November 9,2005 Pmjed#03066
Mr,Patrick 0.Fmn,RA
Landry Architects
369 Main SVad
Salem,NH 03079 RECEIVED
U. Reambow to the Existing office Bvi� N O V 1 7 2005
SIO Tu"ikc Road
North Andover,MA BUILDING DEPT.
Dear Pat
Atyoar mquest,l have examined muctwal support for the new HVAC units that were installed as past of the renovations
to the Office Bailding bested at 51.01'urg"Road in North Andover,MA. Thu 81MC ral steel supports that were added
aro installed cwrmly and will a&quately sepport the wilts installed.
Upon approval adthe building deparkwdx work can conaiave tows*ccompletien Ora=projcct.
If you should have any questions mprdio$this mean or mgwm additional call at your ommmicam
OFi
MLE A.
V 81191
Dale A.Dubois,P.E. 0
D
L
3 EgOneer of Record SEAL
117 HARRISON.STREL I',MANCRESTRR.NH 03104.3642 0(603)666-0900 o FAX(603)669.0400
Nov 09 2005 4: 38PM Landry Architects 603-894-4358 P. 1
NA1
X TRANSHf7TAL
Cz7
C] JOB NO.:
a TO: lei
. ... . .... .
.. .... .... .
.. ....RT pN ... ..... .. .. .... .. . .. . - .
NO.OF SH E15 INCLUDINGCOVER SHEET
sv$iEcTORma I N' SvLTu L,
W + -�ft*4
`'+ .. .... . . . .. �.. ..L.6, L. .. .R..... . ........
.. ..... ...
.... . ..... ..... .. ..
.. ..... .. .. ... . . ... . .. . .......
389 MAIN
sntEEr
and FLOOR . .. .
. .. . . . ... .... ....
SALEM,N.IL 03079
. ... . .. . . . .. . .... .
I=L(609)89046414
FAX (OW)894-4358
Nov 09 2005 12: 02PM Landry 8rchitects 603-894-4358 p. 2
November 8,2005
x
RE: Site Visit Report
w
Jerry Brown: Inspector of Buildings RECEIVED .
V Town of North Andover
400 Osgood Street
North Andover,MA.01845 NOV 1 7 2005
0
a RE:Renovations to the existing BUILDING 2 story.of e.building located at NG DEPT
510 Turnpike Road.
North Andover,MA,
Architects Site Visit Report:0251a-SVR-I
Date of Visit:November 2nd,2005
Present on Site:Superintendent,Door,Metal Stud,Mechanical&Electrical
Contractors.
QWork in Progress: The stud work contractor was securing studs in various areas of
the building, Door contractor was placing welded metal frames prior to dry wall
installation,HVAC ducts when being installed. Various electrical and plumbing
work was being completed.
Problems Encounter.None
General Comments; The work completed looks good and appears to be in
conformance with the original working drawings.
Submitted by,
Land Architects
atrick .Finn,R.A.
Project Architect
Richard E.Landry,
AIA
Principal
389 MAIN S'1ZtF.L�"T'
Znd FLOOR
SAtEM'� ' a3d79 cc:John McGarry,Coolidge Construction Co.
TEL:(603)890-6414
FAX:(663)89"356
RICHARD E.LANDRY AIA
II
.... . ... . .. .. .. . . .. . .. .
�tfi9�06g (F709)'I9;L
Woo'73 Pug
IzMus Nrm 6m
. . .. ... .
. ... . .. .. .... .
. t� .
... .. .... .... .. ... .
.. ... . ... .. . .. .... .. . . .. .. .... .... .. ... ... . ... . ...
b 9/s.
... ..... . ... . ... .... . ...
IMS o,SMI
��aMMMW.
�o-ox
.. .... .. . . .
:. .
*Jett.,
ro
a
d 0
0� X11 =tea
x
t 'd BSEP-b68-E09 slOaIT40 Jd RupuQl WdZO :Zi SOOZ 60 AON