Loading...
HomeMy WebLinkAboutMiscellaneous - 44 COMPASS POINT ROAD 4/30/2018 i i I i i f v! ou" ssdd�o� h� 5/30/2017 CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Building Permit Number: 194-2017 Date: May 30, 2017 G Q 4- THIS CERTIFIES THAT THE BUILDING LOCATED ON: 44 COMPASS POINT ROAD MAY BE OCCUPIED AS IN ACCORDANCE WITH THE PROVISIONS OF THE-MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: Berry trust Ilc. Building Inspector This is an e-permit.To learn more,scan this barcode or visit northandoverma.viewpointcloud.com/#/records/24699 1/1 • NORTH i Town of sAndover I 1 0 %N Ah ver, Mass, iii Mt A �� A_ COCMICN!WIC" 1' 7q 04A-rEO S U BOARD OF HEALTH Food/Kitchen PER Septic System THIS CERTIFIES THATLO BUILDING INSPECTOR M LD has permission to erect .......................... buildings on .......... ........ ....................... .......... q WJI Foundation ... .. ........ ... ...... ............... °u to be occupied as .......�..... rr���� u15�1��*cf^� ►� �/� l ...�....�4/SRa�r••�.... ... ....... .... . ..........�...... . .. .............�j � Chimney provided that the person accepting this permit shall in every espect conform to the tems of the-application final ct��GG'� on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. UMBING INSPEC R VIOLATION of the Zoningor Building Regulations Voids this Permit. Roug ")I� �fr /7Xrr, g g Final � PERMIT EXPIRES IN 6 MONTH ELE TRICALI S E OR: UNLESS CON10 TS Rough Service WBUILDING PE OR. Final GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough . Display in a Conspicuous Place on the Premises — Do Not Remove Final r7 No Lathing or Dry Wall To Be Done FIRE DEPARTMEN Until Inspected and Approved by the Building Inspector. Burner Sew 1&149 Street N Smoke Det, y�1-9 s �r� /V jz91g Home Energy Rating certificate Property HERS Rating Type: Confirmed Certified Energy Rater: Nicholas Abreu 44 Compass Point Rating Date: 5/18/17 Rating Number: North Andover, MA 01845 Registry ID: 068984036 Estimated Annual Energy Cost Use MMBtu Cost Percent HERS Index: 52 Heating 30.8 $551 29% General Information Cooling 0 $0 0% Conditioned Area 2349 sq. ft. House Type Townhouse, end unit _ Hot Water 3.8 $202 11% Conditioned Volume 19972 cubic ft. Foundation Unconditioned basement Lights/Appliances 23.0 $985 52% Bedrooms 3 Photovoltaics -0.0 $-0 -0% Service Charges $157 8% Mechanical Systems Features Total 57.6 $1895 100% ! Heating: Fuel-fired air distribution, Natural gas, 96.1 AFUE. - --- Heating: Fuel-fired air distribution, Natural gas, 96.1 AFUE. Criteria Water Heating: Heat pump, Electric, 3.07 EF, 80.0 Gal. This home meets or exceeds the minimum criteria for the following: Duct Leakage to Outside 63.11 CFM25. 2009 International Energy Conservation Code Ventilation System None Programmable Thermostat Heat=Yes; Cool=Yes Building Shell Features j Ceiling Flat R-51.8 Slab None Sealed Attic NA Exposed Floor R-30.0 Vaulted Ceiling NA Window Type U-Value: 0.240, SHGC: 0.250 Above Grade Walls R-21.0 Infiltration Rate Htg: 2.76 Clg: 2.76 ACH50 Foundation Walls R-0.0 Method Blower door test CLEAResult Nicholas Abreu Lights and Appliance Features 50 Washington Street Percent Interior Lighting 90.40 Range/Oven Fuel Natural gas Westborough, MA 01581 Percent Garage Lighting 100.00 Clothes Dryer Fuel Electric 508-326-7506 Refrigerator (kWh/yr) 616 Clothes Dryer EF 3.01 Dishwasher(kWh/yr) 270 Ceiling Fan (cfm/Watt) 0.00 REM/Rate- Residential Energy Analysis and Rating Software v14.6.4 This information does not constitute any warranty of energy cost or savings. ©1985-2016 Noresco, Boulder, Colorado. The Home Energy Rating Standard Disclosure for this home is available from the rating provider. CLEAResu It 50 Washington Street Westborough, MA 01581 IECC 2012 402.4.2.1 Testing Option Blower Door Testing Pass Fail Date of Test Street Address 44 Compass Point North Andover MA Source of Area and Volume Calculations: Builder Rater X Other HERS Rater: Nick Abreu Certification# 8368122 Signature Builder Barlow Building and Excavating Builder Contact Tim Barlow Tested Air Leakage Requirement: 3 Air Changes per hour at 50 Pascals (ACH50)or less Measurement 917.9 ACH50 2.76 Y4661- r1l6 1,1L Ytkr,+ rp- Location CUl;1 nnCS POY /l T -7 f No. Date • - TOWN OF NORTH ANDOVER t • jj� Certificate of Occupancy $ Building/Frame Permit Fee Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check# �4 �; 1. Building Inspector Commonwealth of Massachusetts Sheet Metal Permit Date: /� �7•/ � Permit'll 38 Lstinaatecl Job Cost: Permit I'cc: $ Plans submitted: YES NO Plans Reviewed: YES NO Business License fl. 196 Applicant License it Business Information: Property Owner/Job Location Information: Name: J&J Ileatiug. & Air Conditiouing, Name: I" X11,51 0'lS FrJ C_1-/ V/d street: 17 Arlington St.. Street: City/Town: Dracut, MA 01826 City/Town: North Andover, MA 01845 Telephone: .97.8-454-8197 Telephone: Photo I.D. required / Copy of Photo I.D. attached: YES NO ` slntriullinl J-f / IVI-l-unrest:rictcd license J-2 /M-2-restrictcd to dwellings 3-stories or less and commercial up to 10,000 sq. ft. /2-slorics or less [Zcsic:Iciatilil:7= "ftiliiily Ivliilti-fanuly Condo /Townhotiscs Other Coininei•cial: Office Retail Industrial Educational Institutional Othci' 9 SquareFootage: under' 10,0.00 sq. ft, tl over 10,000 sq. ft. Number of Stories: Sliest inetal woi'lc to be conipleted: New Work: Renovation: HVAC ✓ Mctal Watershed Roofing Kitchen Exhaust system Metal Chimney/Vents Air Balancing Provide detailed description of work to be clone: t i INSURANCE COVERAGE: I have a current liability insurance policy or Its equivalent.which meets the requirements of M.G.L. Ch. 112 Yes,2I No❑ If you have checked Yes, indicate the type of coverage by checking the appropriate box below: i A liability insurance policy [( Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the Insurance coverage required by Chapter 1121of the Massachusetts General Laws, and that my ;signature on this permit application waives this requirement. Check One Only / Owner [❑ Agent ❑ Signature of Owner or Owner's Agent By checking this boxCj, I hereby certify that all of the details and Information I have subrnitted(or entered) regarding this appllcatlon are true and accurate to the best of my knowledge and that all sheet molal work and Installations performed under the permit Issued for this appllcatlon will bo in compliance with all pertinent pi'ovlslon of the Massachusetts Building Code and Chapter 112 or the General Laws. Duct inspection required prior to insulation installation: YES NO PI-ogl-ess Jrtspcctions te C0111n1C11ts Final Jnspectioll Dat.c Comments Type of License: -- ---- By E] Master Tille ❑ Master-Restricted Cilyrfown - ❑Journeyperson Signature of Licensee f'ermil it ❑Journeyperson-Restricted /5-1 g. License Number: Fee$_ Check at vvww.mass.govldpl Inspector Signature of Perri t Approval The Commonwealth of Massachusetts = Department of Industrial Accidents I Congress Street, Suite 100 Boston,MA 02114-2017 www.mass.gov/dia Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name (Business/Organization/Individual): J & J Heating & Air Conditioning, Inc. Address: 17 Arlington Street City/State/Zip: Dracut, MA. 01826 Phone #: 978-454-8197 Are you an employer?Check the appropriate box: Type of project(required): 1.M I am a employer with 40 employees(full and/or part-time)." 7. [JNew construction 2.❑I am a sole proprietor or partnership and have no employees working for me in 8. [J Remodeling any capacity.[No workers'comp.insurance required.] 3.M I am a homeowner doing all work myself.[No workers'comp.insurance required.]t 9. ❑Demolition 4.[:]l am a homeowner and will pe hiring contractors to conduct all work on my property. f will 10 ❑Building addition ensure that all contractors either have workers'compensation insurance or are sole I LM Electrical repairs or additions proprietors with no employees. 12.Q Plumbing repairs or additions S.a I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.❑ROOFrepair� These sub-contractors have employees and have workers'comp.insurance. 6.M We are a corporation and its officers have exercised their right of exemption per MGL c. 14.❑Other 152,§1(4),and we have no employees.[No workers'comp.insurance required.] 'Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: A.I.M. Mutual Insurance Policy#or Self-ins.Lic.#: WMZ-800-8Q06553-2016 _ Expiration Date: 6/2/17 Job Site Address: J- City/State/Zip:l Attach a.copy,'of the workersi compensation policy declaration page(showing the policy number and expiration date). Failure',to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-ye risonme ,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day againsiifhe violator.A c y of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverag:yentication. I do here n�ler the ai an pen lt' o perju that the information provided above is true and correct. Si nature: Date: 197 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issaing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: '`SIL6/2/20166 Rte'® CERTIFICATE OF LIABILITY INSURANCE DADDIY 6/2/ ' THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDJTIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Laurence Hall, CIC Sennott Insurance Agency PHONE (978)887_4900 FAX _CA (978)887-2404 LCI O-F-Y-1' AJC No): 16 South Main Street E-MAIL y ADDRESS:larr hall@ sennottinsurance.com P. O. Box 457 INSURER(S)AFFORDING COVERAGE NAIC d Topsfield MA 01983 INSURERA:Great American Alliance Ins.Co _ INSURED INSURER B:Safety Ins CO J&J Beating & Air Conditioning, Inc. INSURERCA.I.M. Mutual Ins Co _ 17 Arlington Street INSURER D: INSURER E Dracut MA 01826 INSURER F COVERAGES CERTIFICATE NUMBER:2016-2017 Renewal Certs REVISION NUMBER: THIS IS TO'CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR No_DL SUBR LTR TYPE OF INSURANCE POLICY EFF POLICY EXP POLICY NUMBER (MMiDD1YYYYI IMMIDDIYYYYILIMITS X COMMERCIAL GENERAL LIABILITY 14 EACH OCCURRENCE $ 1,000,000 A CLAIMS-MADE a OCCUR DAMAGE TO RENTED 300,000 PREMISES(Ea occurrence__ $ PAC6418906-10 6/1/2016 6/1/2017 MED EXP(Any one person) $ 10,000 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY O PRO I— I LOC JECT I J PRODUCTS-COMPIOPAGG $ 2,000,000 OTHER: AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 (Ea accitlentl ANY AUTO B BODILY INJURY(Per person) $ ALL OWNED SCHEDULED AUTOS X AUTOS 2434550 6/1/2016 6/1/2017 BODILY INJURY(Per accident) $ X HIRED AUTOS X NON-OWNED PROPERTY DAMAGE AUTOS Per accident $ X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 2,000,000 A EXCESS LIAB CLAIMS-MADE AGGREGATE $ 2,000,000 DED RETENTION$ UMB6418958-09 6/1/2016 6/1/2017 $ WORKERS COMPENSATION. X PER OTH- AND EMPLOYERS'LIABILItY YIN STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT _ 8 1 000,0_00 OFFICER/MEMBER EXCLUDED? - a NIA _ C (Mandatory in UndNH)er WMZ-800=8006553-2016 6/2/2016 6/2/2017 E.L.DISEASE-EA EMPLOYE $ 1,000,000 If yes,describe Under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 i' DESCRIPTION OF OPERATIONS J LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) CERTIFICATEil-!OLDERk CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES'BE CANCELLED BEFORE Evidence of Insurance THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE L Hall, CIC/LH2 �w �rw- ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD INS025 on14n T1 N :;COMMONWEALTH OF MASSACHUSETTS BOARI 'OF SHEET METAL W(7RKE.RS ISSUCS THF FOLLOWING LICENSE AS A MASTER-UNRESTRICTED W j ERIC,:R KLINE 17 ARLINGTON,ST' J&J HI�T►N "&AC DRACUT, MA 018263. 36 1568 Q5/28/2018...: 3 744 . i ASISA�zI,U/SL :1 1 DRIVER'S i'! 111'la��na e LICENSE n.05 01tt 11+Erm u;IS: T k f A 1 NUMBER013 2016 NONE 8 411 E%v 996.55871 non 1` Ak 21 0(5 • `I yr 'x. ASS l7 of T 15'SE% �li1w., trl -0M NONE M n�t.HGTAG 09 t ,KLINE z ERIC RJ s,a ., n 106 MEADOW CREEK DR DRACUT, 5;�ziiVidn. MA 0182G DD 0504-1016 Rev 0T.15.2009 I@fi%I. L�QJI �If STI SO IES l IVIETAL WORKER I'S UES THS f OLl OWING LICENSE ASA cc DUSIPtrf*t ;DIIVARD 1 AVOI V, ' Lj "1 'J I IIEA: jI .IG elf: CONDiI"IORIIRIG,.INC Ill' ;en 1n 17 AF2LING. :Kl Si J N{ 1�(ZACUT, NIA 01826 196 .: fJ1/1`�l�Uifj.: .. 12401 ��I�sa�;k'�>=i�r`.n?)Lt.;,7C� ;'�''�`���U•:ul K��.�i�Y;�r';, �µ � '� °���1 Load Short Form Job: Lot J1 44 Compass Point wrightsoftm Date: Oct 14,2016 Entire House By: J&J Heating and Air Conditioning 17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:ijheatac.com • • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Inforination Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 56 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 43 28 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 778 cfm Actual air flow 778 cfm Air flow factor 0.027 cfm/Btuh Air flow factor 0.046 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.83 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Garage 286 0 1164 0 54 Family Room 208 4109 2044 110 94 Kitchen 294 5558 3702 149 170 Stair 84 1029 222 28 10 1/2 bath 42 1736 679 47 31 Entry 56 1683 706 45 32 master bath 96 2335 1355 63 62 master bedroom 290 4287 2758 115 127 bedroom 2 247 4301 1927 115 89 Full bath 91 2326 821 62 38 2nd floor stairs 84 836 632 22 29 closet 100 741 220 20 10 wash/dryer 24 41 659 1 30 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft° 2017-Jan-1213:38:27 9 Right-Suite®Universal 2015 15.0.23 RSU05790 Page 1 �C� ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Entire House 1902 28982 16889 778 778 Other equip loads 0 2730 Equip. @ 0.93 RSM 18167 Latent cooling 3891 TOTALS 1902 28982 22058 778 778 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft° 2017-Jan-1213:38:27 9 Right-Suite®Universal 2015 15.0.23 RSU05790 Page 2 ACCP. ...-)-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Building Analysis Job: Lot A 44 Compass Point + - wrightsoft� y Date: Oct 14,2016 Entire House By: J&J Heating and Air Conditioning 17 Arlington st,Dracut, Ma 01826 Phone:978 454 8197 Email:eric@jjheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 - • • • i ions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative hums lty (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range6°F) - 15 ( L ) Method Simplified Wet bulb (° - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Hdating Component Btuh/ft2 Btuh % of load Walls 2.8 6623 22.9 Glazing 16.7 2952 10.2 Doors 4.0 339 1.2 Ceilings 2.0 2074 7.2 Floors 3.5 4375 15.1 Infiltration 4.3 9912 34.2 Ducts 2708 9.3 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 289821 100.0 Component Btuh/ft2 Btuh % of load Walls 0.9 2050 10.4 Glazing 13.9 2467 12.6 Doors 7.7 646 3.3 °® Ceilings 1.9 1920 9.8 �i,hliwilll'"�� Floors 0.8 991 5.1 Infiltration 0.9 2105 10.7 Ducts 1821 9.3 Ventilation 0 0 Internal gains 4890 24.9 Blower 2730 13.9 Adjustments 0 Total 1 196191 100.0 Latent Cooling Load = 3891 Btuh Overall U-value = 0.096 Btuh/ft2-°F Data entries checked. 2017-Jan-12 13:38:27 �ti. wrightsoft- Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 1 r� ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N i Component Constructions Job: Lot Ji 44 Compass Point i wrighfisoft`ry Date: Oct 14,2016 Entire House By: J&J Heating and Air Conditioning 17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/V Btu Btuh/ft2 Btu Wal I s 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" n 375 0.065 21.0 3.61 1355 0.99 373 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 525 0.065 21.0 3.61 1897 0.99 522 s 315 0.065 21.0 3.61 1138 0.99 313 W 504 0.065 21.0 3.61 1821 0.99 501 all 1719 0.065 21.0 3.61 6212 0.99 1710 12F-Osw:Frm wall,wd ext,5/8"wood shth,r-21 cav ins,5/8" a 54 0.065 21.0 0 0 0.99 54 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 54 0.065 21.0 0 0 0.99 54 w 198 0.065 21.0 0 0 0.99 197 all 306 0.065 21.0 0 0 0.99 304 15B-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, a 90 0.073 8.0 4.56 410 0.40 36 r-8 ins,8"thk,1/2"gypsum board int fnsh Partitions 12C-Osw:12C-Osw 261 0 0 0 0 0 0 Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 111 0.300 0 16.7 1851 8.94 992 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; a 33 0.300 0 16.7 550 29.1 961 6.67 ft head ht s 33 0.300 0 16.7 550 15.6 514 all 177 0.300 0 16.7 2952 13.9 2467 Doors 11 P0:Door,mtl pur core type s 21 0.290 10.5 16.1 339 7.68 161 s 63 0.290 10.5 0 0 7.68 484 all 84 0.290 10.5 4.03 339 7.68 646 Ceilings 166-30ad:Attic ceiling,asphalt shingles roof mat,r-20 roof ins, 100 0.032 30.0 1.78 178 1.60 160 r-30 ceiI ins 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 832 0.026 38.0 1.45 1203 1.30 1082 gypsum board int fish C part ceiling,:C part ceiling,hrd wd fir fish,frm fir,10"thkns,1/2" 49 0.255 1.0 14.2 693 12.7 624 gypsum board int fnsh Id I 2017-Jan-1213:38:27t% wri htsoftA Right-Suite®Universal 2015 15.0.23 RSU05790 Page 1 RCCA ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N C part ceiling,:C part ceiling,hrd wd flr fnsh,r-38 ins,frm flr,12" 39 0.028 38.0 0 0 1.40 55 thkns,5/8"gypsum board int fnsh Floors 19A-Obswp:Part floor,hrd wd flr fnsh,frm flr,10"thkns 684 0.295 0 6.16 4215 1.40 955 19A-Obswp: Part floor,hrd wd flr fnsh,frm flr,8"thkns 26 0.295 0 6.16 160 1.40 36 19C-19cscp: 19C-19cscp 247 0 0 0 0 0 0 21A-24t:Bg floor,heavy dry or light damp soil,6'depth 286 0.025 0 0 0 0 0 2017-Jan-12 13:38:27 wrightsoft" Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 2 /CCK ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: Lot J1 44 Compass Point wrightsoft� Date: Oct 14,2016 Garage By: J&J Heating and Air Conditioning 17 Arlington st, Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 � - o e • o Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftl-°F ft2-°FBtuh Btuh/ft2 Btu Btuh/f[l Btu Walls 12F-Osw:Frm wall,wd ext,5/8"wood shth,r-21 cav ins,5/8" a 54 0.065 21.0 0 0 0.99 54 gypsum board int fnsh,2"x6"wood firm,16"o.c.stud s 54 0.065 21.0 0 0 0.99 54 W 198 0.065 21.0 0 0 0.99 197 all 306 0.065 21.0 0 0 0.99 304 Partitions (none) Windows (none) Doors 11 P0:Door,mtl pur core type s 63 0.290 10.5 0 0 7.68 484 Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,r-38 ins,frm flr,12" 39 0.028 38.0 0 0 1.40 55 thkns,5/8"gypsum board int fish Floors 21A-24t:Bg floor,heavy dry or light damp soil,6'depth 286 0.025 0 0 0 0 0 Wr'1 htsoft 2017-Jan-1213:38:27 9 Right-Suite®Universal 2015 15.0.23 RSU05790 Page 3 ACCN ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: Lot J1 44 Compass Point wrightsoft� Date: Oct 14,2016 Family Room By: J&J Heating and Air Conditioning 17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com Project Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 ! - • • • i tions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Bluh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btuh Walls 12F-Osw: Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" n 87 0.065 21.0 3.61 314 0.99 87 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud w 144 0.065 21.0 3.61 520 0.99 143 all 231 0.065 21.0 3.61 835 0.99 230 Partitions 12C-Osw:12C-Osw 117 0 0 0 0 0 0 Windows 2 glazing,cir outr,air gas,vnl frm mat,cir innr,1/4"gap,1/4"thk:2 n 30 0.300 0 16.7 500 8.94 268 glazing,clr outr,air gas,vnl frm mat,cir innr, 1/4"gap, 1/4"thk; 6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor,hrd wd flr fnsh,frm fir,10"thkns 208 0.295 0 6.16 1282 1.40 290 2017-Jan-12 13:38:27 „t wrightsoft' Right-Suite®Universal 2015 15.0.23 RSU05790 Page 4 RCCA ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: Lot J1 44 Compass Point wrightsoft� Component Date: Oct 14,2016 Kitchen By: J&J Heating and Air Conditioning 17 Arlington st, Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insult R Htg HTM Loss Clg HTM Gain ft2 Btuh/R2-°F ft2°F/Btuh Btuh/ft' Btu MOW Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" n 90 0.065 21.0 3.61 325 0.99 90 gypsum board int fnsh,2"W'wood frm,16"o.c.stud a 177 0.065 21.0 3.61 640 0.99 176 W 18 0.065 21.0 3.61 65 0.99 18 all 285 0.065 21.0 3.61 1030 0.99 283 Partitions 12C-Osw: 12C-Osw 27 0 0 0 0 0 0 Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 36 0.300 0 16.7 600 8.94 322 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; a 12 0.300 0 16.7 200 29.1 349 6.67 ft head ht all 48 0.300 0 16.7 801 14.0 671 Doors (none) Ceilings (none) Floors 19A-Obswp:Part floor,hrd wd flr fnsh,frm flr,10"thkns 294 0.295 0 6.16 1812 1.40 411 ttiWrl htSOW Right-SuiteUniversal 2015 15.0.23 RSU05790 2017-Jan-1213:38:27 Page 5 ACC*. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions � Job: Lot J1 44 Compass Point wrightsoft� Date: Oct 14,2016 Stair By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain fF Btuh/ft2-°F ft�°FBtuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" a 54 0.065 21.0 3.61 195 0.99 54 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions 12C-Osw:12C-Osw 54 0 0 0 0 0 0 Windows (none) Doors (none) Ceilings (none) Floors 19A-Obswp:Part floor,hrd wd flr fnsh,frm fir,10"thkns 84 0.295 0 6.16 518 1.40 117 2017-Jan-12 13:38:27 wrightsoft' Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 6 ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: Lot J1 44 Compass Point wrightsoft P Date: Oct 14,2016 1/2 bath By: J&J Heating and Air Conditioning 17 Arlington st,Dracut,Ma 01826 Phone:978 454 8197 Email:eric@jjheatac.com Web:jjheatac.com Oman 0 1- 4 a r1l F.I I I• For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 P;esign Conditions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftl-°F ft2-°FBtuh BtuhM Btu BION Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" a 63 0.065 21.0 3.61 228 0.99 63 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 48 0.065 21.0 3.61 173 0.99 48 all 111 0.065 21.0 3.61 401 0.99 110 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 s 6 0.300 0 16.7 100 15.6 93 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm flr,10"thkns,1/2" 22 0.255 1.0 14.2 311 12.7 280 gypsum board int fnsh Floors 19A-Obswp:Part floor,hrd wd fir fnsh,frm fir,10"thkns 42 0.295 0 6.16 259 1.40 59 2017-Jan-12 13:38:27 wrightsoft3 Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 7 ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: Lot J1 44 Compass Point wrightsoftm Date: Oct 14,2016 Entry By: J&J Heating and Air Conditioning 17 Arlington st, Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com ine g A,III • I • 71 IT.M. For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 De 940 Conditions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftp°F ft�°FBtuh Btuh/ft2 Btu Btu h/ftz Btu Walls 12F-Osw: Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" s 51 0.065 21.0 3.61 184 0.99 51 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions 12C-Osw:12C-Osw 63 0 0 0 0 0 0 Windows (none) Doors 11 P0:Door,mtl pur core type s 21 0.290 10.5 16.1 339 7.68 161 Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,10"thkns,1/2" 27 0.255 1.0 14.2 382 12.7 344 gypsum board int fnsh Floors 19A-Obswp:Part floor,hrd wd flr fnsh,frm flr,10"thkns 56 0.295 0 6.16 345 1.40 78 2017-Jan-12 13:38:27 wrightsoftr Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 8 AC(:A' ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: Lot J1 44 Compass Point wrightsoft� Date: Oct 14,2016 master bath By: J&J Heating and Air Conditioning 17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 � - • Conditions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ftl-°F/Btuh Btuh/112 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" n 99 0.065 21.0 3.61 358 0.99 98 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 60 0.065 21.0 3.61 217 0.99 60 all 159 0.065 21.0 3.61 575 0.99 158 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 9 0.300 0 16.7 150 8.94 80 glazing,clr outr,air gas,vni frm mat,clr innr, 1/4"gap, 1/4"thk; a 12 0.300 0 16.7 200 29.1 349 6.67 ft head ht all 21 0.300 0 16.7 350 20.5 430 Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 96 0.026 38.0 1.45 139 1.30 125 gypsum board int fnsh Floors (none) 2017-Jan-12 13:38:27 wrightsoft* Right-Suite®Universal 2015 15.0.23 RSU05790 Page 9 ACOA ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Wrl htSOft Component Constructions Job: Lot J1 44 Compass Point 9 Date: Oct 14,2016 master bedroom By: J&J Heating and Air Conditioning 17 Arlington st, Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 ! - •in"Conditions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btuh Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" n 99 0.065 21.0 3.61 358 0.99 98 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud w 162 0.065 21.0 3.61 585 0.99 161 all 261 0.065 21.0 3.61 943 0.99 260 Partitions (none) Windows 2 glazing,cir outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 36 0.300 0 16.7 600 8.94 322 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap, 1/4"thk; 6.67 ft head ht Doors (none) Ceilings 166-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceiI ins,1/2" 290 0.026 38.0 1.45 419 1.30 377 gypsum board int fnsh Floors 19A-Obswp: Part floor,hrd wd fir fnsh,frm flr,8"thkns 26 0.295 0 6.16 160 1.40 36 2017-Jan-12 13:38:27 a wrightsoft" Right-Suite®Universal 2015 15.0.23 RSU05790 Page 10 ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: Lot J1 44 Compass Point wrightsoft° M Date: Oct 14,2016 bedroom 2 By: J&J Heating and Air Conditioning 17 Arlington st, Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 ! - • onditions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss CIg HTM Gain ft2 Btuh/ft2-°F ftz-°FBtuh Bluh/ftz Btuh Btuh/ftz Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" a 63 0.065 21.0 3.61 228 0.99 63 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 99 0.065 21.0 3.61 358 0.99 98 w 171 0.065 21.0 3.61 618 0.99 170 all 333 0.065 21.0 3.61 1203 0.99 331 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 s 18 0.300 0 16.7 300 15.6 280 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 6.67 ft head ht Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 247 0.026 38.0 1.45 357 1.30 321 gypsum board int fnsh Floors 19C-19cscp:19C-19cscp 247 0 0 0 0 0 0 rF 2017-Jan-12 13:38:27 wrightsOfta Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 11 ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N wri htsoft Component Constructions Job: Lot J1 44 Compass Point 9 � Full bath Byte: Oct 14,2016 J&J Heating and Air Conditioning 17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com Project Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area Ll-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz°F ft2-°F/Btuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" a 63 0.065 21.0 3.61 228 0.99 63 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 117 0.065 21.0 3.61 423 0.99 116 w 9 0.065 21.0 3.61 33 0.99 9 all 189 0.065 21.0 3.61 683 0.99 188 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,cir innr,1/4"gap,1/4"thk:2 s 9 0.300 0 16.7 150 15.6 140 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk; 6.67 ft head ht Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 91 0.026 38.0 1.45 132 1.30 118 gypsum board int fnsh Floors (none) 2017-Jan-12 13:38:27 1-% wrightsoft' Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 12 ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: Lot J1 44 Compass Point wrightsoft� P Date: Oct 14,2016 2nd floor stairs By: J&J Heating and Air Conditioning 17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jiheatac.com Web:jjheatac.com Eli For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area Ll-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ftz-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btuh Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" a 45 0.065 21.0 3.61 163 0.99 45 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 e 9 0.300 0 16.7 150 29.1 262 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 6.67 It head ht Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 cell ins,1/2" 84 0.026 38.0 1.45 121 1.30 109 gypsum board int fnsh Floors (none) 2017-Jan-12 13:38:27 wrightsoft' Right-Suiten Universal 2015 15.0.23 RSU05790 Page 13 0 1W ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: Lot J1 44 Compass Point wrightsoft� p Date: Oct 14,2016 closet By: J&J Heating and Air Conditioning 17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com • Rome • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 ! - • • • • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/%h Btuh/ft� Btuh Btuh/ftz Btuh Wal I s 15B-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, a 90 0.073 8.0 4.56 410 0.40 36 r-8 ins,8"thk,1/2"gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings 1613-30ad:Attic ceiling,asphalt shingles roof mat,r-20 roof ins, 100 0.032 30.0 1.78 178 1.60 160 r-30 ceil ins Floors (none) 2017-Jan-12 13:38:27 wrightsoft Right-Suite®Universal 2015 15.0.23 RSU05790 Page 14 AC01 ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: Lot Ji 44 Compass Point • " wrightsoft� Date: Oct 14,2016 wash/dryer By: J&J Heating and Air Conditioning 17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb ('F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftp Btuh/ftl-°F frl-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 24 0.026 38.0 1.45 35 1.30 31 gypsum board int fnsh Floors (none) wri htsoft Right-Suite®Universal 2015 15.0.23 RSU05790 2017-Jan-1213:38:27 ,r_ Page 15 ACCT\ ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Project Summar Job: Lot J1 44 Compass Point • wrightsoft� y Date: Oct 14,2016 Entire House By: J&J Heating and Air Conditioning 17 Arlington st, Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Notes: Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 68 OF Inside db 75 OF Design TD 56 OF Design TD 13 OF Dajly range L Relative Humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 26275 Btuh Structure 15068 Btuh Ducts 2708 Btuh Ducts 1821 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 2730 Btuh Piping 0 Btuh Equipment load 28982 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 18167 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 3466 Btuh Ducts 425 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2 1616 1902 Equipment latent load 3891 Btuh Volume ft3) 13944 16518 Air changes/hour 0.27 0.09 Equipment total load 22058 Btuh Equiv.AVF (cfm) 162 152 Req. total capacity at 0.70 SHR 2.2 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 778 cfm Actual air flow 778 cfm Air flow factor 0.027 cfm/Btuh Air flow factor 0.046 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.83 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. WrI htsofta 2017-Jan-1213:38:27 9 Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 1 ACCk ..-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N