Loading...
HomeMy WebLinkAboutMiscellaneous - 64 COMPASS POINT ROAD 4/30/2018 .\ 'b "C J2 - z� - 15 �- Date............................................. �OR7{q °� "" '•�~ TOWN OF NORTH ANDOVER 3a;' -�. .• °oma O 9 PERMIT FOR WIRING gs�CHU G I This certifies that ...... a� L G ............................................... . t � r v - has permission to perform ..........L..�................ ( ..................................................... wiring in the building.of..... � 0� at ...... ..... ' , ..s.5.... North ndover,Mass.+ . ` Fee/r•O .:.'............ ......... ...1... ����.��......rc....... .. ELECTRICAL INSPECTOR Check# M A-0 Commonwealth of Massachusetts Official Use Only o Department of Fire Services Permit No. Occupancy and Fee Checked ,M BOARD OF FIRE PREVENTION REGULATIONS [Rev.1/07] (leaveblank APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code(MEC),527 CMR 12.00 (PLEASE PRINT IN NK OR TYPE ALL)NFORMATION) Date: City or Town of: NORTH ANDOVER To the Inspector of Wires: By this application the undersigned gives notice,orff his or her intention to perform the electrical work described below. Location(Street&N�mber) L f 1,1-W-I cC�j EQ C/�'� Owner or Tenant I �' �" � �e1� Telephone No. Owner's Address / TT— U Is this permit in conjunction with a building permit? Yes No ❑ (Check Appropriate)Box) Purpose of Building Aze,"j Gond e) Utility Authorization No. - Existing Service Amps / Volts Overhead❑ Undgrd❑ No.of Meters New Service CO Amps 116-1 V&Volts Overhead❑ Undgrd L❑� No.of Meters Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work: Completion of the following table may be waived by the Inspector of Wires. No.of Recessed Luminaires No.of Ceil:Susp.(Paddle)FansNo.of Total Transformers KVA No.of Luminaire Outlets No.of Hot Tubs Generators KVA No.of Luminaires Swimming Pool Above ❑ In- Elo.o mergency ig ting rnd. rnd. Battery Units No.of Receptacle Outlets No.of Oil Burners FIRE ALARMS No. of Zones No.of Switches No.of Gas Burners No.of Detection and 7i Initiating Devices No.of Ranges No.of Air Cond. 2 Tons `J TotNo.of Alerting Devices No.of Waste Disposers Heat Pump Number Tons KW....... No.of Self-Contained �✓ Totals: ' Detection/Alerting Devices t7 No.of Dishwashers / S ace/Area Heating KW Local❑ Municipal Other ` p g Connection No.of Dryers P Heating Appliances KW Security o Systems:* e ices or Equivalent No.of Water No.of No.of Data Wiring: S Heaters q.#,) KW Signs Ballasts No.of Devices or Eq ecommunications uivaglent WiriNo.Hydromassage Bathtubs No.of Motors Total HP Tel No.of Devices or Eq uivalent OTHER: + ,,�Attach additional detail if desired,or as required by the Inspector of Wires. Estimated Value of Electrical Work: - /ice _ (When required by municipal policy.) i Work to Start: /Z —/I- Inspections to be requested in accordance with MEC Rule 10,and upon completion. INSURANCE COVERAGE: Unless waived by the owner,no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including"completed operation"coverage or its substantial equivalent. The undersigned certifies that such coverage is in force,and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE ❑ BOND ❑ OTHER ❑ (Specify:) I certify,under the pains and enaltie of perjury,that the information on this application is true and complete. FIRM NAME: . l(, 60-19 LTC.NO.:�14 u l Licensee: I -L— Signature � LIC.NO.: (If applicable,enter "exempt"in the license number line}- Bus.Tel.No.: Address: 2 hmliaCAS ZT LA:&4�cw Y Alt.Tel.No.: *Per M.G.L c. 147,s.57-61,security work requires DepartdAt of Public Safety"S"License: Lie.No. OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally required by law. By my signature below,I hereby waive this requirement. I am the(check one)❑owner ❑owner's agent. Owner/Agent PERMIT FEE: $ Signature Telephone No. ❑ 2012 Massachusetts Electrical Code Amendments 527 CMR 12.00§Rule 8: In accordance with the provisions of M.G.L.c. 143,§3L,the permit application form to provide notice of installation of wiring shall be uniform throughout the Commonwealth,and applications shall be filed / on the prescribed form.After a permit application has been accepted by an Inspector of Wires appointed pursuant to M.G.L c. 166,§ 32,an I/ electrical permit shall be issued to the person, firm or corporation stated on the permit application. Such entity shall be responsible for the notification of completion of the work as required in M.G.L.c.143,§3L. Permits shall be limited as to the time of ongoing construction activity,and may be deemed by the Inspector of Wires abandoned and invalid if he or she has determined that the authorized work has not commenced or has not progressed during the preceding 12-month period.Upon written application,an extension of time for completion of work shall be permitted for reasonable cause.A permit shall be terminated upon the written request of either the owner or the installing entity stated on the permit application. ❑ The Permit Extension Act was created by Section 173 of Chapter 240 of the Acts of 2010 and extended by Sections 74 and 75 of Chapter 238 of the Acts of 2012.The purpose of this act is to promote job growth and long-term economic recovery and the Permit Extension Act furthers this purpose by establishing an automatic four-year extension to certain permits and licenses concerning the use or development of real property.With limited exceptions,the Act automatically extends,for four years beyond its otherwise applicable expiration date,any permit or approval that was "in effect or existence"during the qualifying period beginning on August 15,2008 and extending through August 15,2012. ❑ Rule 8—Permit/Date Closed: ***Note:Reapply for new permit ❑ ❑Permit Extension Act—Permit/Date Closed: Trench Inspection Pass 0 Failed Re-Inspection Required($.)❑ Inspectors Comments: Inspectors Signature: Date: SERVICE INSPECTION: Pass M Failed Re-Inspection Required($.) ❑ Inspectors Comments: tf Inspectors Signature: Date: PARTIAL ROUGH INSPECTION: Pass M Failed 0 Re-Inspection Required($.)❑ Inspectors Comments: Inspectors Signature: Date: ROUGH INS CTION: Pass 0 Failed Re-Inspection Required($.)❑ Inspectors Comments: I Inspectors Signature: Date: FINAL INSPECTI Pass M Failed Re-Inspection Required($.) ❑ Inspectors Comments: Inspectors Signature: Date: DEB WEINHOLD ...TOWN OF MERRIMAC,MA. .......dweinhold@townofinerrimac.com The Commonwealth of Massachusetts F Department of Industrial Accidents „ �_~ ~•- 1 Congress Street,Suite 100 02114 2017 Boston,MA. w~• �` www mass.gov/dia o�M sv' " Workers'Compensationxusuxance Affidavit:Builders/Contractors/Electricians/�lumbexs. TO BE FILED WITH THE PERMITTING AUTHORI7 Y. ,lease Print Legribly A ••licant Information Name(Business/Oiganization/lndividual): Address: Phone 4- city/State/Zip: • . ° .. : .-•�x'" °. Type of project(required): Are you an employer?Check the appropriate box: 1.[]1 am a employer with employees(frill and/or part time).* 7. E]NeW'constr6d lon 2.Q I am a sole proprietor or partnership and have no employees working for me in 8. R emodell ug any capacity.[No workers'comp.insurance required] 9. ❑Demolition 3.E]I am a homeowner doing all work myself[No workers'comp.insurance required.]' 10❑Building addition 4. 1 I am a homeowner and will be hiring contractors to conduct all work on my property. I will 11.❑Electrical repairs or additions ensure that all contractors either have workers'compensation insurance or are sole 12.U Pliun.bing repairs Or additions �,. proprietors with.no employees. 5.❑I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13�.[j Ro6f repairs These sub contractors have employees and have workers'comp.insurance t 14.Q Other 6,QWe are a corporation and its,officers have exercised their right of exemption per MGL c. 152,§1(4),and We have no employees.[No workers'comp.insurance required.] *Any applicant that check's box#i crust sal cating Y are domgsection lall work and then hire outside ow showing their workers'compensation must submi nevi affidavit indicating such. I Homeowners who submit•this aff, Contractors that check flus box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities, ave employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. X am an employer that is providing-Workers'compensation insurance for~my employees. Below is the policy and job site information. Insurance Company Name: Expiration Date: Policy#or Self-ins.Lic.#: City/State/Zip: Job Site Address: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiratiion date). on Failure to secure coverage as required under iil enalties?in the form of 25A is a criminal OP WORKORDERORDERIand fine of up to $250.00 a and/or one-year imprisonment,as well as av p day against the violator.A copy of this statement may be,forwarded to the Office of Investigations of the DIA for insurance coverage verification. X do hereby certify.under the pains and penalties ofperjury that the information provided above is true and.correct. Date: Signature: Phone#: r[official use only. Do not write in this area,to he completed by city or town official • Permit/License# ity or Town: suing Authority(circle one): Board utof Health i Building Department 3.City/Town Clerk a4.Electrical Inspector 5.Plumbing Inspector 1. 6.Other Phone#• Contact Person: Information and Instructions Massachusetts General Laws chapter 152 requires all employers to provide workers'compensation for their employees. Pursuant to this statute,an employee is defined as"...every person in the service of another under any contract of hize, express or implied,oral or written." An employer is'defined as"an individual,partnership,association,corporation or other legal entity,or any two or more ofthe foregoing engaged in a joint enferpri'se,and including the legal representatives of a deceased employer,or the receiver'or trustee of an individual,partnership,association or other legal entity,employing emplby ees. Howevexthe owner of a dwelling house having not more than three apartments and who resides therein,or the occupant of the dwelling house of another who employs persons to do maintenance,construction or repair work on such dwelling house or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer." MGL chapter 152,§25C(6)also states that"every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced-acceptable evidence of compliance with the insurance coverage required." Additionally,MGL chapter 152,§25C('1)states"Neither the commonwealth nor any of its political subdivisions shall enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority." Applicants Please fill out the workers'compensation affidavit completely,by checking the boxes that apply to your situation and,if necessary,supply sub contractors)name(s),address(es)and phone number(s)along with their certificates)of insurance. Limited Liability Companies(LLC)or Limited Liability Partnerships(LLP)with no employees other than the members or partners,are not required to carry workers'compensation insurance. If an LLC or LLP does have employees,a policy is required. Be advised that this affidavit may be submitted to the Department of Industrial Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be returned to the city or town that the application for the permit or license is being requested,not the Department of Industrial-Accidents. Should you have any questions regarding the law or if you are required to obtain a workers' compensation policy,please call the Department at the number listed below. Self-insured companies should enter their self insurance license number on the appropriate line. - City or Town Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant. Please be sure to fill in the permit/license number which will be used as a reference number. In addition,an applicant that must submit multiple permit/license applications in any given year,need only submit one affidavit indicating current policy information(if necessary)and under"Job Site Address"the applicant should write"all locations in (city or town)."A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each year.Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture (i.e. a dog license or permit to burn leaves etc.)said person is NOT required to complete this affidavit. The Department's address,telephone and fax number: The Commonwealth of Massachusetts Department of Industrial.Accidents 1 Congress Street, Suite 100 Boston,MA 02114-2017 Tel. #617-727-4900 ext. 7406 or 1-877-NUSSAFE Fax#617.727-7749 Revised 02-23-15 www.mass.gov/dia A Date............. L...�.�......... 1 `t 4, 7 TOWN OF NORTH ANDOVER ° 9 PERMIT FOR PLUMBING BSACHUS� / This certifies that..................................:Q�..............N ./,`'`"......................................... has permission to perform...... Nip ...'.........'1.v►'.R'.............................. plumbing in the buildin sof......./. -5� 5 ' ..... .p...../.......................................................... at........................ .., .......... .......... .... ...../.....T...<.., North Andover, Mass. Fee...y'' Lic. No. .3/.....7 ................................................................................. PLUMBING INSPECTOR Check# �/� _ r MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM PLUMBING WORK CITY NOTH ANDOVER MA. DATE 111-4-15 _ PERMIT# JOBSITE ADDRESS 64 COMPASS POINT OWNER'S NAME TRUST CONSTRUCTION POWNER ADDRESS: 51 MT JOY DR TEWKSBURY MA TELI 9788513456 FAX: TYPE OR OCCUPANCY TYPE: COMMERCIAL❑ EDUCATIONAL ❑ RESIDENTIAL❑■ PRINT CLEARLY NEW:❑■ RENOVATION: ❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES❑ NO❑ FIXUTRES Z FLOORS- Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BATHTUB 2 CROSS CONN DEVICE DEDICATED SPECIAL WASTE SYS DEDICATED GAS/OIUSAND SYS DEDICATED GREASE SYSTEM DEDICATED GRAY WATER SYS DEDICATED WATER REUSE SYS DISHWASHER 1 DRINKING FOUNTAIN FOOD WASTE GRINDER UNIT 1 FLOOR I AREA DRAIN INTERCEPTOR INTERIOR KITCHEN SINK 1 LAVATORY 1 3 ROOF DRAIN, SHOWER STALL 1 SERVICE/MOP SINK TOILET 1 2 URINAL WASHING MACHINE CONNECTION 1 WATER HEATER ALL TYPES 1 WATER PIPING 1 'SPIGOTS 2 " INSURANCE COVERAGE I have a current liabilily insurance policy or its substantial equivalent which meets the requirements of MGL.Ch.142 YES ❑Q NO ❑ If you have checked YES,please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY ❑■ OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER:I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws,and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER ❑ AGENT ❑ SIGNATURE OF OWNER OR AGENT I hereby certify that all of the details and information I have submitted(or entered)regarding this application a an cc ate to the best of my Knowledge and that all plumbing work and installations performed under the permit issued for this applicat' be i co lance with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER NAME: MIKE BURKE LICENSE# 13127_ SIGNATURE COMPANY NAME: I POWERHOUSE PLUMBING AND HEATING CORP ! ADDRESS: POB 896 CITY: PLAISTOW STATE: NH 1 ZIP: 10865 FAX: 6033780040 TEL: 1,16033780020 _ : CELL: 19784909385 EMAIL: J.LAURENCIO@POWERHOUSEPLUMBING.CCOM__ _ MASTER❑■ JOURNEYMAN❑ CORPORATION #F2-482-----]PARTNERSHIP❑# LLC❑# __ ROUGH PLUMBING INSPICTION NOTES BELOW FOR OFFICE USE ONLY FAAL INSPEC ION NOTES Yes No t-,O/x-:5 6AB THIS APPLICATION SERVES AS THE PERMIT ❑ ❑ FEE: $ PERMIT# PLAN REVIEW NOTES s Date.......1�.... ./... .................... OF NORT#1 O TOWN OF NORTH ANDOVER r 9 PERMIT FOR GAS INSTALLATION Ss�cH�ss /...U This certifies that ........1.......I../..... r......?..'z.4L-........................................... has permission for gas installation ...., P.t.........� -....................... in the building of.....................f...A^:1/ ......1.....Le- .r........................................ at,.......52. ... .............�'� s........el.................. North Andover, Mass. Fee/ :......... Lic. No. ...J.-a�.!2.7 ..................................................................... GASINSPECTOR Check# 2 MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK CITY I NORTH ANDOVER MA. DATE 11-4-15 PERMIT# JOBSITE ADDRESS 64 COMPASS POINT OWNER'S NAME TRUST CONSTRUCTION GOWNER ADDRESS: 1,51 MT JOY DRIVE TEWKSBURY MA TEL: 9788513456 _ J FAX: TYPE OR OCCUPANCY TYPE: COMMERCIAL❑ EDUCATIONAL ❑ RESIDENTIAL❑■ PRINT CLEARLY NEW:❑■ RENOVATION: ❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES❑ NO❑ FIXUTRES Z FLOOR- Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BOILER BOOSTER CONVERSION BURNER COOK STOVE DIRECT VENT HEATER DRYER FIREPLACE FRYOLATOR FURNACE i GENERATOR GRILLE LABORATORY COCKS MAKEUP AIR UNIT OVEN POOL HEATER ROOM/SPACE HEATER RO F TOP UNIT TEST UNIT HEATER UNVENTED ROOM HEATER WATER HEATER INSURANCE COVERAGE I have a current liabilily insurance policy or its substantial equivalent which meets the requirements of MGL.Ch.142 YES ❑■ NO ❑ If you have checked YES,please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY ❑■ OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER:I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws,and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER ❑ AGENT ❑ SIGNATURE OF OWNER OR AGENT hereby certify that all of the details and information I have submitted(or entered)regarding this application true a ate to the best of my ' Knowledge and that all plumbing work and installations performed under the permit issued for this appli i will in o liance with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER/GASFITTER NAME: I MIKE BURKE LICENSE#1-13127 U COMPANY NAME: POWERHOUSE PLUMBING AND HEATING CORP ; ADD ESS: POBOX 896 _ CITY: I PLAISTOW ___Jj STATE: a] ZIP: 103865 FAX: 16033780040 TEL: 16033780020 _ j CELL: 1.9784909385 ', EMAIL: J.LAURENCIO@POWERHOUSEPLUMBINGAND HEATIN '.COM MASTER❑■ JOURNEYMAN❑ LP INSTALLER❑ CORPORATION X#12482 PARTNERSHIP❑#=LLC 94ML] 4 ROUGH GAS INSPECTION NOTES BELOW FOR OFFICE USE ONLY FINAL I SPE I N NOTES Yes No THIS APPLICATION SERVES AS THE PERMIT ❑ ❑ FEE: $ PERMIT# PLAN REVIEW NOTES ' r The Commonwealth of Massachusetts Department of Industrial Accidents 4 Office of Investigations ' I Congress Street, Suite 100 w W Boston,MA 02114-2017 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): POWERHOUSE PLUMBING CORP Address: PO BOX 896 City/State/Zip: PLAISTOW, NH 03865 Phone#:6033780020 Are you an employer? Check the appropriate box: Type of project(required): 1. ■❑ I am a employer with 6 4. ❑ I am a general contractor and 1 6. ■❑New construction employees (full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have 8. [] Demolition working for me in any capacity. employees and have workers' 9. ❑ Building addition [No workers' comp. insurance comp. insurance.$ required.] 5. ❑ We are a corporation and its 10.F] Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.E] Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 131-1 Other comp. insurance required.] Any applicant that checks box#I must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: HARTFORD UNDERWRITERS INSURANCE COMP Policy#or Self-ins. Lic. #:04WECIT2480 Expiration Date:7-28-15 Job Site Address: 64 Compass point City/State/Zip: N Andover Ma Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year i isonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day Wainst the 'olat r. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the A for in ranc coverage verification. Ido hereby cert'y u der th pains nd penalties of perjury that the information provided above is true and correct. 11-4-15 Si ature: Date: Phone#: 03 0020 Official us only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3. City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: " 1 ,00MMONWEACM OF M AdHUSE1 I R 50ARD,0F , 4 PLUMBERSAND GASFITTERS '' ISSUES THE, FOLLOWING LI.E ' L 1 ff NSEA AS A JOURNEYMAN .,L"U MICHAEL W BURKE1 61 COR L I SS H 1 X KO a ' HAVERHI LL MA' o 183o-1613 8088 .11 117 7� ONiI''40NWEA1<.TH OF SETTS1. . . jo L.# • r 10 3 15:44 ROARD of n PLUMBERSAND GASFITTERS I SSUES JHE FOLLOWING L I C._It, L It LASED ASA MASTER UM MICHAtL W BURKE 61 CORL I`SS HILL RO;-.•. . � l HAVERH I LL MA ;01830-1613 � aw _ rtKlntl s�ftnAg i •o .f �as4[INs� CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Building Permit Number 971-2015 on 5/27/2015 Date: September 14, 2016 THIS CERTIFIES THAT THE BUILDING LOCATED at 64 Compass Point—Building G MAY BE OCCUPIED AS a single family home IN ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: Berry Co LLC 64 Compass Point North Andover, MA 01845 uilding Inspector Fee: PrePaid $100.00 Receipt: 28837 Check : 7876 i � NORTIy Town of ? E ndover No. h ver Mass j o� 9 �- �/_ COCHIChIWICM 7.e A04ATEO PPP��S S U BOARD OF HEALTH Food/Kitchen P -ERMIT _T D Septic System THIS CERTIFIES THATUILDING INSPECTOR ...........&4112�7...CO.:............................................................................... has permission to erect ..................... buildings on . 01!^!44 (�3 Foundation .... , ... .. . ..... . ........ 3 / Rough 1 � to be occupied as .................. : ........ ......... . .. .... �.............. .. .... ........1►r.A . • C h i m n e dz provided that the person accepting this permit shall in every respect conform to the terms of the application final e>6 on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. MBING INSPECyOR Rough VIOLATION of the Zoning or Building Regulations Voids this Permit. 0 Final " fks/ �Z ZPERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR ( I' UNLESS CONSTRUCTIO T S 4 0 �/• LD• Service ................... ... ..... ...... ................................ BUILDING INSPECTOR GAS INSPECT Rj� Occupancy Permit Required to Occupy Building Rough -f, lr�/ Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTME Until Inspected and Approved by the Building Inspector. Burner 1 Street Nor Smoke Det, t4 TH Towno' f �. � E , ndover - - 0% No. * y ' Z h , ver, Mass, o coc N1c Mlw.c. �1• S U BOARD OF HEALTH -ERM T Food/Kitchen P -T D Septic System THIS CERTIFIES THATCPBUILDING INSPECTOR has permission to erect ...................... buildings on k ....C_oVVy.W......�'?A�e'vT....!!o�,Q. �j-, ('�3 Foundation 3 Rough to be occupied as ........... .. ........p�..�.L-:... �Y.'i'�!�.. .._. Chimney �G�` provided that the person accepting this permit shall in every respect conform to the terms of the application final e�6 on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. MBING INSPEOR Rough VIOLATION of the Zoning or Building Regulations Voids this Permit. O Final 4 f �2 Z PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTIO T 5tS Rou 0�_�`2-Z4, 4 o v• ��• Service BUILDING INSPECTOR V x GAS INSPECTR/� Occupancy Permit Required to Occupy Building Rough ;t41`�/ Display in a Conspicuous Place on the Premises - Do Not Remove Final essr X11 d- No Lathing or Dry Wall To Be Done FIRE DEPARTME Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke DetY*4 �iORTF/ 3•Z yE.. a, rtb p O c4 t APPLICATION FOR CERTIFICATE OF OCCUPANCYANSPECTION �• C, eyb 5 R^1.,o� �K.�S BUILDING PERMIT # SACHUS r •// � /I n ADDRESS/LOCATION OF PROPERTY: Po 1t Map k 06 Parcel O_Lot Number SUBDIVISION: Merf i {Y1 uC.k lit 1 G C� S DATE REQUESTED FILED/READY FOR INSPECTION: CLOSING DATE ON PROPERTY: FIVE(S)DAYS NOTICE PRIOR.TO CLOSING DATE IS REQUIRED ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A REINSPECTION FEE OF TWENTY DOLLARS ($20.00)WILL BE CHARGED IF THE-STRUCTURE DOES NOT MEET ALL APPLICABLE CODES. APPLICANT SIGNATURE Permit Issued to: Address: ROUTING TOWN ENGINEER, SITE PLAN—DRIVE-WAY REVIEW CONSERVATION PLANNING DPW-WATER METER rJ g� i h 6 SEWER CONNECTION DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO SUBMITTAL OF THE OCCUPANCYANSPECTION REQUEST DPW SIGNATLJIW File:Application for OC form revised Jan 2007/2011 LEst SO Washington Street Westborough, MA 01581 IECC 2009 & IECC 2012 Duct Tightness Verification Pass / Fail Date:January 12`h, 2016 Permit No.: Street Address: 64 Compass Point North Andover, MA 01845 Total conditioned floor area: 2,400 Sq Ft Source of Area Calculation: Builder HERS Rater: Nicholas Abreu Certification Number: 8368122 Signature: Client: Tim Barlow 2009 IECC-New Construction Post-construction test ❑ Total Leakage—12 cfm/100 ft2 maximum allowed ❑ Leakage to outdoors—8 cfm/100 ft2 maximum allowed Testing result: cfm/100 ft2 Rough-in test Total leakage Air Handler Installed? ❑ Yes-6 cfm/100 ft2 maximum allowed ❑ No-4 cfm/100 ft2 maximum allowed Testing result: cfm/100 ft2 2012 IECC-New Construction Post-construction test ❑ Total Leakage—4 cfm/100 ft2 maximum allowed Testing result: cfm/100 ft2 Rough-in test-Total leakage Air Handler Installed? ® Yes-4 cfm/100 ft2 maximum allowed ❑ No-3 cfm/100 ft2 maximum allowed Testing result: 3.75 cfm/100 ft2 Results apply to the system as tested on the date above. Compliance is void if any changes are made to the duct system. CLEAResult 50 Washington Street, Suite 3000 Westborough, MA 01581 IECC 2012 402.4.2.1 Testing option Blower Door Testing Pass / Fail Date of test: September 12, 2016 Street Address: 64 Compass Point North Andover, MA 01845 Total conditioned floor area: 2,400 Square Feet Total conditioned volume: 22,050 Cubic Feet Source of area and volume calculations: Builder X Rater Other HERS Rater: CLEAResult, Certification Number: 8368122 Signature: Builder: Trust Construction Builder Contact: Tim Barlow Tested Air Leakage Requirement: 3 Air Changes per hour at 50 pascals(ACH50)or less Measurement: ACH50: 2.98 CLEAResult © 2015 Final Construction Control Document 4 d To be submitted at completion of construction by a W Registered Design Professional F� ear for work per the Bch edition of the 9, Jev` Massachusetts State Building Code, 780 CMR, Section 107 Project Title: MERRIMACKTOWNHOMES Date: 9/13/16 Permit No. 973-15 Property Address: G3 -64 COMPASS PONT, NORTH ANDOVER, MA Project: Check one or both as applicable: X1 New construction ❑ Existing Construction Project description: Wood framed, fire sprinkled,three story town homes in a row of four in the building named "G" with u g gas, electric, water and sewer services. I KANAYO LALA MA Registration Number: 33710-C Expiration date: JUNE 30, 18 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [ ] Architectural [ ] Structural [ ] Mechanical [ ] Fire Protection [ ] Electrical [X] Other: ALL DESCIPLINES for the above named project. 1, or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or wuH vo t.nix electronic signature and seal: nro aanac Esse AL 1 �.- Phone number: 978-337-5252 Email: kanayolala@gmail.com Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 3018 Date�,. . .�. ... NORTH TOWN OF NORTH ANDOVER pF 4��ao .a,h0 PERMIT FOR MECHANICAL INSTALLATION o � m !- D ,SSACHUSEt 1 t This certifies that . .J4<�7. . . . . . . . . 4 .L -r . . . . . . . . . . . has permission for mechanical installation in the buildings of . .�..�.':`� �':� . . . . . .�•�• • .n�. . .. . . t at . . , North Andover, Mass. Fee. . . . . Lic. No. t1 's. S . . . . . . . . . . . .r GAS'• SPEC R WHITE:Applicant CANARY: Building Dept. PINK:Treasurer Commonwealth of Massachusetts Sheet Metal Permit Date: Estimated Job Cost: , 00Z • Permit Fee: $ Plans Submitted: YES NO flans Reviewed: YES NO Business License It 196 Applicant License 11 Business Information: Property Owner/Job Location Information: Nance: J&J Ileatiug. & Air Conditiouing Name: CU's t r, 'O 17 Arlington St.; L Street: Street: �- City/Town: Dracut, MA 01826 City/Town: North Ando-ver, MA 01845 Telephone: 97.8-454-8197 Telephone: 3 � S� Photo I.D. required/ Copy of Photo I.D. attached: YES NO StnfCiultinl J-1 / M-1-unrestricted license J-2 /M-2-restrictcd to dwellings 3-stories or less and conuncrcial tip to 10,000 sq. ft. /2-stories or less Resideiitiiil: 1=2'iali�ily •�.-M.ulti-faiiuly Condo/Tbwiihouscs Other Commercial: Office Retail Industrial Educational Institutional Other e Square Footage: under 10,000 sq. ft. ✓ over 10,000 sq. ft. Number of Stories: i Sheet metal ivorlc to be completed: New Work: Y' Renovation: HVAC ✓ Metal Watershed Roofing Kitchen Exhaust Systcin Metal Chimney /Vents Air Balancing v Provide detailed description of work to be done: SRP �� i � �L /ilY7al du ��`"raarGr -Fer /1u� c sysTe.,-, �� INSURANCE COVERAGE: I have a current liability insurance policy or its equivalent which meets the requirements of M.G.L. Ch. 112 YeZNo ❑ If you have checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the Insurance coverage required by Chapter 112 of the Massachusetts General I-aws, and that my ,signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this boxD,I hereby certify that all of the details and Information I have submitted(or entered)regarding this application aro true and accurate to the best of my knowledge and that all sheet motal work and Installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO PI.01,71-ess 111spections_ Date Comments r Final TIlspection a Date comments Type of License: By ❑ Master Title ❑ Master-Restricted Cily/ own_ ❑Journeyperson Signature of Licensee Permit 1✓ ❑Journeyperson-Restricted License Number: )-5- — Fee y .CI Check at www.mass.ctovldpl Inspector Signature of Permit Approval • -N The Commonwealth of Massachusetts <iat9ar�rnCiir 0 �uGcr.�u'iCttJ �Ct(reiits fi I Congress Street, Suite 100 --— — -- - ' 13osta11, MA 02114-2017 = 77 -, iNww minas govirurr -,— -„ .-== Nl orlcers' Compensation lnsut ince Affidavit: Butlde7 s/Conh•actors/Electricians/Plumbers. Applicant Information CO BE PILED WITH THE PEIZNIITTiNG AUTHORITY. Plcasc Print Lc ibly Name (Business/Organization/Individual): J & J Heating & Air Conditioning, Inc. Addt•ess: 17 Arlington Street City/State/Zip: Dracut, MA. 01826 Phone#: 978-454-8197 Are you an employer?Checic file appropriate box: Type of project (required): i,L31 am a employer with 40 employees(full and/or pan-time).* 2.�I am a sole proprietor or partnership and have no employees working for me in y ❑New construction any capacity.[No workers'comp.insurance required.] 8. Remodeling 3.Ej Ion a homeowner doing all work myself.[No workers'comp.insurance required.]t 9. ❑ Demolition 4.❑1 ami homeowner and will be hiring contractors to conduct all work on my property. I will 10❑ Building addition ensure that all contractors either have workers'compensation insurance or are sole proprietors with no employees. I I.Fj Electrical repairs or additions 5.❑1 am a general contractor and I have hired the sub-contractors listed on the attached sheet. 12.E]Plumbing repairs or additions These sub-contractors have employees and have workers'comp.insurance.* 13.❑Roof repairs 6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14.❑Otller 152,§1(4),and we have no employees.[No workers'comp.insurance required] *Any applicant that checks box B I must also fill out Ute section below showing their workers'compensation policy information. ubmit this t Homeowners who saffidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. 1 ant an en7ploger that isproviding mor/vers'co»tpelisation ilrstu•m7ce for nip en7p/ogees. Below is thepo/icy and job she information. insurance Company Name: A.I.M. Mutual Insurance Policy#or Self-ins. Lic. #: WM —8006553-2015 Expiration Date: 06/02/16 Job Site Address: Ll SS0, E ^ Attach a copy of til era' compens,tion policy declaration c showing�l e policy cy number and cxpiratio da eN t`t G �Y P”g Failure to see e coveragerequired under MGL c. 152, §25A is a criminal violation punishable by a fine up to$1,500.00 and/or on ear impt-ison nt,as well as civil penalties in the form of a STOP WORK ORDER and a fine of tip to$250.00 a day ag 'list the violator co of this statement may be forwarded to the Offic cover ge verificatio e of Investigations of the DIA for insurance 1(to h cer ,It r pains rallies of petjury that the information provided above is true and correct. Si nature- Phone . 97 54-81 Date: (p Official use only. Do not write in this area,to be c0177pleted by city o1•(0)1,17 official City or Town: Permit/License# Issuing Authority(circle one): 1. Board of i-Iealth 2. Building Department 3. City/Town Cleric 4. Electrical Inspector S. Plumbing Inspector 6. Other Contact Person: Phone/h ACORD CERTIFICATE OF LIABILITY INSURANCEDATE(MM/DD/YYYY) .[ 05/27/2015 PRODUCER 978,887.4900 FAX 978.887.2404 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Edward F. Sennott Insurance Agency, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 16 South Main Street HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P. 0. Box 457 Topsfield, MA 01983 INSURERS AFFORDING COVERAGE NAIC# INSURED J&3 Heating & Air Conditioning, Inc. INSURERA: Great American Alliance Ins Co 17 Arlington Street • INSURERB: Safety Insurance Company 39454 Dracut, MA 01826 INSURERC: A.I.M. Mutual Insurance Co INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED,NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR DD' POLICY EFFECTIVE POLICY EXPIRATION t LTR NSR TYPE OF INSURANCE POLICY NUMBER DATE MM DD DATE MM DD LIMITS; GENERAL LIABILITY PAC6418906-09 06/01/2015 06/01/2016 EACH OCCURRENCE .. S' 11000,00 X COMMERCIAL GENERAL LIABILITY DAMPREMISES GE TO FI occurrence $' 300,OO CLAIMS MADE a OCCUR MED EXP(Any one person) $ 10,00C A PERSONAL&ADV INJURY $ 1 000 ON GENERAL AGGREGATE $ ; 2,000,00( GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,000 POLICY PRO- JECT LOC AUTOMOBILE LIABILITY 2434550 06/01/2015 06/01/2016 COMBINED SINGLE LIMIT ANY AUTO (Ea accident) $ 1-000,000 ALL OWNED AUTOS BODILY INJURY B X SCHEDULED AUTOS (Per person) $ X HIRED AUTOS BODILY INJURY X $NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY UMB6418958-08 06/01/2015 06/01/2016 EACH OCCURRENCE $ 21000,00 A X OCCUR EICLAIMS MADE AGGREGATE $ 2,000,00 $ DEDUCTIBLE RETENTION $ '• $ WORKERS COMPENSATION WMZ-800-8006553-2015 06 02 2015 06 02 2016 X DIH- AND EMPLOYERS'LIABILITY `Y/N / / / / TORY LIMITS ER ANY C OFFICER/MEMBEER/PARTNER/EEXCLUDED?ECUTIVEF---I E.L.EACH ACCIDENT $ 1,000,000 (Mandatory In Has,If E.L.DISEASE-EA EMPLOYE $ 1,000,000 e SPEand describe Under CIAL PROVISIONS pelow E.L.DISEASE-POLICY LIMIT $ 1,000,000 OTHER DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS I CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,13UT FAILURE TO DO SO SHALL ' IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR •. REPRESENTATIVES. Evidence of Insurance AUTHORIZED REPRESENTATIVE Peter Sennott/LAR ACORD 25(2009/01) ©1.988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD .... : . :.: ... v :C OMMONWI,AI_TI-1 Of MASSAC1-111SE1'T,c,.. ISO . • - r�c�nl�� chi Sh . Ll MI .f'11L WOIlI<l ISSUCS "1111 IOlIOWIN(� l I'CCNSC,I �5 n 'Mns rra UNR(*.,Sl R I CTt 1) 1 E,, 1' HEATING F AC LR.I U R I L,I iIf 4 17 11fja._I NGTON S1 UR is u r: Mn 0182.6-39 3G' 1 .;X 0i�'/213/16 21h��39 19C�lA[11(�L°]1yl'Lt. 118'>m `_"Amw71�1TI)0.1�2)i>l l�' M�AS'S'1'CIIUSE;TT`S pICINSE poen 0135e `{;BO ENO 4d NUMBER f105-03-2011' NoNE _..S99655871 u4b.E%P 0p5 016 `�• ISCW9S�.'1?REST 15SE%QM 2. 198Q .. . 1` a "IDM NONE 2 ERIC RJ e 83 LONG DR DRACUT,MA 01826.2048 J + 5 DD 05-042011 Rw 07.15-2008 i r i .<..vq;::COMMONWF ILTH Ok` MA: S H E E >M. 1 A L`.':IO R K.: I _ ISSUES THE FOLLOW ING `!LtCEtlSE , AS A QUSIN>rSS E:QW:`A 'D T AYOTTE",:.. . 1" J"HEgTIN;>a IR CONDITIONING ;I. y ' 17 ARL j NGTdN STRRE„T r: .Y.:; 6'>, "` 01/1; :/:l:;G< 14 4 4 8 5 :. wrightsoftm Load Short Form Job: 66 Compass Point Date: May 06,2015 Entire House By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 MINIMUM=I llf - • • e Htg Clg Infiltration Outside db (°F) 14 82 Method Simplified Inside db (°F) 69 74 Construction quality Tight Design TD (°F) 55 8 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 43 50 Moisture difference (gr/Ib) 35 41 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Geo 1 d 2184 51632 19189 815 815 Geo 2 d 2184 23342 25057 1000 1000 geo reclaim d 384 3424 3292 369 369 Entire House d 4752 78398 47537 2184 2184 Other equip loads 0 0 Equip. @ 0.87 RSM 41358 Latent cooling 14477 TOTALS 4752 78398 55834 2184 2184 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ft' 2015-Nov-1614:26:08 wri htso Right-Suite®Universal 2015 15.0.12 RSU05790 Page 1 laCCiPI ...c\Desktop\wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Load Short Form Job: 66 Compass Point - - wrightsoft� Date: May 06,2015 Geo 1 By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 i. • • 0 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Htg Clg Infiltration Outside db (°F) 14 82 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 56 7 Fireplaces 0 Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 46 38 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 815 cfm Actual air flow 815 cfm Air flow factor 0.016 cfm/Btuh Air flow factor 0.042 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.84 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) CONDITIONED SPACE 1595 30259 12498 477 531 WOMEN 63 5013 1563 79 66 MEN 63 2820 879 44 37 HALL 174 7453 2350 118 100 UTILITY 143 6088 1898 96 81 CL 30 0 0 0 0 EL. MACH 12 0 0 0 0 STAIR 104 0 0 0 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. WCI IItSOft 2015-Nov-1614:26:08 Right-Suite®Universal 2015 15.0.12 RSU05790 Page 2 ACCK ..c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Geo 1 d 2184 51632 19189 815 815 Other equip loads 0 0 Equip. @ 0.87 RSM 16694 Latent cooling 3569 TOTALS 2184 51632 20263 815 815 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsOftm 2015-Nov-1614:26:08 1" g Right-Suite®Universal 2015 15.0.12 RSU05790 Page 3 ...c\Desktop\W rights oft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N wrightsofte Load Short Form Job: 66 Compass Point Date: May 06,2015 Geo 2 By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 � e • 0 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 ® - e e • Htg Clg Infiltration Outside db (°F) 14 82 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 56 7 Fireplaces 0 Daily range - L Inside humidity (%) 30 50 Moisture difference (gr/Ib) 24 38 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 100AFUE Efficiency 0 SEER Heating input 22590 Btuh Sensible cooling 0 Btuh Heating output 22590 Btuh Latent cooling 0 Btuh Temperature rise 21 °F P Total cooling 0 Btuh Actual air flow 1000 cfm Actual air flow 1000 cfm Air flow factor 0.043 cfm/Btuh Air flow factor 0.040 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load oad sensible heat ratio 0.71 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2ND FL STORAGE 481 6120 1833 262 73 OFFICEI 120 1619 1801 69 72 OFFICE2 120 1619 1801 69 72 CONFERENCE RM 208 474 4532 20 181 FILES 422 962 2461 41 98 R M 1 42 739 135 32 5 RM2 42 1165 729 50 29 R M3 42 739 135 32 5 RM4 36 1612 771 69 31 H ALL2 135 1193 591 51 24 STAIR2 104 1892 340 81 14 BATH RM 120 273 183 12 7 BREAK RM 192 2761 7250 118 289 LOBBY 120 2171 2497 93 100 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsOft 2015-Nov-16 14:26:08 A` 9 Right-Suite®Universal 2015 15.0.12 RSU05790 Page 4 +� ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Geo 2 d 2184 23342 25057 1000 1000 Other equip loads 0 0 Equip. @ 0.87 RSM 21800 Latent cooling 10283 TOTALS 2184 23342 32082 1000 1000 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft 2015-Nov-1614:26:08 �,.. 9 Right-Suite®Universal 2015 15.0.12 RSU05790 Page 5 RCCA ...c\Desktop\W rights oft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N wrightsoft`5 Load Short Form Job: 66 Compass Point Date: May 06,2015 geo reclaim By: J&J Heating and Air Conditioning 17 Arlingtion st, Dracut, MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 � - • • • Htg Clg Infiltration Outside db (°F) 14 82 Method Simplified Inside db (°F) 50 50 Construction quality Tight Design TD (°F) 36 32 Fireplaces 0 Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 18 76 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 369 cfm Actual air flow 369 cfm Air flow factor 0.108 cfm/Btuh Air flow factor 0.112 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) refrig 384 3424 3292 369 369 geo reclaim d 384 3424 3292 369 369 Other equip loads 63 0 Equip. @ 0.87 RSM 2864 Latent cooling 548 TOTALS 384 3487 3412 369 369 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015-Nov-1614:26:08wri htSof ° Right-SuiteUniversal 2015 15.0.12 RSU05790 Page 6 ACCI. ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N wri htsoft Load Multizone Summary Report Job: 66 Compass Point 9 Date: May 06,2015 By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 • Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM ft3 cfm Btuh/ft2 ft3 cfm Btuh/ft2 Geo 1 30576 0 . 16 81 2 .2 30576 0 . 07 37 0 . 1 Geo 2 21840 0 . 16 58 2 . 2 21840 0 . 07 27 0 . 1 geo reclaim 4608 0 . 07 5 1 . 4 4608 0 . 03 2 0 . 6 Entire House 57024 0 . 15 144 2 . 2 57024 0 . 07 67 0 . 1 ROOM NAME Area Htg load Clg load Htg AVF C1gAVF ft2 Btuh Btuh cfm Cfm CONDITIONED SPACE 1595 30259 12498 477 531 WOMEN 63 5013 1563 79 66 MEN 63 2820 879 44 37 HALL 174 7453 2350 118 100 UTILITY 143 6088 1898 96 81 CL 30 0 0 0 0 EL. MACH 12 0 0 0 0 STAIR 104 0 0 0 0 Geo 1 2184 51632 19189 815 815 2ND FL STORAGE 481 6120 1833 262 73 OFFICEI 120 1619 1801 69 72 OFFICE2 120 1619 1801 69 72 CONFERENCE RM 208 474 4532 20 181 FILES 422 962 2461 41 98 RM1 42 739 135 32 5 RM2 42 1165 729 50 29 RM3 42 739 135 32 5 RM4 36 1612 771 69 31 HALL2 135 1193 591 51 24 STAIR2 104 1892 340 81 14 BATH RM 120 273 183 12 7 BREAK RM 192 2761 7250 118 289 LOBBY 120 2171 2497 93 100 Geo 2 2184 23342 25057 1000 1000 refrig 384 3424 3292 369 369 geo reclaim 384 3424 3292 369 369 Entire House 4752 78398 47537 2184 2184 A wrl htsoftA 2015-Nov-1614:26:08 �� g Right-SuiteO Universal 2015 15.0.12 RSU05790 ..c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Page 1 Building Anal SIS Job: 66 Compass Point wrightsoft. y Date: May 06,2015 Entire House By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut, MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 69 74 Elevation: 131 ft Design TD (°F) 55 8 Latitude: 42°N Relative humsdlty (%) 43 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 35.2 40.7 Dry bulb (°F) 14 82 Infiltration: Dally range6°F) - 15 ( L ) Method Simplified Wet bulb (° - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Component Btuh/ft2 Btuh % of load Walls 9.2 32208 41.1 Glazing 26.3 2843 3.6 Doors 19.4 6252 8.0 Ceilings 1.5 3180 4.1 Floors 3.5 8958 11.4 Infiltration 2.2 8686 11.1 Ducts 16271 20.8 Piping 0 0 Humidification 0 0 Al Ventilation 0 0 Adjustments 0 Total 1 783981 100.0 • • e Component Btuh/ft2 Btuh % of load Walls 3.2 11057 23.3 Glazing 25.4 2742 5.8 �� Doors 11.2 3612 7.6 Ceilings 1.2 2527 5.3 Floors 0 0 0 Infiltration 0.1 576 1.2 I Ducts 12933 27.2 Ventilation 0 0 I Internal gains 14090 29.6 Blower 0 0 Adjustments 0 Total 47537 100.0 Latent Cooling Load = 14477 Btuh Overall U-value = 0.112 Btuh/ft2-°F WARNING: window to floor area ratio = 2.3% - less than 5%. 2015-Nov-16 14:26:08 wrightsoftm Right-Suite®Universal 2015 15.0.12 RSU05790 Page 1 ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N i Building Analysis Job: 66 Compass Point wrightsoft, y Date: May 06,2015 Geo 1 By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut, MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 ' � - e e • s Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 42°N Relative humidity (%) Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37..6 Dry bulb (°F) 14 82 Infiltration: Dally range4°F) - 15 ( L ) Method Simplified Wet bulb (° - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Component Btuh/ft2 Btuh % of load Walls 13.4 26746 51.8 Glazing 0 0 0 Doors 21.8 4848 9.4 Ceilings 0 0 0 Floors 4.0 8751 16.9 Infiltration 2.2 4946 9.6 Ducts 6342 12.3 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 51632 100.0 Component Btuh/ft2 Btuh % of load Walls 5.0 10030 52.3 Glazinq 0 0 0 Doors 8.2 1818 9.5 Ceilings 0 0 0 Floors 0 0 0 Infiltration 0.1 287 1.5 Ducts 4974 25.9 Ventilation 0 0 Internal gains 2080 10.8 Blower 0 0 Adjustments 0 ° Total 1 191891 100.0 Latent Cooling Load = 3569 Btuh Overall U-value = 0.164 Btuh/ft2-°F WARNING: window to floor area ratio = 0.0% - less than 5%. 2015-Nov-16 14:26:08 ACCP + wrightsoftm Right-Suite®Universal 2015 15.0.12 RSU05790 Page 2 ..c\Desktop\wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N • i Building Analysis Job: 66 Compass Point wrightsoft g y Date: May 06,2015 Geo 2 By: J&J Heating and Air Conditioning 17 Arlingtion st, Dracut,MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 MEN= malm • e • ! Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 3.8 37.6 Dry bulb (°F) 14 82 Infiltration: Dally range °F) - 15 ( L ) Method Simplified Wet bulb (°F� - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 ! —Component Btuh/ft2 Btuh % of load Walls 3.6 5358 23.0 Glazing 26.3 2843 12.2 Doors 0 0 0 Ceilings 1.5 3180 13.6 Floors 0 0 0 , Infiltration 2.2 3533 15.1 Ducts 8428 36.1 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 23342 100.0 —Component Btuh/ft2 Btuh % of load Walls 0.6 938 3.7 ° w Glazing 25.4 2742 10.9 Doors 0 0 0 Ceilings 1.2 2527 10.1 w. Floors 0 0 0 Infiltration 0.1 205 0.8 Ducts 6636 26.5 Ventilation 0 0 Internal gains 12010 47.9 Blower 0 0 Adjustments 0 P. Total 25057 100.0 Latent Cooling Load = 10283 Btuh Overall U-value= 0.054 Btuh/ft2-0F WARNING: window to floor area ratio= 4.9% - less than 5%. - - wrightsoft® g 2015-Nov-16 14:26:08 1 Right-Suite(k)Universal 2015 15.0.12 RSU05790 Page 3 /�� ...c\Desktop\wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Job: 66 wrightsoftm Building Analysis Date: May 06, ass Point 015 geo reclaim By: J&J Heating and Air Conditioning 17 Arlingtion st, Dracut, MA 01826 NOT ,h For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 50 50 Elevation: 131 ft Design TD (°F) 36 32 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 17.8 76.1 Dry bulb (°F) 14 82 Infiltration: Dally range °F) - 15 ( L ) Method Simplified Wet bulb (° - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 • Component Btuh/ft2 Btuh % of load Walls 2.4 105 3.0 Glazing 0 0 0 Doors 14.0 1404 40.3 Ceilings 0 0 0 Floors 0.5 207 5.9 ` Infiltration 1.4 207 5.9 Ducts 1501 43.0 Piping 0 0 Humidification 63 1.8 Ventilation 0 0 Adjustments 0 Total 1 34871 100.0 Component Btuh/ft2 Btuh % of load Walls 2.0 90 2.7 Glazing 0 0 0 Doors 17.9 1794 54.5 Ceilings 0 0 0 Floors 0 0 0 Infiltration 0.6 85 2.6 Ducts 1323 40.2 Ventilation 0 0 �. Internal gains 0 0 Blower 0 0 Ali Adjustments 0 Total 3292 100.0 - Latent Cooling Load = 548 Btuh Overall U-value = 0.090 Btuh/ft2-0F WARNING: window to floor area ratio = 0.0% - less than 5%. 2015-Nov-16 14:26:08 wrightsoft• Right-Suite®Universal 2015 15.0.12 RSU05790 Page 4 ..c\Desktop\wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 66 Compass Point - - wrightsoft� Date: May 06,2015 Entire House By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 I! - • e • e Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 69 74 Elevation: 131 ft Design TD (°F) 55 8 Latitude: 42°N Relative humidity (%) 43 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 35.2 40.7 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/112-°F ftz-°F/Btuh Btuh/ftz Btu Btuh/ftz Btu Walls 12A-Osw:Frm wall,wd ext,3/8"wood shth,2"x6"wood frm,16"o.c. n 602 0.240 0 13.4 8091 5.04 3034 stud a 803 0.240 0 13.4 10792 5.04 4047 S 501 0.240 0 13.4 6733 5.04 2525 w 84 0.240 0 13.4 1129 5.04 423 all 1990 0.240 0 13.4 26746 5.04 10030 12F-Osw:Frm wall,wd ext,r-21 cav ins,1/2"gypsum board int n 430 0.065 21.0 3.64 1565 0.64 274 fnsh,2"x6"wood frm,16"o.c.stud a 600 0.065 21.0 3.64 2184 0.64 382 s 382 0.065 21.0 3.64 1390 0.64 243 w 60 0.065 21.0 3.64 218 0.64 38 all 1472 0.065 21.0 3.64 5358 0.64 938 12F-6sm:Frm wall,mtl ext,r-30 cav ins,mtl int fnsh,r-10 ext bd s 44 0.066 27.0 2.38 105 2.04 90 ins,2"x4"metal frm, 16"o.c.stud,r-12 int bd ins Partitions (none) Windows 4A5-2ov:2 glazing,clr low-e outr,argon gas,insulated vinyl frm e 60 0.470 0 26.3 1579 32.4 1946 mat,clr innr, 1/2"gap, 1/4"thk;6.67 ft head ht s 48 0.470 0 26.3 1263 16.6 797 all 108 0.470 0 26.3 2843 25.4 2742 Doors 11 DO:Door,wd sc type a 121 0.390 0 21.8 2643 8.19 991 S 101 0.390 0 21.8 2206 8.19 827 s 100 0.390 0 14.0 1404 17.9 1794 all 322 0.390 0 19.4 6252 11.2 3612 Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins 2184 0.026 38.0 1.46 3180 1.16 2527 Floors 21 B-28t:Bg floor,light dry soil,full ext ins cov,6.5'depth,r-3 ins 384 0.015 3.0 0.54 207 0 0 22A-tpl:Bg floor,light dry soil,on grade depth 158 0.989 0 55.4 8751 0 0 2015-Nov-16 14:26:08 ,y wrightsoft' Right-SuiteOO Universal 2015 15.0.12 RSU05790 Page 1 ACCA ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N 2015-Nov-16 14:26:08 wrightsoft' Right-Suite®Universal 2015 15.0.12 RSU05790 Page 2 .CCA ...c\Desktop\Wrightsoft HVAC\115 forest st CJ M.rup Calc=MJ8 Front Door faces: N wri htsoft Component Constructions Job: 66 Compass Point Q Date: May 06,2015 Geo 1 By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut, MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ft2-°FBtuh Btuh/ftz Btu Btuh/ft2 Btu Walls 12A-Osw:Frm wall,wd ext,3/8"wood shth,2"x6"wood frm,16"o.c. n 602 0.240 0 13.4 8091 5.04 3034 stud a 803 0.240 0 13.4 10792 5.04 4047 S 501 0.240 0 13.4 6733 5.04 2525 w 84 0.240 0 13.4 1129 5.04 423 all 1990 0.240 0 13.4 26746 5.04 10030 Partitions (none) Windows (none) Doors 11 DO:Door,wd sc type a 121 0.390 0 21.8 2643 8.19 991 S 101 0.390 0 21.8 2206 8.19 827 all 222 0.390 0 21.8 4848 8.19 1818 Ceilings (none) Floors 22A-tpl:Bg floor,light dry soil,on grade depth 158 0.989 0 55.4 8751 0 0 2015-Nov-16 14:26:08 wrightsoft" Right-Suite®Universal 2015 15.0.12 RSU05790 Page 3 ACCK ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N I Wrl htsoft Component Constructions Job: 66 Compass Point 9 Date: May 06,2015 Geo 2 By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ft2-°F ft2-°FBtuh BtuhM Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,wd ext,r-21 cav ins,1/2"gypsum board int n 430 0.065 21.0 3.64 1565 0.64 274 fnsh,2"x6"wood frm,16"o.c.stud a 600 0.065 21.0 3.64 2184 0.64 382 s 382 0.065 21.0 3.64 1390 0.64 243 w 60 0.065 21.0 3.64 218 0.64 38 all 1472 0.065 21.0 3.64 5358 0.64 938 Partitions (none) Windows 4A5-2ov:2 glazing,cir low-e outr,argon gas,insulated vinyl frm a 60 0.470 0 26.3 1579 32.4 1946 mat,cir innr, 1/2"gap, 1/4"thk;6.67 ft head ht s 48 0.470 0 26.3 1263 16.6 797 all 108 0.470 0 26.3 2843 25.4 2742 Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins 2184 0.026 38.0 1.46 3180 1.16 2527 Floors (none) 2015-Nov-16 14:26:08 rF wrightsoft' Right-Suite®Universal 2015 15.0.12 RSU05790 Page 4 ACCP. ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 66 Compass Point Q Date: May 06,2015 geo reclaim By: J&J Heating and Air Conditioning 17 Arlingtion st, Dracut, MA 01826 i For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 gg • e • e Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 50 50 Elevation: 131 ft Design TD (°F) 36 32 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 17.8 76.1 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area 1.1-value Insul R Htg HTM Loss Cig HTM Gain ft� Btuh/ft2-°F ft2-°FBtuh BtuhM Btu Btuh/ftp Btu Walls 12F-6sm:Frm wall,mtl ext,r-30 cav ins,mtl int fnsh,r-10 ext bd s 44 0.066 27.0 2.38 105 2.04 90 ins,2"x4"metal frm,16"o.c.stud,r-12 int bd ins Partitions (none) Windows (none) Doors 11 D0:Door,wd sc type s 100 0.390 0 14.0 1404 17.9 1794 Ceilings (none) Floors 21 13-28t:Bg floor,light dry soil,full ext ins cov,6.5'depth,r-3 ins 384 0.015 3.0 0.54 207 0 0 2015-Nov-16 14:26:08 wrightsoft' Right-Suited Universal 2015 15.0.12 RSU05790 Page 5 ACCK ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJS Front Door faces: N +wrightsoft- Component Constructions Job: 66 Compass Point Date: May 06,2015 CONDITIONED SPACE By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 � � o e • o Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain W Btuh/ftl-°F ft�-°F/Btuh Btuh/ft2 Btu Btu hA2 Btu Wal I s 12A-Osw:Frm wall,wd ext,3/8"wood shth,2"x6"wood frm,16"o.c. n 518 0.240 0 13.4 6962 5.04 2611 stud a 369 0.240 0 13.4 4959 5.04 1860 s 88 0.240 0 13.4 1183 5.04 444 all 975 0.240 0 13.4 13104 5.04 4914 Partitions (none) Windows (none) Doors 11 DO:Door,wd sc type a 121 0.390 0 21.8 2643 8.19 991 S 80 0.390 0 21.8 1747 8.19 655 all 201 0.390 0 21.8 4390 8.19 1646 Ceilings (none) Floors 22A-tpl:Bg floor,light dry soil,on grade depth 84 0.989 0 55.4 4652 0 0 wrightsoft Right-Suite® 2015-Nov-16 14:26:08 Universal 2015 15.0.12 RSU05790 Page 6 ACCK ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 66 Compass Point - ' WrightSOftn WOMEN Bate: May 06,2015 By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut, MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma.O1876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Wal I s 12A-Osw:Frm wall,wd ext,3/8"wood shth,2"x6"wood frm,16"o.c. a 98 0.240 0 13.4 1317 5.04 494 stud S 126 0.240 0 13.4 1693 5.04 635 all 224 0.240 0 13.4 3011 5.04 1129 Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 22A-tpl:Bg floor,light dry soil,on grade depth 16 0.989 0 55.4 886 0 0 II 2015-Nov-16 14:26:08 wrightsoft°' Right-Suite®Universal 2015 15.0.12 RSU05790 Page 7 ACC-K ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 66 Compass Point - w1'ightS4ft p Bate: May 06,2015 MEN By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut, MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-°F ftp-°F/Btuh Btuh/ft2 Btu Btuh/112 Btu Walls 12A-Osw:Frm wall,wd ext,3/8"wood shth,2"x6"wood frm,16"o.c. s 126 0.240 0 13.4 1693 5.04 635 stud Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 22A-tpl:Bg floor,light dry soil,on grade depth 9 0.989 0 55.4 498 0 0 t wri htsoft 2015-Nov-1614:26:08 �.�, 9 Flight-Suite(g)Universal 2015 15.0.12 RSU05790 Page 8 ACCK ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 66 Compass Point wrightsoft Date: May 06,2015 HALL By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut, MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ft2-°F ftz-°F/Btuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 12A-Osw:Frm wall,wd ext,3/8"wood shth,2"x6"wood frm,16"o.c. n 84 0.240 0 13.4 1129 5.04 423 stud e 70 0.240 0 13.4 941 5.04 353 s 77 0.240 0 13.4 1035 5.04 388 all 231 0.240 0 13.4 3105 5.04 1164 Partitions (none) Windows (none) Doors 11 DO:Door,wd sc type s 21 0.390 0 21.8 459 8.19 172 Ceilings (none) Floors 22A-tpl:Bg floor,light dry soil,on grade depth 18 0.989 0 55.4 997 0 0 2015-Nov-16 14:26:08 wrightsoft" Right-Suite(R)Universal 2015 15.0.12 RSU05790 Page 9 ACCP. ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 66 Compass Point - - wrightsoft� UTILITY Date: May 06,2015 By: J&J Heating and Air Conditioning 17 Arlingtion st, Dracut, MA 01826 5 1111 11 IN 0 • e For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 11! • e • • Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ftz-°F/Btuh Btuh/ft' Btu Btu h/ft2 Btu Walls 12A-Osw: Firm wall,wd ext,3/8"wood shth,2"x6"wood frm,16"o.c. a 182 0.240 0 13.4 2446 5.04 917 stud Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 22A-tpl:Bg floor,light dry soil,on grade depth 13 0.989 0 55.4 720 0 0 WrhtSOfRight-Suite®Universal 2015 15.0.12 RSU05790 2015-Nov-1614:26:08 Page 10 ACCA ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N wrightsoft- Component Constructions Job: 66 Compass Point /+ Date: May 06,2015 `i L By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut, MA 01826 � e • e For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 ® - o e • emom Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ftp-°F ft2-°F/Btuh Btuh/112 Btu Btu h/ft2 Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors (none) 2015-Nov-16 14:26:08 19� wrightsoft" Right-SuiteOO Universal 2015 15.0.12 RSU05790 Page 11 ACCP. ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N wri htsoft Component Constructions Job: 66 Compass Point 9 Date: May 06,2015 EL. MACH By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 � 0 • e For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 ® - e e • e Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ft2-°F ft2-°FBtuh Btuh/ft2 Btu Btuh/ftp Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors (none) 2015-Nov-16 14:26:08 1Q;-- rF wrightsoft" Right-SuiteOO Universal 2015 15.0.12 RSU05790 Page 12 ACOA ...c\Desktop\W rights oft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 66 Compass Point - ' wrightsaft` STAIR Date: May 06,2015 By: J&J Heating and Air Conditioning 17 Arlingtion st, Dracut,MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 ® - o e • o Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.0 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss CIg HTM Gain W BtuhM-°F W-T/Btuh Btuh/ftz Btu Btuh/112 Btu Walls 12A-Osw:Frm wall,wd ext,3/8"wood shth,2"x6"wood frm, 16"o.c. a 84 0.240 0 13.4 1129 5.04 423 stud s 84 0.240 0 13.4 1129 5.04 423 w 84 0.240 0 13.4 1129 5.04 423 all 252 0.240 0 13.4 3387 5.04 1270 Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 22A-tpl:Bg floor,light dry soil,on grade depth 18 0.989 0 55.4 997 0 0 2015-Nov-16 14:26:08 )9M„t wrightsoft* Right-Suite®Universal 2015 15.0.12 RSU05790 Page 13 ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Co -+ - wrightsoft- Component Constructions Date: 66 ompass Point ,2015 2ND FL STORAGE By: J&J Heating and Air Conditioning 17 Arlingtion st, Dracut,MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 0 - • e s e Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 42°N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain fti, Btuh/ft2-°F ftz-°F/Btuh Btu hA2 Btu Btuh/ftz Btu Walls 12F-Osw:Frm wall,wd ext,r-21 cav ins,1/2"gypsum board int n 370 0.065 21.0 3.64 1347 0.64 236 fnsh,2"x6"wood frm,16"o.c.stud a 118 0.065 21.0 3.64 430 0.64 75 all 488 0.065 21.0 3.64 1776 0.64 311 Partitions (none) Windows 4A5-2ov:2 glazing,clr low-e outr,argon gas,insulated vinyl frm a 12 0.470 0 26.3 316 32.4 389 mat,clr innr, 1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings 166-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins 481 0.026 38.0 1.46 700 1.16 557 Floors (none) 2015-Nov-16 14:26:08 wrightsoft" Right-Suite®Universal 2015 15.0.12 RSU05790 Page 14 ACCP. ...c\Desktop\wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Wrl htsoft Component Constructions Job: 66 Compass Point 9 Date: May 06,2015 OFFICEI By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut, MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 - e e • e Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design.TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,wd ext,r-21 cav ins,1/2"gypsum board int a 88 0.065 21.0 3.64 320 0.64 56 fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 4A5-2ov:2 glazing,clr low-e outr,argon gas,insulated vinyl frm a 12 0.470 0 26.3 316 32.4 389 mat,clr innr, 1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins 120 0.026 38.0 1.46 175 1.16 139 Floors (none) 2015-Nov-16 14:26:08 .- rF wrightsofta Right-Suite®Universal 2015 15.0.12 RSU05790 Page 15 ACOA ...c\Desktop\wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 66 Compass Point 9 OFFICE2 Byte: May 06,2015 J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 @ ' • e e eSEMI Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 _ Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ftz°F/Btuh Btuh/ft2 Btu Btuh/ftp Btu Walls 12F-Osw:Frm wall,wd ext,r-21 cav ins,1/2"gypsum board int a 88 0.065 21.0 3.64 320 0.64 56 fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 4A5-2ov:2 glazing,clr low-e outr,argon gas,insulated vinyl frm e 12 0.470 0 26.3 316 32.4 389 mat,clr innr, 1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins 120 0.026 38.0 1.46 175 1.16 139 Floors (none) 2015-Nov-16 14:26:08 wrightsoft" Right-Suite(g)Universal 2015 15.0.12 RSU05790 Page 16 ACCP. ...c\Desktop\wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N - - wrightsoft- Component Constructions Job: 66 Compass Point Date: May 06,2015 CONFERENCE RM By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 • • • I For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 i Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb ( F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins 208 0.026 38.0 1.46 303 1.16 241 Floors (none) 2015-Nov-16 14:26:08 , wrightsoft" Right-SuiteOO Universal 2015 15.0.12 RSU05790 Page 17 RCCA ...c\Desktop\wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N i wri htsoft- Component Constructions Job: 66 Compass Point 9 FILES Date: May 06,2015 J&J Heating and Air Conditioning 17 Arlingtion st, Dracut, MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 R - o e • o Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftp-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft' Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins 422 0.026 38.0 1.46 614 1.16 488 Floors (none) 2015-Nov-16 14:26:08 wrightsoft° Right-Suite®Universal 2015 15.0.12 RSUC5790 Page 18 RCCA ...c\Desktop\wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N wrl htsoft- Component Constructions Job: 66 Compass Point 9 RM1 Byte: May 06,2015 J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 MINES=I 11M 1,11M Elltlf - • e • e Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ft2-°F ftp-TBtuh Btuh/ftp Btuh Btuh/ftz Btu Walls 12F-Osw:Frm wall,wd ext,r-21 cav ins,1/2"gypsum board int a 70 0.065 21.0 3.64 255 0.64 45 fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins 42 0.026 38.0 1.46 61 1.16 49 Floors (none) 2015-Nov-16 14:26:08 rF wrightsoft' Right-SuiteOO Universal 2015 15.0.12 RSU05790 Page 19 ACCK ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 66 Compass Point - wrightSOft` P Bate:May 06,2015 RM2 By: J&J Heating and Air Conditioning 17 Arlingtion st, Dracut,MA01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftl-°F W-T/Btuh Btu h/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,wd ext,r-21 cav ins,1/2"gypsum board int a 58 0.065 21.0 3.64 211 0.64 37 fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 4A5-2ov:2 glazing,clr low-e outr,argon gas,insulated vinyl frm e 12 0.470 0 26.3 316 32.4 389 mat,clr innr, 1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins 42 0.026 38.0 1.46 61 1.16 49 Floors (none) 2015-Nov-16 14:26:08 „1 - - wrightsoft" Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 20 ACCK ...c\Desktop\wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 66 Compass Point wrightsoft Date: May 06,2015 RM3 By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 MENEMEEM ! • • For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (OF) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area Ll-value Insul R Htg HTM Loss CIg HTM Gain ft2 Btuh/ft'-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft' Btuh Walls 12F-Osw: Frm wall,wd ext,r-21 cav ins,1/2"gypsum board int e 70 0.065 21.0 3.64 255 0.64 45 fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins 42 0.026 38.0 1.46 61 1.16 49 Floors (none) 2015-Nov-16 14:26:08 wrightsoft% Right-SuiteOR Universal 2015 15.0.12 RSU05790 Page 21 ACCK ...c\Desktop\wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N i Wri htsoft Component Constructions Job: 66 Compass Point 9 RM4 Date: May 06,2015 J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 i For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss CIg HTM Gain ft2 Btuh/ftl-°F ftz-°F/Btuh Btuh/ftz Btu BtuhtV Btu Walls 12F-Osw: Frm wall,wd ext,r-21 cav ins,1/2"gypsum board int a 48 0.065 21.0 3.64 175 0.64 31 fnsh,2"x6"wood frm,16"o.c.stud s 60 0.065 21.0 3.64 218 0.64 38 all 108 0.065 21.0 3.64 393 0.64 69 Partitions (none) Windows 4A5-2ov:2 glazing,clr low-e outr,argon gas,insulated vin frm a 12 0.470 0 26.3 316 2.4 YI 3 389 mat,clr innr, 1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins 36 0.026 38.0 1.46 52 1.16 42 Floors (none) 2015-Nov-16 14:26:08 wrightsoft' Right-Suite®Universal 2015 15.0.12 RSU05790 Page 22 ACCK ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 66 Compass Point 9 HALL2 Date: May 06,2015 By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 BOOM IN MIMI Will 111 PH e • e For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 MEMESSIM ® - e e • e Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-"F ft2-°FBtuh Btuh/112 Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall,wd ext,r-21 cav ins,1/2"gypsum board int s 38 0.065 21.0 3.64 138 0.64 24 fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 4A5-2ov:2 glazing,clr low-e outr,argon gas,insulated vinyl frm s 12 0.470 0 26.3 316 16.6 199 mat,clr innr, 1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins 135 0.026 38.0 1.46 197 1.16 156 Floors (none) AJL 2015-Nov-16 14:26:08 wrightsoft' Right-Suite®Universal 2015 15.0.12 RSU05790 Page 23 ACCP. ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MA Front Door faces: N wrigrttsoft- Component Constructions Job: 66 Compass Point STAIR2 Bate: May 06,2015 By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut, MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 MENEM;11111 W - • • • • Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (°F) 14 82 Infiltration: Dally range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/V Btu Btuh/ft2 Btu Walls 12F-Osw:Frm wall,wd ext,r-21 cav ins,1/2"gypsum board int a 60 0.065 21.0 3.64 218 0.64 38 fnsh,2"x6"wood frm,16"o.c.stud s 60 0.065 21.0 3.64 218 0.64 38 w 60 0.065 21.0 3.64 218 0.64 38 all 180 0.065 21.0 3.64 655 0.64 115 Partitions (none) Windows (none) Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins 104 0.026 38.0 1.46 151 1.16 120 Floors (none) 2015-Nov-16 14:26:08 wrightsoft" Right-SuiteOO Universal 2015 15.0.12 RSU05790 Page 24 ACCA ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 66 Compass Point 9 BATH RM Byte: May 06,2015 J&J Heating and Air Conditioning 17 Arlingtion st,Dracut, MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 D - o e • e Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (OF) 14 82 Infiltration: Daily range (°F) - 15 ( L. ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area LI-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/i ft2-°F/Btuh Btuh/ft' Btu Btuh/ft' Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings 1613-38ad:Attic ceiling,asphalt shingles roof mat,r-38 cell ins 120 0.026 38.0 1.46 175 1.16 139 Floors (none) wrightso2015-Nov-16 14:26:08 ft� Right-Suite(R)Universal 2015 15.0.12 RSU05790 Page 25 ACCK ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 66 Compass Point 9 BREAK RM Byte: May 06,2015 J&J Heating and Air Conditioning 17 Arlingtion st,Dracut, MA 01826 � e e • For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (OF) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ftz-°F/Btuh Btuh/112 Btu Btuh/112 Btu Walls 12F-Osw: Frm wall,wd ext,r-21 cav ins,1/2"gypsum board int s 136 0.065 21.0 3.64 495 0.64 87 fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 4A5-2ov:2 glazing,clr low-e outr,argon gas,insulated vinyl frm s 24 0.470 0 26.3 632 16.6 398 mat,clr innr, 1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 cell ins 192 0.026 38.0 1.46 280 1.16 222 Floors (none) 2015-Nov-16 14:26:08 wrightsoft' Flight-Suite(g)Universal 2015 15.0.12 RSU05790 Page 26 ACCP. ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N i wri htsoft- Component Constructions Job: 66 Compass Point 9 LOBBY Date: May 06,2015 J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 0111 0 • p For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 !A - • o • e Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 70 75 Elevation: 131 ft . Design TD (°F) 56 7 Latitude: 420N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 23.8 37.6 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area LI-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-'F ftl-'F/Btuh Btuh/ftz Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall,wd ext,r-21 cav ins,1/2"gypsum board int n 60 0.065 21.0 3.64 218 0.64 38 fnsh,2"W'wood frm,16"o.c.stud s 88 0.065 21.0 3.64 320 0.64 56 all 148 0.065 21.0 3.64 539 0.64 94 Partitions (none) Windows 4A5-2ov:2 glazing,clr low-e outr,argon gas,insulated vinyl frm s 12 0.470 0 26.3 316 16.6 199 mat,clr innr, 1/2"gap, 1/4"thk;6.67 ft head ht Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 ceil ins 120 0.026 . 38.0 1.46 175 1.16 139 Floors (none) 2015-Nov-16 14:26:08 wrightsoft" Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 27 ACCP, ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MA Front Door faces: N Component Constructions Job: 66 Compass Point wrightsOft� Date: May 06,2015 reffig By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut, MA 01826 1�71 IN 0 • 0 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Location: Indoor: Heating Cooling East Falmouth, Otis Angb, MA, US Indoor temperature (°F) 50 50 Elevation: 131 ft Design TD (°F) 36 32 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 17.8 76.1 Dry bulb (°F) 14 82 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area LI-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ftz-°FBtuh Btuh/ftp Btu Btuh/112 Btu Walls 12F-6sm: Frm wall,mtl ext,r-30 cav ins,mtl int fnsh,r-10 ext bd s 44 0.066 27.0 2.38 105 2.04 90 ins,2"x4"metal frm,16"o.c.stud,r-12 int bd ins Partitions (none) Windows (none) Doors 11 D0:Door,wd s type s 100 0.390 0 14.0 1404 17.9 1794 Ceilings (none) Floors 21B-28t:Bg floor,light dry soil,full ext ins cov,6.5'depth,r-3 ins 384 0.015 3.0 0.54 207 0 0 2015-Nov-16 14:26:08 wrightsoft• Right-Suite®Universal 2015 15.0.12 RSU05790 Page 28 ACCK ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Job: 66 Compass Point - - wrightsoft® Project Summary Date: May 06,2015 Entire House By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 i Notes: 1# - o • e Weather: East Falmouth, Otis Angb, MA, US Winter Design Conditions Summer Design Conditions Outside db 14 OF Outside db 82 OF Inside db 69 OF Inside db 74 OF Design TD 55 OF Design TD 8 OF Daily range L Relative humidity 50 % Moisture difference 41 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 62127 Btuh Structure 34604 Btuh Ducts 16271 Btuh Ducts 12933 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 78398 Btuh Use manufacturer's data n Rate/swing multiplier 0.87 Infiltration Equipment sensible load 41358 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 11634 Btuh Ducts 2843 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 4752 4752 Equipment latent load 14477 Btuh Volume (ft3) 57024 57024 Air changes/hour 0.15 0.07 Equipment total load 55834 Btuh Equiv.AVF (cfm) 144 67 Req. total capacity at 0.70 SHR 4.9 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015-Nov-16 14:26:08 wrightsoft'" Right-Suite®Universal 2015 15.0.12 RSU05790 Page 1 ACC` ...c\Desktop\wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Pro ect Summar Job: 66CompassPoint - - wrightsoft Y Date: May 06,2015 Geo 1 By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut, MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Notes: ® - • MITe e Weather: East Falmouth, Otis Angb, MA, US Winter Design Conditions Summer Design Conditions Outside db 14 OF Outside db 82 OF Inside db 70 OF Inside db 75 OF Design TD 56 OF Design TD 7 OF Daily range L Relative humidity 50 % Moisture difference 38 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 45291 Btuh Structure 14214 Btuh Ducts 6342 Btuh Ducts 4974 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 51632 Btuh Use manufacturer's data n Rate/swing multiplier 0.87 Infiltration Equipment sensible load 16694 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 0 Structure 2552 Btuh Ducts 1017 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 2184 2184 Equipment latent load 3569 Btuh Volume (ft3) 30576 30576 Air changes/hour 0.16 0.07 Equipment total load 20263 Btuh Equiv.AVF (cfm) 81 37 Req. total capacity at 0.70 SHR 2.0 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 815 cfm Actual air flow 815 cfm Air flow factor 0.016 cfm/Btuh Air flow factor 0.042 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.84 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015-Nov-16 14:26:08 wrightsoft'p Right-Suite®Universal 2015 15.0.12 RSU05790 Page 2 ACCA ...c\Desktop\W rights oft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Project Summar Job: 66 Compass Point - - wrightsoft° Y Date: May 06,2015 Geo 2 By: J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA01826 ! ! oil For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Notes: Weather: East Falmouth, Otis Angb, MA, US Winter Design Conditions Summer Design Conditions Outside db 14 OF Outside db 82 OF Inside db 70 OF Inside db 75 OF Design TD 56 OF Design TD 7 OF Daily range L Relative humidity 50 % Moisture difference 38 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 14913 Btuh Structure 18421 Btuh Ducts 8428 Btuh Ducts 6636 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 23342 Btuh Use manufacturer's data n Rate/swing multiplier 0.87 Infiltration Equipment sensible load 21800 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 0 Structure 8880 Btuh Ducts 1403 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 2184 2184 Equipment latent load 10283 Btuh Volume (ft3) 21840 21840 Air changes/hour 0.16 0.07 Equipment total load 32082 Btuh Equiv.AVF (cfm) 58 27 Req. total capacity at 0.70 SHR 2.6 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 100AFUE Efficiency 0 SEER Heating input 22590 Btuh Sensible cooling 0 Btuh Heating output 22590 Btuh Latent cooling 0 Btuh Temperature rise 21 OF Total cooling 0 Btuh Actual air flow 1000 cfm Actual air flow 1000 cfm Air flow factor 0.043 cfm/Btuh Air flow factor 0.040 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.71 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015-Nov-16 14:26:08 wrightsoft'A Right-Suite®Universal 2015 15.0.12 RSU05790 Page 3 �� ...c\Desktop\Wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N wri htsoft, Project Summary Job: 66 Compass Point ' 9 geo reclaim Byte: May 06,2015 J&J Heating and Air Conditioning 17 Arlingtion st,Dracut,MA 01826 For: Trust Construction 51 Moun Joy Drive, Tewksbury, ma 01876 Notes: ® - • e e Weather: East Falmouth, Otis Angb, MA, US Winter Design Conditions Summer Design Conditions Outside db 14 °F Outside db 82 °F Inside db 50 °F Inside db 50 °F Design TD 36 °F Design TD 32 °F Daily range L Relative humidity 50 % Moisture difference 76 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 1923 Btuh Structure 1969 Btuh Ducts 1501 Btuh Ducts 1323 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 63 Btuh Blower 0 Btuh Pi in Btuh Equipment load 34807 Btuh Use manufacturer's data n Rate/swing multiplier 0.87 Infiltration Equipment sensible load 2864 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 0 Structure 125 Btuh Ducts 423 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 384 384 Equipment latent load 548 Btuh Volume (ft3) 4608 4608 Air changes/hour 0.07 0.03 Equipment total load 3412 Btuh Equiv.AVF (cfm) 5 2 Req. total capacity at 0.70 SHR 0.3 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 369 cfm Actual air flow 369 cfm Air flow factor 0.108 cfm/Btuh Air flow factor 0.112 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 12015-Nov-1614:26:08 Wrl htsoft Right-Suite®Universal 2015 15.0.12 RSU05790 Page 4 ...c\Desktop\wrightsoft HVAC\115 forest st CJM.rup Calc=MJ8 Front Door faces: N Commonwealth of Massachusetts Sheet Metal Permit c Date: , Permit# � �a � Estimated Job Cost: $ (7 no, (Z.0 Permit Fee: $ Plans Submitted: YES NO Plans Reviewed: YES NO Business License 11 196 Applicant License# Business information: Property Owner/Job ocation Information: Name: J&J Beating & Air Conditioning Name: Inis c/G/_-f Vj Street: 17 Arlington St.:. Street: to (_a City/Town: Dracut, MA 01826 City/Town. North Andover, rtA 01845 Telephone: 978-454-8197 Telephone: 3 -- Photo I.D. required/ Copy of Photo I.D. attached: YES NO Stnfflnitinl J-1 /M-1-unrestricted license " J-2 /M-2-restricted to dwellings 3-stories or less and conunercial up to 10,000 sq. ft. /2-stories or less Resideutialc'TT2-fdhiily y'IvTulti-family Condo/Towiihouses Other Commercial: Office Retail Industrial _ Educational Institutional Other Square h'ootage: under 10,000 sq. ft. ✓ over 10,000 sq. ft. Number of Stories: Sheet metal work to be completed: New Work: ►� Renovation: HVAC ✓ Metal Watershed Roofing Kitchen Exhaust System Metal Chimney /Vents Air Balancing Provide detailed description of work to be done: ` /�� g install /ti1�7a / duv�worl� -FefsysT�,,, e � FERAGEE COVERAGE: ent liability insurance policy or its equivalent which meets the requirements of M.G.L.Ch. 112 Yese No❑ checked Yes, indicattee,the type of coverage by checking the appropriate box below: nsurance policy L�' Other type of indemnity ❑ Bond ❑NSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter112 of the etts General Laws,and that my gignature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this boxEl,I hereby certify that all of the details and Information I have submitted(or entered)regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and Installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO Proaress Inspections Date Comments Final Inspection Date Comments TTypeLicense: By ter Title ter-Restricted City/Town ❑Journeyperson Signature of Licensee Permit It ❑Journeyperson-Restricted License Number: 1.510 Fee$ ❑ Check at www.mass.govldpl Inspector Signature of Permit Approval The Conznio%zwealih of Massach usetts -" u2pa%'tirieiii Of ii liiiSti'ittiACC%!le%9tJ' ----__..- 1 Congress Street, Suite 100 ----- -- -�`_ _ ......------- - _- -..............Boston, MA 02114-2017 www.nzass.govlllllt -- - . Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO 131;FILED WITH THE PCRNIITT[NC AUTHORITY. Applicant Information Please Print Legibly Name (Business/Organization/Individual): J & J Heating & Air Conditioning, Inc. Address:_17 .Arlington Street City/State/Zip: Dracut, MA. 01826 Phone#: 978-454-8197 Are you an employer?Check the appropriate box: 1.[31 am a employer with 40 employees(full and/orpart-time).* Type of project(required): 2.[:]1 am a sole proprietor or partnership and have no employees working forme in 7. []New construction any capacity.[No workers'comp.insurance required.] 8• E] Remodeling 3.01 am a homeowner doing all work myself.[No workers'comp.insurance required.] 9• ❑Demolition 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property, t will 10[] Building addition ensure that all contractors either have workers'compensation insurance or are sole proprietors with no employees. II.[]Electrical repairs or additions 5.❑1 am a general contractor and I have hired the sub-contractors listed on the attached sheet. 12.❑Plumbing repairs or additions These sub-contractors have employees and have workers'comp.insurance.; 13.❑Roof repairs 6.O We are a corporation and its officers have exercised their right of exemption per MGL c. 14.❑Other 152,§1(4),and we have no employees.[No workers'comp.insurance required.] +Any applicant that checks box NI must also fill out the section belotvshowing their workers'compensation policy information. Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a nety affidavit indicating such. -Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp,policy number. l am air employer that is providing rvorlrers'conrperrsation irrsrrrairce for nrh employees. Below is the policy and job site information. Insurance Company Name: A.I.M. Mutual Insurance Policy#or Self-ins. Lic. #: WMZ-8006553-201506/02/16 Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage.as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to$1,500.00 and/orone- r 'vi'mprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of tip to$250.00 a day ag ' st the olator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance cover ge verifi tion. I d hereby r• ' ruder a pains al /rhies of perjury that the information provided above is true and correct. Si nat e: Date: Pilo e#: 978-454-8197 Official use only. Do notwrite hr this area,to be completedby city or town official. City or Town: Permit/License# issuing Authority(circle one): 1. Board of Health 2. Building Department 3. City/Town Cleric 4. Electrical Inspector S. Plumbing Inspector 6. Other Contact Person: Phone#: ACORD,. CERTIFICATE OF LIABILITY INSURANCE FDATE(MM/DD/YYYY) 05/27/2015 PRODUCER 978,887,4900 FAX 978.887.2404 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Edward F. Sennott Insurance Agency, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 16 South Main Street HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR P. 0. Box 457 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Topsfiel d, MA 01983 INSURERS AFFORDING COVERAGE NAIC# INSURED JW Heating & Air Conditioning, Inc. INSURERA: Great American Alliance Ins Co 17 Arlington Street INSURERB: Safety Insurance Company 39454 Dracut, MA 01826 INSURERC: A.I.M. Mutual Insurance Co INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR DD' POLICY EFFECTIVE POLICY EXPIRATION LTR IINSR TYPE OF INSURANCE POLICY NUMBER DATE MM DD DATE (MM/DD 0MITS: GENERAL LIABILITY PAC6418906-09 06/01/2015 06/01/2016 EACH OCCURRENCE . $ 1,000,00( X COMMERCIAL GENERAL LIABILITY -DANIPREMISES Ea oc urrehce' $ 300,00( CLAIMS MADE a OCCUR MED EXP(Any one person) $ 10,OO A PERSONAL&ADV INJURY $ 1,000,00( GENERAL AGGREGATE $ ; 2,000,00( GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS•COMP/OP AGG $ 2,000,OO POLICY PRO LOC JECT AUTOMOBILE LIABILITY 2434550 06/01/2015 06/01/2016 COMBINED SINGLE LIMIT ANY AUTO (Ea accident) $ 1,000,000 ALL OWNED AUTOS BODILY INJURY B X SCHEDULED AUTOS (Per person) $ X HIRED AUTOS BODILY INJURY X NON-OWNED AUTOS (Per accident) $ PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY UMB6418958-08 06/01/2015 06/01/2016 EACH OCCURRENCE $ 2,000,00 X OCCUR EICLAIMS MADE AGGREGATE $ 2,000,00 A $ DEDUCTIBLE RETENTION $ ' $ WORKERS COMPENSATION WMZ-800-8006553-2015 06/02/2015 06/02/2016 X I TORY LIMITS ER AND EMPLOYERS'LIABILITY C OFFICER/MEMBEERANY /EXCLUDED?ECUTIVF{Y� E.L.EACH ACCIDENT $ 1,000,000 (Mandatory In NH) E.L.DISEASE-EA EMPLOYE $ 1 000,000 If yes,describe under SPECIAL PROVISIONS below E.L.DISEASE-POLICY LIMIT $ 1,0 0OO OTHER DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR REPRESENTATIVES. Evidence of Insurance AUTHORIZED REPRESENTATIVE Peter Sennott/LAR '-�?- ACORD 25(2009/01) ©1.988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD c0v <:C OMMONWimAurvi OFvM^ASSACHl1SE.T :.ill, P7 i A.A.,4J . BOARD OF SilEf.`Y MI_ (;IIL WOf;J<Ef2S ;: I SSUES 1.11! F OLLOWI N;G I I CCNSC, .;MAST[f2—UNFt.I;.Sl R.I GT(1) ` IIEAI I N G b AC Oil R ,I(I ;IIlr I 11 r J I-1 r-AT I N G `c Ac , 17 1112L;;INGTON 5-1 MA 0182.G-39�6 1 �AN'SACHLT/S'E,TT`S; DRIVER'S M L�� LICENSE 0 ISS N -pe END 4d NUMBER @05-03-201 :NONE,.-$996 .87 L4b.EXP 3::DOB i 50p5272016 05 22'A980:: :- 3 CLASS 12 REST 15-SEX-M 1f}+Igf4 d9 " DM NONE 7T( q KLINE' k r 2 ERIC RJ „WDx�i•Igpp,! a r, 8 83 LONG DR DRACUT,MA 01826.2048 5 DD 05-04-2011 R.v 07.162000 f OMMONW�ALTH OF MA x: S H E c '':. 1. T.!A L 110:FZ:K R, ":�•;.f' ISSUES. THE FOLLOWING"LICENSE ; - `<<:':;<:> •:;A S A D U S:I:.N:Iw S S rs mow., �. ,.EQWWARD T AYOTT�.'` UO<> t J;. J;. HE<AT 1:VV, >4,I RGC1ND I T)ON I NG,.i.l N„ 17 ARL I.:NG`f'dN t RACuT MA o18z6 y,. 1 6 0 11.�/:l fa Y 144485 Al , wrightsoft. Load Short Form Job: 64 Compass Point Date: May 22,2015 Entire House By: J&J Heating and A/C 17 Arlington st.,Dracut,Ma 01826 Email:Jeff@jjheatac.com • s • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Htg Cig Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 63 8 Fireplaces 0 Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 24 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1427 cfm Actual air flow 1427 cfm Air flow factor 0.024 cfm/Btuh Air flow factor 0.047 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.99 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Garage 599 9582 4334 227 204 closet 10 254 40 6 2 Dining 182 1247 1200 30 57 Foyer 168 2637 1130 62 53 Living 361 8772 5923 208 279 Kitchen 399 7135 3193 169 151 Laundry 144 3626 1542 86 73 R oom9 195 4494 2028 106 96 Room10 78 1565 774 37 36 Room11 169 3277 1663 78 78 Room12 117 2848 1245 67 59 Room13 357 7635 3627 181 171 Room14 182 4039 1876 96 88 Room15 121 2359 1195 56 56 Room16 55 835 506 20 24 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ti WI'1 11tS0 2015-Sep-25 07:10:39 9 Right-Suite®Universal 2015 15.0.12 RSU05790 Page 1 Ar—CA ...ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N Entire House 3137 60305 30275 1427 1427 Other equip loads 0 0 Equip. @ 0.88 RSM 26551 Latent cooling 365 TOTALS 3137 60305 26916 1427 1427 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015-Sep-25 07:10:39wri htsot' Right-Suite®Universal 2015 15.0.12 RSU05790 Page 2 ...ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N Building Anal sis Job: 64 Compass Point wrightsoft� y Date: May 22,2015 Entire House By: J&J Heating and A/C 17 Arlington st., Dracut,Ma 01826 Email:Jeff@jiheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative hums lty (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Dally range6°F) - 17 ( M ) Method Simplified Wet bulb (° - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 • Component Btuh/ft2 Btuh % of load Walls 4.3 12839 21.3 Glazing 28.8 3689 6.1 Doors 23.5 3122 5.2 Ceilings 15.2 33539 55.6 Floors 1.8 3971 6.6 - ` Infiltration 1.0 3144 5.2 Ducts 0 0 �• Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 60305 1 100.0 e • • Component Btuh/ft2 Btuh % of load w Walls 0.8 2405 7.9 Glazing 40.5 5181 17.1 Doors 7.8 1036 3.4 Ceilings 9.5 20975 69.3 Floors 0.2 485 1.6 ` Infiltration 0.1 192 0.6 Ducts 0 0 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 30275 100.0 Latent Cooling Load = 365 Btuh Overall U-value = 0.120 Btuh/ft2-°F WARNING: window to floor area ratio = 4.1% - less than 5%. - wrightsoftm g 2015-Sep-25 07:10:39 Ri ht-Suite@ Universal 2015 15.0.12 RSU05790 Page 1 ACClk ...ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 64 Compass Point wrightsoft Date: May 22,2015 Entire House By: J&J Heating and A/C 17 Arlington st., Dracut, Ma 01826 Email:Jeff@jjheatac.com • • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Dally range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Or Area U-value Insul R Ht Construction descriptions g HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft�-°F/Btuh BtuhN Btu Btuh/ft' Btu Walls 12E-Osw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" n 945 0.068 19.0 4.28 4048 0.80 758 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 628 0.068 19.0 4.28 2690 0.80 504 s 788 0.068 19.0 4.28 3376 0.80 632 W 636 0.068 19.0 4.28 2725 0.80 510 all 2997 0.068 19.0 4.28 12839 0.80 2405 Partitions (none) Windows 1 glazing,clr glz,mtl no brk frm mat,1/8"thk:1 glazing,clr glz,mtl n 12 0.270 0 17.0 204 16.4 197 no brk frm mat, 1/8"thk;6.67 ft head ht n 24 1.270 0 80.0 1920 24.1 579 e 20 0.270 0 17.0 340 72.5 1449 s 60 0.270 0 17.0 1021 34.8 2087 w 12 0.270 0 17.0 204 72.5 870 all 128 0.270 0 28.8 3689 40.5 5181 Doors 11 DO:Door,wd sc type s 112 0.390 0 24.6 2752 8.15 913 11 F0:Door,wd sc type,mtl strm s 21 0.280 1.0 17.6 370 5.85 123 Ceilings 18A-Oad: Rf/clg ceiling,asphalt shingles roof mat,frm cons,1/2" 2209 0.241 0 15.2 33539 9.50 20975 gypsum board int fnsh,6"thkns Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm fir,6"thkns, 1863 0.034 30.0 1.80 3349 0.22 409 1/2"gypsum board int fnsh 346 0.034 30.0 1.80 622 0.22 76 all 2209 0.034 30.0 1.80 3971 0.22 485 2015-Sep-25 07:10:39 wrightsoft°' Right-Suite@ Universal 2015 15.0.12 RSU05790 p Page 1 ACCA ...ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 64 Compass Point wrightsoft� Date: May 22,2015 Garage By: J&J Heating and A/C 17 Arlington st.,Dracut,Ma 01826 Email:Jeff@jjheatac.com • • I 1IM • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/112-01F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12E-Osw: Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" In 171 0.068 19.0 4.28 733 0.80 137 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 63 0.068 19.0 4.28 270 0.80 51 S 104 0.068 19.0 4.28 446 0.80 83 w 222 0.068 19.0 4.28 951 0.80 178 all 560 0.068 19.0 4.28 2399 0.80 449 Partitions (none) Windows 1 glazing,clr glz,mtl no brk frm mat,1/8"thk:1 glazing,clr glz,mtl w 12 0.270 0 17.0 204 72.5 870 no brk frm mat, 1/8"thk;6.67 ft head ht Doors 11 DO:Door,wd sc type s 112 0.390 0 24.6 2752 8.15 913 Ceilinggs 18A-0ad:Rf/clg ceiling,asphalt shingles roof mat,frm cons,1/2" 164 0.241 0 15.2 2490 9.50 1557 gypsum board int fnsh,6"thkns Floors 19A-30bswp:Part floor,I wd flr fnsh,r-30 ins,frm flr,6"thkns, 599 0.034 30.0 1.80 1077 0.22 132 1/2"gypsum board int fnsh 2015-Sep-25 07:10:39 wrightsoft" Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 2 XCK ..ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 64 Compass Point wrightsoft Date: May 22,2015 closet By: J&J Heating and A/C 17 Arlington st.,Dracut,Ma 01826 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz-°F ft2-°FBtuh Btuh/ft2 Btu BtuhM Btu Walls 12E-Osw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" n 45 0.068 19.0 4.28 193 0.80 36 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm flr,6"thkns, 10 0.034 30.0 1.80 18 0.22 2 1/2"gypsum board int fnsh 1 WI.1 11t SOf 2015-Sep-25 07:10:39 �. 9 Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 3 ACO, ...ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 64 Compass Point wrightsoft� Date: May 22,2015 Dining By: J&J Heating and A/C 17 Arlington st.,Dracut, Ma 01826 Email:Jeff@jjheatac.com 0 • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 01-77. • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F 112-0F/Btuh Btuh/112 Btu BtuhM Btuh Walls 12E-Osw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" s 93 0.068 19.0 4.28 398 0.80 75 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows 1 glazing,clr glz,mtl no brk frm mat,1/8"thk:1 glazing,clr glz,mtl s 24 0.270 0 17.0 408 34.8 835 no brk frm mat, 1/8"thk;6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm flr,6"thkns, 182 0.034 30.0 1.80 327 0.22 40 1/2"gypsum board int fnsh wrightsoft° Right-Suite®Universal 2015 15.0.12 RSU05790 2015-Sep-25 07:10:39Page 4 ACCK ..ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 64 Compass Point wrightsoft� p Date: May 22,2015 Foyer By: J&J Heating and A/C 17 Arlington st., Dracut,Ma 01826 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 ® - • • •H,If-19M Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12E-Osw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" s 87 0.068 19.0 4.28 373 0.80 70 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors 11 F0:Door,wd se type,mtl strm s 21 0.280 1.0 17.6 370 5.85 123 Ceilings 18A-Oad:Rf/clg ceiling,asphalt shingles roof mat,frm cons,1/2" 98 0.241 0 15.2 1488 9.50 931 gypsum board int fnsh,6"thkns Floors 19A-30bswp: Part floor,hrd wd fir fnsh,r-30 ins,frm fir,6"thkns, 168 0.034 30.0 1.80 302 0.22 37 1/2"gypsum board int fnsh 2015-Sep-25 07:10:39 wrightsoft" Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 5 /�Cp. ...ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N Wrl htsoft- Component Constructions Job: 64 Compass Point 9 Date: May 22,2015 Living By: J&J Heating and A/C 17 Arlington st.,Dracut, Ma 01826 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ft" Btuh/ftz-°F ft�-°F/Btuh Btuh/ftp Btu Btuh/ft2 Btu Walls 12E-Osw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" a 159 0.068 19.0 4.28 681 0.80 128 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 135 0.068 19.0 4.28 578 0.80 108 W 45 0.068 19.0 4.28 193 0.80 36 all 339 0.068 19.0 4.28 1452 0.80 272 Partitions (none) Windows 1 glazing,clr glz,mtl no brk frm mat,1/8"thk: 1 glazing,clr glz,mtl a 12 0.270 0 17.0 204 72.5 870 no brk frm mat, 1/8"thk;6.67 ft head ht s 36 0.270 0 17.0 612 34.8 1252 all 48 0.270 0 17.0 816 44.2 2122 Doors (none) Ceilinggs 18A-Oad:Rf/clg ceiling,asphalt shingles roof mat,frm cons,1/2" 361 0.241 0 15.2 5481 9.50 3428 gypsum board int fnsh,6"thkns Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm flr,6"thkns, 361 0.034 30.0 1.80 649 0.22 79 1/2"gypsum board int fnsh 2015-Sep-25 07:10:39 ACCAwrightsoft°' Right-Suite®Universal 2015 15.0.12 RSU05790 Page 6 ...ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N i wri htsoft Component Constructions Job: 64 Compass Point 9 � By: May 22,2015 Kitchen J&J Heating and A/C 17 Arlington st.,Dracut,Ma 01826 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 If - • • • • Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftp°F ftz°F/Btuh Btuh/112 Btu MOM Btuh Walls 12E-Osw:Firm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" n 216 0.068 19.0 4.28 925 0.80 173 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 19 0.068 19.0 4.28 81 0.80 15 w 63 0.068 19.0 4.28 270 0.80 51 all 298 0.068 19.0 4.28 1277 0.80 239 Partitions (none) Windows 1 glazing,clr glz,mtl no brk frm mat,1/8"thk: 1 glazing,clr glz,mtl n 12 0.270 0 17.0 204 16.4 197 no brk frm mat, 1/8"thk;6.67 ft head ht n 24 1.270 0 80.0 1920 24.1 579 e 8 0.270 0 17.0 136 72.5 580 all 44 0.270 0 51.4 2260 30.8 1355 Doors (none) Ceilings 18A-Oad:Rf/clg ceiling,asphalt shingles roof mat,frm cons,1/2" 168 0.241 0 15.2 2551 9.50 1595 gypsum board int fish,6"thkns Floors 19A-30bswp: Part floor,hrd wd flr fnsh,r-30 ins,frm flr,6"thkns, 399 0.034 30.0 1.80 717 0.22 88 1/2"gypsum board int fnsh 2015-Sep-25 07:10:39 wrightsoft' Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 7 ACCK ..ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N wri htsoft� Component Constructions Job: 64 Compass Point 9 Laund Date: May 22,2015 ry J&J Heating and A/C 17 Arlington st., Dracut,Ma 01826 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area 1.1-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft' Btu Btuh/ft2 Btu Walls 12E-Osw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" n 144 0.068 19.0 4.28 617 0.80 116 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 81 0.068 19.0 4.28 347 0.80 65 all 225 0.068 19.0 4.28 964 0.80 181 Partitions (none) Windows (none) Doors (none) Ceilings 18A-0ad:Rf/clg ceiling,asphalt shingles roof mat,frm cons,1/2" 144 0.241 0 15.2 2186 9.50 1367 gypsum board int fnsh,6"thkns Floors 19A-30bswp: Part floor,hrd wd fir fnsh,r-30 ins,frm fir,6"thkns, 144 0.034 30.0 1.80 259 0.22 32 1/2"gypsum board int fnsh 2015-Sep-25 07:10:39 .- rF wrightsoft° Right-SuiteO Universal 2015 15.0.12 RSU05790 Page 8 ACCP. ...ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 64 Compass Point wrightsoft� Date: May 22,2015 Ro=9 By: J&J Heating and A/C 17 Arlington at., Dracut,Ma 01826 Email:Jeff@jjheatac.com • - rev • • I MCI For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftp°F ft2-°F/Btuh Btuh/ft2 Btuh Btuh/ft2 Btuh Walls 12E-Osw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" n 117 0.068 19.0 4.28 501 0.80 94 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud w 135 0.068 19.0 4.28 578 0.80 108 all 252 0.068 19.0 4.28 1080 0.80 202 Partitions (none) Windows (none) Doors (none) Ceilinggs 18A-Oad:Rf/clg ceiling,asphalt shingles roof mat,frm cons,1/2" 195 0.241 0 15.2 2961 9.50 1852 gypsum board int fnsh,6"thkns Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm flr,6"thkns, 117 0.034 30.0 1.80 210 0.22 26 1/2"gypsum board int fnsh 2015-Sep-25 07:10:39 " wrightsoft Right-Suite®Universal 2015 15.0.12 RSU05790 Page 9 ACCT\ ...ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N Wrightsoft- Component Constructions Job: 64 Compass Point R00/1110 Byte: May 22,2015 J&J Heating and A/C 17 Arlington st.,Dracut,Ma 01826 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (O ) 7 5 Construction quality Tight Wind speed (mph) 15.0 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Cig HTM Gain ftz Btuh/Rz-°F ft2-°FBtuh Btuh/V Btuh Btuh/ft2 Btu Walls 12E-Osw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" n 54 0.068 19.0 4.28 231 0.80 43 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings 18A-Oad:Rf/clg ceiling,asphalt shingles roof mat,frm cons,1/2" 78 0.241 0 15.2 1184 9.50 741 gypsum board int fnsh,6"thkns Floors 19A-30bswp: Part floor,hrd wd fir fnsh,r-30 ins,frm fir,6"thkns, 54 0.034 30.0 1.80 97 0.22 12 1/2"gypsum board int fnsh 2015-Sep-25 07:10:39 �4 Z- wrightsoft" Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 10 ..ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 64 Compass Point wrightsoft Date: May 22,2015 Room 11 By: J&J Heating and A/C 17 Arlington st.,Dracut,Ma 01826 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions or Area U-value Insul R Htg HTM Loss Clg HTM Gain V Btuh/ftl-°F ft2-°FBtuh Btuh/ft2 Btu BtuhM Btu Walls 12E-Osw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" n 117 0.068 19.0 4.28 501 0.80 94 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings 18A-Oad:Rf/clg ceiling,asphalt shingles roof mat,frm cons,1/2" 169 0.241 0 15.2 2566 9.50 1605 gypsum board int fnsh,6"thkns Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm fir,6"thkns, 54 0.034 30.0 1.80 97 0.22 12 1/2"gypsum board int fnsh 2015-Sep-25 07:10:39 wrightsoft" Right-SuiteR,Universal 2015 15.0.12 RSU05790 Page 11 ACCK ..ic\Desktop\wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N WPI htsoft Component Constructions Job: 64 Compass Point 9 ROOM 12 Date: May 22,2015 J&J Heating and A/C I 17 Arlington st.,Dracut, Ma 01826 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb ( F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-°F ft2-0F/Btuh Btu h/ft2 Btu Btuh/ft2 Btuh Walls 12E-Osw: Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" n 81 0.068 19.0 4.28 347 0.80 65 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud a 117 0.068 19.0 4.28 501 0.80 94 all 198 0.068 19.0 4.28 848 0.80 159 Partitions (none) Windows (none) Doors (none) Ceilinggs 18A-0ad:Rf/clg ceiling,asphalt shingles roof mat,frm cons,1/2" 117 0.241 0 15.2 1776 9.50 1111 gypsum board int fnsh,6"thkns Floors 19A-30bswp: Part floor,hrd wd flr fnsh,r-30 ins,frm flr,6"thkns, 18 0.034 30.0 1.80 32 0.22 4 1/2"gypsum board int fnsh 2015-Sep-25 07:10:39 ACCP. -9- wrightsoft°' Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 12 ..ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N - Component Constructions Job: 64 Compass Point wrightsoft pp Date: May 22,2015 Room 13 By: J&J Heating and A/C 17 Arlington st.,Dracut,Me 01826 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft�°F/Btuh Btuh/112 Btu Btu h/ftz Btuh Wal I s 12E-Osw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" a 189 0.068 19.0 4.28 810 0.80 152 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud s 153 0.068 19.0 4.28 655 0.80 123 w 45 0.068 19.0 4.28 193 0.80 36 all 387 0.068 19.0 4.28 1658 0.80 311 Partitions (none) Windows (none) Doors (none) Ceilings 18A-Oad: Rf/clg ceiling,asphalt shingles roof mat,frm cons,1/2" 357 0.241 0 15.2 5420 9.50 3390 gypsum board int fnsh,6"thkns Floors 19A-30bswp:Part floor,hrd wd fir fnsh,r-30 ins,frm flr,6"thkns, 102 0.034 30.0 1.80 183 0.22 22 1/2"gypsum board int fnsh 2015-Sep-25 07:10:39 wrightsoft' Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 13 ACCP. ...ic\Desktop\wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 64 Compass Point - - wrightsoft p Date: May 22,2015 Room 14 By: J&J Heating and A/C 17 Arlington st.,Dracut, Ma 01826 Email:Jeff@jjheatac.com i • • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ftz-°F ft�°F/Btuh Btuh/ft2 Btu Btuh/ft� Btu Walls 12E-Osw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" s 117 0.068 19.0 4.28 501 0.80 94 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud w 126 0.068 19.0 4.28 540 0.80 101 all 243 0.068 19.0 4.28 1041 0.80 195 Partitions (none) Windows (none) Doors (none) Ceilinggs 18A-Oad:Rf/clg ceiling,asphalt shingles roof mat,frm cons,1/2" 182 0.241 0 15.2 2763 9.50 1728 gypsum board int fnsh,6"thkns Floors (none) Al 2015-Sep-25 07:10:39 .4CCwrightsoft°' Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 14 ..ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N Component Constructions Job: 64 Compass Point wrightsoft Date: May 22,2015 Room 15 By: J&J Heating and A/C 17 Arlington st.,Dracut,Ma 01826 Email:Jeff@ijheatac.com ill[mml • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft% BtuhN-°F ft�-°FBtuh Btuh/ftz Btuh Btuh/ft2 Btu Wal I s 12E-Osw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2" s 99 0.068 19.0 4.28 424 0.80 79 gypsum board int fnsh,2"x6"wood frm,16"o.c.stud Partitions (none) Windows (none) Doors (none) Ceilings 18A-0ad: Rf/clg ceiling,asphalt shingles roof mat,frm cons,1/2" 121 0.241 0 15.2 1837 9.50 1149 gypsum board int fish,6"thkns Floors 19A-30bswp:Part floor,hrd wd flr fnsh,r-30 ins,frm flr,6"thkns, 1 0.034 30.0 1.80 2 0.22 0 1/2"gypsum board int fnsh 2015-Sep-25 07:10:39 wrightsoft" Right-Suite@ Universal 2015 15.0.12 RSU05790 p Page 15 ACCA ...ic\Desktop\wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJB Front Door faces: N • Job: 64 Compass Point wri htsoft- Component Constructions Q Date: May 22,2015 Room 16 By: J&J Heating and A/C 17 Arlington st.,Dracut,Ma 01826 Email:Jeff@jjheatac.com For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 i i ® - • • • e Location: Indoor: Heating Cooling j Worcester, MA, US Indoor temperature (°F) 68 75 Elevation: 1010 ft Design TD (°F) 63 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (OF) 5 83 Infiltration: Daily range (°F) - 17 ( M ) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft= Btuh/ft'-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilinggs 18A-0ad:Rf/clg ceiling,asphalt shingles roof mat,frm cons,1/2" 55 0.241 0 15.2 835 9.50 522 gypsum board int fnsh,6"thkns Floors (none) 2015-Sep-25 07:10:39 - wrightsoft' Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 16 �� ...ic\Desktop\W rights oft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N Project Summar Job: 64 Compass Point wrightsoft� y Date: May 22,2015 Entire House By: J&J Heating and A/C 17 Arlington st.,Dracut,Ma 01826 Email:Jeff@iiheatac.com • • • For: Trust Construction 51 Mount Joy Dr, Tewksbury, Ma 01876 Notes: Weather: Worcester, MA, US Winter Design Conditions Summer Design Conditions Outside db 5 OF Outside db 83 OF Inside db 68 OF Inside db 75 OF Design TD 63 OF Design TD 8 OF Daily range M Relative Humidity 50 % Moisture difference 24 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 60305 Btuh Structure 30275 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 60305 Btuh Use manufacturer's data n Rate/swing multiplier 0.88 Infiltration Equipment sensible load 26551 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 0 Structure 365 Btuh Ducts 0 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 3137 3137 Equipment latent load 365 Btuh Volume (ft3) 28233 28233 Air changes/hour 0.10 0.05 Equipment total load 26916 Btuh Equiv.AVF (cfm) 47 24 Req. total capacity at 0.70 SHR 3.2 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1427 cfm Actual air flow 1427 cfm Air flow factor 0.024 cfm/Btuh Air flow factor 0.047 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.99 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015-Sep-25 07:10:39 wrightsoft9 Right-Suite@ Universal 2015 15.0.12 RSU05790 Page 1 ..ic\Desktop\Wrightsoft HVAC\Aprils Way Lot 7.rup Calc=MJ8 Front Door faces: N 381 Date.qq i' NORTH TOWN OF NORTH ANDOVER 3?0y`,..o ,e�hOp PERMIT FOR MECHANICAL INSTALLATION 0 ♦ y,SSACNUSEtt 1 This certifies that . .Jis-.a .r.-�.`. �� �• �• . ``'�• 1, • •w has permission for mechanical installation �,4' .a. . . .ti^-. ... ..: .L in the buildings of . 7x " `.... . . . . c.. . . . . . at � . . ' !`.�� . . . . . . . . , North Andover, Mass. Fee. . ? .7. . Lic. No.)�.P. . . . . --- . . . . . . . . . . GAS INSPECTOR /� WHITE:Applicant CANARY:Building Dept. PINK:Treasurer Fl / � ) r\'it A- C;w�I, { L4