Loading...
HomeMy WebLinkAboutMiscellaneous - 60 COMPASS POINT ROAD 4/30/2018 �� V -- - �'. - -- ---- - Date... ................... TOWN OF NORTH ANDOVER PERMIT FOR WIRING HU This certifies that ...... .........�—)...O..S-p................................................... ........ .. ........ .......... ..... .. ............ has permission to perforrn ........................................................................................ wiring in the building of...... ............................... .................................................... at ............... ...... ....................... North Andover,Mass. Af� Fee..,.T.W..............Lic.No. .11M .................................................................................... ELECTRICAL INSPECTOR Check# ILH3 .00 COMMOnwea/th of Massachusetts Official Use Onl Department of Fire Services Permit No.�.b Occupancy and Fee Checked BOARD OF FIRE PREVENTION REGULATIONS [Rev.1/07] (leave blank APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code(MEC),527 CMR 12.00 ! (PLEASEPRINTWINKORTYPEALLINFORMATION) Date: f City or Town of. NORTH ANDOVER By this application the undersigned gives notice ofhis orer hintention to perform the electrical wor dTo the Inspector of tescribed below. f Location(Street&Number) 60 com S!�g JPQ Owner or Tenant P�C�� ST, Owner's Address Lt*X,'T' A ./,- Telephone No. Is this permit in conjunction with a building permit? Yes NO ❑ (Check Appropriate Box) Purpose of Building . Utility Authorization No. - Existing Service Ams p _�_Volts Overhead ❑ Und rd��y ! New Service 2�0 Ams g L1 No.of�Vleters P �1 Z UVolts Overhead Number of Feeders and Ampacity ❑ Undgrd [j No.of Meters Location and Nature of Proposed Electrical Work. ! do UW iT_ Completion of the following table may be waived by the Inspector of Wires. + No.of Recessed Luminaires 1 No.of Cell:Sus No.of p (Paddle)Fans � Transformers Total No.of Luminaire Outlets No.of Hot Tubs KVA Generators KVA No.of Luminaires Swimming pool Above In- oo No.of Receptacle Outlets rnd. rnd• ❑ Batte. r Unmergency ig ting its a No,of Oil Burners FIRE ALARMS No. of Zones No.of Switches �j No.of Gas Burners 'fi No. of Detection and No.of Ranges / Total Initiatin Devices No.of Air Cond. G No.of Alerting Devices � Tons No.of Waste Disposers Heat Pump Number Tons... KW No.of self-Contained Totals: .............................. No.of Dishwashersf Detection/Alertin Devices Space/Area Heating KW Local❑ Municipal No. of Dryers Connection ❑ Other ` HeatingAppliances KW SecurityNystems:Y No. of Water No.of No.of Devices or E uivalent Heaters KW Si ns Ballasts ts Data Wiring: No.of Devices or E uivalent No.Hydromassage Bathtubs No.of Motors Telecommunications Wiring: - Total HP OTHER: No.of Devices or E uivalent At Estimated Value of Electrical3®m'�® tach additional detail ifdesired,or as required by the Inspector of Wires. W k: Work to Start: (When required by municipal policy.) �l l -� Inspections to be requested in accordance with MEC Rule 10,and upon completion. ' INSURANCE COVERAGE: Unless waived by the owner,no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including"completed operation"coverage or its substantial e uivalen undersigned certifies that such coverage is in force,and has exhibited proof of same to the permit issuin office. t. The CHECK ONE: INSURANCE ElBOND [] OTHER g Ycertify,under the pales and enalties o er'u that the innforn atr'on on this application is true and complete. FIRM NAME: . /T(�!i Q fP J rJ'� Licensee: w C� LTC.NO.: p ' %A, ` �— Signature ((7f applicable,enter "exempt"in the license number line.) LTC.NO.: Address: Bus.Tel.No.: Per M.G. c. 147,s.57-61,security work requires Department ofPublic Safety"S"License: Alt,Lel.No.No.: OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally required by law. By my signature below,I hereby waive this requirement. I am the(check one)❑owner E]owner's agent. Own er/Agent Signature Telephone No. PP"ITFEE.$ ❑ 2012 Massachusetts Electrical Code Amendments 527 CMR 12.00§Rule 8: In accordance with the provisions of M.G.L.c.143,§3L,the permit application form to provide notice of installation of wiring shall be uniform throughout the Commonwealth,and applications shall be filed on the prescribed form.After a permit application has been accepted by an Inspector of Wires appointed pursuant to M. G.L c. 166, §32,an electrical permit shall be issued to the person, firm or corporation stated on the permit application. Such entity shall be responsible for the ♦ P notification of completion of the work as required in M.G.L.c.143,§3L. Permits shall be limited as to the time of ongoing construction activity,and may be deemed by the Inspector of Wires abandoned and invalid if he or she has determined that the authorized work has not commenced or has not progressed during the preceding 12-month period.Upon written application,an extension of time for completion of work shall be permitted for reasonable cause.A permit shall be terminated upon the written request of either the owner or the installing entity stated on the permit application. ❑ The Permit Extension Act was created by Section 173 of Chapter 240 of the Acts of 2010 and extended by Sections 74 and 75 of Chapter 238 of the Acts of 2012.The purpose of this act is to promote job growth and long-term economic recovery and the Permit Extension Act furthers this purpose by establishing an automatic four-year extension to certain permits and licenses concerning the use or development of real property.With limited exceptions,the Act automatically extends,for four years beyond its otherwise applicable expiration date,any permit or approval that was "in effect or existence"during the qualifying period beginning on August 15,2008 and extending through August 15,2012. ❑ Rule 8—Permit/Date Closed: ***Note:Reapply for new permit❑ ❑Permit Extension Act—Permit/Date Closed: Trench Inspection Pass 0 Failed Ifl Re-Inspection Required($.) ❑ Inspectors Comments: Inspectors Signature: Date: SERVICE INSPECTION: Pass 0 Failed 0 Re-Inspection Required($.)❑ Inspectors Comments: Inspectors Signature: Date: PARTIAL ROUGH INSPECTION: Pass M Failed Re-Inspection Required($.)❑ Inspectors Comments: Inspectors Signature: Date: ROUGH INSP TION: Pass 0 Failed Re-Inspection Required($.) ❑ Inspectors Comments: Inspectors Signat e: Date: Z FINAL INSPEC ION: Pass Failed Re-Inspection Required($.) ❑ Inspectors Comments: 441 Inspectors Signature: Date: �' L DEB WEINHOLD ...TOWN OF MERRIMAC,MA. .......dweinhold@townofinerrimac.com The Commonwealth of Massachusetts Department of IndustrialAccidents I Congress Street,Suite 100 Boston,MA 02114-2017 www mass.gov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name(Business/Organization/Individual): Address: City/State/Zip: Phone#: Are you an employer?Check the appropriate box: Type of project(required): 1.❑I am a employerwith employees(full and/or part-time).* 7. ❑New construction 2.❑I am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling any capacity.[No workers'comp.insurance required.] 3.F1I am a homeowner doing all work myself[No workers'comp.insurance required.]t 9. El Demolition 4.F1I am a homeowner and will be hiring contractors to conduct all work on my property. I will 10 F1 Building addition ensure that all contractors either have workers'compensation insurance or are sole 11.❑Electrical repairs or additions proprietors with no employees. 12.0 Plumbing repairs or additions 5. I am a general contractor and I have hired the sub-contractors listed on the attached sheet. ❑ $ 13.❑Roof repairs • These sub-contractors have employees and have workers'comp.insurance. 6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14.❑Other 152,§1(4),and we have no.employees.[No workers'comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. ?Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. #Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees.'Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins.Lie.#: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under thepains andpenalties ofpeijury that the information provided above is true and correct. Signature: Date: Phone#: Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): ; 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: ,1 Information and Instructions Massachusetts General Laws chapter 152 requires all employers to provide workers'compensation for their employees. Pursuant to this statute,an employee is defined as"...every person in the service of another under any contract of hire, express or implied,oral or written." An employer is defined as"an individual,partnership,association,corporation or other legal entity,or any two or more of the foregoing engaged in a joint enterprise,and including the legal representatives of a deceased employer,or the receiver or trustee of an individual,partnership,association or other legal entity,employing employees. However the owner of a dwelling house having not more than three apartments and who resides therein,or the occupant of the dwelling house of another who employs persons to do maintenance,construction or repair work on such dwelling house or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer." MGL chapter 152, §25C(6)also states that"every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced acceptable evidence of compliance with the insurance coverage required." Additionally,MGL chapter 152,§25C(7)states"Neither the commonwealth nor any of its political subdivisions shall. enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority." Applicants Please fill out the workers' compensation affidavit completely,by checking the boxes that apply to your situation and,if necessary,supply sub-contractor(s)name(s),address(es)and phone number(s)along with their certificate(s)of insurance. Limited Liability Companies(LLC)or Limited Liability Partnerships(LLP)with no employees other than the members or partners,are not required to carry workers' compensation insurance. If an LLC or LLP does have employees,a policy is required. Be advised that this affidavit may be submitted to the Department of Industrial Accidents foi-confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be returned to the city or town that the application for the permit or license is being requested,not the Department of Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers' compensation policy,please call the Department at the number listed below. Self-insured companies should'enter their self-insurance license number on the appropriate line. City or Town Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant. Please be sure to fill in the permit/license number which will be used as a reference number. In addition,an applicant that must submit multiple permit/license applications in any given year,need only submit one affidavit indicating current policy information(if necessary)and under"Job Site Address"the applicant should write"all locations in (city or town)."A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each year.Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture (i.e.a dog license or permit to burn leaves etc.)said person is NOT required to complete this affidavit. The Department's address,telephone and fax number: The Commonwealth of Massachusetts Department of Industrial Accidents 1 Congress Street, Suite 100 Boston,MA 02114-2017 Tel. # 617-727-4900 ext. 7406 or 1-877-MASSAFE Fax#617-727-7749 Revised 02-23-15 www.mass.gov/dia � 1 i . COMMONWEALTH OF MASSACHUSETTS ' • •All • • . BOy4€pD'DF � ELECTRICIANS ISSUES THE.;FOLLOWING LICENSE REG`I57ERD MASTER ELECTRIG�,�4N� w: #'2OS ELECTRIC CORP ROBERT W; ROSL 2 MARTENS STREET WILMINGTON MA 01887-1343 1 1044.A .:. ..0 366223. .. J r i` i' 1" 377 Date.. �.� I i.. ... ........ NORTH TOWN OF NORTH ANDOVER 6 PERMIT FOR MECHANICAL INSTALLATION p m �. P t • ,SSAOHUSEt This certifies that'�,_1 . :, . . . i. . nn. . . . . . . . . ... . . . . . . . '. has permission for mechanical installation . . , . . . . .C, . . . . . . . . . .. . . in the buildings of . . I�J� 4L4 .`-A- ( 14�'.`:.?.Y. . . ' `. . . . . • . . . . at :7, North Andover, Mass. Fee.f .4_ . . Lic. No.),1. . . . . . . . . . . . . . . . . . . . . . . . . . . :.I GAS INSPECTOR WHITE:Applicant t CANARY: Building Dept. PINK:Treasurer Commonwealth of Massachusetts Sheet Metal Permit Date: . / / Permit# L/ ! Estimated Job Cost: $_3 00. Permit Fee: $ / Plans Reviewed: YES NO Plans Submitted: YES NO Business License 11 196 Applicant License# lJrlD Business Information: Property Owner/Job ocation Information: Name: J&J Heating & Air Conditioning Name: /r1)S ef70^� Street: 17 Arlington St.:. Street: 60. 61 North Andover, MA 01845 City/Town: Dracut, MA 01826 City/Town: Telephone: .978-454-8197 Telephone: /C� 7,?" Fs-/ -3 �- Photo I.D. required/ Copy of Photo I.D. attached: YES NO star[lIII tinl J-1 /M-1-unrestricted license J-2 /M-2-restricted to dwellings 3-stories or less and commercial up to 10,000 sq. it. /2-stories or less Residential T-2-fa1nily _ "IvIulti-fanuly Condo/Townhouses Other Commercial: Office Retail Industrial _ Educational Institutional Other Square Footage: under 10,000 sq. ft. ' over 10,000 sq. ft. Number of Stories: Sheet metal work to be completed: New Work: �' Renovation: HVAC ✓ Metal Watershed Roofing Kitchen Exhaust System Metal Chimney /Vents Air Balancing o Provide detailed description of work to be done: . S � �'n /i1 677a l d u �7`_co a r kk -F=-- INSURANCE COVERAGE: I have a current liabilit insurance policy or its equivalent which meets the requirements of M.G.L.Ch.,112 Yes No❑ If you have checked Yes, indicate the type of coverage by checking the appropriate box below: Other type of Indemnity Bond ❑ A liability insurance policy YP Y ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws, and that my ��ignature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this box[],I hereby certify that all of the details and Information I have submitted(or entered)regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and Installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO ProL,rress InspeCtiOn Date Comments Final InSpection Date Comments Type of License: FBy ❑ Master ❑ Master-Restricted City/Town ❑Journeyperson Signature of Licensee Permit# ❑Journeyperson-Restricted License Number: � Fee b ❑ Check at www.mass.govldpl Inspector Signature of Permit Approval The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations ' 600 Washington Street Boston, MA 02111 wwiv.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Pltimbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): J & J Heating & Air Conditioning, Inc. Address: 17 Arlington Street City/State/Zip: Dracut, MA. 01826 phone #: 978-454-8197 Are you an employer? Check the appropriate box: Type of project.(requi'red): L® I am a employer with 40 4. ❑ I am a general contractor and I •' employees (full and/or part-time).* have hired the sub-contractors 6. 1:1 New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7., ❑ Remodeling ship and have no employees These sub-contractors have 8,.� ❑ Demolition working for me in any capacity. employees and have workers' comp, insurance.t 9. ❑ Building addition [No workers comp. insurance 5. ❑ p• required.] We are a corporation and its 10.0 Electrical repairs or additions officers have exercised their 11. Plumbing repairs or additions 3.❑ I am a homeowner doing all work ❑ g P myself. [No workers' comp. right of exemption per MGL 12 ❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13.❑ Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such, tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. 1f the sub-contractors have employees,they must provide their workers'comp.policy number.. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: A.I.M. Mutual Insurance Policy#or Self-ins. Lic. #: WMZ-8006553-2015 Expiration.Date: 06/02/16 Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a st the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigation the DIA r insurance rage verification. I do Irene fy u er t e pa' and e es ofperjr�ry that the information provided above is trite and correct. Si nature: Date: of ° C) ' 978— 54-8197 Phone#: Official use only. Do not write in this area,to be completed by city or town official i City or Town: Pertnit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4. Electrical Inspector S.Plumbing Inspector 6.Other Contact Person: Phone#: i DATE(MM/DDmYY) ACORD,. CERTIFICATE OF LIABILITY INSURANCE 05/27/2015 PRODUCER 978,887,4900 FAX 978.887.2404 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Edward F. Sennott Insurance Agency, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 16 South Main Street HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P. 0. Box 4S7 Topsfield, MA 01983 INSURERS AFFORDING COVERAGE NAIC# INSURED )&J Heating & Air Conditioning, Inc. INSURERA: Great American Alliance Ins Co , 17 Arlington Street INSURER B: Safety Insurance Company 39454 Dracut, MA 01826 INSURERC: A.I.M. Mutual Insurance Co INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR DD' POLICY EFFECTIVE POLICY EXPIRATION i LTR NSR TYPE OF INSURANCE POLICY NUMBER DATE MM DD DATE MM DD LyMITS: GENERAL LIABILITY PAC6418906-09 06/01/2015 06/01/2016 EACH OCCURRENCE $' 1,000,00( X COMMERCIAL GENERAL LIABILITY PREMISES Ea N I E encs' $ 300,00 CLAIMS MAGE I OCCUR MED EXP(Any one person) $ 10,00( A PERSONAL 8 ADV INJURY $ 1,000,00( GENERAL AGGREGATE $ 2,000,00( GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,000 POLICYF_j PRO LOC JECT AUTOMOBILE LIABILITY 2434550 06/01/2015 06/01/2016 COMBINED SINGLE LIMIT ANY AUTO (Ea accident) $ 1,000,000 ALL OWNED AUTOS BODILY INJURY X SCHEDULED AUTOS (Per person) $ B X HIRED AUTOS BODILY INJURY $ X NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY UMB6418958-08 06/01/2015 06/01/2016 EACH OCCURRENCE $ 2,000,000 _X1 OCCUR F] CLAIMS MADE AGGREGATE -i-2,000,QQ A $ DEDUCTIBLE RETENTION $ ` $ WORKERS COMPENSATIONWMZ-800-8006553-2015 06/02/201S 06/02/2016 X H- AND EMPLOYERS'LIABILITY \Y/N TORY LIMITS ER ANY PROPRIETOR/PARTNER/EXECUTIV E.L.EACH ACCIDENT C OFFICER/MEMBER EXCLUDED? $ 1,000,000 (Mandatory In NH) If yes,describe under E.L.DISEASE-EA EMPLOYE $ 1,000,000 SPECIAL PROVISIONS below E.L.DISEASE-POLICY LIMIT $ 11000,000 OTHER DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR REPRESENTATIVES. Evidence of Insurance AUTHORIZED REPRESENTATIVE [PeterSennott/LAR ACORD 25(2009/01) ©1.988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD V :COMMONWEALTH OF MASSACHUSETTS BOARD.OF SHED Ml (AL `WORK RS I SSUES 1.IL fOLLOWI N 1 IGNSC A&.:;11 ;MASTER—UNRISTR I GTEI)�,::: 2 1 t J: HEATING [-All U:R i & J H LATf NG '& AC :r 17 11R1.a NGTON ST \`~ EliZ�t'U'1' MA 01826-3936 1,Csb 28/16 z 11f5 9 `� ; iAS1S'ACHUSE,TT'S! DRIVERS IC SE T F* pIISP i 4-ZO 9a END 4d NUMBER ' .9Q5-03-201'1,,'-,:NUNS_ S99655-87"t-1. ._ �4b.EXP 2 'DOE- LASS-C:12 :. 3. DOB LASS___12 REST' 15 SEX-M- kC�jFWrT -09 — DM NONE ,,KLINE �`'x T 2 ERIC RJ e 83 LONG DR DRACUT,MA 01826.2048, 5 00 05.04.2011 Rav 07.15-2009 ` i OMMONWEALTH OF M/ S`' "HUS Ri >>;><<;:,.,< , • • • ij.I.L • SHEET ;:ME.TAL .°WORKI,RS I ISSUES_ THE FOLLOWING EICENSE AS ABUSINESS EDWARD T AYOTTE J J HEATING.; ` QIR CONDITIONING L W" 17 ARL`NNG'T"ONSTREET DRACUT MA 01826 < 'oTl1;. /;::1 i wrightsofto Load Short Form Job: G1,60 Compass Point Date: Jan 12,2015 Entire House By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com 0166fifif6rmation For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma i ® - • • • Htg Cig Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 68 75 Construction quality Average Design TD (°F) 56 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 43 28 i HEATING EQUIPMENT COOLING EQUIPMENT Make Amana Make Amana Trade Amana Trade ASX14 SERIES Model AMVC950905DX Cond ASX130481 B* AHRI ref 2012279 Coil CA*F4860*6D* AHRI ref 4214134 Efficiency 95.7AFUE Efficiency 11.2 EER, 13 SEER Heating input 92000 Btuh Sensible cooling 36800 Btuh Heating output 90000 Btuh Latent cooling 9200 Btuh Temperature rise 53 OF Total cooling 46000 Btuh Actual air flow 1533 cfm Actual air flow 1533 cfm Air flow factor 0.021 cfm/Btuh Air flow factor 0.040 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.97 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) second Floor 1014 19440 7197 401 287 (Rest of House) 2600 43835 24243 904 966 Great Room Zone 357 11064 7541 228 300 Entire House 3971 74339 38491 1533 1533 Other equip loads 0 0 Equip. @ 0.93 RSM 35643 Latent cooling 1379 TOTALS 3971 74339 37021 1533 1533 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. .: wri htsoft, 2015-Sep-10 08:39:01 g Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 1 RCCA ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N f Load Short Form Job: G1,60 Compass Point wrihtsofte ' 9 Date: Jan 12,2015 (Rest of House) By: J&J Heating and A/C 17 Arlington St., Dracut, Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com • • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 68 75 Construction quality Average Design TD (°F) 56 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 43 28 I HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Cig load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Den 156 4859 3582 100 143 bathl 25 916 795 19 32 Dining 195 4613 3804 95 152 Foyer 135 3473 2369 72 94 clst 20 63 31 1 1 Kitchen 293 6897 5274 142 210 Basement/Garage 1594 17578 4517 363 180 study 182 5435 3870 112 154 Calculations approved b ACCA to meet all requirements pp y q ements of Manual J 8th Ed. wri htsoft 2015-Sep-10 08:39:01 9 Right-Suited Universal 2015 15.0.12 RSU05790 ACCA ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Page 2 (Rest of House) 2600 43835 24243 904 966 Other equip loads 0 0 Equip. @ 0.93 RSM 22449 Latent cooling 662 TOTALS 2600 43835 23111 904 966 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 11- 2015-Sep-10 08:39:01 wrightSOW Right-Suite®Universal 2015 15.0.12 RSU05790 Page 3 AC+CA ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N ' • I Load Short Form Job: G1,60 Compass Point wrightsoft. Date: Jan 12,2015 Great Room Zone By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@iiheatac.com e • e For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Htg Cig Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 68 75 Construction quality Average Design TD (°F) 56 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 43 28 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Great Room 357 11064 7541 228 300 Great Room Zone 357 11064 7541 228 300 Other equip loads 0 0 Equip. @ 0.93 RSM 6983 Latent cooling 223 TOTALS 357 11064 7206 228 300 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft° Right-Suite®Universal 2015 15.0.12 RSU05790 2015-Sep-10 08:39:01 4 ACCA ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N . 9 o Load Short Form Job: 60 Compass Point wri htsoft Jan Date: an 12,2015 second Floor By. J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com • t Jec • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma ! • - ormation Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 68 75 Construction quality Average Design TD (°F) 56 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 43 28 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) laundry/bath 110 1916 807 40 32 bed2 156 3544 1350 73 54 Bed3 156 3596 1382 74 55 Bed4 100 1860 977 38 39 Hallway 60 190 80 4 3 Mastbath 120 2862 788 59 31 Master 252 4934 1710 102 68 wal k i n 60 539 103 11 4 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsOft° 2015-Sep-10 08:39:01 ti 9 Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 5 ACCK ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N second Floor 1014 19440 7197 401 287 Other equip loads 0 0 Equip. @ 0.93 RSM 6664 Latent cooling 494 TOTALS 1014 19440 7158 401 287 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ti WCI htSOfta 2015-Sep-10 08:39:01 ,v,.+��.1. 9 Right-SuiteO Universal 2015 15.0.12 RSU05790 Page 6 'I-m ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N . . i wri htsoft Load Multizone Summary Report Job: G1,60 Compass Point g Date: Jan 12,2015 By: J&J Heating and A/C 17 Arlington St., Dracut, Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com • Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM ft3 cfm Btuh/ft2 ft3 cfm Btuh/ft2 second Floor 8766 0 . 72 106 5 . 7 8766 0 . 18 26 0 . 3 (Rest of House) 13836 0 . 62 142 5 . 7 13836 0 . 15 35 0 . 3 Great Room Zone 3213 0 . 89 48 5 . 7 3213 0 .22 12 0 . 3 Entire House 25815 0 . 37 296 3 . 0 25815 0 . 17 73 0 . 3 • , •Mae ROOM NAME Area Htg load Clg load HtgAVF C1gAVF ft2 Btuh Btuh cfm cfm laundry/bath 110 1916 807 40 32 bed2 156 3544 1350 73 54 Bed3 156 3596 1382 74 55 �Bed4 100 1860 977 38 39 Hallway 60 190 80 4 3 Mastbath 120 2862 788 59 31 Master 252 4934 1710 102 68 walkin 60 539 103 11 4 second Floor 1014 19440 7197 401 287 Den 156 4859 3582 100 143 bathl 25 916 795 19 32 Dining 195 4613 3804 95 152 Foyer 135 3473 2369 72 94 clst 20 63 31 1 1 Kitchen 293 6897 5274 142 210 Basement/Garage 1594 17578 4517 363 180 study 182 5435 3870 112 154 (Rest of House) 2600 43835 24243 904 966 Great Room 357 11064 7541 228 300 Great Room Zone 357 11064 7541 228 300 Entire House 3971 1 74339 38491 1533 1533 � 2015-Sep-10 08:39:01 wrightsoftw Right-Suite®Universal 2015 15.0.12 RSU05790 Page 1 ..Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Building Analysis Job: G1,60 Compass Point - - wrightsoft� g Y Date: Jan 12,2015 Entire House By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com ■ • • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°l 56 13 Latitude: 420N Relative hums Ity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range °F) - 15 ( L ) Method Simplified Wet bulb (°F� - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) • Component Btuh/ft2 Btuh % of load Walls 3.9 15121 20.3 Glazing 16.7 4137 5.6 m Doors 17.9 3635 4.9 Ceilings 5.9 23339 31.4 Floors 2.5 10049 13.5 ' Infiltration 5.7 18058 24.3 Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 74339 100.0 • • lip • Com onent Btuh/ft2 Btuh % of load Walls 0.7 2836 7.4 Glazing 26.0 6439 16.7 Doors 8.5 1733 4.5 Ceilings 6.2 24739 64.3 Floors 0.4 1731 4.5 Infiltration 0.3 1013 2.6 Ducts 0 0 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 38491 100.0 Latent Cooling Load = 1379 Btuh Overall U-value= 0.096 Btuh/ft2-0F Data entries checked. -�- wrightsoft® 2015-Sep-10 08:39:01 .�.. Right-Suite®Universal 2015 15.0.12 RSU05790 Page 1 �� ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Building Anal sis Job: G1,60 Compass Point wrightsoft y Date: Jan 12,2015 (Rest of House) By: J&J Heating and A/C 17 Arlington St.,Dracut, Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma ® - • •n:'ditions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°I� 56 13 Latitude: 420N Relative hums Ity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range °F) - 15 ( L ) Method Simplified Wet bulb (°F� - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) • Component Btuh/ft2 Btuh % of load Walls 4.1 9595 21.9 Glazing 16.7 1334 3.0 Doors 17.9 3635 8.3 Ceilings 6.5 16792 38.3 Floors 1.5 3808 8.7 Infiltration 5.7 8670 19.8 Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 -- Total 1 438351 100.0 es • Component Btuh/ft2 Btuh % of load Walls 0.6 1362 5.6 Glazing 30.7 2453 10.1 Doors 8.5 1733 7.1 Ceilings 6.9 17855 73.7 Floors 0.1 354 1.5 Infiltration 0.3 486 2.0 Ducts 0 0 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 1 242431 100.0 Latent Cooling Load = 662 Btuh Overall U-value = 0.080 Btuh/ft2-°F WARNING: window to floor area radio = 3.1% - less than 5%. + wrightsoft® 2015-Sep-10 08:39:01 ,..._. Right-Suite®Universal 2015 15.0.12 RSU05790 SCA ...wrightsoft HVAC\61 Sawyer way Leominster Ma.rup Calc=MJ8 Front Door faces: N Page 2 I Building Analysis Job: G1,60 Compass Point wrightsoft° g Y Date: Jan 12,2015 Great Room Zone By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com e • Jaw • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 11 - • • • e Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative hums(�f(Ity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range °F) - 15 ( L ) Method Simplified Wet bulb (°F� - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) • Component Btuh/ft2 Btuh % of load Walls 3.6 1666 15.1 Glazing 16.7 867 7.8 Doors 0 0 0 Ceilings 14.1 5040 45.6 . . Floors 1.6 566 5.1 Infiltration 5.7 2924 26.4 Ducts 0 0 Po, Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1110641 100.0 e • • Component Btuh/ft2 Btuh % of load Walls 1.0 458 6.1 Glazing 24.2 1260 16.7 Doors 0 0 0 Ceilings 15.5 5530 73.3 Floors 0.4 128 1.7 Infiltration 0.3 164 2.2 Ducts 0 0 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 1 7541 100.0 Latent Cooling Load = 223 Btuh Overall U-value = 0.121 Btuh/ft2-°F Data entries checked. 2015-Sep-10 08:39:01 wrightsoft® Right-Suite®Universal 2015 15.0.12 RSU05790 Page 3 ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Building Analysis Job: G1,60 Compass Point wrightsoft° g y Date: Jan 12,2015 second Floor By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jiheatac.com • • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma i - • • • • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F)) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range °F) - 15 ( L ) Method Simplified Wet bulb (°F� - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) • Component Btuh/ft2 Btuh % of load Walls 3.7 3860 19.9 Glazing 16.7 1935 10.0 Doors 0 0 0 Ceilings 1.5 1506 7.7 Floors 5.6 5675 29.2 ` Infiltration 5.7 6464 33.2 Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 194401 100.0 Component Btuh/ft2 Btuh % of load Walls 1.0 1016 14.1 Glazing 27.7 3216 44.7 Doors 0 0 0 Ceilings 1.3 1354 18.8 r Floors 1.2 1248 17.3 Infiltration 0.3 362 5.0 ?. , Ducts 0 0 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 1 7197 1 100.0 Latent Cooling Load = 494 Btuh Overall U-value = 0.124 Btuh/ft2-°F Data entries checked. 2015-Sep-10 08:39:01 wrightsoftw Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 4 A+CK ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Component Constructions Job: G1,60 Compass Point - - wrightsoft� Component Date: Jan 12,2015 Entire House By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@ijheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma NEEM9MffZ=' • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/112 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 476 0.065 21.0 3.61 1720 0.99 473 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 691 0.065 21.0 3.61 2497 0.99 687 s 488 0.065 21.0 3.61 1764 0.99 485 w 665 0.065 21.0 3.61 2403 0.99 661 all 2320 0.065 21.0 3.61 8384 0.99 2307 15B-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, n 148 0.073 8.0 3.61 535 0 0 r-8 ins,8"thk,1/2"gypsum board int fnsh a 522 0.073 8.0 4.56 2380 0.40 209 S 288 0.073 8.0 4.56 1313 0.40 115 W 555 0.073 8.0 4.52 2509 0.37 205 all 1513 0.073 8.0 4.45 6737 0.35 529 Partitions (none) Windows 2 glazing,clr low-e outr,air gas,vnl frm mat,clr innr,1/2"gap,1/4" n 20 0.300 0 16.7 334 8.94 179 thk:2 glazing,clr low-e outr,air gas,vnl frm mat,clr innr,1/2"gap, a 48 0.300 0 16.7 801 29.1 1397 1/4"thk;6.67 ft head ht s 16 0.300 0 16.7 267 15.6 249 W 48 0.300 0 16.7 801 29.1 1397 all 132 0.300 0 16.7 2202 24.4 3223 2 glazing,clr outr,air gas,vnl frm mat,clr low-e innr,1/2"gap,1/4" n 8 0.300 0 16.7 133 8.94 71 thk:2 glazing,clr outr,air gas,vnl frm mat,clr low-e innr,1/2"gap, a 68 0.300 0 16.7 1134 29.1 1980 1/4"thk;6.67 ft head ht w 40 0.300 0 16.7 667 29.1 1165 all 116 0.300 0 16.7 1935 27.7 3216 Doors 11 P0:Door,mtl pur core type n 140 0.290 10.5 16.1 2257 7.68 1076 e 21 0.290 10.5 16.1 339 7.68 161 W 21 0.290 10.5 16.1 339 7.68 161 all 182 0.290 10.5 16.1 2935 7.69 1399 11JO:Door,mtl fbrgl type w 21 0.600 6.3 33.4 701 15.9 334 Id I- 2015-Sep-10 08:39:01 wrightsoft° Right-Suite(R)Universal 2015 15.0.12 RSU05790 Page 1 /4C� ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Ceilings 16 -30ad:Attic ceiling,asphalt shingles roof mat,r-20 roof ins, 1734 0.032 30.0 1.78 3085 1.60 2774 r-30 ceil ins 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 894 0.026 38.0 1.45 1292 1.30 1162 gypsum board int fnsh C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,12"thkns,1/2" 1343 0.254 1.0 14.1 18961 15.5 20803 gypsum board int fnsh Floors 19A-Obswp:Part floor,hrd wd fir fnsh,frm fir,12"thkns,1/2" 894 0.295 0 6.16 5508 1.40 1248 gypsum board int fnsh 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 1343 0.034 30.0 1.59 2131 0.36 483 21A-24t:Bg floor,heavy dry or light damp soil,6'depth 1594 0.025 0 1.39 2216 0 0 20 0.025 0 1.39 28 0 0 120 0.025 0 1.39 167 0 0 all 1734 0.025 0 1.39 2410 0 0 2015-Sep-10 08:39:01 i WrrghtSOft" Right-Suite®Universal 2015 15.0.12 RSU05790 p Page 2 ACCK ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Component Constructions Job: G1,60 Compass Point wrightsoft" P Date: Jan 12,2015 second Floor By: J&J Heating and A/C 17 Arlington St., Dracut, Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com i • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma i Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft�°F ft?°FBtuh Btuh/ft2 Btu Btuh/ft2 Btu Wal I s 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 226 0.065 21.0 3.61 817 0.99 225 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 283 0.065 21.0 3.61 1023 0.99 281 S 234 0.065 21.0 3.61 846 0.99 233 W 257 0.065 21.0 3.61 929 0.99 256 all 1000 0.065 21.0 3.61 3614 0.99 994 15B-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, w 54 0.073 8.0 4.56 246 0.40 22 r-8 ins,8"thk,1/2"gypsum board int fnsh Partitions (none) Windows I, 2 glazing,clr outr,air gas,vnl frm mat,clr low-e innr,1/2"gap,1/4" n 8 0.300 0 16.7 133 8.94 71 thk:2 glazing,clr outr,air gas,vnl frm mat,cir low-e innr,1/2"gap, a 68 0.300 0 16.7 1134 29.1 1980 1/4"thk;6.67 ft head ht w 40 0.300 0 16.7 667 29.1 1165 all 116 0.300 0 16.7 1935 27.7 3216 Doors (none) Ceilings 16B-30ad:Attic ceiling,asphalt shingles roof mat,r-20 roof ins, 120 0.032 30.0 1.78 214 1.60 192 r-30 ceil ins 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 894 0.026 38.0 1.45 1292 1.30 1162 gypsum board int fish Floors 19A-Obswp:Part floor,hrd wd flr fnsh,frm flr,12"thkns,1/2" 694 0.295 0 6.16 5508 1.40 1248 gypsum board int fnsh 21A-24t:Bg floor,heavy dry or light damp soil,6'depth 120 0.025 0 1.39 167 0 0 2015-Sep-10 08:39:01 rF wrightsoft' Right-Suite®Universal 2015 15.0.12 RSUD5790 Page 3 ACCK ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Component Constructions Job: G1,60 Compass Point wrightsoft" Date: Jan 12,2015 (Rest of House) By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jiheatac.com Exi • • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 BtuhM-°F ft2-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 45 0.065 21.0 3.61 163 0.99 45 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 289 0.065 21.0 3.61 1044 0.99 287 s 236 0.065 21.0 3.61 853 0.99 235 W 289 0.065 21.0 3.61 1044 0.99 287 all 859 0.065 21.0 3.61 3104 0.99 854 15B-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, n 148 0.073 8.0 3.61 535 0 0 r-8 ins,8"thk,1/2"gypsum board int fnsh a 522 0.073 8.0 4.56 2380 0.40 209 s 288 0.073 8.0 4.56 1313 0.40 115 w 501 0.073 8.0 4.52 2263 0.37 184 all 1459 0.073 8.0 4.45 6491 0.35 508 Partitions (none) Windows 2 glazing,cir low-e outr,air gas,vnl frm mat,clr innr,1/2"gap,1/4" a 32 0.300 0 16.7 534 29.1 932 thk:2 glazing,clr low-e outr,air gas,vnl frm mat,clr innr,1/2"gap, s 16 0.300 0 16.7 267 15.6 249 1/4"thk;6.67 ft head ht w 32 0.300 0 16.7 534 29.1 932 all 80 0.300 0 16.7 1334 26.4 2113 Doors 11 P0:Door,mtl pur core type n 140 0.290 10.5 16.1 2257 7.68 1076 e 21 0.290 10.5 16.1 339 7.68 161 w 21 0.290 10.5 16.1 339 7.68 161 all 182 0.290 10.5 16.1 2935 7.69 1399 11JO:Door,mtl fbrgl type w 21 0.600 6.3 33.4 701 15.9 334 Ceilings 1613-30ad:Attic ceiling,asphalt shingles roof mat,r-20 roof ins, 1614 0.032 30.0 1.78 2872 1.60 2582 r-30 ceil ins C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,12"thkns,1/2" 986 0.254 1.0 14.1 13921 15.5 15273 gypsum board int fnsh wri htsoft 2015-Sep-10 08:39:01 ..� 9 Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 4 ACCT\ ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Floors' 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 986 0.034 30.0 1.59 1564 0.36 354 21A-24t:Bg floor,heavy dry or light damp soil,6'depth 1594 0.025 0 1.39 2216 0 0 20 0.025 0 1.39 28 0 0 all 1614 0.025 0 1.39 2243 0 0 wri htsoft 2015-Sep-10 08:39:01 9 Right-Suite®Universal 2015 15.0.12 RSU05790 Page 5 /�� ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Component Constructions Job: G1,60 Compass Point - - wrightsoft� Date: Jan 12,2015 Great Room Zone By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com 77 • Information For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ft2-°F/Btuh Btuh/ftz Btu MOM Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 205 0.065 21.0 3.61 741 0.99 204 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 119 0.065 21.0 3.61 430 0.99 118 s 18 0.065 21.0 3.61 65 0.99 18 W 119 0.065 21.0 3.61 430 0.99 118 all 461 0.065 21.0 3.61 1666 0.99 458 Partitions (none) Windows 2 glazing,clr low-e outr,air gas,vnl frm mat,clr innr,1/2"gap,1/4" n 20 0.300 0 16.7 334 8.94 179 thk:2 glazing,clr low-e outr,air gas,vnl frm mat,clr innr,1/2"gap, a 16 0.300 0 16.7 267 29.1 466 1/4"thk•6.67 ft head ht W 16 0.300 0 16.7 267 29.1 466 all 52 0.300 0 16.7 867 21.4 1110 Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,12"thkns,1/2" 357 0.254 1.0 14.1 5040 15.5 5530 gypsum board int fnsh Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 357 0.034 30.0 1.59 566 0.36 128 2015-Sep-10 08:39:01 wrightsoft" Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 6 ACCP ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Component Constructions Job: G1,60 Compass Point wrightsoft� Component Date: Jan 12,2015 Den By: J&J Heating and A/C 17 Arlington St.,Dracut, Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma =230Is 114 lei Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" s 109 0.065 21.0 3.61 394 0.99 108 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud w 92 0.065 21.0 3.61 332 0.99 91 all 201 0.065 21.0 3.61 726 0.99 200 Partitions (none) Windows 2 glazing,clr low-e outr,air gas,vnl frm mat,clr innr,1/2"gap,1/4" s 8 0.300 0 16.7 133 15.6 125 thk:2 glazing,clr low-e outr,air gas,vnl frm mat,cir innr,1/2"gap, w 16 0.300 0 16.7 267 29.1 466 1/4"thk;6.67 ft head ht all 24 0.300 0 16.7 400 24.6 590 Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,12"thkns,1/2" 156 0.254 1.0 14.1 2202 15.5 2416 gypsum board int fish Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm fir,10"thkns 156 0.034 30.0 1.59 247 0.36 56 2015-Sep-10 08:39:01 wrightsoft" Right-Suite@ Universal 2015 15.0.12 RSU05790 p Page 7 ACCO ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N wri htsoft� Component Constructions Job: G1,60 Compass Point 9 Date: Jan 12,2015 study By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com • • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma ® - • '!Meg • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� BtuhN-°F ft2-'F/Btuh Btuh/ft2 Btu Btuh[V Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" a 110 0.065 21.0 3.61 398 0.99 109 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 109 0.065 21.0 3.61 394 0.99 108 all 219 0.065 21.0 3.61 791 0.99 218 Partitions (none) Windows 2 glazing,cir low-e outr,air gas,vnl frm mat,clr innr,1/2"gap,1/4" a 16 0.300 0 16.7 267 29.1 466 thk:2 glazing,clr low-e outr,air gas,vnl frm mat,clr innr,1/2"gap, S 8 0.300 0 16.7 133 15.6 125 1/4"thk;6.67 ft head ht all 24 0.300 0 16.7 400 24.6 590 Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,12"thkns,1/2" 182 0.254 1.0 14.1 2570 15.5 2819 gypsum board int fnsh Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 182 0.034 30.0 1.59 289 0.36 65 2015-Sep-10 08:39:01 wrightSOW Right-Suite@ Universal 2015 15.0.12 RSU05790 p Page 8 JCCA ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Component Constructions Job: G1,60 Compass Point wrightsoft� �" Date: Jan 12,2015 bath 1 By: J&J Heating and A/C 17 Arlington St.,Dracut, Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com Project • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-'F ft2-'F/Btuh Btuh/ftz Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" w 37 0.065 21.0 3.61 134 0.99 37 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 2 glazing,clr low-e outr,air gas,vnl frm mat,cir innr,1/2"gap,1/4" w 8 0.300 0 16.7 133 29.1 233 thk:2 glazing,clr low-e outr,air gas,vnl frm mat,clr innr,1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,12"thkns,1/2" 25 0.254 1.0 14.1 353 15.5 387 gypsum board int fnsh Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm flr,10"thkns 25 0.034 30.0 1.59 40 0.36 9 2015-Sep-10 08:39:01 ,,Z- - wrightsoft' Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 9 ACCA ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Component Constructions Job: G1,60 Compass Point wrightsoft� Component Date: Jan 12,2015 Dining By: J&J Heating and A/C 17 Arlington St., Dracut, Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area LI-value Instill R li HTM Loss Cig HTM Gain fF Btuh/ft2-°F ft2-°F/Btuh Btuh/i Btu %h/ft2 Btu Walls 12F-Osw: Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 9 0.065 21.0 3.61 33 0.99 9 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 119 0.065 21.0 3.61 430 0.99 118 all 128 0.065 21.0 3.61 463 0.99 127 Partitions (none) Windows 2 glazing,clr low-e outr,air gas,vnl frm mat,clr innr,1/2"gap,1/4" a 16 0.300 0 16.7 267 29.1 466 thk:2 glazing,clr low-e outr,air gas,vnl frm mat,clr innr,1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr,12"thkns,1/2" 195 0.254 1.0 14.1 2753 15.5 3020 gypsum board int fnsh Floors 19A-30bswp: Part floor,hrd wd flr fnsh,r-30 ins,frm flr,10"thkns 195 0.034 30.0 1.59 309 0.36 70 2015-Sep-10 08:39:01 - wrightsoft" Right-Suite®Universal 2015 15.0.12 RSU05790 Page 10 ACCK ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Component Constructions Job: G1,60 Compass Point wrightsoft� Date: Jan 12,2015 Foyer By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com e • VOT11 For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area LI-value Insul R Htg HTM Loss Clg HTM Gain it, Btuh/ftl-°F fV-°FBtuh BtuhN Btu Btuh/ftz Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 18 0.065 21.0 3.61 65 0.99. 18 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 60 0.065 21.0 3.61 217 0.99 60 S 18 0.065 21.0 3.61 65 0.99 18 all 96 0.065 21.0 3.61 347 0.99 95 Partitions (none) Windows (none) Doors 11 Po:Door,mtl pur core type a 21 0.290 10.5 16.1 339 7.68 161 Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,12"thkns,1/2" 135 0.254 1.0 14.1 1906 15.5 2091 gypsum board int fnsh Floors 19A-30bswp: Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 135 0.034 30.0 1.59 214 0.36 49 Fr 2015-Sep-10 08:39:01 wrightsoft' Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 11 ACCK ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Component Constructions Job: G1,60 Compass Point wrightsoft� Date: Jan 12,2015 clst By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com • • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain 112 Btuh/ft2-°F ft2-°F/BWh Btuh/ft2 Btu Btuh/ftz Btuh Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings 16B-30ad:Attic ceiling,asphalt shingles roof mat,r-20 roof ins, 20 0.032 30.0 1.78 36 1.60 32 r-30 ceil ins Floors 21A-24t:Bg floor,heavy dry or light damp soil,6'depth 20 0.025 0 1.39 28 0 0 -{��}" 2015-Sep-10 08:39:01 I"' wrightsoft° Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 12 RCCA ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Component Constructions Job: G1,60 Compass Point wrightsoft �" Date: Jan 12,2015 Kitchen By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma R esi-9n,::,Conditions �I Location: Indoor: Heating Cooling Boston Logan Intl AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-1F ft2-°FBtuh Btuh/112 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 18 0.065 21.0 3.61 65 0.99 18 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud w 160 0.065 21.0 3.61 578 0.99 159 all 178 0.065 21.0 3.61 643 0.99 177 Partitions (none) Windows 2 glazing,clr low-e outr,air gas,vnl frm mat,clr innr,1/2"gap,1/4" w 8 0.300 0 16.7 133 29.1 233 thk:2 glazing,clr low-e outr,air gas,vnl frm mat,cir innr,1/2"gap, 1/4"thk;6.67 ft head ht Doors 11 P0:Door,mtl pur core type w 21 0.290 10.5 16.1 339 7.68 161 Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm flr,12"thkns,1/2" 293 0.254 1.0 14.1 4137 15.5 4538 gypsum board int fnsh Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm flr,10"thkns 293 0.034 30.0 1.59 465 0.36 105 2015-Sep-10 08:39:01 �, �" wrightsoft°' Right-Suite@ Universal 2015 15.0.12 RSU05790 p Page 13 ".M ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Component Constructions Job: G1,60 Compass Point wrightsoft� Date: Jan 12,2015 Great Room By: J&J Heating and A/C 17 Arlington St., Dracut, Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com ME • • 0 For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss CIg HTM Gain ft2 Btuh/ft2-°F ftz-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btuh Wal I s 12F-Osw:Firm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 205 0.065 21.0 3.61 741 0.99 204 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 119 0.065 21.0 3.61 430 0.99 118 s 18 0.065 21.0 3.61 65 0.99 18 w 119 0.065 21.0 3.61 430 0.99 118 all 461 0.065 21.0 3.61 1666 0.99 458 Partitions (none) Windows 2 glazing,clr low-e outr,air gas,vnl frm mat,cir innr,1/2"gap,1/4" n 20 0.300 0 16.7 334 8.94 179 thk:2 glazing,cir low-e outr,air gas,vni frm mat,clr innr,1/2"gap, a 16 0.300 0 16.7 267 29.1 466 1/4"thl 6.67 ft head ht w 16 0.300 0 16.7 267 29.1 466 all 52 0.300 0 16.7 867 21.4 1110 Doors (none) Ceilings C part ceiling,:C part ceiling,hrd wd fir fnsh,frm fir,12"thkns,1/2" 357 0.254 1.0 14.1 5040 15.5 5530 gypsum board int fish Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm fir,10"thkns 357 0.034 30.0 1.59 566 0.36 128 2015-Sep-10 08:39:01 wrightsoft' Right-Suite®Universal 2015 15.0.12 RSU05790 Page 14 ACCK ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N wri htsoft� Component Constructions Job: G1,60 Compass Point 9 Mastbath Byte: Jan 12,2015 J&J Heating and A/C 17 Arlington St.,Dracut, Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com N! III111111 Ell • • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-°F ft�-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 108 0.065 21.0 3.61 390 0.99 107 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud w 82 0.065 21.0 3.61 296 0.99 82 all 190 0.065 21.0 3.61 687 0.99 189 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr low-e innr,1/2"gap,1/4" w 8 0.300 0 16.7 133 29.1 233 thk:2 glazing,cir outr,air gas,vnl frm mat,clr low-e innr,1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 120 0.026 38.0 1.45 173 1.30 156 gypsum board int fnsh Floors 19A-Obswp:Part floor,hrd wd fir fnsh,frm flr,12"thkns,1/2" 120 0.295 0 6.16 739 1.40 168 gypsum board int fish 2015-Sep-10 08:39:01 wrightsoft° Right-Suite@ Universal 2015 15.0.12 RSU05790 p Page 15 ACCA ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N wri htsoft� Component Constructions Job: G1,60 Compass Point ' 9 Date: Jan 12,2015 walkin By: J&J Heating and A/C 17 Arlington St., Dracut, Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com e • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ftz-°F/%h Btuh/ft2 Btu Btuh/ft2 Btu Walls 15B-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, w 54 0.073 8.0 4.56 246 0.40 22 r-8 ins,8"thk,1/2"gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings 16B-30ad:Attic ceiling,asphalt shingles roof mat,r-20 roof ins, 60 0.032 30.0 1.78 107 1.60 96 r-30 ceil ins Floors 21A-24t:Bg floor,heavy dry or light damp soil,6'depth 60 0.025 0 1.39 83 0 0 2015-Sep-10 08:39:01 wrightsoft°' Right-Suite@ Universal 2015 15.0.12 RSU05790 p Page 16 ACCA ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Component Constructions Job: G1,60 Compass Point wrightsoft� Date: Jan 12,2015 laundry/bath By: JU Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft, Btuh/ft2-°F ft2-'FBtuh Btuh/112 Btu Btuh/ft2 Btuh Walls 12F-Osw: Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" w 87 0.065 21.0 3.61 314 0.99 87 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr low-e innr,1/2"gap,1/4" w 12 0.300 0 16.7 200 29.1 349 thk:2 glazing,clr outr,air gas,vnl frm mat,clr low-e innr,1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 110 0.026 38.0 1.45 159 1.30 143 gypsum board int fnsh Floors 19A-Obswp:Part floor,hrd wd fir fish,frm fir,12"thkns,1/2" 110 0.295 0 6.16 678 1.40 154 gypsum board int fnsh wri htsoft 2015-Sep-10 08:39:01 1 g Right-Suite®Universal 2015 15.0.12 RSU05790 Page 17 ACCA ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Component Constructions Job: G1,60 Compass Point wrightsoft- Date: Jan 12,2015 bed2 By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma R - • • • • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/V T ft�°FBtuh Btuh/ftz Btu Btuh/ft2 Btuh Wal I s 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" s 117 0.065 21.0 3.61 423 0.99 116 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud W 88 0.065 21.0 3.61 318 0.99 88 all 205 0.065 21.0 3.61 741 0.99 204 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr low-e innr,1/2"gap,1/4" w 20 0.300 0 16.7 334 29.1 582 thk:2 glazing,clr outr,air gas,vnl frm mat,cir low-e innr,1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 156 0.026 38.0 1.45 226 1.30 203 gypsum board int fnsh Floors 19A-Obswp: Part floor,hrd wd flr fnsh,frm flr,12"thkns,1/2" 156 0.295 0 6.16 961 1.40 218 gypsum board int fnsh 2015-Sep-10 08:39:01 wrightsoft" Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 18 ACCK ...Wrightsoft HVAM61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N wri htsoft� Component Constructions Job: G1,60 Compass Point 9 Bed3 Bate: Jan 12,2015 Y J&J Heating and A/C 17 Arlington St., Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@iiheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft�°F ft2-°FBtuh Btuh/ftz Btu MON Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" a 84 0.065 21.0 3.61 304 0.99 84 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 117 0.065 21.0 3.61 423 0.99 116 all 201 0.065 21.0 3.61 726 0.99 200 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr low-e innr,1/2"gap,1/4" a 24 0.300 0 16.7 400 29.1 699 thk:2 glazing,clr outr,air gas,vnl frm mat,clr low-e innr,1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 156 0.026 38.0 1.45 226 1.30 203 gypsum board int fnsh Floors 19A-Obswp:Part floor,hrd wd flr fnsh,frm fir,12"thkns,1/2" 156 0.295 0 6.16 961 1.40 218 gypsum board int fnsh 11+ Wrl htsoft 2015-Sep-10 08:39:01 �+.,. 9 Right-Suite®Universal 2015 15.0.12 RSU05790 ACCA ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Page 19 wri htsoft� Component Constructions Job: G1,60 Compass Point 9 Bed4 Bate: Jan 12,2015 Y J&J Heating and A/C 17 Arlington St., Dracut,Me 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com O • M MINItell For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/112-°F ft`-°F/Btuh Btuh/ft2 Btuh Btuh/ft2 Btu Walls 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" a 70 0.065 21.0 3.61 253 0.99 70 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr low-e innr,1/2"gap,1/4" a 20 0.300 0 16.7 334 29.1 582 thk:2 glazing,clr outr,air gas,vnl frm mat,clr low-e innr,1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 100 0.026 38.0 1.45 145 1.30 130 gypsum board int fnsh Floors 19A-Obswp:Part floor,hrd wd fir fish,frm flr,12"thkns,1/2" 100 0.295 0 6.16 616 1.40 140 gypsum board int fnsh ,.� 2015-Sep-10 08:39:01t WI1 ItSOft" Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 20 .SCK ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N �'OITI onent Constructions Job: G1,60 Compass Point wrightsoft p Date: Jan 12,2015 Master By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma • • • • i Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Dally range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area Ll-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ftz-°F ft�°FBtuh Btuh/112 Btu Btuh/ft2 Btu Wal I s 12F-Osw:Frm wall,vnl ext,1/2"wood shth,r-21 cav ins,1/2" n 118 0.065 21.0 3.61 426 0.99 117 gypsum board int fish,2"x6"wood frm,16"o.c.stud a 129 0.065 21.0 3.61 466 0.99 128 all 247 0.065 21.0 3.61 893 0.99 246 Partitions (none) Windows 2 glazing,clr outr,air gas,vnl frm mat,clr low-e innr,1/2"gap,1/4" n 8 0.300 0 16.7 133 8.94 71 thk:2 glazing,clr outr,air gas,vnl frm mat,clr low-e innr,1/2"gap, a 24 0.300 0 16.7 400 29.1 699 1/4"thk;6.67 ft head ht all 32 0.300 0 16.7 534 24.1 770 Doors (none) Ceilings 166-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins,1/2" 252 0.026 38.0 1.45 364 1.30 328 gypsum board int fnsh Floors 19A-Obswp:Part floor,hrd wd fir fnsh,frm flr,12"thkns,1/2" 252 0.295 0 6.16 1553 1.40 352 gypsum board int fnsh t wri htsoft° Right-Suite®Universal 2015 15.0. 2015-Sep-10 08:39:01 12 RSU05790 Page 21 ACZ:k ...Wrightsoft HVAC\61 Sawyer Way Leominster Me.rup Calc=MJ8 Front Door faces: N wri htsoft Component Constructions Job: G1,60 Compass Point 9 HallWa Byte: Jan 12,2015 Y J&J Heating and A/C 17 Arlington St.,Dracut, Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz-°F ft�°FBtuh Btu hM2 Btu Btuh/f[2 Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings 16B-30ad:Attic ceiling,asphalt shingles roof mat,r-20 roof ins, 60 0.032 30.0 1.78 107 1.60 96 r-30 ceil ins Floors 21A-24t:Bg floor,heavy dry or light damp soil,6'depth 60 0.025 0 1.39 83 0 0 ,.� 2015-Sep-10 08:39:01 wrightsoft^ Right-Suite®Universal 2015 15.0.12 RSU05790 Page 22 ACCK ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Component Constructions Job: G1,60 Compass Point wrightsoft- Date: Jan 12,2015 Basement/Garage By: J&J Heating and A/C 17 Arlington St., Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com P r6je6t Info ion I For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma ! - • • • • Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 BtuhM-°F ftz-°FBtuh Bluh/V Btuh Btuh/ft2 Btu Walls 15B-8s3c-6:Bg wall,heavy dry or light damp soil,concrete wall, n 148 0.073 8.0 3.61 535 0 0 r-8 ins,8"thk,1/2"gypsum board int fnsh a 522 0.073 8.0 4.56 2380 0.40 209 S 288 0.073 8.0 4.56 1313 0.40 115 W 501 0.073 8.0 4.52 2263 0.37 184 all 1459 0.073 8.0 4.45 6491 0.35 508 Partitions (none) Windows (none) Doors 11 P0:Door,mtl pur core type n 140 0.290 10.5 16.1 2257 7.68 1076 11JO:Door,mtl fbrgl type w 21 0.600 6.3 33.4 701 15.9 334 Ceilings 1613-30ad:Attic ceiling,asphalt shingles roof mat,r-20 roof ins, 1594 0.032 30.0 1.78 2836 1.60 2550 r-30 ceiI ins Floors 21A-24t:Bg floor,heavy dry or light damp soil,6'depth 1594 0.025 0 1.39 2216 0 0 2015-Sep-10 08:39:01 wrightsoft" Right-Suite®Universal 2015 15.0.12 RSU05790 p Page 23 ACCA ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N PCO @Ct SUCi1Ci18C Job: G1,60 Compass Point wrightsoft, Y Date: Jan 12,2015 Entire House By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Notes: Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 68 OF Inside db 75 OF Design TD 56 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 74339 Btuh Structure 38491 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 74339 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 35643 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 1 (Average) Structure 1379 Btuh Ducts 0 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 3971 3971 Equipment latent load 1379 Btuh Volume (ft3) 25815 25815 Air changes/hour 0.37 0.17 Equipment total load 37021 Btuh Equiv.AVF (cfm) 296 73 Req. total capacity at 0.80 SHR 3.7 ton Heating Equipment Summary Cooling Equipment Summary Make Amana Make Amana Trade Amana Trade ASX14 SERIES Model AMVC950905DX Cond ASX130481 B* AHRI ref 2012279 Coil CA*F4860*6D* AHRI ref 4214134 Efficiency 95.7AFUE Efficiency 11.2 EER, 13 SEER Heating input 92000 Btuh Sensible cooling 36800 Btuh Heating output 90000 Btuh Latent cooling 9200 Btuh Temperature rise 53 OF Total cooling 46000 Btuh Actual air flow 1533 cfm Actual air flow 1533 cfm Air flow factor 0.021 cfm/Btuh Air flow factor 0.040 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.97 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015-Sep-10 08:39:02 wrightsoft' Right-Suite@ Universal 2015 15.0.12 RSU05790 Pagel ACCA ..Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Project Summar Job: G1,60 Compass Point wrightsoft® y Date: Jan 12,2015 (Rest of House) By: J&J Heating and A/C 17 Arlington St., Dracut, Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Notes: ® - • • M01, Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 68 OF Inside db 75 OF Design TD 56 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 43835 Btuh Structure 24243 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Pi In 0 Btuh Equipment load 43835 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 22449 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 1 (Average) Structure 662 Btuh Ducts 0 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2 2600 2600 Equipment latent load 662 Btuh Volume (ft3) 13836 13836 Air changes/hour 0.62 0.15 Equipment total load 23111 Btuh Equiv.AVF (cfm) 142 35 Req. total capacity at 0.70 SHR 2.7 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Wrl9 htsoft" Right-SuiteO Universal 2015 15.0.12 RSU05790 2015-Sep-10 08:39:02 ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Page 2 Project Summar Job: G1,60 Compass Point • Wrlghtsoft� y Date: Jan 12,2015 Great Room Zone By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com • in • • ME For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Notes: Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 68 OF Inside db 75 OF Design TD 56 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 11064 Btuh Structure 7541 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 11064 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 6983 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 1 (Average) Structure 223 Btuh Ducts 0 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 357 357 Equipment latent load 223 Btuh Volume (ft3) 3213 3213 Air changes/hour 0.89 0.22 Equipment total load 7206 Btuh Equiv.AVF (cfm) 48 12 Req. total capacity at 0.70 SHR 0.8 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015-Sep-10 08:39:02 wrightsoft' Right-Suite(g)Universal 2015 15.0.12 RSU05790 Page 3 ACC,k ...Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N Pro ect Summar Job: G1,60 Compass Point wrightsoft° Y Date: Jan 12,2015 second Floor By: J&J Heating and A/C 17 Arlington St.,Dracut,Ma 01826 Phone:978-454-8197 Email:Jeff@jjheatac.com • • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma Notes: ® - • • • Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 68 OF Inside db 75 OF Design TD 56 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 19440 Btuh Structure 7197 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 19440 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 6664 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 1 (Average) Structure 494 Btuh Ducts 0 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 1014 1014 Equipment latent load 494 Btuh Volume (ft3) 8766 8766 Air changes/hour 0.72 0.18 Equipment total load 7158 Btuh Equiv.AVF (cfm) 106 26 Req. total capacity at 0.70 SHR 0.8 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015-Sep-10 08:39:02 wrightsoft' Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 4 ACCK ..Wrightsoft HVAC\61 Sawyer Way Leominster Ma.rup Calc=MJ8 Front Door faces: N