mechanical installation . ... . . . . • . . . . in the buildings of . . � J. . ; -: . . �• at . . 7=� . . . � !����• • �� . . • . • North Andover, Mass. Fee. p . . Lic. No.. .,/.7 f.�: . ,._ GAS INSPECTOR WHITE:Applicant CANARY: Building Dept. PINK:Treasurer Commonwealth of Massachusetts Sheet Metal Permit Date: 3 1 L/ Permit# i � Estimated Job Cost: $� (� D Permit Fee: $ �P Plans Submitted: YES NO Plans Reviewed: YES NO Business License# 196 Applicant License Business Information: Property Owner/Job Location Information: Name: J&J Heating & Air Conditioning Name: 13A-!l Oef aIg c g Street: 17 Arlington St..: Street: d ST City/Town: Dracut, MA 01826 City/Town: North Andover, HA 01845 Telephone: .978-454-8197 Telephone: 771'' /y/GL+6a/ licLa,, Y"" Photo I.D. required/Copy of Photo I.D. attached: YES NO Staff Initinl J-1 /M-1-unrestricted license {/ J-2 /M-2-restricted to dwellings 3-stories or less and commercial up to 10,000 sq. ft. /2-stories or less Resideutiah­T-2-family Iv7ulti-family Condo/Townhouses Other Commercial: ' Office Retail Industrial Educational Institutional Other Square Footage: wider 10,0.00 sq. ft. �' over 10,000 sq. ft. Number of Stories: Sheet metal work to be completed: New Work: ✓ Renovation: HVAC ✓ Metal Watershed Roofing Kitchen Exhaust System Metal Chimney/Vents Air Balancing a Provide detailed description of work to be done: rt-1 e,7d / d u U7`ca o r !,� Fe f r ' 4. ASURANCE COVERAGE: 1 have a current liability insurance policy or its equivalent which meets the requirements of M.G.L.Ch. 112 Yes [-No❑ If you have checked Yes,indicate the type of coverage by checking the appropriate box below: A liability insurance policy ❑ Other type of indemnity 21 Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws,and that my signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this box❑,1 hereby certify that all of the details and Information I have submitted(or entered)regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation:YES NO Progress Inspections Date Comments Final Inspection Date Comments Type of License: By ❑ Master Title ❑ Master-Restricted CityfTown ❑Journeyperson Signature of Licensee Permit# �5 G e ❑Journeyperson-Restricted License Number: Fee$ ❑ Check at www.mass.govldpl Inspector Signature of Permit Approval � rA. The Commonwealth of Massachusetts Department afbulusfrialAccidents ' Of of Investigations _ . ' 600 Washington Street Bosion, MA 02111 RI� cC 14'N'it).Pt t IXSS'.�OV�dl a Workers' Compensation 111surance Affidavit:: ]BLiilders/Conti•actOts/FKcll-iciZtls/Plixi)il)et•s A tlicslnt Tttforttlatioll 'lease Pri11t:Le_Zibl N11111C (T3usincss/Organization/111(lividual): JSJ Heating & Air Conditioning, INc. Address:- 17 ArJ.irrl;ton. St. City/State/7j1): Dracut, MA 01826 I'11o1le g: •978-454-8197 Are you au employer? Check the appropriate box:— Type of project(required): 1.❑ 1 arh a employer witl:i 40 _ 4• ❑ T am a general contractor and T cmployecs (full and/or part-till1c). * have hired the sub-contractors 6. F]New construction 2.❑ 1 ant a sole proptictor or partner- listed on the attached sheet. 7. ❑Remodeling slip and have Ifo e1311)loyces These sub-contractors bavc 8. ❑Demolition working for Inc in any capacity. employees and have workers' 9. ❑Building addition [No workers' comp. insurance comp. insuranec.1 _ required,] 5. ❑ We are a corporation and its 10.0 Electrical repairs or additions 3.❑ i a)n a h.ontcowncr doing all work officers have exercised their 11.E]Plumbing repairs or additions thyself. [No workers' corn>, right of exemption per MGT l 12.❑Roof rcpatrs . insurance required.] 1 c. 1.52, §1(4), and we have no employees. [No workers' 13.❑Olhcr _ ___• _ _^ – comp.insurance required.] `Any applicant that checks box#1 Tnlsl Also fill,out the suction below showing their workers'compensation policy information. t 1 fonlcowncrs who submit this affidavit indicating they ate doing all work and then hire outside contractors must submit a new affidavit indicating such, lContractols that check this box must attached an additional sheet showing the runne of the sub-contractors and state whether or not those entities have C11111loyces. if lhC SUb-(X)nllaetbl:S}IaVC CfnpIOyCCS,they must pf•ovidc their workers'comp.policy number. 1 Wit rtrr employer that is providing workers'compensation insurance for n:y employees. Xlelow is thepolicy and job site _ irrfin•nration. Insurance Cotrtpltily Name:•—A.I.M. Mutual Insurance Policy I/or Self-ins, Li,(c.�ll: WZ4Z-800-8006553-20.13A Expiration Date: 0Y-01 7.5 Job Site Address: - - ----- City/State/7,ip:____ Attach :1 copy of the workers' compensation policy declaration page(showing the policy munber and expiration elate). Fai.lurc to sec ire coverage as reclidie l under Section 25A of MGL c, 152 can lead to the imposition of crirttinal penalties of a tine up to$1,500.00 and/or otic-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of't.tp to 2. (a(7^t� ay against the violator. De advised that a copy of tlfis statement maybe forwarded to the Office of lnvestip lfwlls of th IIIA for 'list anc over ttc vcri0catiou. 1110 here ertif ruder tl r and` ltiev-of4,)cijitry that the information provided above is True and correct. Si natuc – -- _ Date: y ]'Nolte •713-454-8197 Official 4sc orrly. bo not write ill this arca, to be completed by city or town oftial. — City or Town: PerrnlifLiccrtse it __ _• Issuing Authority(circle one.): 1.Board of Health 2.Building Department 3.Cityffown Clerk 4.Electrical Inspector S.Phimbing Inspector 6.Other Contac( ACOR_®M CERTIFICATE OF LIABILITY INSURANCE_ DATE(MM/DD(YYYY) PRODUCER06/10/2014 978.887.4900 FAX 978.887.2404 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Edward F. Sennott Insurance Agency, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 1.6 South Main Street HOLDER.THIS CERTIFICATE DOES NOT AMEND, EXTEND OR P. 0. 130x 457 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. ToI)sfielcl MA 01983 INSURERS AFFORDING COVERAGE INSURED 3&3 Beating & Air Conditioning, Inc. ---- _ NAICIE NSURER& Great American Alliance Ins Co 17 Arlington Street __ Dracut, MA 01826 NSURERo: Safety Insurance Company 0. INSURER 39454 INSURERc: A.I.M. Mutual Insurance Co INSURER D: COVERAGES NSURER E: THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR NSRC TYPE OF INSUI7ANCF_ POLICY NUMBER POLICY EFFECTIVE POLICYMEXPIRKf10N —'---"-- DATE MM DD YYY DATE M DD VY LIMITS GENERAL LIABILITY PAC6418906-08 06/01/2014 06/01/201.5 EACH OCCURRENCE $ 1,000,000 X COMMFRCIAI-GENERAL LIABILITYDAMAGF- F R_NT�IJ — CLAIMS MADE X OCCUR PREMISES(Ea occurrence) $ _— 300,000 — A MED EXP(Any one person) $ 10,000 PERSONAL&ADV INJURY_ F J.'000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPI-IES PER: ------------------.---....-...._....._._—____—._- POLICY PRGO- LOC PRODUCTS-COMP/OP AGG- 1; 2,000,000 JEi ---- AUTOMOBILE LIABILITY 2434550 06/01/2014 06/01/2015 ANY AUTO COMBINED SINGLE LIMIT :r (Ea accident) 1'QQQ'QQ AI-L OWNED AUTOS ---- _- 13 X SCHEDULED AUTOS BODILY INJURY $ -- X HIRED AUTOS (Per person) X NON-OWNED AUTOS BODILY INJURY -- (Per accident) $ -----_-----'-_-- -- PROPERTY DAMAGEIF (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ —_ OTHER THAN EA ACC $ AUTO ONLY: AGG :F EXCESS/UMBRELLA LIABILITY UMB6418958-06 06/01/2014 06/01/2015 EACH OCCURRENCE $ :2,000,000 X_I OCCUR nCLAIMS MADE -- A AGGREGATE $ — 00,000 DEDUCTIBt.E _— rIETENTION _$ WOR KERSCORS'LIATION IT WMZ-800-8006553-2014A 06/02/2014 06/02/2015 X t AND EMPLOYERS'LIABII_Il'Y C S I A F - l H- ANY PROPRIETOR/PAFITNER/EXECUFIVE� _TORY LIMITS __ I_R C OFFICER/MEMBER EXCLUDED? I E.I_.EACH ACCIDENT 5 1,000,000 (Mandatory in NH) It ycs,describe under SPECIAL PROVISIONS belowE.L.DISEASE-EA EMPLOYEE $— 1,000,000 -------- _ ___ OTHER E.L.DISEASE-POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR REPRESENTATIVES. Evidence of Insurance AUTHORIZED REPRESENTATIVE ACORD 25 2009/01) Peter Sennott/LAR ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD :`PuGOIVIMONWEALTIA OF MAS SACf�USE.TTS OEMBOARD (Jf S11EGTwoc�I<ERS,: I SSUtS lalE FOLLOWING ) E. A'S A MASTER—LJNR[STRICTE ` J :&< J II[ATING & AC E12.I C :.R L.I NE 17 ARCM NGTON .ST " EIi�ACU t€ MA ol826396' ;. State ®f Nem Hampshire GAS FITTERS;L1CA:'. .E I e. NAME: ERIC KLINE: ENDORSEMENTS: :STN;'STP DATE ISSUED: 04/21/2014 DATE EXPIRES: 05131/2016 " LICENSE#: GF0700971 commo NW ALTH OF MA .`SASr.r S 'OF sl L :. WO,R I«R I ssUrs 1.;1IG FULLOWI N.G L (CCNSE :> AS A [3US I.. ESS FDWARD T AYU11E \ > J HCA T-h:NG C0ND I T I,.ON I NG.. I 17 ARI_l Nc,1 ON STR DRACUT U MA 0)826 q:'h14 4 485 v Load Short Form Job: 41 Second st N andover • wrightsoft` Date: May 1 ,2014 Basemnt/1 st sys By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref. n/a Coil n/a AHRI ref, n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Cig AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor d 2927 47865 29857 1250 1250 1 st floor system d 2358 43447 28883 1314 1314 Basemnt/1st sys d 5285 91312 58857 2565 2817 Other equip loads 8476 0 Equip. @ 0.93 RSM 54502 Latent cooling 7589 TOTALS 5285 99788 62091 2565 2817 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrl htSOft' 2014-Jun-30 08:58:20 9 Right-Suite®Universal 2013 13.0.07 RSU05790 Page 1 ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N V . 9 x Load Short Form Job: 41 Second st N andover wri htsoft Date: May 1 ,2014 1st floor system By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 � • e o Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 1314 cfm Actual air flow 1314 cfm Air flow factor 0.030 cfm/Btuh Air flow factor 0.046 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.93 ROOM NAME Area Ht load CIg load Htg AVF Cig AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) basement zone p 1274 24469 16831 740 766 1 st floor p 1084 18978 13036 574 593 1 st floor system d 2358 43447 28883 1314 1314 Other equip loads 3626 0 Equip. @ 0.93 RSM 26745 Latent cooling 2044 TOTALS 2358 47073 28789 1314 1314 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft 2014-Jun-30 08:58:20 9 Right-Suite®Universal 2013 13.0.07 RSU05790 Page 2 ACCA ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N g Load Short Form Job: 41 Second st N andover i'1 11t WS0�� Date: May 1 ,2014 2nd floor By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 EMEMI ® - • e • mom Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 1250 cfm Actual air flow 1250 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.041 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 ROOM NAME Area Htg load Cig load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Bouns zone p 885 13058 8549 341 350 2nd floor zone p 2042 34807 27010 909 1107 2nd floor d 2927 47865 29857 1250 1250 Other equip loads 4850 4096 Equip. @ 0.93 RSM 31440 Latent cooling 5545 TOTALS 2927 52715 36986 1250 1250 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 1 wri htsOft° 2014-Jun-30 08:58:20 ,.�/�� 9 Right-Suite®Universal 2013 13.0.07 RSU05790 Page 3 XCCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N - 9 o Load Short Form Job: 41 Second st N andover wri htsoft Date: May 1 ,2014 1st floor By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 � - • • e Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Living room 704 8928 5556 270 253 Kitchen 130 1672 2581 51 117 office 250 8378 4898 253 223 1st floor p 1084 18978 13036 574 593 Other equip loads 2805 0 Equip. @ 0.93 RSM 12071 Latent cooling 1581 TOTALS 1084 21783 13652 574 593 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. WI-i F1tSOft" 2014-Jun-30 08:58:20 9 Right-Suite®Universal 2013 13.0.07 RSU05790 Page 4 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Load Short Form Job: 41 Second st N andover wrightsofto Date: May 1 ,2014 2nd floor zone By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 111111 allm Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Ldy 32 1097 294 29 12 Masterbath 65 2667 1501 70 62 Bedroom 2 208 4865 2622 127 107 bedroom 1 176 2952 3058 77 125 1/2 bath 91 1432 375 37 15 Masterbed room 325 8308 7137 217 293 full bath 77 675 171 18 7 2nd floor hall 180 2237 707 58 29 attic 888 10574 11144 276 457 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. AZL wri htsoft 2014-Jun-30 08:58:20 )m9 Right-Suite®Universal 2013 13.0.07 RSU05790 ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Page 5 2nd floor zone p 2042 34807 27010 909 1107 Other equip loads 2817 0 Equip. @ 0.93 RSM 25012 Latent cooling 4033 TOTALS 2042 37624 29045 909 1107 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. i 2014-Jun-30 08:58:20 'rwri htsof � Right-SuiteUniversal 2013 13.0.07 RSU05790 Page 6 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Load Short Form Job: 41 Second st N andover • wrightsoftm Date: May 1 ,2014 basement zone By: Croinin Construction Management P.0 Box 7237, Lowell,Ma 01852 � • e e For: 483 Nashua Rd, Dracut, Ma 01826 EMEMESIM - • e • 1111111 ME= Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Basement 1274 24469 16831 740 766 basement zone p 1274 24469 16831 740 766 Other equip loads 822 0 Equip. @ 0.93 RSM 15585 Latent cooling 463 TOTALS 1274 25291 16049 740 766 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ti 2014-Jun-30 08:58:20 wri htsoftRight-Suite®Universal 2013 13.0.07 RSU05790 Page 7 ACCK ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Load Short Form Job: 41 Second st N andover wrightsoft` Date: May 1 ,2014 Bouns zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 ' • e e Htg Cig Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Cig load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) bouns room 625 8866 7083 232 290 bouns room closet 70 1248 334 33 14 dining room 190 2944 1132 77 46 Bouns zone p 885 13058 8549 341 350 Other equip loads 2033 0 Equip. @ 0.93 RSM 7916 Latent cooling 1512 TOTALS 1 885 15091 9428 341 350 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. WCI IItSOft° 2014-Jun-30 08:58:20 9 Right-Suite®Universal 2013 13.0.07 RSU05790 Page 8 ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N wri htsoftm Load Multizone Summary Report Job: 41 Second st N andover g Date: May 1 ,2014 By: Croinin Construction Management P.0 Box 7237, Lowell,Ma 01852 • Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM ft3 cfm Btuh/ftz ft3 cfm Btuh/ftz basement zone 3822 0 . 41 26 4 .2 3822 0 . 39 25 0 . 9 1st floor 9756 0 . 55 89 4 .2 9756 0 . 52 84 0 . 9 Bouns zone 8975 0 . 43 64 4 .2 8975 0 . 41 61 0 . 9 2nd floor zone 13050 0 . 41 89 4 .2 13050 0 . 39 84 0 . 9 Basemnt/1st Sys 35603 0 . 16 268 1 . 5 35603 0 . 07 253 0 . 1 ROOM NAME Area Htg load Clg load HtgAVF C1gAVF ftz Btuh Btuh cfm cfm Basement 1274 24469 16831 740 766 basement zone 1274 24469 16831 740 766 Living room 704 8928 5556 270 253 Kitchen 130 1672 2581 51 117 office 250 8378 4898 253 223 1st floor 1084 18978 13036 574 593 bouns room 625 8866 7083 232 290 bouns room closet 70 1248 334 33 14 dining room 190 2944 1132 77 46 Bouns zone 885 13058 8549 341 350 Ldy 32 1097 294 29 12 Masterbath 65 2667 1501 70 62 Bedroom 2 208 4865 2622 127 107 bedroom 1 176 2952 3058 77 125 1/2 bath 91 1432 375 37 15 Masterbed room 325 8308 7137 217 293 full bath 77 675 171 18 7 2nd floor hall 180 2237 707 58 29 attic 888 10574 11144 276 457 2nd floor zone 2042 34807 27010 909 1107 Basemnt/lst Sys 5285 91312 58857 2565 2817 wri htsoft' 2014-Jun-30 08:58:20 g Right-Suite®Universal 2013 13.0.07 RSU05790 Page 1 ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N a Buildin Anal $I$ Job: 41 Second st N andover • WrlghtSOft� y Date: May 1 ,2014 Basemnt/1st sys By: Croinin Construction Management I P.O Box 7237,Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative,humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range °F) - 15 ( L ) Method Simplified Wet bulb (° - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) MENEM• Component Btuh/ft2 Btuh % of load ,fig Walls 3.7 19328 19.4 Glazing 17.3 5656 5.7 Doors 16.7 702 0.7 Ceilings 13.9 28587 28.6 Floors 4.2 10371 10.4 Infiltration 4.2 16975 17.0 Ducts 9692 9.7 Piping 0 0 Humidification 8476 8.5 Ventilation 0 0 Adjustments 0 Total 1 997881 100.0 • s e Component Btuh/ft2 Btuh % of load w Walls 0.7 3604 6.1 Glazing 22.5 7349 12.5 Doors 7.7 323 0.5 � `p Ceilings 12.1 24815 42.2 Floors 0.8 2071 3.5 Infiltration 0.9 3509 6.0 Ducts 9447 16.1 Ventilation 0 0 Internal gains 7740 13.2 Blower 0 0 Adjustments 0 � Total 1 1 58857 100.0 Latent Cooling Load = 7589 Btuh Overall U-value = 0.140 Btuh/ft2-°F Data entries checked. 2014-Jun-30 08:58:20 wrightsoft- Right-Suite(g)Universal 2013 13.0.07 RSU05790 Page 1 /CCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N a Building Anal sis Job: 41 Second st N andover wrightsoft� y Date: May 1 ,2014 1st floor system By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 • • • For: 483 Nashua Rd, Dracut, Ma 01826 EMSENEEMEMSEM D - • • • • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F)) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range �°F) - 15 ( L ) Method Simplified Wet bulb (°F - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) • Component Btuh/ft2 Btuh % of load - Walls 3.3 8015 17.0 wd Glazing 17.3 1233 2.6 Doors 16.7 702 1.5 ° Ceilings 14.7 25507 54.2 Floors 1.4 729 1.5 Infiltration 4.2 7263 15.4 � �� Ducts 0 0 � Piping 0 0 � _R, Humidification 3626 7.7 Ventilation 0 0 Adjustments 0 Total 47073 100.0 e e • Component Btuh/ft2 Btuh % of load Walls 0.6 1500 5.2 Glazing 31.1 2217 7.7 ° Doors 7.7 323 1.1 Ceilings 12.7 22142 76.7 Floors 0 0 0 a Infiltration 0.9 1501 5.2 Ducts 0 0 Ventilation 0 0 Internal gains 1200 4.2 Blower 0 0 Adjustments 0 Total 28883 100.0 Latent Cooling Load = 2044 Btuh Overall U-value= 0.130 Btuh/ft2-°F WARNING: window to floor area ratio = 3.0% - less than 5%. 2014-Jun-30 08:58:20 wrightsoft' Right-SuiteOO Universal 2013 13.0.07 RSU05790 Page 2 /SCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Building Anal sls Job: 41 Second st N andover wrightsoft® y Date: May 1 ,2014 2nd floor By. Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 MEMEM • • o For: 483 Nashua Rd, Dracut, Ma 01826 MEMESIMMEMEM � - o • • • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range °F) - 15 ( L ) Method Simplified Wet bulb (° - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) e Component Btuh/ft2 Btuh % of load Walls 4.0 11314 21.5 w �� Glazing 17.3 4424 8.4 Doors 0 0 0 Ceilings 9.9 3080 5.8 Floors 4.9 9642 18.3 Infiltration 4.2 9713 18.4 Ducts 9692 18.4 Piping 0 0 Humidification 4850 9.2 � Ventilation 0 0 Adjustments 0 Total 52715 100.0 • • o Component Btuh/ft2 Btuh % of load w Walls 0.8 2104 6.2 Glazing 20.0 5132 15.1 ° Doors 0 0 0 Ceilings 8.6 2673 7.9 Floors 1.1 2071 6.1 Infiltration 0.9 2008 5.9 Ducts 9330 27.5 Ventilation 0 0 Internal gains 6540 19.3 Blower 4096 12.1 Adjustments 0 Total 1 33953 100.0 Latent Cooling Load = 5545 Btuh Overall U-value= 0.149 Btuh/ft2-°F Data entries checked. Wrl htsoftw 2014-Jun-30 08:58:20 g Right-Suite®Universal 2013 13.0.07 RSU05790 Page 3 ACCk ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Buildin Anal $1$ Job: 41 Second st N andover wrightsoft� y Date: May 1 ,2014 1st floor By: Croinin Construction Management P.0 Box 7237, Lowell,Ma 01852 e 0 • For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humldlty (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range °F) - 15 ( L ) Method Simplified Wet bulb (° - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) e Component Btuh/ft2 Btuh % of load en„a;v, Walls 3.7 4596 21.1 Glazing 17.3 1233 5.7E Doors 16.7 702 3.2 Ceilings 14.7 6831 31.4 Floors 0 0 0 Infiltration 4.2 5617 25.8 � Ducts 0 0 Piping 0 0 Humidification 2805 12.9 Ventilation 0 0 Adjustments 0 Total 1 1 21783 100.0 MEMENNEMEMMEM • • e Component Btuh/ft2 Btuh % of load Walls 1.0 1221 9.4 Glazing 44.9 3201 24.6 Doors 7.7 323 2.5 Ceilings 12.7 5930 45.5 Floors 0 0 0 Infiltration 0.9 1161 8.9 ,, D ucts 0 0 Ventilation 0 0 Internal gains 1200 9.2 Blower 0 0 Adjustments 0 Total 1 1 13036 100.0 Latent Cooling Load = 1581 Btuh Overall U-value = 0.128 Btuh/ft2-°F Data entries checked. I'1 htsofta 2014-Jun-30 08:58:20 r— W g Right-Suite®Universal 2013 13.0.07 RSU05790 Page 4 ACCA ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Buildin Anal Job: 41 Second st N andover WrightSoft® y$I$ Date: May 1 ,2014 2nd floor zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 lip MEN= e e 0 For: 483 Nashua Rd, Dracut, Ma 01826 ENEENEEM ! - • e • e Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range °F) - 15 ( L ) Method Simplified Wet bulb (°F� - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) • Component Btuh/ft2 Btuh % of load Walls 4.2 7899 21.0 w � Glazing 17.3 3387 9.0 Doors 0 0 0 's Ceilings 8.8 2379 6.3 Floors 6.4 8132 21.6 Infiltration 4.2 5642 15.0 g Ducts 7368 19.6 Piping 0 0 Humidification 2817 7.5 Ventilation 0 0 Adjustments 0 Total 37624 100.0 e e • Component Btuh/ft2 Btuh % of load w Walls 0.6 1197 4.4 �� Glazing 35.4 6931 25.7 Doors 0 0 Ceilings 7.6 2065 7.66 Floors 1.4 1741 6.4y, Infiltration 0.9 1166 4.3 W ,.. Ducts 8571 31.7 Ventilation 0 0 �� s Internal gains 5340 19.8 Blower 0 0 'dl�' Adjustments 0 y + # Total 1 1 27010 100.0 „o� Latent Cooling Load = 4033 Btuh Overall U-value = 0.182 Btuh/ft2-°F Data entries checked. Wrl htsoft" 2014-Jun-30 08:58:20 ACCg Right-Suite®Universal 2013 13.0.07 RSU05790 Page 5 ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Job: 41 Second st N andover - - wrightsoft� Building Analysis Date: May ,2014 basement zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 i • 0 • For: 483 Nashua Rd, Dracut, Ma 01826 liewilin � - • • • • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range6°F) - 15 ( L ) Method Simplified Wet bulb (° - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) • Component Btuh/ft2 Btuh % of load Walls 2.9 3418 13.5 Glazing 0 0 0 Doors 0 0 0 Ceilings 14.7 18676 73.8 Floors 1.4 729 2.9 �_= Infiltration 4.2 1646 6.5 Ducts 0 0 :' Piping 0 0 Humidification 822 3.2 Ventilation 0 0 Adjustments 0 Total 25291 100.0 Component Btuh/ft2 Btuh % of load Walls 0.2 279 1.7 Glazing 0 0 0 Doors 0 0 0 ak Ceilings 12.7 16212 96.3 Floors 0 0 0 � ; Infiltration 0.9 340 2.0 Ducts 0 0 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 16831 100.0 Latent Cooling Load = 463 Btuh Overall U-value = 0.131 Btuh/ft2-°F WARNING: window to floor area ratio = 0.0% - less than 5%. 2014-Jun-30 08:58:20 AGCKwrilghtsoftm Right-Suite®Universal 2013 13.0.07 RSU05790 Page 6 ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Building Anal $I$ Job: 41 Second st N andover wrightsoft� y Date: May 1 ,2014 Bouns zone By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range °F) - 15 ( L ) Method Simplified Wet bulb (°F� - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) • Component Btuh/ft2 Btuh % of load Walls 3.7 3415 22.6 w Glazing 17.3 1037 6.9 -- Doors 0 0 0 � Ceilings 17.5 701 4.6 Floors 2.2 1510 10.0 Infiltration 4.2 4071 27.0 — ° D ucts 2324 15.4 Piping 0 0 Humidification 2033 13.5 Ventilation 0 0 Adjustments 0 Total 15091 100.0 MEMEEMEEM MEM • • Component Btuh/ft2 Btuh % of load Walls 1.0 907 10.6 w �� Glazing 35.8 2148 25.1 Doors 0 0 0 Ceilings 15.2 609 7.1e ,_ Floors 0.5 330 3.9 Infiltration 0.9 841 9.8 °®m Ducts 2514 29.4 Ventilation 0 0 Internal gains 1200 14.0 Blower 0 0 Adjustments 0 �r Total 8549 100.0 Latent Cooling Load = 1512 Btuh Overall U-value = 0.080 Btuh/ft2-°F Data entries checked. 2014-Jun-30 08:58:20 wrightsoft� Right-Suite®Universal 2013 13.0.07 RSU05790 Page 7 �� ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Pro ect Summar Job: 41 Second st N andover • wrightsoft® Y Date: May 1 ,2014 Basemnt/1st sys By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Notes: ! - • a e Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 81619 Btuh Structure 49410 Btuh Ducts 9692 Btuh Ducts 9447 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 8476 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 99788 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 54502 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 6378 Btuh Ducts 1211 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2 5285 5285 Equipment latent load 7589 Btuh Volume ft3) 35603 35603 Air changes/hour 0.16 0.07 Equipment total load 62091 Btuh Equiv.AVF (cfm) 268 253 Req. total capacity at 0.80 SHR 5.7 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. WriihtsoftA 2014-Jun-30 08:58:20 - g Right-Suite®Universal 2013 13.0.07 RSU05790 Pagel ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Pro ect Summar Job: 41 Second st N andover • wrightsoft® Y Date: May 1 ,2014 1st floor system By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 e e e For: 483 Nashua Rd, Dracut, Ma 01826 Notes: ENEENAMEMSEM i - • MINOT M11 . Ie Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Cly range L live Humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 43447 Btuh Structure 28883 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 3626 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 47073 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 26745 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 2044 Btuh Ducts 0 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 2358 2358 Equipment latent load 2044 Btuh Volume (ft3) 13578 13578 Air changes/hour 0.51 0.48 Equipment total load 28789 Btuh Equiv.AVF (cfm) 115 108 Req. total capacity at 0.70 SHR 3.2 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1314 cfm Actual air flow 1314 cfm Air flow factor 0.030 cfm/Btuh Air flow factor 0.046 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.93 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. WI'1 htSOftQ 2014-Jun-30 08:58:20 9 Right-Suite®Universal 2013 13.0.07 RSU05790 Page 2 ACCA ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Pro ect Summar Job: 41 Second st N andover • wrightsoft° Y Date: May 1 ,2014 2nd floor By: Croinin Construction Management P.0 Box 7237, Lowell,Ma 01852 • e • For: 483 Nashua Rd, Dracut, Ma 01826 Notes: i - • e e Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 38172 Btuh Structure 20528 Btuh Ducts 9692 Btuh Ducts 9330 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 4850 Btuh Blower 4096 Btuh Piping 0 Btuh Equipment load 52715 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 31440 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 4334 Btuh Ducts 1211 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 2927 2927 Equipment latent load 5545 Btuh Volume (ft3) 22025 22025 Air changes/hour 0.42 0.40 Equipment total load 36986 Btuh Equiv.AVF (cfm) 153 145 Req. total capacity at 0.70 SHR 3.7 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1250 cfm Actual air flow 1250 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.041 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Jun-30 08:58:20 ACCP, wrightsoft'° Right-Suite(R)Universal 2013 13.0.07 RSU05790 Page 3 ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Pro ect Summar Job: 41 Second st N andover • wrightsoft, Y Date: May 1 ,2014 1st floor By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 • • • For: 483 Nashua Rd, Dracut, Ma 01826 Notes: Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 °F Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 18978 Btuh Structure 13036 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 2805 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 21783 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 12071 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 1581 Btuh Ducts 0 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2 1084 1084 Equipment latent load 1581 Btuh Volume �W) 9756 9756 Air changes/hour 0.55 0.52 Equipment total load 13652 Btuh Equiv.AVF (cfm) 89 84 Req. total capacity at 0.80 SHR 1.3 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Jun-30 08:58:20 RCCA wrightSoft® Right-Suite®Universal 2013 13.0.07 RSU05790 Page 4 ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Pro ect Summar Job: 41 Second st N andover ' wrlghtsoft- y Date: May 1 ,2014 2nd floor zone By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 ! ! 11F.1110i For: 483 Nashua Rd, Dracut, Ma 01826 Notes: Mi d - • fra toyl • Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily ran e L Relative fgiumidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 27439 Btuh Structure 18440 Btuh Ducts 7368 Btuh Ducts 8571 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 2817 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 37624 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 25012 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 3188 Btuh Ducts 846 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 2042 2042 Equipment latent load 4033 Btuh Volume (ft3) 13050 13050 Air changes/hour 0.41 0.39 Equipment total load 29045 Btuh Equiv.AVF (cfm) 89 84 Req. total capacity at 0.80 SHR 2.6 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Jun-30 08:58:20 .4C m- wrightsoft'4 Right-Suite®Universal 2013 13.0.07 RSU05790 Page 5 ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N a - - 9 Project Summar Job: 41 Second st N andover Wrl htsof'� y Date: May 1 ,2014 basement zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 NEENNEEM • 0 e For: 483 Nashua Rd, Dracut, Ma 01826 N otes: ® - • e e Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 24469 Btuh Structure 16831 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 822 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 25291 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 15585 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 463 Btuh Ducts 0 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 1274 1274 Equipment latent load 463 Btuh Volume (ft3) 3822 3822 Air changes/hour 0.41 0.39 Equipment total load 16049 Btuh Equiv.AVF (cfm) 26 25 Req. total capacity at 0.70 SHR 1.9 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency . n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightSoft9 Right-Suite®Universal 2013 13.0.07 RSU05790 2014-Jun-30 08:58:20Page 6 ACCA ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Pro ect Summar Job: 41 Second st N andover - - wrightsoftm Y Date: May 1 ,2014 Bouns Zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Notes: Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD, 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 10734 Btuh Structure 6035 Btuh Ducts 2324 Btuh Ducts 2514 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 2033 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 15091 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 7916 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 1146 Btuh Ducts 366 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 885 885 Equipment latent load 1512 Btuh Volume (ft3) 8975 8975 Air changes/hour 0.43 0.41 Equipment total load 9428 Btuh Equiv.AVF (cfm) 64 61 Req. total capacity at 0.80 SHR 0.8 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Jun-30 08:58:20 wrightsoft'° Right-Suite@ Universal 2013 13.0.07 RSU05790 Page 7 ACCk ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N