Loading...
HomeMy WebLinkAboutMiscellaneous - 58 APPLETON STREET 4/30/2018 (6) r Town of North AndoverpoRTH pf4to 6�ti0 Office of the Conservation Department Ip- A Community Development and Services Division o 1 400 Osgood Street ,SSACHUSE� North Andover,Massachusetts 01845 Alison McKay Telephone(978) 688-9530 Conservation Administrator Fax (978)688-9542 November 14, 2005 Mr. William Hmurciak, DPW Director North Andover Public Works Department 384 Osgood Street North Andover, MA 01845 HAND DELIVERD RE: ENFORCEMENT ORDER-58 Appleton Street,North Andover,MA Dear Mr. Hmurciak: The attached Enforcement Order is being issued to your department as a mechanism to perform work within the buffer zone to a Bordering Vegetated Wetland (BVW), jurisdictional under the MA Wetlands Protection Regulations and the North Andover Wetlands Protection Bylaw Regulations. Specific work activities will include the installation of a deep-sump catch basin to alleviate ongoing flooding problems at the corner of the driveway associated with 58 Appleton Street, North Andover. In addition, approximately 70 -80 feet of pipe will be installed along the roadway shoulder of Appleton Street to connect in t an existing catch basin located 40-feet u slo e of the BVW. new catch bas o , the e g P p On behalf of the North Andover Conservation Commission(NACC), the Conservation Department will allow the aforementioned work with the following mandatory conditions: ❑ Prior to the commencement of any work, erosion controls, consisting of double- staked hay bales and trenched silt fence shall be installed along the limit of work upslope of the BVW. ❑ Prior to the commencement of any work, the contractor shall schedule a pre- construction meeting with the Conservation Department to ensure that erosion control measures have been properly installed. ❑ Upon completion of work activities, all disturbed areas shall be loamed and seeded for permanent stabilization against erosion. The Conservation Department shall be contacted in order to conduct a final site inspection. ❑ All work shall be completed by no later than Monday, December 5, 2005. BOARD OF APPEALS 688-9541 BUILDING 684-9545 CONSERVATION 688-9530 I IL-ALTFI 6880540 PLANNING 688')535 Failure to comply with this Order and the deadlines referenced herein will result in the issuance of additional penalties. Any violations to this Enforcement Order as documented herein are subject to no more than a$100 per day penalty' until such time as the Enforcement Order is fully complied with. Each day or portion thereof during which any violation continues shall constitute a separate offense. The Conservation Department reserves the right to take additional action in the future should this Enforcement Order not be complied with retroactive from the date we were first made aware of the violations. This Enforcement Order shall become effective upon receipt. Please feel free to contact me should you have any further questions or concerns in this regard. Thank you in advance for your anticipated cooperation. Sincerely, NO H ANDOVER CONSERVATION COMMISSION A Alison McKay Conservation Administrator Encl. Cc: Pamela Merrill, Conservation Associate Jim Timmons, DPW Tim Willett, Sewer&Water Superintendent Curt Bellavance, Community Development Director NACC File 1 In accordance with the provisions of MGL c.40 s.21D and Section 178.10 of the North Andover Wetland Protection ByLaw(REV May 1993/REV October 1998) Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands WPA Form 9A - Enforcement Order Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 File Number Condition number(s) B. Findings (cont.) ® Other(specify): Please refer to the attached letter dated November 14, 2005. C. Order The issuing authority hereby orders the following (check all that apply): ❑ The property owner, his agents, permittees, and all others shall immediately cease and desist from the further activity affecting the Buffer Zone and/or wetland resource areas on this property. ❑ Wetland alterations resulting from said activity should be corrected and the site returned to its original condition. application and plans for all ❑ Complete the required by attached the Act and Intent. The Regulations Regulat ons shall be fed with the Issuing Authority on or ore sed work as req Date No further work shall be performed until a public hearing has been held and an Order of Conditions has been issued to regulate said work. ® The property owner shall take the following action to prevent further violations of the Act: This Enforcement completed by no later than December 5,r is being issued as a mechanism t2005.rove site drainage on Appleton Please refer t.the letter datedStreet. All work shallP . November 14, 2005. Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts General Laws Chapter 131, Section 40 provides:"Whoever violates any provision of this section (a) shall be punished by a fine of not more than twenty-five thousand dollars or by imprisonment for not more than two years, or both, such fine and imprisonment; or(b)shall be subject to a civil penalty not to exceed twenty-five thousand dollars for each violation". Each day or portion thereof of continuing violation shall constitute a separate offense. Page 2 of 3 wpaformga.doc•rev.12/15/00