Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miscellaneous - 54 COMPASS POINT ROAD 4/30/2018
54 I BUILDING2 nm i I 4 t h I J �i 1 i i i i 1 I f�ygRYy� gb°D lbs frO eNORTH ANDOVER.BUR-MING DEPARTMENT y`°RATED- 1600 Osgood Street �SSACfiU North.Andover Tel: 97.8-688-9545 - Fax: 978-688.9542 BUSMSS FORMFOR TOWN CLERK DATP–: NAVE: i ADDRESS; SY 6?Y,, T ONINGDIBTRIEC i r �7-6'� } 3USII�TGZ�C BUILDIL G LAYOUT PROVIDED: YES NO A7 A_LABC-H PAR MG SPACtS: ZONA G BY LAW USAGE: CIES NO ff D G kNSP CTOR.SIGN•ATUPIE BUSINESS FORM FORMWN CLERK 2.40 Rome Occupation(1939132) An accessory use conducted witbia a dwelling by a resident who resides in the dwelling as his principal address, which is clearly secondary to the use-of the buildin . for iiiag piuposes. Home occupations shall 'iiicIiide,'bu't not'limited to the following uses; personal services such as furnished by an artist or instructor, but not occupation involved with motor vehicle repairs, beauty parlors, animal Fennels, or the conduct of retail business,or the*ma„ufacturing agoods,which impacts the residential nature of the neighborhood', 4. For use of a dwelling in any residential district or multi-family district for a home occupation,the following conditions shall apply: a. Not more than a total of three (3) people may be employed in the.dome occupation, one of whom shall be fhe-omier of the hbme occupation anal residing in said divelling; b. The use is carried on strictly within the principal building; c. There shall be no extexior alterations, accessory buildings, or display which are not customary with residential buildings; - d. Not more than,twentS five(25)percent of the existing gross floor area of fhe dwelling unit. so used, not to exceed one thousand (1000) square feet, is devoted to'such use. fn connecdon.with such use,there is to be kept no stock in trade, commodities or products which occupy space beyond these limits; e. There will be no display of goods or wares visible from the street; f The building or premises occupied shall not lie rendered objectionable or detrimental to the residential character of the neighborhood due to the exterior appearance, emission of odor, gas, smoke, dust, noise, disturbance, or in any other way become objectionable or detrimental to any residential use,witbhithe.neighborhood;- g. Avy such building shall include no features of desip-not cust6mary in buildings for residential Use. D o- Date....!... .` ........... N�pTM TOWN OF NORTH ANDOVER 9 » PERMIT FOR WIRING SS�CHUS� This certifies that ......�� � 2( d"( .................................................... has permission to perform ....... tiC>....ca)4'z!.............................................. ey S iS wiringin the building of.............. .......................................................... ....................... ' at ...... T....L. - ....r �tt/7`/........................... North Andover,Mass. Fee.... .....1 ..... Lic.No. ! l C��rT ............. ......................................................................... ..... 1 EL CTRICALINSPECTOR Check# !3 . . . offioial use only Commonwealth of Massachusetts � Permit No. a Department of Fire Services Occupancy and Fee Checked BOARD OF FIRE PREVENTION REGULATIONS [Rev.1/07] (leaveblank APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK .All work to be performed in accordance with the Massachusetts Electrical Code(MBC),527 CMR 12.00 (PLEASE PRE TWINK-ORTYPEALLVVFORMA77OA9 Date: CW or Town of: NORTH ANDOVER To the Inspector of Wires: By this application the undersigned M--W tice of his or her intention to perform the electrical work described below. Location(Street&Number) Com(&55 PO j 11 T Owner or Tenant Corp Telephone No. 979 8,51 jgo�; Owner's Address 51 i Is this permit in conj unction with a building permit? Yes No E] (Check Appropriate Boz) Purpose of Building_ _ Ne.S C'M aT�tta.•C�'C'(tm Utility Authorization No. 1 ;F t 2 .V 3 Existing Service © Amps / Volts Overhead❑ Undgrd❑ No.of Meters New Service --Amps 44 kftolts Overhead❑ Undgrd'bEr— No.of Meters_ Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work: U jZg-.e., I4 C.4,j C_0-I(:b 2,3 0c, 2�q P-, Completion o the ollowin table maybe waived by the I ector of Wires. No.of Recessed LuminairesNo.of Ceil.-Susp.(Paddle)Fans No.of Tota Transformers KVA No.of Luminaire Outlets 12, No.of Hot Tubs Generators KVA No.of Luminaires Swimming Pool Above El ❑ o.o mergency ig mg grad. rnd. BLftea Units No.of Receptacle Outlets GlC) No.of Oil Burners FIRE ALARMS No.of Zones No.of Switches No.of Gas Burners o.of Detection andInitiating Devices No.of Ranges No.of Air Cond. Total y� No.of Alerting Devices Tons No.of Waste DisposersHeat Pump Number Tons KW_ No.of Self-Contained �O I Totals: -- Detection/Alerting Devices No.of Dishwashers Space/Area Heating KW Local❑ un tips ❑ Other Connection No.of Dryers Heating Appliances KW Security Systems: No.of Devices or Equivalent Heaters No.of Water KW � No.of No.of Data Wiring: Si s Ballasts No.of Devices or Equivalent ' No.Hydromassage Bathtubs No.of Motors Total HP Telecommunications Wiring: 2 No.of Devices or Equivalent,, OTHER: ��y Attach additional detail{f desired,or as required by the Inspector of fres. Estimated Value of Ble ca Work: 2 (When required by municipal policy.) Work to Start: 10 2 Inspections to be requested in accordance with NEC Rule 10,and upon completion. INSURANCE CO : Unless waived by the owner,no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including"completed operation"coverage or its substantial equivalent. The undersigned certifies that such cove a is in force,and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE V BOND ❑ OTHER ❑ (Specify:) I certb,under the pains and penalties of perjury,that the information on this application is true and completes FIRM NAME: , -z-) UI i C P LIC.NO.: fl O q 4t 11 Licensee: W d 2&w— Signature LIC.NO.: 7 73t, (If applicable,a ter" em t"in the licens b r line. Bus.Tel.No.• 3 Address: 3 l37 Alt.Tel.No.: *Per M.G.L c. 147,s.57-61,security work requires DepartWent of Public Safety"S"License: Lic.No. OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally required by law. By my signature below,I hereby waive this requirement. I am the(check one)❑owner ❑owner's agent. Owner/Agent ,PERMIT FEE:$ 3 Signature Telephone No. +/' `.� 1� 5 rt .. � � /a-�-�y� �. p. P s i The Commonwealth ofMassachusetts ,~ - Department of bdush*1 Accidents Office ofrnvestigations 600 Washington Street Boston,MA 02111 www.mass gov1d1a Workers' Compensation Insurance Affidavit:Builders/Contractors/Electrichm Pinmbers Applicant Information ly ` �� Please Print Legib Name(Business/organizzationffadividual)• � U-1 ��0� �(�C�-i��l(. ��� Address: d IMAYIT'M5 25-17, City/State/Zip: tL%M' oibS7 Phone#: Q 72� *57 ?535 Are yyu an employer?Check the appropriate box: Typo of project(required): 1.VI am a employer with $ 4. ❑ I am a general contractor and I 6. ❑New construction employees(full and/or part-time).` have hired the sub-contractors 2.0 I am a sole proprietor or partner- listed on the attached sheet t 7• ❑Remodeling ship and'have no employees These sub-contractors have 8. ❑Demolition working for me in any capacity. workers'gyp•hismance• 9. ❑Building addition [No workers'comp.insurance 5. ❑ We are a corporation and its required.] officers have exercised their 10 Blectrical repairs or additions 3.❑ 1 am a homeowner,doing all work right of exemption per MGL I L[I Plumbing repairs or additions myself.[No workers'comp. c.152,§1(4),andwehaveno 12.Q Roofrepairs insurance required.]t employees.[No workers' 13.0 Other comp.insurance required.] *Any applicant that checks box#I mustalso fill outthe section below showingtheirworkers'compensationpolicyinfo=adoa f Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. #Contractors that checkthis boar must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. X am an employer that is providing workers'compensation insurance for my employees Below is the policy and job site information. Insurance Company Name:. r'rt �� ��c Policy#or Self-ins.Lia M A tU G-y6a-70A2"i f 201V 1 Expiration:Date:,_� Z,S Job Site Address: '� GCity/State/Zip: AiV3lli Pyr' h'I/ Attach a copy of the wor ers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as requiredunder Section 25A of MGL o.152 can lead to iho imposition of criminal penalties of a fine up to$1,500.00 and/or one=year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement maybe forwarded to the Office of Investigations of the DTA for insurance coverage verification. X do hereby cern ulde y flee p_4 Owqnd penalties ofperjury that the information provided above is true and correct - i ature• Date: d~ #: Official a Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector S.PIumbing Inspector 6.Other - - - Contact Person: Phone M ^ _ i J Date.''V"V/.......... a J � 40 Th TOWN OF NORTH ANDOVER ° 9 PERMIT FOR PLUMBING I,� This certifies '.U1.l.!. 7e.. I has permission to perform...sR 1. .ri�,a....( ,r! -�- ................... plumbing in the buildings of... .... .s "........:....Vyc°�v ...... at.... 1.... ..h- .` ............' :...........(.�............. North Andover, Mass. Fee .''...Lic. No. ' ..4-'. ............................................................. \A PLUMBING INSPECTOR Check 4 Y , t ` MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM PLUMBING WORK CITY I NORTH ANDOVER MA. DATE 9-3-14 PERMIT# JOBSITE ADDRESS 154 COMPASS POINT OWNER'S NAME TRUST CONSTRUCTOIN POWNER ADDRESS:I 51 MT JOY DRIVE TEWKSBURY MA 01876 TELj 9788513456 FAX: TYPE OR OCCUPANCY TYPE: COMMERCIAL❑ EDUCATIONAL ❑ RESIDENTIAL❑■ PRINT CLEARLY NEW:❑N RENOVATION:❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES❑ NO❑ FIXUTRES-1 FLOORS- Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BATHTUB 2 CROSS CONN DEVICE DEDICATED SPECIAL WASTE SYS DEDICATED GAS/OIUSAND SYS DEDICATED GREASE SYSTEM DEDICATED GRAY WATER SYS DEDICATED WATER REUSE SYS DISHWASHER DRINKING FOUNTAIN FOOD WASTE GRINDER UNIT FLOOR/AREA DRAIN INTERCEPTOR INTERIOR KITCHEN SINK LAVATORY 1 3 ROOF DRAIN SHOWER STALL 1 SERVICE/MOP SINK TOILET 1 2 URINAL WASHING MACHINE CONNECTION 1 WATER HEATER ALL TYPES 1 WATER PIPING 1 SPIGOTS 2 7 INSURANCE COVERAGE I have a current liabilityinsurance policy or its substantial equivalent which meets the requirements of MGL.Ch.142 YES ❑■ NO ❑ If you have checked YES,please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY ❑■ OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER:I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws,and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER ❑ AGENT ❑ SIGNATURE OF OWNER OR AGENT 14 A I hereby certify that all of the details and information I have submitted(or entered)regarding this ap"reue�ana to the best of my Knowledge andthat all plumbing work and installations performed under the permit issued for this ae with all Pertinent / provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. f PLUMBER NAME: MIKE BURKE LICENSE#113127 /ZGNATURE COMPANY NAME: POWERHOUSE PLUMBING AND HEATING CORP ADDRESS: PO B 896 CITY: PLAISTOW __ _ STATE: NH ZIP: 03865 ___ FAX: 6033780040 _ TEL: 16033780020 _ CELL:119784909385 EMAIL: J.LAURENCIO@POWERHOUSEPLUMBING.COM MASTER❑■ JOURNEYMAN❑ CORPORATION❑■ # 2482*_�PARTNERSHIP❑# LLC❑# ROUGH PLUMBINGJNSWCTION NOTES BELOW FOR OFFICE USE ONLY FINAL INSPECTIO T NOTES w Yes No 16 THIS APPLICATION SERVES AS THE PERMIT ❑ ❑ FEE: $ PERMIT# PLAN REVIEW NOTES Date............. ..... .................. TOWN OF NORTH ANDOVER F � 9 PERMIT FOR GAS INSTALLATION 8s,�c►ae� This certifies that .0!. Lt......&!2.)u........t.......... ►'1�!hS .:..Q ! has permission for gas installation .. .. . ............................! ... in the buildings of..........`r ....C.:.. s............... ....^..--................ at................................... .!�.,`f�.M±..................... North Andover, Mass. Fee...�....... Lic. NocA`7. zr..... H. ................................................ ( t GAS INSPECTOR Check# (V^/ 1 MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK CITY NOR TH ANDOVER MA. DATE9-3-14 _ PERMIT# JOBSITE ADDRESS 154 COMPASS POINT j OWNER'S NAME TRUST CONSTRUCTION OWNER ADDRESS: 51 MT JOY DRIVE TEWKSBURY MA 01876 TEL: 9788513456 FAX: TPYPP�ErOTR OCCUPANCY TYPE: COMMERCIAL ElEDUCATIONAL ❑ RESIDENTIAL CLEARLY NEVA:0 RENOVATION: ❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES❑ NO❑ FIXUTRES Z FLOOR- Bsmt 1 2 3 4 5 6 7 1 8 9 10 11 12 13 14 BOILER BOOSTER CONVERSION BURNER COOK STOVE DIRECT VENT HEATER DRYER FIREPLACE FRYOLATOR FURNACE GENERATOR GRILLE LABORATORY COCKS MAKEUP AIR UNIT OVEN POOL HEATER ROOM/SPACE HEATER ROOF TOP UNIT TEST UNIT HEATER UNVENTED ROOM HEATER WATER HEATER INSURANCE COVERAGE I have a current liabili insurance policy or its substantial equivalent which meets the requirements of MGL.Ch.142 YES Q NO ❑ If you have checked YES,please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY ❑■ OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER:I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws,and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWN El AGENT F]SIGNATURE OF OWNER OR AGENT hereby certify that all of the details and information I have submitted(or entered)regarding this applicatio/onillbein e and rate to the best of my Knowledge and that all plumbing work and installations performed under the permit issued for this applic o pliance with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER/GASFITTER NAME: MIKEBURKE LICENSE# 13127 SIG A COMPANY NAME: POWERHOUSE PLUMBING AND HEATING CORP ADDR POB 6 i CITY: I PLAISTOW STATE: NH ZIP: 0386 FAX: 6033 040 TEL: 16033780020 CELL: 9784909385 EMAIL: J.LAURENCIO _E OWERHOUSEPLUMBINGAND HEATI M MASTER❑■ JOURNEYMAN❑ LP INSTALLER❑ CORPORATION❑■ # 2482_ PARTNERSHIP❑#=LLC❑#I-_ffinr ROUGH GAS I SPECT O , OTES BELOW FOR OFFICE USE ONLY FINAL INSPECTI N NOTES Yes No 1' / THIS APPLICATION SERVES AS THE PERMIT ❑ ❑ FEE: $ PERMIT# PLAN REVIEW NOTES i The Commonwealth of Massachusetts Department of IndustrialAccidents Office of Investigations x d I Congress Street, Suite 100 Boston,MA 02114-2017 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): POWERHOUSE PLUMBING CORP Address:PO BOX 896 City/State/Zip:PLAISTOW, NH 03865 Phone #:6033780020 Are you an employer?Check the appropriate box: Type of project(required): 1.0 I am a employer with 6 4. ❑ I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. K New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑Remodeling ship and have no employees These sub-contractors have 8, ❑Demolition working for me in any capacity. employees and have workers' 9. ❑ Building addition [No workers' comp. insurance comp. insurance. required.] 5. ❑ We are a corporation and its 10.❑Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.0 Roof repairs insurance required.] t c. 152,§1(4),and we have no 13.❑ Other employees. [No workers' comp. insurance required.] "Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is lite policy and job site information. Insurance Company Name:HARTFORD UNDERWRITERS INSURANCE COMP Policy#or Self-ins. Lic.#:04WECIT2480 Expiration Date:7-28-15 Job Site Address: 54 compass point City/State/Zip:N andover Mass Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day nst the viol . Be advised that a copy of this statement may be forwarded to the Office of Investigations of th for insur a overage verification. I do hereby ce tfy der th ains nd p nalties ofperjury that the information provided above is true and correct. Si aturDate:9-3-14 Phone#: 60 780020 Official se only. D o rite in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: UCMW �° y CONSTRUCTION PLUMBING SAFETY S;ECTIpI,J wt «.. NAME MICHAE6M BUR F .:. 4 LIC 0 3801 M 1lo EXPIRES: 05/31/2015 Mate of New Hampshire Voluntary Heating Technician IMlil +r �r .3 _ # NAME MICHAEL BURKE � Ru D r ENDORSEMENTS Hlo/HSI s # g014s'TtAto IS DATE ISSUED 02M3/2014" t E ' DATE EXPIRES: 02129/2016 �€ � BU�K Co '�' J bt WMA'-IN LL LICENSE#: HT 1400207Y• gEtiMAo $� � ' w. 0-31 A Comm©nwcartn of Massachusetts Department of Public Safety Oil Hurrtrr rechnivian (er-tr(icait AAML4 > t_icenw BU459572 A M10ML W SURK! r 61 foRm H1 . Hsveddil MA 0830 - Conmrssrrxner Exprration 05128+12016 i ACORV CERTIFICATE OF LIABILITY INSURANCE OATE(MMroD/YYYY) 8/20/2014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AN THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the policy(lei)must be endorsed. If S BROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER NTACT liathleen Miller, CISR, CPIW Insurance Solutions Corporation PHONE- (603)382-4600 F (603)392-2034 60 Westville Rd -MI kmiller@isc-insurance.com INSURER(S) AFFORDING COVERAGE NAIC 0 Plaistow NH 03865 INSURER A Merchants 23329 INSURED INSURER B.Hartford Underwriters Ins. Co. POWERHOUSE PLUMBING & HEATING INSURERC: CORP INSURER 0: PO BOX 896 INSURER E: PLAISTOW NH 03865-0896 INSURER F: COVERAGES CERTIFICATE NUMBER-CL1472917730 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY'REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES,LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. NSR TYPEOFtNSURANCE UCY EFF POLIC EXP PO CY NUMBER LIMITS GENERAL LIABILITY EACH OCCURRENCE S 1,000,000 X COMMERCIAL GENERAL LIABILITY rPREMISES(Ee occurrence)CLAIMS-MADE $ 500,000 A OCCUR OP1065497 /1/2014 /1/2015 MED EXP(An one on $ 15,000 PERSONAL 3 ADV INJURY $ GENERAL AGGREGATE $ 2,000,000 GENL AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG S 2,000,000 X POLICY JFCT -1 PRO LOC S AUTOMOBILE LIABILITYa BINED IN ELMIT 1,000,000 A ANY X AUTOS AUTO AUTOS BODILY INJINJURY(Per person) S ALL OWNED SCHEDULED 1058154 /1/2014 /1/2015 BOO INJURY(Per accident) S u HIRED AUTOS NON-OWNED PROPERTY DAMA E $ AUTOS e Medical payments S $ 000 UMBRELLA UABOCCUR EACH OCCURRENCE S EXCESS UAB CLAIMS-MADE AGGREGATE $ DED I I RETE 1 $ B WORKERS COMPENSATION I WC STATU- OTH. AND EMPLOYERS'LIABILITY Y I N 'M TS ANY PROPRIETOR/PARTNER/EXECUTIVE E.L EACH ACCIDENT $__ _ 100,000 OFFICERIMEMBER EXCLUDED? N!A (Mandatary In NH) 4wECIT2480 /28/201d /28/2015 E.L.DISEASE-EA EMPLOYEE S - 100,000 Ifyyeess desafbeunder DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT I S 500,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(Attach ACORD 101,Additional Remarks Schedule,N more space is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. JTNORRED REPRESENTATIVE lith Maglia/tutrs 01988-2010 ACORD CORPORATION. All rights reserved. banicfararl marlec of ARnpn t' 285 Date. ,U Zi'? 4 ... . HORTM TOWN OF NORTH ANDOVER pf ,tea° ,e, 'O 3? •'tp` PERMIT FOR MECHANICAL INSTALLATION p F F 4 • 4 i, � • • a �,SSACHUSESS - This certifies that . . ... . . . . . . . . ,, .++ . . . . . . . . . . . . . . . . . has permission for mechanical installation . , . .0 . . . . . . . . . . in the buildings of ��.�s.T. . at . . . c-!-% f s. . . �.�. . ; North A dover, Mass. Fee-3k .'. Lic. No..� . . . . . . . . . . , _. . . . . . . . . . . . . GAS INSPECTOR WHITE:Applicant CANARY:Building Dept. PINK:Treasurer , Commonwealth of Massachusetts Sheet Metal Permit Date: 1 Permit# Estimated Job Cost: $ G 3� -V Permit Fee: Plans Submitted: YES NO Plans Reviewed: YES NO Business License# 196 Applicant License # ' Business Information: Property Owner/Job Location Information: Name: J&J Heating & Air Conditioning Name7R..t' J (°QST t__X — Street: 17 Arlington St. Street: S�q C4�T� City/Town: Dracut, YEA 01826 City/Town: N U'r*� 11' X oy--e-v Telephone: 978-454-8197 Telephone: 'I 7'O -(o 8"q - Z G 3 S Photo I.D. required/Copy of Photo I.D. attached: YES NO Staff Initial J-1 /M-1-unrestricted license J-2 /M-2-restricted to dwellings 3-stories or less and commercial up to 10,000 sq. ft. /2-stories or less Residential: 1-2 family x Multi-family Condo/Townhouses Other Commercial: Office Retail Industrial Educational Institutional Other Square Footage: under 10,000 sq. ft.x over 10,000 sq. ft. Number of Stories: Sheet metal work to be completed: New Work:-3r_ Renovation: HVAC x Metal Watershed Roofing Kitchen Exhaust System Metal Chimney/Vents Air Balancing Provide detailed description of work to be done: Supply & install metal duct work for HVAC system - new construction Residential 7INSURANCE COVERAGE: rrent liabili insurance policy or its equivalent which meets the requirements of M.G.L.Ch..112 Yes Er No❑checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy (l Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws,and that my gignature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this box(],I hereby certify that all of the details and Information I have submitted(or entered)regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and Installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO Progress Inspections Date Comments Final Inspection Date Comments I Type of License: By ❑ Master Title ❑ Master-Restricted City/Town ❑Journeyperson Signature of Licensee Permit# ❑Journeyperson-Restricted License Number: Fee$ ❑ Check at www.mass.govldpl Inspector Signature of Permit Approval The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations U1V 600 Washington Street Roston,MA 02111 wn,minass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name(Business/Organizatiott/lndividual): J&J Heating & Air Conditioning, INc. Address: 17 Arlington St. City/State/Tip: Dracut, MA 01826 Phone it: 978-454-8197 Are you an employer?Check the appropriate box: Type of project(required): 1.® I am a employer with 40 4. [j I am a general contractor and I employees(full and/or part-tune). have hired the sub-contractors G. E]Now construction 2.❑ 1 am a sole proprietor or partner- listed on the attached sheet. 7. (]Remodeling ship and have no employees These sub-contractors have g 1 ❑Demolition working for me in any capacity, employees and have workers' 9. ❑Building addition [No workers'comp.insurance comp.insurance. � required.] 5. 0 We are a corporation and its 10.[]Electrical repairs or additions 3.0 I am a homeowner doing all work officers have exercised their 11.❑Plumbing repairs or additions myself. [No workers'comp. right of exemption per MGL 12.❑Roof repairs . insurance required.]t c. 152,§1(4),and we have no employees. [No workers' 13.❑Other comp.insurance required.] 'Any applicant that checks box#1 must also fit!out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit anew affidavit indicating such. lContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'corp,policy number. I ant an employer that is providing workers'compensation insurance for my employees. Below is the policy andjob site information. Insurance Company Name: A.I.M. Mutual Insurance Policy#or Self-ins.Lie.#: WMZ-800-8006553-2013A Expiration Date: 06/01/15 Job Site Address: k©rqtl A-�.wa e r City/State/Zip: Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$25 ay against the violator. a advised that a copy of this statement maybe forwarded to the Office of Investi Vtons of tit DIA for 'ns ane ove gc verification. I do here erd alder tl ai and erjury that the information provided above is true and correct. , l Si nalur . Date: / J L/ Phone 54-8197 Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Ifealth 2.Building Department 3.City/Town Clerk 4.Electrical Inspector S.Plumbing Inspector 6.Other Contact Pei-soil: Phone#: _ ACORD. CERTIFICATE OF LIABILITY INSURANCE F DATE(MM/DD/YYYY) PRODUCER 06/10/2014 78.887.4900 FAX 97$,$$7,2404 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Eoward F. Sennott Insurance Agency, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 16 South Main Street HOLDER.THIS CERTIFICATE DOES NOT AMEND, EXTEND OR P. 0. Box 457 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Topsfiel d, MA 019$3 INSURERS AFFORDING COVERAGE NAIC J! INSURED )g,j Beating & Air Conditioning, Inc. INSURERA: Great American Alliance Ins Co 17 Arlington Street INSURER B: Safety Insurance Company 39454 Dracut, MA 01826 INSURERc: A.I.M. Mutual Insurance Co. _ INSURER D: NSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR DD' LTR NSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION ---' DATE MM OD/YYY DATE MM DD YYY LIMITS GENERAL LIABILITY PAC6418906-08 06/01/2014 06/01/2015 EACH OCCURRENCE- $ 1,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE-TOREN I ED PREMISES Ea occurrence_ �� 300,000 CLAIMS MADE OCCUR A MED EXP(Any one person) $ 10,000 -- PERSONAL&ADV INJURY $ I.,000,OO '---'----- GENERAL AGGREGATE $ 2,000,000 GEY'L AGGREGATE LIMIT APPLIES PER: "— ---------- POLICY JECPROT LOC PRODUCTS-COMP/OP AGG $ 2,000,000 — AUTOMOBILE LIABILITY AUTO ANY AUTO 2434550 06/01/2014 06/01/2015 COMBINED SINGLE LIMIT ALL OWNED AUTOS ,� --- 1,000,000 (Ea accident) ' — .-- X SCHEDULED AUTOS BODILY INJURY $ B — (Per person) X HIRED AUTOS — X NON-OWNED AUTOS BODILY INJURY $ (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY ANY AUTO AUTO ONLY-EA ACCIDENT $ OTHER THAN EA ACC $ AUTO ONLY: AGG $ AlEXCESS/UMBRELLA LIABILITY UMB6418958-06 06/01/2014 06/01/2015 EACH OCCURRENCE $ 2,000,00 OCCUR ❑CLAIMS MADE -- — — A AGGREGATE $ 2r 00Oe OO -- - DEDUCTIBLE RETENTION $ WORKERS COMPENSATION $ AND EMPLOYERS'LIABILITY WMZ-800-8006553-2014A 06/02/2014 06/02/2015 R/EXECUTIVES LIMITS TORY MITS C-R ANY PROPRIETOR/PARTNE -- ---- C OFFICER/MEMBER EXCL (Mandatory in NH) UDED? I J E.L.EACH ACCIDENT 1S 1,000,00C —_— If yes,describe under E.L.DISEASE-EA EMPI-OYES $ 1,000,00C SPECIAL PROVISIONS below OTHER E.I_.DISEASE-POLICY LIMIT $ 1,OOO,OO DESCRIPTION OF OPr_RATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR REPRESENTATIVES. Evidence of Insurance AUTHORIZED REPRESENTATIVE Peter Sennott/LAR ��J`--- ACORD 25(2009/01) ©1988-2009, CORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD . �:.. � . r. . . «UOMMONW¢$L§ OR Mk§k C USETT ? . . SHE . ]tL WORKERS-, ISSUES. T E FOLLOW I G\I EiSE : . S A $USS}SS y y „ \ � ::EDWARD T TTE . . . , 7y. y � O � � ��� � \ � • \� \\��\ � - a HE T'FN G:".:,, IR CONDITI NTNG I 17ARL )( S REIT. ' 2 �«< (U .: <%% 07826 . «» , . . e <u — ; 1,96 /« of /.\'° . . � MY A`SSACX_1<!,Utik TTS DRIVER'S LICENSE as 4 ISS "' 9q END4,1 NUMBER (105-0372 NONE. S99.655$71 :. '4h.UP.. 'J 006 'SS0p',1�,2r2016 05 22-1 y$0 LASS...j2 REST 1 SE! DM NONE FF k �~ ,KUNE k 2 ERIC RJ 83 LONG DR DRACUT,MA 01826.2048 5 DD 05-O4.2011 R.W-112001 �1 :COMMONWEALTH OF MASSACHUSETTS ,,: BOARD CJ.E SHEET METAL `WORI<ER.S ISSUES THE FOLLOWING LICENSE ASA` MASTER UNRESTRI CTS J HEATING ERIC •R :KLINE; i;l, J & J H`EAT]fNG & AC 17 ARL:lNGTON ST IJ b`RACUT. MA 01826-39136 1568 05/28/16 2145 9 - 9 m Load Short Form Job: 54 Compass Point wri htsoft Date: June 8,2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:iiheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Des!6n information Htg Cig Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 63 8 Fireplaces 3 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 24 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref. n/a Coil n/a AHRI ref. n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Ht g load Cig load Htg AVF CIg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor system d 1414 35976 16059 927 927 1st floor system d 2964 49817 32943 1648 1648 Entire House d 4378 85793 49002 2575 2575 Other equip loads 0 0 Equip. @ 0.88 RSM 42975 Latent cooling 7574 TOTALS 1 4378 85793 50549 2575 2575 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft' 2014-Oct-08 06:52:25 ,�/�/�� 9 Right-Sutecn�Universal 2015 15.0.03 RSU05790 Page 1 PCCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Load Short Form Job: 54 Compass Point wrightsoft® Date: June S,2013 1st floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 D- gn information Htg Clg Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 63 8 Fireplaces 2 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 24 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1648 cfm Actual air flow 1648 cfm Air flow factor 0.033 cfm/Btuh Air flow factor 0.050 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Dining room 225 4392 1700 145 85 Kitchen 180 1823 3728 60 186 Laundry 45 605 1121 20 56 Living room 180 3560 2729 118 136 Master bedroom 273 7276 3435 241 172 Master bath 120 3168 2396 105 120 W.I.0 120 1477 476 49 24 Entry 68 1341 421 44 21 Powder Rm 48 95 514 3 26 Front entry 230 457 555 15 28 Recreation Room 270 4088 3729 135 186 Bar area 506 11658 7389 386 370 Bath room 90 538 651 18 33 spare room 216 3226 1519 107 76 Room5 393 6112 2580 202 129 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ti Wrl htSOft° 2014-Oct-08 06:52:25 r 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 2 iCl1 ...Desktop\wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N 1 st floor system d 2964 49817 32943 1648 1648 Other equip loads 5697 2389 Equip. @ 0.88 RSM 30987 Latent cooling 4619 TOTALS 2964 55513 35606 1648 1648 II Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Wrl htsoft" 2014-Oct-08 08:52:25 9 Right-Suite(g)Universal 2015 15.0.03 RSU05790 Page 3 fICCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Load Short Form Job: 54 Compass Point • wrightsoft. Date: June 8,2013 2nd floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Information Htg Clg Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 63 8 Fireplaces 2 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 24 HEATING EQUIPMENT COOLING EQUIPMENT Make Goodman Mfg. Make Goodman Mfg. Trade GOODMAN Trade GOODMAN, JANITROL,AMANA DISTI... Model GMVC950453BX* Cond SSX160301A* AHRI ref 2002234 Coil CHPF3642C6C* AHRI ref 5039169 Efficiency 95AFUE Efficiency 12.7 EER, 15.5 SEER Heating input 46000 Btuh Sensible cooling 22240 Btuh Heating output 45000 Btuh Latent cooling 5560 Btuh Temperature rise 46 OF Total cooling 27800 Btuh Actual air flow 927 cfm Actual air flow 927 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.058 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) bedroom 2\ 278 5208 2533 134 146 bath2 65 1652 544 43 31 2nd floor hall 176 8231 3864 212 223 Bathroom 3 187 1793 1333 46 77 Bedroom 3 225 6263 4494 161 259 storage 483 12828 3290 331 190 2nd floor system d 1414 35976 16059 927 927 Other equip loads 4345 2389 Equip. @ 0.88 RSM 16179 Latent cooling 2955 TOTALS 1414 40321 19134 927 927 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. .� Wrl htsOft° 2014-Oct-08 06:52:25 .� 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 4 / .C� ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N wri so htft Load Multizone Summary Report Job: 54 Compass Point 9 Date: June 8,2013 By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Infiltration Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM ft3 cfm Btuh/ft2 ft3 cfm Btuh/ft2 2nd floor system 13864 0 . 61 141 4 . 3 13864 0 . 57 132 0 . 5 1st floor system 31175 0 . 36 185 4 . 3 31175 0 . 33 173 0 . 5 Entire House 45039 0 . 17 326 1 . 7 45039 0 . 07 305 0 . 1 Load • AVF Summary ROOM NAME Area Htg load Clg load HtgAVF C1gAVF ft2 Btuh Btuh cfm cfm bedroom 2 \ 278 5208 2533 134 146 bath2 65 1652 544 43 31 2nd floor hall 176 8231 3864 212 223 Bathroom 3 187 1793 1333 46 77 Bedroom 3 225 6263 4494 161 259 storage 483 12828 3290 331 190 2nd floor system 1414 35976 16059 927 927 Dining room 225 4392 1700 145 85 Kitchen 180 1823 3728 60 186 Laundry 45 605 1121 20 56 Living room 180 3560 2729 118 136 Master bedroom 273 7276 3435 241 172 Master bath 120 3168 2396 105 120 W. I .0 120 1477 476 49 24 Entry 68 1341 421 44 21 Powder Rm 48 95 514 3 26 Front entry 230 457 555 15 28 Recreation Room 270 4088 3729 135 186 Bar area 506 11658 7389 386 370 Bath room 90 538 651 18 33 spare room 216 3226 1519 107 76 Room5 393 6112 2580 202 129 1st floor system 2964 49817 32943 1 1648 1648 Entire House 4378 85793 49002 2575 2575 _Atzp2014-Oct-O8 06:52:25 � wrightsoft" Right-Suite®Universal 2015 15.0.03 RSU05790 Page 1 ..Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N t - - wrightsoft Building Analysis Job: 54 Compass Point Date: June 8,2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@iiheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 016sign Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (° 63 8 Latitude: 420N Relative hums Ity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Dally range6°F) - 17 ( M ) Method Simplified Wet bulb (° - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 3 Average) • Component Btuh/ft2 Btuh % of load Walls 5.2 24380 28.4 Glazing 24.3 5799 6.8 Doors 24.6 4472 5.2 - Ceilings 8.7 18079 21.1 Floors 3.2 6264 7.3 Infiltration 4.3 21780 25.4 Ducts 5019 5.9 Piping 0 0 Humidification 0 0 Ventilation , 0 0 Adjustments 0 Total 1 857931 100.0 Coolin • Component Btuh/ft2 Btuh % of load Walls 1.3 5934 12.1 w. Glazing 26.4 6292 12.8 Doors 8.2 1483 3.0 Ceilings 5.8 12173 24.8 Floors 0.4 766 1.6 fix' Infiltration 0.5 2487 5.1 # Ducts 2837 5.8 Ventilation 0 0 Internal gains 17030 34.8 Blower 0 0 Adjustments 0 Total 49002 100.0 Latent Cooling Load = 7574 Btuh Overall U-value = 0.116 Btuh/ft2-°F Data entries checked. �� 2014-Oct-O8 06:52:25 wrightsoft' Right-SuiteO Universal 2015 15.0.03 RSU05790 Page 1 ..Desktop\wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Building Anal $I$ Job: 54 Compass Point wrightsoft. y Date: June 8,2013 1st floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:llheatac.com Prooect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 - • • • ons Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humldlty (%) Outdoor: Heating Cooling Moisture difference (gr/Ib) 47..0 23 6 Dry bulb (°F) 5 83 Infiltration: Dally range6°F) - 17 ( M ) Method Simplified Wet bulb (° - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) • Component Btuh/ft2 Btuh % of load Walls 6.1 15608 28.1 Glazing 20.9 3485 6.3 " Doors 24.6 4472 8.1 Ceilings 16.2 8900 16.0 Floors 1.8 2677 4.8 ��- Infiltration 4.3 12355 22.3 Ducts 2319 4.2 Piping 0 0 Humidification 5697 10.3 Ventilation 0 0 ° Adjustments 0 Total 1 1555131 100.0 Component Btuh/ft2 Btuh % of load Walls 1.8 4583 13.0 " Glazing 22.5 3744 10.6 Doors 8.2 1483 4.2 Ceilings 11.4 6272 17.8 Floors 0.2 327 0.9 ; Infiltration 0.5 1411 4.0 Ducts 483 1.4 Ventilation 0 0 Internal gains 14640 41.4 Blower 2389 6.8 Adjustments 0 Total 1 353321 100.0 Latent Cooling Load = 4619 Btuh Overall U-value = 0.115 Btuh/ft2-°F Data entries checked. wri htsoft- 2014-Oct-08 06:52:25 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 2 /� � ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N wri htsoft� Building Analysis Job:Building 54 uJu Compass Point 9 13 2nd floor system Date: S,20,3 J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Projed information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Dally range6°F) - 17 ( M ) Method Simplified Wet bulb (° - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) • Component Btuh/ft2 Btuh % of load Walls 4.1 8771 21.8 Glazing 32.1 2313 5.7 Doors 0 0 0 Ceilings 6.0 9180 22.8 Floors 7.5 3587 8.9 � Infiltration 4.3 9424 23.4 p Ducts 2700 6.7 ��� Piping 0 0 Humidification 4345 10.8 Ventilation 0 0 Adjustments 0 Total 1 40321 100.0 • sillily! Component Btuh/ft2 Btuh % of load Walls 0.6 1351 7.3 Glazing 35.4 2549 13.8 ©® Doors 0 0 0 Ceilings 3.9 5901 32.0 Floors 0.9 438 2.4 Infiltration 0.5 1076 5.8 Ducts 2354 12.8 Ventilation 0 0 Internal gains 2390 13.0 Blower 2389 13.0 Adjustments 0 Total 1184481 100.0 Latent Cooling Load = 2955 Btuh Overall U-value = 0.118 Btuh/ft2-°F Data entries checked. - - wrightsoft" 2014-Oct-O8 06:52:25 Right-Suite®Universal 2015 15.0.03 RSU05790 Page 3 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MA Front Door faces: N Component Constructions Job: 54 Compass Point • wrightsoft- Date: June 8,2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 3 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ft�-°F/Btuh Btu h/V Btu Btuh/ft2 Btu Walls 12B-Osw: Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 609 0.097 11.0 6.11 3719 1.79 1092 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud se 900 0.097 11.0 6.11 5497 1.79 1614 sw 410 0.097 11.0 6.11 2502 1.79 735 W 50 0.097 11.0 6.11 303 1.79 89 nw 587 0.097 11.0 6.11 3587 1.79 1053 all 2554 0.097 11.0 6.11 15608 1.79 4583 12F-Osw:Frm wall,stucco ext 1/2"wood shth r-21 cav ins 1/2"/2 ne 376 0.065 21.0 4.09 1540 0.63 237 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 675 0.065 21.0 4.09 2764 0.63 426 sw 416 0.065 21.0 4.09 1704 0.63 262 nw 675 0.065 21.0 4.09 2764 0.63 426 all 2142 0.065 21.0 4.09 8771 0.63 1351 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 ne 105 0.300 0 18.9 1992 18.8 1985 glazing,clr outr,air gas,wd frm mat,clr innr, 1/4"gap, 1/8"thk; ne 56 0.570 0 35.9 2011 38.7 2165 6.67 ft head ht sw 20 0.570 0 35.9 718 49.3 986 sw 16 0.300 0 18.9 302 24.0 384 nw 41 0.300 0 18.9 775 18.8 772 all 238 0.300 0 24.3 5799 26.4 6292 Doors 11 DO:Door,wd s type ne 161 0.390 0 24.6 3956 8.15 1312 sw 21 0.390 0 24.6 516 8.15 171 all 182 0.390 0 24.6 4472 8.15 1483 Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 755 0.026 38.0 1.64 1237 1.15 872 gypsum board int fnsh 17B-6al:Rf/clg ceiling,asphalt shingles roof mat,wd cons,r-6 602 0.105 6.0 6.61 3979 3.72 2236 deck ins,1"thkns 2014-Oct-08 06:52:26 wrightsoft' Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 1 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,6"thkns,1/2" 536 0.257 1.0 16.2 8663 11.4 6105 gypsum board int fnsh C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,8"thkns,1/2" 15 0.255 1.0 16.1 236 11.3 167 gypsum board int fnsh C part ceiling,:C part ceiling,frm fir,6"thkns 176 0.357 1.0 22.5 3964 15.9 2794 Floors 19A-Obstp:Part floor,frm flr,6"thkns 476 0.368 0 7.54 3587 0.92 438 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 1489 0.034 30.0 1.80 2677 0.22 327 c wri htsoft" 2014-Oct-08 06:52:26 �.. 9 Right-Suite®Universal 2015 15.0.03 RSU05790 Page 2 /CCK ...Desktop\wrightsoft HVAC\murteild building 8.rup Calc=MJ8 Front Door faces: N wri htsoft Component Constructions Job: 54 Compass Point g Date: June S,2013 2nd floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com • Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss CIg HTM Gain ft2 Btuh/ft�'F ftp-°F/Btuh Btuh/111 Btuh Btuh/ftz Btuh Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 376 0.065 21.0 4.09 1540 0.63 237 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 675 0.065 21.0 4.09 2764 0.63 426 sw 416 0.065 21.0 4.09 1704 0.63 262 nw 675 0.065 21.0 4.09 2764 0.63 426 all 2142 0.065 21.0 4.09 8771 0.63 1351 Partitions (none) Windows 1D-c2ow:2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap, ne 56 0.570 0 35.9 2011 38.7 2165 1/8"thk;6.67 ft head ht sw 16 0.300 0 18.9 302 24.0 384 all 72 0.300 0 32.1 2313 35.4 2549 Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 755 0.026 38.0 1.64 1237 1.15 872 gypsum board int fnsh 17B-6al:Rf/clg ceiling,asphalt shingles roof mat,wd cons,r-6 602 0.105 6.0 6.61 3979 3.72 2236 deck ins,1"thkns C part ceiling,:C part ceiling,frm fir,6"thkns 176 0.357 1.0 22.5 3964 15.9 2794 Floors 19A-Obstp:Part floor,frm fir,6"thkns 476 0.368 0 7.54 3587 0.92 438 2014-Oct-08 06:52:26 wrightsoft" Right-SuiteO Universal 2015 15.0.03 RSU05790 Page 3 rF RCCA ...Desktop\Wrightsoft HVAC\murteild building 8.rup Calc=MJ8 Front Door faces: N wri htsoft� Component Constructions Job: 54 Compass Point 9 Date: June 8,2013 1st floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Pr6je t information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 D - • n Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (OF) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12B-Osw: Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 609 0.097 11.0 6.11 3719 1.79 1092 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud se 900 0.097 11.0 6.11 5497 1.79 1614 sw 410 0.097 11.0 6.11 2502 1.79 735 W 50 0.097 11.0 6.11 303 1.79 89 nw 587 0.097 11.0 6.11 3587 1.79 1053 all 2554 0.097 11.0 6.11 15608 1.79 4583 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 ne 105 0.300 0 18.9 1992 18.8 1985 glazing,clr outr,air gas,wd frm mat,clr innr, 1/4"gap, 1/8"thk; sw 20 0.570 0 35.9 718 49.3 986 6.67 ft head ht nw 41 0.300 0 18.9 775 18.8 772 all 166 0.300 0 20.9 3485 22.5 3744 Doors 11 DO:Door,wd sc type ne 161 0.390 0 24.6 3956 8.15 1312 sw 21 0.390 0 24.6 516 8.15 171 all 182 0.390 0 24.6 4472 8.15 1483 Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm flr,6"thkns,1/2" 536 0.257 1.0 16.2 8663 11.4 6105 gypsum board int fnsh C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,8"thkns,1/2" 15 0.255 1.0 16.1 236 11.3 167 gypsum board int fnsh Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm flr,10"thkns 1489 0.034 30.0 1.80 2677 0.22 327 wrightsoft' Right-Suite®Universal 2015 15.0.03 RSU05790 2014-Oct-08 06:52:26Page 4 ACO, ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N • Job: 54 Compass Point wrightsoft- Component Constructions Date: June 8,2013 Recreation Room By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 D- • Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0' 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/P-°F ft2-°FBtuh Btuh/ft' Btu Btuh/it' Btuh Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 118 0.097 11.0 6.11 719 1.79 211 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud nw 128 0.097 11.0 6.11 779 1.79 229 all 245 0.097 11.0 6.11 1498 1.79 440 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 ne 35 0.300 0 18.9 669 18.8 667 glazing,clr outr,air gas,wd frm mat,clr innr, 1/4"gap, 1/8"thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,6"thkns,1/2" 45 0.257 1.0 16.2 727 11.4 513 gypsum board int fnsh Floors (none) c wri htsoft 2014-Oct-08 06:52:26 ,.� 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 5 ACCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJB Front Door faces: N Cornrtonent Constructions Job: 54 Compass Point • wrightsoft- P Date: June 8,2013 Bar area By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut,MA01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Ellbsign Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Bluh/ft2-°F ft2-°F/Btuh Btu h/ft2 Btu Btuh/ftz Btuh Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 75 0.097 11.0 6.11 458 1.79 135 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud se 196 0.097 11.0 6.11 1195 1.79 351 all 271 0.097 11.0 6.11 1653 1.79 485 Partitions (none) Windows (none) Doors 11 DO:Door,wd sc type ne 112 0.390 0 24.6 2752 8.15 913 Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,6"thkns,1/2" 348 0.257 1.0 16.2 5625 11.4 3964 gypsum board int fnsh Floors (none) 2014-Oct-08 06:52:26 wrightsoft" Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 6 ACCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Com onent Constructions Job: 54 Compass Point ' Wr19I'1tSOft- � Date: June 8,2013 Bath room By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Dally range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft`-°F ftz-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12B-Osw: Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" nw 43 0.097 11.0 6.11 260 1.79 76 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm flr,6"thkns,1/2" 6 0.257 1.0 16.2 97 11.4 68 gypsum board int fnsh Floors (none) 2014-Oct-0806:52:26 ,t, Wrl htSOfta Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 7 ACOA ...Desktop\wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 54 Compass Point • wrightsoft" Date: June 8,2013 spare room By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Cohditi6ns Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss CIg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btu h/ft2 Btuh Btu h/ft2 Btuh Walls 126-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" sw 153 0.097 11.0 6.11 935 1.79 275 gypsum board int fnsh,2"x4"wood firm,16"o.c.stud nw 102 0.097 11.0 6.11 623 1.79 183 all 255 0.097 11.0 6.11 1558 1.79 458 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,6"thkns,1/2" 36 0.257 1.0 16.2 582 11.4 410 gypsum board int fnsh Floors (none) 2014-Oct-08 06:52:26 wrightsoft• Right-SuiteO Universal 2015 15.0.03 RSU05790 Page 8 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Wrl htsoft- Component Constructions Job: 54 Compass Point 9 Rooms Date: June 8,2013 Y J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 DeignCo • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/Rz-°F ft2-°F/BWh BWh/ft2 Btu Btuh/ft2 Btu Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" se 170 0.097 11.0 6.11 1039 1.79 305 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud sw 145 0.097 11.0 6.11 883 1.79 259 w 50 0.097 11.0 6.11 303 1.79 89 nw 68 0.097 11.0 6.11 416 1.79 122 all 432 0.097 11.0 6.11 2640 1.79 775 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,6"thkns,1/2" 101 0.257 1.0 16.2 1632 11.4 1150 gypsum board int fnsh Floors (none) ,. wrightsoft°' Right-Suite®Universal 2015 15.0.03 RSU05790 2014-Oct-08 06:52:26Page 9 ACCK ...Desktop\W rights oft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N wri htsoft Component Constructions Job: 54 Compass Point ' 9 � Date: June 8,2013 Dining room By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 � - • Co • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ftz Btuh/ft2°F ft2-'F/Btuh BtuhM Btuh Btuh/ft2 Btuh Walls 1213-0sw: Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 100 0.097 11.0 6.11 611 1.79 179 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud nw 110 0.097 11.0 6.11 672 1.79 197 all 210 0.097 11.0 6.11 1283 1.79 377 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 ne 35 0.300 0 18.9 662 18.8 659 glazing,cir outr,air gas,wd frm mat,cir innr,1/4"gap,1/8"thk; nw 25 0.300 0 18.9 473 18.8 471 6.67 ft head ht all 60 0.300 0 18.9 1134 18.8 1130 Doors (none) Ceilings (none) Floors 19A-30bswp: Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 225 0.034 30.0 1.80 404 0.22 49 rF 2014-Oct-08 06:52:26 wrightsoft' Right-Suite@O Universal 2015 15.0.03 RSU05790 Page 10 /C�1 ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Wrl htsoft Component Constructions Job: 54 Compass Point 9 Kitchen Date: June 8,2013 Y: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/f2-°F ft2-°F/Btuh Btuh/ft2 Btuh Btu hN Btuh Walls 1213-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" nw 92 0.097 11.0 6.11 562 1.79 165 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows 2 glazing,cir outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 nw 16 0.300 0 18.9 302 18.8 301 glazing,clr outr,air gas,wd frm mat,clr innr, 1/4"gap, 1/8"thk; 6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-30bswp: Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 180 0.034 30.0 1.80 324 0.22 40 .` Wrl htsoft 2014-Oct-08 06:52:26 9 Right-Suite®Universal 2015 15.0.03 RSU05790 Page 11 ACCN ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 54 Compass Point wrightsoft Laund Byte: June 8,2013 ry J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:ijheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Desig: n Condltio; hs Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 B4uh/ft2-°F ft�-°F/Btuh Btuh/112 Btu BtuhM Bluh Walls 1213-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" nw 45 0.097 11.0 6.11 275 1.79 81 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm flr,10"thkns 45 0.034 30.0 1.80 81 0.22 10 wri htsoft° 2014-Oct-OB 06:52:26 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 12 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Wrl htsoft Component Constructions Job: 54 Compass Point 9 �a Date: June 8,2013 Living room By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 BtuhM-°F ft2-°F/BWh Btuh/ftz Btu Btuh/ft2 Btu Walls 12B-Osw: Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 143 0.097 11.0 6.11 874 1.79 257 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows none Doors 11 DO:Door,wd sc type ne 49 0.390 0 24.6 1204 8.15 399 Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm flr,10"thkns 180 0.034 30.0 1.80 324 0.22 40 L Wrl htSOft9 2014-Oct-08 06:52:26 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 13 ACCK ...Des ktop\W rights oft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N i Component Constructions Job: 54 Compass Point wrightsoft� Component Date: June 8,2013 Master bedroom By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Desi§n cohditi6ns Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Bluh/ft2-°F ft�-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 173 0.097 11.0 6.11 1057 1.79 310 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud se 336 0.097 11.0 6.11 2053 1.79 603 all 509 0.097 11.0 6.11 3110 1.79 913 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 ne 35 0.300 0 18.9 662 18.8 659 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk; 6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 273 0.034 30.0 1.80 491 0.22 60 2014-Oct-08 06:52:26 wrightsoft' Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 14 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N k wri htsoft Component Constructions Job: 54 Compass Point 9 Master Bate: June 8,2013 e bath y. J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Desi§n Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain fP Btuh/ft2-oF ft2-oF/Btuh Btuh/ftz Btu Btuh/ftz Btu Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" se 90 0.097 11.0 6.11 550 1.79 162 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud sw 88 0.097 11.0 6.11 538 1.79 158 all 178 0.097 11.0 6.11 1088 1.79 319 Partitions (none) Windows 1 D-clow:2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap, sw 20 0.570 0 35.9 718 49.3 986 1/8"thk;6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 120 0.034 30.0 1.80 216 0.22 26 2014-Oct-08 06:52:26 wrightsoft°' Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 15 ACCA ...Desktop\wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N ComConstructions Job: Compass Point Component Ju wrightsoftM P Date: June 8,2013 W.I.0 By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 �Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ft2-°F ft2-°F/Btuh Btuh/W Btu Btuh/ft2 Btu Walls 128-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" se 108 0.097 11.0 6.11 660 1.79 194 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 120 0.034 30.0 1.80 216 0.22 26 wri htsoft" 2014-opt-08 06:52:26 ,-:z Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 16 ACCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 54 Compass Point wrightsoft Date: June 8,2013 Entry By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ft2-°F ftz-°FBtuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" sw 24 0.097 11.0 6.11 147 1.79 43 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors 11 DO:Door,wd sc type sw 21 0.390 0 24.6 516 8.15 171 Ceilings C part ceiling,:C part ceiling,hrd wd flr fish,frm flr,8"thkns,1/2" 15 0.255 1.0 16.1 236 11.3 167 gypsum board int fnsh Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm flr,10"thkns 68 0.034 30.0 1.80 122 0.22 15 2014-Oct-08 06:52:26 wrightsoft" Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 17 ,4CCA ...Desktop\wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N wri htsoft- Component Constructions Job: Compass Point 9 Date: Juune 8,2013 Powder Rm By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Desicin Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/V-°F ftl-°FBtuh Btu h/ftz Btu Btuh/ftz Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fish,r-30 ins,frm fir,10"thkns 48 0.034 30.0 1.80 86 0.22 11 wri htsoft 2014-Oct-O8 06:52:26 9 Right-Suite(g)Universal 2015 15.0.03 RSU05790 Page 18 ACCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 54 Compass Point wrightsoft- Date: June 8,2013 Front entry By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Pr6ject Inf6rm'6tion For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-'F ft2-'F/&uh Stuh/ft2 Btu Btuh/ftz Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 230 0.034 30.0 1.80 413 0.22 51 2014-Oct-08 06:52:26 y wrightsoft° Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 19 ACCP. ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Com t Constructions Job: 54 Compass Point wrightsoft ponenDate: June 8,2013 Bedroom 3 By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com ProjectInformation For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Dally range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/112-01` ft2-°F/Btuh Btuh/V Btu Btuh/V Btu Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 79 0.065 21.0 4.09 324 0.63 50 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 135 0.065 21.0 4.09 553 0.63 85 nw 135 0.065 21.0 4.09 553 0.63 85 all 349 0.065 21.0 4.09 1429 0.63 220 Partitions (none) Windows 1 D-c2ow:2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap, ne 56 0.570 0 35.9 2011 38.7 2165 1/8"thk;6.67 ft head ht Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 225 0.026 38.0 1.64 369 1.15 260 gypsum board int fnsh Floors (none) 2014-Oct-08 06:52:26 ,,t- Wrl htSOft' Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 20 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N WPI htsoft`a Component Constructions Job: 54 Compass Point 9 Bathroom 3 Byte: June 8,2013 J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuhffl-T W-°FBtuh BtuhtV Bluh Btuh/ft2 Btu Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" nw 153 0.065 21.0 4.09 627 0.63 96 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings 166-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 187 0.026 38.0 1.64 306 1.15 216 gypsum board int fnsh Floors (none) 2014-Oct-08 06:52:26 i wrightsoft* Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 21 RCCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Wrl htsoft- Component Constructions Job: 54 Compass Point 9 Byte: June 8,2013 2nd floor hall By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Pt6j6dt Inforhiation For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh BtuhtV Btu Btuh/ftz Btu Wal I s 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 108 0.065 21.0 4.09 442 0.63 68 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 135 0.065 21.0 4.09 553 0.63 85 sw 72 0.065 21.0 4.09 295 0.63 45 nw 81 0.065 21.0 4.09 332 0.63 51 all 396 0.065 21.0 4.09 1622 0.63 250 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,frm fir,6"thkns 176 0.357 1.0 22.5 3964 15.9 2794 Floors (none) t Wrl htsoft° 2014-Oct-08 06:52:26 1 g Right-Suite®Universal 2015 15.0.03 RSU05790 Page 22 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 54 Compass Point wrightsoft� Date: June 8,2013 bath2 By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Pe6ject Informati6n For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ftl-°F ft2-°FBtuh BtuhtV Btu Btuh/ft2 Btuh Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 117 0.065 21.0 4.09 479 0.63 74 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 45 0.065 21.0 4.09 184 0.63 28 all 162 0.065 21.0 4.10 663 0.63 102 Partitions (none) Windows (none) Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 65 0.026 38.0 1.64 106 1.15 75 gypsum board int fnsh Floors (none) 2014-Oct-08 06:52:26 wrightsoft* Right-Suite®Universal 2015 15.0.03 RSU05790 Page 23 "-M ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N ' wri htsoft- Component Constructions Job: Compass Point 9 Date: Juune 8,2013 bedroom 2 \ By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 esilight6nditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" se 198 0.065 21.0 4.09 811 0.63 125 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud sw 137 0.065 21.0 4.09 561 0.63 86 nw 117 0.065 21.0 4.09 479 0.63 74 all 452 0.065 21.0 4.09 1851 0.63 285 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 sw 16 0.300 0 18.9 302 24.0 384 glazing,clr outr,air gas,wd frm mat,clr innr, 1/4"gap, 1/8"thk; 6.67 ft head ht Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceiI ins,1/2" 278 0.026 38.0 1.64 455 1.15 321 gypsum board int fnsh Floors (none) 2014-Oct-08 06:52:26 wrightsoft" Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 24 ACCP. ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 54 Compass Point • wrightsoft� Date: June 8,2013 storage By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 p - • • • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-°F ftp-°FBtuh Btuh/ftz Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 72 0.065 21.0 4.09 295 0.63 45 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 162 0.065 21.0 4.09 663 0.63 102 sw 207 0.065 21.0 4.09 848 0.63 131 nw 189 0.065 21.0 4.09 774 0.63 119 all 630 0.065 21.0 4.10 2580 0.63 397 Partitions (none) Windows (none) Doors (none) Ceilings 176-6al:Rf/clg ceiling,asphalt shingles roof mat,wd cons,r-6 602 0.105 6.0 6.61 3979 3.72 2236 deck ins,1"thkns Floors 19A-Obstp:Part floor,frm flr,6"thkns 476 0.368 0 7.54 3587 0.92 438 2014-Oct-08 06:52:26 ,, wrightSOW Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 25 ACOL ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Project Summar Job: 54 Compass Point - - wrightsoft' y Date: June 8,2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Pro*ec Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Notes: Diiii!On Information Weather: Worcester, MA, US Winter Design Conditions Summer Design Conditions Outside db 5 OF Outside db 83 OF Inside db 68 OF Inside db 75 OF Design TD 63 OF Design TD 8 OF Daily range M Relative humidity 50 % Moisture difference 24 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 80773 Btuh Structure 46165 Btuh Ducts 5019 Btuh Ducts 2837 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh piP in 0 Btuh Equipment load 85793 Btuh Use manufacturer's data n Rate/swing multiplier 0.88 Infiltration Equipment sensible load 42975 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 3 (Average) Structure 6522 Btuh Ducts 1053 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 4378 4378 Equipment latent load 7574 Btuh Volume (ft3) 45039 45039 Air changes/hour 0.17 0.07 Equipment total load 50549 Btuh Equiv.AVF (cfm) 326 305 Req. total capacity at 0.80 SHR 4.5 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2.0 Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoftm 2014-Oct-08 06:52:26 �� 9 Right-Suite®Universal 2015 15.0.03 RSU05790 Page 1 ..Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N - - 9 Project Summar Job: 54 Compass Point wri htsoft y Date: June 8,2013 1st floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Pi6ie6t Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Notes: DeSign Inforthation Weather: Worcester, MA, US Winter Design Conditions Summer Design Conditions Outside db 5 OF Outside db 83 OF Inside db 68 OF Inside db 75 OF Design TD 63 OF Design TD 8 OF Daily range M Relative humidity 50 % Moisture difference 24 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 47497 Btuh Structure 32461 Btuh Ducts 2319 Btuh Ducts 483 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 5697 Btuh Blower 2389 Btuh Piping 0 Btuh Equipment load 55513 Btuh Use manufacturer's data n Rate/swing multiplier 0.88 Infiltration Equipment sensible load 30987 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 2 (Average) Structure 3878 Btuh Ducts 741 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 2964 2964 Equipment latent load 4619 Btuh Volume (ft3) 31175 31175 Air changes/hour 0.36 0.33 Equipment total load 35606 Btuh Equiv.AVF (cfm) 185 173 Req. total capacity at 0.80 SHR 3.2 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1648 cfm Actual air flow 1648 cfm Air flow factor 0.033 cfm/Btuh Air flow factor 0.050 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Ril Wrhtsoft'° 9 2014-Oct-08 06:52:26 9 ht-SuiteO Universal 2015 15.0.03 RSU05790 Al. ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Page 2 y Project Summar Job: 54 Compass Point • wrightsoft y Date: June 8,2013 2nd floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com • e6t: Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Notes: Design InfdrMation Weather: Worcester, MA, US Winter Design Conditions Summer Design Conditions Outside db 5 OF Outside db 83 OF Inside db 68 OF Inside db 75 OF Design TD 63 OF Design TD 8 OF Daily range M Relative humidity 50 % Moisture difference 24 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 33276 Btuh Structure 13705 Btuh Ducts 2700 Btuh Ducts 2354 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 4345 Bti-1h Blower 2389 Btuh Piping 0 Btuh Equipment load 40321 Btuh Use manufacturer's data n Rate/swing multiplier 0.88 Infiltration Equipment sensible load 16179 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 2 (Average) Structure 2643 Btuh Ducts 312 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 1414 1414 Equipment latent load 2955 Btuh Volume (W) 13864 13864 Air changes/hour 0.61 0.57 Equipment total load 19134 Btuh Equiv.AVF (cfm) 141 132 Req. total capacity at 0.80 SHR 1.7 ton Heating Equipment Summary Cooling Equipment Summary Make Goodman Mfg. Make Goodman Mfg. Trade GOODMAN Trade GOODMAN, JANITROL,AMANA DISTI... Model GMVC950453BX* Cond SSX160301A* AHRI ref 2002234 Coil CHPF3642C6C* AHRI ref 5039169 Efficiency 95AFUE Efficiency 12.7 EER, 15.5 SEER Heating input 46000 Btuh Sensible cooling 22240 Btuh Heating output 45000 Btuh Latent cooling 5560 Btuh Temperature rise 46 OF Total cooling 27800 Btuh Actual air flow 927 cfm Actual air flow 927 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.058 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Oct-08 06:52:26 -f - wrightsoft® Right-Suite(g)Universal 2015 15.0.03 RS1-105790 Page 3 ACCK ..Desktop\wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N f a REScheck Software Version 4.5.0 cl�(J VJ Compliance Certificate Project 140707 Trust_MerrimackCondosBIdgF_ nitsB-E-E_NAndover Energy Code: 2009 IECC Location: North Andover, Massachusetts Construction Type: Multi-family Project Type: New Construction Conditioned Floor Area: 2,159 ft2 Glazing 10%Area Climate Zone: 5 Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 54-F3 North Andover, MA Compliance: 0.3%Better Than Code Maximum UA: 328 Your UA: 327 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. G azing Assembly or lue R-Value oroor UA Perimeter U-Factor Floor 1st Floor:All-Wood J o ist/Truss:Over Unconditioned Space 534 38.0 0.0 0.026 14 Wall 1st Separation:Wood Frame, 16"o.c. 612 15.0 0.0 0.077 47 Wall 1st Ext 2x6:Wood Frame, 16"o.c. 480 21.0 0.0 0.057 22 Door Front Ground Fir entry: Glass 34 0.210 7 Door Metal: Solid 18 0.160 3 Door Slider: Glass 40 0.290 12 Floor 2nd Over garage:All-Wood Joist/Truss:Over Unconditioned Space 554 38.0 0.0 0.026 14 Wall 2nd Floor 2x6: Wood Frame, 16"o.c. 585 21.0 0.0 0.057 26 Window DH: Vinyl Frame:Double Pane with Low-E 34 0.290 10 Window Fix:Vinyl Frame:Double Pane with Low-E 19 0.280 5 Window CSMT:Vinyl Frame:Double Pane with Low-E 12 0.260 3 Door Slider: Glass 68 0.290 20 Wall 2nd Fir Separation:Wood Frame, 16"o.c. 495 15.0 0.0 0.077 38 Ceiling Bay Win: Flat Ceiling or Scissor Truss 6 30.0 0.0 0.035 0 Wall 3rd Floor:Wood Frame, 16"o.c. 496 21.0 0.0 0.057 23 Window DH:Vinyl Frame:Double Pane with Low-E 80 0.290 23 Window Awn:Vinyl Frame:Double Pane with Low-E 7 0.270 2 Wall 3rd Separation:Wood Frame, 16"o.c. 440 15.0 0.0 0.077 34 i Project Title: 140707 Trust_MerrimackCondos_Bldg F_UnitsB-E-E_NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust MerrimackCondos BldgF_UnitsB-E- Page 1 of 9 M E_NAndover\REScheck\140707_Trust_ errimac_BldgF_UnitF3_54.rck Assem Gross Area Cavity ont. Glazing Door Perimeter U-Factor Ceiling Main: Flat Ceiling or Scissor Truss 810 38.0 0.0 0.030 24 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.5.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Notes: Building F Project Title: 140707 Trust_MerrimackCondos_BldgF_UnitsB-E-E NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust_MerrimackCondos BldgF_UnitsB-E- Page 2 of 9 E_NAndover\REScheck\140707 Trust_Merrimac_BldgF_UnitF3_54.rck i REScheck Software Version 4.5.0 Inspection Checklist Energy Code: 2009 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified' Field Verified # Pre-Inspection/Plan Review Complies? Comments/Assumptions &Re .ID� Value value"` 103.2 Construction drawingsand [PR1]1 documentation demonstrate �� []Does Not energy code compliance for theN. All �J-E]Complies ❑Not Observable building envelope. e - ❑Not Applicable 103.2, Construction drawings and ❑Complies 403.7 documentation demonstrate ❑Does Not [PR3]1 energy code compliance for j lighting and mechanical systems. ❑Not Observable Systems serving multiple []Not Applicable ;dwelling units must demonstrate a compliance with the commercial code. 403.6 Heating and cooling equipment is Heating: Heating: ❑Complies [PR2]2sized per ACCA Manual S based E Btu/hr Btu/hr— ❑Does Not ,on loads per ACCA Manual J or '« Cooling: Cooling: ❑Not Observable 'other approved methods. Btu/hr ? Btu/hr I ❑Not Applicable I Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 140707_Trust_MerrimackCondos_BldgF_UnitsB-E-E_NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust_MerrimackCondos BIdgF_UnitsB-E- Page 3 of 9 E_NAndover\REScheck\140707 Trust_Merrimac_BldgF_UnitF3_54.rck 009 1ECC foundation Inspection Complies? 'Comments/Assumptions' 303.2.1 A protective covering is installed to ❑Complies [FO11]2 protect exposed exterior insulation ❑Does Not and extends a minimum of 6 in. below ❑Not Observable grade. ❑Not Applicable 403.8 Snow-and ice-melting system controls ❑Complies (FO12J2`':.: installed. ❑Does Not i []Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 140707 Trust_MerrimackCondos_BIdgF_UnitsB-E-E NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust_MerrimackCondos_BldgF_UnitsB-E- Page 4 of 9 M E_NAndover\REScheck\140707_Trust_ errimac_BldgF_UnitF3_54.rck Section y Plans Verified Field Verified. # Framing/Rough-in-inspection Complies? Comments/Assumptions, & Re .iD Value Value 402.1.1, Door U-factor. U- U- ❑Complies See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FRl]1 ❑Not Observable ❑Not Applicable 402.1.1, Glazing LI-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3,402.5 ❑Not Observable [FR2]1 ❑Not Applicable 303.1.3 LI-factors of fenestration products ' ❑Complies [FR4]1 are determined in accordance with the NFRC test procedure or ❑Does Not taken from the default table. ❑Not Observable ❑Not Applicable 402.3.5 Sunrooms enclosing conditioned U- U- ❑Complies [FR8]1 space have a maximum ❑Does Not 0 fenestration LI-factor of 0.50 in Climate Zones 4-8. New glazing ❑Not Observable separating the sunroom from ❑Not Applicable conditioned space must meet code requirements. 402.3.5 Sunrooms enclosing conditioned U- ' U- ❑Complies [FR9]1 space have a maximum skylight ❑Does Not U-factor of 0.75 in Climate Zones EI Not Observable 4 8 ❑Not Applicable 402.4.4 Fenestration that is not site built ❑Complies [FR20]1 is listed and labeled as meeting P, ❑Does Not AAMA/WDMA/CSA 101/I.S.2/A440 " or has infiltration rates per NFRC ";;❑Not Observable 400 that do not exceed code [[]Not Applicable limits. ' l� ,.33 402.4.5 i IC-rated recessed lighting fixtures .❑Complies ['FR1612 sealed at housing/interior finish ❑Does Not and labeled to indicate <_2.0 cfm leakage at 75 Pa. []Not Observable �_❑Not Applicable 403.2.1 Supply ducts in attics are R- R- ❑Complies [FR12]1 insulated to 2:11-8.All other ducts R- R- ❑Does Not in unconditioned spaces or outside the building envelope are ❑Not Observable insulated to >_R-6. ❑Not Applicable 403.2.2 All joints and seams of air ducts, ;`� 1[]Not ❑Complies [FR13]1 air handlers,filter boxes, and ❑Does Not building cavities used as return ,ducts are sealed. Observable - �_,<❑Not Applicable 403.2.3 Building cavities are not used for ❑Complies [FR15]3 supply ducts. ❑Does Not ',,[]Not Observable A M,i, ,❑Not Applicable 403.3 HVAC piping conveying fluids R-_ R- '❑Complies [FR17]2 'above 105°F or chilled fluids s ❑Does Not below 55°F are insulated to>_R I ❑Not Observable 3 IE]Not Applicable 403.4 :Circulating service hot water R- R- 1❑Complies [FR1812 )pipes are insulated to R-2. ❑Does Not ❑Not Observable ❑Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 140707 Trust_MerrimackCondos_BldgF_UnitsB-E-E_NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust_MerrimackCondos BldgF_UnitsB-E- Page 5 of 9 E_NAndover\REScheck\140707_Trust_Merrimac_BldgF_UnitF3_54.rck Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions tk Re :ID 403.5 Automatic or gravity dampers are ❑Complies [FR19)2 installed on all outdoor air a ❑Does Not intakes and exhausts. = � []Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 13 Low Impact(Tier 3) Project Title: 140707_Trust_MerrimackCondos_BldgF_UnitsB-E-E_NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust_MerrimackCondos BldgF_UnitsB-E- Page 6 of 9 E_NAndover\REScheck\140707_Trust_Merrimac_BldgF_UnitF3_54.rck i Section Plans Verified Field Verified Insulation Inspection Complies? Comments/Assumptions & Re .ID Value 4. Value 303,1 All installed insulation is labeled DDoomplies [IN13]2 or the installed R-valueses provided. ❑Not Observable ❑Not Applicable 402.1.1, Floor insulation R-value. R- R- []Complies See the Envelope Assemblies 402.2.5, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.6 ❑ Steel ❑ Steel []Not Not Observable } []Not Applicable 303.2, Floor insulation installed per T❑Complies 402.2.6 manufacturer's instructions, and El Does Not [IN2]1 in substantial contact with the underside of the subfloor. []Not Observable £" ❑Not Applicable I Wood 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.4, mass wall with at least 1/2of the ❑ ❑ ❑Does Not table for values. 402.2.5 wall insulation on the wall Wood [IN3]1 exterior,the exterior insulation ❑ Mass ❑ mass []Not Observable requirement applies. E] Steel ❑ Steel ❑Not Applicable f " I 303.2 (Wall insulation is installed per " ❑Complies [IN4]1 [manufacturer's instructions. '" ❑Does Not 1' ?❑Not Observable ❑Not Applicable 402.2.11 Sunroom wall insulation has a R- R- ❑Complies [IN8]1 minimum R-value of R-13. New ❑Does Not walls separating the sunroom from conditioned space must ❑Not Observable meet code requirements. ❑Not Applicable 303.2 gSunroom wall insulation installed �� ❑Complies [IN9]1 per manufacturer's Instructions. �� '❑Does Not 4E _ ❑Not Observable M ❑Not Applicable 402.2.11 [Sunroom ceiling minimum ? R- R ❑Complies [IN10]1 insulation R-value of R-19 in ❑Does Not Climate Zones 1-4,and R-24 in I t❑Not Observable Climate Zones 5-8. I � ❑Not Applicable 303.2 `Sunroom ceiling insulation is T❑Complies I [IN11]1 installed per manufacturer's '❑Does Not instructions. a ❑Not Observable J❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 140707 Trust_MerrimackCondos_BldgF_UnitsB-E-E_NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707 Trust_MerrimackCondos_BldgF_UnitsB-E- Page 7 of 9 E_NAndover\REScheck\140707_Trust Merrimac_BldgF_UnitF3_54.rck Section plans,Verified Field Verified_. # Final Inspection ProvisionsComplies? Co►nments/Assumptions &ReaD _ Value'" Value 402.1.1, Ceiling insulation R-value.Where R- R- ❑Complies See the Envelope Assemblies 402.2.1, > R-30 is required, R-30 can be ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2 used if insulation is not ❑ Steel ❑ Steel [Fill' compressed at eaves. R-30 may j❑Not Observable f , be used for 500 ft2 or 20% ❑Not Applicable (whichever is less)where sufficient space is not available. I 303.1.1.1, Ceiling insulation installed per ❑Complies 303.2 manufacturer's instructions. ❑Does Not [FI211 Blown insulation marked every { ❑ 300 ft2. Not Observable 00 ,[]Not Applicable 402.2.3 Attic access hatch and door R-_ R- ❑Complies [FI311 insulation >_R-value of the f❑Does Not adjacent assembly. []Not Observable ❑Not Applicable 402.4.2, Building envelope tightness ACH 50 = ACH 50 = ❑Complies 402.4.2.1 verified by blower door test result '❑Does Not [FI1711 of<7 ACH at 50 Pa.This iia requirement may instead be met $❑Not Observable via visual inspection, ❑Not A in which Applicable case verification may need to occur during Insulation Inspection. 402.4.3 Wood-burning fireplaces have []Complies [FI8]2 Igasketed doors and outdoor �❑Does Not combustion air. ,,[]Not Observable i '❑Not Applicable 403.2.2 Post construction duct tightness cfm cfm ❑Complies [FI411 test result of:58 cfm to outdoors, ❑Does Not 14- or:512 cfm across systems.Or, rough-in test result of 6 cfm ❑Not Observable < across systems or<4 cfm !❑Not Applicable without air handler. Rough-in test verification may need to occur during Framing Inspection. 403.1.1 Programmable thermostats ry ❑Complies [FI912 installed on forced air furnaces. ❑Does Not - ""''❑Not Observable ❑Not Applicable 403.1.2; Heat pump thermostat installed ' [ Complies [FI 10]2 on heat pumps. []Does Not � ❑Not Observable T Not Applicable 403.4 Circulating service hot water 1 [ Complies [FI11]2 systems have automatic or ❑Does Not accessible manual controls. M: . ][]Not Observable a M. ❑Not Applicable 403.9.1 Readily accessible switch on - a❑Complies [FI12]3 heaters for swimming pools. =❑Does Not �.,• ,,;. ,", �❑Not Observable ❑Not Applicable 403.9.2 Timer switches on pool heaters "-- "❑Complies [FI19]3 and pumps are present. ArODoes Not ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 140707 Trust_MerrimackCondos_BldgF_UnitsB-E-E_NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust_MerrimackCondos BldgF_UnitsB-E- Page 8 of 9 E_NAndover\REScheck\140707_Trust_Merrimac_BldgF_UnitF3_54.rck Section Plans Verified Field Verified , # Final Inspection Provisions ValueValue Complies? Comments/Assumptions & Re .113 403.9.3 Heated swimming pools have a ❑Complies [F120]3 cover.Covers on pools heated ❑Does Not over 90 9F are insulated to R-12 ❑Not Observable �z ❑Not Applicable 404.1 50%of lamps in permanent ❑Complies [F16]1 fixtures are high efficacy lamps ❑Does Not ❑Not Observable , WK ❑Not Applicable 4013 Compliance certificate posted. (❑Complies [F17]2 I '[]Does Not z.. ❑Not Obseryable []Not Applicable 303.3 Manufacturer manuals for ❑Complies [FI1$]3 mechanical and water heating []Does Not equipment have been provided []Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 140707 Trust MerrimackCondos_BldgF_UnitsB-E-E_NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust_MerrimackCondos_BldgF_UnitsB-E- Page 9 of 9 E_NAndover\REScheck\140707_Trust_Merrimac_BldgF_UnitF3_54.rck 2009 IECC Energy Efficiency Certificate Wall 15.00 Floor 38.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Not Window 0.29 Door 0.29 Heating System• Cooling System: Water Heater: Name• Date• Comments ` REScheck Software Version 4.4.4 AnCompliance Certificate Project Title: 130625 Trust_Merrimack Energy Code: 2009 IECC Location: North Andover,Massachusetts Construction Type: Multi Family Project Type: New Construction Conditioned Floor Area: 2,300 ft2 Glazing Area Percentage: 13% Heating Degree Days: 6322 Climate Zone: 5 Permit Date: Construction Site: Owner/Agent: Designer/Contractor: Unit C4 Turnpike Rd North Andover,MA Compliance: 4.1%Better Than Code Maximum UA: '366 Your UA:351 The%Better or Worse Than Code Index reflects how dose to compliance the house Is based on code bade-off rules. It DOES NOT provide an estkrrate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Cavity Cont. Glazing Assembly Area or R-Value R-Value or Door UA Perimeter U-Factor Floor SLAB:Slab-On-Grade:Unheated 42 10.0 32 Insulation depth:2.0' Wall LOWER LEVEL 2X6 EXT:Wood Frame,16"o.c. 416 19.0 0.0 20 Window DH:Vinyl Frame:Double Pane with Low-E 30 0.290 9 SHGC:0.00 Door SLIDER:Solid 40 0.290 12 Door 15 LITE BACK:Glass 20 0.300 6 SHGC:0.00 Wall SEPARATION 2X6:Wood Frame,16"o.c. 132 19.0 0.0 8 Wall 2X4 GARAGE:Wood Frame,16"o.c. 215 15.0 0.0 15 Door METAL FIRE:Solid 20 0.150 3 Floor ABOVE GARAGE:All-Wood Joistlrruss:Over Unconditioned Space 520 30.0 0.0 17 Wall 1ST FLOOR 2X6:Wood Frame,16"o.c. 748 09.0 0.0 34 Window DH:Vinyl Frame:Double Pane with Low-E 117 0.290 34 SHGC:0.00 Window BAY:Vinyl Frame:Double Pane with Low-E 21 0.270 6 SHGC:0.00' Door SLIDER:Glass 40 0.290 12 SHGC:0.00 Project Title: 130625 Trust Merrimack Report date: 09/28/13 Data filename: S:kEbbeling_Ed\130625 Trust Merrimack C\RESchecks\130625 Trust Merrimack C UnitC4.rck Page 1 of 8 Gross Glazing Cavity Cont. Assembly Area or or Door UA Perimeter U-Factor Wall 1ST FLOOR SEPARATION:Wood Frame, 16"o.c. 306 19.0 0.0 18 Floor 2nd Fir Cantilever:All-Wood Joist/Truss:Over Outside Air 12 30.0 0.0 0 Wall 2ND FLOOR 2X6:Wood Frame,16"o.c. 765 19.0 0.0 38 Window DH:Vinyl Frame:Double Pane with Low-E 64 0.290 19 SHGC:0.00 Door Slider:Glass 40 0.290 12 SHGC:0.00 Door French:Glass 33 0.310 10 SHGC:0.00 Wall 2ND FLOOR SEPARATION:Wood Frame, 16"o.c. 306 19.0 0.0 18 Ceiling ABOVE 2ND FLOOR:Flat Ceiling or Scissor Truss 948 38.0 0.0 28 Compliance Statement. The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.4.4 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Notes: Unit C4 Project Title: 130625_Trust_Merrimack_C Report date: 09/28/13 Data filename: S:\Ebbeling_Ed\130625 Trust Merrimack C\RESchecks\130625_Trust Merrimack C_UnitC4.rck Page 2 of 8 v REScheck Software Version 4.4.4 Inspection Checklist Requirements: 0.0% were addressed directly in the REScheck software Text in the"Comments/Assumptions"column is provided by the user in the REScheck Requirements screen.For each requirement,the user certifies that a code requirement will be met and how that is documented,or that an exception is being claimed.Where compliance is itemized in a separate table,a reference to that table is provided. 2009 IECC Pre4nspection/Plan Review Plans Verified Field Verified Complies? Comments/Assumptions value Value 103.2 Construction drawings and ❑Complies [PR1]1 documentation demonstrate energy ❑Does Not Comply 1' code compliance for the building ,❑Not Observable envelope. ❑Not Applicable 103.2, Construction drawings and ❑Complies 403.7 documentation demonstrate energy PDoes Not Comply [PR3]1 code compliance for lighting and ❑Not Observable mechanical systems.Systems serving multiple dwelling units must Not Applicable demonstrate compliance with the commercial code. 403.6 Heating and cooling equipment is Heating: Heating: ❑Complies [PR2]2 sized per ACCA Manual S based on Btu/hr Btu/hr []Does Not Comply loads per ACCA Manual J or other Cooling: Cooling: ❑Not Observable approved methods. Btu/hr Btu/hr ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 130625_Trust Merrimack_C Report date: 09/28/13 Data filename: S:\Ebbeling_Ed\130625 Trust Merrimack C\RESchecks\130625_Trust Merrimack C_UnitC4.rck Page 3 of 8 2009 IECC Foundation Inspection Plans Verified Field VerifiedValue Value Complies? Comments/Assumptions 402.1.1 Slab edge insulation R-value. R- R- ❑Complies See the table for [FO1]1 ❑ Unheated ❑ Unheated []Does Not Comply values. ❑ Heated ❑ Heated ❑Not Observable []Not Applicable 303.2, Slab edge insulation installed per ❑Complies 402.2.8 manufacturer's instructions. ❑Does Not Comply [FO2]1 []Not Observable '0 []Not Applicable 402.1.1 Slab edge insulation depthflength. ft ft ❑Complies See the table for [FO3]1 ❑Does Not Comply values. ❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed to ❑Complies [FO11]2 protect exposed exterior insulation F❑Does Not Comply J and extends a minimum of 6 in.below ❑Not.Observable grade. ❑Not Applicable 403.8 Snow-and ice-melting system ❑Complies [FO12]2 controls installed. ❑Does Not Comply J []Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 130625—Trust Menimack_C Report date: 09/28/13 Data filename: S:\Ebbeling_Ed\130625_Trust_Merrimack C\RESchecks\130625_Trust_Menimack C_UnitC4.rck Page 4 of 8 2009 IECC Framing/Rough-In Inspection Plans Verified Field Verified Complies? Comments/Assumptions Value Value 402.1.1, Door U-factor. U- U- [ Complies See thetable for 402.3.4 ❑Does Not Comply values. [FR1]1 ❑Not Observable U ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the table for 402.3.1, average). ❑Does Not Comply values. 402.3.3, []Not Observable 402.5 [FR2]1 ❑Not Applicable 303.1.3 U-factors of fenestration products are ❑Complies [FR4]1 determined in accordance with the ❑Does Not Comply NFRC test procedure or taken from ❑Not Observable the default table. []Not Applicable 402.3.5 Sunrooms enclosing conditioned U- U- []Complies [FR8]1 space have a maximum fenestration ❑Does Not Comply U-factor of 0.50 in Climate Zones 4-8. []Not Observable New glazing separating the sunroom from conditioned space must meet []Not Applicable code requirements. 402.3.5 Sunrooms enclosing conditioned U- U- ❑Complies [FR9]1 space have a maximum skylight U- ❑Does Not Comply factor of 0.75 in Climate Zones 4-8. ❑Not Observable [:]Not Applicable 402.4.4 Fenestration that is not site built is []Complies [FR20]' listed and labeled as meeting ❑Does Not Comply AAMA/WDMA/CSA 101/I.S.2/A440 or ❑Not Observable has infiltration rates per NFRC 400 that do not exceed code limits. []Not Applicable 402.4.5 IGrated recessed lighting fixtures ❑Complies [FR16]2 sealed at housingrnterior finish and ❑Does Not Comply labeled to indicate 2.0 cfm leakage at 75 Pa. []Not Observable ❑Not Applicable 403.2.1 Supply ducts in attics are insulated to R- R- ❑Complies [FR12]' R-8.All other ducts in unconditioned R- R- []Does Not Comply 10 spaces or outside the building []Not Observable envelope are insulated to R-6. []Not Applicable 403.2.2 All joints and seams of air ducts,air ❑Complies [FR13]1 handlers,filter boxes,and building ❑Does Not Comply cavities used as return ducts are ❑Not Observable sealed. []Not Applicable 403.2.3 Building cavities are not used for []Complies [FR15]3 supply ducts. ❑Does Not Comply J []Not Observable []Not Applicable 403.3 HVAC piping conveying fluids above R- R- ❑Complies [FR17]2 105 IF or chilled fluids below 55 OF ❑Does Not Comply are insulated to R-3. ❑Not Observable []Not Applicable 403.4 Circulating service hot water pipes are R- R- ❑Complies [FR18]2 insulated to R-2. ❑Does Not Comply G ❑Not Observable ❑Not Applicable 403.5 Automatic or gravity dampers are []Complies [FR19]2 installed on all outdoor air intakes and ❑Does Not Comply exhausts. ❑Not Observable []Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 130625 Trust Merrimack C J _ _ Report date: 09/28/13 — P Data filename: S:\Ebbeling—Ed\130625_Trust Merrimack C\RESchecks\130625_Trust Merrimack C—UnitC4.rck Page 5 of 8 2009 IECC Insulation Inspection Plans Verified Field Verified Complies? Comments/Assumptions Value Value 303.1 All installed insulation is labeled or the ❑Complies [IN13]2 installed R-values provided. ❑Does Not Comply ❑Not Observable ❑Not Applicable 402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envalnna accamnliac table for 402.2.5, ❑ Wood ❑ Wood []Does Not Comply values. 402.2.6 ❑ Steel ❑ Steel ❑Not Observable [IN1]l []Not Applicable 303.2, Floor insulation installed per ❑Complies 402.2.6 manufacturer's instructions,and in ❑Does Not Comply [IN2]1 substantial contact with the underside ❑Not Observable a of the subfloor. []Not Applicable 402.1.1, Wall insulation R-value.If this is a R- R- [ Complies See the Envalona accamhliac table for 402.2.4, mass wall with at least%of the wall ❑ Wood ❑ Wood ❑Does Not Comply values. 402.2.5 insulation on the wall exterior,the ❑ Mass ❑ Mass ❑Not Observable [IN3]' exterior insulation requirement ❑ Steel ❑ Steel ❑Not Applicable 0 applies. 303.2 Wall insulation is installed per ❑Complies [IN4]1 manufacturer's instructions. ❑Does Not Comply ❑Not Observable []Not Applicable 402.2.11 Sunroom wall insulation has a R- R- []Complies [IN811 minimum R-value of R-13.New walls []Does Not Comply separating the sunroom from ❑Not Observable conditioned space must meet code []Not Applicable re uirements. 303.2 Sunroom wall insulation installed per ❑Complies [IN9]1 manufacturer's Instructions. []Does Not Comply ❑Not Observable ❑Not Applicable 402.2.11 Sunroom ceiling minimum insulation R- R- ❑Complies [IN10]1 R-value of R-19 in Climate Zones 1-4, ❑Does Not Comply 0 and R-24 in Climate Zones 5-8. ❑Not Observable []Not Applicable 303.2 Sunroom ceiling insulation is installed ❑Complies [IN11]1 per manufacturer's instructions. ❑Does Not Comply ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 130625—Trust_Merrimack C Report date: 09/28/13 Data filename: S:\Ebbeling_Ed\130625 Trust Merrimack C\RESchecks\130625_Trust Merrimack_C_UnitC4.rck Page 6 of 8 ' 2009 IECC Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions Value Value 402.1.1, Ceiling insulation R-value.Where>R- R- R- []Complies See the FnvalanP Ascamhrna table for 402.2.1, 30 is required,R-30 can be used if ❑ Wood ❑ Wood ❑Does Not Comply values. 402.2.2 insulation is not compressed at eaves. ❑ Steel ❑ Steel ❑Not Observable [FI1]' R-30 may be used for 500 ftz or 20% 1' (whichever is less)where sufficient []Not Applicable space is not available. 303.1.1.1, Ceiling insulation installed per ❑Complies 303.2 manufacturer's instructions.Blown ❑Does Not Comply [FI2]1 insulation marked every 300 ft'. ❑Not Observable 0 ❑Not Applicable 402.2.3 Attic access hatch and door insulation R- R- ❑Complies [F13]1 R-value of the adjacent assembly. ❑Does Not Comply QNot Observable ❑Not Applicable 402.4.2, Building envelope tightness verified ACH 50= ACH 50= ❑Complies 402.4.2.1 by blower door test result of<7 ACH ❑Does Not Comply [FI17]1 at 50 Pa.This requirement may ❑Not Observable 19 instead be met via visual inspection, []Not Applicable in which case verification may need to occur during Insulation Inspection. 402.4.3 Wood-buming fireplaces have ❑Complies [F18]2 gasketed doors and outdoor PDoes Not Comply 10) combustion air. []Not Observable []Not Applicable 403.2.2 Post construction duct tightness test cfm cfm ❑Complies [FI4]1 result of 8 cfm to outdoors,or 12 cfm ❑Does Not Comply across systems.Or,rough-in test []Not Observable result of 6 cfm across systems or 4 cfm without air handler.Rough-in test []Not Applicable verification may need to occur during Framing Inspection. 403.1.1 Programmable thermostats installed ❑Complies [Fl9]2 on forced air furnaces. ❑Does Not Comply AJ []Not Observable []Not Applicable 403.1.2 Heat pump thermostat installed on ❑Complies [F110]2 heat pumps. ❑Does Not Comply J QNot Observable []Not Applicable 403.4 Circulating service hot water systems ❑Complies [FI11]2 have automatic or accessible manual ❑Does Not Comply controls. ej QNot Observable QNot Applicable 403.9.1 Readily accessible switch on heaters [ Complies [FI12]3 for swimming pools. ❑Does Not Comply �y ❑Not Observable []Not Applicable 403.9.2 Timer switches on pool heaters and ❑Complies [FI19]3 pumps are present. ❑Does Not Comply ) ❑Not Observable []Not Applicable 403.9.3 Heated swimming pools have a cover. ❑Complies [F120]3 Covers on pools heated over 90 OF ❑Does Not Comply are insulated to R-12. J QNot Observable .❑Not Applicable 404.1 50%of lamps in permanent fixtures ❑Complies [FI6]' are high efficacy lamps. ❑Does Not Comply ❑Not Observable []Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Ter 3) Project Title: 130625 Trust Merrimack C Report date: 09/28/13 Data filename: S:\Ebbeling_Ed\130625 Trust Merrimack C\RESchecks\130625_Trust Merrimack C_UnitC4.rck Page 7 of 8 20091ECC Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions Value Value 401.3 Compliance certificate posted. ❑Complies [FI7]2 []Does Not Comply 9 []Not Observable 1 []Not Applicable 303.3 Manufacturer manuals for mechanical ' []Complies [F118]3 and water heating equipment have []Does Not Comply been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: i 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 130625—Trust—Merrimack C Report date: 09/28/13 Data filename: S:\Ebbeling_Ed\130625_Trust Merrimack C\RESchecks\130625_Trust Merrimack C_UnitC4.rck Page 8 of 8 2009 SEC C [energy E ff dency Certificate Wall 19.00 Floor 30.00 Ceiling/Roof 38.00 Ductwork(unconditioned spaces): D.. Window 0.29 Door 0.29 Heating System: Cooling System: Water Heater: Name: Date: Comments: