Loading...
HomeMy WebLinkAboutMiscellaneous - 41 SECOND STREET 4/30/2018 (6) � t)e o-r%-,�c 1 � BUILDING FILE Da0?.. ........ OF NORTH,�O TOWN OF NORTH ANDOVER ° 9 PERMIT FOR PLUMBING CHU Thiscertifies that+.................................................................................1.....:.....1.....'.._..I....n....... has permission to perform►- ... ^!�` ...... .u��t.Y-�...I plumbing in the buildings of....L!5,0,.!.�+..�,:?��.................................................. at...........�...-y' '..�'YK Q.. f✓ .a` .. .i ...��...... North Andover, Mass. Feer�3A....Lic. No. ..�1��....... .0......................................................................... PLUMBING INSPECTOR Check# J�'L— MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM PLUMBING WORK T '\ CITY tf� 2� MR. DATE PERMIT'S V ` j R'S NAME " ✓� J03SITE ADDRESS � / 07 i oto u.h S� 7 u�' OWNERS i OWNERADDRESS TEL FAX TYPE OR OCCUPANCY TYPE: COMMERCIAL❑ EDUCATIONAL ❑ RESIDa i IAL' PRINTPLANS SUBMI T ED: YES[] NO Q CLEARLY NUJ' RENOVATION:❑ REPLACEMENT 0 14 FIURES Z OR FLOBSMT , ? 2 j 3 4 j 5 c 7 8 9 10 , 11 72 13 I 3., .)! BATHTUB I I i I I CROSS CONNECTION DEVICE I 1 DEDICATED SPECIAL WASTE SYS I I I I I I DEDICATED GASIOIUSAND SYS DEDICATED GREASE SYS DEDICATED WATER,RECYCLE SYS I I I DRINKING FOUNTAIN I I I I DISHWASHER, I FOOD DISPOSER. I I I I I I I FLOOR 1 AREA DRAIN IN►RCEPTOR(IN T EPJOP•} IQTCHEN SINK LAVATORY I I ROOF DRAIN SHOWER STALL SERVICE 1 MOP SINK b IOILET URINAL I ! I I I I 'WASHING MACHINE CONNECTION I }SIA ER HEATER ALL TYPES ( ! I I I I I ' WATER PIPING ! I I I I I I ' , OTHER. I i , 3 f INSURANCE COVERAGE: I have a currer t liabilityinsurance policy or its substantial equivalent which.meets the requiremen's of MGL Ch.142 Yes r No C IF YOU CHECKED YES. PLEASE INDICATE THE TYPE OF COVERAGE BY CHECKING THE APPROPRIATE BOX BELOW LIABILITY INSURANCE POLICY OTHER TYPE OF INDEMNITY ❑ BOND ❑ OWNERS INSURANCE WAIVER: I am aware the,the licensee does not have the insurance coverage required by Chapter 142 of•the Massachusetts General Laws.and that my signature on this permit application waives this requirement CHECK ONE BOX ONLY: OWNER Q AGENT ❑ Signature of Owner or Ownees Agent I hereby certify that all of the details and information I have submitted(or entered) regarding this application are true and accurawitell be it to the best of my Knowledge and that all plumbing work and installations performed under the permit issued for this application compliance with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. r J PWMBER NAME !L{ t�L�p� / � rb l!��<1 � SIGNATUP.E LIC :Z Mr JP❑ CORPORATION ❑r PARTNERSHIP ❑ COMPANY NAME ADDRESS: Po /�� y 7 5 I l V� a L _ STA,=- AAO. ZIP D/Sl� EtVSA1L — / CELL FAY— w b A . ................... �RTI�1h TOWN OF NORTH ANDOVER PERMIT FOR GAS INSTALLATION a oma•.�+ g`4ACNU5� ibis certifies that ...................... ` C .................................................................................... has permission for gas installation in the buildings of..... ....!..ti�� . ........................................................................ ' `�'. .t�:ti . , North Andover, Mass. Fee... v....:..... Lic. No. 16911......... ®............ ........................................... GASINSPECTOR Check# MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK ' cP^ MA. DATE: PERMIT# �— fz ar- O ER'S NAME: eL JOBSITE ADDRESS: GOWNER ADDRESS: TEL- FAX: TYPE OR OCCUPANCY TYPE: COMMERCIAL❑ EDUCATIONAL ❑ RESIDENTIAL❑ PP,,,�i t-' PLANS SUBMITTED: YES❑ NO❑ CLEARLY NEW:❑ RENOVATION:❑ REPLACEMENT:❑ +APPLIANCES-1 FLOOR--$- Bsmt 1 2 3 4 S 6 7 8 9 10 11 12 13 14 BOILER BOOSTER CONVERSION BURNER COOK STOVE DIRECT VENT HEATER DRYER FIREPLACE FRYOLATOR FURNACE GENERATOR GRILLE INFRARED HEATER LABORATORY COCK MAKEUP AIR UNIT OVEN POOL HEATER ROOM!SPACE HEATER ROOF TOP UNIT TEST NIT HEATER UNVENTED ROOM HEATER WATER HEATER INSURANCE COVERAGE I have a current Iiabili insurance policy or its substantial equivalent which meets the requirements of MGL Ch.142 YES NO ❑ If you have checked YES,please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER`S INSURANCE WAIVER:I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws,and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER ❑ AGENT ❑ SIGNATURE OF OWNER OR AGENT hereby certify that all of the details and information I have submitted(or entered)regarding this application are true and accurate to the best of my Knowledge and that all plumbing work and installations performed under the permit issued for this application will be in compliance with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws.` j y, PLUMBERIGASFrITER NAME j`f-f;r t C,!xj 4'LICENSE# SIGNATURE COMPANY NAME: fl - ADDRESS: .- r CITYSTATE AtQ - ZIP: n f.ter % FAX: TEL CELL EMAIL' t3 LL a r� ;y �r,%.c� �z.° . MASTER- JOURNEYMAN❑ LP INSTALLER❑ CORPORATION❑# PARTNERSHIP❑# LLC❑# S The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston,MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers • Applicant Information Please Print Legibly Name(Business/Organization/Individual): Ilrl .(a 42P i- Address: x 7 5- City/State/Zip: City/State/Zip: D V O c EaP I U&. G 1" .Phone M Y,2 VS Are you an employer?Check the appropriate bog: Type of project(required): 1.E�l I am a employer with S 4. ❑ I am a-general contractor and I 6. ❑New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet.+ 7. ❑Remodeling ship and have no employees These sub-contractors have 8. ❑Demolition working for me in any capacity, workers'comp.insurance. 9. ❑Building addition [No workers'comp.insurance 5. ❑ We are a corporation and its r10.[:1 Electrical repairs or additions required.] officers have exercised their 3.❑ I am a homeowner doing all work right of exemption per MGL I QR Plumbing repairs or additions myself.[No workers'comp. c.152,§1(4),and we have no 12.0 Roof repairs insurance required.]t employees.[No workers' 13.❑Other comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. I am an employer that is providing workers'compensation insurancefor my employees. Below is the policy and job site information. / Insurance Company Name: Policy#or Self-ins.Lic.M L-2 r [L-3 e-) ��/ �_ Expiration Date: cZ—, _ Job Site Address: � /, _ �, %` � City/State/Zip: Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL a 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties ofpedury that the information provided above is true and correct. Si ature: Date: —L Phone#. 7� l� S' t-ze V 0j j`wial use only. Do not write in this area,to be completed by city or town ojjicial City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing.Inspector 6.Other Contact Person: Phone#: :'*'.COMMONWEALTH OF MASSACHUSETTS, BOARD OF �,::��_ND G'ASFITTE;R:S:i:-:;i]�: PLUMBERS.. 'A I SSUES THE FOLLOWV' NI L It E NS E-REG I - RE D AS A PLUMB --:CORP_�..­::' I N G M MARCOUX C CO- P'LUMBiNG & HEATING, LLC 108 LAKESHORE DR -_ ­,. , I I l i:D RA C UT A 01826-1008 311:8,5" 5 :-v::-COMMONWEALTH OF M8SSACHUsETTS!.:::,::::!.. OF BOARD.- PLUMBERS .AND CASFITT;ERS DWI -L--':I CENSE LI.CEL ISSUES THE FOL N S ED AS A M.A S T E R RLU M BE Lu;, � .,..MK,Hk:EL MARCOUX 0; 108 LA"bR:i'E' DR,;.,* lu DRACUT MA 01826-10 8 19 6, 05/0,1/] i i;�, 109., 9204 rimmiziotimm'm mpjmw In ilow--ram�9.jwlrj mel-Mir-TO 4�—1 Date: 3/18/2014 Time: 10:13 AN To: Braley Uellington Page: 01 ® CERTIFICATE OF LIABILITY INSURANCE 3/5/2014 ATJE(MMOIDDIYYYY) -= / i2 14 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate>iolder in lieu of such endorsement(s). PRODUCER ' NAME: Stephen Perry Braley & Wellington Insurance Agency Corp. q/CNNo Ext: 508.754.7255 x135 AIC No):508.797.3507 44 Park Avenue E-MAIL-ADDRESS.Sperry@braleywellingtongroup.com P.O. BOX 15127 INSURERS AFFORDING COVERAGE NAIC# Worcester MA 016150127 INSURER A-Merchants Mutual Ins INSURED Michael Marcoux INSURER B: DBA: MC Co Plumbing & Heating LLC INSURERC: 108 Lake Shore Dr INSURERD: PO BOX 754 INSURERE: Dracut MA 01826 INSURER F: COVERAGES CERTIFICATE NUMBER:2013 - 2014 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAYHAVE BEEN REDUCED BY PAID CLAIMS. VSR ADDL SUBR POLICYEFF POLICY EXP .TR TYPE OF INSURANCE POLICY NUMBER MM1DD YYY MM1DD YYYV LIMITS GENERAL LIABILITY BOPI062862 1/01/2019 1/01/2015 EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED PREMISES Ea occurrence $ 50,000 A CLAIMS-MADE a OCCUR MED EXP(Any one person) $ 5,000 PERSONAL&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,000 POLICY PRO- JECT LOC F] 1 $ AUTOMOBILE LIABILITY ACA 7015019 2/28/2014 2/28/2015 COMBINED SINGLE LIMIT Ea accident 1,000,000 A ANYAUTO BODILY INJURY(Per person) $ ALL OWNED X SCHEDULED AUTOS AUTOS BODILY INJURY(Per accident) $ X HIRED AUTOS X NON-OVINED PROPERTY DAMAGE AUTOS Peraccident $ FI UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB HCLAIMS-MADE AGGREGATE $ DED I RETENTION$ $ tL WORKERS COMPENSATION 098138 2/28/2019 2/28/2015T—TAT-U OTH AND EMPLOYERS'LIABILITY Y/N RY X ER ANY PROPRIETOR/PARTNER/EHECUTIVE OFFICER/MEMBER EXCLUDED? NIA E.L.EACH ACCIDENT $ 500,000 (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ 500,000 /ryes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 500,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space Is required) :ERTIFICATE HOLDER CANCELLATION 978)688-9542 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Town of North Andover ACCORDANCE WITH THE POLICY PROVISIONS. Attn: Plumbing Department 1600 Osgood Street AUTHORIZED REPRESENTATIVE Building 20 North Andover, MA Stephen Perry/PERRY --� ,CORD 25(2010/05) ©1988-2010 ACORD CORPORATION. All rights reserved. 45025(201005).01 The ACORD name and logo are registered marks of ACORD 253 Date..�. Z. . .�.c-!.. .. F NpRTH ,� TOWN OF NORTH ANDOVER .�O r 'r p` PERMIT FOR MECHANICAL INSTALLATION F p S. y SAC MUSES,( 4 4 This certifies that -i . .moi . . . . . .. . �Z--. . . . . . . . . . . . . . v has permission for mechanical installation -.�'. ..S. . . . . . . . . . in the buildings of, . . . G�. . !�.�. -. ��.� J . . . . . . . . . . . at . . . North Andover, Mass. Fee . . . Lic. No.. .I:/1.:!. . . . . . . . . . . . . . . . . . . . GAS INSPECTOR WHITE:Applicant CANARY: Building Dept. PINK:Treasurer # Commonwealth of Massachusetts Sheet Metal Permit Date: - 2 3 — Y Permit# Estimated Job Cost: $ V00 Permit Fee: $ Plans Submitted: YES NO Plans Reviewed: YES NO Business License # 196 Applicant License# Business Infonnation: Property Owner/Job Location Information: y- Air Conditioning Name: . B _ eoe(fl W 4,11 Name: J&J Heating —� Street: 17 Arlington St.:. Street: 1.3 Seems j 5'7 City/Town: Dracut, MA 01826 City/Town: North Andover, MA 01845 Telephone: 978-454-8197 Telephone: Svc ' 376 3770 y 7chGe A✓ 7 Photo I.D. required/Copy of Photo I.D. attached: YES NO Staff lllitl&l J-1 /M-1-unrestricted license J-2 /M-2-restricted to dwellings 3-stories or less and commercial up to 10,000 sq. ft. /2-stories or less Residential:"T=2-fafnily Multi-family Condo/Townhouses- Other Commercial: Office Retail Industrial Educational Institutional Other Square Footage: under 10,000 sq. I ✓' over 10,000 sq. ft. Number of Stories: Sheet metal work to be completed: New Work: ►'� Renovation: HVAC ✓ Metal Watershed Roofing Kitchen Exhaust System Metal Chinuley/Vents Air Balancing o Provide detailed description of work to be done: Al e,7a / d 4 7-w o r PC ZIA C s yr TC'. �-, r INSURANCE COVERAGE: I have a current liability insurance policy or its equivalent which meets the requirements of M.G.L.Ch. 112 Yes g—No El If you have checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy [' Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws,and that my signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this boxi],I hereby certify that all of the details and Information I have submitted(or entered)regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and Installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation:YES NO Progress Inspections Date Comments Final Inspection Date Comments Type of License: By [Master Title ❑ Master-Restricted City/Town ❑Journeyperson Signature of Licensee Permit# Le ❑Journeyperson-Restricted License Number: Fee$ ❑ Check at www.mass.-goyldpl Inspector Signature of Permit Approval The COMM-01"vealth qfMassachusells • Deparltnent of XndusfrialAccidettts • _ Office of Investigations _ 600 Washington Street Boston MA 02111 ivfov.tit ass.go v1dia � 101'}CCI'S' CoI"Pell S ttiO11 111sUt'ance Affidavit: Buil(lers/Contractors/Electl-icialls/pltlllil)et's A i llicatl4: Information 'lease Print Legibly Name (Busi)iess/Organization/Individual): J&J Heating & Air Conditioning, INc. Address 17 Arlington St. _Cit�'/State/'7.,i1): Dracut, MA 01826 – I h.olle it: 978-454-'8197 Are you alt entptoycr? Check the appropriate boX: 4— 'Pypc of project(required): 1. F-,1111 a C)DI)Ioycr with--4-0--- 4. [] 1 ani a general contractor and T cinployccs(full and/or part-time).* have hired the sub-contractors G. El New cozrstrttctiorr 2.❑ 1 air a sole proprietor or pirtncr- listed on the attached sheet. 7. ❑Remodeling ship and Dave no employees Iliese sub-contractors have 8. El Demolition working for me in any capacity. cinployccs and have workers' insurance.# 9• El Building addition [No workers' comp. insurance coin 1' required.] 5. f] We are a corporation and its 10.[]Electrical repairs or additions 3.❑ I am a hon)cowncr doiltg all work officers have exercised their 11.❑Plumbing repairs or additions myself. [No workers' comp, right of exemption per MGL. 12,n Roof repairs . insulance required.)i c. 1.52, §1(4), and we have no cinployccs. [No workers' 13.❑Ofer _ comp.insurance required.] '`Any applicant that checks box 111 Mist also fill out the section below showing their workers'compensation policy information. t I10"-wners who submit this affidavit indicating they are doing all work and then hire outside conh•actors must submit a new affidavit indicating such, lContracto,x th,,t check this box must attached an additional sheet showing the nainc of the sub-contractors and state whether or not those entities have cinployccs. if the sub-continct—have employees,they must provide their workers'comp.policy number. 1 nm 11rr employer that is providing workers'compensation insurance for my employees. Below is the policy acrd job site rlljpr'tlralf07l. I11S111'allce Company Nalnc: A.I.M. Mutual Insurance Policy ii or Self ins.Lic,///:_ IrMZ-800-8006553-2013A _ _ Expiration Date: 06/01/15 Job Site Address: c,r _._ _� 1erY6 /d d-e-r City/State/lip:--_ _ Attach a copy of the workers' compensation policy declaration page(showing the policy munber and czpiration da(s). failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a Cine up to$1,500.00 and/or one-year filtprisomncot,as well as civil penalties in lire form of a STOP WO1M ORDER and a fine of ulto$2.S (3(Ya^.ay against the violator. .e advised that a copy of this statement maybe forwarded to the Office of Inves(ig togs of tb l)lA for'nst. anc over tge verification. 7110 here ertij under t/ ai. and ties-ofpeijurp that the information provided above is true and correct. S�gnatur Date: 1'bone �'8–�a'S4-8197 Official also ollb- 1)0 not)l1rite in this area, to be completed by city or to)vIr official. City or Town:— Perim(/License# Issuing Authority(circle one): 1.Board of I3ea101 2. 13rrilding Department 3. Ciiyfl'o wn Clerk 4.Electrical Inspector S.Plinnbing Inspector 6.01.11er Contact Person: Phone#: ACORD. CERTIF=ICATE ®E LIABILITY INSURANCE DATE(MM/DD/YYYY) M 06/10/2014 PRODUCER 978.887.4800 FAX 97$,887,2404 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Edward F. Sennott IIISUrance Agency, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 1.6 South Main Street HOLDER.THIS CERTIFICATE DOES NOT AMEND, EXTEND OR P. 0. Box 457 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Topsfield, MA 01983 INSt1gED jg,j Ileati»y & Air Conditioning, Inc. INSURERSAFFORDING COVERAGE NAIC# NSURERA: Great American Alliance—Ins Co 17 Arlington Street Dracut, MA 01826 INSURER13: Safety Insurance Company 39454 INSURERc: A.I.M. Mutual Insurance Co. INSURER D: COVERAGES wSURE_R r_:THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED,NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. [NSR DD'L----____—___ LTR_NSR --------------------------TYPE_OF INSURANCE_ POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION DATE MM DD YYV DATE MM DD YY LIMITS GENERAL LIABILITY PAC6418906-08 06/01/2014 06/01/2015 EACH OCCURRENCE $ X COMMERCIAL GENERA[_LIABILITY 1,000,000 —- DAMAGE [URE E CLAIMS MADE �� PREMISES(Ea occurrence) 300,000 OCCUR - — A MED EXP(Any one person) J� _ 10,000 ----- PERSONA[_a ADV INJURY_ $ i 1_000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: --- -----..__...___......---____--- POLICY PDO PRODUCTS-COMP/OP AGG 1; Z,000,000 ,[ECT LOC ------- AUTOMOBILE LIABILITY 2434550 06/01/2014 06/01/2015 ANY AUTO COMBINED SINGLE_LIMIT ,� (Ea accident) 1,000,00 ALL OWNED AUTOS _ SCHEDULED AUTOS BODILY INJURY ? (Per person) X HIRED AUTOS X NON-OWNED AUTOS BODILY INJURY — (Per accident) ---_`---_—"----- - - PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY ANY AUTO AUTO—.ONLY-EA ACCIDENT $ _ OTHER THAN __A ACC $ AUTO ONLY: AGG $ F-XCESS/UMBRELLA LIA81LITY UMB6418958-06 06/01/2014 06/01/2015 EACH OCCURRENCE :A 2,000,00 0 X_I OCCUR Fl CLAIMS MADE -- - A AGGREGATE _ _ $ _ 2,000,000 0,000 DEDUCTIBLE RETENTIONA10 ND EMPLOYERS' MPYERS'LI A ILII WMZ-800-8006553-2014A 06/02/2014 06/02/2015 X ,r AND EMPLOYEq$'LIABII_I'IY (,SIA[ - TH- ANY I'ROPRIrr.TOR/PARTNER/L=.XECU'rivE('/N TORY LIMITS __ I_R _ C OFFICER/MEMBC:R EXCLUDED? (Mandatory in NH) I I EL.EACH ACCIDENT `1,000,000 —J lg If yes, hn antler SPI=CIAI_ E.L.DISEASE-EA F_MPLOYEE ;� 1,000,000 _ A[_PROVISIONS belnw _-- 01NER E.L.DISEASE-POL_ICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS CF_RTIFII ATF- HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL _10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR REPRESENTATIVES. Evidence of Insurance AUTHORIZED REPRESENTATIVE ACORD 25(2009/01) Peter Sennott/LAR %.'%•�•,< .,��'—---- 1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD A i Iv CORAt1/�iHONWEA_LTA�HO�}^}F� MAS SSA610SETTS BOARD:: SIIEO ML AL `WORKERS; I SSULS l;.11E_ f OLLOW I::N(� L I`LLNSC,;� 115 A MA STER�UNRSTRIGTEcr IIEAT 1 NG & AC ' L1tIC R 1<1,INL J & J IIL;A 1 1 NG & AG 17 .ARI I NGTON .ST �il�ncUl MA 018226-396;; 1! :r;8 0:/2$/16 21i,� 9 Mate ®f New,, Hampshire GAS FITTERS:LICEN;S;E NAME: ERIC KLINE ENDORSEMENTS: STN ;.STP DATE ISSUED: 04/21/2014 1 DATE EXPIRES: 05131/2016 LICENSE#: GF0700971 v C OMPViOf�WALTFi OF M QOAff3 qH SFICCT Mr7 iL W0RIQ FSS ISSUES THE FULLOWI:NG L I`CCNSE I LIS ABUs I N;CSS �. ( 1)WA T AYOTI-(. J J 'HCAII:N[, AIR CONDITL.ONING.. I 17 ARI_IN 'IN STRCCT ` DRACUT zi MA 01826 y l gh; o l/19/;;16 144485 Job: 43 Second st N andover - - wrightsoft. Load Short Form Date: May 1 ,2014 Basemnt/1st sys By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 � e e • For: 483 Nashua Rd, Dracut, Ma 01826 MEMENEM ® - • e s Htg Cig Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor d 2927 47865 29857 1250 1250 1st floor system d 2358 43447 28883 1314 1314 Basemnt/1st sys d 5285 91312 58857 2565 2817 Other equip loads 8476 0 Equip. @ 0.93 RSM 54502 Latent cooling 7589 TOTALS 5285 99788 62091 2565 2817 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. htsoft° 2014-Jun-30 09:00:09 wri v 9 Right-Suite®Universal 2013 13.0.07 RSU05790 Page 1 ACCA ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N a Load Short Form Job: 43 Second st N andover ` wrightsoft`� Date: May 1 ,2014 1st floor system By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 • e e • For: 483 Nashua Rd, Dracut, Ma 01826 Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 1314 cfm Actual air flow 1314 cfm Air flow factor 0.030 cfm/Btuh Air flow factor 0.046 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.93 ROOM NAME Area Htg load Clg,load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) basement zone p 1274 24469 16831 740 766 1stfloor p 1084 18978 13036 574 593 1st floor system d 2358 43447 28883 1314 1314 Other equip loads 3626 0 Equip. @ 0.93 RSM 26745 Latent cooling 2044 TOTALS 2358 47073 28789 1314 1 1314 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htSOft° 2014-Jun-30 09:00:09 9 Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 2 ACCP1 ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N i Load Short Form Job: 43 Second st N andover ' wrightsoft" Date: May 1 ,2014 2nd floor By: Croinin Construction Management P.0 Box 7237, Lowell,Ma 01852 ME= MOM For: 483 Nashua Rd, Dracut, Ma 01826 ® - • e o Htg Cig Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1250 cfm Actual air flow 1250 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.041 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Bouns zone p 885 13058 8549 341 350 2nd floor zone p 2042 34807 27010 909 1107 2nd floor d 2927 47865 29857 1250 1250 Other equip loads 4850 4096 Equip. @ 0.93 RSM 31440 Latent cooling 5545 TOTALS 2927 52715 36986 1250 1250 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Jun-30 09:00:09 wrightSOW Right-Suite®Universal 2013 13.0.07 RSU05790 Page 3 /�CCI� ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Load Short Form Job: 43 Second st N andover - - wrightsoft. Date: May 1 ,2014 1st floor By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 e e e For: 483 Nashua Rd, Dracut, Ma 01826 D - • e • Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Living room 704 8928 5556 270 253 Kitchen 130 1672 2581 51 117 office 250 8378 4898 253 223 1st floor p 1084 18978 13036 574 593 Other equip loads 2805 0 Equip. @ 0.93 RSM 12071 Latent cooling 1581 TOTALS 1084 21783 13652 574 593 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsOftm 2014-Jun-30 09:00:09 ,.r 9 Right-Suite®Universal 2013 13.0.07 RSU05790 Page 4 �i`ip4 ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Load Short Form Job: 43 Second st N andover wrightsoft, Date: May 1 ,2014 2nd floor zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 e e e For: 483 Nashua Rd, Dracut, Ma 01826 i - • e e Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Ldy 32 1097 294 29 12 Masterbath 65 2667 1501 70 62 Bedroom 2 208 4865 2622 127 107 bedroom 1 176 2952 3058 77 125 1/2 bath 91 1432 375 37 15 Masterbed room 325 8308 7137 217 293 full bath 77 675 171 18 7 2nd floor hall 180 2237 707 58 29 attic 888 10574 11144 276 457 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft° 2014-Jun-30 09:00:09 9 Right-Suitea Universal 2013 13.0.07 RSU05790 Page 5 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N 2nd floor zone p 2042 34807 27010 909 1107 Other equip loads 2817 0 Equip. @ 0.93 RSM 25012 Latent cooling 4033 TOTALS 2042 37624 29045 909 1107 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htSOft' 2014-Jun-30 09:00:09 g Right-Suite(R)Universal 2013 13.0.07 RSU05790 Page 6 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Load Short Form Job: 43 Second st N andover • wrightsofto Date: May 1 ,2014 basement zone By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 B - • e • Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Basement 1274 24469 16831 740 766 basement zone p 1274 24469 16831 740 766 Other equip loads 822 0 Equip. @ 0.93 RSM 15585 Latent cooling 463 TOTALS 1274 25291 16049 740 766 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsOft° 2014-Jun-30 09:00:09 9 Right-Suite®Universal 2013 13.0.07 RSU05790 Page 7 ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Job: 43 Second st N andover wrightsoft, Load Short Form Date: May 1 ,2014 Bouns zone By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 im For: 483 Nashua Rd, Dracut, Ma 01826 Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) bouns room 625 8866 7083 232 290 bouns room closet 70 1248 334 33 14 dining room 190 2944 1132 77 46 Bouns zone p 885 13058 8549 341 350 Other equip loads 2033 0 Equip. @ 0.93 RSM 7916 Latent cooling 1512 TOTALS 885 15091 9428 341 350 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft� 2014-Jun-30 09:00:09 9 Right-Suite®Universal 2013 13.0.07 RSU05790 Page 8 ACCK ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N wri htsoft. Load Multizone Summary Report Job: 43 Second st N andover g Date: May 1 ,2014 By: Croinin Construction Management P.0 Box 7237, Lowell,Ma 01852 EMEMININEEME q Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM ft3 cfm Btuh/ft2 ft3 cfm Btuh/ft2 basement zone 3822 0 . 41 26 4 . 2 3822 0 . 39 25 0 . 9 1st floor 9756 0 . 55 89 4 . 2 9756 0 . 52 84 0 . 9 Bouns zone 8975 0 . 43 64 4 . 2 8975 0 . 41 61 0 . 9 2nd floor zone 13050 0 . 41 89 4 . 2 13050 0 . 39 84 0 . 9 Basemnt/1st sys 35603 0 . 16 268 1 . 5 35603 0 . 07 253 0 . 1 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF ft2 Btuh Btuh cfm cfm Basement 1274 24469 16831 740 766 basement zone 1274 24469 16831 740 766 Living room 704 8928 5556 270 253 Kitchen 130 1672 2581 51 117 office 250 8378 • 4898 253 223 1st floor 1084 18978 13036 574 593 bouns room 625 8866 7083 232 290 bouns room closet 70 1248 334 33 14 dining room 190 2944 1132 77 46 Bouns zone 885 13058 8549 341 350 Ldy 32 1097 294 29 12 Masterbath 65 2667 1501 70 62 Bedroom 2 208 4865 2622 127 107 bedroom 1 176 2952 3058 77 125 1/2 bath 91 1432 375 37 15 Masterbed room 325 8308 7137 217 293 full bath 77 675 171 18 7 2nd floor hall 180 2237 707 58 29 attic 888 10574 11144 276 457 2nd floor zone 2042 34807 27010 909 1107 Basemnt/1st Sys 5285 91312 58857 2565 2817 C W1'1 F1tSOft� 2014-Jun-30 09:00:09 g Right-Suite®Universal 2013 13.0.07 RSU05790 Page 1 ,t� ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Buildin Anal $ Job: 43 Second st N andover Wrlghtsoft® g y1$ Date: May 1 ,2014 Basemnt/1st sys By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 • 0 0 For: 483 Nashua Rd, Dracut, Ma 01826 f - o e • e Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range6°F) - 15 ( L ) Method Simplified Wet bulb (° - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 ?Average) • Component Btuh/ft2 Btuh % of load Walls 3.7 19328 19.4 " Glazing 17.3 5656 5.7 Doors 16.7 702 0.7 Ceilings 13.9 28587 28.6 Floors 4.2 10371 10.4 Infiltration 4.2 16975 17.0 Ducts 9692 9.7 v" Piping 0 0 $' Humidification 8476 8.5 Ventilation 0 0 � , Adjustments 0 Total 99788 100.0 e e • Component Btuh/ft2 Btuh % of load w Walls 0.7 3604 6.1 Glazing 22.5 7349 12.5 °® Doors 7.7 323 0.5 " Ceilings 12.1 24815 42.2 °� r Floors 0.8 2071 3.5 Infiltration 0.9 3509 6.0 Ducts Ventilation 944 16.1 07 0 Wx Internal gains 7740 13.23 ",� Blower 0 0 Adjustments 0 Total 58857 100.0 Latent Cooling Load = 7589 Btuh Overall U-value= 0.140 Btuh/ft2-°F Data entries checked. 2014-Jun-30 09:00:09 ACCP -9d- wrightsoft" Right-Suite®Universal 2013 13.0.07 RSU05790 Page 1 ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Buildin Anal $I$ Job: 43 Second st N andover - - wrightsoft. g Y Date: May 1 ,2014 list floor system By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 � p p • For: 483 Nashua Rd, Dracut, Ma 01826 ME= mmm • 1 • • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F)) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range�°F) - 15 ( L ) Method Simplified Wet bulb (° - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 ?Average) • Component Btuh/ft2 Btuh % of load uml0ifiwtim Walls 3.3 8015 17.0 Glazing 17.3 1233 2.6 Doors 16.7 702 1.5 ° Ceilings 14.7 25507 54.2 Floors 1.4 729 1.5 Infiltration 4.2 7263 15.43 ,` Piping 0 0 Humidification 3626 7.7 Ventilation 0 0 Adjustments 0 Total 47073 100.0 • • o Component Btuh/ft2 Btuh % of load Walls 0.6 1500 5.2 Glazing 31.1 2217 7.7 ° Doors 7.7 323 1.1 ` Ceilings 12.7 22142 76.7 Floors 0 0 0 ' Infiltration 0.9 1501 5.2 � Ducts 0 0 �� Ventilation 0 0 Internal gains 1200 4.2 . Blower 0 0 � Adjustments 0 Total 28883 100.0 Latent Cooling Load = 2044 Btuh Overall U-value = 0.130 Btuh/ft2-°F WARNING: window to floor area ratio= 3.0% - less than 5%. WCI htsoft® 2014-Jun-3009:00:09 g Right-Suite®Universal 2013 13.0.07 RSU05790 Page 2 ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Buildin Anal $I$ Job: 43 Second st N andover wrightsoft. y Date: May 1 ,2014 2nd floor By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 • e • For: 483 Nashua Rd, Dracut, Ma 01826 - o e • e Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity N 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range °F) - 15 ( L ) Method Simplified Wet bulb (° - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) MME9e MENEM Component Btuh/ft2 Btuh % of load Walls 4.0 11314 21.5 wd Glazing 17.3 4424 8.4 Doors 0 0 0 Ceilings 9.9 3080 5.8 " Floors 4.9 9642 18.3 Infiltration 4.2 9713 18.4 Ducts 9692 18.4 Piping 0 0 Humidification 4850 9.2 ,,,m Ventilation 0 0 Adjustments 0 Total 52715 100.0 o • • Component Btuh/ft2 Btuh % of load Walls 0.8 2104 6.2 Glazing 20.0 5132 15.1 Doors 0 0 0 "'X Ceilings 8.6 2673 7.9 , Floors 1.1 2071 6.1 r a ° Infiltration 0.9 2008 5.9 Ducts 9330 27.5 Ventilation 0 0 Internal gains 6540 19.3 Blower 4096 12.1 Adjustments 0 Total 33953 100.0 Latent Cooling Load = 5545 Btuh Overall U-value= 0.149 Btuh/ft2-°F Data entries checked. 2014-Jun-30 09:00:09 ACCP. wrightsoftm Right-Suite®Universal 2013 13.0.07 RSU05790 Page 3 ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N • i Buildin Anal $I$ Job: 43 Second st N andover • - - wrightsoft� y Date: May 1 ,2014 1st floor By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 111111111111111M • • e For: 483 Nashua Rd, Dracut, Ma 01826 ® - • • • s Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range °F) - 15 ( L ) Method Simplified We bulb (°F� - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 0 Component Btuh/ft2 Btuh % of load Walls 3.7 4596 21.1 w Glazing 17.3 1233 5.7 Doors 16.7 702 3.2 Ceilings 14.7 6831 31.4 Floors 0 0 0 Infiltration 4.2 5617 25.8 Ducts 0 0 Piping 0 0 _ Humidification 2805 12.9 Ventilation 0 0 Adjustments 0 Total 1 21783 100.0 e e • Component Btuh/ft2 Btuh % of load w ��re Walls 1.0 1221 9.4 Glazing 44.9 3201 24.6 md� Doors 7.7 323 2.5 Ceilings 12.7 5930 45.5 Floors 0 0 0 Infiltration 0.9 1161 8.9 Ducts 0 0 Ventilation 0 0 Internal gains 1200 9.2 Blower 0 0 ' Adjustments 0 Total 13036 100.0 Latent Cooling Load = 1581 Btuh Overall U-value = 0.128 Btuh/ft2-°F Data entries checked. 2014-Jun-30 09:00:09 wrightsoft- Right-Suite®Universal 2013 13.0.07 RSU05790 Page 4 ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Buildin Anal $I$ Job: 43 Second st N andover wrightsoft. y Date: May 1 ,2014 2nd floor zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range �°F) - 15 ( L ) Method Simplified Wet bulb (°F - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) eMEMO Component Btuh/ft2 Btuh % of load Walls 4.2 7899 21.0 r�a,fi�m Glazing 17.3 3387 9.0 Doors 0 0 0 '" Ceilings 8.8 2379 6.3 Floors 6.4 8132 21.6 ! k Infiltration 4.2 5642 15.0 Ducts 7368 19.6 Piping 0 0 Humidification 2817 7.5 Ventilation 0 0 Adjustments 0 Total 37624 100.0 • • e Component Btuh/ft2 Btuh % of load Walls 0.6 1197 4.4 Glazing 35.4 6931 25.7 Doors 0 0 0 Ceilings 7.6 2065 7.6 Y_, Floors 1.4 1741 6.4 Infiltration 0.9 1166 4.3 i Ducts 8571 31.7 Ventilation 0 0 Internal gains 5340 19.8 Blower 0 0 Adjustments 0 4vugM��l�ll��� igp1 ,14�11�1 Total 27010 100.0 Latent Cooling Load = 4033 Btuh Overall U-value = 0.182 Btuh/ft2-°F Data entries checked. 2014-Jun-30 09:00:09 wrightsoft® Right-Suite(q Universal 2013 13.0.07 RSU05790 Page 5 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Buildin Anal $I$ Job: 43 Second st N andover • wrightsoft. y Date: May 1 ,2014 basement zone By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range6°F) - 15 ( L ) Method Simplified Wet bulb (° - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) e Component Btuh/ft2 Btuh % of load Walls 2.9 3418 13.5 w �� Glazing 0 0 0 .v5 Doors 0 0 0 Ceilings 14.7 18676 73.8 . Floors 1.4 729 2.9 Infiltration 4.2 1646 6.5 -F�r Ducts 0 ps Piping 0 0 Humidification 822 3.2 °,w.. Ventilation 0 0 Adjustments 0 Total 1 1 25291 1 100.0 Component Btuh/ft2 Btuh % of load Walls 0.2 279 1.7 Glazing 0 0 0 Doors 0 0 0 Ceilings 12.7 16212 96.3 41 Floors 0 0 0 Infiltration 0.9 340 2.0 ; Ducts 0 0 Ventilation 0 0 �� Internal gains 0 0 o Blower 0 0 � Adjustments 0 Total 16831 100.0 Latent Cooling Load = 463 Btuh Overall U-value= 0.131 Btuh/ft2-°F WARNING: window to floor area ratio= 0.0% - less than 5%. 2014-Jun-30 09:00:09 wrightsoft% Right-Suite®Universal 2013 13.0.07 RSU05790 Page 6 ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Buildin Anal $I$ Job: 43 Second st N andover • - - wrightsoft° Y Date: May 1 ,2014 Bouns zone By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 � f f • For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 6.5 27..8 Dry bulb (°F) 12 88 Infiltration: Dally range °F) - 15 ( L ) Method Simplified Wet bulb (° - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) • Component Btuh/ft2 Btuh % of load Walls 3.7 3415 22.6 w Glazing 17.3 1037 6.9 Doors 0 0 0 Ceilings 17.5 701 4.6 Floors 2.2 1510 10.0 Infiltration 4.2 4071 27.0 Ducts 2324 15.4a ,. Piping 0 0 Humidification 2033 13.5 Ventilation 0 .0 , Adjustments 0 Total 15091 100.0 Component Btuh/ft2 Btuh % of load Walls 1.0 907 10.6 wa Glazing 35.8 2148 25.1 Doors 0 0 0 Ceilings 15.2 609 7.1 Floors 0.5 330 3.9 amp Infiltration 0.9 841 9.8 Ducts 2514 29.4 Ventilation 0 0 ,w Internal gains 1200 14.0 Blower 0 0 Adjustments 0 ,� Total 8549 100.0 ,n�� Latent Cooling Load = 1512 Btuh Overall U-value= 0.080 Btuh/ft2-°F Data entries checked. 2014-Jun-30 09:00:09 wrigf>tsaftm Right-Suite@)Universal 2013 13.0.07 RSU05790 Page 7 ACCk ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Comt Constructions Job: 43 Second st N andover wrightsoft p�lonenDate: May 1 ,2014 Basemnt/1st sys By: Croinin Construction Management P.O Box 7237,Lowell,Ma 01852 10 Ig ® 0 • For: 483 Nashua Rd, Dracut, Ma 01826 . ® - e e • e Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ftl-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" in 945 0.065 21.0 3.74 3538 0.99 940 gypsum board int fnsh,2"x6"wood frm e 573 0.065 21.0 3.74 2145 0.99 570 S 934 0.065 21.0 3.74 3496 0.99 929 w 585 0.065 21.0 3.74 2190 0.99 582 all 3037 0.065 21.0 3.74 11369 0.99 3020 1513-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, n 168 0.073 8.0 4.43 744 0.17 29 r-8 ins,8"thk,1/2"gypsum board int fnsh e 333 0.073 8.0 4.72 1573 0.40 133 S 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 15621-Owc-6:Bg wall,heavy dry or light damp soil,2"x4"wood int n 288 0.042 21.0 2.90 835 0.24 68 frm,concrete wall,r-8 ins,r-21 cav ins,8"thk,1/2"gypsum board a 288 0.042 21.0 2.90 835 0.24 68 int fnsh s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 36 0.300 0 17.3 622 8.04 290 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; n 24 0.300 0 17.3 415 13.0 313 50%outdoor insect screen;foreground=green grass(0.23) n 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 e 24 0.300 . 0 17.3 415 52.7 1265 s 48 0.300 0 17.3 829 16.0 769 s 23 0.300 0 17.3 403 27.4 640 s 64 0.300 0 17.3 1106 27.4 1756 w 36 0.300 0 17.3 622 28.2 1015 all 327 0.300 0 17.3 5656 22.5 7349 2014-Jun-30 09:00:09 ,V,Z/�� wrightsoft* Right-Suite®Universal 2013 13.0.07 RSU05790 Page 1 AC CA CA ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Doors 11 P0:Door,mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 s 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 120 0.026 38.0 1.50 180 1.30 156 gypsum board int fnsh C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,10"thkns,1/2" 1890 0.255 1.0 14.7 27706 12.7 24050 gypsum board int fnsh C part ceiling,:C part ceiling,frm fir,10"thkns,1/2"gypsum board 40 0.304 1.0 17.5 701 15.2 609 int fnsh Floors 19A-Obstp:Part floor,frm fir,10"thkns 1224 0.368 0 6.90 8442 1.51 1847 19A-30bstp: Part floor,r-30 ins,frm fir,10"thkns 625 0.034 30.0 1.64 1027 0.36 225 21A-24t:Bg floor,heavy dry or light damp soil,6'depth,tile fir fnsh 506 0.025 0 1.44 729 0 0 120 0.025 0 1.44 173 0 0 all 626 0.025 0 1.44 901 0 0 wri htSOft» 2014-Jun-30 09:00:09 ..,, 9 Right-Suite®Universal 2013 13.0.07 RSU05790 Page 2 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 43 Second st N andover • wrightsoft- Date: May 1 ,2014 basement zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 W:11110=04.e e a Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-°F 112-0F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 15B21-Owc-6:Bg wall,heavy dry or light damp soil,2"x4"wood int n 288 0.042 21.0 2.90 835 0.24 68 frm,concrete wall,r-8 ins,r-21 cav ins,8"thk,1/2"gypsum board a 288 0.042 21.0 2.90 835 0.24 68 int fnsh s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,10"thkns,1/2" 1274 0.255 1.0 14.7 18676 12.7 16212 gypsum board int fnsh Floors 21A-24t:Bg floor,heavy dry or light damp soil,6'depth,tile fir fnsh 506 0.025 0 1.44 729 0 0 �. 2014-Jun-30 09:00:09 wri htsofRight-Suite 0 Universal 2013 13.0.07 RSU05790 Page 3 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N I I Component Constructions Job: 43 Second st N andover • wrightsoft p Date: May 1 ,2014 1st floor By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 0 0 0NORMAN:: IBM= mum For: 483 Nashua Rd, Dracut, Ma 01826 w - • o • o Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz-°F W TBtuh Btuh/112 Btu Btu hA2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 468 0.065 21.0 3.74 1752 0.99 465 gypsum board int fnsh,2"x6"wood frm e 174 0.065 21.0 3.74 651 0.99 173 s 298 0.065 21.0 3.74 1114 0.99 296 w 288 0.065 21.0 3.74 1078 0.99 286 all 1228 0.065 21.0 3.74 4596 0.99 1221 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap,1/4"thk:2 n 24 0.300 0 17.3 415 13.0 313 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; e 24 0.300 0 17.3 415 52.7 1265 50%outdoor insect screen;foreground=green grass(0.23) s 23 0.300 0 17.3 403 27.4 640 all 71 0.300 0 17.3 1233 31.1 2217 Doors 11 P0:Door,mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 s 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm flr,10"thkns,1/2" 466 0.255 1.0 14.7 6831 12.7 5930 gypsum board int fnsh Floors (none) 2014-Jun-30 09:00:09 „z rF wrightsoft' Right-Suite®Universal 2013 13.0.07 RSU05790 Page 4 ACCP. ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 43 Second st N andover wrightsoft`� P Date: May 1 ,2014 Bouns zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 p - • e • e Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain fi Btuh/ftz-°F ftz-°FBtuh BtuhV Btu Btuh/ftz Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 225 0.065 21.0 3.74 842 0.99 224 gypsum board int fnsh,2"x6"wood frm a 90 0.065 21.0 3.74 337 0.99 90 s 390 0.065 21.0 3.74 1460 0.99 388 w 207 0.065 21.0 3.74 775 0.99 206 all 912 0.065 21.0 3.74 3415 0.99 907 Partitions. (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 s 24 0.300 0 17.3 415 16.0 385 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23) w 36 0.300 0 17.3 622 28.2 1015 all 60 0.300 0 17.3 1037 23.3 1400 Doors (none) Ceilings C part ceiling,:C part ceiling,frm fir,10"thkns,1/2"gypsum board 40 0.304 1.0 17.5 701 15.2 609 int fnsh Floors 19A-Obstp:Part floor,frm fir,10"thkns 70 0.368 0 6.90 483 1.51 106 19A-30bstp:Part floor,r-30 ins,frm fir,10"thkns 625 0.034 30.0 1.64 1027 0.36 225 rill 2014-Jun-30 09:00:09 - wrightsoft' Right-Suite®Universal 2013 13.0.07 RSU05790 Page 5 14CC� ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 43 Second st N andover wrightsoft' Date: May 1 ,2014 2nd floor By: Croinin Construction Management P.O Box 7237,Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F f2-°F/13tuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 477 0.065 21.0 3.74 1786 0.99 474 gypsum board int fnsh,2"x6"wood frm a 399 0.065 21.0 3.74 1494 0.99 397 s 636 0.065 21.0 3.74 2381 0.99 633 w 297 0.065 21.0 3.74 1112 0.99 295 all 1809 0.065 21.0 3.74 6773 0.99 1799 15B-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, n 168 0.073 8.0 4.43 744 0.17 29 r-8 ins,8"thk,1/2"gypsum board int fnsh a 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 Partitions (none) Windows 2 glazing,cir outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 36 0.300 0 17.3 622 8.04 290 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; n 48 0.300 0 17.3 829 13.0 625 50%outdoor insect screen;foreground=green grass(0.23) e 24 0.300 0 17.3 415 28.2 677 s 48 0.300 0 17.3 829 16.0 769 s 64 0.300 0 17.3 1106 27.4 1756 w 36 0.300 0 17.3 622 28.2 1015 all 256 0.300 0 17.3 4424 20.0 5132 Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 120 0.026 38.0 1.50 180 1.30 156 gypsum board int fnsh C part ceiling,:C part ceiling,hrd wd fir fnsh,frm flr,10"thkns,1/2" 150 0.255 1.0 14.7 2199 12.7 1909 gypsum board int fnsh C part ceiling,:C part ceiling,frm flr,10"thkns,1/2"gypsum board 40 0.304 1.0 17.5 701 15.2 609 int fnsh 2014-Jun-30 09:00:09 wri htsofa Right-SuiteUniversal 2013 13.0.07 RSU05790 Page 6 ACCP. ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Floors 19A-Obstp: Part floor,frm fir,10"thkns 1224 0.368 0 6.90 8442 1.51 1847 19A-30bstp:Part floor,r-30 ins,frm fir,10"thkns 625 0.034 30.0 1.64 1027 0.36 225 21A-24t:Bg floor,heavy dry or light damp soil,6'depth,tile fir fnsh 120 0.025 0 1.44 173 0 0 L wri htsoft' 2014-Jun-30 09:00:09 g Right-Suite®Universal 2013 13.0.07 RSU05790 Page 7 /CCN ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Com r�onent Constructions Job: 43 Second st N andover wrightsoft- p Date: May 1 ,2014 1st floor system By: Croinin Construction Management P.0 Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-0F ft2-°FBtuh MOM Btu Btuh/ftz Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 468 0.065 21.0 3.74 1752 0.99 465 gypsum board int fnsh,2"x6"wood frm e 174 0.065 21.0 3.74 651 0.99 173 S 298 0.065 21.0 3.74 1114 0.99 296 w 288 0.065 21.0 3.74 1078 0.99 286 all 1228 0.065 21.0 3.74 4596 0.99 1221 15B21-Owc-6:Bg wall,heavy dry or light damp soil,2"x4"wood int n 288 0.042 21.0 2.90 835 0.24 68 frm,concrete wall,r-8 ins,r-21 cav ins,8"thk,1/2"gypsum board a 288 0.042 21.0 2.90 835 0.24 68 int fnsh s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 24 0.300 0 17.3 415 13.0 313 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; e 24 0.300 0 17.3 415 52.7 1265 50%outdoor insect screen;foreground=green grass(0.23) s 23 0.300 0 17.3 403 27.4 640 all 71 0.300 0 17.3 1233 31.1 2217 Doors 11 P0:Door,mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 S 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,10"thkns,1/2" 1740 0.255 1.0 14.7 25507 12.7 22142 gypsum board int fnsh Floors 21A-24t:Bg floor,heavy dry or light damp soil,6'depth,tile fir fnsh 506 0.025 0 1.44 729 0 0 2014-Jun-30 09:00:09 wri htsoft° Right-Suite®Universal 2013 13.0.07 RSU05790 Page 8 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 43 Second st N andover wrightsoft� Date: May 1 ,2014 2nd floor zone By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 0w1morilmill: For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) n Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ftz-°FBtuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" In 252 0.065 21.0 3.74 943 0.99 251 gypsum board int fnsh,2"x6"wood frm a 309 0.065 21.0 3.74 1157 0.99 307 s 246 0.065 21.0 3.74 921 0.99 245 w 90 0.065 21.0 3.74 337 0.99 90 all 897 0.065 21.0 3.74 3358 0.99 892 15B-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, n 168 0.073 8.0 4.43 744 0.17 29 r-8 ins,8"thk,1/2"gypsum board int fnsh a 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 In 36 0.300 0 17.3 622 8.04 290 glazing,cir outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; n 48 0.300 0 17.3 829 13.0 625 50%outdoor insect screen;foreground=green grass(0.23) e 24 0.300 0 17.3 415 28.2 677 s 24 0.300 0 17.3 415 16.0 385 s 64 0.300 0 17.3 1106 27.4 1756 all 196 0.300 0 17.3 3387 19.0 3732 Doors (none) Ceilings 166-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 120 0.026 38.0 1.50 180 1.30 156 gypsum board int fnsh C part ceiling,:C part ceiling,I wd fir fnsh,frm flr,10"thkns,1/2" 150 0.255 1.0 14.7 2199 12.7 1909 gypsum board int fnsh Floors 19A-Obstp: Part floor,frm flr,10"thkns 1154 0.368 0 6.90 7959 1.51 1741 wri htsoft 2014-Jun-30 09:00:09 9 Right-Suite@)Universal 2013 13.0.07 RSU05790 Page 9 ACCX ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N 21A-24t:Bg floor,heavy dry or light damp soil,6'depth,tile flr fnsh 120 0.025 0 1.44 173 0 0 wri htSOft" 2014-Jun-30 09:00:09 ,._ 9 Right-SuiteC�Universal 2013 13.0.07 RSU05790 Page 10 A.CK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 43 Second st N andover wrightsoft- p Date: May 1 ,2014 Basement By: Croinin Construction Management P.0 Box 7237,Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 0 - • s • ! Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain W Btuh/ft2-°F ft2-0F/Btuh Btuh/ft2 Btu Btuh/ft' Btuh Walls 15B21-Owc-6:Bg wall,heavydryor light damp soil,2"x4"wood int n 288 0.042 21.0 2.90 835 0.24 68 frm,concrete wall,r-8 ins,r-21 cav ins,8"thk,1/2"gypsum board a 288 0.042 21.0 2.90 835 0.24 68 int fnsh s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,10"thkns,1/2" 1274 0.255 1.0 14.7 18676 12.7 16212 gypsum board int fnsh Floors 21A-24t:Bg floor,heavy dry or light damp soil,6'depth,tile fir fnsh 506 0.025 0 1.44 729 0 0 • 2014-Jun-30 09:00:09rF wri htsoft" Right-Suite®Universal 2013 13.0.07 RSU05790 Page 11 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 43 Second st N andover wrighfisoft Livinroom Byte: May 1 '2014 Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area 1.1-value Insul R Htg HTM Loss Clg HTM Gain ft, Btuh/112-01` ft2-0F/Btuh Btu h/ft2 Btu Btu h/ft2 Btuh Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 243 0.065 21.0 3.74 910 0.99 242 gypsum board int fnsh,2"x6"wood frm e 174 0.065 21.0 3.74 651 0.99 173 w 198 0.065 21.0 3.74 741 0.99 197 all 615 0.065 21.0 3.74 2303 0.99 612 Partitions (none) Windows 2 glazing,cir outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 24 0.300 0 17.3 415 13.0 313 glazing,clr outr,air gas,vnl frm mat,cir innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23) e 24 0.300 0 17.3 415 52.7 1265 all 48 0.300 0 17.3 829 32.9 1577 Doors 11 P0:Door,mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,10"thkns,1/2" 176 0.255 1.0 14.7 2580 12.7 2240 gypsum board int fnsh Floors (none) 2014-Jun-30 09:00:09 wri h1softA Right-Suite®Universal 2013 13.0.07 RSU05790 Page 12 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N wri htsoft Component Constructions Job: 43 Second st N andover 9 Date: May 1 ,2014 Kitchen By: Croinin Construction Management P.0 Box 7237, Lowell, Me 01852 mom For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Btuh/fl W-T/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" s 105 0.065 21.0 3.74 394 0.99 105 gypsum board int fnsh,2"x6"wood frm Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 s 12 0.300 0 17.3 202 27.4 320 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,10"thkns,1/2" 40 0.255 1.0 14.7 586 12.7 509 gypsum board int fnsh Floors (none) 2014-Jun-30 09:00:09 wrightsoft' Right-Suite(R)Universal 2013 13.0.07 RSU05790 Page 13 �CP. ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 43 Second st N andover wrightsoft- Date: May 1 ,2014 office By: Croinin Construction Management P.0 Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Stuh/ftp-°F ft2-°F/Btuh Btuh/ftz Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 225 0.065 21.0 3.74 842 0.99 224 gypsum board int fnsh,2"x6"wood frm s 192 0.065 21.0 3.74 720 0.99 191 w 90 0.065 21.0 3.74 337 0.99 90 all 507 0.065 21.0 3.74 1899 0.99 505 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 s 12 0.300 0 17.3 202 27.4 320 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23) Doors 11 P0:Door,mtl pur core type s 21 0.290 10.5 16.7 351 7.68 161 Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,10"thkns,1/2" 250 0.255 1.0 14.7 3665 12.7 3181 gypsum board int fnsh Floors (none) 2014-Jun-30 09:00:09 ,._ wri htsoft Right-Suite@ Universal 2013 13.0.07 RSU05790 Page 14 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 43 Second st N andover wrightsoft- Date: May 1 ,2014 Bedroom 2 By: Croinin Construction Management P.O Box 7237,Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-'F ft2-°F/Btuh Btuh/ft2 Btu Btu h/ft2 Btuh Walls 12F-Osw:Firm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 120 0.065 21.0 3.74 449 0.99 119 gypsum board int fnsh,2"x6"wood frm e 117 0.065 21.0 3.74 438 0.99 116 all 237 0.065 21.0 3.74 887 0.99 236 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl firm mat,clr innr,1/4"gap,1/4"thk:2 n 24 0.300 0 17.3 415 8.04 193 glazing,clr outr,air gas,vnl firm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23) Doors (none) Ceilings (none) Floors 19A-Obstp:Part floor,firm flr,10"thkns 208 0.368 0 6.90 1435 1.51 314 wri htsoft" 2014-Jun-30 09:00:09 „� 9 Right-Suite(R)Universal 2013 13.0.07 RSU05790 Page 15 ACCO ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 43 Second st N andover - - wrightsoft Date: May 1 ,2014 Ldy By: Croinin Construction Management P.O Bax 7237, Lowell,Ma 01852 I For: 483 Nashua Rd, Dracut, Ma 01826 1f - e • • e 4 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 ?Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Btuh/112-61` W-T/Btuh Btuh/ftz Btu Btu h/ftz Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 36 0.065 21.0 3.74 135 0.99 36 gypsum board int fnsh,2"x6"wood frm w 45 0.065 21.0 3.74 168 0.99 45 all 81 0.065 21.0 3.74 303 0.99 81 Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp:Part floor,frm flr,10"thkns 32 0.368 0 6.90 221 1.51 48 t Wr 1 htsoft" 2014-Jun-30 09:00:09 g Right-Suite®Universal 2013 13.0.07 RSU05790 Page 16 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 43 Second st N andover Wrightsoft Date: May 1 ,2014 bedroom 1 By: Croinin Construction Management P.0 Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-°F ftl-°FBtuh Btu hA2 Btu BtuhM Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" e 75 0.065 21.0 3.74 281 0.99 75 gypsum board int fnsh,2"x6"wood frm Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 e 24 0.300 0 17.3 415 28.2 677 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor,frm fir,10"thkns 176 0.368 0 6.90 1214 1.51 266 . 2014-Jun-30 09:00:09 L WCI htsof � Right-Suite@ Universal 2013 13.0.07 RSU05790 Page 17 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJB Front Door faces: N • Job: 43 Second st N andover a - - wrightsoft- Component Constructions Date: May 1 ,2014 1/2 bath By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 OEM Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Bwh/ftl-°F W-T/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 63 0.065 21.0 3.74 236 0.99 63 gypsum board int fnsh,2"x6"wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp:Part floor,frm flr,10"thkns 91 0.368 0 6.90 628 1.51 137 2014-Jun-30 09:00:09 irF wrightsoft" Right-Suite@ Universal 2013 13.0.07 RSU05790 Page 18 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N • Job: 43 Second st N andover wrightsOft- Component Constructions Date: May 1 ,2014 Masterbed room By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area 1.1-value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ft2-0F ft2-°F/Btuh Btuh/it2 Btu Btu h/ftz Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" s 201 0.065 21.0 3.74 753 0.99 200 gypsum board int fnsh,2"x6"wood frm w 45 0.065 21.0 3.74 168 0.99 45 all 246 0.065 21.0 3.74 921 0.99 245 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 s 24 0.300 0 17.3 415 16.0 385 glazing,clr outr,air gas,vnl frm mat,cir innr,1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,10"thkns,1/2" 125 0.255 1.0 14.7 1832 12.7 1591 gypsum board int fnsh Floors 19A-Obstp: Part floor,frm fir,10"thkns 325 0.368 0 6.90 2242 1.51 490 wri htsoft 2014-Jun-30 09:00:09 ..` Q Right-Suite®Universal 2013 13.0.07 RSU05790 Page 19 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 43 Second st N andover wrightsoft"-0 p Date: May 1 ,2014 Masterbath By: Croinin Construction Management P.O Box 7237,Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 i - • s • e Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area Ll-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/112-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" e 117 0.065 21.0 3.74 438 0.99 116 gypsum board int fnsh,2"x6"wood frm s 45 0.065 21.0 3.74 168 0.99 45 all 162 0.065 21.0 3.74 607 0.99 161 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,10"thkns,1/2" 25 0.255 1.0 14.7 366 12.7 318 gypsum board int fnsh Floors 19A-Obstp:Part floor,firm flr,10"thkns 65 0.368 0 6.90 448 1.51 98 2014-Jun-30 09:00:09 wrightsoft" Right-Suite®Universal 2013 13.0.07 RSU05790 Page 20 �C� ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 43 Second st N andover • wrightsoft Date: May 1 ,2014 full bath By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 i IN For: 483 Nashua Rd, Dracut, Ma 01826 ® - o e • s Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh Btu h/ft2 Btu Btuh/ft2 Btuh Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-0bstp:Part floor,frm fl r,10"thkns 77 0.368 0 6.90 531 1.51 116 wri htsoft 2014-Jun-30 09:00:09 ,.Z- 9 Right-Suited Universal 2013 13.0.07 RSU05790 Page 21 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Job: 43 Second st N andover wrightsoft- Component Constructions Date: May 1 ,2014 bouns room closet By: Croinin Construction Management P.0 Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ftz-°F ft2-°F/Btuh Btuh/ftz Btu Btu h/ftp Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" s 63 0.065 21.0 3.74 236 0.99 63 gypsum board int fnsh,2"x6"wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor,frm flr,10"thkns 70 0.368 0 6.90 483 1.51 106 2014-Jun-30 09:00:09 ,.. wri htsoft Right-Suite®Universal 2013 13.0.07 RSU05790 Page 22 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N wri htsoft Component Constructions Job: 43 Second st N andover 9 Date: May 1 ,2014 bouns room By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 MENEENEMEEM ® - • • • o Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ft2-°F ft2-°FBtuh MOW Btu Btu hA2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 225 0.065 21.0 3.74 842 0.99 224 gypsum board int fnsh,2"x6"woad frm s 156 0.065 21.0 3.74 584 0.99 155 w 207 0.065 21.0 3.74 775 0.99 206 all 588 0.065 21.0 3.74 2201 0.99 585 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 s 24 0.300 0 17.3 415 16.0 385 glazing,cir outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23) w 36 0.300 0 17.3 622 28.2 1015 all 60 0.300 0 17.3 1037 23.3 1400 Doors (none) Ceilings (none) Floors 19A-30bstp:Part floor,r-30 ins,frm flr,10"thkns 625 0.034 30.0 1.64 1027 0.36 225 2014-Jun-30 09:00:09 wrightsoft' Right-Suite®Universal 2013 13.0.07 RSU05790 Page 23 ACCP. ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 43 Second st N andover - - wrightsoft� p Date: May 1 ,2014 2nd floor hall By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°I) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft�-°F ft2-°FBtuh Btuh/112 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 33 0.065 21.0 3.74 124 0.99 33 gypsum board int fnsh,2"x6"wood frm Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 12 0.300 0 17.3 207 8.04 97 glazing,cir outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23) Doors (none) Ceilings (none) Floors 19A-Obstp:Part floor,frm flr,10"thkns 180 0.368 0 6.90 1241 1.51 272 2014-Jun-30 09:00:09 77 wrightsoft" Right-Suite®Universal 2013 13.0.07 RSU05790 Page 24 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N wrightsoft- Component Constructions Job: 43 Second st N andoverDate: May 1 ,2014 attic By: Croinin Construction Management P.0 Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 1;MEM ® - • • • • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft, Bluh/ft2-°F ft2-°FBtuh Btu h/ftz Btu Btuh/V Btu Walls 15B-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, n 168 0.073 8.0 4.43 744 0.17 29 r-8 ins,8"thk,1/2"gypsum board int fnsh a 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,cir innr,1/4"gap,1/4"thk:2 n 48 0.300 0 17.3 829 13.0 625 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 50%outdoor insect screen;foreground=green grass(0.23) s 64 0.300 0 17.3 1106 27.4 1756 all 112 0.300 0 17.3 1935 21.3 2381 Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 cell ins,1/2" 120 0.026 38.0 1.50 180 1.30 156 gypsum board int fnsh Floors 21A-24t:Bg floor,heavy dry or light damp soil,6'depth,tile flr fnsh 120 0.025 0 1.44 173 0 0 .� wri htsoft 2014-Jun-30 09:00:09 g Right-Suite(R)Universal 2013 13.0.07 RSU05790 Page 25 ACCP. ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 43 Second st N andover wrightsoft� p Date: May 1 ,2014 dining room By: Croinin Construction Management P.0 Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 majill Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ftz'F/Btuh Btu h/ft2 Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall,vnl ext, 1/2"wood shth,r-21 cav ins,1/2" a 90 0.065 21.0 3.74 337 0.99 90 gypsum board int fnsh,2"x6"wood frm s 171 0.065 21.0 3.74 640 0.99 170 all 261 0.065 21.0 3.74 977 0.99 260 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,frm flr,10"thkns,1/2"gypsum board 40 0.304 1.0 17.5 701 15.2 609 int fnsh Floors (none) 2014-Jun-30 09:00:09 ,., wri htsoft Right-SuiteUniversal 2013 13.0.07 RSU05790 Page 26 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Job: 43 Second st N andover - - wrightsoft- Project Summary Date: May 1 ,2014 Basemnt/1 st sys By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Notes: ® - • • eEMEW Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 81619 Btuh Structure 49410 Btuh Ducts 9692 Btuh Ducts 9447 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 8476 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 99788 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 54502 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 6378 Btuh Ducts 1211 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 5285 5285 Equipment latent load 7589 Btuh Volume (ft3) 35603 35603 Air changes/hour 0.16 0.07 Equipment total load 62091 Btuh Equiv.AVF (cfm) 268 253 Req. total capacity at 0.80 SHR 5.7 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Jun-30 09:00:09 wrightsoft` Right-Suite®Universal 2013 13.0.07 RSU05790 Page 1 ACCk ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N wri htsoft Project Summary Job: 43 Second st N andover Q Date: May 1 ,2014 1st floor system By: Croinin Construction Management P.0 Box 7237, Lowell,Ma 01852 • UIT e am M. e For: 483 Nashua Rd, Dracut, Ma 01826 Notes: � - • o e Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 43447 Btuh Structure 28883 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 3626 Btuh Blower 0 Btuh Pi in 0 Btuh Equipment load 47073 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 26745 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 2044 Btuh Ducts 0 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 2358 2358 Equipment latent load 2044 Btuh Volume (ft3) 13578 13578 Air changes/hour 0.51 0.48 Equipment total load 28789 Btuh Equiv.AVF (cfm) 115 108 Req. total capacity at 0.70 SHR 3.2 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1314 cfm Actual air flow 1314 cfm Air flow factor 0.030 cfm/Btuh Air flow factor 0.046 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.93 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Jun-30 09:00:09 wrightsoft" Right-Suite®Universal 2013 13.0.07 RSU05790 Page 2 ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Job: 43 Second st N andover wrightsoft° Project Summary Date: May 1 ,2014 2nd floor By: Croinin Construction Management P.0 Box 7237, Lowell,Ma 01852 e • • For: 483 Nashua Rd, Dracut, Ma 01826 Notes: � - • o e h Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 38172 Btuh Structure 20528 Btuh Ducts 9692 Btuh Ducts 9330 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 4850 Btuh Blower 4096 Btuh Piping 0 Btuh Equipment load 52715 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 31440 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 4334 Btuh Ducts 1211 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 2927 2927 Equipment latent load 5545 Btuh Volume (ft3) 22025 22025 Air changes/hour 0.42 0.40 Equipment total load 36986 Btuh Equiv.AVF (cfm) 153 145 Req. total capacity at 0.70 SHR 3.7 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1250 cfm Actual air flow 1250 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.041 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Jun-30 09:00:09 wrightsoft' Right-Suite®Universal 2013 13.0.07 RSU05790 Page 3 ACCX ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N • Job: 43 Second st N andover wrightsoftm Project SUIlltl7ar�/ Date: May 1 ,2014 1st floor By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Notes: ! - • o e Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 18978 Btuh Structure 13036 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 2805 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 21783 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 12071 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 1581 Btuh Ducts 0 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 1084 1084 Equipment latent load 1581 Btuh Volume (ft3) 9756 9756 Air changes/hour 0.55 0.52 Equipment total load 13652 Btuh Equiv.AVF (cfm) 89 84 Req. total capacity at 0.80 SHR 1.3 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Jun-30 09:00:09 wrightsoft' Right-Suite@ Universal 2013 13.0.07 RSU05790 Page 4 ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N • Project Summar Job: 43 Second st N andover - - wrightsoft� y Date: May 1 ,2014 2nd floor zone By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 � • 0 0 For: 483 Nashua Rd, Dracut, Ma 01826. Notes: � - • e Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 27439 Btuh Structure 18440 Btuh Ducts 7368 Btuh Ducts 8571 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 2817 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 37624 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 25012 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 3188 Btuh Ducts 846 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 2042 2042 Equipment latent load 4033 Btuh Volume W) 13050 13050 Air changes/hour 0.41 0.39 Equipment total load 29045 Btuh Equiv.AVF (cfm) 89 84 Req. total capacity at 0.80 SHR 2.6 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Jun-30 09:00:09 wrightsoft' Right-Suite®Universal 2013 13.0.07 RSU05790 Page 5 ...oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N Project Summar Job: 43 Second st N andover wrightsoft� y Date: May 1 ,2014 basement zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 EM'S M • • 0 For: 483 Nashua Rd, Dracut, Ma 01826 Notes: Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 24469 Btuh Structure 16831 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 822 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 25291 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 15585 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 463 Btuh Ducts 0 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft21274 1274 Equipment latent load 463 Btuh Volume ft3) 3822 3822 Air changes/hour 0.41 0.39 Equipment total load 16049 Btuh Equiv.AVF (cfm) 26 25 Req. total capacity at 0.70 SHR 1.9 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond. n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Jun-30 09:00:09 wrightsoft'° Right-Suite®Universal 2013 13.0.07 RSU05790 Page 6 ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N • Project Summar Job: 43 Second st N andover Wrlght50ft° y Date: May 1 ,2014 Bouns zone By: Croinin Construction Management P.O Box 7237, Lowell,Ma 01852 For: 483 Nashua Rd, Dracut, Ma 01826 Notes: Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 10734 Btuh Structure 6035 Btuh Ducts 2324 Btuh Ducts 2514 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 2033 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 15091 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 7916 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average). Structure 1146 Btuh Ducts 366 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 885 885 Equipment latent load 1512 Btuh Volume (ft3) 8975 8975 Air changes/hour 0.43 0.41 Equipment total load 9428 Btuh Equiv.AVF (cfm) 64 61 Req. total capacity at 0.80 SHR 0.8 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Jun-30 09:00:09 wrightsoft' Right-Suite®Universal 2013 13.0.07 RSU05790 Page 7 ACCA ..oft HVAC\cronin construction 21 gabriel way.rup Calc=MJ8 Front Door faces: N