Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutMiscellaneous - 42 COMPASS POINT ROAD 4/30/2018 �� �,'anlf'�SS �4 init �.
�/
r '
i
5/24/2017 2.4(,e
r
' CERTIFICATE OF USE & OCCUPANCY
TOWN OF NORTH ANDOVER
Building Permit Number: 195-2017 Date: May 22, 2017
THIS CERTIFIES THAT
THE BUILDING LOCATED ON: 42 COMPASS POINT ROAD
MAY BE OCCUPIED AS IN ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE
AND SUCH OTHER REGULATIONS AS MAY APPLY.
Certificate Issued to: berry Trust Llc
Building Inspector
o., , :o
This is an e-permit.To learn more,scan this barcode or visit northandoverma.v4ewpointcloud.com/#/records/24698 .SR
r
1/1
r
NORTF� q
} own of :, _ 6Andover .
O to
, ver, Mass, 74tT914, Zoo(Alv
A-I COC NIG HI W.. . 1.
7a
A3,0,
1S► U
BOARD OF HEALTH
Food/Kitchen
PERM Septic System
L D
THIS CERTIFIES THAT 0......
�� BUILDING INSPECTOR
has permission to erect ........ ............. buildings on ... l j...(4: ..... .�, Foundation 6k,
�
. Rough �Vj- �_. lel
to be occupied as .4 ....... ........ ..... ... .................. .......... Ch' ney p d✓�S �► y,� Z�>� k
provided that the person accepting this permit shall in every espect conform to thrms of application Final
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and
Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR
�6"
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
o 7
Final a,y.�'.S 1
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INS ECTOR_.
UNLESS CONST TIO Roug CS k_ Oaf 1 —13 _( �
Service
.. ..... .... PEC.....
.EC R 6
. Fina � 'If-I?�I/ 1
BUILDING R
Gl1S INS OR .
Occupancy Permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final s ) r f
No Lathing or Dry Wall To Be Done FIRE DEPARTMEIIW
Until Inspected and Approved by the Building Inspector. Burner .S'�� �
Street No.
Smoke Det3 _
0 _)�
Lso/ .2 r8
a
� Home Energy Rating certificate
Property HERS
Rating Type: Confirmed Certified Energy Rater: Nicholas Abreu
42 Compass Point Rating Date: 5/18/17 Rating Number:
North Andover, MA 01845 Registry ID: 386857177
Estimated Annual Energy Cost_
Use MMBtu Cost Percent
HERS Index: 52 Heating 26.3 $497 27%
General Information Cooling 0 $0 0%
Conditioned Area 2339 sq. ft. House Type Townhouse, inside unit Hot Water 3.8 $202 11%
Conditioned Volume 19882 cubic ft. Foundation Unconditioned basement Lights/Appliances 22.9 $986 53%
Bedrooms 3 Photovoltaics -0.0 $-0 -0%
Service Charges $157 9%
:Mechanical Systems Features Total 53.0 $1843 100%
Heating: Fuel-fired air distribution, Natural gas, 96.1 AFUE. - - — — — — - --- --
Heating: Fuel-fired air distribution, Natural gas, 96.1 AFUE. Criteria
Water Heating: Heat pump, Electric, 3.07 EF, 80.0 Gal. This home meets or exceeds the minimum criteria for the following:
Duct Leakage to Outside 52.59 CFM25. 2009 International Energy Conservation Code
Ventilation System None
Programmable Thermostat Heat=Yes; Cool=Yes
Building Shell Features
Ceiling Flat R-51.8 Slab None al
Sealed Attic NA Exposed Floor R-30.0
Vaulted Ceiling NA Window Type U-Value: 0.290, SHGC: 0..260
Above Grade Walls R-21.0 Infiltration Rate Htg: 2.73 Clg: 2.73 ACH50 _-
Foundation Walls R-0.0 Method Blower door test CLEAResult
_ Nicholas Abreu
Lights and Appliance Features 50 Washington Street
Percent Interior Lighting 90.40 Range/Oven Fuel Natural gas Westborough, MA 01581
Percent Garage Lighting 100.00 Clothes Dryer Fuel Electric 508-326-7506
Refrigerator (kWh/yr) 643 Clothes Dryer EF 3.01
Dishwasher (kWh/yr) 270 Ceiling Fan (cfm/Watt) 0.00
REM/Rate- Residential Energy Analysis and Rating Software v14.6.4
This information does not constitute any warranty of energy cost or savings. 0 1985-2016 Noresco, Boulder, Colorado.
The Home Energy Rating Standard Disclosure for this home is available from the rating provider.
CLEAResu It
50 Washington Street
Westborough, MA 01581
IECC 2012 402.4.2.1 Testing Option
Blower Door Testing
Pass Fail
Date of Test
Street Address 42 Compass Point
North Andover MA
Source of Area and Volume Calculations:
Builder Rater X Other
HERS Rater: Nick Abreu
Certification# 8368122
I
Signature
I
Builder Barlow Building and Excavating
Builder Contact Tim Barlow
Tested Air Leakage
I
Requirement: 3 Air Changes per hour at 50 Pascals(ACH50) or less
Measurement 917.9
ACH50 2.73
Location
No. Date
i
• - TOWN OF NORTH ANDOVER
• Certificate of Occupancy $
• Building/Frame Permit Fee $
Foundation Permit Fee $
Other Permit Fee $
TOTAL $ •
Check# .011-L
• l/ Building Inspector
V
commonwenIth ofMassachusetts
Sleet Metal Permit
Date:
Permit-4 I
Estimated Job Cost: �� bow_ Permit Fee: $ �o _
Plains Submitted: YES NO flans Reviewed: YES NO l
Business License if 196 Applicant License 11. 1-5
Business Information: Property Owner/Job Location Information:
Nan1c: J&J heating. & Air Conditioning Name: /US aii►-5 ru t- V,j
Street: 17 Arlington St._ Stt'eet' ( p
City/1'own: Dracut, MA 01U6 City/Town: North Andover, MA 01845
Telephone: 97.8-454-8197 Telephone: 977 t.F5/. 3 gS-lo.
Photo I.D. required / Copy of Photo I.D. attached: YES NO
Stnif]uitiat
J-1. /M-1-unrestricted license
J-2 /M-27restricted to dwellings 3-stories or less acid conunercial up to 10,000 sq. ft. /2-stories or less
Res ideizCondo /Townhouses Other
Commercial. Office Retail Industrial Educational
Institutional Ot11er
Square footage: under 10,000 sq. ft. ✓ over 10,000 sq. ft. Number of Stories:
Sheet metal work to be conipleted: New Work: Y' Renovation:
HVAC ✓ Metal Watershed Roofing _ Kitchen Exhaust System
Metal Chimney /Vents Air Balancing
0
Provide detailed description of work to be done:
--s�-fL��� i J j
Fliability
E COVERAGE:
ent liability insurance policy or its equivalent which meets the requirements of M.G.L. Ch. Yes EA-{�No❑
hecked Yes, indicate the type of coverage by checking the appropriate box below:
nsurance policy [� Other type of indemnity ❑ Bond ❑
SURANCE WAIVER: I am aware that the licensed does not have the Insurance coverage required by Chapter 112 of the
Massachusetts General Laws, and that my signature on this permit application waives this requirement.
Check One Only
Owner ❑ Agent ❑
Signature of Owner or Owner's Agent
By checking this boxo, I hereby certify that all of the details and Information I have submitted(or entered)regarding this application aro true and
accurate to the best of my knowledge and that all shoot metal work and Installations performed under the perrnit issued for this applicatlon will be
in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws.
Duct inspection required prior to insulation installation: YES NO
Progt•ess Inspections
Date Comments
Final Inspection
Datc Comments
Type of License:
By ❑ Master
Title
❑ Master-Restricted
Cilyrfown
❑Journeyperson ignature of Licensee
Permit FF
❑Journeyperson-Restricted License Number: ISS Ll�
Fee$
El Check at www.mass.cgoyldpl
Inspector Signature of Permit Approval
The Commonwealth of Massachusetts
Department of Industrial Accidents
1 Congress Street,Suite 100
Boston,MA 02114-2017
UV www mass.gov/dia
Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers.
TO BE FILED WITH THE PERMITTING AUTHORITY.
Applicant Information Please Print Legibly
Name (Business/Organization/Individual): J & J Heating & Air Conditioning, Inc.
Address: 17 Arlington Street
City/State/Zip: Dracut, MA. 01826 Phone#: 978-454-8197
Are you an employer?Check the appropriate box:
Type of project(required):
LFX, I am a employer with 40 employees(full and/or part-time).* 7. ❑New construction
2.❑I am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling
any capacity.[No workers'comp.insurance required.]
3.M I am a homeowner doingall work myself No workers'comp. t 9. ❑Demolition
Y [ p.insurance required.]
4.❑i am a homeowner and will be hiring contractors to conduct all work on my property. I will 10E]Building addition
ensure that all contractors either have workers'compensation insurance or are sole 11.E]Electrical repairs or additions
' proprietors with no employees.
12.[:]Plumbing repairs or additions
5.❑I am a general contractor and i have hired the sub-contractors listed on the attached sheet.
These sub-contractors have employees and have workers'comp.insurance.:
13.�Roof repairs
6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14.[:]Other
152,§1(4),and we have no employees.[No workers'comp.insurance required.]
Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. if the sub-contractors have employees,they must provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name: A.I.M. Mutual Insurance
Policy#or Self-ins.Lic.#: WMZ-800-8006553-2016Expiration Date: 6/2/17
Job Site Address: V11/ .1
Gl P f5s �o ,t }- " City/State/Zip:�_ 4PMA
Attach a copy`of the workers' compensation policy declaration page(showing the policy number and expiration date).
Failure to secure covera a as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00
and/or one-ye risonme ,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a
day again trfhe violator.A c y of this statement may be forwarded to the Office of Investigations of the DIA for insurance
coveragverification.
I do here --cert{/' n&r the ai ann !to
fipe ' perju that the information provided above is true and correct.
Si nature: Date:
Phone#: 7 — 197
Official use only. Do not write in this area,to be completed by city or town official.
City or Town: Permit/License#
Iss:ding Authority(circle one):
1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector
6.Other
Contact Person: Phone#•
/ ICOR"® DATE(MMIDDIYYYY)
�►.�-% CERTIFICATE OF LIABILITY INSURANCE 6/2/2016
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER CONTACT Laurence Hall, CIC
NAME:
Sennott Insurance Agency PHONE (978)887-4900 FAX (978)887-2404
_l9lC�No-.L)tt) A/C Nod:
16 South Main Street E-MAIL 1;rryhall@sennottinsurance.com
ADDRESS: y
P. 0. Sox 457
Topsfield MA 01983
INSURERS AFFORDING COVERAGE NAIC II
'
INSURER A:Great American Alliance Ins.Co
INSURED
INSURERB:Safety Ins Co
J&J Heating S Air Conditioning, Inc. INSURERCA.I.M. Mutual Ins Co
17 Arlington Street INSURER D:
INSURER E
Dracut MA 01826 INSURER F
COVERAGES CERTIFICATE NUMBER:2016-2017 Renewal Certs REVISION NUMBER:
THIS IS TO'CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR ND—DL SUER POLICY EFF POLICY EXP
LTR TYPE OF INSURANCE POLICY NUMBER MMIDDIYYYY MMIDDIYYYY LIMITS
X COMMERCIAL GENERAL LIABILITY / EACH OCCURRENCE $ 1,000,000
A CLAIMS-MADE a OCCUR DAMAGE TO RENTED 300,000
PREMISES(Ea occurrence)_ $
PAC6418906-10 6/1/2016 6/1/2017 MED EXP(Any one person) $ 10,000
PERSONAL 8 ADV INJURY $ 1,000,000
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000
POLICY 1] JECT n LOC
PRODUCTS-COMP/OPAGG $ 2,000,000
OTHER:
AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000
Ea accident
B ANY AUTO BODILY INJURY(Per person) $
ATOX SCHEDULED 2434550 6/1/2016 6/1/2017 BODILY INJURY(Per accident) $
AUUTOSS AUTOS
X HIRED AUTOS X NON-OWNED PROPERTY DAMAGE
AUTOS Per accident $
$
X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 2 000 000
A EXCESS LIAB CLAIMS-MADE AGGREGATE $ 2,000,000
DED RETENTION$ UMB6418958-09 6/1/2016 6/1/2017 $
WORKERS COMPENSATION, X PER OH-
AND EMPLOYERS'LIABILItY YIN STATUTE ER
ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ 1,000,000
OFFICER/MEMBER EXCLUDED? NIA- _
C (Mandatory in NH) WMZ-800-8006553-2016 6/2/2016 6/2/2017 E.L.DISEASE-EA EMPLOYE $ 1,000,000
If yes,describe tinder
_
DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000 000
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space Is required)
t
CERTIFICATEIHOLDER; CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES'BE CANCELLED BEFORE
Evidence of Insurance THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
L Hall, CIC/LH2 I�ea
©1988-2014 ACORD CORPORATION. All rights reserved.
ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD
INS025nm4n11
OMMONWEALTH OF MASSACHUSETTS
BOAR Q
SHEET METAL WORKERS;
ISSUES THE FOLLOWING LICEN$'E AS A
MAS '.ER-UNRESTRICTED
ccD
ERIC"R KL1NE
17 ARLINGTON,ST:
J&J HATING:&AC y-
DRACUT, MA 01826 3
1568 Q5/28/2018 „ 3 744
lASlSAc-jzjUI,s, J(
�t DRIVER'S
LICENSE
041�"• } (A0503201G ...NONE^INUMDER' --
S996.55871':
-1 on
rt
W r Y DM .t7 NONE ,15's[x M ...I... 1980
{ v., 4tl
�j 1G.HGTtiG 09
•i
KI:.INE
z ERIC RJ
n 10G MEADOW CREEK DR j't07o
DRACUT,MA 01826
OS01-
10161tev0l"15.2009 ��rn
4..... �116Z4�;I%l; l��11 y c�J11f 6�nfi''�a cf C dU 11 alf�lf 6 r : :;
'�' �.._:_p,>It\"A�Vk���;l(cj��• ��I,��o��I ' � 9K���`.r;�yl )f l r �I SII � i
MMV
S IEE7 METAL WORKEWS
IS`UE'.THE COCl OWING LIC C NSE AS A.
rJU:Sl�,rrr,
F�
r�uuar�D r AVOT I E
" J 1 HCA:flNG CONDITIONING,JNC
17 aRl_iNioil °>)"RErL
DRac���, Iu1a 01826
19b 01/1'1/SOP#f 12401 I .:
s.
hll)°}....:�(,..,
wri9htsofik. Load Short Form Job: Lot j2 42 Compass Poin...
Date: Nov 24,2016
Entire House By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
• fif0 ftation
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
Htg Clg Infiltration
Outside db (°F) 12 88 Method Simplified
Inside db (°F) 68 75 Construction quality Tight
Design TD (°F) 56 13 Fireplaces 1 (Average)
Daily range - L
Inside humidity (%) 50 50
Moisture difference (gr/Ib) 43 28
HEATING EQUIPMENT COOLING EQUIPMENT
Make Make
Trade Trade
Model Cond
AHRI ref Coil
AHRI ref
Efficiency 80AFUE Efficiency 0 SEER
Heating input 0 Btuh Sensible cooling 0 Btuh
Heating output 0 Btuh Latent cooling 0 Btuh
Temperature rise 0 OF Total cooling 0 Btuh
Actual air flow 778 cfm Actual air flow 778 cfm
Air flow factor 0.027 cfm/Btuh Air flow factor 0.046 cfm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat Load sensible heat ratio 0.83
ROOM NAME Area Htg load Clg load Htg AVF Clg AVF
(ft2) (Btuh) (Btuh) (cfm) (cfm)
Garage 286 0 1164 0 54
Family Room 208 4109 2044 110 94
Kitchen 294 5558 3702 149 170
Stair 84 1029 222 28 10
1/2 bath 42 1736 679 47 31
Entry 56 1683 706 45 32
master bath 96 2335 1355 63 62
master bedroom 290 4287 2758 115 127
bedroom 2 247 4301 1927 115 89
Full bath 91 2326 821 62 38
2nd floor stairs 84 836 632 22 29
closet 100 741 220 20 10
wash/dryer 24 41 659 1 30
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wri htsoft" 2016-Dec-2106:44:59
9 Right-Suite®Universal 2015 15.0.23 RSU05790 Page 1
ACCK ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
Entire House 1902 28982 16889 778 778
Other equip loads 0 2730
Equip. @ 0.93 RSM 18167
Latent cooling 3891
TOTALS 1902 28982 22058 778 778
I
I
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wri htsaft 2016-Dec-2106:44:59
"im,,� g Right-Suite®Universal 2015 15.0.23 RSU05790 Page 2
...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
Building Anal sis Job: Lot j242Compass Poin...
- - wrightsoft® y Date: Nov 24,2016
Entire House By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
i
MENIN • • •
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
NEEMEENIMENEEM ! - • • • s j
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 42°N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Dally range6°F) - 15 ( L ) Method Simplified
Wet bulb (°
- 72 Construction quality Ti ht
Wind speed (mph) 15.0 7.5 Fireplaces 1 ?Average)
Component Btuh/ft2 Btuh % of load
Walls 2.8 6623 22.9
Glazing 16.7 2952 10.2
Doors 4.0 339 1.2
Ceilings 2.0 2074 7.2
Floors 3.5 4375 15.1
Infiltration 4.3 9912 34.2
Ducts 2708 9.3
Piping 0 0
Humidification 0 0
Ventilation 0 0
Adjustments 0
Total 1 1 28982 100.0
• • •
Component Btuh/ft2 Btuh % of load
Walls 0.9 2050 10.4 wd
Glazing 13.9 2467 12.6
Doors 7.7 646 3.3
Ceilings 1.9 1920 9.8
Floors 0.8 991 5.1
Infiltration 0.9 2105 10.7
Ducts 1821 9.3
Ventilation 0 0
Internal gains 4890 24.9
Blower 2730 13.9
Adjustments 0
Total 1 19619 100.0
Latent Cooling Load = 3891 Btuh
Overall U-value = 0.096 Btuh/ft2-°F
Data entries checked.
2016-Dec-21 06:44:59
wrightsoft' Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 1
ACCA ..-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
wri htsoft- Component Constructions Job: Lot j242 Compass Poin...
9 Date: Nov 24,2016
Entire House By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 420N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Daily range (°F) - 15 ( L ) Method Simplified
Wet bulb (°F) - 72 Construction quality Tiht
Wind speed (mph) 15.0 7.5 Fireplaces 1 Average)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ftp Btu
Walls
12F-Osw: Frm wall,wd ext, 1/2"wood shth,r-21 cav ins,1/2" n 375 0.065 21.0 3.61 1355 0.99 373
gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 525 0.065 21.0 3.61 1897 0.99 522
s 315 0.065 21.0 3.61 1138 0.99 313
w 504 0.065 21.0 3.61 1821 0.99 501
all 1719 0.065 21.0 3.61 6212 0.99 1710
1217-0sw:Frm wall,wd ext,5/8"wood shth,r-21 cav ins,5/8" a 54 0.065 21.0 0 0 0.99 54
gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 54 0.065 21.0 0 0 0.99 54
W 198 0.065 21.0 0 0 0.99 197
all 306 0.065 21.0 0 0 0.99 304
15B-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, a 90 0.073 8.0 4.56 410 0.40 36
r-8 ins,8"thk,1/2"gypsum board int fnsh
Partitions
12C-Osw:12C-Osw 261 0 0 0 0 0 0
Windows
2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 111 0.300 0 16.7 1851 8.94 992
glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk; a 33 0.300 0 16.7 550 29.1 961
6.67 ft head ht s 33 0.300 0 16.7 550 15.6 514
all 177 0.300 0 16.7 2952 13.9 2467
Doors
11 P0:Door,mtl pur core type s 21 0.290 10.5 16.1 339 7.68 161
s 63 0.290 10.5 0 0 7.68 484
all 84 0.290 10.5 4.03 339 7.68 646
Ceilings
1613-30ad:Attic ceiling,asphalt shingles roof mat,r-20 roof ins, 100 0.032 30.0 1.78 178 1.60 160
r-30 ceiI ins
16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 832 0.026 38.0 1.45 1203 1.30 1082
gypsum board int fish
C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,10"thkns,1/2" 49 0.255 1.0 14.2 693 12.7 624
gypsum board int fnsh
141 2016-Dec-21 06:45:00
wrightsoft" Right-Suite i)Universal 2015 15.0.23 RSU05790 Page 1
iC� ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
C part ceiling,:C part ceiling,hrd wd fir fnsh,r-38 ins,frm fir,12" 39 0.028 38.0 0 0 1.40 55
tttkns,5/8"gypsum board int fnsh
Floors
19A-Obswp:Part floor,hrd wd fir fnsh,frm fir,10"thkns 684 0.295 0 6.16 4215 1.40 955
19A-Obswp:Part floor,hrd wd fir fnsh,frm fir,8"thkns 26 0.295 0 6.16 160 1.40 36
19C-19cscp:19C-19cscp 247 0 0 0 0 0 0
21A-24t:Bg floor,heavy dry or light damp soil,6'depth 286 0.025 0 0 0 0 0
AIL2016-Dec-21 06:45:00
wrightsoft" Right-Suite(g)Universal 2015 15.0.23 RSU05790 Page 2
.CC-k, ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
Component Constructions Job: Lot j242 Compass Poin...
wrightsoft- P Date: Nov 24,2016
Garage By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
A - • o •R •
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 420N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Daily range (°F) - 15 ( L ) Method Simplified
Wet bulb ( F) - 72 Construction quality Ti ht
Wind speed (mph) 15.0 7.5 Fireplaces 1 Average)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HT M Gain
ft2 Btuh/ft2-°F ft2-0F/Btuh Btuh/ftz Btu Btuh/ft' Btu
Walls
12F-Osw:Frm wall,wd ext,5/8"wood shth,r-21 cav ins,5/8" a 54 0.065 21.0 0 0 0.99 54
gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 54 0.065 21.0 0 0 0.99 54
W 198 0.065 21.0 0 0 0.99 197
all 306 0.065 21.0 0 0 0.99 304
Partitions
(none)
Windows
(none)
Doors
11 P0:Door,mtl pur core type s 63 0.290 10.5 0 0 7.68 484
Ceilings
C part ceiling,:C part ceiling,hrd wd flr fnsh,r-38 ins,frm flr,12" 39 0.028 38.0 0 0 1.40 55
thkns,5/8"gypsum board int fnsh
Floors
21A-24t:Bg floor,heavy dry or light damp soil,G depth 286 0.025 0 0 0 0 0
2016-Dec-2106:45:00WI1 htsofRight-Suite®Universal 2015 15.0.23 RSU05790
Page 3
ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
Component Constructions Job: Lot j242Compass Poin...
wrightsoft� p Date: Nov 24,2016
Family Room By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
® ' • • • •
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 42°N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Daily range (°F) - 15 ( L ) Method Simplified
Wet bulb (°F) - 72 Construction quality Tiht
Wind speed (mph) 15.0 7.5 Fireplaces 1 Average)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/ft2-°F ft?°F/Btuh Btuh/ftz Btuh Btuh/ftz Btu
Walls
12F-Osw: Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" n 87 0.065 21.0 3.61 314 0.99 87
gypsum board int fnsh,2"x6"wood frm,16"o.c.stud w 144 0.065 21.0 3.61 520 0.99 143
all 231 0.065 21.0 3.61 835 0.99 230
Partitions
12C-Osw:12C-Osw 117 0 0 0 0 0 0
Windows
2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 30 0.300 0 16.7 500 8.94 268
glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap,1/4"thk;
6.67 ft head ht
Doors
(none)
Ceilings
(none)
Floors
19A-Obswp: Part floor,hrd wd flr fnsh,frm fl r,10"thkns 208 0.295 0 6.16 1282 1.40 290
-LLJL
wri htsoft 2016-Dec-2106:45:00
,.� 9 Right-Suite®Universal 2015 15.0.23 RSU05790 Page 4
ACCK ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
wri htsoft- Component Constructions Job: Lot j242 Compass Poin...
9 Date: Nov 24,2016
Kitchen By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut,Ma 01826 Phone:978 454 8197 Email:eric@jjheatac.com Web:jjheatac.com
IN • • In
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 42°N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Daily range (°F) - 15 ( L ) Method Simplified
Wet bulb (°F) - 72 Construction quality Tiht
Wind speed (mph) 15.0 7.5 Fireplaces 1 Average)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
ft2 BtuhM-°F ft�-°FBtuh Btuh/ft2 Btu Btuh/ft' Btu
Walls
12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" n 90 0.065 21.0 3.61 325 0.99 90
gypsum board int fnsh,2"x6"wood frm,16"o.c.stud e 177 0.065 21.0 3.61 640 0.99 176
W 18 0.065 21.0 3.61 65 0.99 18
all 285 0.065 21.0 3.61 1030 0.99 283
Partitions
12C-Osw:12C-Osw 27 0 0 0 0 0 0
Windows
2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 36 0.300 0 16.7 600 8.94 322
glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap,1/4"thk; e 12 0.300 0 16.7 200 29.1 349
6.67 ft head ht all 48 0.300 0 16.7 801 14.0 671
Doors
(none)
Ceilings
(none)
Floors
19A-Obswp:Part floor,hrd wd fir fnsh,frm flr,10"thkns 294 0.295 0 6.16 1812 1.40 411
2016-Dec-21 06:45:00
wrightsoft" Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 5
ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
W rl9htSOft- Component Constructions Job: Lot j2 42 Compass Poin...
Date: Nov 24,2016
Stair By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
M . • i
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 42°N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Daily range (°F) - 15 ( L ) Method Simplified
Wet bulb ( F) - 72 Construction quality Tiht
Wind speed (mph) 15.0 7.5 Fireplaces 1 Average)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
ft� Btuh/ftz-°F ft2-°F/Btuh Btuh/ftp Btu Btuh/ft2 Btu
Walls
12F-Osw: Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" a 54 0.065 21.0 3.61 195 0.99 54
gypsum board int fnsh,2"x6"wood frm,16"o.c.stud
Partitions
12C-Osw: 12C-Osw 54 0 0 0 0 0 0
Windows
(none)
Doors
(none)
Ceilings
(none)
Floors
19A-Obswp: Part floor,hrd wd fir fnsh,frm fir,10"thkns 84 0.295 0 6.16 518 1.40 117
I--- Wrl I1tSOft 2016-Dec-2106:45:00
1 9 Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 6
ACOA ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJB Front Door faces: N
Component ComConstructions Job: Lot j242 Compass Poin...
wrightsoft� P Date: Nov 24,2016
1/2 bath By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
- • 1 • 1 • •
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 420N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Daily range (°F) - 15 ( L ) Method Simplified
Wet bulb (°F) - 72 Construction quality Tiht
Wind speed (mph) 15.0 7.5 Fireplaces 1 Average)
Construction descriptions Or Area 1.1-value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/V-°F ft2-°FBtuh Btuh/112 Btu Btuh/112 Btu
Walls
12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" a 63 0.065 21.0 3.61 228 0.99 63
gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 48 0.065 21.0 3.61 173 0.99 48
all 111 0.065 21.0 3.61 401 0.99 110
Partitions
(none)
Windows
2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 s 6 0.300 0 16.7 100 15.6 93
glazing,cir outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk;
6.67 ft head ht
Doors
(none)
Ceilings
C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,10"thkns,1/2" 22 0.255 1.0 14.2 311 12.7 280
gypsum board int fnsh
Floors
19A-Obswp: Part floor,hrd wd flr fnsh,frm flr,10"thkns 42 0.295 0 6.16 259 1.40 59
2016-Dec-21 06:45:00
wrightsoft' Right-Suite®Universal 2015 15.0.23 RSU05790 Page 7
ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJB Front Door faces: N
- - 11tSOft 9 m Component Constructions Job: Lot j2 42 Compass Poin...
Wrl Date: Nov 24,2016
Entry By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 420N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Daily range (°F) - 15 ( L ) Method Simplified
Wet bulb (°F) - 72 Construction quality Tiht
Wind speed (mph) 15.0 7.5 Fireplaces 1 Average)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh1V-1F ftMF/Btuh Btuh/ft2 Btu Btuh/ft2 Btu
Walls
12F-Osw:Firm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" s 51 0.065 21.0 3.61 184 0.99 51
gypsum board int fnsh,2"x6"wood frm,16"o.c.stud
Partitions
12C-Osw:12C-Osw 63 0 0 0 0 0 0
Windows
(none)
Doors
11 P0:Door,mtl pur core type s 21 0.290 10.5 16.1 339 7.68 161
Ceilings
C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,10"thkns,1/2" 27 0.255 1.0 14.2 382 12.7 344
gypsum board int fnsh
Floors
19A-Obswp: Part floor,hrd wd fir fnsh,frm fir,10"thkns 56 0.295 0 6.16 345 1.40 78
wri htsoft 2016-Dec-2106:45:00
9 Right-Suite®Universal 2015 15.0.23 RSU05790 Page 8
ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
ot
42
- - wrightsoft- Component Constructions Date: Lov24 ,2016 Compass Poin...
master bath By:
J&J Heating and Air Conditioning
17 Arlington st, Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
OEM OTT • • • •
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 420N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Daily range (°F) - 15 ( L ) Method Simplified
Wet bulb (°F) - 72 Construction quality Tiht
Wind speed (mph) 15.0 7.5 Fireplaces 1 Average)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/ft2-°F ft2-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btuh
Walls
12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" n 99 0.065 21.0 3.61 358 0.99 98
gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 60 0.065 21.0 3.61 217 0.99 60
all 159 0.065 21.0 3.61 575 0.99 158
Partitions
(none)
Windows
2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 9 0.300 0 16.7 150 8.94 80
glazing,cir outr,air gas,vnl frm mat,cir innr, 1/4"gap, 1/4"thk; a 12 0.300 0 16.7 200 29.1 349
6.67 ft head ht all 21 0.300 0 16.7 350 20.5 430
Doors
(none)
Ceilings
16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins, 1/2" 96 0.026 38.0 1.45 139 1.30 125
gypsum board int fnsh
Floors
(none)
L wri htsoft� 2016-Dec-2106:45:00
1.,.- 9 Right-Suite®Universal 2015 15.0.23 RSU05790 Page 9
ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
Component Constructions Job: Lot j242 Compass Poin...
- wrightsoft� p Date: Nov 24,2016
master bedroom By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 42°N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Daily range (°F) - 15 ( L ) Method Simplified
Wet bulb (°F) - 72 Construction quality Tiht
Wind speed (mph) 15.0 7.5 Fireplaces 1 Average)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain
ft2 Btuh/ft2-oF ftz-"F/Btuh Btu h/ftz Btu Btuh/112 Btuh
Walls
12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" n 99 0.065 21.0 3.61 358 0.99 98
gypsum board int fnsh,2"x6"wood frm,16"o.c.stud w 162 0.065 21.0 3.61 585 0.99 161
all 261 0.065 21.0 3.61 943 0.99 260
Partitions
(none)
Windows
2 glazing,cir outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 36 0.300 0 16.7 600 8.94 322
glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk;
6.67 ft head ht
Doors
(none)
Ceilings
166-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 290 0.026 38.0 1.45 419 1.30 377
gypsum board int fnsh
Floors
19A-Obswp:Part floor,hrd wd flr fnsh,frm flr,8"thkns 26 0.295 0 6.16 160 1.40 36
�. wri htSOfRight-SuiteUniversal 2015 15.0.23 RSU05790 2016-Dec-2106:45:00
Page 10
/SCCA ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
Component Constructions Job: Lotj242CompassPoin...
wrightsoft- Date: Nov 24,2016
bedroom 2 By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
• • •
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 420N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Daily range (°F) - 15 ( L ) Method Simplified
Wet bulb (°F) - 72 Construction quality Tiht
Wind speed (mph) 15.0 7.5 Fireplaces 1 Average)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/ft?°F ftz-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu
Walls
12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" a 63 0.065 21.0 3.61 228 0.99 63
gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 99 0.065 21.0 3.61 358 0.99 98
W 171 0.065 21.0 3.61 618 0.99 170
all 333 0.065 21.0 3.61 1203 0.99 331
Partitions
(none)
Windows
2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 s 18 0.300 0 16.7 300 15.6 280
glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk;
6.67 ft head ht
Doors
(none)
Ceilings
1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 247 0.026 38.0 1.45 357 1.30 321
gypsum board int fnsh
Floors
19C-19cscp: 19C-19cscp 247 0 0 0 0 0 0
_ELjLwri htsoftA 2016-Dec-2106:45:00
9 Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 11
ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
I
- - W CIhtSOft-9 Component Constructions Job: Lot j242 Compass Poin...
ponenonsons Date: Nov 24,2016
Full bath By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 420N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Daily range (°F) - 15 ( L ) Method Simplified
Wet bulb ( F) - 72 Construction quality Tiht
Wind speed (mph) 15.0 7.5 Fireplaces 1 Average)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
ftz BtuhN-°F ft�-°FBtuh Btuh/V Btu Btuh/ftl Btuh
Walls
12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins, 1/2" a 63 0.065 21.0 3.61 228 0.99 63
gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 117 0.065 21.0 3.61 423 0.99 116
w 9 0.065 21.0 3.61 33 0.99 9
all 189 0.065 21.0 3.61 683 0.99 188
Partitions
(none)
Windows
2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 s 9 0.300 0 16.7 150 15.6 140
glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk;
6.67 ft head ht
Doors
(none)
Ceilings
1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 91 0.026 38.0 1.45 132 1.30 118
gypsum board int fnsh
Floors
(none)
wri htsoft% 2016-Dec-2106:45:00
ti 9 Right-Suite p0 Universal 2015 15.0.23 RSU05790 Page 12
ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
Component Constructions Job: Lot j2 42 Compass Poin...
Wrl Jf1tSOft° p Date: Nov 24,2016
2nd floor stairs By:
J&J Heating and Air Conditioning
17 Arlington st, Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
® - • • • •
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 420N Relative humidity l 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Daily range (°F) - 15 ( L ) Method Simplified
Wet bulb (°F) - 72 Construction quality Tiht
Wind speed (mph) 15.0 7.5 Fireplaces 1 Average)
Construction descriptions Or Area Ul-value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/i ft2-0F/Btuh Bluh/ft' Btu Btuh/ft2 Btu
Walls
12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" a 45 0.065 21.0 3.61 163 0.99 45
gypsum board int fish,2"x6"wood frm,16"o.c.stud
Partitions
(none)
Windows
2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 e 9 0.300 0 16.7 150 29.1 262
glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk;
6.67 ft head ht
Doors
(none)
Ceilings
1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 cell ins,1/2" 84 0.026 38.0 1.45 121 1.30 109
gypsum board int fnsh
Floors
(none)
2016-Dec-21 06:45:00
wrightsoft' Right-Suite®Universal 2015 15.0.23 RSU05790 Page 13
/�.CP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
Component Constructions Job: Lot j242 Compass Poin...
wrightsoft- Date: Nov 24,2016
closet By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 420N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Daily range (°F) - 15 ( L ) Method Simplified
Wet bulb (°F) - 72 Construction quality Tiht
Wind speed (mph) 15.0 7.5 Fireplaces 1 Average)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/112 Btu Btuh/ftz Btu
Walls
15B-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, a 90 0.073 8.0 4.56 410 0.40 36
r-8 ins,8"thk,1/2"gypsum board int fnsh
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
166-30ad:Attic ceiling,asphalt shingles roof mat,r-20 roof ins, 100 0.032 30.0 1.78 178 1.60 160
r-30 ceil ins
Floors
(none)
wrhtSOft" Right-SuiteO Universal 2015 15.0.23 RSU05790 2016-Dec-2106:45:00
Page 14
ACCP. ...-)-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
Component Constructions Job: Lot j2 42 Compass Poin...
• wrightsoft- Date: Nov 24,2016
wash/dryer By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
e • •
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
ON
® - • e • •
Location: Indoor: Heating Cooling
Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75
Elevation: 30 ft Design TD (°F) 56 13
Latitude: 420N Relative humidity (%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8
Dry bulb (°F) 12 88 Infiltration:
Daily range (°F) - 15 ( L ) Method Simplified
Wet bulb (°F) - 72 Construction quality Tiht
Wind speed (mph) 15.0 7.5 Fireplaces 1 Average)
Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/ft2-°F ft2-0F/Btuh Btu h/ft2 Btuh Btuh/ft' Btu
Walls
(none)
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 24 0.026 38.0 1.45 35 1.30 31
gypsum board int fnsh
Floors
(none)
2016-Dec-21 06:45:00
Az wrightsoft" Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 15
/m ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N
Project Summar Job: Lot j2 42 Compass Poin...
. wrightsoft® y Date: Nov 24,2016
Entire House By:
J&J Heating and Air Conditioning
17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com
For:
Trust Construction, 51 Mount Joy Dr, Ma 01876
Notes:
® - • I M, • •
Weather: Boston Logan Int'I AP, MA, US
Winter Design Conditions Summer Design Conditions
Outside db 12 °F Outside db 88 °F
Inside db 68 °F Inside db 75 °F
Design TD 56 °F Design TD 13 °F
Daily range L
Relative humidity 50 %
Moisture difference 28 gr/Ib
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 26275 Btuh Structure 15068 Btuh
Ducts 2708 Btuh Ducts 1821 Btuh
Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh
Humidification 0 Btuh Blower 2730 Btuh
Piping 0 Btuh
Equipment load 28982 Btuh Use manufacturer's data n
Rate/swing multiplier 0.93
Infiltration Equipment sensible load 18167 Btuh
Method Simplified Latent Cooling Equipment Load Sizing
Construction quality Tight
Fireplaces 1 (Average) Structure 3466 Btuh
Ducts 425 Btuh
Heating Cooling Central vent (0 cfm) 0 Btuh
Area (ft2) 1616 1902 Equipment latent load 3891 Btuh
Volume (ft3) 13944 16518
Air changes/hour 0.27 0.09 Equipment total load 22058 Btuh
Equiv.AVF (cfm) 162 152 Req. total capacity at 0.70 SHR 2.2 ton
Heating Equipment Summary Cooling Equipment Summary
Make Make
Trade Trade
Model Cond
AHRI ref Coil
AHRI ref
Efficiency 80AFUE Efficiency 0 SEER
Heating input 0 Btuh Sensible cooling 0 Btuh
Heating output 0 Btuh Latent cooling 0 Btuh
Temperature rise 0 °F Total cooling 0 Btuh
Actual air flow 778 cfm Actual air flow 778 cfm
Air flow factor 0.027 cfm/Btuh Air flow factor 0.046 cfm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat Load sensible heat ratio 0.83
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2016-Dec-2106:45:00wri htsoft' Right-Suite@ Universal
2015 15.0.23 RSU05790 Pagel
AC�CA ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N