Loading...
HomeMy WebLinkAboutMiscellaneous - 500 GREAT POND ROAD 4/30/2018 (4) 500 GREAT POND ROAD 210/064.0-0006-0000.0 P11f1 �� 1 �U B � �lll � JOYCE B��AGSFIAW p TO'�N CLE,rZK An a eal shall be fileTa W N O F NORTH A N D O 7 E RNORTH Any PP MASSACHUSETTS within (20) days after the �R LZ C 16 ° X96 late of filing of this Notice of .... . in the Office of the Town 'r o a Clerk. ' .SqMU SE` NOTICE OF DECISION � jDate . .April 22, 1996 ` . . . . . . . . . . . . . . . . . . . . . . . Date of Hearing ,1.9.96. . Petition of North Andover• Country Club Premises affected Land and buildings numbered 500Great Pond Road, , , , , , , , , , , Referring to the above petition for a special permit from the requirements of the . . North Andover Zoning.Bylaw. Sec.. 4..136. Paragraph 2.B.2. Waters,Y��d ,P,Y;q, ,gist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . So as to allow. for. the moving of two paddle courts and a wa���,rjg ,hut .to . . . upgrade the paddle. facility.and.to.create a gravel parking. lot. where, the, two„courts are currently located. After a public hearing given on the above date, the Planning Board voted APPROVE SPECIAL PERMIT to . . . . . . . . . . . . . . . .the . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 . . . . . . . . . . . . . . . . . . . . . based upon the following conditions : CC: Director of Public Works Building Inspector Natural Resource/Land Use Planner Health Sanitarian Signed Assessors Police Chief Joseph V: Mahonex: Chairman . . . . . . . . . . . . . . . Fire Chief Applicant Richard Rowen.. Vice. Chairman. . . . Engineer . File Alison_ Lescarbeau: Clerk Interested Parties Richard Nardella John Simons This is a request for a special permit to relocate two paddle courts, construct one new paddle court, construct a warming hut, and install a gravel parking area where the paddle courts are currently located. The work would be done outside of 100' but within 325' of a wetland resource area, and a gravel parking area will be created where the courts currently are. Mr. Giles stated that the court has openings in it that allow the water to drain intermittantly— similar to the slats on a deck or a porch. The abutters concern is that a stockade fence be installed along the new parking area to shield headlights. On a motion by Mr. Rowen, seconded by Ms. Lescarbeau, the Board voted unanimously to close the public hearing. Ms. Colwell prepared a draft decision which was briefly discussed by the Board. On a motion by Mr. Angles, seconded by Ms. Lescarbeau, the Board voted unanimously to approve the special permit as amended. Attached are the conditions. Sincerely, V SAF Joseph V. Mahoney, Chairman North Andover Planning Board 2 and intent of the North Andover Zoning Bylaw. Upon reaching the above findings, the Planning Board approves this Special Permit based upon the following conditions.- The onditions:The following items must be added to the plan: a) The gravel parking area and access to the driveway. This decision must be filed with the North Essex Registry of Deeds. The following information is included as part of this decision: Plan titled: North Andover Country Club Parking/Paddle Renovations Prepared by; Scott L. Giles,RP.L.S. Scale: 1" 50' Date: 3/15/96 3. Prior to any work on site: ) A performance guarantee of two thousand ($2,000) dollars in the form of a check made out to the Town of North Andover must be posted to insure that construction will take place in accordance with the plans and the conditions of this decision and to nsure that the as-built plans will be submitted. All erosion control, silt fence and hay bales along the edge of the limit of work, must be in place and reviewed by the Town Planner. 4. Prior to rification of a Certificate of Occupancy: a The existing wooden stockade fence, or other barrier agreeable to the abutter, must be extended along the boundary of the gravel parking area in order to shield the neighboring property from headlights in the parking area. 5. Prior to release of the Performance Bond: a) The applicant shall submit a certified copy of an as-built plan which shows all construction, including sewer lines, infiltration trenches and other pertinent site features. This as-built plan shall be submitted to the Town Planner for approval and shall be stamped by either a Registered Professional Land Surveyor or Practicing Engineer. b) The Planning Board must by a majority vote make a finding that the site is in conformance with the approved plan. 6. In no instance shall the applicant's proposed construction be allowed to further impact the site than as proposed on the plan referenced in Condition#2. 2