HomeMy WebLinkAboutMiscellaneous - 535 CHICKERING ROAD 4/30/2018 (13) Olt,c 4"
7
TOWN OF NORTH ANDOVER
NORT►1 Office of the Building Department
oFstLbo ,6",6 Community Development and Services
32 " - -" OL
O 4 1600 Osgood Street, Bldg. 20,Suite 2035
w North Andover, MA 01845
IL
^0
�qSS Area
Gerald Brown, Inspector of Buildings June 13,2013
I
To: Chickering Properties, LLC
Fr: Gerald Brown
Re: 535 Chickering Road—Quik Pik
An incident occurred at your establishment that resulted in structural damage to the pillar of
the rear entry way to your establishment. You are ordered to immediately secure and support the
entrance and roof structure.As the property owner you are hereby ordered to correct this unsafe
condition today,Thursday June 13, 2013 as it poses a danger to human health and welfare. Please see
attached 2009 ICC,Section 116, 116.1 Conditions to see that you are indeed in violation of ICC Building
Code.
Please notify the North Andover building department at 978-688-9545 once the temporary
correction is complete and provide engineered structural details of the permanent repair.
Thank you for your attention in this matter.
Sin rely,
Gerald Brown
Inspector of Buildings
Cc: Curt Bellavance
UNSAFE
DO NOT ENTER OR OCCUPY
Warning:
This structure has been seriously damaged and is Placard Number:
unsafe. Do not enter. Entry may result in death or Date: — J
jury.in
Time:
Comments: This facility was inspected under emergency
'Q 11 L ` DN /mcA-r, conditions for city/town:
O N= t
c.- 1d Building Department on the date and time noted.
Facility Name and Address; Insnector ID/Agency:
.� �.
Do Not Remove this Placard until Authorized by Governing Authority.
s
SCOPE AND ADMINISTRATION
SECTION 114 tilation,or which constitute a fire hazard,or are otherwise dan-
VIOLATIONS gerous to human life or the public welfare,or that involve ille-
114.1 Unlawful acts.It shall be unlawful for any person,firm gal or improper occupancy or inadequate maintenance,shall be
or corporation to erect, construct, alter, extend, repair, move, deemed an unsafe condition. Unsafe structures shall be taken
remove,demolish or occupy any building, structure or equip- down and removed or made safe,as the building official deems
ment regulated by this code,or cause same to be done,in con- necessary and as provided for in this section.A vacant structure
flict with or in violation of any of the provisions of this code. that is not secured against entry shall be deemed unsafe.
114.2 Notice of violation.The building official is authorized to 116.2 Record.The building official shall cause a report to be
serve a notice of violation or order on the person responsible filed on an unsafe condition. The report shall state the occu-
a
for the erection, construction, alteration, extension, repair, pancy of the structure and the nature of the unsafe condition.
moving, removal, demolition or occupancy of a building or 116.3 Notice.If an unsafe condition is found,the building offi-
structure in violation of the provisions of this code,or in viola- cial shall serve on the owner,agent or person in control of the
tion of a permit or certificate issued under the provisions of this structure,a written notice that describes the condition deemed
code. Such order shall direct the discontinuance of the illegal unsafe and specifies the required repairs or improvements to be
action or condition and the abatement of the violation. made to abate the unsafe condition,or that requires the unsafe
114.3 Prosecution of violation.If the notice of violation is not structure to be demolished within a stipulated time.Such notice
shall require the person thus notified to declare immediately to
complied with promptly,the building official is authorized to the building official acceptance or rejection of the terms of the
I request the legal counsel of the jurisdiction to institute the
appropriate proceeding at law or in equity to restrain,correct or order.
abate such violation,or to require the removal or termination of 116.4 Method of service.Such notice shall be deemed prop-
the unlawful occupancy of the building or structure in violation erly served if a copy thereof is(a)delivered to the owner per-
of the provisions of this code or of the order or direction made sonally;(b)sent by certified or registered mail addressed to the
pursuant thereto. owner at the last known address with the return receipt
114.4 Violation penalties.Any person who violates a provi- requested;or(c)delivered in any other manner as prescribed by
sion of this code or fails to comply with any of the requirements local law.If the certified or registered letter is returned showing
thereof or who erects,constructs,alters or repairs a building or that the letter was not delivered,a copy thereof shall be postedin a conspicuous place in or about the structure affected by such
structure in violation of the-approved construction documents notice.Service of such notice in the foregoing manner upon the
or directive of the building official,or of a permit or certificate owner's agent or upon the person responsible for the structure
issued under the provisions of this code,shall be subject to pen- shall constitute service of notice upon the owner.
alties as prescribed by law.
116.5 Restoration.The structure or equipment determined to
be unsafe by the building official is permitted to be restored to a
SECTION 115 safe condition. To the extent that repairs,alterations or addi-
STOP WORK ORDER tions are made or a change of occupancy occurs during the res-
toration of the structure,such repairs,alterations,additions or
115.1 Authority. Whenever the building official finds any change of occupancy shall comply with the requirements of
work regulated by this code being performed in a manner either Section 105.2.2 and Chapter 34.
contrary to the provisions of this code or dangerous or unsafe,
E the building official is authorized to issue a stop work order.
E
115.2 Issuance. The stop work order shall be in writing and
shall be given to the owner of the property involved,or to the
owner's agent,or to the person doing the work.Upon issuance
of a stop work order,the cited work shall immediately cease.
The stop work order shall state the reason for the order,and the
conditions under which the cited work will be permitted to
resume.
115.3 Unlawful continuance.Any person who shall continue
any work after having been served with a stop work order,
except such work as that person is directed to perform to
h remove a violation or unsafe condition,shall be subject to pen-
alties as prescribed by law.
SECTION 116
UNSAFE STRUCTURES AND EQUIPMENT
116.1 Conditions.Structures or existing equipment that are or
hereafter become unsafe, insanitary or deficient because of
inadequate means of egress facilities,inadequate light and ven-
2009 INTERNATIONAL BUILDING CODE® 9
Vol
NORTil
O e
pq�44rlo wP¢`•(y
9SSACHUS��
BUILDING DEPARTMENT
Community Development Division
June 13, 2013
Quick Picks
Chickering Road
North Andover MA 01835
Based on the resent Structural Damage to the rear pillar of the entry way. You are ordered to
immediately secure and support the entrance and roof structure. As a property owner you are
hereby ordered to correct this unsafe condition today Thursday June 13th as it is dangerous to
human health and welfare. Please notify the North Andover Building Department once the
temporary correction is complete and provide engineered structural details of the permanent
repair.
Gerald Brown
Inspector of Buildings
1600 Osgood Street,North Andover,Massachusetts 01845
Phone 978.688.9545 Fax 978.688.9542 Web www.townofnorthandover.com
North Andover Board of Assessors Public Access Page 1 of 1
f
NCRTM North Andover Beard of Assessors I,
~ 9
roperty Record Card
Click Seal To Return Parcel ID :210/071.0-0033-0000.0 FY:2013 Community:North Andover
SKETCH PHOTO
Click on Photo to EnaTge.
Search for Parcels _
Search for SalesNo
Sketch
€ i
I i
jrt ,
SummaryAvailable
Residence -
Detached Structure
Condo
335 CHICKERING ROAD
�v..l
Commercial
Location: 535 CHICKERING ROAD
Owner Name: CHICKERING PROPERTIES,LLC
Owner Address: 231 SUTTON STREETSUITE 1B
City: NORTH ANDOVER State: MA Zip: 01845
Neighborhood:31-1 Land Area: 1.52 acres
Use Code: 013-MULTIUSE-RES Total Finished Area: 11851 sqft
ASSESSMENTS CURRENT YEAR PREVIOUS YEAR
Total Value: 1,382,900 1,356,600
Building Value: 906,200 893,100
Land Value: 476,700 463,500
Market Land Value: 476,700
Chapter Land Value:
LATEST SALE
Sale Price: 10 Sale 12/14/2006
Date:
Arms Length Sale ESSEX REALTY
F-NO-CONVNIENT Grantor:
Code:
TRUST
Cert Doc: 15558 Book: Page: 11
http://csc-ma.us/PROPAPP/display.do?linkld=2255069&town=NandoverPubAcc 6/13/2013
I
Deems, Maura
From: Cheney, Skip
Sent: Thursday, June 13, 2013 2:05 PM
To: Deems, Maura
Subject: 535 Chickering
Importance: High
Hi Maura,
Sorry I missed you call.
The principle owner of Chickering Properties is Trustee, Louis P. Minicucci,Jr. 231 Sutton Street,Suite 1-A, North
Andover.
Samuel G.Cheney,Jr.
Assistant Assessor/Field Appraiser
Town of North Andover
120 Main Street
North Andover,MA 01845
Phone 978.688.9566
Fax 978.688.3211
Email schenev@townofnorthandover.com
Web www.TownofNorthAndover.com
o u
Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records.For more
information please refer to:http://www.sec.state.ma.us/pre/preidx.htm.
Please consider the environment before printing this email.
1
J. TAYLOR MOYNIHAN FAX
ARCHITECTURE & PLANNING
461 BOSTON STREET, UNIT D-6 TEL: 978 887 8486
TOPSFIELD, MASS. 01983 FAX: 978 887 3077
TO: DATE:
ATTN:epil ►►-�
RE: IL.r
PLEASE FIND ATTACHED:
LETTER REPORT ko� PRINTS PLANS
COPIES -- DESCRIPTION
oe
_ s
REMARKS:
COP O• ,�.��...� SIGNED•
J. TAYLOR MOYNIHAN
Architecture & Planning
DATE: FEBRUARY 1 1 , 2009
TO: BUILDING DEPARTMENT
BUILDING INSPECTOR
TOWN OF NORTH ANDOVER
MASSACHUSETTS
I HEREBY CERTIFY THAT I HAVE SUPERVISED THE CONSTRUCTION OF:
THE INTERIOR REMODEL AND ALTERATIONS OF THE EXISTING
QUIC—PIC CONVENIENCE STORE AT 535 CHICKERING ROAD.
UNDER BUILDING PERMIT NUMBER:
AND THAT THIS STRUCTURE CONFORMS TO THE SUBMITTED PLANS
AND TO THE CODES OF THE CITY/ TOWN
AND THE COMMONWEALTH OF MASSACHUSETTS.
FURTHER THAT ALL REQUIRED APPROVALS AND MATERIAL AFFIDAVITS
HAVE BEEN SUBMITTED, AND THAT THERE ARE NO VIOLATIONS OF LAW
OR ORDERS OF THE DEPARTMENT OF PUBLIC SAFETY PENDING.
I HEREBY CERTIFY THAT I HAVE ON THIS DATE: FEBRUARY 10, 2009
INSPECTED THE PROPERTY LOCATED AT:
535 CHICKERING ROAD, NORTH ANDOVER, MASS.
AND FIND THAT THE LOCUS AND ITS STRUCTURES COMPLY WITH
MY PLANS AND SPECIFICATIONS AND ALL THE RULES AND REGULATIONS
OF THE CODES OF THE COMMONWEALTH.
THEREFORE, I REQUEST A CERTIFICATE OF OCCUPANCY
FOR THE ABOVE ADDRESS. _ " 0
� ?b. 5 {g
n
m4ss,
/8 8
ORIGINAL IGNATURE A 0 FAL ATE
P.O. Box 3 Topsfield, Ma. 0 1983 Tel (978)887-8486 Fax(978)887-3077
1
J. TAYLOR MOYNIHAN
Architecture & Planning
Q
UIC-PIC CONVENIENCE STORE
535 CHICKERING ROAD
NORTH ANDOVER, MASS.
FEBRUARY 4, 2009
SITE V151T - CONSTRUCTION.
WEDNESDAY 12:45 - 1 :30 PM
ON 51TE: ARCHITECT
GENERAL CONTRACTOR
STORE MANAGER
FLOORING CONTRACTOR
WORK IN PROGU55:
I1\15TALLATION OF PLYWOOD SUBFLOOKING.
FRAMING:OF NEW INTERIOR PARTITIONS.
5U5PEN5ED CEILING WORK, IN5TALLATION OF LIGHTING FIXTURES
AND HVAC DIFFUSERS.
OBSERVATIONS:
ALL INTERIOR DEMOLITION WORK INCLUDING REMOVAL OF EXISTING CASEWORK AND
SERVICE EQUIPMENT, DEMOLITIOM OF CERAMIC TILE FLOORING AND BASE, SUSPENDED
CEILINGS AND FIXTURES, HAS BEEN SUBSTANTIALLY COMPLETED.
EXISTING TILE FLOORING HAD BEEN REMOVED. NEW PLYWOOD 5UBFLOORING
IS IN PROGRESS AND 15 NEAR COMPLETE AT THE 5ALE5 AREA AND TOILET ROOM5.
EQUIPMENT AT THE DUNKIN' DONUTS STOCK AND PREP AREA 15 TO BE REMOVED
FOR NEW FLOORING WORK.
NEW 5U5PENDED CEILING PANEL5 AND LIGHTING FIXTURES HAVE BEEN INSTALLED
AND HVAC WORK 15 IN PROGRE55.
METAL STUD FRAMING AT NEW PARTITIONS FOR P05T OFFICE AREA 15 IN PROGRESS.
P05T OFFICE SERVICE CASES AND MILLWORK HAVE BEEN DELIVERED AND ARE ON SITE.
SOFFIT AND MENU FA5CIA FRAMING AND SHEATHING AT THE DUNKIN DONUTS LEA5E AREA
15 IN PKOGRE55 AND NEAR COMPLETE, AND CERAMIC WALL TILE INSTALLATION 15 IN
PROGRESS.
ROUGH PLUMBING AND ROUGH ELECTRICAL WORK AT THE DUNKIN' DONUT5 LEASE AREA
IS SUBSTANTIALLY COMPLETE.
• Fax 978 887-3077
P.O.{' Obox 3 T�rsfiel�, Ma. •19i3 Tel (97i)ii7-i4iG ( )
J. TAYLOR MOYNHUN
Architecture & Planning
ITEMS TO VERIFY:
SCHEDULED INSTALLATION AND FINAL CONNECTION OF SERVICE EQUIPMENT.
FINAL INSPECTIONS AND SHOP OPENING DATE.
INFORMATION / ACTION REQUIRED
CONSTRUCTION SITE VISIT REPORT.
SCHEDULE FOR FINAL INSPECTIONS AND CONSTRUCTION CONTROL AFFIDAVIT.
�tEkED�qC
W
f ' ikta. 4665 y i
BOSTON, i
oy�w
OF
n
REPORT: TAYLOR MOYNIHAN
ARCH ITECT
I
i
P.O. Box 3 Topsfield, Ma. 01983 Tel (978)887-8486 Pax(978)887-3077
I
7 \n !
J. TAYLOR MOYNHUN
Architecture & Planning
QUIC-PIC CONVENIENCE STORE
535 CHICKERING ROAD
NORTH ANDOVER, MASS.
FEBRUARY 10, 2009
SITE VISIT CONSTRUCTION.
TUESDAY 1 : 15 - 2:30 PM
ON SITE: ARCHITECT
GENERAL CONTRACTOR
ELECTRICAL CONTRATOR
PAINTING CONTRACTOR
FLOORING CONTRACTOR
WORK IN PROGRE55:
INSTALLATION OF CA5EWORK AND EQUIPMENT.
FINISH PAINTING AND WALL TILE WORK
FIN15H SU5PEN5ED CEILING PANEL WORK, LIGHTING FIXTURE5
AND HVAC DIFFUSERS.
055ERVATION5:
ALL INTERIOR DEMOLITION WORK HAS BEEN COMPLETED.
NEW PLYWOOD 5UBFLOOKING HAS BEEN COMPLETED, AND NEW FLOORING HAS
BEEN INSTALLED AND 15 NEAR COMPLETE AT THE SALES AREA. NEW COVE BASE 15
TO BE IN5TALLED THROUGHOUT.
INTERIOR PARTITIONS HAVE BEEN FRAMED, SHEATHED, FINISHED AND PAINTED
AT THE P05T OFFICE AREA, P05T OFFICE CASEWORK HAS BEEN INSTALLED.
INTERIOR WALL5 HAVE BEEN PATCHED AND PAINTED, AND WALL TILE WORK 15
IN PROGRESS. ADDITIONAL WALL TILE WORK WA5 REQUE5TED BY THE STORE MANAGER
AND APPROVED BY THE ARCHITECT.
NEW SUSPENDED CEILING PANEL5 AND LIGHTING FIXTURES, INCLUDING EMERGENCY
LIGHTING AND EXIT SIGNS AND LIGHTING HAVE BEEN INSTALLED, CONNECTED,
AND ARE FUNCTIONING IN THE SALES AREA.
SOFFIT AND MENU FASCIA FRAMING AND SHEATHING AT THE DUNKIN DONUTS LEA5E AREA
15 COMPLETE, AND CERAMIC WALL TILE IN5TALLATION 15 COMPLETE.
NEW SERVICE CA5ES AND EQUIPMENT AT THE DUNKIN' DONUTS SERVICE AREA HAS
BEEN INSTALLED AND CONNECTED. EQUIPMENT ID BEING CLEANED AND TESTED.
ALL PLUMBING AND ELECTRICAL WORK AT THE DUNKIN' DONUTS LEA5E AREA
15 SUBSTANTIALLY COMPLETE.
P.O. Box 3 ' Topsfield, Ma. 0 1983 ' Tel (978)887-8486 ' Fax (978)887-3077
J. TAYLOR MOYNIHAN
Architecture & Planning
ITEMS TO VERIFY:
SCHEDULED FINAL INSPECTIONS AND SHOP OPENING DATE.
INFORMATION / ACTION REQUIRED
CONSTRUCTION SITE VISIT REPORTS.
SCHEDULE FOR FINAL INSPECTIONS AND CONSTRUCTION CONTROL AFFIDAVIT.
gip_. I
495
of ��
REPORT: TAYLOR MOYNIHAN
ARCHITECT
P.O. Box 3 Topsfield, Ma. 0 1983 ` Tel (978)887-8486 Fax(978)887-3077
r
J. TAYLOR, MOY,.NIHAN
Are ' & Planning
QUIC-PIC C NVENIENCE STORE
535 C KERING ROAD
AN DOVER, MA55.
FEBRUARY 4. 2009
51TE V151T - CON5TRUCTION.
WEDNE50AY 12:45 - 1 ,30 FM
ON 51TE: ARCHITECT
GENERAL CONTRACTOR
STORE MANAGER
FLOORING CONTRACTOR
WORK IN FROGRE55:
IN5TALLATION OF PL.YW00D 5UBFLOORING.
FRAMING OF NrW INTERIOR PARTITION5.
5U5PEN5E0 CEILING WORK, INSTALLATION OF LIGHTING FIXTURE5
AND HVAC DIFFUSERS.
0135ERVATION5:
ALL INTERIOR DEMOLITION WORK INCLUDING REMOVAL Of EX15TING CA5EWORK AND
5ERVICE EQUIPMENT, OEMOLITIOM OF CERAMIC TILE FLOORING AND BASE, 50PENDED
CEIUNG5 AND FIXTURES, MA5 BEEN 5UB8TANTIALLY COMPUTED.
EXISTING TILE FLOORING HAD BEEN REMOVED. NEW PLYWOOD 5UBFLOORING
15 IN PROGRE55 AND 15 NEAR COMPLETE AT THE SALES AREA AND TOILET ROOMS.
EQUIPMENT AT THE DUNKIN' DONUT5 STOCK AND PREP AREA 15 TO BE REMOVED
FOR NEW FLOORING WORK
NEW SUSPENDED CEILING PANELS AND LIGHTING FIXTURE5 HAVE BEEN IN5TALLED
AND HVAC WORK 15 IN PROGRE95.
METAL STUD FRAMING AT NEW PARTITIONS FOR P05T OFFICE AREA 15 IN PROGRE55.
POST OFFICE SERVICE CASES AND MILLWORK HAVE BEEN DEUVERED AND ARE ON 51TE,
50FFIT AND MENU FASCIA FRAMING AND 5HEATHING AT THE OUNKIN DONUT5 LEA5E AREA
15 IN PROGRE55 AND NEAR COMPLETE,AND CERAMIC WALL TILE INSTALLATION 15 IN
PROGRPS5.
ROUGH PLUMBING AND ROUGH ELECTRICAL WORK AT THE DUNKIN' DONUT5 LEA5E AREA
15 SUB5TANTIALLY COMPLETE.
• P.O. Box 3 - Toj4heli. Ma. 01963 - Tel(976)887-8486 • Pax(978)887.3077 '
S0 •d 1402 188 8L6 i Qio839Z1Id f t Wd 0ZsT0 60-£1-93d
e 4
J. TAYLOR MOYNIHAN
Architecture & Planning
ITEMS TO VERWY.-
5CHEDUIED FINAL IN51PECTION5 AND 5HOP OPENING HATE.
INFORMATION / ACTION REQUIRED
CONSTRUCTION 51TE V151T REPORTS.
5CHEDULE FOR FINAL IN5PECTION5 AND CON5TRUCTION CONTROL AFFIDAVIT.
�tABO ABry�.
4865
W41
REPORT; TAYLOR MOYNIHAN
ARCHITECT
• P.O. Box 3 Topefield, Ms. 01983 ' Tel(978)887-8486 ' Fax(978)887-3077 '
b0 'd
1102 488 846 T a1VN30Z1Id t f Wd 61 : T0 60-£T-83d
i r
I
J. TAYLOR MOYNIHAN
Architecture & Planning
QUIC-PIC CONVENIENCE 5TORE
535 CHICKERING ROAD
NORTH ANDOVER, MA55.
FE13RUARY 10, 2009
BITE V151T- CONSTRUCTION.
TUESDAY 1 ; 15 - 2:30 PM
ON 51TE: ARCHITECT
GENERAL CONTRACTOR
ELECTRICAL CONTRATOR
PAINTING CONTRACTOR
FLOORJNG CONTRACTOR
WORK IN MOGRE55:
INSTALLATION OF CASEWORK AND EQUIPMENT,
PIN15H PAINTING AND WALL TILE WORK
FINISH 5U5PENSED CEILING PANEL WORK, LIGHTING FIXTURES
AND HVAC DIFFU5ER5.
0135ERVATION5:
ALL INTERIOR DEMOLITION WORK HA5 BEEN COMPLETED.
NEW PLYWOOD 5UBFL.00RING HAS BEEN COMPLETED.AND NEW FLOORING HA5
BEEN INSTALLED AND 15 NEAR COMPLETE AT THE SAIES AREA. NEW COVE BA5E 15
TO BE IN5TALLED THROUGHOUT.
INTERIOR PAKTITION5 HAVE BEEN FRAMED, SHEATHED, FIN15HED AND PAINTI=D
AT THE POST OFFICE AREA, POST OFFICE CASEWORK HAS BEEN INSTALLED,
INTERIOR WALL5 HAVE BEEN PATCHED AND PAINTED,AND WALL TILE WORK 15
IN PROGRESS. ADDITIONAL WALL TILE WORK WAS KEQUE5TED DY THE STORE MANAGER
AND APPROVED BY THE ARCHITE=CT.
NEW 5U5PENDED CEIEJNG PANELS AND LIGHTING FIXTURE5, INCLUDING EMERGENCY
LIGHTING AND EXIT SIGNS AND LIGHTING HAVE BEEN INSTALLED, CONNECTED,
AND ARE FUNCTIONING IN THE 5ALE5 AREA.
5OFFIT AND MENU FASCIA FRAMING AND SHEATHING AT THE DUNKIN DONUTS LEASE AREA
15 COMPLETE. AND CERAMIC WALL TILT:INSTALLATION 15 COMPLETE.
NEW 5ERVICE CASES AND EQUIPMENT AT THE:DUNKIN' DONUT5 5ERVICE AREA HA5
BEEN INSTALLED AND CONNECTED_ EQUIPMENT ID BEING CLEANED AND TE5TED,
ALL PLUMBING AND ELECTRICAL WORK AT THE OUNKIN' DONUTS LEA5E AREA
15 5UB57ANTIALLY COMPLETE:.
• P,0. Boos 3 • Topsfie►d, Ma. 01983 ' Tel(978)887-6486 • Fax(978)887-3077 '
£0 'd LLS£ L88 8L6 i Q'ioman21Id f f Wd 61 : 10 60-£1-93d
. u
TAYLOR MOYNIHAN
Architecture & Planning
DATE: FEBRUARY 1 1 , 2009
TO: BUILDING DEPARTMENT
BUILDING INSPECTOR
TOWN Of NORTH ANDOVER
MA55ACHU5E775
I HEREBY CERTIFY THAT I HAVE 5UPERV15ED THE CONSTRUCTION OF.'
THE INTERIOR REMODEL AND ALTERATION5 OF THE EXISTING
QUIC-PIC CONVENIENCE STORE AT 535 CHICKERING ROAD,
UNDER BUILDING PERMIT NUMBER:
AND THAT THIS STRUCTURE CONFORMS TO THE SUBMITTED PLANS
AND TO THE CODES OF THE CITY/TOWN
AND THE COMMONWEALTH OF MA55ACHU5ETT5.
FU01ER THAT ALL REQUIRED APPROVAL5 AND MATERIAL AFFIDAVIT5
HAVE BEEN 5U13MITTED, AND THAT THERE ARE NO VIOLATION5 OF LAW
OR ORDERS OF THE DEPARTMENT OF PUBLIC 5AFETY PENDING.
1 HER) BY CERTIFY THAT I HAVE ON THIS DATE: FEBRUARY 10, 2009
IN5PECTED THE PROPERTY LOCATED AT:
535 CHICKERNG ROAD. NORTH ANDOVER, MA55.
AND FIND THAT THE LOCUS AND IT5 STRUCTURES COMPLY WITH
MY PLANS AND SPECIFICATIONS AND ALL THE RULE5 AND REGULATIONS
OF THE CODES OF THE COMMONWEALTH,
THERfFORE, I REOUE5T A CEKTIFIGATE OF OCCUPANCY
FOR THE ABOVE ADDRESS.
o
No. 460"5 ,�� �•
QRIGI AL [GNAT URE A b CAL CATE
• P.O. box 3 Tppsheld, MA. 01983 Tel(979)667-WG ' fax(878)887-3077
Z0 'd
1102 L88 8L6 T al"30Z1Id f t Wd 61 : T0 60-£1-83A
. w
J. TAYLOR D40YNIHAN FAX
ARCHITECTURE & PLANNING
461 BOSTON STREET, UNIT D-6 TEL: 978 887 8486
TOPSFIELD, MASS. 01983 FAX: 978 887 3077
TO: DATE loos.074"
ATTN:� � ►�
ZRE-. Qj'AX4 � o e.
PLEASE FIND ATTACHED:
LETTER REPORT PRINTS PLANS
f O M, --DESCRiPTION. - -
REMARKS: � �
pr
t �
COPY TO: SIGNED: �..
T0 'd 4102 L88 8L6 T QlVN39Z1Id r r Wd 81 : TO 60-£T-93A
A �
1
J. TAYLOR M. OYNIHAN
Architecture & Planning
ITEM5 TO VERIFY:
5CHEDULE0 INSTALLATION AND FINAL CONNECTION OF 5EKVICE EQUIPMENT.
FINAL INSPECTIONS AND 5HOF OPENING DATE.
INFORMATION 1 ACTION REQUIRED
CONSTRUCTION 5ITE V151T REPORT,
5CHfzDULE FOR FINAL IN5PECTION5 AND CON5TRUCTION CONTROL AFFIDAVIT.
M0. {65S
Of
REPORT: TAYLOR MOYNIHAN
ARCHITECT
P.0, Box 3 Topeheld, Mo. O 1983 Tel(978)887-848G Fsx(978)887.3077
90 'd
1402 Lee 8L6 I aivN39Z1Id r r Wd 0Z: 10 60-£1-93d