Loading...
HomeMy WebLinkAboutMiscellaneous - 61 Willow Street 61 L�oW rRE / I t t.FJ MLIRIVERMOOR ENGINEERING& ASSOCIATES,INC. PROFESSIONAL ENGINEERS R I V E R M O O R DATE: December 8, 1999 TR �i [ TTAL TO: Michael McGuire FROM: Brian K. Jones, P.E. Town of N. Andover— Building Dept. RE: Bake `N Joy Foods 27 Charles Street PROJECT 9922 N. Andover, MA 01845 �, -tai t 1 d LL) �-}- l WE ARE SENDING YOU (attached): VIA: Mail Submittals Plans Specifications X Other: #of Copies Date Drawing No. I Description 1 12-8-99 Meeting Min. &Test Reports THESE ARE TRANSMITTED: X For your use _ Approved as Submitted _ Disapproved Resubmit As Requested Approved as Noted For Review and Comment REMARKS: Brian K. Jones, P.E. 259 STOCKBRII)GE ROAD-P.O.BOX 276-SCITUATE,MA 02040-0276 TEL.(781)545-2848-FAX(781)544-7729 RIVERMOOR ENGINEERING & ASSOCIATES, INC. PROFESSIONAL ENGINEERS RIVER'MOOR� Job Meeting Minutes No. 10 November 19, 1999 PrTct: Dry Storage Addition Foods—North Andover, MA Project#: 9922 Reported by: Brian K Jones, P.E. Meeting Date: 11-16-99 Attendance: Michael Berry Bake `n Joy Foods(MB) Joe Anderson Bake `n Joy Foods(JA) Brian K Jones, P.E. Rivermoor Engineering and Associates(BKJ) John Grant R C. Griffin, Inc. (JG) Bill Twomey R. C. Griffin, Inc. (BT) Mike DeCristoforo S.S. and L Electrical Brian Mitchell Structural Systems DISCUSSION Old'Business 5.1+ Air rotation shall move east V2 bay to allow for additional clearance to the west. 10/19 Rivermoor will issue revised drawing once rack layout is finalized. 7.161 SS and L will provide photometrics for lighting. 8.101, BNJ is continuing to evaluate the layout for the battery chargers. New fan and ductwork location must be coordinated with layout. Layout should be available at the next job meeting. 9.02 Gas pressure was reported to be 9"wc. Rivermoor will review with Shekar. Griffin shall review with the mechanical subcontractor. 9.03 SS and L shall provide proposed UG layout to PD for approval. 259 STOCKBRIDGE ROAD • P.O. 80X 276 • SCITUATE,MA 02040-0.276 TEL. (781)545-1848 FAX(781)544-7729 1 i if Bake`n Joy Foods Job Meeting Minutes 10 November 19,1999 Page 2 New-Business 10.01 Submitted miscellaneous metal drawings to Rivermoor. 10.02 REA returned thermal shops 10.03 High bay lighting fixture was delivered for PD's review. 1.0.0 Fire protection drawings are in progress. 10.0 Water continues to be an issue with the site work Underdrain will be extended at the SW j corner. 10.0 Reviewed CB pipe grades and inverts. Center line of CB shall be approximately 5' off of the face of building. J'Q;O [Joists have been fabricated. Steel is due on site the week of 11/29. 10.08 SS and L will coordinate house keeping pad size with BT. Length of pipe rail protection may require adjustment. 4 feet of clearance is required in front of the 480V panel. 10.00. Condensate drain will be installed on a T and M basis. 10.10 RCG to submit site extras promptly. Handle earthwork as a deduct to the base proposal as the existing gravel sub-grade look good Progress • Continued progress on the building pad. • Backfilling around foundation walls. • Continued progress on foundation walls. Wall remaining to be placed includes section to the east of the truck dock. • Forming the balance of the footing along D line. • Continuing progress on leveling plates. Preparing to pave along fire water line and around dolly pad. •: Replaced second phase of the existing dolly pad. • Completed running main electrical conduits through the existing plant to the addition. i Short Schedule • Binder around dolly pad 11/16 • Complete wall along D line 11/17 • Complete interior piers 11/17 • Complete site work and drainage at dock 11/25 • Steel delivery, (verify) 11/29 i I i I Bake`n Joy Foods Job Meeting Mmi tes 10 November 19,1999 Page 3 The next job meeting is scheduled for Tuesday,November 23, 1999, at 9 AM. Respectfully submitted, Brian K Jones, P.E. is President i I CC. J. Bourgeois Shekar Associates Peter Stefanini-Rivermoor it i. II I I I I� I �r Ise :i I ,1 �I li i it I �I RIVERMOOR ENGINEERING & ASSOCIATES, INC. PROFESSIONAL ENGINEERS RIVERMOOR� r Job Meeting Minutes-No. 9 November 12, 1999 Project: Dry Storage Addition Bake 'n Joy Foods North Andover, M dove A Project#: 9922 Reported by: Brian K. Jones, P.E. Meeting Date: 11-9-99 Attendance: Paul DePew Bake `n Joy Foods (PD) Michael Berry Bake `n Joy Foods (MB) Joe Anderson Bake `n Joy Foods(JA) Brian K. Jones, P.E. Rivermoor Engineering and Associates (BKJ) John Grant R. C. Griffin, Inc. (JG) Bill Twomey R. C. Griffin, Inc. (BT) Mike S.S. and L Electrical DISCUSSION Old Business 4.13 RCG will coordinate light fixture type with PD, and submit package to Rivermoor. 10112 Fixture type and contact provided. 10/19 RCG shall verify that the reflectors are clear and reflectors "float". 10126 S. S. and L shall submit sample high bay,pulse fixture for review. 11102 Submit photometrics for all proposed alternate fixtures. Fixture package is not accepted pending receipt of photometrics. 11/09 Photometrics submitted,fixture sample pending. 5.14 Air rotation shall move east 1/2 bay to allow for additional clearance to the west. 10/19 Rivermoor will issue revised drawing once rack layout is finalized. 6.05 RCG shall submit a price to add a CB between the two loading dock doors. 10/26 Pending, Rivermoor will issue a sketch of the revised grading scheme. 11/02 Sketch issued. Price additional CB as an add alternate. 259 5TOCKBRI06E ROAD • P.O. BOX 276 • SCITUATE, MA 02040-0276 TEL. (781)545-2848 • FAX(781)544-7729 Bake`n Joy Foods Job Meeting Minutes 9 November 12, 1999 Page 2 7.07 RCG shall submit a price to provide 30" dock bumpers. 11/09 Price submitted and approved. 7.08 SS and L shall verify spares in FRCP. 11/09 (2)zones are available. 7.16 SS and L will provide photometrics for lighting. 8.08 BNJ shall finalize rack package and layout this week. Once finalized, please forward copy of plan to Rivermoor for coordination. 11/09 Approved plan provided to Rivermoor. 8.10 BNJ is continuing to evaluate the layout for the battery chargers. New fan and ductwork location must be coordinated with layout. Layout should be available at the next job meeting. 8.11 BNJ shall verify the required size of the new dolly pad. 11/09 Pad shall be centered 37'-6"off face of building and shall be IS'wide. New Business 9.01 A binder pavement course shall be placed around the perimeter of the dolly pad. 9.02 Gas pressure was reported to be 9" wc. Rivermoor will review with Shekar. Griffin shall review with the mechanical subcontractor. 9.03 SS and L shall provide proposed UG layout to PD for approval. 9.04 Payment application#2 submitted to BNJ. Progress • Continued progress on the building pad. • Backfilling around foundation walls. • Continued progress on footings and foundation walls. Wall has been placed along 11 line and along the truck dock face. • Forming the balance of the footing along D line. • Placed footing along 7 line. Forming piers along 7 line. • Continuing progress on leveling plates. • Completed reinforcement of the existing roof structure. • Completed backfilling FW line. • Replaced 'h of the existing dolly pad. • Continuing running main electrical conduits through the existing plant. Bake`n Joy Foods Job Meeting Minutes 9 November 12, 1999 Page 3 Short Schedule • Balance of dolly pad 11/12 • Binder around dolly pad 11/15 • Place footing along D line (partial) 11/9 • Place foundation wall along D line (Part) 11/15 • Steel delivery, (verify) 11/29 The next job meeting is scheduled for Tuesday, November 9, 1999, at 9 AM. Respectfully submitted, Brian K. Jones, P.E. President cc. J. Bourgeois Shekar Associates Peter Stefanini-Rivermoor GRAIN SIZE DISTRIBUTION TEST REPORT C: 0!N o o_ 0 0 0 oa o 1 OO M N M M 90 80 70 w Z 60 w w50 U Li 40 d 30 20 10 200 100 1.0:.0 _ 1. 0,. ... .... 0. 1... 0 .01 -0.001 GRAIN SIZE - mm % +3" % GRAVEL %' SAND % SILT % CLAY USCS LL PI • 0 . 0 49 . 2 37 . 7 13 . 1 GM SIEVE PERCENT FINER SIEVE PERCENT FINER Location : inches number size size • •N.PARKING LOT+DRIVEWAY • 1 .5 100.0 4 50.8 j 1 89 .6 10 43.3 0 .75 82.2 20 34.7 Description : 0.375 62.9 40 27.5 •RECYCLED MATERIALS 50 24..3 100 18.5 GRAIN SIZE 200 13. 1 8 . 39 D30 UT3 OF MAS)SACHUSETT%S, INC. D10 Rte. Remarks: #200 WASH SIEVE COEFFICIENTS /7,- c C u . UTS OF MASSACHUSETTS, INC. Project No. : 5840 Project : BAKE'N JOY FOODS , N . ANDOVER, MA 5 Richardson Lane Stoneham, MA 02180 Date: 11/15/99 Sample No . 7814 4 U U TTTTTTTTTT S S S U U T S S U U T S U U T S S S Of MASSACHUSETTS, INC. U U T S U U T S S U U U T S S S 5 Richardson Lane, Stoneham, MA 02180 - 781-438-7755 SOIL INSPECTION REPORT DATE 11-08-99 9 Rivermoor Engineering & Assoc . Job No. UTS 5840 Attn: Brian K. Jones P.E. Project Bake 'n Joy Foods, N. Andover 259 Stockbridge Rd P.O.Box 276 Contractor R.C. Griffin, Inc Scituate, MA 02040-0276 FIELD TEST # % MOISTURE M.D.D. DRY DENSITY % COMPACTION 1 5 . 3 134 . 8 128 . 6 95 .4 _ 2 7 ..5 134 . 8 130 . 7 96 . 9 3 6 . 7 134 . 8 128 . 7 95 . 5 4 6 . 7 134 . 8 128 .4 95 . 2 5 7 . 5 134 . 8 129 . 5 96 . 0 LOCATION: ELEVATION: Test #1 - See sketch -12 " Test #2 - if -3 ' Test #3 - It " Test #4 - " Test #5 - " -2 ' Weather: Sunny, 40 degrees Purpose : Observe earthwork construction and perform field density tests Equip: 320B excavator, Wacker plate compactor Summary: The writer arrived at the project site at 7 : 00 AM and met with Bill Twomey from R.C. Griffin. The purpose of this visit was to perform a soil inspection. Backfill began along 11 line at A-D lines . The 320B excavator was placing 6" -10" loose lifts. of onsite soil in the trench along the interior foundation at 11 line A-D. The Wacker plate compac- tor made several repeated and overlapping passes . Five field density tests were performed according to ASTM D1556 using the sand cone method. Test results exceeded 95% of the MDD obtained from the modified proctor ASTM D1557 according to specifications . , Also a perforated drain pipe was placed along the exterior foundation top of footing. The pipe was covered with 12" of crushed stone and a layer of filter fabric was placed over the crushed stone . A trench was being excavated along D line at 8 . 1-9 . 5 . These observations were related to Mr. Twomey. INSPECTOR: C. Lund Max day + 1 hour U T S OF MASSACHUSETTS, INC. Reviewed /�, travel By: William P. Crabtre4aCl e To ✓e r, 5 rjfieo o( V, ti M �� 5 Richardson Lane �' q JOB NAME:.-A— ✓ F(:56 FIELD Stoneham, Ma 02180 A'I 44"The Construction Testing People" PROJECT NO.: 5 SKETCH (husells Inc. t � � f i t Pv �y i F, 5 Richardson Lane //- �- / JOB NAME: KN /U 5O Y (003 S FIELD �n I Stoneham, Ma 02180 47"The Construction Testing people" PROJECT NO.: SKETCH U U TTTTTTTTTT S S S U U T S S U U T S U U T S S S Of MASSACHUSETTS, INC. U U T S U U T S S U U U T S S S 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 CONCRETE INSPECTION REPORT II DATE 10/19/99 1 Rivermoor Engineering & Assoc . Job No. UTS 5840 Attn: Brian K. Jones P.E. Project Bake 'n Joy Foods, N. Andover z G49-ridge Rd P.O.Box 276 Contractor R.C. Griffin, Inc Scituate, MA 02040-0276 Conc . Co. Red E Mix CLASS CONCRETE 3000# 3/4" CUBIC YARDS 26 ASTM C-39 _ TEST SAMPLES LOCATION 4 cylinders Footing B line at 11 line slump 3 3/411 , air temp. 58, conc . temp. 72 , truck #50 , ticket #102758, time : 1 : 15 Total Pour: line 7 . 1-11 at line A and line 11 lines A-B. 5 TESTS ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 LAB DATE DATE AGE NO. SIZE AREA CAST - TESTED DAYS P. S . I . H740 6x12 28 . 27 10/19/99 10/26/99 7 1, 840 19 16 H741 6x12 28 . 27 10/19/99 11 99 28 4 , 210 / / / 070 H742 6x12 28 . 27 10/19/99 11/16/99 28 4, 070 H743 6x12 28 . 27 10/19/99 11/16/99 28 3 , 930 REMARKS : U T S OF MASSACHUSETTS, INC. INSPECTOR: Reviewed Field- C. Lund By: Steven T. Crabtre�/ U U TTTTTTTTTT S S S U U T S S, U U T S U U T S S S Of MASSACHUSETTS, INC. U U T S U U T S S U U U T S S S 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 CONCRETE INSPECTION REPORT II DATE 11/09/99 7 Rivermoor Engineering & Assoc . Job No. UTS 5840 Attn: Brian K. Jones P.E. Project Bake ' n Joy Foods, N. Andover 259 Stockbridge Rd P.O.Box 276 Contractor R.C. Griffin, Inc Scituate, MA 02040-0276 Conc .. Co. Red E Mix CLASS CONCRETE 3000# 3/4" CUBIC YARDS 10 ASTM C-39 TEST SAMPLES LOCATION 4 cylinders Footing: pier, 21 line at C line : Slump: 3" , air temp. 50, conc .temp. 68 , truck #1765, ticket #108600, time 2 : 00 Total placement : piers, B.0 and C. 9 line at 7 . 1 line : Footings, D line at 8 . 1-9 . 5 . TESTS ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 LAB DATE DATE AGE NO. SIZE AREA CAST` TESTED DAYS P. S . I . M545 6x12 28 . 27 11/09/99 11/16/99 7 2 , 120 M546 6x12 28 . 27 11/09/99 12/07/99 28 M547 6x12 28 . 27 11/09/99 12/07/99 28 M548 6x12 28 . 27 11/09/99 12/07/99 28 L REMARKS : U T S OF MASSACHUSETTS, INC. INSPECTOR: Reviewed Field- C. Lund By: Steven T. Crabtre 1 U U TTTTTTTTTT S S S U U T S S U U T S U U T S S S Of MASSACHUSETTS, INC. U U T S U U T S S U U U T S S S 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 REINFORCING STEEL INSPECTION DATE 11/05/99 4 Rivermoor Engineering & Assoc . Job No. UTS 5840 Attn: Brian K. Jones P.E. Project Bake 'n Joy Foods, N. Andover 259 Stockbridge Rd P.O.Box 276 Contractor R.C. Griffin, Inc Scituate, MA 02040-0276 CONTACTS : Bill Twomey of R.C. Griffin, Inc. SPECIFICATION: ASTM A615 Grade 40 Grade 60 X Grade 75 ASTM A616 Grade 50 Grade 60 ASTM A617 Grade 40 Grade 60 ACCEPTANCE CRITERIA: CONTRACT DRAWINGS) S1 . 1 SHOP DRAWING(S) R02 - Job #1000277 PROJECT SPECIFICATIONS 03300 OTHER AREA REVIEWED: B+C+C. 9 at 7 . 1, footing ACCEPTABLE VERIFY: YES NO Coverage (Top and Bottom) x Clearance x _ Cleanliness (heavy rust, scale,mug?,di rt,oil, etc. not permitted) x Bar Supports x Bar Spacing x Bar Quantity x Placement (position and tying) x REMARKS : INSPECTOR: C. Lund U T S OF MASSACHUSETTS, INC. Reviewed By: William P. Crabtre4°� U U TTTTTTTTTT S S S U U T S S U U T S U U T S S S Of MASSACHUSETTS, INC. U U T S U U T S S U U U T S S S 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 CONCRETE INSPECTION REPORT DATE 10/18/99 4 Rivermoor Engineering & Assoc . Job No. UTS 5840 Attn: Brian K. Jones P.E. Project Bake 'n Joy Foods, N. Andover 259 Stockbridge Rd P.O.Box 276 Contractor R.C. Griffin, Inc Scituate, MA 02040-0276 Conc. Co. CLASS CONCRETE CUBIC YARDS _ DRY WEIGHTS MATERIALS . Cement Brand Name Fine Aggr. Source Coarse Aggr. Source Admixture Brand Name Admixture Brand Name Water Source TEST SAMPLES LOCATION Scheduled concrete placement cancelled by Bill Toomey of RC Griffin; due to inclement weather (rain) . f f Moisture in Sand % PLANT GRADATIONS Moisture in C. Aggr. % F.M. SAND F.M. C.AGGR. No. of Determinations #8 Weights Adjusted to Compensate #100 #4 for Moisture #50 3/8" Sand Colormetric Test #30 1/2" #16 3/4" REMARKS : #8 1" #4 1 1/2 " r INSPECTORS : U T S OF MASSACHUSETTS, INC. Plant- Reviewed Field- C. Lund - Min Day + 1 Hr. Tr. By: William P. Crabtree U U TTTTTTTTTT S S S U U T S S U U T S U U T S S S Of MASSACHUSETTS, INC. U U T S U U. T S S U U U T S S S 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 CONCRETE INSPECTION REPORT II DATE 11/04/99 4 Rivermoor Engineering & Assoc . Job No. UTS 5840 Attn: Brian K. Jones P.E. Project Bake 'n Joy Foods, N. Andover 259 Stockbridge Rd P.O.Box 276 Contractor R.C. Griffin, Inc Scituate, MA 02040-0276 Conc . Co. Red E Mix CLASS CONCRETE 30004 3/4" CUBIC YARDS 21 ASTM C-39 _ TEST SAMPLES LOCATION 4 cylinders Wall : line 11 B to D/D 11 to 10 . 3 : Slump: 411 , air temp. 56, conc . temp. 68, truck #1765, ticket #107301, time 1 : 00 Total placement : wall, line 11 B-D, D line 11-10 . 8 . TESTS ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 LAB DATE DATE AGE NO. SIZE AREA CAST TESTED DAYS P. S . I . L861 6x12 28 . 27 11/04/99 11/11/99 7 1, 770 L862 6x12 28 . 27 11/04/99 12/02/99 28 L863 6x12 28 .27 11/04/99 12/02/99 28 L864 6x12 28 . 27 11/04/99 12/02/99 28 REMARKS : U T S OF MASSACHUSETTS, INC. INSPECTOR: Reviewed Field- M. Konjkavfard By: Steven T. Crabtree/ r U U TTTTTTTTTT S S S U U T S S U U T S U U T S S S Of MASSACHUSETTS, INC. U U T S U U T S S U U U T S S S 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 CONCRETE INSPECTION REPORT II DATE 11/05/99 6 Rivermoor Engineering & Assoc . Job No. UTS 5840 Attn: Brian K. Jones P.E. Project Bake 'n Joy Fbods, N. Andover 259 Stockbridge Rd P.O.Box 276 Contractor R.C. Griffin, Inc Scituate, MA 02040-0276 Conc. Co. Red E Mix CLASS CONCRETE 3000# 3/411 CUBIC YARDS 3 ASTM C-39 _ TEST SAMPLES LOCATION 4 cylinders Footing: 7 . 1 line at C line : Slump : 4 3/411 , air temp. 62 , conc .temp. 70, truck #1724 , ticket #09994 , time 3 : 30 . Total placement : footig B, C,D at 7 . 1 line . TESTS ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 LAB DATE DATE AGE NO. SIZE AREA CAST TESTED DAYS P.S . I .' L865 6x12 28 . 27 11/05/99 11/12/99 7 1, 770 L866 6x12 28 . 27 11/05/99 12/03/99 28 L867 6x12 28 . 27 11/05/99 12/03/99 28 L868 6x12 28 . 27 11/05/99 12/03/99 28 REMARKS : U T S OF MASSACHUSETTS, INC. INSPECTOR: Reviewed Field- C. Lund By: Steven T. Crabtree MOISTURE-DENSITY RELATIONSHIP TEST 130 125 U a- 120 T y U) C Q) 115 L 110 00 ZAV for Sp .G. 2.75 105 10 12.5 15 17.5 20 22.5 25 Water content , % Test specification : ASTM D 1557-91 Procedure C, Modified Oversize correction applied to each point Elev/ Classification Nat . S GLL PI % > % < Depth USCS AASHTO Moist . Sp.G. 3/4 in No.200 GM 2.64 17 .8 % 13 . 1 % ROCK CORRECTED TEST RESULTS UNCORRECTED MATERIAL DESCRIPTION Maximum dry density = 121 .3 pcf 114.7 pcf RECYCLED MATERIALS Optimum moisture = 13.0 % 15 .7 % Project No. : 5840 Remarks : Project : BAKE' N JOY FOODS , N.ANDOVER, MA Location: N. PARKING LOT+DRIVEWAY Date: 11-15-1999 MOISTURE-DENSITY RELATIONSHIP TEST UTS OF MASSACHUSETTS , INC . Sample No. 7814 N ♦i U U TTTTTTTTTT S S S U U T S S'. U U T S U U T S S S Of MASSACHUSETTS, INC. U U T S U U T S S U U U T S S S 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 CONCRETE INSPECTION REPORT II DATE 11/06/99 5 Rivermoor Engineering & Assoc . Job No. UTS 5840 Attn: Brian K. Jones P.E. Project Bake 'n Joy Foods, N. Andover 25_._,_ --'_-'ridge--Rd P.O.Box 276 Contractor R.C. Griffin, Inc Scituate, MA 02040-0276 Conc . Co. Wakefield CLASS CONCRETE 4000# 3/4" * CUBIC YARDS 20 ASTM C-39 TEST SAMPLES LOCATION 4 cylinders Slab: dolly-slab, rear of bldg. : Slump : 4 1/211 , air temp. 62 , conc .temp. 62 , truck #1131, ticket #107948 , time 8 :20 Total placement : behind building, dolly slab. All samples collected according to ASTM C-172 . TESTS ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 LAB DATE, DATE AGE NO. SIZE AREA CAST TESTED DAYS P.S . I . L857 6x12 28 . 27 11/06/99 11/15/99 9 3 , 890 L858 6x12 28 . 27 11/06/99 12/06/99 30 L859 6x12 28 . 27 11/06/99 12/06/99 30 L860 6x12 28 . 27 11/06./99 12/06/99 30 REMARKS : 1% po arset U T S OF MASSACHUSETTS, INC. INSPECTOR: Reviewed Field- C. Harr-Min Day + 1 Hr.Tr. (Sat . ) By: Steven T. Crabtre Of Massachusetts Inc. "The Construction Testing People" DAILY REPORT OF CONCRETE POUR PROJECT: Bald-n- oU PROJECT NO: DATE: q9 AIR TW:(e2° TOTAL YARDS: 10 J — +OW3/4 w 1 % ?olCif50J- - LOCATION OF POUR:Z.n rear OF Aollu st" LOAD & SLUMP BATCHING TIME TIME IN 'CONC TRUCK# INCHES IN OUT MINS YARDS TEMP % AIR TICKET; NO OF CYLS 2 1131 4-'/2_1 -730 I g : 4.0 P10 1 2 0 NA 10-7 q ,+ 4-A 1 I. 1101 AIA 1 -7:40 1 Qr 0 0 I <90 20 N A I NA 10-7q,55-1tiR 121 I I 1 I I I I I . I II I I I 1 I I I 1 ! i i I I I I INSPECTOR: REMARKS: POIC- TIME: 5 Richardson Lane, Stoneham, Massachusetts 02180 (617) 438-7755 Fax (617) 438-6216 U U TTTTTTTTTT S S S U U T S S U U T S U U T S S S Of MASSACHUSETTS, INC. U U T S U U T S S U U U T S S S 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 SOIL FIELD REPORT DATE 11-11-99 3 Rivermoor Engineering & Assoc . Job. No. UTS 5840 Attn: Brian K. Jones P .E. Project Bake 'n Joy Foods, N. Andover Rd P.O.Box 276 Contractor R.C. Griffin, Inc Scituate, MA 02040-0276 WEATHER: Drizzle, 32 degrees PURPOSE: Perform field density tests EQUIPMENT OPERATING: N/A SUMMARY: The writer arrived at the proj&ct site at 7 : 00 AM and met with Bill Twomey from R.C. Griffin. The purpose of this visit was to perform a soil inspection. Field density testing was cancelled due to rain and extremely muddy conditions . INSPECTOR_ : C. Lund Min day + 1 hour U T S OF MASSACHUSETTS, INC. travel• Reviewed By: William P. Crabtre4%L r U U TTTTTTTTTT S S S U U T S S U U T S U U T S S S Of MASSACHUSETTS, INC. U U T S U U T S S U U U T S S S 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 REINFORCING STEEL INSPECTION DATE 11/12/99 6 Rivermoor Engineering & Assoc . Job No. UTS 5840 Attn: Brian K. Jones P.E . Project Bake 'n Joy Foods, N. Andover Rd P.O.Box 276 Contractor R.C. Griffin, Inc Scituate, MA 02040-0276 CONTACTS : Bill Twomey of R.C. Griffin SPECIFICATION: ASTM A615 Grade 40 Grade 60 X Grade 75 ASTM A616 Grade 50 Grade 60 ASTM A617 Grade 40 Grade 60 ACCEPTANCE CRITERIA: CONTRACT DRAWINGS) 1 . 1 SHOP DRAWING (S) R-02 PROJECT SPECIFICATIONS 03300 OTHER AREA REVIEWED: Wall and piers : D line, 8 . 1-9 Loading dock leveller pits : D line at 10-11 lines ACCEPTABLE VERIFY: YES NO Coverage (top and bottom) x Clearance x Cleanliness (heavy rust, scale,mud, dirt,oil, etc . no` permitted) x Bar Supports x Bar Spacing x Bar Quantity x Placement (position and tying) x REMARKS : A spot check inspection of reinforcing steel was performed on the above referenced area (s) . � F MASSACHUSETTS INSPE C. Lund U T S O , INC. Reviewed By: William P. Crabtre/100L U U TTTTTTTTTT S S S U U T S S U U T S U U T S S S Of MASSACHUSETTS, INC. U U T S ' U U T S S U U U T S S S 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 REINFORCING STEEL INSPECTION DATE 11/09/99 5 Rivermoor Engineering & Assoc . Job No. UTS 5840 Attn: Brian K. Jones P.E . Project Bake 'n Joy Foods, N. Andover ye Rd P.O.Box 276 Contractor R.C. Griffin, Inc Scituate, MA 02040-0276 CONTACTS : Bill Twomey of R.C. Griffin, Inc . SPECIFICATION: ASTM A615 Grade 40 Grade 60 X Grade 75 ASTM A616 Grade 50 Grade 60 ASTM A617 Grade 40 Grade 60 ACCEPTANCE CRITERIA: CONTRACT DRAWINGS) S1 . 1 SHOP DRAWINGS) R-02 PROJECT SPECIFICATIONS 03300 OTHER AREA REVIEWED: Piers 7 . 1 line at B, C, and C. 9 lines Footing D line at 8 . 1-9 . 5 lines ACCEPTABLE VERIFY: YES NO Coverage (top and bottom) x Clearance x Cleanliness (heavy rust, scale,mud,dirt, oil, etc . not permitted) x Bar Supports x Bar Spacing x Bar Quantity x Placement (position and tying) x REMARKS : INSPECTOR: C. Lund U T S OF MASSACHUSETTS, INC. ' Reviewed By: William P. Crabtree • U U TTTTTTTTTT S S S U U T S S U U T S U U T S S S Of MASSACHUSETTS, INC. U U T S U U T S S U U U T S S S 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 SOIL INSPECTION REPORT DATE 11-09-99 8 Rivermoor Engineering & Assoc . Job No. UTS 5840 Attn: Brian K. Jones P.E. Project Bake ' n Joy Foods, N. Andover 259 Stockbridge Rd P.O.Box 276 Contractor R.C. Griffin, Inc Scituate, MA 02040-0276 FIELD TEST # % MOISTURE M.D.D. DRY DENSITY % COMPACTION 1 5 . 3 134 . 8 128 . 9 95 .4 _ 2 5 . 3 134 . 8 130 . 5 96 . 8 3 4 . 2 134 . 8 129 . 1 95 . 7 4 5 . 3 134 . 8 129 . 5 96 . 0 5 6 . 7 134 . 8 130 . 1 96 . 5 6 7 . 5 134 . 8 129 . 0 95 . 6 LOCATION: ELEVATION: Test #1 - See sketch -2411 Test #2 - " -1811 Test #3 - -12 " Test #4 - " " Test #5 -18" Test #6 - " Weather: Overcast, 44 degrees Purpose : Observe earthwork construction and perform field density tests Equip: 320B Cat excavator, Mikasa plate compactor Summary: The writer arrived at the project site at 7 : 00 AM and met with Bill Twomey from R.C. Griffin. The purpose of this visit was to perform a soil inspection. A trench was excavated on D line at 8 . 1-9 . 5 . Filter fabric was placed at base of trench then covered with 6" -12" of crushed stone . Crushed stone was compacted with the Mikasa plate compactor mak- ing repeated and overlapping passes . The backfill of interior & exterior foundation continued from previous day, placing 6" -8" loose lifts of on- site soil then leveled by hand & shovel . The Mikasa plate compactor made repeated & overlapping passes . A perforated drain pipe was placed along the exterior foundation top of footing then covered with 12" of crushed stone, and then covered with filter fabric . Six field density tests were performed according to ASTM D1556 . Test results exceeded 95% of ASTM D1557 modified. These observations were related to Mr. Twomey. INSPECTOR: C. Lund Max day + 1 hour U T S OF MASSACHUSETTS, INC. Reviewed travel By: William P. Crabtree