Loading...
HomeMy WebLinkAboutMiscellaneous - 56 COMPASS POINT ROAD 4/30/2018 BUILDING FILE Date....1. - . .." .L .... OF NOH7Iy,� co TOWN OF NORTH ANDOVER O 9 PERMIT FOR WIRING CHU X540 This certifies that ............. .,.. nJ .......................................... has permission to perform ....... .................................................. wiring in the building of........`1'4.U.S..1................. ?.!'l_T ...T.................................... at ,F.z... �............A.�+.!�7�-..................North Andover,Mass. Fee....... q.Y.......Lic. No. .�f.�,�..�lp�,��..... ��! ...... . .�......�............... ELECTRICAL INSPECTOR Check# t Commonwealth of Massachusetts Oral Use On>y Department of Fire Services Occupancy and Fee Chedwd BOARD OF FIRE PREVENTION REGULATIONS p1xv,1/07J Ocaveblank APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in s000rdance with the Massachusetts Electrical Code(MBCI 527 CMR 12.00 (PLEASE PMT ININK-OR MB ALL WFORMATIOA9 Date: City or Town of: NORTH ANDOVER To the Inspector of Wires: By this application the undersigned ce of his or her intention to perform the electrical work described below. Location(Street&Number) am C01(VMQ,t#5 Poj 1'1,1" Owner or tenant rr�,¢�yt f"�� Telephone No. q79 13LT7 Owner's Address 51 Is this permit fun conjunction with a building permit? Yes No ❑ (Check Appropriate]Box) Purpose of Building11etas C&n "oUtility Authorhation No. 1F02 Exitng Service d Amps / Volts Overhead❑ Undgrd❑ No.of Meters New Service t2��Amps olts Overhead❑ Undgrd- jj,0--' No.of Meters- 71--Number of Feeders and A,mpacity Location and Nature of Proposed Electrical Work: Completion qf4he oil table may bevabodbytheLm Jorefftrek No.of Recessed Luminaires d No.of Cell.-Susp.(Paddle)Fans NO.or Total Transformers ICVA No.of Luminaire Outlets t 'L, No.of Hot Tabs Generators KVA ' No.of Luminaires Swimming Pool de ❑ Ignm-d. 11 Bette IIni � g g No.of Receptacle Outlets 40 No of Oil Burners FM ALARMS No.of Zones No.of Switches No.of Gas Burners o.o e e on andInitiating Devices No.of Ranges No.of Air Cond. Tons N No.of Alerting Devices No.of Waste Disposers Heat Pmap I&umberIons ' o.o Self-contained ,p Totals: Detection/Ale Devices No.of Dishwashers Space/Area Heating HW Local❑ Conn570 n ❑ Ofer ri tam No.of Dryers Heating Appliances KW ecu No.of Devices or Eaulvalent No.of ater ` xW o.of o.o Data irig: Hearn S BaBallastsNoW.of Dnevices o ulvalent No.Hydromassage Bathtubs No.of Motors Total HPa ceO cation g� 2 No.of Devices or uivalent OTHER: y rc� Attach additional detail j desired or as required by the Inspector of Aires. Estimated Value of Bl Work 2 r (When required by municipal policy.) Work to Start: 10 Inspections to be requested in accordance with MBC Rule 10,and upon completion. INSURANCE C0 : Unless waived by the owner,no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance inchuling"completed operation"coverage or its substantial equivalent. The undersigned certifies that such cov is in farce,and has mdu'bi M proof of same to the permit issuing office. CHECK ONE: INSURANCE BOND ❑ OTHER ❑ (Specify:) I cedg y,under the pains and penalties of perjury,that the tnformadon on this appilcadon is true and completes FIRM NAME: . ---) bLAGt6LJ rica f PLIC.NO.: 4 03 Licensee: �,c��'e-Y'T W` 91&0e . Signature LIG NO.: Z71-736 ('applicable,e r" "in the livens r line. �', Bus.Tel.No.• 3 Address: � � Alt.Tel.No.• '�Pes M.G.L c. 147,s.57-61,security work requires Dap ant of lic Safety"S"License: Lia No.• OWNER'S INSUXtANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally requited by law. By my signature below,I hereby waive this xequiremant. I am the(check ora owner owner's a ant. � Owner/Agent P�RIIIIT FEE: �� Sfgnatare Telephone No. $ t .1, 3 �' � - - _ E �. - - � - i ., � _ i F/ \. � _ .. �� 1 2. - � c� � J -�-.,, �� ��� - The Commonwealth of Massachusetts ,- .Department of Industrigl'Accidenfs Office oflnvesfigations 600 Washington Street Boston,MA 02111 www.mass gov/dia Workers' Compensation Insurance Affidavit:Builders/Contractors/ElectrieLvmPlumbers ppUeant Information 7- Please Print Lesiil�ly Name(Businesdorgat&ation/individual): Pi U-1&7-5 � ✓`���. '' Address: 0� 1MV�YLT`2y1S c7� City/State/Zip: LL%A t 0123)57 Phone#: 97a S32 737- Are yyu an employer?Check the appropriate box: Type of project(required): 1. 1 am a employer with $ 4. ❑I am a general contractor and I 6. []New construction employees(full and/or part time).` have biredthe sub-contractors 2.0 lama sole proprietor or partner- listed on the attached sheet 7. Remodeling ship and'have no employees These sub-contractors have 8. ❑Demolition working for me in any capacity. workers'comp.insurance. 9. ❑Building addition [No workers'comp.insurance 5. ❑ We are a corporation and its 10 V lectrical repairs or additions required.) officers have exercised their 3.❑ I am a homeowner doing allwork right of exemption per MGL I Ln Plumbing repairs or additions myself.[No workers'comp. c.152,§1(4),and we have no 12.Q Roof repairs insurance required.]f employees.[No workers' 1311 Other comp.insurance required.] Mny applicant that checks box#I must also fill out the section below showing their workers'compensation policy infiommation. t Homeowners who submit this affidavit indicating they hie doing all world and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must affached an additional sheet showing the name ofthe sub-contractors and their workers'comp.policy information. lam an employer that is providing workers'compensatlon Insurance for my employees Below is the policy and job site informatdon. Insurance Company Name% A TM 1cor Policy#or Self-ins.Lie.#: Bxp"tion Date: ZJ7 4 Job Site Address aJ6 L +City/State/Zip:N- &y&U,er Ln/t Attach a copy of the wor ers'compensation-policy 8eclaration page(showing the policy number and expiration date). Failure to secure coverage as requiredunder Section 25A of MGL o.152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement maybe forwarded to the Office of Investigations of the DIA for insurance coverage verification. Ido hereby certify udder Chep d penalties ofperjury that the inf ormation provided above is trueand correct - i lure: &AEDate, d— Phone# q7� 1 4 v33 Ofchd use only. Do not write to this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle dyne): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other - - - Contact Person: Phone M Date..51.`.'1:.1 1.1.......... NORTIy of .'tio TOWN OF NORTH ANDOVER ^fie .�?+' �' �• OL ° 9 PERMIT FOR PLUMBING BS,�O�gE r This certifies thad , ..... ........... ".���.Ye..... ...... has permission to perform...N.R::f�.....--t P� ............... ... VY plumbing in the buildings of. .........:... -' ....... at.....2 . C/.... .... .! .......L. '............/...�......, North Andover, Mass. Fee.`/!...X......Lic. No. ;�1. . ..... .r a.............................................................. PLUMBING INSPECTOR Check# � P MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM PLUMBING WORK CITY NORTH ANDOVER MA. DATE 9-3-14 PERMIT# U JOBSITE ADDRESS 56 COMPASS POINT OWNER'S NAME TRUST CONSTRUCTOIN POWNER ADDRESS:I51 MT JOY DRIVE TEWKSBURY MA 01876 TEL: 9788513456 FAX: TYPE OR OCCUPANCY TYPE: COMMERCIAL❑ EDUCATIONAL ❑ RESIDENTIAL PRINT CLEARLY NEW:0 RENOVATION:❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES❑ NO❑ FIXUTRES-1 FLOORS- Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BATHTUB 2 CROSS CONN DEVICE DEDICATED SPECIAL WASTE SYS DEDICATED GAS/OIUSAND SYS DEDICATED GREASE SYSTEM DEDICATED GRAY WATER SYS DEDICATED WATER REUSE SYS DISHWASHER 1 DRINKING FOUNTAIN FOOD WASTE GRINDER UNIT FLOOR/AREA DRAIN INTERCEPTOR INTERIOR KITCHEN SINK LAVATORY 1 3 ROOF DRAIN SHOWER STALL 1 SERVICE/MOP SINK TOILET 1 2 URINAL WASHING MACHINE CONNECTION 1 WATER HEATER ALL TYPES 1 WATER PIPING 1 'SPIGOTS 2 INSURANCE COVERAGE I have a current liability insurance policy or its substantial equivalent which meets the requirements of MGL.Ch.142 YES NO ❑ If you have checked YES,please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY H OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER:I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws,and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER ❑ ENT ❑ SIGNATURE OF OWNER OR AGENT Al I hereby certify that all of the details and information I have submitted(or entered)regarding this application/Vflecur to a best of my Knowledge and that all plumbing work and installations performed under the permit issued for this applicatioance ith all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER NAME: LICENSE#113127 . SIG URE COMPANY NAME: I POWERHOUSE PLUMBING AND HEATING CORPADDRESS: PO BOX 896 CITY:AAI—STOW _ STATE: NH ZIP: .038Ei5 _ FAX: 6033780040 TEL: 16033780020 CELL: 19784909385 EMAIL: J.LAURENCIO POWERHOUSEPLUMBING.COM MASTER Q JOURNEYMAN❑ CORPORATION ■❑# 2482j PARTNERSHIP❑# LLC❑# ._ ROUGH PLUMBING INSPECTION NOTES BELOW FOR OFFICE USE ONLY FINAL INSPECTIO OTES 7 f`� Yes No .>^ aVA - THIS APPLICATION SERVES AS THE PERMIT ❑ ❑ FEE: $ PERMIT# PLAN REVIEW NOTES Date... .�..I' . ........................ TOWN OF NORTH ANDOVER PERMIT FOR GAS INSTALLATION r ♦83�•Hus-�,�e This certifies that .1.... .I -..... ' '. >..... { has permission for gas installation ..... ^!.... .^-!�. e'........ -in the buildings of.......................S.....(....�!?��� ..�.................... at... .. .... ! -' ......VIVI........................... Andover, Mass. Feel ............ Lic. No:24�2-..... M..G?....................................................... GASINSPECTOR Check# MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK CITY NORT=w H ANDOVER �1, MA. DATE 9-3-14PERMIT JOBSITE ADDRESS 56 COMPASS POINT OWNER'S NAME TRUST CONSTRUCTION COWNER ADDRESS: 51 MT JOY DRIVE TEWKSBURY MA 01876 TEL: 9788513456 FAX: TYPE OR OCCUPANCY TYPE: COMMERCIAL❑ EDUCATIONAL ❑ RESIDENTIAL IN PRINT CLEARLY NEW:❑■ RENOVATION: ❑ REPLACEMENT:❑ PLANS SUBMITTED: YES❑ NO❑ FIXUTRES Z FLOOR- Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BOILER BOOSTER CONVERSION BURNER COOK STOVE DIRECT VENT HEATER DRYER FIREPLACE FRYOLATOR FURNACE GENERATOR GRILLE LABORATORY COCKS MAKEUP AIR UNIT OVEN POOL HEATER ROOM I SPACE HEATER ROOF TOP UNIT TEST UNIT HEATER UNVENTED ROOM HEATER WATER HEATER INSURANCE COVERAGE I have a current liability insurance policy or its substantial equivalent which meets the requirements of MGL.Ch.142 YES ❑■ NO ❑ If you have checked YES,please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY ❑■ OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER:I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws,and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER [I AGENT F1SIGNATURE OF OWNER OR AGENT hereby certify that all of the details and information I have submitted(or entered)regarding this application are u nd a rat o the b f my Knowledge and that all plumbing work and installations performed under the permit issued for this applicatio wil e' ompli ce W Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBERIGASFITTER NAME: MIKE BURKE LICENSE# 13127 _ V. PO RE US COMPANY NAME: POWERHOE PLUMBING AND HEATING CORP ADDRES BOX 896 CITY: PLAISTOW STATE: NH I ZIP: 03865_ FAX; 6033780040 TEL: 16033780020 --� CELL: 9784909385_ EMAIL: I J.LAURENCIO POWERHOUSEPLUMBINGAND HEATING. MASTER 0 JOURNEYMAN ❑ LP INSTALLER❑ CORPORATION N# 2482 PARTNERSHIP❑#=LLC❑# t ROUGH GAS INSPECTI N NOTES BELOW FOR OFFICE USE ONLY FINAL INSPECTION NOTES ` ® Yes No ��� oZ/ �� THIS APPLICATION SERVES AS THE PERMIT ❑ ❑ FEE: $ PERMIT# PLAN REVIEW NOTES The Commonwealth of Massachusetts Department of IndustrialAccidents ro Office of Investigations d 1 Congress Street,Suite 100 Boston,MA 02114-2017 www mass.gov/dia Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): POWERHOUSE PLUMBING CORP Address:PO BOX 896 City/State/Zip:PLAISTOW, NH 03865 Phone#:6033780020 Are you an employer?Check the appropriate box: Type of project(required): 1.❑Q I am a employer with 6 4. ❑ I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. H New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑Remodeling ship and have no employees These sub-contractors have 8, ❑Demolition working for me in any capacity. employees and have workers' [No workers' comp. insurance comp. insurance.: 9. E]Building addition required.] 5. ❑ We are a corporation and its 10.0 Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑Roof repairs insurance required.] t c. 152,§1(4),and we have no 13.❑Other employees. [No workers' comp.insurance required.] 'Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: HARTFORD UNDERWRITERS INSURANCE COMP Policy#or Self-ins. Lic. #:04WECIT2480 Expiration Date:7-28-15 56 compass point City/State/Zip: Job Site Address: P P N andover Mass Attach a copy of the workers' compensation p 'c declaration page(showing the policy number and expiration date). Failure to secure coverage as requ>impr der cti 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-ye ' t, as well as civilpenalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day m the r. B advised that a copy of this statement may be forwarded to the Office of Investigations of th IA f insurov age verification. I do hereblcefy under he ins and enald of perjury that the information provided above is true and correct. Si afar . Date: 9-3-14 Phone#: 60337 020 Official use 0/1y. Do not ri in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: eu Kt^u W bUILOING SAFETY i CONSTRUCTION PLUMBING SAFETY SECTION tw � , NAME MICHAE6W BUR4� ., LIC # 3801 M } "~ EXPIRES- 0513112015 , State of Now HamPMIre ._, az Voluntary Heating Technician NAME MICHAEL BURKE r ENDORSEMENTS HIOMS0 DATE ISSUED 02M$1 DATE EXPIRES: 01291211113MEL , , � o LICENSE#: HT 140007 f� ,0: i`Y��JJ3 Comr»onwreartfr of massnccteusetss Department of public Safety ChD burner Trchmawn ( rilinjait t License BU459572 MICHAILL w Bye, i 61 CO81JSS Ha Haverblil KA at1 V (:cKrr►Ks�=nnc[ �.x��r as tC,t r9 osrmo,1e ACGIR0CERTIFICATE F DATE(MMIDWYYYY) O LIABILITY INSURANCE 8/20/2014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF. INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the po9cy(les)must be endorsed. If SUBROGATION IS WAIVED,subject to �. the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT- NAME N CT Kathleen Miller, CISR, CPIW Insurance Solutions Corporation PHONE* (6031382-4600 FAX (603)382-2034 60 Westville RdE-MAIL kmiller@iac-insurance.com AMBESS: INSURE 8 AFFORDING COVERAGE NAIC 0 Plaistow NH 03865 INSURER A Merchants 3329 INSURED INSURER s.Hartford Underwriters Ins. Co.POWERHOUSE PLU1rIDING 5 DATING INSURER C: CORP INSURER D: PO BOX 896 INSURERE: PLAISTOW NH 03865-0896 INSURER F: COVERAGES CERTIFICATE NUMBERCL1472917730 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILTRNSR I TYPE OF INSURANCEAO SUBA PO CY EFF POLIO P LIMITS POLICYN NUMBER GENERAL LIABILITY EACH OCCURRENCE _ $ 1,000,000 X COMMERCIAL GENERAL LIABILITY tdjaES We -T $ 500,000 A CLAIMS-MADE OCCUR OP1065497 /1/2018 J1/2015 PRFMED EXP(Any one son) $ 15,000 PERSONAL&ADV INJURY $ GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG S 2,000,000 X POLICY PIFCTRO LOC $ AUTOMOBILE UABIRMCOMBINED SINGLE LIMIT 1 000 000 A X ANY AUTO fEa BODILY INJURY(Par person) $ ALLOWNEO SCHEDULED 2058154 /1/2014 /1/2015 -"""— AUTOS AUTOS BODILY INJURY(Par accident) S HIRED AUTOS NON-OWNED PROPERTY DAMA E —" AUTOS $ UMBRELLA UA Medical payments $ 51000 OCCUR EACH OCCURRENCE $ EXCESS LIAR CLAIMS-MADE AGGREGATE $ DED I I RETENTIONS $ B WORKERS COMPENSATION WC STATU- OTH AND EMPLOYERS,LIABILITY Y l N ANY PROPRIETOR/PARTNERIEXECUTIVE OFFICER/MEMBEREXCLUDED? NIA E.L.EACH ACCIDENT $ 100,000 (Mandatory In NH) 4WECIT2490 /28/2014 /28/2015 It yes,describe under E.L.DISEASE-EA EMPLOYEE $ 100,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT S 500,000 DESCRIPTION OF OPERATIONS!LOCATIONS f VEHICLES(Attach ACORD 101,Additional Remarks Schedule,If more space is required) CERTIFICATE HOLDER CANCELLATION i SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE VALL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. ITTHORO:ED REPRESENTATIVE ( 1 lith Maglia/PMMc�- 01988-2010 ACORD CORPORATION. All rights reserved. nictorori mnrkc of Arnpn 284 Date.l.l,.��: ��.1.��. .. ... . pf HpRTh TOWN OF NORTH ANDOVER ,a.�ti0 PERMIT FOR MECHANICAL INSTALLATION ti D °sem:,...S:.L.,•,��h �'Iss USEt1 i This certifies that . . . . . . . . . . . . . . . . . .�!! . . . . . . . . , has permission for mechanical installation .tf �: - . . . . . . . . . . . in the buildings of- ..1 �. . °'r--\. .. . . . . . at . . s:'. . . .f. /. .�`l . . . �.c! ;North Andover, Mass. J � . Fee. 1�,: . . Lic. No.. . .�.� . �.9 . . . . . . . . . . . . . . ..t-- . . . . GAS INSPECTOR WHITE:Applicant CANARY: Building Dept. PINK:Treasurer Commonwealth of Massachusetts Sheet Metal Permit Date: Permit# Estimated Job Cost: $ 3 O C9 0 Permit Fee: $ !� Plans Submitted: YES NO Plans Reviewed: YES NO Business License# 196 Applicant License # 1 S L Business Information: Property Owner/Job Location Information: Name: J&J Heating & Air Conditioning Name: 16LusT Co-, -z-r Street: 17 Arlington St. Street: q S S �0 l kn City/Town: Dracut, MA 01826 City/Town: 4" 6v �e✓ r7 Telephone: 978-454-8197 Telephone: �� (. $ ^7 S Photo I.D. required/Copy of Photo I.D. attached: YES NO Staff Initial J-1 /M-1-unrestricted license J-2 /M-2-restricted to dwellings 3-stories or less and commercial up to 10,000 sq. ft. /2-stories or less Residential: 1-2 family x Multi-family Condo/Townhouses Other Commercial: Office Retail Industrial Educational Institutional Other Square Footage: under 10,000 sq. ft.x over 10,000 sq. ft. Number of Stories: Sheet metal work to be completed: New Work: Renovation: HVAC X Metal Watershed Roofing Kitchen Exhaust System Metal Chimney/Vents Air Balancing Provide detailed description of work to be done: t Supply & install metal duct work for HVAC system - new construction Residential INSURANCE COVERAGE: ' policy or its equivalent which meets the requirements of M.G.L.Ch.112 Yes[�No❑ I have a current liabili insurance P indicate the type of coverage by checking the appropriate If you have checked Yes, box below: licy Other type of indemnity ❑ Bond A liability insurance po ❑ OWNER'S INSURANCE WAIVER:I am aware that the licensee donithave on insurance nce covera this requirement.ge uired by Chapter 112 of the Massachusetts General Laws,and that my oignature on this pe PP — Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent metal work and installations performed under the permit issued for this application will be By checking this boxes,I hereby certify that all of the details and information I have submitted(or entered)regarding this application are true an accurate to the best of my knowledge and that all sheet m in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws as Duct inspection required prior to insulation installation:YES — NO Prnuress Inspections Com_ts Date Final Inspection Comments Date Type of License: ❑ Master c rPermit# ❑Master-Restricted ❑Journeypdrson Signature of Licensee ❑Journeyperson-Restricted License Number: G❑ Check at www.mass-lov/dpl ,ature of Permit Approval The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston,MA 02111 www.rnassgov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant I>«formation PIease Print Legibly NalTle (Business/Organizatiot-dindividual): J&J Heating & Air Conditioning, INc. Address: 17 Arlington St. City/State/Zip: Dracut, MA 01826 Phone if: 978-454-8197 Are you an employer?Check the appropriate box: Type of project(required): I.® I am a employer with 40 4. [] I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. Now construction 2.❑ 1 am a sole proprietor or partner- listed on the attached sheet. 7. ❑Remodeling slug and have no employees These sub-contractors have g. E]Demolition working for me in any capacity. employees and have workers' [No workers'comp.insurance comp.insurance) 9. [:]Building addition required.] 5. (] We are;a corporation and its 10.❑Electrical repairs or additions 3.0 1 am a homeowner doing all work officers have exercised their 11.[]Plumbing repairs or additions thyself. [No workers'comp. right of exemption per MGL 12.0 Roof repairs . insurance required.]t c. 152, §1(4),and we have no employees.[No workers' 13.0 Other comp.insurance required.] *Any applicant that checks box#1 must also fill out die section below showing their workers'compensation policy information. t Homeowners who submit this at'Fdavit indicating they are doing all work and then hire outside contiactbrs must submit a new affidavit indicating such. lContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have errghloyces. if the sub-contractors have employees,they must provido their workers'comp,policy number. I am an employer that is providing workers'compensation insurance for my employees Below is the policy and job site information. Insurance Company Name: A.I.M. Mutual Insurance Policy#or Self-ins.Lie.#/: `/'WMZ-800-8006553-2013A Expiration Date: 06/01/15 Job Site Address: �e �( / o�Oy�y- City/State/Zip: Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$2S ay against the violator. a advised that a copy of this statement maybe forwarded to the Office of Investi tons of th DIA for 'ns altc ove ge verification. Ido here ertif tnder tl ai and erjury that the information provided above is true and correct. Si natar . Date: Phone 54-8197 Official use only. Do not write in this area,to be completed by city or town official. City or Town: PerrnitlLicense# Issuing Authority(circle one): 1.Hoard of Healdt 2.Building Department 3.Cityl'I'own Clerk 4.Electrical Inspector S.Plumbing Inspector 6.Other Contact Person: Phone#: i ACR TM CERTIFICATE OF LIABILITY INSURANCE 06/10/2014) PRODUCER 978 887.4900 FAX 978.887.2404 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Edward F. Sennott Insurance Agency, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 16 South Main Street HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR P. 0. Box 457 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Topsfield, MA 01983 INSURERS AFFORDING COVERAGE NAIClk INSURED ]gr) Ideating & Air CondTtiomn Inc. 9, INSURERA: Great American Alliance Ins Co 17 Arlington Street INSURER B: Safety Insurance Company 39454 Dracut, MA 01826 INSURERc: A.I..M. Mutual Ins_u_rance Co. INSURER D: -- NSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH . POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSRDD' LTR_NSR TYPE OF INSURANCE_ POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION DATE MM DD YYYY DATE MM DD YY LIMITS GENERAL LIABILITY PAC6418906-08 06/01/2014 06/01/2015 EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE O RF_NTED �x PREMISES(Ea occurrence)_ $ 300,000 CLAIMS MADE I -� OCCUR A MED EXP(Any one person) $ 10,000 —_ PERSONAL 8 ADV INJURY $ 1.,000,00 ----- ------ GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,OO POLICY PRO- -- )ECT LOC AUTOMOBILE LIABILITY 2434550 06/01/2014 06/01/2015 ANY AUTO (Ea SINGLE LIMIT ,� (Ea accident) 1,000,000 ALL OWNED AUTOS --- -- X SCHEDULED AUTOS BODILY INJURY $B - (Per person) X HIRED AUTOS X NON-OWNED AUTOS BODILY INJURY $ (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO -- — OTHER THAN EA ACC $ AUTO ONLY: AGG EXCESS/UMBRELLA LIABILITYUMB6418958-06 06/01/2014 06/01/2015 EACH OCCURRENCE $ 2,000,000 OCCUR CLAIMS MADE A AGGREGATE .$ 2,000,OO DEDUCTIBLE ---- $ _ RETENTION $ - WOREMPLOY RS'LIKERS AILIT WMZ-800-8006553-2014A 06/02/2014 06/02/2015 X AND EMPLOYERS'LIABILITY S A H. TION Y/N TORY LIMITS____En.___ _ ANY PROPRIETOR/EXCLU R/EXECUTIVE� E.L.EACH ACCIDENT $ 1,000,00C C OFFICER/MEMBER EXCLUDED? (Mandatory in NH) If yes,describe under E.L.DISEASE-EA EMPLOYE- $ 1,000,000 SPECIAL PROVISIONS below — OTHER E.L.DISEASE-POLICY LIMIT I$ 1,000,DO DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR REPRESENTATIVES. Evidence of Insurance AUTHORIZED REPRESENTATIVE i Peter Sennott/LAR ACORD 25 (2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD rNSS DRIVER'S LICENSE b14. 4,1 ISS ` qT END- 4d NUMBER t m kkppp n05-03-26 NONE S99.655871 ''.. 41,EXP w DOA � 2 016 55051 05 22-19$0 CLASS 12 REST iS SEX--M-. 1HOt+609 `bi a5 DM. NONE 4 i Yom• z ERIC RJ r A 83 LONG DR DRACUT,MA 01826-2048 �-�y' ,� 5 OD OSOd2011 Rev 07.1S100B 4„:COMMONWEALTH OF MASSACHUSETTS BOARD OE SHEET mETAL'`WORI<ER.S ISSUES THE FOLLOWING LICENSE J'w AS .A' MASTER UNRESTR I CTEJ� r J >:& ,J HEATING ER'I C R KL I NE: J & J HEAT.]NG & A.0 U 17 ARLINGTON ST bACu1 MA w826-3936 156f3og/28/16> . 2145 9 i Comm ..S OF W. OH RUA(D'Of= SHEET MLTA WORKERS ISSUES THE FOLLOWI`N.G LICENSE AS A BU:5I N;Ess " CDWA,R0 T AYOTTE '. J J HEATING AIR CONDITL,ONINGI C� 17 ARL IN`CTM SIRECT''' J DRACUr MA o18z6 ' � 1 6 of/1 /�6 144485 �1 9. r,_ .. L'iLL�:LlA;L1uC1�: =43:t11".T:S "� -:;�il�Rll_LiLL�.] ` + wrightsoftoJob: 56 Compass Point Load Short Form Date: June S,2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Uesign Information Htg Clg Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 63 8 Fireplaces 3 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 24 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm Btuh Air flow/ o factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor system d 1414 35976 16059 927 927 1st floor system d 2964 49817 32943 1648 1648 Entire House d 4378 85793 49002 2575 2575 Other equip loads 0 0 Equip. @ 0.88 RSM 42975 Latent cooling 7574 TOTALS 4378 85793 50549 2575 2575 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrl htSOft" 2014-Oct-08 06:55:25 g Right-Suite®Universal 2015 15.0.03 RSU05790 Page 1 ACCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N - - wrihtsofte 9 Load Short Form . Job: 56 Compass Point Date: June 8,2013 1st floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Information Htg Cig Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 63 8 Fireplaces 2 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 24 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1648 cfm Actual air flow 1648 cfm Air flow factor 0.033 cfm/Btuh Air flow factor 0.050 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Dining room 225 4392 1700 145 85 Kitchen 180 1823 3728 60 186 Laundry 45 605 1121 20 56 living room 180 3560 2729 118 136 Master bedroom 273 7276 3435 241 172 Master bath 120 3168 2396 105 120 W.I.0 120 1477 476 49 24 Entry 68 1341 421 44 21 Powder Rm 48 95 514 3 26 Front entry 230 457 555 15 28 Recreation Room 270 4088 3729 135 186 Bar area 506 11658 7389 386 370 Bath room 90 538 651 18 33 spare room 216 3226 1519 107 76 Room5 393 6112 2580 202 129 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ti ri htsoft 2014-Oct-08 06:55:25 vr�. w9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 2 ACOA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N istfloor system d 2964 49817 32943 1648 1648 Other equip loads 5697 2389 Equip. @ 0.88 RSM 30987 Latent cooling 4619 TOTALS 2964 55513 35606 1648 1648 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft° 2014-Oct-08 06:55:25 v���/�r. 9 Right-Suite(R)Universal 2015 15.0.03 RSU05790 Page 3 ACCK ...Desktop\Wrights oft HVAC\murteild building 8.rup Calc=MJ8 Front Door faces: N Load Short Form Job: 56 Compass Point • wrightsoft. Date: June 8,2013 2nd floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Information Htg Clg Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 63 8 Fireplaces 2 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 24 HEATING EQUIPMENT COOLING EQUIPMENT Make Goodman Mfg. Make Goodman Mfg. Trade GOODMAN Trade GOODMAN, JANITROL,AMANA DISTI... Model GMVC950453BX* Cond SSX160301A* AHRI ref 2002234 Coil CHPF3642C6C* AHRI ref 5039169 Efficiency 95AFUE Efficiency 12.7 EER, 15.5 SEER Heating input 46000 Btuh Sensible cooling 22240 Btuh Heating output 45000 Btuh Latent cooling 5560 Btuh Temperature rise 46 OF Total cooling 27800 Btuh Actual air flow 927 cfm Actual air flow 927 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.058 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) bedroom 2\ 278 5208 2533 134 146 bath2 65 1652 544 43 31 2nd floor hall 176 8231 3864 212 223 Bathroom 3 187 1793 1333 46 77 Bedroom 3 225 6263 4494 161 259 storage 483 12828 3290 331 190 2nd floor system d 1414 35976 16059 927 927 Other equip loads 4345 2389 Equip. @ 0.88 RSM 16179 Latent cooling 2955 TOTALS 1414 40321 19134 927 927 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Oct-08 06:55:25wri htsoftRight-Suite@ Universal 2015 15.0.03 RSU05790 Page 4 XCICK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N i htsoft Load Multizone Summary Report Job: 56 Compass Point wr F � g � Date: June 8,2013 By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Infiltration Summary '7i Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM ft3 cfm Btuh/ft2 ft3 cfm Btuh/ft2 2nd floor system 13864 0 . 61 141 4 . 3 13864 0 . 57 132 0 . 5 1st floor system 31175 0 . 36 185 4 . 3 31175 0 . 33 173 0 . 5 Entire House 45039 0 . 17 326 1 . 7 45039 0 . 07 305 0 . 1 • • and AVF Summary ROOM NAME Area Htg load Clg load Htg AVF Clg AVF ft2 Btuh Btuh cfm cfm bedroom 2 \ 278 5208 2533 134 146 bath2 65 1652 544 43 31 2nd floor hall 176 8231 3864 212 223 Bathroom 3 187 1793 1333 46 77 Bedroom 3 225 6263 4494 161 259 storage 483 12828 3290 331 190 2nd floor system 1414 35976 16059 927 927 Dining room 225 4392 1700 145 85 Kitchen 180 1823 3728 60 186 Laundry 45 605 1121 20 56 Living room 180 3560 2729 118 136 Master bedroom 273 7276 3435 241 172 Master bath 120 3168 2396 105 120 W. I .0 120 1477 476 49 24 Entry 68 1341 421 44 21 Powder Rm 48 95 514 3 26 Front entry 230 457 555 15 28 Recreation Room 270 4088 3729 135 186 Bar area 506 11658 7389 386 370 Bath room 90 538 651 18 33 spare room 216 3226 1519 107 76 Room5 393 6112 2580 202 129 lst floor system 2964 49817 32943 1648 1648 Entire House 4378 85793 49002 2575 2575 .` WPI (ltSOft- 2014-Oct-08 06:55:25 A, g Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 1 �� ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Building Analysis Job: 56 Compass Point wrightsoft° g y Date: June 8,2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:flheatac.com Pro66t information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Des:166 Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humlcllty (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Dally range6°F) - 17 ( M ) Method Simplified Wet bulb (° - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 3 Average) • Component Btuh/ft2 Btuh % of load Walls 5.2 24380 28.4 Glazing 24.3 5799 6.8 Doors 24.6 4472 5.2 Ceilings 8.7 18079 21.1 Floors 3.2 6264 7.3 Infiltration 4.3 21780 25.4 Ducts 5019 5.9 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 857931 100.0 Component Btuh/ft2 Btuh % of load Walls 1.3 5934 12.1 Glazing 26.4 6292 12.8 Doors 8.2 1483 3.0 Ceilings 5.8 12173 24.8 Floors 0.4 766 1.6 ' „ ,& Infiltration 0.5 2487 5.1 Ducts 2837 5.8 Ventilation 0 0 Internal gains 17030 34.8 Blower 0 0 Adjustments 0 Total 1 49002 100.0 Latent Cooling Load = 7574 Btuh Overall U-value = 0.116 Btuh/ft2-°F Data entries checked. � 2014-Oct-O8 06:55:25 wrightsoft` Right-Suite®Universal 2015 15.0.03 RSU05790 Page 1 ..Desktop\wrightsoft HVAC\murteild building 8.rup Calc=MJ8 Front Door faces: N Building Anali ss Job: 56 Compass Point wrightsoftm y Date: June 8,2013 1st floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Dally range °F) - 17 ( M ) Method Simplified Wet bulb (°F� - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2?Average) • Component Btuh/ft2 Btuh % of load Walls 6.1 15608 28.1 Glazing 20.9 3485 6.3 w Doors 24.6 4472 8.1 Ceilings 16.2 8900 16.0 Floors 1.8 2677 4.8 ,a Infiltration 4.3 12355 22.3 Ducts 2319 4.2 Piping 0 0 Humidification 5697 10.3 Ventilation 0 0 Adjustments 0 Total 1 55513 100.0 Component Btuh/ft2 Btuh % of load Walls 1.8 4583 13.0 Glazing 22.5 3744 10.6 Doors 8.2 1483 4.2 Ceilings 11.4 6272 17.8 Floors 0.2 327 0.9 .; Infiltration 0.5 1411 4.0 Ducts 483 1.4 �. Ventilation 0 0 Internal gains 14640 41.4 Blower 2389 6.8 Adjustments 0 Total 35332 100.0 a Latent Cooling Load = 4619 Btuh Overall U-value = 0.115 Btuh/ft2-°F Data entries checked. + wrightsoft® 2014-Oct-08 06:55:25 ,1 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 2 Ar-CK ...Desktop\wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Buildin Anal SIS Job: 56 Compass Point wrightsoft. y Date: June 8,2013 2nd floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Prooect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) Outdoor: Heating Cooling Moisture difference (gr/Ib) 47..0 23 6 Dry bulb (°F) 5 83 Infiltration: Dally range�°F) - 17 ( M ) Method Simplified Wet bulb (° - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) • Component Btuh/ft2 Btuh % of load Walls 4.1 8771 21.8 wd Glazing 32.1 2313 5.7 Doors 0 0 0 Ceilings 6.0 9180 22.8 Floors 7.5 3587 8.9 Infiltration 4.3 9424 23.4 1 Ducts 2700 6.7md Piping 0 0 Humidification 4345 10.8 Ventilation 0 0 " Adjustments 0 Total 1 40321 100.0 • • Component Btuh/ft2 Btuh % of load Walls 0.6 1351 7.3 Glazing 35.4 2549 13.8 ° Doors 0 0 0 f Ceilings 3.9 5901 32.0 Floors 0.9 438 2.4 t Infiltration 0.5 1076 5.8 Ducts 2354 12.8 Ventilation 0 0 Internal gains 2390 13.0 Blower 2389 13.0 Adjustments 0 Total 1 184481 100.0 Latent Cooling Load = 2955 Btuh Overall U-value = 0.118 Btuh/ft2-°F Data entries checked. - wrightsoft% 9 2014-Oct-O8 06:55:25 Ri ht-Suite@ Universal 2015 15.0.03 RSU05790 Page 3 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N wrso i htft Component Constructions Job: 56 Compass Point • 9 Date: June 8,2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington at,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 3 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftp-°F ftz-°F/Btuh BtuhM Btuh Btuh/ftp Btuh Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 609 0.097 11.0 6.11 3719 1.79 1092 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud se 900 0.097 11.0 6.11 5497 1.79 1614 sw 410 0.097 11.0 6.11 2502 1.79 735 W 50 0.097 11.0 6.11 303 1.79 89 nw 587 0.097 11.0 6.11 3587 1.79 1053 all 2554 0.097 11.0 6.11 15608 1.79 4583 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 376 0.065 21.0 4.09 1540 0.63 237 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 675 0.065 21.0 4.09 2764 0.63 426 sw 416 0.065 21.0 4.09 1704 0.63 262 nw 675 0.065 21.0 4.09 2764 0.63 426 all 2142 0.065 21.0 4.09 8771 0.63 1351 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,cir innr,1/4"gap,1/8"thk:2 ne 105 0.300 0 18.9 1992 18.8 1985 glazing,clr outr,air gas,wd frm mat,clr innr, 1/4"gap, 1/8"thk; ne 56 0.570 0 35.9 2011 38.7 2165 6.67 ft head ht sw 20 0.570 0 35.9 718 49.3 986 sw 16 0.300 0 18.9 302 24.0 384 nw 41 0.300 0 18.9 775 18.8 772 all 238 0.300 0 24.3 5799 26.4 6292 Doors 11 DO:Door,wd sc type ne 161 0.390 0 24.6 3956 8.15 1312 sw 21 0.390 0 24.6 516 8.15 171 all 182 0.390 0 24.6 4472 8.15 1483 Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 755 0.026 38.0 1.64 1237 1.15 872 gypsum board int fnsh 17B-6al:Rf/clg ceiling,asphalt shingles roof mat,wd cons,r-6 602 0.105 6.0 6.61 3979 3.72 2236 deck ins,1"thkns 2014-Oct-08 06:55:25 wrightsoft" Right-Suite@ Universal 2015 15.0.03 RSU05790 Pagel ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N R C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,6"thkns,1/2" 536 0.257 1.0 16.2 8663 11.4 6105 gypsum board int fnsh C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,8"thkns,1/2" 15 0.255 1.0 16.1 236 11.3 167 gypsum board int fnsh C part ceiling,:C part ceiling,frm fir,6"thkns 176 0.357 1.0 22.5 3964 15.9 2794 Floors 19A-Obstp:Part floor,frm fir,6"thkns 476 0.368 0 7.54 3567 0.92 438 19A-30bswp: Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 1489 0.034 30.0 1.80 2677 0.22 327 2014-Oct-08 06:55:25 wrightsoft' Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 2 /CCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MA Front Door faces: N Com Constructions Job: 56 Compass Point onent wrightsoft- P Cate: June 8,2013 2nd floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain V Btuh/ft'-°F ftz-°F/Btuh BtuhW Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 376 0.065 21.0 4.09 1540 0.63 237 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Be 675 0.065 21.0 4.09 2764 0.63 426 sw 416 0.065 21.0 4.09 1704 0.63 262 nw 675 0.065 21.0 4.09 2764 0.63 426 all 2142 0.065 21.0 4.09 8771 0.63 1351 Partitions (none) Windows 1 D-c2ow:2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap, ne 56 0.570 0 35.9 2011 38.7 2165 1/8"thk;6.67 ft head ht sw 16 0.300 0 18.9 302 24.0 384 all 72 0.300 0 32.1 2313 35.4 2549 Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 755 0.026 38.0 1.64 1237 1.15 872 gypsum board int fnsh 1713-6al:Rf/cig ceiling,asphalt shingles roof mat,wd cons,r-6 602 0.105 6.0 6.61 3979 3.72 2236 deck ins,1"thkns C part ceiling,:C part ceiling,frm flr,6"thkns 176 0.357 1.0 22.5 3964 15.9 2794 Floors 19A-Obstp:Part floor,frm flr,6"thkns 476 0.368 0 7.54 3587 0.92 438 C wri htsaft" 2014-Oct-08 06:55:25 1 g Right-Suite(g)Universal 2015 15.0.03 RSU05790 Page 3 ACCK ...Des ktop\W rights oft HVAC\murteild building 8.rup Calc=MJ8 Front Door faces: N ' Wrl htsoft- Component Constructions Job: 56 Compass Point 9 Date: June 8,2013 1st floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Desiah Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btuh Btuh/ft2 Btu Walls 126-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 609 0.097 11.0 6.11 3719 1.79 1092 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud se 900 0.097 11.0 6.11 5497 1.79 1614 sw 410 0.097 11.0 6.11 2502 1.79 735 W 50 0.097 11.0 6.11 303 1.79 89 nw 587 0.097 11.0 6.11 3587 1.79 1053 all 2554 0.097 11.0 6.11 15608 1.79 4583 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 ne 105 0.300 0 18.9 1992 18.8 1985 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk; sw 20 0.570 0 35.9 718 49.3 986 6.67 ft head ht nw 41 0.300 0 18.9 775 18.8 772 all 166 0.300 0 20.9 3485 22.5 3744 Doors 11 DO:Door,wd sc type ne 161 0.390 0 24.6 3956 8.15 1312 sw 21 0.390 0 24.6 516 8.15 171 all 182 0.390 0 24.6 4472 8.15 1483 Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,6"thkns,1/2" 536 0.257 1.0 16.2 8663 11.4 6105 gypsum board int fnsh C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,8"thkns,1/2" 15 0.255 1.0 16.1 236 11.3 167 gypsum board int fnsh Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm flr,10"thkns 1489 0.034 30.0 1.80 2677 0.22 327 C WYI htsoft 2014-Oct-08 06:55:25 �., 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 4 ACCP. ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Com onent Constructions Job: 56 Compass Point wrightsoft'° � Date: Junes,2013 Recreation Room By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft� Btuh/ftz°F ft2-°FBtuh Btuh/ftz Btu Btuh/ftz Btuh Walls 1213-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 118 0.097 11.0 6.11 719 1.79 211 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud nw 128 0.097 11.0 6.11 779 1.79 229 all 245 0.097 11.0 6.11 1498 1.79 440 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 ne 35 0.300 0 18.9 669 18.8 667 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,6"thkns,1/2" 45 0.257 1.0 16.2 727 11.4 513 gypsum board int fnsh Floors (none) ,: 14, WI'1 htsoft 2014-Oct-08 06:55:25 1 g Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 5 ACCP. ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 56 Compass Point wrightsoft- Date: June 8,2013 Bar area By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain V BtuhM-°F f-°F/Btuh Btuh/ftz Btu Btuh/ftz Btu Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 75 0.097 11.0 6.11 458 1.79 135 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud se 196 0.097 11.0 6.11 1195 1.79 351 all 271 0.097 11.0 6.11 1653 1.79 485 Partitions (none) Windows (none) Doors 11 DO:Door,wd sc type ne 112 0.390 0 24.6 2752 8.15 913 Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,6"thkns,1/2" 348 0.257 1.0 16.2 5625 11.4 3964 gypsum board int fnsh Floors (none) 1 wri htsoft 2014-Oct-08 06:55:25 ,zz. 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 6 ACO, ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 56 Compass Point • wrightsoft- Date: June 8,2013 Bath room By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MAO 1826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 D- • Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain 112 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btuh Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" nw 43 0.097 11.0 6.11 260 1.79 76 gypsum board int fish,2"x4"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,6"thkns,1/2" 6 0.257 1.0 16.2 97 11.4 68 gypsum board int fnsh Floors (none) 2014-Oct-08 06:55:25 .4ZE rF wrightsoft" Right-Suite(g)Universal 2015 15.0.03 RSU05790 Page 7 ACCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 56 Compass Point wrightsoft p Date: June 8,2013 spare room By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/13tuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12B-Osw:Firm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" sw 153 0.097 11.0 6.11 935 1.79 275 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud nw 102 0.097 11.0 6.11 623 1.79 183 all 255 0.097 11.0 6.11 1558 1.79 458 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd flr fish,frm flr,6"thkns,1/2" 36 0.257 1.0 16.2 582 11.4 410 gypsum board int fnsh Floors (none) 2014-Oct-08 06:55:25 wrightsoft' Right-Suite®Universal 2015 15.0.03 RSU05790 Page 8 /� /� ...Desktop\wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 56 Compass Point Com ' -�- wrightsoft- p Date: June 8,2013 Rooms By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com • ect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area Ll-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-'F ftl-°FBtuh Btuh/V Btu Btuh/V Btu Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" se 170 0.097 11.0 6.11 1039 1.79 305 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud sw 145 0.097 11.0 6.11 883 1.79 259 w 50 0.097 11.0 6.11 303 1.79 89 nw 68 0.097 11.0 6.11 416 1.79 122 all 432 0.097 11.0 6.11 2640 1.79 775 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd flr fish,frm flr,6"thkns,1/2" 101 0.257 1.0 16.2 1632 11.4 1150 gypsum board int fnsh Floors (none) 2014-Oct-08 06:55:25 wrightsoft* Right-Suite®Universal 2015 15.0.03 RSU05790 Page 9 rF ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 56 Compass Point wrightsoft- Date: June 8,2013 Dining room By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project ! • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design ConditionS; Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz°F ft�'FBtuh Btuh/ftz Btuh Btuh/ftz Btu Walls 126-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 100 0.097 11.0 6.11 611 1.79 179 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud nw 110 0.097 11.0 6.11 672 1.79 197 all 210 0.097 11.0 6.11 1283 1.79 377 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 ne 35 0.300 0 18.9 662 18.8 659 glazing,clr outr,air gas,wd frm mat,clr innr, 1/4"gap, 1/8"thk; nw 25 0.300 0 18.9 473 18.8 471 6.67 ft head ht all 60 0.300 0 18.9 1134 18.8 1130 Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm flr,10"thkns 225 0.034 30.0 1.80 404 0.22 49 2014-Oct-0806:55:25 Wrl ttSOf � Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 10 RCCA ...Desktop\wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N COnlrlonent Constructions Job: 56 Compass Point wrightsoft- p Date: June 8,2013 Kitchen By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft'-°F ftz-°F/Btuh BtuhN Btu Btu hN Btu Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" nw 92 0.097 11.0 6.11 562 1.79 165 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,cir innr,1/4"gap,1/8"thk:2 nw 16 0.300 0 18.9 302 18.8 301 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk; 6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fl fnsh,r-30 ins,frm fl r,10"thkns 180 0.034 30.0 1.80 324 0.22 40 � 2014-Oct-08 06:55:25 WI1 1tSOfRight-Suite@ Universal 2015 15.0.03 RSU05790 Page 11 ACC,k ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N - - 9 - Com Job: 56 Compass Point wri htsoft Component Constructions� Date: June 8,2013 Laundry By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W BtuhM-°F ft2-°F/Btuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 126-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" nw 45 0.097 11.0 6.11 275 1.79 81 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 45 0.034 30.0 1.80 81 0.22 10 t wri htsoft 2014-Oct-08 06:55:25 �., 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 12 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Com onent Constructions Job: 56 Compass Point wrightsoft°' � Date: June 8,2013 Living room By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-0F ft2-°F/Btuh Btuh/ft2 Btu Btuh/112 Btu Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 143 0.097 11.0 6.11 874 1.79 257 gypsum board int fish,2"x4"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors 11 DO:Door,wd sc type ne 49 0.390 0 24.6 1204 8.15 399 Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm flr,10"thkns 180 0.034 30.0 1.80 324 0.22 40 J. 2014-Oct-08 06:55:25 WI1 htsoft Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 13 ACCP ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 56 Compass Point ' -�- wrightsoft- Date: June 8,2013 Master bedroom By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42'N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-°F ft2-°F/3tuh Btuh/ft2 Bluh Btu h/ft2 Btu Walls 126-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 173 0.097 11.0 6.11 1057 1.79 310 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud se 336 0.097 11.0 6.11 2053 1.79 603 all 509 0.097 11.0 6.11 3110 1.79 913 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 ne 35 0.300 0 18.9 662 18.8 659 glazing,clr outr,air gas,wd frm mat,clr innr, 1/4"gap,1/8"thk; 6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm flr,10"thkns 273 0.034 30.0 1.80 491 0.22 60 wri htsoft 2014-Oct-O8 06:55:25 �., 9 Right-SuteOO Universal 2015 15.0.03 RSU05790 Page 14 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 56 Compass Point wrightsoft- Date: June 8,2013 Master bath By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:ijheatac.com -Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 • n Con' ditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� BtuhM-°F W-T/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Wal I s 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" se 90 0.097 11.0 6.11 550 1.79 162 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud sw 88 0.097 11.0 6.11 538 1.79 158 all 178 0.097 11.0 6.11 1088 1.79 319 Partitions (none) Windows 1 D-c2ow:2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap, sw 20 0.570 0 35.9 718 49.3 986 1/8"thk;6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 120 0.034 30.0 1.80 216 0.22 26 ti 2014-Oct-08 06:55:25wri hsoft° Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 15 ACCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N ComConstructions Job: 56 Compass Point Component• wrightsoft- p Date: June 8,2013 W LC By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 DeSion Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh Btuh/ft2 Btu Btuh/f 2 Btu Wal I s 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" se 108 0.097 11.0 6.11 660 1.79 194 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 120 0.034 30.0 1.80 216 0.22 26 2014-Oct-08 06:55:25 ,y wrightsoft' Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 16 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 56 Compass Point wrightsoft� P Date: June 8,2013 ` Entry By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/tt2-0F ft2-°FBtuh Btuh/ft2 Btu Btuh/112 Btu Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" sw 24 0.097 11.0 6.11 147 1.79 43 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors 11 DO:Door,wd sc type sw 21 0.390 0 24.6 516 8.15 171 Ceilings C part ceiling,:C part ceiling,hrd wd fir fish,frm fir,8"thkns,1/2" 15 0.255 1.0 16.1 236 11.3 167 gypsum board int fnsh Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 68 0.034 30.0 1.80 122 0.22 15 t tiWrl htSOf " Right-SuRe�Universal 2015 15.0.03 RSU05790 2014-Oct-08 06:55:25 Page 17 ACCp. ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 56 Compass Point wrightsoft- Date: June 8,2013 Powder Rm By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-oF ft2-"F/13tuh Btuh/ftz Btu Btuh/(t2 Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fish,r-30 ins,frm fir,10"thkns 48 0.034 30.0 1.80 86 0.22 11 2014-Oct-08 06:55:25 ,-"-% wrightsoft* Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 18 ACCP. ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 56 Compass Point wrightsoft� p Date: June 8,2013 • Front entry By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft�-°F/Btuh Btuh/ftz Btu Btuh/V Btu Wal I s (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 230 0.034 30.0 1.80 413 0.22 51 2014-Oct-08 06:55:25 wrightsOft• Right-SuiteO Universal 2015 15.0.03 RSU05790 Page 19 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N • Job: 56 Compass Point • wriQ htsoft Component Constructions Date: June 8,2013 Bedroom 3 By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jiheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 BtuhM-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Wal I s 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 79 0.065 21.0 4.09 324 0.63 50 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 135 0.065 21.0 4.09 553 0.63 85 nw 135 0.065 21.0 4.09 553 0.63 85 all 349 0.065 21.0 4.09 1429 0.63 220 Partitions (none) Windows 1 D-c2ow:2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap, ne 56 0.570 0 35.9 2011 38.7 2165 1/8"thk;6.67 ft head ht Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 225 0.026 38.0 1.64 369 1.15 260 gypsum board int fish Floors (none) 2014-Oct-08 06:55:25 't. rF WI1 htsoft Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 20 ACCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N . wri htsoft Component Constructions Job: 56 Compass Point 9 Date: June 8,2013 Bathroom 3 By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area LI-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftl-°F ftz-°FBtuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 12F-0sw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" nw 153 0.065 21.0 4.09 627 0.63 96 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 187 0.026 38.0 1.64 306 1.15 216 gypsum board int fnsh Floors (none) wri htsoft" 2014-Oct-08 06:55:25 ,.,.,_ 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 21 ACCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 56 Compass Point wrightsoft� p Date: June 8,2013 2nd floor hall By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:Ijheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ft2-°FBtuh Btuh/ft2 Btu Btuh/Itz Btu Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 108 0.065 21.0 4.09 442 0.63 68 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 135 0.065 21.0 4.09 553 0.63 85 sw 72 0.065 21.0 4.09 295 0.63 45 nw 81 0.065 21.0 4.09 332 0.63 51 all 396 0.065 21.0 4.09 1622 0.63 250 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,frm fir,6"thkns 176 0.357 1.0 22.5 3964 15.9 2794 Floors (none) 2014-Oct-08 06:55:25 Wrl htSOf " Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 22. ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJB Front Door faces: N Comonent Constructions Job: 56 Compass Point wrightsoft� �" Date: June 8,2013 bath2 By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jiheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft, BtuhM-'F ft'-°FBtuh Btuh/ft2 Btu BtuhN Btu Wal I s 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 117 0.065 21.0 4.09 479 0.63 74 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 45 0.065 21.0 4.09 184 0.63 28 all 162 0.065 21.0 4.10 663 0.63 102 Partitions (none) Windows (none) Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 65 0.026 38.0 1.64 106 1.15 75 gypsum board int fnsh Floors (none) t wri htsofta 2014-Oct-08 06:55:25 9 Right-Suite®Universal 2015 15.0.03 RSU05790 Page 23 ACCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 56 Compass Point wrightsoft- COn1 P Date: June 8,2013 bedroom 2 \ By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss CIg HTM Gain ft� Btuh/ftz-°F ft2-'FBtuh Btuh/V Btu Btuh/ftz Btu Wal I s 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" se 198 0.065 21.0 4.09 811 0.63 125 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud sw 137 0.065 21.0 4.09 561 0.63 86 nw 117 0.065 21.0 4.09 479 0.63 74 all 452 0.065 21.0 4.09 1851 0.63 285 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 sw 16 0.300 0 18.9 302 24.0 384 glazing,clr outr,air gas,wd frm mat,clr innr, 1/4"gap, 1/8"thk; 6.67 ft head ht Doors (none) Ceilings 166-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 278 0.026 38.0 1.64 455 1.15 321 gypsum board int fnsh Floors (none) t wri htsoft 2014-Oct-08 06:55:25 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 24 ACCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N • Component Constructions Job: 56 Compass Point wrightsoft� p Date: June 8,2013 storage By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42'N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ft?-°FBtuh Btuh/ftz Btu BtuhM Btu Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 72 0.065 21.0 4.09 295 0.63 45 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 162 0.065 21.0 4.09 663 0.63 102 sw 207 0.065 21.0 4.09 848 0.63 131 nw 189 0.065 21.0 4.09 774 0.63 119 all 630 0.065 21.0 4.10 2580 0.63 397 Partitions (none) Windows (none) Doors (none) Ceilings 17B-6al:Rf/clg ceiling,asphalt shingles roof mat,wd cons,r-6 602 0.105 6.0 6.61 3979 3.72 2236 deckins,l"thkns Floors 19A-Obstp:Part floor,frm flr,6"thkns 476 0.368 0 7.54 35.87 0.92 438 2014-Oct-08 06:55:25 „ wrightsoft' Right-Suite©Universal 2015 15.0.03 RSU05790 Page 25 RCCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Project Summar Job: 56 Compass Point - - wrightsoft- y Date: June 8,2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Notes: Design Information Weather: Worcester, MA, US Winter Design Conditions Summer Design Conditions Outside db 5 OF Outside db 83 OF Inside db 68 OF Inside db 75 OF Design TD 63 OF Design TD 8 OF Daily range M Relative humidity 50 % Moisture difference 24 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 80773 Btuh Structure 46165 Btuh Ducts 5019 Btuh Ducts 2837 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 85793 Btuh Use manufacturer's data n Rate/swing multiplier 0.88 Infiltration Equipment sensible load 42975 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 3 (Average) Structure 6522 Btuh Ducts 1053 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 4378 4378 Equipment latent load 7574 Btuh Volume (ft3) 45039 45039 Air changes/hour 0.17 0.07 Equipment total load 50549 Btuh Equiv.AVF (cfm) 326 305 Req. total capacity at 0.80 SHR 4.5 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Oct-08 06:55:25 9C- wrightsoftm Right-Suite@ Universal 2015 15.0.03 RSU05790 Pagel . ..Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Project Summar Job: 56 Compass Point ' wrightsoft° y Date: June 8,2013 1st floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Notes: Design Information Weather: Worcester, MA, US Winter Design Conditions Summer Design Conditions Outside db 5 OF Outside db 83 OF Inside db 68 OF Inside db 75 OF Design TD 63 OF Design TD 8 OF Daily range M Relative humidity 50 % Moisture difference 24 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 47497 Btuh Structure 32461 Btuh Ducts 2319 Btuh Ducts 483 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 5697 Btuh Blower 2389 Btuh Piping 0 Btuh Equipment load 55513 Btuh Use manufacturer's data n Rate/swing multiplier 0.88 Infiltration Equipment sensible load 30987 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 2 (Average) Structure 3878 Btuh Ducts 741 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 2964 2964 Equipment latent load 4619 Btuh Volume (ft3) 31175 31175 Air changes/hour 0.36 0.33 Equipment total load 35606 Btuh Equiv.AVF (cfm) 185 173 Req. total capacity at 0.80 SHR 3.2 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1648 cfm Actual air flow 1648 cfm Air flow factor 0.033 cfm/Btuh Air flow factor 0.050 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Oct-08 06:55:25 wrightsoft" Right-Suite®Universal 2015 15.0.03 RSU05790 Page 2 ACCX ..Desktop\wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Pro ect Summar Job: 56 Compass Point A wrightsoft- Y Date: June 8,2013 2nd floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Proie6t Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Notes: Desicin Information Weather: Worcester, MA, US Winter Design Conditions Summer Design Conditions Outside db 5 OF Outside db 83 OF Inside db 68 OF Inside db 75 OF Design TD 63 OF Design TD 8 OF Daily range M Relative humidity 50 % Moisture difference 24 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 33276 Btuh Structure 13705 Btuh Ducts 2700 Btuh Ducts 2354 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 4345 Btuh Blower 2389 Btuh Piping 0 Btuh Equipment load 40321 Btuh Use manufacturer's data n Rate/swing multiplier 0.88 Infiltration Equipment sensible load 16179 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 2 (Average) Structure 2643 Btuh Ducts 312 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 1414 1414 Equipment latent load 2955 Btuh Volume (ft3) 13864 13864 Air changes/hour 0.61 0.57 Equipment total load 19134 Btuh Equiv.AVF (cfm) 141 132 Req. total capacity at 0.80 SHR 1.7 ton Heating Equipment Summary Cooling Equipment Summary Make Goodman Mfg. Make Goodman Mfg. Trade GOODMAN Trade GOODMAN, JANITROL,AMANA DISTI... Model GMVC950453BX* Cond SSX160301A* AHRI ref 2002234 Coil CHPF3642C6C* AHRI ref 5039169 Efficiency 95AFUE Efficiency 12.7 EER, 15.5 SEER Heating input 46000 Btuh Sensible cooling 22240 Btuh Heating output 45000 Btuh Latent cooling 5560 Btuh Temperature rise 46 OF Total cooling 27800 Btuh Actual air flow 927 cfm Actual air flow 927 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.058 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Oct-08 06:55:25 wrightsoft' Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 3 ACCK ..Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N i REScheck Software Version 4.5.0 Compliance Certificate Project 140707Trust_MerrimackCondos_BIdgF_UnitsB-E-E_NAndover Energy Code: 2009 IECC Location: North Andover, Massachusetts Construction Type: Multi-family Project Type: New Construction Conditioned Floor Area: 2,117 ft2 Glazing Area 11% Climate Zone: 5 Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 56-F2 North Andover, MA R R R R R r! Compliance: 0.3%Better Than Code Maximum UA: 311 Your UA: 310 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Assembly Gross Area Cav ty Cont. Glazing R-Vallue R-Value or Door UA Floor 1st Floor:All-Wood Joist/Truss:Over Unconditioned Space 516 38.0 0.0 0.026 13 Wall 1st Separation: Wood Frame, 16" o.c. 440 15.0 0.0 0.077 34 Wall 1st Ext 2x6:Wood Frame, 16"o.c. 480 21.0 0.0 0.057 20 Window Dh:Vinyl Frame:Double Pane with Low-E 48 0.290 14 Door Slider: Glass 40 0.290 12 Door Side Ground Flr entry: Glass 23 0.260 6 Door Metal: Solid 18 0.170 3 Wall 2nd Floor 2x6: Wood Frame, 16" D.C. 576 21.0 0.0 0.057 25 Window DH:Vinyl Frame:Double Pane with Low-E 34 0.290 10 Window Fix:Vinyl Frame:Double Pane with Low-E 19 0.280 5 Window CSMT:Vinyl Frame:Double Pane with Low-E 12 0.260 3 Door Slider: Glass 68 0.290 20 Wall 2nd Flr Separation: Wood Frame, 16"o.c. 504 15.0 0.0 0.077 39 Ceiling Bay Win: Flat Ceiling or Scissor Truss 6 30.0 0.0 0.035 0 Wall 3rd Floor Walls 2x6: Wood Frame, 16" o.c. 496 21.0 0.0 0.057 23 Window DH:Vinyl Frame:Double Pane with Low-E 80 0.290 23 Window Awn:Vinyl Frame:Double Pane with Low-E 7 0.270 2 Wall 3rd Separation:Wood Frame, 16"o.c. 448 15.0 0.0 0.077 34 Project Title: 140707 Trust_MerrimackCondos_BldgF_UnitsB-E-E_NAndover Report date: 07/15/1 I Data filename: S:\Ebbeling_Ed\140707_Trust_MerrimackCondos BldgF_UnitsB-E- Page 1 of 9 E_NAndover\REScheck\140707_Trust_Merrimac_BldgF_UnitF2 56.rck Gross Area Cavity Cont. Glazing Assembly or R-Value R-Value or Door UA Perimeter U-Factor Ceiling 2: Flat Ceiling or Scissor Truss 798 38.0 0.0 0.030 24 Compliance Statement. The proposed building design described here is consistent with the building plans,specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.5.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Notes: Building F Project Title: 140707 Trust_MerrimackCondos_BldgF_UnitsB-E-E_NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust_MerrimackCondos BldgF_UnitsB-E- Page 2 of 9 E_NAndover\REScheck\140707_Trust_Merrimac_BldgF_UnitF2_56.rck REScheck Software Version 4.5.0 Inspection Checklist Energy Code: 2009 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section_ Plans Verified. ; Field Verified # _ Pr@ inspection/Plan'Review Complies? Comments/Assumptions &Re .ID value • . . Value. 103.2 1construction drawings and i❑Complies [PR11 documentation demonstrate **A,- ❑Does Not energy code compliance for the Ibuilding envelope. f° ' ❑Not Observable 3- .- ❑Not Applicable 103.2, Construction drawings and [ Complies 403.7 documentation demonstrate ❑Does Not AJ [PR311 energy code compliance for , lighting and mechanical systems I ❑Not Observable Systems serving multiple ` E]Not Applicable dwelling units must demonstrate compliance with the commercial code. 403.6 Heating and cooling equipment is Heating: Heating:: ❑Complies PR2 z sized per ACCA Manual 5 based Btu hr Btu hr [ l P / Btu/hr— Not ono I ads per ACCA Manual J or Cooling: Cooling: Not Observable other approved methods. Btu/hr Btu/hr ❑Not Applicable I Additional Comments/Assumptions: 1 High Impact(Tier 1) 12 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 140707 Trust_MerrimackCondos_BldgF_UnitsB-E-E_NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust MerrimackCondos BldgF_UnitsB-E- Page 3 of 9 M E_NAndover\REScheck\140707_Trust_ errimac_BldgF_UnitF2_56.rck 2009 IECC , Foundation Inspection Complies? Comments/Assumptions 3012.1 A protective covering is installed to ❑Complies [FO11]2 protect exposed exterior insulation ❑Does Not and extends a minimum of 6 in. below grade. ❑Not Observable ❑Not Applicable 403.8 Snow-and ice-melting system controls []Complies [FO12]2 installed. []Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: i 1 High Impact(Tier 1) 12 IMedium Impact(Tier 2) 13 Low Impact(Tier 3) Project Title: 140707 Trust_MerrimackCondos_BldgF_UnitsB-E-E_NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust_MerrimackCondos BldgF_UnitsB-E- Page 4 of 9 E_NAndover\REScheck\140707_Trust_Merrimac_BldgF_UnitF2_56.rck Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? ' Comme,nts/Assumptions & Re .ID 402.1.1, Door U-factor. U- U- ❑Complies See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FRl]1 i ❑Not Observable '_ ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope assemblies 402.3.1, average). []Does Not table for values. 402.3.3, 402.5 []Not Observable [FR2]1 10Not Applicable 303.1.3 U-factors of fenestration products ;❑Complies [FR4]1 are determined in accordance :. �. (❑Does Not with the NFRC test procedure or taken from the default table. .. - '❑Not Observable ❑Not Applicable 402.3.5 Sunrooms enclosing conditioned U- U- ❑Complies [FR8]1 space have a maximum ❑Does Not fenestration U-factor of 0.50 in Climate Zones 4-8. New glazing ❑Not Observable separating the sunroom from ❑Not Applicable conditioned space must meet ,code requirements. 402.3.5 #Sunrooms enclosing conditioned U- U- ❑Complies [FR9]1 'space have a maximum skylight ❑Does Not (U-factor of 0.75 in Climate Zones 4-8 ❑Not Observable [ ❑Not Applicable 402.4.4 jFenestration that is not site built I1, ❑Complies [FR20]1 his listed and labeled as meeting , ', 't3 ' 1 � ❑Does Not [AAMA/WDMA/CSA 101/I.S.2/A440 or has infiltration rates per NFRC ❑Not Observable 400 that do not exceed code s ❑Not Applicable limits. . 402.4.5 IC-rated recessed lighting fixtures 14 � '❑Complies [FR16]2 sealed at housing/interior finish 1❑Does Not and labeled to indicate <_2.0 cfm . ❑Not Observable leakage at 75 Pa. ' []Not Applicable 403.2.1 Supply ducts in attics are i R R-_ ❑Complies [FR12]1 insulated to>_R-8.All other ducts R_ $ R ❑Does Not in unconditioned spaces or t 4 — outside the building envelope are []Not Observable insulated to >_R-6. ❑Not Applicable 403.2.2 'All joints and seams of air ' 1 ducts, t.> . � � _� x 111Complies [FR13]1 air handlers,filter boxes, and ❑Does Not buildingcavities used as return �h '' i❑Not Observable ;ducts are sealed. if x' Not Applicable 403.2.3 Building cavities are not used for ❑Complies [FR15]3 ?supply ducts. ❑Does Not ' ¢ -]Not Observable ❑Not Applicable 403.3 HVAC piping conveying fluids R- R- ❑Complies [FR17]2 above 105 9F or chilled fluids ❑Does Not below 55 9F are insulated to >_R- 3 ❑Not Observable ❑Not Applicable 4014 Circulating service hot water R- R- ❑Complies [FR18]2 pipes are insulated to R-2. ❑Does Not i0Not Observable ❑Not Applicable i 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 1 3 ILow Impact(Tier 3) Project Title: 140707 Trust_MerrimackCondos_BldgF_UnitsB-E-E NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust MerrimackCondos BldgF_UnitsB-E- Page 5 of 9 M E_NAndover\REScheck\140707_Trust_ errimac_BldgF_UnitF2_56.rck 6 SectionPlans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions> & Re .ID 403,5 Automatic or gravity dampers are „ ,N ❑Com lies [FR19]2 installed on all outdoor air ❑Doe phot intakes and exhausts00, . ❑Not Observable I , 'IdEINot Applicable Additional Comments/Assumptions: I I 1 High Impact(Tier 1) 12° Medium Impact(Tier 2) 13 Low Impact(Tier 3) i Project Title: 140707_Trust_MerrimackCondos_BldgF_UnitsB-E-E_NAndover Report date: 07/15/1 Data filename: 5:\Ebbeling_Ed\140707 Trust_MerrimackCondos_BldgF_UnitsB-E- Page 6 of 9 E_NAndover\REScheck\140707_Trust_Merrimac_BldgF_UnitF2_56.rck Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Re .ID 303.1 1All installed insulation is labeled ❑Complies [IN13]2 or the installed R-values ` ❑Does Not provided. a❑Not Observable -� Pff ❑Not Applicable 402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.5, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.6 [IN1]1 ❑ Steel E] Steel []Not Observable ❑Not Applicable s 303.2, Floor insulation installed per ❑Complies 402.2.6 manufacturer's instructions,and 1,111 ' ❑Does Not [IN2]1 in substantial contact with the �' []Not Observable underside of the subfloor. ❑Not Applicable 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.4, mass wall with at least 1/2 of the ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.5 wall insulation on the wall [IN3]1 exterior,the exterior insulation E] Mass mass []Not Observable requirement applies. E] Steel ❑ Steel ❑Not Applicable 303.2 lWall insulation is installed per ] ❑Complies [IN4]1 manufacturer's instructions. "❑Does Not s ❑Not Observable ❑Not Applicable 402.2.11 Sunroom wall insulation has a R- R- ❑Complies [IN8]1 minimum R-value of R-13. New ❑Does Not —01 walls separating the sunroom from conditioned space must ❑Not Observable meet code requirements. ❑Not Applicable 303.2 Sunroom wall insulation installed ❑Complies [IN9]1 per manufacturer's Instructions ❑Does Not 90 []Not Observable a. =❑Not Applicable 402.2.11 €Sunroom ceiling minimum 1 R- R- ❑Complies [IN10]1 ;insulation R-value of R-19 in ❑Does Not 10 Climate Zones 1-4, and R-24 in 'Climate Zones 5-8. ❑Not Observable ❑Not Applicable 303.2 Sunroom ceiling insulation is " ❑Complies [IN11]1 installed per manufacturer's - uPM ❑Does Not instructions. All ❑Not Observable I❑Not Applicable Additionalmm Assum ti Co ents / ons: P 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 140707 Trust_MerrimackCondos_BldgF_UnitsB-E-E_NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust_MerrimackCondos BldgF_UnitsB-E- Page 7 of 9 E_NAndover\REScheck\140707_Trust_Merrimac_BldgF_UnitF2_56.rck Section Plans Verified : Field Verified`` Final Inspection Provisions Value Value Complies? Comments/Assumptions &Re .ID 402.1.1, Ceiling insulation R-value.Where R- R- [ Complies tSee the Envelope Assemblies 402.2.1, > R-30 is required, R-30 can be ❑ Wood ❑ Wood ❑Does Not !table for values. 402.2.2 used if insulation is not ❑ Steel ❑ Steel [FI111 compressed at eaves. R-30 may ❑Not Observable ; , be used for 500 ftz or 20% ❑Not Applicable (whichever is less)where sufficient space is not available. 303.1.1.1, Ceiling insulation installed per ;❑Complies 303.2 manufacturer's instructions. A c '❑Does Not [F1211 Blown insulation marked every �} 300 ftz. ❑Not Observable A=: ❑Not Applicable 402.2.3 Attic access hatch and door R-_ R- ❑Complies [F1311 insulation >_R-value of the ❑Does Not adjacent assembly. ❑Not Observable €, ❑Not Applicable 402.4.2, Building envelope tightness ACH 50 = ACH 50 = ❑Complies 402.4.2.1 Iverified by blower door test result []Does Not [FI17]1 of<7 ACH at 50 Pa.This requirement may instead be met ❑Not Observable via visual inspection, in which ❑Not Applicable case verification may need to occur during Insulation Inspection. 402.4.3 Mood-burning fireplaces have ) ❑Complies [FI8]2 Basketed doors and outdoor : ❑Does Not combustion air. ❑Not Observable []Not Applicable 403.2.2 I Post construction duct tightness cfm cfm [ Complies [F1411 test result of<_8 cfm to outdoors, ❑Does Not or<12 cfm across systems.Or, rough-in test result of<_6 cfm ❑Not Observable across systems or<4 cfm ❑Not Applicable without air handler. Rough-in test, verification may need to occur during Framing Inspection. 403.1.1 ;Programmable thermostats ❑Complies [F1912 installed on forced air furnaces. J❑Does Not ❑Not Observable ' I a❑Not Applicable 403.12 :Heat pump thermostat installed I❑Complies [FI101 on heat pumps. a j ❑Does Not 9): ? ❑Not Observable ❑Not Applicable 403.4 Circulating service hotwater '❑Complies [FI 1112 systems have automatic or ❑Does Not accessible manual controls. 1 " T )[]Not Observable ❑Not Applicable 403.9.1 Readily accessible switch on [ Complies [FI12]3 j heaters for swimming pools. I❑Does Not [❑Not Observable ❑Not Applicable 403.9.2 Timer switches on pool heaters A❑Complies [1`119]3 and pumps are present. ❑Does Not t a ' I ?❑Not Observable 46, ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 140707 Trust_MerrimackCondos_BldgF_UnitsB-E-E_NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust_MerrimackCondos_BIdgF_UnitsB-E- Page 8 of 9 M E_NAndover\REScheck\140707_Trust_ errimac_BldgF_UnitF2_56.rck Section Value e Valerified Plus Verified Field V ='Comments/Assum tions Final Inspection Provisions Complies?, p " &Re .i[fl ue � 403.9.3 Heated swimming pools have a % ❑Com lies [F120]3 cover.Covers on pools heated ❑Does Not over 90°F are insulated to R-12. - []Not Observable - ❑Not Applicable 404.1 50%of lamps in permanent `❑Complies [FI6]1 fixtures are high efficacy lamps ❑Does Not ' ❑Not Observable ❑Not Applicable 401.3 Compliance certificate posted. W. ❑Complies [F[7]2 1 []Does Not ' ❑Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ][]Complies [F118]3 mechanical and water heating Does Not equipment have been provided 1 ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: I 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 140707 Trust_MerrimackCondos_BldgF_UnitsB-E-E_NAndover Report date: 07/15/1 Data filename: S:\Ebbeling_Ed\140707_Trust_MerrimackCondos_BldgF_UnitsB-E- Page 9 of 9 E_NAndover\REScheck\140707_Trust_Merrimac_BldgF_UnitF2_56.rck 2009 IECC Energy Efficiency Certificate Wall 15.00 Floor 38.00 Ceiling/ Roof 38.00 Ductwork (unconditioned spaces): dee e Window 0.29 Door 0.29 Heating System: Cooling System• Water Heater: Name• Date• Comments