Loading...
HomeMy WebLinkAboutMiscellaneous - 535 CHICKERING ROAD 4/30/2018 (13) Olt,c 4" 7 TOWN OF NORTH ANDOVER NORT►1 Office of the Building Department oFstLbo ,6",6 Community Development and Services 32 " - -" OL O 4 1600 Osgood Street, Bldg. 20,Suite 2035 w North Andover, MA 01845 IL ^0 �qSS Area Gerald Brown, Inspector of Buildings June 13,2013 I To: Chickering Properties, LLC Fr: Gerald Brown Re: 535 Chickering Road—Quik Pik An incident occurred at your establishment that resulted in structural damage to the pillar of the rear entry way to your establishment. You are ordered to immediately secure and support the entrance and roof structure.As the property owner you are hereby ordered to correct this unsafe condition today,Thursday June 13, 2013 as it poses a danger to human health and welfare. Please see attached 2009 ICC,Section 116, 116.1 Conditions to see that you are indeed in violation of ICC Building Code. Please notify the North Andover building department at 978-688-9545 once the temporary correction is complete and provide engineered structural details of the permanent repair. Thank you for your attention in this matter. Sin rely, Gerald Brown Inspector of Buildings Cc: Curt Bellavance UNSAFE DO NOT ENTER OR OCCUPY Warning: This structure has been seriously damaged and is Placard Number: unsafe. Do not enter. Entry may result in death or Date: — J jury.in Time: Comments: This facility was inspected under emergency 'Q 11 L ` DN /mcA-r, conditions for city/town: O N= t c.- 1d Building Department on the date and time noted. Facility Name and Address; Insnector ID/Agency: .� �. Do Not Remove this Placard until Authorized by Governing Authority. s SCOPE AND ADMINISTRATION SECTION 114 tilation,or which constitute a fire hazard,or are otherwise dan- VIOLATIONS gerous to human life or the public welfare,or that involve ille- 114.1 Unlawful acts.It shall be unlawful for any person,firm gal or improper occupancy or inadequate maintenance,shall be or corporation to erect, construct, alter, extend, repair, move, deemed an unsafe condition. Unsafe structures shall be taken remove,demolish or occupy any building, structure or equip- down and removed or made safe,as the building official deems ment regulated by this code,or cause same to be done,in con- necessary and as provided for in this section.A vacant structure flict with or in violation of any of the provisions of this code. that is not secured against entry shall be deemed unsafe. 114.2 Notice of violation.The building official is authorized to 116.2 Record.The building official shall cause a report to be serve a notice of violation or order on the person responsible filed on an unsafe condition. The report shall state the occu- a for the erection, construction, alteration, extension, repair, pancy of the structure and the nature of the unsafe condition. moving, removal, demolition or occupancy of a building or 116.3 Notice.If an unsafe condition is found,the building offi- structure in violation of the provisions of this code,or in viola- cial shall serve on the owner,agent or person in control of the tion of a permit or certificate issued under the provisions of this structure,a written notice that describes the condition deemed code. Such order shall direct the discontinuance of the illegal unsafe and specifies the required repairs or improvements to be action or condition and the abatement of the violation. made to abate the unsafe condition,or that requires the unsafe 114.3 Prosecution of violation.If the notice of violation is not structure to be demolished within a stipulated time.Such notice shall require the person thus notified to declare immediately to complied with promptly,the building official is authorized to the building official acceptance or rejection of the terms of the I request the legal counsel of the jurisdiction to institute the appropriate proceeding at law or in equity to restrain,correct or order. abate such violation,or to require the removal or termination of 116.4 Method of service.Such notice shall be deemed prop- the unlawful occupancy of the building or structure in violation erly served if a copy thereof is(a)delivered to the owner per- of the provisions of this code or of the order or direction made sonally;(b)sent by certified or registered mail addressed to the pursuant thereto. owner at the last known address with the return receipt 114.4 Violation penalties.Any person who violates a provi- requested;or(c)delivered in any other manner as prescribed by sion of this code or fails to comply with any of the requirements local law.If the certified or registered letter is returned showing thereof or who erects,constructs,alters or repairs a building or that the letter was not delivered,a copy thereof shall be postedin a conspicuous place in or about the structure affected by such structure in violation of the-approved construction documents notice.Service of such notice in the foregoing manner upon the or directive of the building official,or of a permit or certificate owner's agent or upon the person responsible for the structure issued under the provisions of this code,shall be subject to pen- shall constitute service of notice upon the owner. alties as prescribed by law. 116.5 Restoration.The structure or equipment determined to be unsafe by the building official is permitted to be restored to a SECTION 115 safe condition. To the extent that repairs,alterations or addi- STOP WORK ORDER tions are made or a change of occupancy occurs during the res- toration of the structure,such repairs,alterations,additions or 115.1 Authority. Whenever the building official finds any change of occupancy shall comply with the requirements of work regulated by this code being performed in a manner either Section 105.2.2 and Chapter 34. contrary to the provisions of this code or dangerous or unsafe, E the building official is authorized to issue a stop work order. E 115.2 Issuance. The stop work order shall be in writing and shall be given to the owner of the property involved,or to the owner's agent,or to the person doing the work.Upon issuance of a stop work order,the cited work shall immediately cease. The stop work order shall state the reason for the order,and the conditions under which the cited work will be permitted to resume. 115.3 Unlawful continuance.Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform to h remove a violation or unsafe condition,shall be subject to pen- alties as prescribed by law. SECTION 116 UNSAFE STRUCTURES AND EQUIPMENT 116.1 Conditions.Structures or existing equipment that are or hereafter become unsafe, insanitary or deficient because of inadequate means of egress facilities,inadequate light and ven- 2009 INTERNATIONAL BUILDING CODE® 9 Vol NORTil O e pq�44rlo wP¢`•(y 9SSACHUS�� BUILDING DEPARTMENT Community Development Division June 13, 2013 Quick Picks Chickering Road North Andover MA 01835 Based on the resent Structural Damage to the rear pillar of the entry way. You are ordered to immediately secure and support the entrance and roof structure. As a property owner you are hereby ordered to correct this unsafe condition today Thursday June 13th as it is dangerous to human health and welfare. Please notify the North Andover Building Department once the temporary correction is complete and provide engineered structural details of the permanent repair. Gerald Brown Inspector of Buildings 1600 Osgood Street,North Andover,Massachusetts 01845 Phone 978.688.9545 Fax 978.688.9542 Web www.townofnorthandover.com North Andover Board of Assessors Public Access Page 1 of 1 f NCRTM North Andover Beard of Assessors I, ~ 9 roperty Record Card Click Seal To Return Parcel ID :210/071.0-0033-0000.0 FY:2013 Community:North Andover SKETCH PHOTO Click on Photo to EnaTge. Search for Parcels _ Search for SalesNo Sketch € i I i jrt , SummaryAvailable Residence - Detached Structure Condo 335 CHICKERING ROAD �v..l Commercial Location: 535 CHICKERING ROAD Owner Name: CHICKERING PROPERTIES,LLC Owner Address: 231 SUTTON STREETSUITE 1B City: NORTH ANDOVER State: MA Zip: 01845 Neighborhood:31-1 Land Area: 1.52 acres Use Code: 013-MULTIUSE-RES Total Finished Area: 11851 sqft ASSESSMENTS CURRENT YEAR PREVIOUS YEAR Total Value: 1,382,900 1,356,600 Building Value: 906,200 893,100 Land Value: 476,700 463,500 Market Land Value: 476,700 Chapter Land Value: LATEST SALE Sale Price: 10 Sale 12/14/2006 Date: Arms Length Sale ESSEX REALTY F-NO-CONVNIENT Grantor: Code: TRUST Cert Doc: 15558 Book: Page: 11 http://csc-ma.us/PROPAPP/display.do?linkld=2255069&town=NandoverPubAcc 6/13/2013 I Deems, Maura From: Cheney, Skip Sent: Thursday, June 13, 2013 2:05 PM To: Deems, Maura Subject: 535 Chickering Importance: High Hi Maura, Sorry I missed you call. The principle owner of Chickering Properties is Trustee, Louis P. Minicucci,Jr. 231 Sutton Street,Suite 1-A, North Andover. Samuel G.Cheney,Jr. Assistant Assessor/Field Appraiser Town of North Andover 120 Main Street North Andover,MA 01845 Phone 978.688.9566 Fax 978.688.3211 Email schenev@townofnorthandover.com Web www.TownofNorthAndover.com o u Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records.For more information please refer to:http://www.sec.state.ma.us/pre/preidx.htm. Please consider the environment before printing this email. 1 J. TAYLOR MOYNIHAN FAX ARCHITECTURE & PLANNING 461 BOSTON STREET, UNIT D-6 TEL: 978 887 8486 TOPSFIELD, MASS. 01983 FAX: 978 887 3077 TO: DATE: ATTN:epil ►►-� RE: IL.r PLEASE FIND ATTACHED: LETTER REPORT ko� PRINTS PLANS COPIES -- DESCRIPTION oe _ s REMARKS: COP O• ,�.��...� SIGNED• J. TAYLOR MOYNIHAN Architecture & Planning DATE: FEBRUARY 1 1 , 2009 TO: BUILDING DEPARTMENT BUILDING INSPECTOR TOWN OF NORTH ANDOVER MASSACHUSETTS I HEREBY CERTIFY THAT I HAVE SUPERVISED THE CONSTRUCTION OF: THE INTERIOR REMODEL AND ALTERATIONS OF THE EXISTING QUIC—PIC CONVENIENCE STORE AT 535 CHICKERING ROAD. UNDER BUILDING PERMIT NUMBER: AND THAT THIS STRUCTURE CONFORMS TO THE SUBMITTED PLANS AND TO THE CODES OF THE CITY/ TOWN AND THE COMMONWEALTH OF MASSACHUSETTS. FURTHER THAT ALL REQUIRED APPROVALS AND MATERIAL AFFIDAVITS HAVE BEEN SUBMITTED, AND THAT THERE ARE NO VIOLATIONS OF LAW OR ORDERS OF THE DEPARTMENT OF PUBLIC SAFETY PENDING. I HEREBY CERTIFY THAT I HAVE ON THIS DATE: FEBRUARY 10, 2009 INSPECTED THE PROPERTY LOCATED AT: 535 CHICKERING ROAD, NORTH ANDOVER, MASS. AND FIND THAT THE LOCUS AND ITS STRUCTURES COMPLY WITH MY PLANS AND SPECIFICATIONS AND ALL THE RULES AND REGULATIONS OF THE CODES OF THE COMMONWEALTH. THEREFORE, I REQUEST A CERTIFICATE OF OCCUPANCY FOR THE ABOVE ADDRESS. _ " 0 � ?b. 5 {g n m4ss, /8 8 ORIGINAL IGNATURE A 0 FAL ATE P.O. Box 3 Topsfield, Ma. 0 1983 Tel (978)887-8486 Fax(978)887-3077 1 J. TAYLOR MOYNIHAN Architecture & Planning Q UIC-PIC CONVENIENCE STORE 535 CHICKERING ROAD NORTH ANDOVER, MASS. FEBRUARY 4, 2009 SITE V151T - CONSTRUCTION. WEDNESDAY 12:45 - 1 :30 PM ON 51TE: ARCHITECT GENERAL CONTRACTOR STORE MANAGER FLOORING CONTRACTOR WORK IN PROGU55: I1\15TALLATION OF PLYWOOD SUBFLOOKING. FRAMING:OF NEW INTERIOR PARTITIONS. 5U5PEN5ED CEILING WORK, IN5TALLATION OF LIGHTING FIXTURES AND HVAC DIFFUSERS. OBSERVATIONS: ALL INTERIOR DEMOLITION WORK INCLUDING REMOVAL OF EXISTING CASEWORK AND SERVICE EQUIPMENT, DEMOLITIOM OF CERAMIC TILE FLOORING AND BASE, SUSPENDED CEILINGS AND FIXTURES, HAS BEEN SUBSTANTIALLY COMPLETED. EXISTING TILE FLOORING HAD BEEN REMOVED. NEW PLYWOOD 5UBFLOORING IS IN PROGRESS AND 15 NEAR COMPLETE AT THE 5ALE5 AREA AND TOILET ROOM5. EQUIPMENT AT THE DUNKIN' DONUTS STOCK AND PREP AREA 15 TO BE REMOVED FOR NEW FLOORING WORK. NEW 5U5PENDED CEILING PANEL5 AND LIGHTING FIXTURES HAVE BEEN INSTALLED AND HVAC WORK 15 IN PROGRE55. METAL STUD FRAMING AT NEW PARTITIONS FOR P05T OFFICE AREA 15 IN PROGRESS. P05T OFFICE SERVICE CASES AND MILLWORK HAVE BEEN DELIVERED AND ARE ON SITE. SOFFIT AND MENU FA5CIA FRAMING AND SHEATHING AT THE DUNKIN DONUTS LEA5E AREA 15 IN PKOGRE55 AND NEAR COMPLETE, AND CERAMIC WALL TILE INSTALLATION 15 IN PROGRESS. ROUGH PLUMBING AND ROUGH ELECTRICAL WORK AT THE DUNKIN' DONUT5 LEASE AREA IS SUBSTANTIALLY COMPLETE. • Fax 978 887-3077 P.O.{' Obox 3 T�rsfiel�, Ma. •19i3 Tel (97i)ii7-i4iG ( ) J. TAYLOR MOYNHUN Architecture & Planning ITEMS TO VERIFY: SCHEDULED INSTALLATION AND FINAL CONNECTION OF SERVICE EQUIPMENT. FINAL INSPECTIONS AND SHOP OPENING DATE. INFORMATION / ACTION REQUIRED CONSTRUCTION SITE VISIT REPORT. SCHEDULE FOR FINAL INSPECTIONS AND CONSTRUCTION CONTROL AFFIDAVIT. �tEkED�qC W f ' ikta. 4665 y i BOSTON, i oy�w OF n REPORT: TAYLOR MOYNIHAN ARCH ITECT I i P.O. Box 3 Topsfield, Ma. 01983 Tel (978)887-8486 Pax(978)887-3077 I 7 \n ! J. TAYLOR MOYNHUN Architecture & Planning QUIC-PIC CONVENIENCE STORE 535 CHICKERING ROAD NORTH ANDOVER, MASS. FEBRUARY 10, 2009 SITE VISIT CONSTRUCTION. TUESDAY 1 : 15 - 2:30 PM ON SITE: ARCHITECT GENERAL CONTRACTOR ELECTRICAL CONTRATOR PAINTING CONTRACTOR FLOORING CONTRACTOR WORK IN PROGRE55: INSTALLATION OF CA5EWORK AND EQUIPMENT. FINISH PAINTING AND WALL TILE WORK FIN15H SU5PEN5ED CEILING PANEL WORK, LIGHTING FIXTURE5 AND HVAC DIFFUSERS. 055ERVATION5: ALL INTERIOR DEMOLITION WORK HAS BEEN COMPLETED. NEW PLYWOOD 5UBFLOOKING HAS BEEN COMPLETED, AND NEW FLOORING HAS BEEN INSTALLED AND 15 NEAR COMPLETE AT THE SALES AREA. NEW COVE BASE 15 TO BE IN5TALLED THROUGHOUT. INTERIOR PARTITIONS HAVE BEEN FRAMED, SHEATHED, FINISHED AND PAINTED AT THE P05T OFFICE AREA, P05T OFFICE CASEWORK HAS BEEN INSTALLED. INTERIOR WALL5 HAVE BEEN PATCHED AND PAINTED, AND WALL TILE WORK 15 IN PROGRESS. ADDITIONAL WALL TILE WORK WA5 REQUE5TED BY THE STORE MANAGER AND APPROVED BY THE ARCHITECT. NEW SUSPENDED CEILING PANEL5 AND LIGHTING FIXTURES, INCLUDING EMERGENCY LIGHTING AND EXIT SIGNS AND LIGHTING HAVE BEEN INSTALLED, CONNECTED, AND ARE FUNCTIONING IN THE SALES AREA. SOFFIT AND MENU FASCIA FRAMING AND SHEATHING AT THE DUNKIN DONUTS LEA5E AREA 15 COMPLETE, AND CERAMIC WALL TILE IN5TALLATION 15 COMPLETE. NEW SERVICE CA5ES AND EQUIPMENT AT THE DUNKIN' DONUTS SERVICE AREA HAS BEEN INSTALLED AND CONNECTED. EQUIPMENT ID BEING CLEANED AND TESTED. ALL PLUMBING AND ELECTRICAL WORK AT THE DUNKIN' DONUTS LEA5E AREA 15 SUBSTANTIALLY COMPLETE. P.O. Box 3 ' Topsfield, Ma. 0 1983 ' Tel (978)887-8486 ' Fax (978)887-3077 J. TAYLOR MOYNIHAN Architecture & Planning ITEMS TO VERIFY: SCHEDULED FINAL INSPECTIONS AND SHOP OPENING DATE. INFORMATION / ACTION REQUIRED CONSTRUCTION SITE VISIT REPORTS. SCHEDULE FOR FINAL INSPECTIONS AND CONSTRUCTION CONTROL AFFIDAVIT. gip_. I 495 of �� REPORT: TAYLOR MOYNIHAN ARCHITECT P.O. Box 3 Topsfield, Ma. 0 1983 ` Tel (978)887-8486 Fax(978)887-3077 r J. TAYLOR, MOY,.NIHAN Are ' & Planning QUIC-PIC C NVENIENCE STORE 535 C KERING ROAD AN DOVER, MA55. FEBRUARY 4. 2009 51TE V151T - CON5TRUCTION. WEDNE50AY 12:45 - 1 ,30 FM ON 51TE: ARCHITECT GENERAL CONTRACTOR STORE MANAGER FLOORING CONTRACTOR WORK IN FROGRE55: IN5TALLATION OF PL.YW00D 5UBFLOORING. FRAMING OF NrW INTERIOR PARTITION5. 5U5PEN5E0 CEILING WORK, INSTALLATION OF LIGHTING FIXTURE5 AND HVAC DIFFUSERS. 0135ERVATION5: ALL INTERIOR DEMOLITION WORK INCLUDING REMOVAL Of EX15TING CA5EWORK AND 5ERVICE EQUIPMENT, OEMOLITIOM OF CERAMIC TILE FLOORING AND BASE, 50PENDED CEIUNG5 AND FIXTURES, MA5 BEEN 5UB8TANTIALLY COMPUTED. EXISTING TILE FLOORING HAD BEEN REMOVED. NEW PLYWOOD 5UBFLOORING 15 IN PROGRE55 AND 15 NEAR COMPLETE AT THE SALES AREA AND TOILET ROOMS. EQUIPMENT AT THE DUNKIN' DONUT5 STOCK AND PREP AREA 15 TO BE REMOVED FOR NEW FLOORING WORK NEW SUSPENDED CEILING PANELS AND LIGHTING FIXTURE5 HAVE BEEN IN5TALLED AND HVAC WORK 15 IN PROGRE95. METAL STUD FRAMING AT NEW PARTITIONS FOR P05T OFFICE AREA 15 IN PROGRE55. POST OFFICE SERVICE CASES AND MILLWORK HAVE BEEN DEUVERED AND ARE ON 51TE, 50FFIT AND MENU FASCIA FRAMING AND 5HEATHING AT THE OUNKIN DONUT5 LEA5E AREA 15 IN PROGRE55 AND NEAR COMPLETE,AND CERAMIC WALL TILE INSTALLATION 15 IN PROGRPS5. ROUGH PLUMBING AND ROUGH ELECTRICAL WORK AT THE DUNKIN' DONUT5 LEA5E AREA 15 SUB5TANTIALLY COMPLETE. • P.O. Box 3 - Toj4heli. Ma. 01963 - Tel(976)887-8486 • Pax(978)887.3077 ' S0 •d 1402 188 8L6 i Qio839Z1Id f t Wd 0ZsT0 60-£1-93d e 4 J. TAYLOR MOYNIHAN Architecture & Planning ITEMS TO VERWY.- 5CHEDUIED FINAL IN51PECTION5 AND 5HOP OPENING HATE. INFORMATION / ACTION REQUIRED CONSTRUCTION 51TE V151T REPORTS. 5CHEDULE FOR FINAL IN5PECTION5 AND CON5TRUCTION CONTROL AFFIDAVIT. �tABO ABry�. 4865 W41 REPORT; TAYLOR MOYNIHAN ARCHITECT • P.O. Box 3 Topefield, Ms. 01983 ' Tel(978)887-8486 ' Fax(978)887-3077 ' b0 'd 1102 488 846 T a1VN30Z1Id t f Wd 61 : T0 60-£T-83d i r I J. TAYLOR MOYNIHAN Architecture & Planning QUIC-PIC CONVENIENCE 5TORE 535 CHICKERING ROAD NORTH ANDOVER, MA55. FE13RUARY 10, 2009 BITE V151T- CONSTRUCTION. TUESDAY 1 ; 15 - 2:30 PM ON 51TE: ARCHITECT GENERAL CONTRACTOR ELECTRICAL CONTRATOR PAINTING CONTRACTOR FLOORJNG CONTRACTOR WORK IN MOGRE55: INSTALLATION OF CASEWORK AND EQUIPMENT, PIN15H PAINTING AND WALL TILE WORK FINISH 5U5PENSED CEILING PANEL WORK, LIGHTING FIXTURES AND HVAC DIFFU5ER5. 0135ERVATION5: ALL INTERIOR DEMOLITION WORK HA5 BEEN COMPLETED. NEW PLYWOOD 5UBFL.00RING HAS BEEN COMPLETED.AND NEW FLOORING HA5 BEEN INSTALLED AND 15 NEAR COMPLETE AT THE SAIES AREA. NEW COVE BA5E 15 TO BE IN5TALLED THROUGHOUT. INTERIOR PAKTITION5 HAVE BEEN FRAMED, SHEATHED, FIN15HED AND PAINTI=D AT THE POST OFFICE AREA, POST OFFICE CASEWORK HAS BEEN INSTALLED, INTERIOR WALL5 HAVE BEEN PATCHED AND PAINTED,AND WALL TILE WORK 15 IN PROGRESS. ADDITIONAL WALL TILE WORK WAS KEQUE5TED DY THE STORE MANAGER AND APPROVED BY THE ARCHITE=CT. NEW 5U5PENDED CEIEJNG PANELS AND LIGHTING FIXTURE5, INCLUDING EMERGENCY LIGHTING AND EXIT SIGNS AND LIGHTING HAVE BEEN INSTALLED, CONNECTED, AND ARE FUNCTIONING IN THE 5ALE5 AREA. 5OFFIT AND MENU FASCIA FRAMING AND SHEATHING AT THE DUNKIN DONUTS LEASE AREA 15 COMPLETE. AND CERAMIC WALL TILT:INSTALLATION 15 COMPLETE. NEW 5ERVICE CASES AND EQUIPMENT AT THE:DUNKIN' DONUT5 5ERVICE AREA HA5 BEEN INSTALLED AND CONNECTED_ EQUIPMENT ID BEING CLEANED AND TE5TED, ALL PLUMBING AND ELECTRICAL WORK AT THE OUNKIN' DONUTS LEA5E AREA 15 5UB57ANTIALLY COMPLETE:. • P,0. Boos 3 • Topsfie►d, Ma. 01983 ' Tel(978)887-6486 • Fax(978)887-3077 ' £0 'd LLS£ L88 8L6 i Q'ioman21Id f f Wd 61 : 10 60-£1-93d . u TAYLOR MOYNIHAN Architecture & Planning DATE: FEBRUARY 1 1 , 2009 TO: BUILDING DEPARTMENT BUILDING INSPECTOR TOWN Of NORTH ANDOVER MA55ACHU5E775 I HEREBY CERTIFY THAT I HAVE 5UPERV15ED THE CONSTRUCTION OF.' THE INTERIOR REMODEL AND ALTERATION5 OF THE EXISTING QUIC-PIC CONVENIENCE STORE AT 535 CHICKERING ROAD, UNDER BUILDING PERMIT NUMBER: AND THAT THIS STRUCTURE CONFORMS TO THE SUBMITTED PLANS AND TO THE CODES OF THE CITY/TOWN AND THE COMMONWEALTH OF MA55ACHU5ETT5. FU01ER THAT ALL REQUIRED APPROVAL5 AND MATERIAL AFFIDAVIT5 HAVE BEEN 5U13MITTED, AND THAT THERE ARE NO VIOLATION5 OF LAW OR ORDERS OF THE DEPARTMENT OF PUBLIC 5AFETY PENDING. 1 HER) BY CERTIFY THAT I HAVE ON THIS DATE: FEBRUARY 10, 2009 IN5PECTED THE PROPERTY LOCATED AT: 535 CHICKERNG ROAD. NORTH ANDOVER, MA55. AND FIND THAT THE LOCUS AND IT5 STRUCTURES COMPLY WITH MY PLANS AND SPECIFICATIONS AND ALL THE RULE5 AND REGULATIONS OF THE CODES OF THE COMMONWEALTH, THERfFORE, I REOUE5T A CEKTIFIGATE OF OCCUPANCY FOR THE ABOVE ADDRESS. o No. 460"5 ,�� �• QRIGI AL [GNAT URE A b CAL CATE • P.O. box 3 Tppsheld, MA. 01983 Tel(979)667-WG ' fax(878)887-3077 Z0 'd 1102 L88 8L6 T al"30Z1Id f t Wd 61 : T0 60-£1-83A . w J. TAYLOR D40YNIHAN FAX ARCHITECTURE & PLANNING 461 BOSTON STREET, UNIT D-6 TEL: 978 887 8486 TOPSFIELD, MASS. 01983 FAX: 978 887 3077 TO: DATE loos.074" ATTN:� � ►� ZRE-. Qj'AX4 � o e. PLEASE FIND ATTACHED: LETTER REPORT PRINTS PLANS f O M, --DESCRiPTION. - - REMARKS: � � pr t � COPY TO: SIGNED: �.. T0 'd 4102 L88 8L6 T QlVN39Z1Id r r Wd 81 : TO 60-£T-93A A � 1 J. TAYLOR M. OYNIHAN Architecture & Planning ITEM5 TO VERIFY: 5CHEDULE0 INSTALLATION AND FINAL CONNECTION OF 5EKVICE EQUIPMENT. FINAL INSPECTIONS AND 5HOF OPENING DATE. INFORMATION 1 ACTION REQUIRED CONSTRUCTION 5ITE V151T REPORT, 5CHfzDULE FOR FINAL IN5PECTION5 AND CON5TRUCTION CONTROL AFFIDAVIT. M0. {65S Of REPORT: TAYLOR MOYNIHAN ARCHITECT P.0, Box 3 Topeheld, Mo. O 1983 Tel(978)887-848G Fsx(978)887.3077 90 'd 1402 Lee 8L6 I aivN39Z1Id r r Wd 0Z: 10 60-£1-93d