HomeMy WebLinkAboutMiscellaneous - 476 GREAT POND ROAD 4/30/2018 476 GREAT POND ROAD ` 210/064.0-0022-0000.0 I I MUM fflfl TOWN OF NORTH ANDOVER F. L '' i H A S S A C H U S E T T S ORTH . Any appeal shall be filed ss s f within (20) days after the ,.,,'',,'date of filing of this Notice NOTICE of L)ECIs ION In the Office of the Town Clerk. Date. .29�. 1991. . . . . . . . . . . . . . . . . Date of Bearing May. 16. ,1991. . . . . . . . Petition Of Edward & GaXle Nieburger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 . . . Premises affected . 476 Great Pond Road . . . . . . . . . . . . . . . . , . . . . . . , Referring to the above petition for a special permit from the requirements of the . North Andove� �Zoninp� Bylaw ; ,Sect'ipp, �,jq ,; ,�qop, priyeway. . . . . . . . . . . SO as to permit . . . .the. .constru. ction.of .a�ommon� driy�way. q ,gaiApCFeSS.t0 .tWc1 .(.2). lots. . •.. . • . . . . . . . . . . . . . . . . . . . . • . . . . . . . . . . . . . . . . . . . . . . . . 0 . . . . . . . . . . . . . . . 0 . . . . . . . . . . . After a public hearing given ori the above date, the Platiiiing Board voted Conditionally t0 Approve . . . . . . . . . . .the . . . . SpecialPermit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . based upon the following collditiorls : cc: Director of Public Works � Board of Public Works Sighed Highway Surveyor George Perna, Jr., Chairmh 3 Building Inspector . . . . . . . . . . . . . . . . . . . . . " . . . . . . . Board of Health John Simons, Clerk Conservation Commission . . . . . 0 . . . . . . . . . . . . 0 . . . . . . . 0 . . . . . Assessors John Draper Police Chief . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Fire Chief Joseph Mahoney Applicant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Engineer Richard Nardella Interested Parties, File . . . . . . . . . . . . . . . . . . . .I�Inttttittrr Iln�tt•rl r of NOH ip 1ti KAREN H.P.NELSON n Town of 120 Main Street, 01845 DiYeC`°' '•°° `� NORTH ANDOVER (508) 682-6483 BUILDING e,���st CONSERVATION DIVISION OF PLANNING PLANNING & COMMUNITY DEVELOPMENT May 28 , 1991. Mr. Daniel Long, Town Clerk Town of North Andover 120 Main Street North Andover, MA 01845 Re : Special Permits - 476 Great Pond Road - Watershed District & Common Driveway Dear Mr. Long: The North Andover Planning Board held a public hearing on March 28 , 1991 in the Town Hall , Selectmen' s Meeting Room on the application of Edward and Gayle Nieburger, 476 Great Pond Road, North Andover, requesting a Special Permit in the Lake Cochickewick Watershed Protection District under the provisions of Section 4 . 136 , Para 5b of the North Andover Zoning Bylaws . The public hearing was duly advertised in the North Andover Citizen on March 13 and March 20, 1991 and all parties of interest were properly notified. The following members were present: George Perna, Chairman, John Draper and Joseph Mahoney. The petitioner is seeking a Special Permit for regrading within the 250 ' buffer zone of lake Cochickewick around the foundation of a proposed single family home located outside the 250 ' buffer zone of the Lake Cochickewick Watershed District. The premises affected is located on the east side of Great Pond Road, known as 476 Great Pond Road in a Residential-1 ( R-1 ) Zoning District, also in the Watershed Protection District. Joseph Mahoney, Acting Clerk, read the legal notice to open the public hearing . A motion was made by Joseph Mahoney to continue the public hearing to April 11 , 1991 , due to the lack of a quorum. The motion was seconded by John Draper and voted unanimously by those present. On April 11 , 1991 , the Planning Board continued the public hearing with regard to the application of Ed & Gayle Nieburger for a Special Permit in the Watershed Protection District. Christian Huntress , Town Planner, stated that the Technical Review Committee has minor concerns with the application . The Division of Public Works is concerned with the design of the sewer tie in to Great Pond Road. The sewer connection shall be gravity fed out to the proposed structure to a forced pump located behind the existing cottage . The sewer line shall run across the property of N/F Walter Saxe and the applicant shall be required to secure a written easement across said property. Page 2 : George Perna asked if the forced pump could be redirected or relocated so as to be outside of 100 ' from the tributary to the lake . Christian Huntress stated due to topography of the lot and elevation of the proposed dwelling, the proper location of the pump was shown on the plans . Christian Huntress further stated that the applicant has filed a request for a Special Permit to construct a common driveway to service both lots. That Special Permit shall be opened on April 18, 1991 . A motion was made by Richard Nardella, seconded by Joseph Mahoney, the Planning Board voted to continue the public hearing to April 18, 1991 . On April 18 , 1991 , the Planning Board opened the public hearing on the Special Permit for the Common Driveway application. John Simons read the legal notice to open that hearing. The petitioner is requesting was requesting a Special Permit for the construction of a common driveway to gain access to two lots . The premises affected are Lot 5 and Lot 6 , 476 Great Pond Road . Christian Huntress, Town Planner stated that the granting of a Special Permit for a Common Driveway shall eliminate unnecessary construction within the Watershed District. The applicant intends to hold both properties under one ownership but due to the requirements of the Zoning Bylaws , had to split the property into two lots. The common driveway will allow the property to remain as an estate rather than two separate properties . Christian Huntress further stated that the applicant is still awaiting an easement from Walter Saxe for the extension of the sewer line and asked the Board to wait upon granting of the Special Permits until the easement had been secured. A motion was made by John Draper to continue the public hearing on the common driveway as there were issued that still needed to be addressed. The motion was seconded by Joseph Mahoney and voted unanimously by those present. A motion was made by John Draper to continue the public hearing on the Special Permit for the Watershed District. The motion was seconded by Joseph Mahoney and voted unanimously by those present. On April 25 , 1991 the Planning Board held a regular meeting . Christian Huntress, Town Planner, stated that he was waiting for an easement from the applicant. He asked that the Board continue the hearing to the May 16 , 1991 meeting . A motion was made by Joseph Mahoney and seconded by Richard Nardella to continue the public hearing to May 16 , 1991 . The vote was unanimous of those present. On May 16 , 1991 , the Planning Board continued both public hearings for the Special Permits for the Lake Cochickewick Watershed Protection District and for a common driveway. Page 3 : Copies of draft decisions were given to the Board members . John Simons expressed his feelings about being consistent with Special Permits within the Watershed District. He stated that in this case there would not be any building within the Watershed, only grading which is for a future sewer. Members of the Planning Board were in agreement and expressed the need for sewers within the Watershed Protection District. Mr. Nieburger is trying to obtain an easement from his neighbor. A motion was made by John Simons to approve the Special Permit for regrading within the Watershed Protection District for the property at 47G Great Pond Road, Lots 5 and 6 . The motion was seconded by Joseph Mahoney and voted unanimous by those present. A motion was made by John Simons to approve the common driveway special permit for Lots 5 and 6 at 476 Great Pond Road . Christian Huntress brought the Board' s attention to the Fire Chief ' s recommendations on the size of the stone bounds being 8"x8" and not 12"x12" . The motion was seconded by Richard Nardella and voted unanimously by those present. Attached are conditions which were placed on both Special Permits . Sincerely, PLANNING BOARD Georgd D . Perna, Jr. , Chairman CC : Director of Public Works Board of Public Works Highway Surveyor Building Inspector Conservation Commission Board of Health Assessors Police Chief Fire Chief Applicant Engineer File EDWARD AND GAYLE NEIBURGER 476 GREAT POND ROAD LOTS 5 AND 6 SPECIAL PERMIT FOR REGRADING WITHIN THE WATERSHED PROTECTION DISTRICT. ZONING BYLAW, SECTION 4.135 FINDINGS OF FACT: The Planning Board makes the following findings regarding this Special Permit as required by section 4. 135 of the Zoning Bylaws: 1. The proposed use and site design for this lot are appropriate, due to it's location in Town. 2 . Adequate vehicular and pedestrian access into the surrounding site has been provided. 3 . The applicant has met the requirements of the Town for a Special Permit as stated in Section 4 . 135 of the Zoning Bylaw. 4 . Adequate and appropriate facilities will be provided for the proper operation of the proposed use. 5. This application for construction within the Watershed Protection District, Section 4 . 135 of the North Andover Zoning Bylaw, was specifically granted for regrading within the Non-disturbance Zone to Lake Cochichiwick. The Planning Board has determined that the regrading and sewer improvements associated with this Special Permit will reduce the potential for contamination to the town's drinking water supply. The Planning Board finds under Section 4 . 135 of the Zoning Bylaw that the proposed site plan generally complies with the Town Bylaw requirements but requires minor conditions in order to be completely in compliance with Town Bylaws. Upon reaching the above findings, the Planning Board approves this Special Permit based upon the following conditions which shall be submitted to the Board prior to signing the documents to be filed with the North Essex Registry of Deeds. SPECIAL CONDITIONS: 1. This decision shall be filed with the North Essex Registry of Deeds. Included as part of this decision are 'the following plans: Plans entitled: Site Plan of Land in North Andover, Mass. Drawn for: Edward and Gayle Neiburger Drawn By: Merrimack Engineering Services 66 Park Street Andover, MA 01810 Dated: Jan 23, 1991 Final Revision: Feb. 8, 1991 2 . The Order of Conditions issued by the North Andover Conservation Commission, Dated March 1, 1991, Shall be considered as part of this decision. 3 . The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 4 . Gas, Telephone, Cable and Electric utilities shall be installed as specified by the respective utility companies. 5. All catch basins shall be protected and maintained with hay bales to prevent siltation into the drain lines during construction. 6. No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 7 . No underground fuel storage shall be installed except as may be allowed by Town Regulations. 8. Prior to a Certificate of Occupancy being issued for any structures, this site shall have received all necessary permits and approvals from the North Andover Board of Health. 9. Prior to the Building Permit being issued for the structure and again prior to occupancy of the structure, the applicant shall receive a written determination from the Conservation Administrator that all work being done under the jurisdiction of the Conservation Commission is being satisfactorily performed and maintained. 10. The provisions of this conditional approval shall apply to and be binding upon the applicant, it's employees and all successors and assigns in interest or control. 11. This Special Permit is hereby granted with the understanding that this property will tie into the Town's sewer system located within Great Pond Road. Any alteration to the approved plans as referenced in condition one (1) shall be submitted to the Planning Board as a modification to this approval. 12 . Prior to a Certificate of Occupancy being issued for the proposed structure the applicant shall complete the construction of the proposed sewer line connection. 13. The applicant shall secure a written easement agreement for any and all work being done on other property, specifically the installation of the sewer tie-in. These easements shall be approved by the Planning Board prior to the issuance of a Building Permit. The applicant shall submit these easment documents within one year from the date of this conditional Special Permit approval. Should the applicant fail to secure these easements within one year this Special Permit shall be null and void. cc: Director of Public Works Board of Public Works Highway Surveyor Building Inspector Board of Health Assessors Conservation Commission Police Chief Fire Chief Applicant Engineer 'File EDWARD AND GAYLE NEIBURGER 476 GREAT POND ROAD LOTS 5 AND 6 SPECIAL PERMIT FOR CONSTRUCTION OF A COMMON DRIVEWAY TO SERVICE LOTS 5 AND 6 ON GREAT POND ROAD. The Planning Board makes the following findings regarding the Special Permit Application cited above: FINDINGS OF FACT: 1. The application adheres to the bylaw restriction that no more than two (2) lots be serviced by this common drive. 2 . The specific location of the common driveway is appropriate due to its location. 3 . The design and location will not adversely affect the neighborhood. 4 . Adequate standards have been placed on the design which will meet public health and safety concerns. 5. The purpose and intent of the regulations contained in the Zoning Bylaw are met with the Special Permit Application before us. Upon reaching the above findings, the Planning Board approves this Special Permit based upon the following conditions which shall be submitted to the Board prior to signing the documents to be filed with the North Essex Registry of Deeds. SPECIAL CONDITIONS: 1. The Applicant shall place a stone bollard at the entry to the common drive off Great Pond Road. This stone bollard shall have the street numbers of both dwellings engraved on all four sides of the stone. The dimensions of the stone shall be as follows: 8" x 8" x 72" . The stone shall have 48" exposed and 24" buried, and all numbering on the stone shall be 4" in height. This condition is placed upon the applicant for the purpose of public safety. 2 . Easements pertaining to the rights of access for driveways between the lots involved, and the approved Form A plan, shall be filed with the Registry of Deeds Office prior to the issuance of the building permit for lot 5 or 6 3 . In no instance shall the Applicant's proposed construction be allowed to further impact the site than as proposed on the following plans: Plans entitled: Site Plan of Land r in North Andover, Mass. Drawn for: Edward and Gayle Neiburger Drawn By: Merrimack Engineering Services 66 Park Street .Andover, MA 01810 Dated: Jan 23, 1991 Final Revision: Feb. 8, 1991 4. The Determination of Applicability issued by the North Andover Conservation Commission, Dated March 1, 1991, shall be considered as part of this decision. 5. The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 6. Gas, Telephone, Cable and Electric utilities shall be installed as specified by the respective utility companies. 7. All catch basins shall be protected and maintained with hay bales to prevent siltation into the drain lines during construction. 8. No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 9. No underground fuel storage shall be installed except as may be allowed by Town Regulations. 10. Prior to a Certificate of Occupancy being issued for any structures, this site shall have received all necessary permits .and approvals from the North Andover Board of Health. 11. Prior to the Building Permit being issued for the structure and again prior to occupancy of the structure, the applicant shall receive a written determination from the Conservation Administrator that all work being done under the jurisdiction of the Conservation Commission is being satisfactorily performed and maintained. 12 . The provisions of this conditional approval shall apply to and be binding upon the applicant, it' s employees and all successors and assigns in interest or control. 13. The applicant shall secure a written easement agreement for any and all work being done on other property, specifically the installation of the sewer tie-in. These easements shall be approved' by the Planning Board prior to the issuance of a Building Permit. The applicant shall submit these easment documents within one year from the date of this conditional Special Permit approval. Should the applicant fail to secure these easements within one year this Special Permit shall be null and void. cc: Director of Public Works Board of Public Works Highway Surveyor Building Inspector Board of Health Assessors Conservation Commission Police Chief Fire Chief Applicant Engineer File Town of North Andover rELFlrFrD OFFICE OF ,Yf�E' IZAas! {; t NORTh COMMUfNITY DEVELOPMENT AND SL1.' iT �vER o?�.� �° ���on 30 School Street7 * , WILLLAM J. SCOTT North Andover, Massachusetts 01845 AUG 1L Director SSACHUSES NOTICE OF DECISION Any appeal shall be filled ` `1 °frIZ/ within (20) days after the / date of filling this Notice i n th . e Office of the Town Clerk. Date' August 12, 1997 Date of Hearing Juni 24 T» Petition of 366 Great Pond Road DQ 5 august S, Premises affected 386 Great Pond ROad in the Residential - 1 zoning W .ing District Referring to the above petition for a speciapermit from the requirements of the North Andover Zoning By-Law Section 4. Watelshed Special Permit 136 Paragraph 3 (b) so as to allow for a two stor addition to an existin home. I After a public hearing given on the above date, the Planning Board voted to Approve the Special Permit based upon the following conditions: Signed CC: Director of Public Works Building Inspector Richard S.Rowen Chairman Natural Resource/Land Use Planner Health Sanitarian Alison Lescarbeau V. Chairman Assessors ' Police Ghief John Simons Clerk Fire Chief Applicant Richard Nardella Engineer File Joseph V Mahone Interested Parties Planning Board CONSERVATION 688-9530 HEALTH 688-9340 PLANNING 688-9333 . Registry of Deeds Northern District of Essex County Lawrence, M 01840 03/12/98 DOUGLAS J ELY KD # 16 Rec: Type CERT 10.00 Inst 7056 Postage 0.32. Total 10.32 # 17 Payment Cash 10.32 THANK YOU! Thomas J. Burke Register of Deeds l I ItORTy O��tLED I ql�r h6'6 OL O P+ SSgcNus<�5 CONSERVATION DEPARTMENT Community Development Division November 20, 2012 Gayle Neiburger 476 Great Pond Road North Andover, MA 01845 RE: Selective cutting of two (2) trees within a wetland resource area. This is a follow up letter pertaining to your request to remove two (2) willow (salix sp.) trees at 476 Great Pond Road which are dead or dying and were severely damaged in a recent storm. The trees were identified during a site visit by the Conservation Department on November 16, 2012. It was determined that the trees are located within the resource area. Removal of vegetation, including pruning and cutting, is prohibited within the resource area and the associated No-Disturbance Zone except in rare circumstances, such as for safety. Large portions of both trees snapped off and fell into the lawn area near the house in a recent storm. The trees which are permitted to be removed are identified in the attached photo. Due to the potential danger imposed by the damaged trees, the Conservation Department will permit their removal to prevent possible injury or property damage. These cutting activities shall be limited to the two trees identified and shown in the attached photograph. Prior to work commencing a pre-cutting site visit shall be scheduled with the tree contractor and the conservation department staff to discuss the removal procedure. If planting is desired, please contact the conservation department for information on how to proceed. This property is located within the Watershed Protection District. The town planner has been notified about the above referenced tree cutting activities and no further action is needed. The approved cutting will be subject to the following conditions: ❖ The work approved in this letter shall be completed by March 31, 2012. ❖ No machinery shall enter the 25' No Disturbance Zone. ❖ No work shall occur in resource areas. ❖ All tree limbs, brush, and other debris materials shall be taken off site and disposed of properly. ❖ Stumps of the trees shall not be removed and shall be left in place. Stumps may be ground down or cut flush with the landscape. 1600 Osgood Sfreet,North Andover,Massachusetts 01845 Phone 978.688.9530 Fox 978.688.9542 Web www.townofnorthandover.com Y ❖ Care shall be taken to prevent damage to surrounding trees during removal of the approved trees. ❖ Upon completion of the tree removal, all disturbed areas shall be properly stabilized. ❖ The applicant shall notify this department immediately following completion of work for a final site inspection. ❖ Areas within 100-feet of wetland resource areas shall remain in a natural state and no further vegetation shall be removed without the prior approval of the Conservation Department/Commission. ❖ Please contact the conservation department if you wish to replant the area with native plants. Please do not hesitate to contact me should you have any further questions or concerns in this regard. Sincerely, NORTH ANDOVER CONSERVATION COMMISSION C'/x" ''PWWI Heidi Gaffney Conservation Field Inspector Cc: Jennifer Hughes, Conservation Administrator f : N n mat � Yom? Trees permitted for removal 1600 Osgood Street,North Andover,Massachusetts 01845 Phone 978.688.9530 Fox 978.688.9542 Web www.townofnorthandover.com