Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miscellaneous - 58 COMPASS POINT ROAD 4/30/2018
� � $ COMPOS �} \ BUILDING FILE I $NEE TO Location (76 tM wP.v4 c.S )t e-1 E No. 31 q(p Date r �?d�7 • • TOWN OF NORTH ANDOVER Certificate of Occupancy $ Building/Frame Permit Fee $ 3� ..- Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check# � ., LOuilding Inspector Commonwealth of Massachusetts Sheet Metal Permit Date: Ja , 19 - /(A � I Estimated Job Cost: $ ^ rjo, on Permit Pee: $ A0 Plans Submitted: YES NO Plans Reviewed: YES NO Business License 4. 196 Appliuuit License il- 1,Y(a g Business Information: Property Owner/Job Location Information: Name: J&J lleating. & Air Conditiouinb Name: ri-54— 00 ,,i Street: 17 Arlington St.... Street: City/Town: Dracut, MA 01826 City/Town: North Andover, MA 01845 Telephone: .97.8-454-8197 Telephone: Photo I.D. required / Copy of Photo I.D. attached: YES NO Stn CClultial J-1 / M-1-tuirestrictcd license J-2 /M-2-restrictcd to dwellings 3-stories or less quad conunerclal up to 10,000 sq. ft. /2-stories or less Iles idential:T-2'1;lhily — -w1wii-family Condo/Townhouses Other Commercial: Office Retail Industrial Educational Institutional Other Square Footage: under 10,000 sq. ft. ✓ over 10,000 sq. ft. Number- of Stories: Sheet metal ivork to be coinpleted: New Work: Renovation: HVAC ✓ Metal Watershed Roofing Kitchen Exhaust System Metal Chimney /Vents Air Balancing 0 Provide detailed description of work to be done: C s INSURANCE COVERAGE: I have a current liability insurance policy or its equivalent which meets the requirements of M.G.L. Ch..112 Yes No❑ If you have checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy V( Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the Insurance coverage required by Chapter 112 of the Massachusetts General Laws, and that my i:ignature on this permit application waives this requirement. Check One Only Owner ❑ Agent Signature of Owner or Owner's Agent By checking this boxE], I hereby certify that all of the details and Information I have submitted(or entered) regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and Installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO PI.01"t•css J11spections 1)ate C0111111cllts Final Inspection Date Comments Type of License: By ❑ Master Title [] Master-Restricted , ciiyn own ❑Journeyperson Signature of Licensee Permit if G ❑Journeyperson-Restricted License Number. �� O Fee$ ❑ Check at vvww.mass.dovldpl • I I Inspector Signature of Permit Approval I ,per \ The Commonwealth of Massachusetts Z Department of Industrial Accidents a 1 Congress Street,Suite 100 Boston,MA 02114-2017 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name (Business/Organization/Individual): J & J Heating & Air Conditioning, Inc. Address: 17 Arlington Street City/State/Zip: Dracut, MA. 01826 Phone#: 978-454-8197 Are you an employer?Check the appropriate box: Type of project(required): l.[N I am a employer with 40 employees(full and/or part-time).* 7. ❑New construction 2.❑I am a sole proprietor or partnership and have no employees working for me in 8. M Remodeling any capacity.[No workers'comp.insurance required.] 9. El Demolition 3.O I am a homeowner doing all work myself.[No workers'comp.insurance required.]t 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will 10 ❑Building addition ensure that all contractors either have workers'compensation insurance or are sole 11.Q Electrical repairs or additions proprietors with no employees. 12.E]Plumbing repairs or additions 5.Q I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.F-]Roof repairs These sub-contractors have employees and have workers'comp.insurance. 6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14.❑Other 152,§1(4),and we have no employees.[No workers'comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: A.I.M. Mutual Insurance Policy#or Self-ins.Lic.#: WMZ7800-8006553--2016Expiration Date: 6/2///17 �/,� Job Site Address: P ,5 City/State/Zip: k �4eet --�1,q 6f W Attach a copy,'of the workers'co miliensation policy declaration page(showing the policy number and expiration date). Failure to secure covera a as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one ye risotime ,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day againstrfhe violator.A c y of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverag..verification. I do here niter the ai an)d pen l ' o perjuthat the information provided above is true and correct Si nature: . Date: � 4 Phone#: 7 — 197 Of use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issihing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: I DATE(MM/DDIYYYY) CERTIFICATE OF LIABILITY INSURANCE 6/2/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER NAM EACT Laurence Hall, CIC Sennott Insurance Agency PHONE (978)887-4900 FTAX (978)887-2404 (A/C.No): 16 South Main Street E-MAIL y ADDRESS:larr hall@sennottinsurance.com P. O. Box 457 — - INSURER(S)AFFORDING COVERAGE NAIC If INSURED INURED ld MA 01983 INSURERA:Great American Alliance Ins.Co INSURERB:Safet Iris Co J-&J Heating & Air Conditioning, Inc. INSURERCA.I.M. Mutual Ins Co 17 Arlington Street INSURERD: INSURER E Dracut MA 01826 INSURER F: COVERAGES CERTIFICATE NUMBER:2016-2017 Renewal Certs REVISION NUMBER: THIS IS TO'CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES,LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADOL SUER LTR TYPE OF INSURANCE POLICY NUMBER FOLIC YYYY MM DD YYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A CLAIMS-MADE ❑X OCCUR DAMAGE TO RENTED 300,000 PREMISES Ea occurrenc $e)__ _ PAC6418906-10 6/1/2016 6/1/2017 MED EXP(Any one person) $ 10,000 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY�PRO- n LOC PRODUCTS-COMP/OPAGG $ 2,000,000 OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ Ea accident 1,000,000 ANY AUTO B BODILY INJURY(Per person) $ ALL OWNED SCHEDULED AUTOS X AUTOS 2434550 6/1/2016 6/1/2017 BODILY INJURY(Per accident) $ X HIRED AUTOS X NON-OWNED PROPERTY DAMAGE AUTOS Per accident) $ $ X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 2,000,000 A EXCESS LIAR CLAIMS-MADE AGGREGATE $ 2,000,000 DED RETENTION$ UMB6418958-09 6/1/2016 6/1/2017 $ WORKERS COMPENSATION. PER OTH- AND EMPLOYERS'LIABILItY YIN X STATUTE ER .ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT _ $ 1,000,000 OFFICER/MEMBER EXCLUDED? - � NIA _ C (Mandatory in NH) WMZ-800-8006553-2016 6/2/2016 6/2/2017 If yes,describe under E.L.DISEASE-EA EMPLOYEE $ 1,000,000 _ DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) CERTIFICATE!HOLDER, CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES'BE CANCELLED BEFORE Evidence of Insurance THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE L Hall, CIC/LH2 ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD INS025 onienn v OMMONWEALTH OF MASS/aCH USE TTS or- SHEET MLfAL WORKERS ISSUCS THS FOLLOWING LICCNS`C AS A MAST:rzR-UNRESTRICTED q . FRIG R KL-INE 17 ARLINGTON.ST: :I J&J l- -_A rINO:: Ac DRACUT, MA 01II26 3.0 15G8 Q5/28/2018 3 744 I�L"I�iLL�rDP,T�� �771T5 i r , DRIVER S LICENSE l4 7 ise 1' f ,,o CIID. A1NU, ' ('10J-03-2016 NONE S9965587f. '. � �,.05 �r021 05 22 g � t iu1 ✓ DSMss ti nr r s scx M r.fi T 6 9 1 t Ibt 1i e NONE aY KLINE ERIC RJ 106 MEADOW CREEK DR ., :ds�22�ilipn�:. DRACUT,MA 01026 5 DD 0544-2016 17cv 07.15.2 oq ..... Ii4d6�fi1��6�IVi/I,l��LI II L CSI Ind SIIEEI METAL WORKLI2S'I ISUES.1 H.E t OLl ODUING LICENSE A.S.A. id :> �il6SlP,rr'n IIUUARD T AVOl T.4_ L J 1 I IL/1TIPlC?Ai ("ONDII IONING)NC I I: 17 Af'I`INV'1`OKI n�lArur, IWA 01826 19(, U1/1r?/2Q if 12401 wrightsoft° Load Short Form Job: 58 Compass Point Date: Oct 14,2016 Entire House By: J&J Heating and Air Conditioning 17 Arlington st, Dracut,Ma 01826 Phone:978 454 8197 Email:eric@ijheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 DeSian Information Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 56 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 43 28 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 778 cfm Actual air flow 778 cfm Air flow factor 0.027 cfm/Btuh Air flow factor 0.046 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.83 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Garage 286 0 1164 0 54 Family Room 208 4109 2044 110 94 Kitchen 294 5558 3702 149 170 Stair 84 1029 222 28 10 1/2 bath 42 1736 679 47 31 Entry 56 1683 706 45 32 master bath 96 2335 1355 63 62 master bedroom 290 4287 2758 115 127 bedroom 2 247 4301 1927 115 89 Full bath 91 2326 821 62 38 2nd floor stairs 84 836 632 22 29 closet 100 741 220 20 10 wash/dryer 24 41 659 1 30 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ti wri htsoft 2017-Jan-1214:11:13 1- g Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 1 RCCA ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Entire House 1902 28982 16889 778 778 Other equip loads 0 2730 Equip. @ 0.93 RSM 18167 Latent cooling 3891 TOTALS 1902 28982 22058 778 778 I I I Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. FF 2017-Jan-12 14:11:13 wrightsoft" Right-Suite®Universal 2015 15.0.23 RSU05790 Page 2 ACCA ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Buildin Anal $ Job: 58 Compass Point wrightsoft. g yI$ Date: Oct 14,2016 Entire House By: J&J Heating and Air Conditioning 17 Arlington st,Dracut,Me 01826 Phone:978 454 8197 Email:eric@jjheatac.com Web:jjheatac.com • • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design• Conditions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27 8 Dry bulb (°F) 12 88 Infiltration: Daily b(e60F) _ 72 ( L ) Method Simplified Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Heatina Component Btuh/ft2 Btuh % of load Walls 2.8 6623 22.9 Glazing 16.7 2952 10.2 Doors 4.0 339 1.2 Ceilings 2.0 2074 7.2 Floors 3.5 4375 15.1 i Infiltration 4.3 9912 34.2 Ducts 2708 9.3 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 289821 100.0 Component Btuh/ft2 Btuh % of load Walls 0.9 2050 10.4 w Glazing 13.9 2467 12.6 Doors 7.7 646 3.3 a� Ceilings 1.9 1920 9.8 Floors 0.8 991 5.1 Infiltration 0.9 2105 10.7 Ducts 1821 9.3 Ventilation 0 0 Internal gains 4890 24.9 . Blower 2730 13.9 Adjustments 0 . Total 19619 100.0 „b Latent Cooling Load = 3891 Btuh Overall U-value = 0.096 Btuh/ft2-°F Data entries checked. 2017-Jan-12 14:11:13 wrightsoft Right-Suite(R Universal 2015 15.0.23 RSU05790 Page 1 ACCK ..-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Cont onent Constructions Job: 58 Compass Point wrightsoft- p Date: Oct 14,2016 Entire House By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com Pi;0: 166t'" • rmatio For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Pbsigh Conditions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ftl-°F W-T/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" n 375 0.065 21.0 3.61 1355 0.99 373 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 525 0.065 21.0 3.61 1897 0.99 522 s 315 0.065 21.0 3.61 1138 0.99 313 W 504 0.065 21.0 3.61 1821 0.99 501 all 1719 0.065 21.0 3.61 6212 0.99 1710 12F-Osw: Frm wall,wd ext,5/8"wood shth,r-21 cav ins,5/8" a 54 0.065 21.0 0 0 0.99 54 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 54 0.065 21.0 0 0 0.99 54 W 198 0.065 21.0 0 0 0.99 197 all 306 0.065 21.0 0 0 0.99 304 15B-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, a 90 0.073 8.0 4.56 410 0.40 36 r-8 ins,8"thk,1/2"gypsum board int fnsh Partitions 12C-Osw:12C-Osw 261 0 0 0 0 0 0 Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 111 0.300 0 16.7 1851 8.94 992 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap,1/4"thk; a 33 0.300 0 16.7 550 29.1 961 6.67 ft head ht s 33 0.300 0 16.7 550 15.6 514 all 177 0.300 0 16.7 2952 13.9 2467 Doors 11 P0:Door,mtl pur core type s 21 0.290 10.5 16.1 339 7.68 161 s 63 0.290 10.5 0 0 7.68 484 all 84 0.290 10.5 4.03 339 7.68 646 Ceilings 1613-30ad:Attic ceiling,asphalt shingles roof mat,r-20 roof ins, 100 0.032 30.0 1.78 178 1.60 160 r-30 ceiI ins 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins, 1/2" 832 0.026 38.0 1.45 1203 1.30 1082 gypsum board int fnsh C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,10"thkns,1/2" 49 0.255 1.0 14.2 693 12.7 624 gypsum board int fnsh 2017-Jan-12 14:11:13 wrightsoft' Right-Suite®Universal 2015 15.0.23 RSU05790 Page 1 ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N C part ceiling,:C part ceiling,hrd wd fir fnsh,r-38 ins,frm fir,12" 39 0.028 38.0 0 0 1.40 55 thkns,5/8"gypsum board int fish Floors 19A-Obswp:Part floor,hrd wd fir fnsh,frm fir,10"thkns 684 0.295 0 6.16 4215 1.40 955 19A-Obswp: Part floor,hrd wd fir fnsh,frm fir,8"thkns 26 0.295 0 6.16 160 1.40 36 19C-19cscp: 19C-19cscp 247 0 0 0 0 0 0 21A-24t:Bg floor,heavy dry or light damp soil,U depth 286 0.025 0 0 0 0 0 II t wri htsoft 2017-Jan-1214:11:13 ,., g Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 2 AiCA ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft Date: Oct 14,2016 Garage By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Me 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Bbih/ft�°F ftl-°F/Btuh BtuhN Btu Btuh/ft2 Btu Walls 1217-0sw:Frm wall,wd ext,5/8"wood shth,r-21 cav ins,5/8" a 54 0.065 21.0 0 0 0.99 54 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 54 0.065 21.0 0 0 0.99 54 w 198 0.065 21.0 0 0 0.99 197 all 306 0.065 21.0 0 0 0.99 304 Partitions (none) Windows (none) Doors 11 P0:Door,mtl pur core type s 63 0.290 10.5 0 0 7.68 484 Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,r-38 ins,frm fir,12" 39 0.028 38.0 0 0 1.40 55 thkns,5/8"gypsum board int fnsh Floors 21A-24t:Bg floor,heavy dry or light damp soil,6'depth 286 0.025 0 0 0 0 0 2017-Jan-12 14:11:13 wrightsoft" Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 3 ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N - - 9 - Component Constructions Job: 58 Compass Point wri htsoft p Cate: Oct 14,2016 � Family Room By: J&J Heating and Air Conditioning 17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com Proillict Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 42'N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/t2-°F ft2-°F/Btuh Btuh/112 Btu Btu h/ft2 Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" n 87 0.065 21.0 3.61 314 0.99 87 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud w 144 0.065 21.0 3.61 520 0.99 143 all 231 0.065 21.0 3.61 835 0.99 230 Partitions 12C-Osw:12C-Osw 117 0 0 0 0 0 0 Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 30 0.300 0 16.7 500 8.94 268 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; 6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-Obswp:Part floor,hrd wd fir fnsh,frm fl r,10"thkns 208 0.295 0 6.16 1282 1.40 290 2017-Jan-12 14:11:13 wrightsoft' Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 4 RCCA ...-J-Copy\61d 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft" p Date: Oct 14,2016 Kitchen By: J&J Heating and Air Conditioning 17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com • ect�Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 ® - • • • • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13, Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area 1.1-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftp-°F ft2-°F/Btuh Btuh/W Bluh Btuh/ft2 Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" n 90 0.065 21.0 3.61 325 0.99 90 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 177 0.065 21.0 3.61 640 0.99 176 w 18 0.065 21.0 3.61 65 0.99 18 all 285 0.065 21.0 3.61 1030 0.99 283 Partitions 12C-Osw:12C-Osw 27 0 0 0 0 0 0 Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 36 0.300 0 16.7 600 8.94 322 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; a 12 0.300 0 16.7 200 29.1 349 6.67 ft head ht all 48 0.300 0 16.7 801 14.0 671 Doors (none) Ceilings (none) Floors 19A-Obswp:Part floor,hrd wd fir fish,frm fir,10"thkns 294 0.295 0 6.16 1812 1.40 411 t ti- Wrl htsoft Right-SuiteO Universal 2015 15.0.23 RSU05790 2017-Jan-1214:11:13 Page 5 ACCA ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Com Constructions Job: 58 Compass Point onent • "�' wrightsoft- p Date: Oct 14,2016 Stair By: J&J Heating and Air Conditioning 17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com • Information, For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 - • Conditions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz BtuhW-°F ft2-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" a 54 0.065 21.0 3.61 195 0.99 54 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions 12C-Osw:12C-Osw 54 0 0 0 0 0 0 Windows (none) Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor,hrd wd fir fnsh,frm flr,10"thkns 84 0.295 0 6.16 518 1.40 117 wri htsOft" 2017-Jan-1214:11:13 9 Right-Suite®Universal 2015 15.0.23 RSU05790 Page 6 ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N CiO171 onent Constructions Job: 58 Compass Point wrightsoft- p Date: Oct 14,2016 1/2 bath By: JU Heating and Air Conditioning 17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 D- • • • • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-°F ft2-°FBtuh Btuh/ft2 Btu MOW Btu Walls 12F-Osw:Firm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" a 63 0.065 21.0 3.61 228 0.99 63 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 48 0.065 21.0 3.61 173 0.99 48 all 111 0.065 21.0 3.61 401 0.99 110 Partitions (none) Windows 2 glazing,cir outr,air gas,vni frm mat,cir innr,1/4"gap,1/4"thk:2 s 6 0.300 0 16.7 100 15.6 93 glazing,cir outr,air gas,vnl frm mat,cir innr, 1/4"gap, 1/4"thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm flr,10"thkns,1/2" 22 0.255 1.0 14.2 311 12.7 280 gypsum board int fnsh Floors 19A-Obswp: Part floor,hrd wd fir fnsh,frm fir,10"thkns 42 0.295 0 6.16 259 1.40 59 2017-Jan-12 14:11:13 i wrightsoft* Right-Suite®Universal 2015 15.0.23 RSU05790 Page 7 ACCA ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Cont onent Constructions Job: 56 Compass Point • wrightsoft- p Date: Oct 14,2016 Entry By: J&J Heating and Air Conditioning 17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jiheatac.com Web:jjheatac.com ! ect:Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 ! - • !nditions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area 1.11-value Insul R Htg HTM Loss Cig HTM Gain ft, Btuh/ft=-°F ft2-°FBtuh Btuh/ft2 Btu Btuh/V Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" s 51 0.065 21.0 3.61 184 0.99 51 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions 12C-Osw: 12C-Osw 63 0 0 0 0 0 0 Windows (none) Doors 11 P0:Door,mtl pur core type s 21 0.290 10.5 16.1 339 7.68 161 Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,10"thkns,1/2" 27 0.255 1.0 14.2 382 12.7 344 gypsum board int fnsh Floors 19A-Obswp: Part floor,hrd wd fir fnsh,frm fir,10"thkns 56 0.295 0 6.16 345 1.40 78 2017-Jan-12 14:11:13 wrightsOft' Right-Suite(R)Universal 2015 15.0.23 RSU05790 Page 8 ACC P. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N WPI htSOft Component Constructions Job: 58 Compass Point 9 Date: Oct 14,2016 master bath By: J&J Heating and Air Conditioning 17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com U • - • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area 1.1-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftl-°F ftz°FBtuh Btuh/ft' Stuh Btuh/112 Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" n 99 0.065 21.0 3.61 358 0.99 98 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 60 0.065 21.0 3.61 217 0.99 60 all 159 0.065 21.0 3.61 575 0.99 158 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 9 0.300 0 16.7 150 8.94 80 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, 1/4"thk; a 12 0.300 0 16.7 200 29.1 349 6.67 ft head ht all 21 0.300 0 16.7 350 20.5 430 Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 96 0.026 38.0 1.45 139 1.30 125 gypsum board int fnsh Floors (none) 2017-Jan-12 14:11:13 wrightsoft" Right-Suite@O Universal 2015 15.0.23 RSU05790 Page 9 'I'M ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 58CompPoint 9 Date: Oct 14,200ss16 master bedroom By: J&J Heating and Air Conditioning 17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com BE P roject Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 ! - • • • • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh BtuhM Btu Btuh/112 Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" n 99 0.065 21.0 3.61 358 0.99 98 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud w 162 0.065 21.0 3.61 585 0.99 161 all 261 0.065 21.0 3.61 943 0.99 260 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 n 36 0.300 0 16.7 600 8.94 322 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap, 1/4"thk; 6.67 ft head ht Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 290 0.026 38.0 1.45 419 1.30 377 gypsum board int fnsh Floors 19A-Obswp:Part floor,hrd wd flr fnsh,frm flr,8"thkns 26 0.295 0 6.16 160 1.40 36 2017-Jan-12 14:11:13 wrightsoft" Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 10 ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Com onent Constructions Job: 58 Compass Point ' wrightsoft- � Date: Oct 14,2016 bedroom 2 By: J&J Heating and Air Conditioning 17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com • I Pro:je6t information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 D- • n'Conditio Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ~ ftz Btuh/ft2-'F ft�-'F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" a 63 0.065 21.0 3.61 228 0.99 63 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 99 0.065 21.0 3.61 358 0.99 98 w 171 0.065 21.0 3.61 618 0.99 170 all 333 0.065 21.0 3.61 1203 0.99 331 Partitions (none) Windows j 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 s 18 0.300 0 16.7 300 15.6 280 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap, 1/4"thk; 6.67 ft head ht I Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 247 0.026 38.0 1.45 357 1.30 321 gypsum board int fish Floors 19C-19cscp:19C-19cscp 247 0 0 0 0 0 0 2017-Jan-12 14:11:13 ,y wrightsoft" Right-Suite AO Universal 2015 15.0.23 RSU05790 Page 11 ACCP. ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Wrl htsoft- Component Constructions Job: 58 Compass oint 9 Full bath Byte: Oct 14,, 016 2lois J&J Heating and Air Conditioning 17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com Projectjnf6rmation For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ftz-°F fr2-°F/Btuh Btu h/ft2 Btu BtuhM2 Btu Walls 12F-Osw:Frm wall,wd ext,1/2"wood shth,r-21 cav ins,1/2" a 63 0.065 21.0 3.61 228 0.99 63 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 117 0.065 21.0 3.61 423 0.99 116 W 9 0.065 21.0 3.61 33 0.99 9 all 189 0.065 21.0 3.61 683 0.99 188 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 s 9 0.300 0 16.7 150 15.6 140 glazing,cir outr,air gas,vni frm mat,cir innr, 1/4"gap, 1/4"thk; 6.67 ft head ht Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 cell ins,1/2" 91 0.026 38.0 1.45 132 1.30 118 gypsum board int fns Floors (none) AL t WCI htsoftT 2017-Jan-1214:11:13 ,.� 9 Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 12 ACC K ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point r�onen wrightsoft, p Date: Oct 14,2016 2nd floor stairs By: J&J Heating and Air Conditioning 17 Arlington st,Dracut,Ma 01826 Phone:978 454 8197 Email:eric@jjheatac.com Web:jjheatac.com PEZ '� Pr • • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 �iDllisign Conditions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Stuh ROM Btu Walls 12F-Osw:Frm wall,wd ext, 1/2"wood shth,r-21 cav ins,1/2" a 45 0.065 21.0 3.61 163 0.99 45 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 2 glazing,cir outr,air gas,vnl frm mat,clr innr,1/4"gap,1/4"thk:2 e 9 0.300 0 16.7 150 29.1 262 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap,1/4"thk; 6.67 ft head ht Doors (none) Ceilings 166-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 84 0.026 38.0 1.45 121 1.30 109 gypsum board int fnsh Floors (none) 2017-Jan-12 14:11:13 . " wrightSOW Right-Suite®Universal 2015 15.0.23 RSU05790 Page 13 ACCA ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft- Date: Oct 14,2016 closet By: J&J Heating and Air Conditioning 17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:ijheatac.com For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 �!j���:Design Conditions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain 112 Btuh/ft2-°F ftz-°F/Btuh Btuh/112 Btu Btuh/ft2 Btu Walls 15B-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, a 90 0.073 8.0 4.56 410 0.40 36 r-8 ins,8"thk,1/2"gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings 16B-30ad:Attic ceiling,asphalt shingles roof mat,r-20 roof ins, 100 0.032 30.0 1.78 178 1.60 160 r-30 ceil ins Floors (none) -CLL2017-Jan-12 14:11:13 ".t� 114wrightsoft" Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 14 ACCK ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft- Date: Oct 14,2016 wash/dryer By: J&J Heating and Air Conditioning 17 Arlington st,Dracut, Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 - • • • • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area Ll-value Insul R Htg HTM Loss Clg HTM Gain ft2 BtuhN-°F ft2-°FBtuh Btuh/ftP Btuh MOM Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 24 0.026 38.0 1.45 35 1.30 31 gypsum board int fnsh Floors (none) 2017-Jan-12 14:11:13 wrightsoft" Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 15 RCCA ...-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N + i Pro ect Summar Job: 58 Compass Point wrightsoft- Y Date: Oct 14,2016 Entire House By: J&J Heating and Air Conditioning 17 Arlington st,Dracut,Ma 01826 Phone:978 4548197 Email:eric@jjheatac.com Web:jjheatac.com MPr• Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Notes: DesiOn Information Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 68 OF Inside db 75 OF Design TD 56 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 26275 Btuh Structure 15068 Btuh Ducts 2708 Btuh Ducts 1821 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 2730 Btuh Piping 0 Btuh Equipment load 28982 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 18167 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight '1 Fireplaces 1 (Average) Structure 3466 Btuh Ducts 425 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 1616 1902 Equipment latent load 3891 Btuh Volume (ft3) 13944 16518 Air changes/hour 0.27 0.09 Equipment total load 22058 Btuh Equiv.AVF (cfm) 162 152 Req. total capacity at 0.70 SHR 2.2 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 778 cfm Actual air flow 778 cfm Air flow factor 0.027 cfm/Btuh Air flow factor 0.046 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.83 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Wrl F1t50ft" 2017-Jan-1214:11:13 9 Right-Suite@ Universal 2015 15.0.23 RSU05790 Page 1 ACCA ..-J-Copy\Bld 13-246 lake Williams Unit 120.rup Calc=MJ8 Front Door faces: N Date............................................ ' OF NOR7' q1� TOWN OF NORTH ANDOVER ' PERMIT FOR WIRING s`SACHUS� 4 This certifies that ....... . L.......Plee , � .......... ................................................. has permission to perform ....... wiring in the building of....... ............. v C T 7-at ....5...........................Y .............. . ..... .................. ort h Andover,Mass. Fee.? Lic. No. ..l/D. r• ....................../ �.. ..... ELE TRICAL INSPECTOR Check# Commonwealth of Massachusetts Official Use Only 2 r o Department of Fire Services Permit No. Occupancy and Fee Checked BOARD OF FIRE PREVENTION REGULATIONS [Rev. 1/071 (leave blank APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code(MEC),527 CMR 12.00 (PLEASE PRINT ININK OR TYPE ALL INFORMATION) Date: City or Town of: NORTH ANDOVER To the Inspector of Wires: By this application the undersigned gives notice of his or her intention to perform the electrical work described below. Location Street&Number 51 Co WV23L,5 ( )_ 5 (h nT Owner or Tenant �-t ��yti ,� Cei-P Telephone No. 975 95-1 J Owner's Address 51 etyej Is this permit in conjunction with a building permit? Yes No ❑ (Check Appropriate Box) Purpose of Building NetnSem nT�q�0^ Utility Authorization No. - Existing Service © Amps / Volts Overhead❑ Undgrd❑ No.of Meters New Service =��"Tnps J-2QVolts Overhead❑ Undgrd'kl't' No.of Meters-4— Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work: �,r c, 174 CA.1S C-6VA 0 23 oc� 5q PTI Completion of thefollowing table may be waived by the Inspector of Wires. No.of Recessed Luminaires No.of CeiI.Susp.(Paddle)Fans No.of Total Transformers KVA No.of Luminaire Outlets 2 No.of Hot Tubs Generators KVA Above In- o.o Emergency Lighting No.of Luminaires Swimming Pool rnd. ❑ rnd. ❑ Battery Units No.of Receptacle Outlets I/C) No.of Oil Burners FIRE ALARMS No. of Zones No.of Switches No.of Gas BurnersNo.of Detection and 2 Initiatin Devices No.of Ranges No.of Air Cond. Total g Tons No.of Alerting Devices No.of Waste Disposers Heat Pump Number Tons KW No.of Self-Contained �O Totals: Detection/Alerting Devices No.of Dishwashers Space/Area Heating KW Local❑ Municipal ❑ Other Connection No.of Dryers Heating Appliances KW Security Systems:* No.of Devices or Equivalent No.of Water KW No.of No.of Data Wiring: Heaters ` Signs Ballasts No.of Devices or Equivalent No.Hydromassage Bathtubs No.of Motors Total HP Telecommunications Wiring: /L No.of Devices or Equivalent OTHER: Attach additional detail if desired,or as required by the Inspector of Wires. Estimated Value of El e trica Work: ,2�� (When required by municipal policy.) Work to Start: Jo ?- Inspections to be requested in accordance with MEC Rule 10,and upon completion. INSURANCE COAIR AVA, Unless waived by the owner,no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including"completed operation"coverage or its substantial equivalent. The undersigned certifies that such cove e is in force,and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE J7 BOND ❑ OTHER ❑ (Specify:) I certify, tinder Ili epains and penalties ofperjury,that the information on flus application is true and complefe. FIRM NAME: . LU Vrco &G&c \rig rAn(-(2 LIC.NO.: Ji O 401 Licensee: Uko-e (T %,J V- E' Signature LIC.NO.: Z (If applicable,a ter "exempt in the license na mb r line. Bus.Tel.No..-!g 7 X �7 9 33� Address: 3 247' Alt.Tel.No.: *Per M.G.L c. 147,s.57-61,security work requires Depa ent of ublic Safety"S"License: Lic.No. � OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally required by law. By my signature below,I hereby waive this requirement. I am the(check one)❑owner ❑owner's agent. Owner/Agent PERMIT FEE:$ Signature Telephone No. ❑ 2012 Massachusetts Electrical Code Amendments 527 CMR 12.00§Rule 8: In accordance-with the provisions of M.G.L.c. 143,§3L,the C� permit application form to provide notice of installation of wiring shall be uniform throughout the Commonwealth,and applications shall be filed on the prescribed form.After a permit application has been accepted by an Inspector of Wires appointed pursuant to M.G.L c. 166,§32,an electrical permit shall be issued to the person, firm or corporation stated on the permit application. Such entity shall be responsible for the v notification of completion of the work as required in M.G.L.c.143,§3L. Permits shall.be limited as to the time of ongoing construction activity,and may be deemed by the Inspector of Wires abandoned and invalid if he or she has determined that the authorized work has not commenced or has not progressed during the preceding 12-month period.Upon written application,an extension of time for completion of work shall be permitted for reasonable cause.A permit shall be terminated upon the written request of either the owner or the installing entity stated on the permit application. ❑ The Permit Extension Act was created by Section 173 of Chapter 240 of the Acts of 2010 and extended by Sections 74 and 75 of Chapter 238 of the Acts of 2012.The purpose of this act is to promote job growth and long-term economic recovery and the Permit Extension Act furthers this purpose by establishing an automatic four-year extension to certain permits and licenses concerning the use or development of real property.With limited exceptions,the Act automatically extends,for four years beyond its otherwise applicable expiration date,any permit or approval that was "in effect or existence"during the qualifying period beginning on August 15,2008 and extending through August 15,2012. ❑ Rule 8—Permit/Date Closed: ***Note:Reapply for new permit ❑ ❑ Permit Extension Act—Permit/Date Closed: Trench Inspection Pass 0 Failed Re-Inspection Required($.) ❑ Inspectors Comments: Inspectors Signature: Date: SERVICE INSPECTION: Pass M Failed 0 Re-Inspection Required($.)❑ Inspectors Comments: Inspectors Signature: Date: PARTIAL ROUGH INSPECTION: Pass M Failed Re-Inspection Required($.) ❑ Inspectors Comments: Inspectors Signature: Date: ROUGH MSPEC ION: !"~ Pass Failed Re-Inspection Required($.) ❑ Inspectors Commen Inspectors Signature: Date: FINAL INSPECTION: Pass M Failed 0 Re-Inspection Required($.) ❑ Inspectors Comme ts: Inspectors Signature: Date: DEB WEINHOLD ...TOWN OF MERRIMAC,MA. .......dweinhold@townofinerrimac.com b d The Commonwealth of Massachusetts Department oflndustriglAccidents Office of Investigations 600 Washington Street .Boston,MA.02111 www.mass gov/dia Workers' Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name(Business/Orgaaization/Individual): R l,L. &75 GLbq6 L core, Address: MAVuVeV1S z-5-1 - City/State/Zip: Utwt olW Phone#• 9 2a *Y7 �77✓ Are Y9u an employer?Check the appropriate box: Typo of project(required): 1. I am a employer with $ 4. ❑ I am a general contractor and I 6. E]New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet.t 7• E]Remodeling ship and'have no employees These sub-contractors have S. ❑Demolition working for me in any capacity. workers'comp.insurance, g• ❑Building addition [No workers' comp.insurance 5. El We are a corporation and its required.] officers have exercised their 10V lectrical repairs or additions 3.❑ I am a homeowner doing all work right of exemption per MGL I LE]Plumbing repairs or additions myself.[No workers'comp. c. 152,§1(4),and we have no 12.Q Roof repairs insurance required.] employees.[No workers' q � 13.❑Other comp.insurance required.] 'Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. 7 Homeowners who submit this affidavit indicating they 2re doing all work and then hire outside contractors must submit anew affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. lam an employer that is providing workers'compensation insurance for my employees. Below is the policy andjob site information. _ii M _1 Insurance Company Name: --F� 1 ��i 4AI-3 It CC)' Policy#or Self-ins.Lic.#: Au C-qao•-7oa,% 22q 2p t /q Expiration Date: ZJ� ,41 Job Site Address: t City/State/Zip:�c ()/1(&11 PA" WI.�} Attach a copy of the wor ers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as requiredunder Section 25A ofMGL c.152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one=year imprisonment,as well as civil penalties in the form of a STOP-WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement maybe forwarded to the Office of Investigations of the DIA for insurance coverage verification. X do hereby cerfifv under the p yA&qnd penalties ofperjury that the information provided above is true and correct. - Si ature: w Date: d Phone#: 725 307 Z 0:�2 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other - - Contact Person: Phone#: Information and Instructs on*8 Massachusetts General Laws chapter 152 requires all employers to provide workers'compensation for their employees. Pursuant to this statute,an employee is defined as"....every person in the service of another under any contract ofhire,- express or implied,oral or.written." An employer is defined as"an individual,partnership,association,corporation or other legal entity,or any two or more of the foregoing engaged in a j oint enterprise,and including the legal representatives of a deceased employer,or the receiver or trustee of an individual,partnership,association or other legal entity,employing employees. However the owner of a dwelling house having not more than three apartments and who resides therein,or the occupant of the dwelling house of another who employs persons to do maintenance,construction or repair work on such dwelling house or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer.." MGL chapter 152,§25C(6)also states that"every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced-acceptable evidence of compliance with the insurance coverage required" Additionally,MGL chapter 152,§25C(7)states"Neither the commonwealth nor any of its political subdivisions shall enter into any contract for the performance ofpublic work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority." Applicants Please fill out the workers'compensation affidavit completely,by checking the boxes that apply to your situation and,if necessary,supply sub-contractors)name(s),address(es)and phone number(s)along with their certificate(s)of insurance. Limited Liability Companies(LLC)or Limited Liability Partnerships(LLP)with no employees other than the members or partners,are not required to carry workers'compensation insurance. If an LLC or LLP does have employees,a policy is required. Be advised that this affidavit maybe submitted to the Department of Industrial Accidents for confirmation o£insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be returned to the city or town that the application for the permit or license is being requested,not the Department of Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers, compensation policy,please call the Department at the number listed below. Self-insured companies should enter their self-insurance license number on the appropriate line. City or Town Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant. Please be sure to fill in the permit/license number which will be used as a reference number. In addition,an applicant that must submit multiple permit/license applications in any given year,need only submit one affidavit indicating current policy information(ifnecessary)and under"Job Site Address"the applicant should write"all locations in (city or town)"A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. Anew affidavit must be filled out each year.Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture (i.e.a dog license or permit to burn leaves etc.)said person is NOT required to complete this affidavit. The Office of Investigations would like to thank you in advance for your cooperation and should you have any questions, please do not hesitate to give us a call. The Department's address,telephone and fax number: The CornTonwealth ofMassachwotts Department ofJndustral.Accidents OfAce offavestigations 600 Washuagtoa Street Boston}MA,021 X Z i Tel,#617-727-4900 QXt 406-or 1-877,MASSAFE Revised 5-26-05 Fax##617-727-7749 ' u€_mace anzr�rl;a �, 7 e r- Date..'.�.r .t�......... r►ORTM of TOWN OF NORTH ANDOVER PERMIT FOR PLUMBING This certifies that.. ......!.., . ..... &r....(c,.(..... ........ has permission to perform...N.P .....�. ; plumbing in the buildings of.7.. ............. at.... t\. s............ �. ..:�""..., North Andover, M . nass Fee....�u.�....Lic. No. tZ tea. .................................................................. ..... INSPECTOR Check#� f 19-W APLUMBING M- -7111114 MASSACHUSETTS UNIFORM APPLICATION FORA PERMIT TO PERFORM PLUMBING WORK CITY NORTH ANDOVER MA. DATE 9-3-14 '� JOBSITE ADDRESS 58 COMPASS POINT PERMIT# P OWNER'S NAME TRUST CONSTRUCTOIN 1 OWNER ADDRESS: 51 MT JOY DRIVE TEWKSBURY MA 01876 TYPE OR TEL: 9788513456 FAX: PRINT OCCUPANCY TYPE: COMMERCIAL❑ EDUCATIONAL ❑ RESIDENTIAL❑■ CLEARLY NEW.9 RENOVATION:❑ REPLACEMENT:❑ FIXUTRES 1PLANS SUBMITTED: YES❑ NO❑ FLOORS—� Bsmt 1 2 3 4 BATHTUB 5 6 7 8 9 2 10 11 12 13 14 CROSS CONN DEVICE DEDICATED SPECIAL WASTE SYS i DEDICATED GAS/OIUSAND SYS DEDICATED GREASE SYSTEM DEDICATED GRAY WATER SYS DEDICATED WATER REUSE SYS DISHWASHER DRINKING FOUNTAIN FOOD WASTE GRINDER UNIT FLOOR/AREA DRAIN INTERCEPTOR INTERIOR KITCHEN SINK LAVATORY 3 ROOF DRAIN SHOWER STALL SERVICE/MOP SINK TOILET URINAL 2 WASHING MACHINE CONNECTION i WATER HEATER ALL TYPES 1 WATER PIPING I 113PIGOTS 2 J'1111.1:11 60 UE I have a current liabili insurance policy or its substantial equivalent whichmeetss he requirements of MGL.Ch.142 YES ■ If you have checked YES,please indicate the ❑ NO ❑ type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY X OTHER TYPE INDEMNITY ❑ BOND OWNER'S INSURANCE WAIVER:I am aware that the licensee does�Ve the insurance coverage required by Chapter 142 of Massachusetts General Laws,and that my signature on this permit application waives this requirement. the SIGNATURE OF OWNER OR AGENT CHECK ONE ONLY: OWNER ❑ AG T ❑ I hereby certify that all of the details and in I have submitted(or entered)regarding this application tr n Knowledge and that all plumbing work and installations performed under the permit issued for this a lica' ccur t e best of my provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PP e i om ' nc with all Pertinent PLUMBER NAME: MIKE BURKE - _ LICENSE# 13127 �— -- S NATURE COMPANY NAME: POWERHOUSE PLUMBING AND HEATING CORP ADDRESS: P OX 896 CITY: STATE:PLAISTOW — _ NH _ ZIP: 03865 __ --- TEL: .16033780020 FAX: 6033780040 CELL: 19784909385 _ EMAIL: J.LAURENCIO@POWERHOUSEPLUMBING.COM MASTER Q JOURNEYMAN ❑ CORPORATION # 2482PARTNERSHIP❑#r LLC❑# R O GH PLUMBING INSPECTION NOTES BELOW FOR OFFICE USE ONLY FINAL INSPECTI N TES } THIS APPLICATION SERVES AS THE PERMIT Yes No I h FEE: $ PERMIT# PLAN REVIEW NOTES f i 1. h {i I h I � i I I I I I I ...1....t4......................... OF NORT�y,� TOWN OF NORTH ANDOVER PERMIT FOR GAS INSTALLATION e. SSgCHU5E This certifies thatY.A? ..w. - -. ..........(/.VW... ..........:.......v�- has permission for gas installation../.Y .�7 U .n.. -�v .l ..... in the buildings of �� �...`.................��5.��`�O n ............................................. at....5.1......... ...............°..!n..r., North Andover, Mass. Fee...10............ Lic. No. ...�.��...{.. ....................................................�....... GASINSPECTOR Check# C ,� i MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK CITYNORTH ANDOVER ^T II, MA. DATE PERMIT# N(Mr— JOBSITE ADDRESS58 COMPASS POINT OWNER'S NAME TRUST CONSTRUCTION GOWNER ADDRESS: 51 MT JOY DRIVE TEWKSBURY MA 01876 TEL: 9788513456 FAX: TYPE OR OCCUPANCY TYPE: COMMERCIAL❑ EDUCATIONAL ❑ RESIDENTIAL❑■ PRINT CLEARLY NEW:Q RENOVATION: ❑ REPLACEMENT:❑ PLANS SUBMITTED: YES❑ NO❑ FIXUTRES -1 FLOOR- Bsmt 1 2 13 4 5 6 1 7 8 9 10 11 12 13 14 BOILER BOOSTER CONVERSION BURNER COOK STOVE DIRECT VENT HEATER DRYER FIREPLACE FRYOLATOR FURNACE GENERATOR GRILLE LABORATORY COCKS MAKEUP AIR UNIT OVEN POOL HEATER ROOM/SPACE HEATER ROOF TOP UNIT TEST UNIT HEATER UNVENTED ROOM HEATER WATER HEATER 5 INSURANCE COVERAGE I have a current liabilily insurance policy or its substantial equivalent which meets the requirements of MGL.Ch.142 YES ❑■ NO ❑ If you have checked YES,please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY ❑■ OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER:I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws,and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNE AGENT ❑ SIGNATURE OF OWNER OR AGENT hereby certify that all of the details and information I have submitted(or entered)regarding this applicatiVillb ate to the best of my Knowledge and that all plumbing work and installations performed under the permit issued for this applicpliance with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER/GASFITTER NAME: MIKE BURKE LICENSE# 13127 SI COMPANY NAME: POWERHOUSE PLUMBING AND HEATING CORP ADD SS: P- X 6 CITY: I PLAISTOW _ STATE: FNH I ZIP: 03865 FAX: 16033780040 TEL: 6033780020 CELL:F97547909385 EMAIL: I J.LAURENCIO POWERHOUSEPLUMBINGAND HEATING.0 MASTER❑■ JOURNEYMAN❑ LP INSTALLER❑ CORPORATION❑■ #=PARTNERSHIP❑#=LLC 0# \� C ROUGH GAS INSPEC ION NOTES BELOW FOR OFFICE USE ONLY FINAL INSPECTION NOTES i? Ifo Yes No THIS APPLICATION SERVES AS THE PERMIT ❑ ❑ FEE: $ PERMIT# PLAN REVIEW NOTES esureeAu us 81ALDING SAFETY&CONSTRUCTION +�I PLUMBING SAFETY SECTION °B NAME MICHABL,1/1I BUJZ uc# 38Q1 M � EXPIRES- 05/31rz015 State of New HJaMpshtre x Voluntary Heating TechnicianA NAME MICHAEL BURKE e r ENDORSEMENTS MOMSD TE ISSUED DATE EXPIRES: 028/2016 MW S , LICENSE#: HT 1400207hh . , Commonwweann of massachusetts • Department of Public Satety Oil Buturr rrchnu urn (c•r trfi\rjt a. License BU459572 # ,. MR3 AtL W I%URXI 61 CORLtSS Hl> . HswerbM MA 0t830 - s Ccxnnns%roncr l~x 0=812016J2o181201 d I The Commonwealth of Massachusetts Department of IndustrialAccidents Office of Investigations d 1 Congress Street, Suite 100 'tw Boston,MA 02114-2017 www.mass.gov/dia Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Ledbly Name (Business/Organization/Individual): POWERHOUSE PLUMBING CORP Address:PO BOX 896 City/State/Zip:PLAISTOW, NH 03865 Phone#:6033780020 Are you an employer?Check the appropriate box: Type of project(required): 1.❑■ I am a employer with 6 4. ❑ I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑Remodeling ship and have no employees These sub-contractors have g• ❑Demolition workingfor me in an capacity. employees and have workers' y p ty• 9. r-1 Building addition [No workers' comp. insurance comp.insurance.: required.] 5. ❑ We are a corporation and its 10.El Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.0 Roof repairs insurance required.]t c. 152, §1(4),and we have no employees. [No workers' 13.❑Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contract rs that check this box must attached an additional sheet showing the name of the sub contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:HARTFORD UNDERWRITERS INSURANCE COMP Policy#or Self-ins.Lic.#:04WECIT2480 Expiration Date:7-28-15 Job Site Address: 58 Compass point City/State/Zip:N andover Mass Attach a copy of the workers' compens "o Failure policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required r Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-ye • prisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day gainst t olator. advised that a copy of this statement may be forwarded to the Office of Investigations of th A for' s ance co age verification. I do hereby cert' unde the ains a penalties of perjury that the information provided above is true and correct. Si nature: Date: 9-3-14 Phone/6/ 780 Offici use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: AIa°® CERTIFICATE OF LIABILITY INSURANCE 8A20M 014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE 'POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORjANT: If the certificate holder Is an ADDITIONAL INSURED;the policy(les)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this Certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER NCAZCT Kathleen Miller, CISR, CPIW Insurance Solutions Corporation PHONE" (603)382-4600 N14.(603)382-2034 60 Westville Rd E4AAIL_AvpgESS.kmiller@isc-insurance.com INSURERS AFFORDING COVERAGE MAIC 0 Plaistow NH 03865 INSURER A Merchants 23329 INSURED INSURER B.HartfOrd Underwriters Ins. Co. POWERHOUSE PLUbSING 6 HEATING INSURERC: CORP INSURER D: PO BOX 896 INSURER E: P1,AISTOW NH 03865-0896 INSURER F: COVERAGES CERTIFICATE NUMBER-.CL1472917730 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, INSR TYPE OFINSURANCEADOLSUOR PO CY FF POLICYE P POLICY MBER LIMITS GENERAL LIABILITY EACH OCCURRENCE S 1,000,000 X COMMERCIAL GENERAL LIABILITY S 500,000 f"a Duan A CLAIMS-MADE Fx�OCCUR BOP1065497 /1/2014 /1/2015 MED EXP(Any one on) S 15,000 PERSONAL 6 ADV INJURY $ GENERAL AGGREGATE $ 2,000,000 GENL AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG S 2,000,000 X POLICY PRO LOC $ AUTOMOBILE LIABILITYBe"'N1, SINGLE LIMIT 11000,000 A X ANY AUTO BODILY INJURY(Per AUTOSSALL uNED AUTOESDULED 2058154 /1/2014 /1/2015 BODILY INJURY(Per accident) S HIRED AUTOS NON-OWNED PROPERTY DAMAGE $ AUTOS r Modlcal a merits $ 5,000 UMBRELLA UAB OCCUR EACH OCCURRENCE $ EXCESS UAB CLAIMS-MADE AGGREGATE $ DED I I RETENTION $ B WORKERS COMPENSATION I WC STATU- OTH. AND EMPLOYERS'LIABILITY Y I N ANY PROPRIETORIPARTNER/EXECUTIVE OFFICERMIEMBER EXCLUDED? y NIA E.L EACH ACCIDENT $ 100,000 (Mandatory in NH) 4WECIT2480 /28/2014 /28/2015 E.L.DISEASE-EA EMPLOYEE S 100,000 Dys describeunder E.L.DISEASE-POLICY LIMIT $ 500,000 DES(�IPIION OF OPERATIONS below DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(Attach ACORD 101,Additional Remarks Schedule,H more space Is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. UTHORIZED REPRESENTATIVE Lith Maglia/ARM �nicfiariarl ©1988-2010 ACORD CORPORATION. All rights reserved. marker of Ar:nRr1 ) 286 Date. .. .. l pf NpRTM TOWN OF NORTH ANDOVER ,e.,ti0 PERMIT FOR MECHANICAL INSTALLATION p m /- D t • SSACMUSES w This certifies that . . . 4. . . � . .?�?` �'JU . . . . . . . . . . . . . . . . has permission for mechanical installation . . . . . . . . . ... . . . . . . . . rN in the buildings of . :-:t.44"'.4A i `.!.`'.n . . . . . a at j.,/L�f c7. . ��: ", North Andover, Mass. Fee,` . . . Lic. No. . . ?. . . . . . . . . GAS INSPECTOR WHITE:Applicant CANARY:Building Dept. PINK:Treasurer b. Commonwealth of Massachusetts Sheet Metal Permit Date: (?' �� Permit## Estimated Job Cost: $ 360 0 o v Permit Fee: $ Plans Submitted: YES NO Plans Reviewed: YES NO Business License ## 196 Applicant License Business Information: Property Owner/Job Location Information: Name: J&J Heating & Air Conditioning Name: . -Aa , s /�7 �O r eel ya-y� Strect: 17 Arlington St.; Street: �a ��f^ /v .q -C S City/Town: Dracut, MA 01826 City/Town: North'-Andover, NA 01845 978-454-8197 S-0e • 3 Zo - c} 3 3 7 Telephone: Telephone: Photo I.D. required/ Copy of Photo I.D. attached: YES NO Staff Initial J-1 /M-1-unrestricted license .-�� J-2 /M-2-restricted to dwellings 3-stories or less and commercial up to 10,000 sq. ft. /2-stories or less Residential:'T-2"family " IvTulti-family Condo/Townhouses- Other Commercial: Office Retail Industrial Educational Institutional Other Square Footage: under 10,0.00 sq. ft. ✓' over 10,000 sq. ft. Number of Storics: Sheet metal work to be completed: , New Work: ✓ Renovation: HVAC ✓ Metal Watershed Roofing Kitchen Exhaust System Metal Chimney/Vents Air Balancing Provide detailed description of work to be done: S�L,n7n l�� e iht [al� Iti1�7� 1 du �7`toorl� �e /7��c syrT�,,,, h e,� �- FINSURANCE COVERAGE: ent liability insurance policy or its equivalent which meets the requirements of M.G.L. Ch..112 Yes �No❑hecked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws,and that my signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this box❑,I hereby certify that all of the details and Information I have submitted(or entered)regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and Installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO Progress Inspections Date Continents Final Inspection Date Comments Type of License: By ❑ Master Title ❑ Master-Restricted CitylTown ❑Journeyperson Signature of Licensee Permit# r G ❑Journeyperson-Restricted License Number: 5 Pee$ ❑ Check at www.mass.gov/dpi i Inspector Signature of Permit Approval The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations UV 600 Washington Street Boston,MA 02111 wr,mmass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/1Jlectricians/Plumbers Applicant Information Please Print Legibly NaMC(Business/Organization/Individual): J&J Heating & Air Conditioning, Me. Address: 17 Arlington St. City/State/Zip: Dracut, MA 01826 Phone It: '978-454-8197 Are you an employer?Check the appropriate box: Type of project(required): 1.9 I am a employer with_ 40 4. E] I am a general contractor and I 6. E]New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑Remodeling ship and have no employees These sub-contractors have 8. ❑Demolition working for me in any capacity, employees and have workers' 9. ❑Building addition [No workers'comp,insurance comp.insurance.$ required.] 5. ❑ We ate a corporation and its 10.0 Electrical repairs or additions 3.0 I am a homeowner doing all work officers have exercised their 11.❑Phunbing repairs or additions myself. [No workers'corn . right of exemption per MGL Y p 12.❑Roof repairs . insurance required.]t c. 152, §1(4),and we have no 13.❑Otheremployees.[No workers' comp.insurance required.] 'Any applicant that checks box#1 trust also fill.out lire section below showing their workers'compensation policy information. t iiomeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such, lContractots that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have ctriployees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: A.I.M. Mutual Insurance Policy#or Self-ins.Lic.M WMZ-800-8006553-2013A Expiration Date: 06/01/15 Job Site Address:__A,,r-� A�n e buw✓ City/State/Zip: Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required underSection 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$25 ay against the violator. a advised that a copy of this statement may be forwarded to Ole Office of lnvesti tons of dr DIA forjnsufxieKbvege verification. I do here ertif ruder tl ai and ef�rerjrrry that the information provided about is true and correct. Si natul' DatC: �� r t Phone 54-8197 Official use only. Do not write in this arca,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Ifealth 2.Building Department 3.City/Town Clerk 4.Electrical Inspector S.Plumbing Inspector 6.Other Contact Person: Phone#: PRoAGpp DATE(MM/DD/YYYY) ORDCEB87.4900 CERT'IFICAT'E ®F LIABILITY INSURANCE 06/10/2014 FAX 978.887.2404 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Edward F. Sennott Insurance Agency, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE ' 16 South Main Street HOLDER.THIS CERTIFICATE DOES NOT AMEND, EXTEND OR P. 0. Box 457 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. TUWsD- l d, MA 01983 INSURERS AFFORDING COVERAGE NAIC It INSURED J&J Heating & Air CondTtTomng, Inc. INSURER& Great American Alliance Ins Co _ 17 Arlington Street INSURERB: Safety Insurance Company 39454 Dracut, MA 01826 INSURERc: A.I.M. Mutual Ins_u_rance Co. INSURER D: NSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR DD' LTR NSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION - DATE MM OD YVY DATE MM DD YY LIMITS GENERAL LIABILITY PAC6418906-08 06/01/2014 06/01/2015 EACHOCCURRENCE $ 1,000,00 X COMMERCIAL GENERAL LIABILITYOAMAG O RENTED CLAIMS MAGE 1:X1 OCCUR PREMISES Ea occurrence $ 300,000 — -- A MED EXP(Any one person) $ 10,000 PERSONAL&ADV INJURY $ 1,000,000 --– GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: ---"—'--"----"'------------ --------- POLICY PRO- ECT LOC PRODUCTS-COMP/OP AGG $ 2,000,OO J AUTOMOBILE LIABILITY 2434550 06/01/2014 06/01/2015 ANY AUTO COMBINED SINGLE LIMIT ALL OWNED AUTOS ,� (Ea accident) 1,000,000 ---- -- X SCHEDULED AUTOS BODILY INJURY Q –X (Per person) HIRED AUTOS X NON-OWNED AUTOS BODILY INJURY $(Per accident) PROPERTY DAMAGE :F (Per accident) GARAGE LIABILITY ANY AUTO AUTO ONLY-EA ACCIDENT $ — OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY UMB6418958-06 06/01/2014 06/01/2015 EACH—OCCURRENCE $ 2,000,00 A OCCUR CLAIMS MADE AGGREGATE $ 2,000,000 DEDUCTIBLE — — RETENTION $ a WOREMPLOY COMPENSATION ILIT WMZ-800-8006553-2014A 06/02/2014 06/02/2015 X AND EMPLOYERS'LIABILITY L AlA l - H- AND PROPRIETOR/PARTNER/EXECUTIVE _TORY I_IMI7SER C OFFICER/MEMBER EXCLUDED? E.L.EACH ACCIDENT $ 1,000,000 (Mandatory in NH) —_ If yes,describe under E.L.DISEASE-EA EMPLOYEE $ 1,000,000 SPECIAL PROVISIONS below — OTHER E.L.DISEASE-POLICY LIMIT $ 1,000,00 DESCRIPTION OF OPr_RATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR REPRESENTATIVES. Evidence of Insurance AUTHORIZED REPRESENTATIVE Peter Sennott/LAR %<'%•�y,-,> ,;. �,-=- ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD �AS1S'ACHIJ JF, JSETTS� DRIVER'S = J LICENSE o 1. Eu�A 4a ISS PS gB END- 4d NUMBER- ,03�2011k, NONE �59965587'1'�' `n05� 016 a Do I� l �useJ RE is sEx M 66' NONEINE1 fi z ERIC RJ N,> v B 83 LONG DR DRACUT,MA 01826.2048 'S DD 05.042011 Rav 07�15.200A COMMONWEALTH OF MASSACHUSETTS:. BOARD Of SHEET:;.METAL `WORKERS ISSUES THE FOLLOWING >LICENSE AS' A1ASTER—UNRESTRiCTE J. & ..J HEATING AC ERIC'R KLI;R J & J HEAT-TNG & AC z 17 ARLI NGTON ST f�i�ACliT MA o 1826-3936 ». 156$ 05/28/16 214 9 I 5 . I ! I 1 v OMMONWE ILTH OF MASS �HOSETTS BOARD OF SHEET MC7 L 'WQIIKERS :. ISSUCS THE FOL LOW`N.G Lf`CENSE ..; <nS A BUSINESS CDW..'A. D T AYOTTE J J HEATI NG I R COND I l I ON IG ( N 17 ARL I NG`TON STRF LT" LU oRncur rin 01826 1g6 _ oi/19/16 144485 �1 i i wri htsoft� Load Short Form Job: 58 Compass Point 9 Date: June 8,2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Information Htg Clg Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 63 8 Fireplaces 3 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 24 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor system d 1414 35976 16059 927 927 1st floor system d 2964 49817 32943 1648 1648 Entire House d 4378 85793 49002 2575 2575 Other equip loads 0 0 Equip. @ 0.88 RSM 42975 Latent cooling 7574 TOTALS 4378 85793 50549 2575 2575 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft° 2014-Oct-08 06:58:14 9 Right-Suite®Universal 2015 15.0.03 RSU05790 ACCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Page 1 ti Load Short Form Job: 58 Compass Point wrightsoftry Date: June 8,2013 1st floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 DeSign Information Htg Clg Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 63 8 Fireplaces 2 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 24 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1648 cfm Actual air flow 1648 cfm Air flow factor 0.033 cfm/Btuh Air flow factor 0.050 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 ROOM NAME Area Htg load Clg load Htg AVF Cig AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Dining room 225 4392 1700 145 85 Kitchen 180 1823 3728 60 186 Laundry 45 605 1121 20 56 Living room 180 3560 2729 118 136 Master bedroom 273 7276 3435 241 172 Master bath 120 3168 2396 105 120 W.I.C 120 1477 476 49 24 Entry 68 1341 421 44 21 Powder Rm 48 95 514 3 26 Front entry 230 457 555 15 28 Recreation Room 270 4088 3729 135 186 Bar area 506 11658 7389 386 370 Bath room 90 538 651 18 33 spare room 216 3226 1519 107 76 Room5 393 6112 2580 202 129 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft� 2014-Oct-08 06:58:14 „�, 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 2 /CCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N 1st floor system d 2964 49817 32943 1648 1648 Other equip loads 5697 2389 Equip. @ 0.88 RSM 30987 Latent cooling 4619 TOTALS 2964 55513 35606 1648 1648 i Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. .^� WI'1 f1tSOf#° 2014-Oct-08 06:58:14 ti g Right-Suite®Universal 2015 15.0.03 RSU05790 Page 3 BCCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJB Front Door faces: N r 9 Load Short Form Job: 58 Compass Point wri htsoft Date: June 8,2013 2nd floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com I Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Information Htg Clg Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 63 8 Fireplaces 2 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 24 HEATING EQUIPMENT COOLING EQUIPMENT Make Goodman Mfg. Make Goodman Mfg. Trade GOODMAN Trade GOODMAN, JANITROL,AMANA DISTI... Model GMVC950453BX* Cond SSX160301A* AHRI ref 2002234 Coil CHPF3642C6C* AHRI ref 5039169 Efficiency 95 AFUE Efficiency 12.7 EER, 15.5 SEER Heating input 46000 Btuh Sensible cooling 22240 Btuh Heating output 45000 Btuh Latent cooling 5560 Btuh Temperature rise 46 OF Total cooling 27800 Btuh Actual air flow 927 cfm Actual air flow 927 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.058 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) bedroom 2\ 278 5208 2533 134 146 bath2 65 1652 544 43 31 2nd floor hall 176 8231 3864 212 223 Bathroom 3 187 1793 1333 46 77 Bedroom 3 225 6263 4494 161 259 storage 483 12828 3290 331 190 2nd floor system d 1414 35976 16059 927 927 Other equip loads 4345 2389 Equip. @ 0.88 RSM 16179 Latent cooling 2955 TOTALS 1414 40321 19134 927 927 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. WCI IltS0lft° 2014-Oct-08 06:58:14 " 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 4 ACC+A ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N i wri htsoft Load Multizone Summary Report Job: 58 Compass Point 9 Date: June 8,2013 By: JU Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Infiltration Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM ft3 cfm Btuh/ft2 ft3 cfm Btuh/ft2 2nd floor system 13864 0 . 61 141 4 . 3 13864 0 . 57 132 0 . 5 lst floor system 31175 0 . 36 185 4 . 3 31175 0 . 33 173 0 . 5 Entire House 45039 0 . 17 326 1 . 7 45039 0 . 07 305 0 . 1 Load • AVF Summary ROOM NAME Area Htg load Clg load HtgAVF C1gAVF ft2 Btuh Btuh cfm cfm bedroom 2 \ 278 5208 2533 134 146 bath2 65 1652 544 43 31 2nd floor hall 176 8231 3864 212 223 Bathroom 3 187 1793 1333 46 77 Bedroom 3 225 6263 4494 161 259 storage 483 12828 3290 331 190 2nd floor system 1414 35976 16059 927 927 Dining room 225 4392 1700 145 85 Kitchen 180 1823 3728 60 186 Laundry 45 605 1121 20 56 Living room 180 3560 2729 118 136 Master bedroom 273 7276 3435 241 172 Master bath 120 3168 2396 105 120 W. I .0 120 1477 476 49 24 Entry 68 1341 421 44 21 Powder Rm 48 95 514 3 26 Front entry 230 457 555 15 28 Recreation Room 270 4088 3729 135 186 Bar area 506 11658 7389 386 370 Bath room 90 538 651 18 33 spare room 216 3226 1519 107 76 Room5 393 6112 2580 202 129 lst floor system 2964 49817 32943 1648 1648 Entire House 4378 85793 49002 2575 2575 .per wri htsoft 2014-Oct-08 06:58:14 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Page 1 wri htsoft Building Analysis Job: Compass Point g ® Ju Date: June 8,2013 • Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com i Project Inf• • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative hums ity N 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range °F) - 17 ( M ) Method Simplified Wet bulb (° - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 3 Average) • Component Btuh/ft2 Btuh % of load Walls 5.2 24380 28.4 Glazing 24.3 5799 6.8 Doors 24.6 4472 5.2 a Ceilings 8.7 18079 21.1 Floors 3.2 6264 7.3 Infiltration 4.3 21780 25.4 Ducts 5019 5.9 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 - Total 85793 100.0 -Component Btuh/ft2 Btuh % of load Walls 1.3 5934 12.1 w Glazing 26.4 6292 12.8 Doors 8.2 1483 3.0 Ceilings 5.8 12173 24.8 Floors 0.4 766 1.6 1 . Infiltration 0.5 2487 5.1 Ducts 2837 5.8 Ventilation 0 0 Internal gains 17030 34.8 Blower 0 0 Adjustments 0 Total 49002 100.0 Latent Cooling Load = 7574 Btuh Overall U-value= 0.116 Btuh/ft2-°F Data entries checked. wri htsoft6 2014-Oct-08 06:58:14 C� 9 Right-Suite(g)Universal 2015 15.0.03 RSU05790 Page 1 � ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Building Analysis Job: 58 Compass Point wrightsoft 9 y Date: June 8,2013 1st floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut, MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Pro*ect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative hums�{ity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Dally range °F) - 17 ( M ) Method Simplified Wet bulb (°F� - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) • Component Btuh/ft2 Btuh % of load Walls 6.1 15608 28.1 Glazing 20.9 3485 6.3 " Doors 24.6 4472 8.1 Ceilings 16.2 8900 16.0 Floors 1.8 2677 4.8 Infiltration 4.3 12355 22.3 Ducts 2319 4.2 Piping 0 0 Humidification 5697 10.3 Ventilation 0 0 Adjustments 0 Total 1 1555131 100.0 Component Btuh/ft2 Btuh % of load Walls 1.8 4583 13.0 � Glazing 22.5 3744 10.6 Doors 8.2 1483 4.2 Ceilings 11.4 6272 17.8 Floors 0.2 327 0.9 Infiltration 0.5 1411 4.0 Ducts 483 1.4 � Ventilation 0 0 Internal gains 14640 41.4 Blower 2389 6.8 Adjustments 0 Total 1 353321 100.0 Latent Cooling Load = 4619 Btuh Overall U-value = 0.115 Btuh/ft2-°F Data entries checked. 2014-Oct-08 06:58:14 wrightsoft` Right-Suite®Universal 2015 15.0.03 RSU05790 Page 2 ACCA ...Desktop\wrightsoft HVAC\murteild building 8.rup Calc=MJ8 Front Door faces: N Building Anal sis Job: 58 Compass Point wrightsoft y Date: June 8,2013 2nd floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Prooect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (° 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range °F) - 17 ( M ) Method Simplified Wet bulb (°F� - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) • Component Btuh/ft2 Btuh % of load Walls 4.1 8771 21.8 Glazing 32.1 2313 5.7 , Doors 0 0 0 Ceilings 6.0 9180 22.8 Floors 7.5 3587 8.9 � Infiltration 4.3 9424 23.4 Ducts 2700 6.7 ^mom Piping 0 0 Humidification 4345 10.8 Ventilation 0 0 Adjustments 0 Total 1 40321 100.0 —Component Btuh/ft2 Btuh % of load Walls 0.6 1351 7.3 Glazing 35.4 2549 13.8 Doors 0 0 0 Ceilings 3.9 5901 32.0 Floors 0.9 438 2.4 Infiltration 0.5 1076 5.8 Ducts 2354 12.8 Ventilation 0 0 Internal gains 2390 13.0 Blower 2389 13.0 Adjustments 0 Total 1 18448 100.0 , Latent Cooling Load = 2955 Btuh Overall U-value = 0.118 Btuh/ft2-°F Data entries checked. 2014-Oct-08 06:58:14 wrightsoft" Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 3 ACCK ...Desktop\wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft- Date: June 8,2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 �I Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 3 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 BtuhM-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 1213-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 609 0.097 11.0 6.11 3719 1.79 1092 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud se 900 0.097 11.0 6.11 5497 1.79 1614 sw 410 0.097 11.0 6.11 2502 1.79 735 W 50 0.097 11.0 6.11 303 1.79 89 nw 587 0.097 11.0 6.11 3587 1.79 1053 all 2554 0.097 11.0 6.11 15608 1.79 4583 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 376 0.065 21.0 4.09 1540 0.63 237 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 675 0.065 21.0 4.09 2764 0.63 426 sw 416 0.065 21.0 4.09 1704 0.63 262 nw 675 0.065 21.0 4.09 2764 0.63 426 all 2142 0.065 21.0 4.09 8771 0.63 1351 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 ne 105 0.300 0 18.9 1992 18.8 1985 glazing,clr outr,air gas,wd frm mat,clr innr, 1/4"gap, 1/8"thk; ne 56 0.570 0 35.9 2011 38.7 2165 6.67 ft head ht sw 20 0.570 0 35.9 718 49.3 986 sw 16 0.300 0 18.9 302 24.0 384 nw 41 0.300 0 18.9 775 18.8 772 all 238 0.300 0 24.3 5799 26.4 6292 Doors 11 DO:Door,wd sc type ne 161 0.390 0 24.6 3956 8.15 1312 sw 21 0.390 0 24.6 516 8.15 171 all 182 0.390 0 24.6 4472 8.15 1483 Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 cell ins,1/2" 755 0.026 38.0 1.64 1237 1.15 872 gypsum board int fnsh 17B-6a1:Rf/clg ceiling,asphalt shingles roof mat,wd cons,r-6 602 0.105 6.0 6.61 3979 3.72 2236 deck ins,1"thkns 2014-Oct-08 06:58:14 wrightsoft" Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 1 /�Cp. ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,6"thkns,1/2" 536 0.257 1.0 16.2 8663 11.4 6105 gypsum board int fnsh p C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,8"thkns,1/2" 15 0.255 1.0 16.1 236 11.3 167 gypsum board int fnsh C part ceiling,:C part ceiling,frm fir,6"thkns 176 0.357 1.0 22.5 3964 15.9 2794 Floors 19A-Obstp: Part floor,frm fir,6"thkns 476 0.368 0 7.54 3587 0.92 438 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 1489 0.034 30.0 1.80 2677 0.22 327 2014-Oct-08 06:58:14 wri htsaft Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 2 /�C� ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N wri htsoft Component Constructions Job: 58 Compass Point D 9 � Date: June 8,2013 2nd floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut, MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft2°F ft'°F/Btuh MON Btu MOM Btu Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 376 0.065 21.0 4.09 1540 0.63 237 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 675 0.065 21.0 4.09 2764 0.63 426 sw 416 0.065 21.0 4.09 1704 0.63 262 nw 675 0.065 21.0 4.09 2764 0.63 426 all 2142 0.065 21.0 4.09 8771 0.63 1351 Partitions (none) Windows 1 D-c2ow:2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap, ne 56 0.570 0 35.9 2011 38.7 2165 1/8"thk;6.67 ft head ht sw 16 0.300 0 18.9 302 24.0 384 all 72 0.300 0 32.1 2313 35.4 2549 Doors (none) Ceilings 166-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 755 0.026 38.0 1.64 1237 1.15 872 gypsum board int fnsh 17B-6al:Rf/clg ceiling,asphalt shingles roof mat,wd cons,r-6 602 0.105 6.0 6.61 3979 3.72 2236 deck ins,1"thkns C part ceiling,:C part ceiling,frm flr,6"thkns 176 0.357 1.0 22.5 3964 15.9 2794 Floors Part 19A-Obst : p a t floor,frm fl r,6"thkns 476 0.368 0 7.54 3587 0.92 438 wri htsoft� 2014-Oct-08 06:58:14 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 3 �CP. ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N -�- Component Construction s Job: 58 Compass Point wr�ghtsoft Date: Junes,2013 1st floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ftz-°F ft�°F/Btuh Btuh/V Btuh Btuh/112 Btu Walls 1213-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 609 0.097 11.0 6.11 3719 1.79 1092 gypsum board int fish,2"x4"wood frm,16"o.c.stud se 900 0.097 11.0 6.11 5497 1.79 1614 sw 410 0.097 11.0 6.11 2502 1.79 735 w 50 0.097 11.0 6.11 303 1.79 89 nw 5877 0 09 11.0 6.11 3587 1.79 1053 all 2554 0.097 11.0 6.11 15608 1.79 4583 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 ne 105 0.300 0 18.9 1992 18.8 1985 glazing,clr outr,air gas,wd frm mat,clr innr, 1/4"gap, 1/8"thk; sw 20 0.570 0 35.9 718 49.3 986 6.67 ft head ht nw 41 0.300 0 18.9 775 18.8 772 all 166 0.300 0 20.9 3485 22.5 3744 Doors 11 DO:Door,wd sc type ne 161 0.390 0 24.6 3956 8.15 1312 sw 21 0.390 0 24.6 516 8.15 171 all 182 0.390 0 24.6 4472 8.15 1483 Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,6"thkns,1/2" 536 0.257 1.0 16.2 8663 11.4 6105 gypsum board int fnsh C part ceiling,:C part ceiling,hrd wd fir fish,frm fir,8"thkns,1/2" 15 0.255 1.0 16.1 236 11.3 167 gypsum board int fish Floors 19A-30bswp: Part floor,hrd wd flr fnsh,r-30 ins,frm flr,10"thkns 1489 0.034 30.0 1.80 2677 0.22 327 wri htsoft, 2014-Oct-08 06:58:14 �., 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 4 A CCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft� p Date: June 8,2013 Recreation Room By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@iiheatac.com Web:jjheatac.com Project Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C0 nditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (OF) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain fr Btuhffl-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/112 Btu Walls 126-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 118 0.097 11.0 6.11 719 1.79 211 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud nw 128 0.097 11.0 6.11 779 1.79 229 all 245 0.097 11.0 6.11 1498 1.79 440 Partitions (none) Windows 2 glazing,cir outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 ne 35 0.300 0 18.9 669 18.8 667 glazing,clr outr,air gas,wd frm mat,cir innr, 1/4"gap, 1/8"thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,6"thkns,1/2" 45 0.257 1.0 16.2 727 11.4 513 gypsum board int fnsh Floors (none) 2014-Oct-08 06:58:14 wrightsofta Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 5 ACC( ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Comonent Constructions Job: 58 Compass Point wrightsoft- p Date: June 8,2013 Bar area By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jiheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft�-°F/Btuh Btuh/V Stuh BtuhM Btu Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 75 0.097 11.0 6.11 458 1.79 135 gypsum board int fnsh,2"x4"wood firm,16"o.c.stud se 196 0.097 11.0 6.11 1195 1.79 351 all 271 0.097 11.0 6.11 1653 1.79 485 Partitions (none) Windows (none) Doors 11 DO:Door,wd sc type ne 112 0.390 0 24.6 2752 8.15 913 Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh frm fir,6" thkns,1/2" 348 0.257 1.0 16.2 5625 11.4 3964 gypsum board int fnsh Floors (none) Azzwri htsoftp 2014-Oct-08 06:58:14 I- 9 Right-Suite®Universal 2015 15.0.03 RSU05790 Page 6 ACO, ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft- Date: June 8,2013 Bath room By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-°F W-T/Btuh Btuh/112 Btuh Btuh/ftp Btu Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" nw 43 0.097 11.0 6.11 260 1.79 76 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,6"thkns,1/2" 6 0.257 1.0 16.2 97 11.4 68 gypsum board int fnsh Floors (none) wri htsOft' 2014-Oct-08 06:58:14 r' g Right-SuiteOO Universal 2015 15.0.03 RSU05790 Page 7 ACCK ...Des ktop\W rights oft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Com onent Constructions Job: 58 Compass Point wrightsoft� p Date: June 8,2013 spare room By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 II Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuhffl-°F ftz-°FBtuh Btuh/ft2 Btu BtuhtV Btuh Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" sw 153 0.097 11.0 6.11 935 1.79 275 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud nw 102 0.097 11.0 6.11 623 1.79 183 all 255 0.097 11.0 6.11 1558 1.79 458 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,6"thkns,1/2" 36 0.257 1.0 16.2 582 11.4 410 gypsum board int fnsh Floors (none) wri htsoft 2014-Oct-08 06:58:14 ti g Right-Suite@O Universal 2015 15.0.03 RSU05790 Page 8 IICCp. ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft" Date: June 8,2013 ' Rooms By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com • Info'rmation For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh Btuh/V Btuh Btuh/112 Btu Wal I s 1213-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" se 170 0.097 11.0 6.11 1039 1.79 305 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud sw 145 0.097 11.0 6.11 883 1.79 259 W 50 0.097 11.0 6.11 303 1.79 89 nw 68 0.097 11.0 6.11 416 1.79 122 all 432 0.097 11.0 6.11 2640 1.79 775 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,6"thkns,1/2" 101 0.257 1.0 16.2 1632 11.4 1150 gypsum board int fnsh Floors (none) c wri htsoft 2014-Oct-08 06:58:14 ti 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 9 ACCK ...Desktop\W rights oft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft9 Date: June 8,2013 Dining room By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/V-°F ft2-°F/Btuh Btuh/ft2 Btuh Btuh/ftz Btu Walls 1213-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 100 0.097 11.0 6.11 611 1.79 179 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud nw 110 0.097 11.0 6.11 672 1.79 197 all 210 0.097 11.0 6.11 1283 1.79 377 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 ne 35 0.300 0 18.9 662 18.8 659 glazing,clr outr,air gas,wd frm mat,cir innr, 1/4"gap, 1/8"thk; nw 25 0.300 0 18.9 473 18.8 471 6.67 ft head ht all 60 0.300 0 18.9 1134 18.8 1130 Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 225 0.034 30.0 1.80 404 0.22 49 2014-Oct-08 06:58:14 i -1- wrightsoft" Right-Suite®Universal 2015 15.0.03 RSU05790 Page 10 I�Cip1 ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft� Date: June 8,2013 ' Kitchen By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 D- • • • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 i Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ~ ft2 Btuh/ft�°F ft�°FBtuh Btuh/ft2 B[uh Btuh/ft2 Btuh Walls 126-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" nw 92 0.097 11.0 6.11 562 1.79 165 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows 2 glaang,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 nw 16 0.300 0 18.9 302 18.8 301 glazing,clr outr,air gas,wd frm mat,clr innr, 1/4"gap, 1/8"thk; 6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm flr,10"thkns 180 0.034 30.0 1.80 324 0.22 40 2014-Oct-08 06:58:14 wri htsoftp Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 11 ACCK ...Desktop\wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft� Date: June 8,2013 Laundry By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/V-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ftp Btu Walls 12131-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" nw 45 0.097 11.0 6.11 275 1.79 81 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 45 0.034 30.0 1.80 81 0.22 10 wri htsoft 2014-Oct-O8 06:58:14 �.� 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 12 AC CA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point - wrightsoft� P Date: June 8,2013 Living room By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� BtuhM-°F ft2-'FBtuh Btuh/ft2 Btu MOM Btu Wal I s 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 143 0.097 11.0 6.11 874 1.79 257 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors 11 DO:Door,wd sc type ne 49 0.390 0 24.6 1204 8.15 399 Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd flr fish,r-30 ins,frm flr,10"thkns 180 0.034 30.0 1.80 324 0.22 40 t " 2014-Oct-08 06:58:14 Wri htsoftRight-Suite®Universal 2015 15.0.03 RSU05790 Page 13 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft� p Date: June 8,2013 Master bedroom By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Dally range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces aces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/V-°F ftz-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12B-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" ne 173 0.097 11.0 6.11 1057 1.79 310 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud se 336 0.097 11.0 6.11 2053 1.79 603 all 509 0.097 11.0 6.11 3110 1.79 913 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 ne 35 0.300 0 18.9 662 18.8 659 glazing,clr outr,air gas,wd frm mat,clr innr, 1/4"gap,1/8"thk; 6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm flr,10"thkns 273 0.034 30.0 1.80 491 0.22 60 t Wrl htsoft 2014-Oct-08 06:58:14 g Right-SuiteC�Universal 2015 15.0.03 RSU05790 Page 14 RCCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 58 Compass Point 9 Master bath Byte: June 8,2013 J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com j Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 I Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ftz Btu Btuh/ft2 Btu Walls 1213-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" se 90 0.097 11.0 6.11 550 1.79 162 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud sw 88 0.097 11.0 6.11 538 1.79 158 all 178 0.097 11.0 6.11 1088 1.79 319 Partitions (none) Windows 1D-c2ow:2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap, sw 20 0.570 0 35.9 718 49.3 986 1/8"thk;6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 120 0.034 30.0 1.80 216 0.22 26 2014-Oct-08 06:58:14 i -L- wrightsoft" Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 15 ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point - - wrightsoft� p Date: June 8,2013 W.I.0 By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area Ll-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/fr1-°F ft2-°F/Bluh Btuh/ft2 Stuh Btuh/ft2 Btuh Walls 1213-0sw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" se 108 0.097 11.0 6.11 660 1.79 194 gypsum board int fnsh,2'x4"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm flr,10"thkns 120 0.034 30.0 1.80 216 0.22 26 W11 htsoft" 2014-Oct-08 06:58:14 ,.� 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 16 ACCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft- Date: June 8,2013 Entry By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain fF Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 1213-Osw:Frm wall,stucco ext,1/2"wood shth,r-11 cav ins,1/2" sw 24 0.097 11.0 6.11 147 1.79 43 gypsum board int fnsh,2"x4"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors 11 DO:Door,wd sc type sw 21 0.390 0 24.6 516 8.15 171 Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,8"thkns,1/2" 15 0.255 1.0 16.1 236 11.3 167 gypsum board int fnsh Floors 19A-30bswp: Part floor,hrd wd flr fnsh,r-30 ins,frm flr,10"thkns 68 0.034 30.0 1.80 122 0.22 15 2014-Oct-08 06:58:14wri htsoft Right-Sute@ Universal 2015 15.0.03 RSU05790 Page 17 ACCI4 ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 58 Compass Point 9 Date: June 8,2013 Powder Rm By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft�°F ft�'F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm flr,10"thkns 48 0.034 30.0 1.80 86 0.22 11 t., 2014-Oct-08 06:58:14 wri htsoft Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 18 ACO, ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrighfisaft� P Date: June 8,2013 Front entry By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft2-°F ft%T/Btuh Btuh/112 Btuh Btuh/ft2 Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm flr,10"thkns 230 0.034 30.0 1.80 413 0.22 51 .� Wrl htsoft" 2014-Oct-08 06:58:14 g Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 19 ACCP. ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N -�- htsoft-9 Component Constructions Job: 58 Compass Point wri p Date: June 8,2013 Bedroom 3 By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-°F ftz-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12F-Osw:Firm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 79 0.065 21.0 4.09 324 0.63 50 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 135 0.065 21.0 4.09 553 0.63 85 nw 135 0.065 21.0 4.09 553 0.63 85 all 349 0.065 21.0 4.09 1429 0.63 220 Partitions (none) Windows 1 D-c2ow:2 glazing,clr outr,air gas,wd frm mat,cir innr,1/4"gap, ne 56 0.570 0 35.9 2011 38.7 2165 1/8"thk;6.67 ft head ht Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 225 0.026 38.0 1.64 369 1.15 260 gypsum board int fnsh Floors (none) wri htsoft Right-SuiteO Universal 2015 15.0.03 RSU05790 2014-Oct-08 06:58:14 ti- Page 20 ACCI1 ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft- Date: June 8,2013 Bathroom 3 By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/f?-°F ft2-°F/Btuh Btuh/V Btu Stuh/ft2 Btu Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" nw 153 0.065 21.0 4.09 627 0.63 96 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 187 0.026 38.0 1.64 306 1.15 216 gypsum board int fnsh Floors (none) wri htsoft" 2014-Oct-08 06:58:14 1 9 Right-Suite®Universal 2015 15.0.03 RSU05790 Page 21 ACCP. ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 58 Compass Point 9 2nd floor hall Byte: June 8,2013 J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Ht HTM Loss CI HTM Gain r► 9 9 ~ ft2 Btuh/ft2-°F ft2-°F/Btuh BtuhN Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 108 0.065 21.0 4.09 442 0.63 68 gypsum board int fish,2"x6"wood frm,16"o.c.stud se 135 0.065 21.0 4.09 553 0.63 85 sw 72 0.065 21.0 4.09 295 0.63 45 nw 81 0.065 21.0 4.09 332 0.63 51 all 396 0.065 21.0 4.09 1622 0.63 250 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,:C part ceiling,frm flr,6"thkns 176 0.357 1.0 22.5 3964 15.9 2794 Floors (none) .` wri htsoft• 2014-Oct-08 06:58:14 9 Right-Suite®Universal 2015 15.0.03 RSU05790 Page 22 ACCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N wri htsoft Component Constructions Job: 58 Compass Point 9 bath2 Date: June 8,2013 J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 —Design • • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftp'F ftz-°F/Btuh Btuh/ftz Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 117 0.065 21.0 4.09 479 0.63 74 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 45 0.065 21.0 4.09 184 0.63 28 all 162 0.065 21.0 4.10 663 0.63 102 Partitions (none) Windows (none) Doors (none) Ceilings 166-38ad:Attic ceiling,asphalt shingles roof mat,r-38 cell ins,1/2" 65 0.026 38.0 1.64 106 1.15 75 gypsum board int fns Floors (none) _XLjL � 2014-Oct-08 06:58:14wri htsaftRight-Suite@ Universal 2015 15.0.03 RSU05790 Page 23 ACCK ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 58 Compass Point wrightsoft- Date: June 8,2013 bedroom 2 \ By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design C• • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh Btuh/ftz Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" se 198 0.065 21.0 4.09 811 0.63 125 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud sw 137 0.065 21.0 4.09 561 0.63 86 nw 117 0.065 21.0 4.09 479 0.63 74 all 452 0.065 21.0 4.09 1851 0.63 285 Partitions (none) Windows 2 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap,1/8"thk:2 sw 16 0.300 0 18.9 302 24.0 384 glazing,clr outr,air gas,wd frm mat,clr innr,1/4"gap, 1/8"thk; 6.67 ft head ht Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceiI ins,1/2" 278 0.026 38.0 1.64 455 1.15 321 gypsum board int fnsh Floors (none) t Wrl htSOft° 2014-Oct-08 06:58:14 9 Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 24 .C� ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Wrl htsoft Component Constructions Job: 58 Compass Point 9 Date: June 8,2013 storage By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Project Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Design Conditions Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Dally range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 2 Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ftp'F ft�°FBtuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,stucco ext,1/2"wood shth,r-21 cav ins,1/2" ne 72 0.065 21.0 4.09 295 0.63 45 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud se 162 0.065 21.0 4.09 663 0.63 102 sw 207 0.065 21.0 4.09 848 0.63 131 nw 189 0.065 21.0 4.09 774 0.63 119 all 630 0.065 21.0 4.10 2580 0.63 397 Partitions (none) Windows (none) Doors (none) Ceilings 17B-6al:Rf/clg ceiling,asphalt shingles roof mat,wd cons,r-6 602 0.105 6.0 6.61 3979 3.72 2236 deckins,1"thkns Floors 19A-Obstp:Part floor,frm flr,6"thkns 476 0.368 0 7.54 3587 0.92 438 141 2014-Oct-08 06:58:14 ,Zwri htsoft' Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 25 /TCCA ...Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N Project Summar Job: 58 Compass Point wrightsoftm 1 Y Date: June 8,2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone:978 454 8197 Fax 978 454 8615 Email:office@jjheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Notes: Des!q- n Information Weather: Worcester, MA, US Winter Design Conditions Summer Design Conditions Outside db 5 OF Outside db 83 OF Inside db 68 OF Inside db 75 OF Design TD 63 OF Design TD 8 OF Daily range M Relative humidity 50 % Moisture difference 24 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 80773 Btuh Structure 46165 Btuh Ducts 5019 Btuh Ducts 2837 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 85793 Btuh Use manufacturer's data n Rate/swing multiplier 0.88 Infiltration Equipment sensible load 42975 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 3 (Average) Structure 6522 Btuh Ducts 1053 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 4378 4378 Equipment latent load 7574 Btuh Volume (ft3) 45039 45039 Air changes/hour 0.17 0.07 Equipment total load 50549 Btuh Equiv.AVF (cfm) 326 305 Req. total capacity at 0.80 SHR 4.5 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Oct-08 06:58:15 wrightsoft' Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 1 ..Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N - - 9 m Project Summar Job: Compass Point WCI �ltSO� � y Ju Date: June 8,2013 1st floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st,Dracut,MA01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@jjheatac.com Web:flheatac.com Proiect Inf6rmation For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Notes: Desicin information Weather: Worcester, MA, US Winter Design Conditions Summer Design Conditions Outside db 5 OF Outside db 83 OF Inside db 68 OF Inside db 75 OF Design TD 63 OF Design TD 8 OF Daily range M Relative Humidity 50 % Moisture difference 24 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 47497 Btuh Structure 32461 Btuh Ducts 2319 Btuh Ducts 483 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 5697 Btuh Blower 2389 Btuh Piping 0 Btuh Equipment load 55513 Btuh Use manufacturer's data n Rate/swing multiplier 0.88 Infiltration Equipment sensible load 30987 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 2 (Average) Structure 3878 Btuh Ducts 741 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 2964 2964 Equipment latent load 4619 Btuh Volume (ft3) 31175 31175 Air changes/hour 0.36 0.33 Equipment total load 35606 Btuh Equiv.AVF (cfm) 185 173 Req. total capacity at 0.80 SHR 3.2 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1648 cfm Actual air flow 1648 cfm Air flow factor 0.033 cfm/Btuh Air flow factor 0.050 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Oct-08 06:58:15 wrightsoft'° Right-Suite@ Universal 2015 15.0.03 RSU05790 Page 2 ACCIk ..Desktop\Wrightsoft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N e Project Summar Job: 58 Compass Point 44 - wrightsoft° y Date: June 8,2013 2nd floor system By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone:978 454 8197 Fax:978 454 8615 Email:office@iiheatac.com Web:jjheatac.com Proiect Information For: Trust Construction 51 Mount Joy Drive, Tewksbury, Ma 01876 Notes: i Design Information Weather: Worcester, MA, US Winter Design Conditions Summer Design Conditions Outside db 5 OF Outside db 83 OF Inside db 68 OF Inside db 75 OF Design TD 63 OF Design TD 8 OF Daily range M Relative humidity 50 % Moisture difference 24 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 33276 Btuh Structure 13705 Btuh Ducts 2700 Btuh Ducts 2354 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 4345 Btuh Blower 2389 Btuh Piping 0 Btuh Equipment load 40321 Btuh Use manufacturer's data n Rate/swing multiplier 0.88 Infiltration Equipment sensible load 16179 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 2 (Average) Structure 2643 Btuh Ducts 312 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 1414 1414 Equipment latent load 2955 Btuh Volume (ft3) 13864 13864 Air changes/hour 0.61 0.57 Equipment total load 19134 Btuh Equiv.AVF (cfm) 141 132 Req. total capacity at 0.80 SHR 1.7 ton Heating Equipment Summary Cooling Equipment Summary Make Goodman Mfg. Make Goodman Mfg. Trade GOODMAN Trade GOODMAN, JANITROL,AMANA DISTI... Model GMVC950453BX* Cond SSX160301A* AHRI ref 2002234 Coil CHPF3642C6C* AHRI ref 5039169 Efficiency 95AFUE Efficiency 12.7 EER, 15.5 SEER Heating input 46000 Btuh Sensible cooling 22240 Btuh Heating output 45000 Btuh Latent cooling 5560 Btuh Temperature rise 46 OF Total cooling 27800 Btuh Actual air flow 927 cfm Actual air flow 927 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.058 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014-Oct-08 06:58:15 wrightsoftm Right-Suite®Universal 2015 15.0.03 RSU05790 Page 3 ...Des ktop\W rights oft HVAC\murfeild building 8.rup Calc=MJ8 Front Door faces: N