Loading...
HomeMy WebLinkAboutMiscellaneous - 70 Meridian Wayi I J 4� d Date. -'! ! ........... TOWN OF NORTH ANDOVER PERMIT FOR MECHANICAL INSTALLATION 'a f r This certifies that,. ..� ... .:� . .. � 1 1 . .......... . 'I has permission for mechanical installation .�.�, in the buildings of .. .............. at . %! ' :? � .... ..:�..... ......... North Andover, Mass. Fee.... t. Lic. No.!` irk....1 GAS INSPECTOR WHITE: Applicant CANARY: Building Dept. PINK: Treasurer t Commonwealth of 'Massachusetts Sheet Metal Permit Date: Estimated Job Cost: $ 3 n oo, D D Plans Submitted: YES NO Business License # 196 Business Information: Name: J&J Heating & Air Conditioning Street: 17 Arlington St.:. City/Town: Dracut, MA 01826 Permit # Permit Fee: $ 04, " Plans Reviewed: YEAS p/ NO Applicant License # Property Owner / Job Location Information: Name: ri.2,5 L U4 I Street: D r2 '7 O City/Town: North Andover, HA 01845 Telephone: .978-454-8197 Telephone: 5_0T , 2 a 0, 9 i r7 Photo I.D. required / Copy of Photo I.D. attached: YES NO staff Initial J-1 / M -1 -unrestricted license J-2 / M -2 -restricted to dwellings 3 -stories or less and commercial up to 10,000 sq. ft. / 2 -stories or less Residential 'T-Tfamily " 'MWti-family Condo / Townhouses' Other Commercial: ' Office Retail Industrial Educational Institutional Other Square Footage: under 10,000 sq. ft. ✓' over 10,000 sq. ft. Number of Stories: Sheet metal work to be completed: New Work: ✓ Renovation: HVAC ✓ Metal Watershed Roofing Kitchen Exhaust System Metal Chimney / Vents Air Balancing Provide detailed description of work to be done: �� , � i nr �a l l /ti1,�7a / d u �7'`"w o r � -Fe ►^ h' Ute- c s y s T �-, �-, �-~-�-- INSURANCE COVERAGE: I have a current liabilityinsurance policy or its equivalent which meets the requirements of M.G.L. Ch.,112 Yes �o 11 If you have checked Yes, indicate the type of coverage by checking the aRpropriate box below: A liability insurance policy Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws, and that my :signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this box❑, 1 hereby certify that all of the details and information I have submitted (or entered) regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO Date Date By Title City/Town Permit # Fee $ Inspector Signature of Permit Approval Progress Inspections Comments Final Inspection Type of License: ❑ Master ❑ Master -Restricted ❑Journeyperson ❑Journeyperson-Restricted El Comments Signature of Licensee License Number: ) ?, Check at www.mass.gov/dpi The Commonwealth ofMassachuselts .Department ofXndusirialAccidents kiOffice of Investigations p 600 Washington Street Roston, MA 02111 www.inass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Lezibly: Name(13usittess/Organi7.ation/individual): J&J Heating & Air Conditioning, INc. Address: 17 Arlington St. Dracut, MA 01826 Phone #: '978-454-8197 Arc you an employer? Check the appropriate box: 1. ® 1 am a employer with 40 4. [] I am a general contractor and I employ ces (full and/or part-time).* have hired the sub -contractors 2. [] I am a sole proprietor or partner- listed on the attached sheet. ' ship and have no employees These sub -contractors have working for me in any capacity, employees and have workers' [No workers' comp. insurance comp. insurance.t required.] 5. ❑ We arc a corporation and its 3. ❑ 1 am a homeowner doing all work officers have exercised their myself. [No workers' comp. right of exemption per MGL insurance required.] t c. 152, § 1(4), and we have no employees. [No workers' comp. insurance required.j '][ape of project (required); 6. ❑ New construction 7. ❑ Remodeling 8. ❑ Demolition 9. ❑ Building addition 10.0 Electrical repairs. or additions 11.❑ Plumbing repairs or additions 12.❑ Roof repairs . 13.❑ Other *Any applicant that checks box #1 must also fill. out the section below showing their workers' compensation policy infomration. t liomxowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit anew affidavit indicating such. lContractors that check this box must attached an additional sheet showing the name of the sub -contractors and state whether or not those entities have employees. if the sub -contractors have employees, they must provide their workers' comp. policy numt er. I ant an employer Mal is providing workers' compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: A.I.M. Mutual Insurance Policy # or Self -ins. Lic. #: WMZ-800-8006553-2013A Expiration Date: 06/01/15 Job Site Address:_— City/State/Zip: Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a Pure up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $25ay against the violator.-Beadvised that a copy of this statement may be forwarded to the Office of lnvesti tons of didDIA forpnsujwic ovelgc verification. I do It ere ertifyrarder t/ ar and les-eJCperjury that the information provided above is true and correct. Date - 197 Official t,se only. Do not write in this area, to be completed by city or town official. City or Town: Permit/License # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/'I'own Clerk 4. Electrical Inspector S. Plumbing Inspector 6.011rer Contact Pel :son: Phone #: /'4r1./ORDm CERTIFICATE ICATE ®0 LIABILITY INSURANCE N@,O'E DATE(MM/DDIYYYY) 06/10/2014 PRODUCEli 978. 887. 4900 FAX 978, 887.2404 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION 'Edward F. Sennott Insurance Agency, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR P. 0. Box 457 South Main Street ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P. — Topsfield, P1A 01983 _ INSURERS AFFORDING COVERAGE NAICIt INSURED 3&] Heating &Air Conditioning, Inc. _wsURER& Great American Alliance Ins Co__ 17 Arlington Street INsunERB: Safety Insurance Company_ 39454 Dracut, MA 01826 INSURER c: A.I.M. Mutual Insurance Co__ INSURER D: __- INSURER E: ----- --'----- ------- COVERAGES 111E POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE_ FOR THE POLICY PERIOD INDICATED. NOTWITI•ISTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE= LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. - -- LTR — NSR TYPE OF INSURANCE POLICY NUMBER POLICV EFFECTIVE DATE (MMIDD/YYYY) POLICY EXPIR/Yf10N DATE- MMMYVYY ------------ - .,.— - ------ LIMII"S GENERALLIABILITY PAC6418906-08 06/01./2014 06/01/2015 EACH OCCURRENCE $ ].,000,00(' X COMMERCIAI_ GP_NERAI_ LIABiurY DAM AGFWOGNT M[ D - CLAIMS MADE I OCCUR PREMISES Ea occ0rrcfieC 300,000 --- MED EXP (Any uric person) 1.0 000 — —�� _X, A------.—._._—.. '--- , --' ' — —.. --- PERSONAL 8 ADV INJURY :I, 1. , 000 , 000 GENERALAGGREGAIE 2,000,00( GEN'L AGGREGATE LIMrr APPLIES PER; PRODUCTS - COMP/OP AGG ? 2,000,000 ) _- POLICY I'IEC7 I10� LOC 1, -------- _ -------- - ------ AUTOMOBILE LIABILITY 2434550 06/01/2014 06/01/2015 COMBINED SINGLE LIMII �6 ANY ALTO (Ea i1CCi(ent) ----- -- 1,000,000 ALL T OWNED AUO$ ------------- -"- X BODILY INJURY 0 SCHEDULED AUTOS (Per person) ' X HIRED AU -I Os ------------- -------__.--___._.-- X NON -OWNED AUTOS BODILY INJURY (Per acciden) PROPERTY DAMAGE (Pcr acuidenQ(' GAFlAGE LIABILITY AUTO ONLY - EA ACCIDENT 7. ANY AUTO -------------_..-----'---- -�-- O rHER THAN 1=A ACC 11 — --- AUTO ONLY: AGO $---`—.__...----- EXCESS / UMBRELLA LIALILITY ... UMQ6418958-06 06/01./2014 66/01/201—S--- EACH OCCURRENCE :K 2,000,000 _I OCCUP CLAIMS MADE - --'-2 A AGGREGATE , 000 , 000 DEDUCTIEiij' __—_-...______—.--__. ---------------5 ;C RETENTION _F - ---------- — ANDEMPS YERS'LIATION ANfJ EMPLOYERS' LIAI31l_ITY _ WMZ-800-8006553-2014A 06/02/2014 06/02/2015 X w'$rAru- Uirl- _ TORY LIMIT$_-� l;n -- C ANY PROCII(/M MOEn/IEXCLUEll/EXECUTIVE�Y OFPICEI�I/MEM81n EXCI_UOEO'? E.L.ACH ACCIDENT 000 --. JII if�ycr., �itorydoscr In and II yes, rlascribe under _ ___1,000 _____, E.L. DISEASE_ - EA EMPLOYEE 6 ` 1 , 0OO_, - SPECIAL PROVISIONS below ' _ _ _ _ _OO E.L. DISEASE - POLICY I_IMfr :f 1,000,000 OTHER OF_SCRIPTION OF OPERATIONS /LOCATIONS /VEHICLES 1 EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS — CF_RTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATID DATE THEREOF, TIhIE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 __ DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLOER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSUnCR, ITS AGENTS OR REPRESENTATIVES. Evidence of Insurance AUTHORIZED REPRESENTATIVE I —I Peter Sennott/LAft ACORD 25 (2009/01) © 1988-2009 AC013D CORPORATION! All rights reserved. The ACORD name and logo are registered marks of ACORD ,R COMMONWEALTH OF MASSACHUSETTS AS1S`,ACHUSET`]C'S DRIVERS LICENSE USA "4a ISSN9a END 4d NUMBERCCCC-,CCoo t 1105.03 201 f'. NONEEXP `S99VJ�r0�� i0.52r�os 05 2:1980 }s �DMSS t2 NONE as sex M t5 Nci�6 09 KLINE� z ERIC RJ S. 1880 ; r B 83 LONG DR DRACUT, MA 01826.2048'., s V DD os aazo,� Rai 07-15-2009o 5 q HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat E*47 1J2 0 Btuh 0 Btuh 0 °F 1573 cfm 0.028 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER Area (ft2) 0 Btuh 0 Btuh 0 Btuh 1573 cfm 0.047 cfm/Btuh 0 in H2O 0.90 3479 ROOM NAME Area (ft2) Htg load (Btuh) Cig load (Btuh) Htg AVF (cfm) Clg AVF (cfm) Lving room 257 4102 1622 114 77 Dining room 236 4669 3479 129 165 Kitchen 192 4004 4596 111 218 Brkfst 145 2593 1093 72 52 M. bed 315 7820 6739 217 319 Master bath 70 2164 1318 60 62 Bath 80 1606 1019 45 48 Laun 60 1204 1766 33 84 Bedroom 3 375 8892 3700 247 175 Bedroom 2 300 6696 3980 186 189 WIC 70 1260 266 35 13 2nd floor bath 140 1124 259 31 12 Loft 356 8301 2812 230 133 HAII nn 00-11) rnn . A Calculations approved by ACCA to meet all requirements .of Manual J 8th Ed. Wrl htSo'Pt" 2015 -Apr -02 09:23:52 �.... g Right -Suite® Universal 2015 15.0.12 RSU05790 A+0, C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Page 1 Entire House d 2680 56748 33185 1573 1573 Other equip loads 0 2389 Equip. @ 0.93 RSM 32942 Latent cooling 3876 TnTAI C )Con cc -7n0 nnnq- cuuu IWI/tO JVOII ID/J IZ)/J Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015 -Apr -02 09:23:52 ,.- wi htsof°Right-Suite® Universal 2015 15.0.12 RSU05790 Page 2 ACCP. C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Front Door North Northeast East Southeast Location: Southwest Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 32731 Indoor temperature (°F) 70 75 Elevation: 30 ft 32720 Design TD (°F) 58 13 Latitude: 420N 3868 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 36388 36592 Daily range (°F) - 15 ( L ) 1560 1548 Wet bulb (°F) - 72 1551 1562 1520 Wind speed (mph) 15.0 7.5 1560 1548 1504 Front Door North Northeast East Southeast South Southwest West Northwest Sensible Load (Btuh) 32942 32731 32377 31391 32399 32520 32720 31781 Latent Load (Btuh) "3876 3871 3868 3830 3868 3868 3872 3835 Total Load (Btuh) ;.3631°7. 36602 36245 35221 36267 36388 36592 35616 Heating AVF (cfm), .1x73' 1560 1548 1504 1549 1551 1562 1520 Cooling AVF (cfm) 1573;; 1560 1548 1504 1549 1551 1562 1520 Building Orientation Cooling Load N NE E SE S SW W NW Direction Front Door faces Current Orientation: Front Door faces North Highest Cooling Load: Front Door faces North Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft 2015 -Apr -02 09:23:52 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 1 XCN C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N h�eatin %5, ,3 -Component Btuh/ft2 Btuh % of load Walls Location: 10944 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 6.2 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 420N 4.9 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range� °F) - 15 ( L ) Method Simplified 0 Wet bulb (° -72 Construction quality Average Adjustments Wind speed (mph) 15.0 7.5 Fireplaces 0 1567481 h�eatin %5, ,3 -Component Btuh/ft2 Btuh % of load Walls 3.9 10944 19.3 Glazing 17.3 3519 6.2 Doors 22.5 1756 3.1 Ceilings 8.5 15389 27.1 Floors 4.9 8807 15.5 Infiltration 3.2 8655 15.3 Ducts 7677 13.5 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1567481 35574 100.0 -Component Btuh/ft2 Btuh % of load Walls 0.9 2417 6.8 Glazing 24.9 5063 14.2 Doors 10.3 808 2.3 Ceilings 7.4 13359 37.6 Floors 1.1 1927 5.4 Infiltration 0.3 792 2.2 Ducts 3741 10.5 Ventilation 0 0 Internal gains 5080 14.3 Blower 2389 6.7 Adjustments 0 Total 35574 100.0 Latent Cooling Load = 3876 Btuh Overall U -value = 0.140 Btuh/ft2-°F Data entries checked. WrIQf1tSo'ft, Right -Suite® Universal 2015 15.0.12 RSU05790 2015 -Apr -02 09:23:52Page 1 ACCK C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N wri htsoft Component Constructions Job: BLD2 70 Meridian way Date: April 12015 Entire House By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 INEWS;Pro`ect Information T' ro I MountFor: Trust Construction 51 •Tewksbury,01876 Construction descriptions Or Area U -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 112 Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/ft2 Design TD (°F) 58 13 Latitude: 420N 0.300 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 1788 0.99 Daily range (°F) - 15 ( L ) Method Simplified 0.065 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Average 0 800 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; se 112 Btu h/ftz-°F ft2-°FBtuh Btuh/ftp Btu Btuh/ft2 Btu Walls sw 84 0.300 0 17.3 1452 25.5 2138 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" ne 478 0.065 21.0 3.74 1788 0.99 475 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud se 804 0.065 21.0 3.74 3010 0.99 800 6.38 sw 532 0.065 21.0 3.74 1992 0.99 529 nw 617 0.065 21.0 3.74 2309 0.99 613 all 2430 0.065 21.0 3.74 9099 0.99 2417 Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" 352 0.091 13.0 5.24 1845 0 0 o.c. stud Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 ne 36 0.300 0 17.3 628 20.3 737 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; se 36 0.300 0 17.3 622 25.5 916 6.67 ft head ht sw 84 0.300 0 17.3 1452 25.5 2138 600 nw 47 0.300 0 17.3 818 20.3 961 0.255 all 204 0.300 0 17.3 3519 23.3 4752 Doors 11 DO: Door, wd sc type Ceilings 16B-30ad: Attic ceiling, asphalt shingles roof mat, r-31 roof ins, r-30 ceil ins 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obswp: Part floor, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh ne 22 0.390 0 22.5 498 10.3 229 sw 56 0.390 0 22.5 1258 10.3 579 all 78 0.390 0 22.5 1756 10.3 808 375 0.032 30.0 1.84 691 1.60 600 486 0.026 38.0 1.50 728 1.30 632 953 0.255 1.0 14.7 13970 12.7 12127 1241 0.295 0 6.38 7922 1.40 1733 Wrl htSOft 2015 -Apr -02 09:23:52 Right -Suite® Universal 2015 15.0.12 RSU05790 ACCA C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Page 1 19A-30bswp: Part floor, hrd wd fir fnsh, r-30 ins, frm fir, 10" thkns 489 0.034 30.0 1.64 804 0.36 176 19C-19cscp: Fir floor, frm fl r, 6" thkns, carpet fir fnsh, r-2 ext ins, 84 0.049 30.0 0.98 82 0.21 18 r-19 cav ins, tight crwl ovr, r-11 wall insul .; 2015 -Apr -02 09:23:52 iSOtRight-Suite® Universal 2015 15.0.12 RSU05790 Page 2 ACCP. C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N WrIJi1tS0ft`k Component Constructions Job: BLD270 Meridian way Date: April 12015 Lving room By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ftz-°FBtuh Btuh/ftp Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors 11 DO: Door, wd sc type Ceilings 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns ne 16 0.065 21.0 3.74 Location: 0.99 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 21.0 Indoor temperature (°F) 70 75 Elevation: 30 ft sw Design TD (°F) 58 13 Latitude: 42°N 419 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ftz-°FBtuh Btuh/ftp Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors 11 DO: Door, wd sc type Ceilings 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns ne 16 0.065 21.0 3.74 60 0.99 16 se 104 0.065 21.0 3.74 389 0.99 103 sw 112 0.065 21.0 3.74 419 0.99 111 all 232 0.065 21.0 3.74 869 0.99 231 sw 56 0.390 0 22.5 1258 10.3 579 257 0.026 38.0 1.50 385 1.30 334 257 0.034 30.0 1.64 422 0.36 92 ti Wrl htSoft' 2015 -Apr -02 09:23:52 1" g Right -Suite® Universal 2015 15.0.12 RSU05790 ACCP. C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Page 3 wrighfisoftCoin Component Constructions Job: BLD270 Meridian way p Date: April 12015 Dining room By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area U -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft' Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/ftz Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 314 0.99 Daily range (°F) - 15 ( L ) Method Simplified 0.065 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Average 0 8 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 3460 12.7 ft' Btuh/ft2-°F ft2-T/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" se 84 0.065 21.0 3.74 314 0.99 84 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud sw 8 0.065 21.0 3.74 30 0.99 8 all 92 0.065 21.0 3.74 344 0.99 91 Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" 8 0.091 13.0 o.c. stud Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 se 12 0.300 0 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm fir, 10" thkns, 1/2" 236 0.255 1.0 gypsum board int fnsh Floors (none) 5.24 42 0 0 17.3 207 25.5 305 14.7 3460 12.7 3003 WPI i1tSQ,tt" 2015 -Apr -02 09:23:52 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 4 ACCP. C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N wri htsoft Component Constructions Job: BLD270 Meridian way Date: April 12015 Kitchen By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 x Z � II -mill l! arkw�3-<`t .0 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Z. 2815 12.7 2443 1.64 Location: 0.36 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area LI -value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-°F ftz-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" se 84 0.065 21.0 3.74 314 0.99 84 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 2 glazing, clr outr, air gas, wd frm mat, cir innr, 1/4" gap, 1/8" thk: 2 se 12 0.300 0 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 192 0.255 1.0 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 72 0.034 30.0 -9- wrightsoft" Right -Suite® Universal 2015 15.0.12 RSU05790 ACCP. C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N 17.3 207 25.5 305 14.7 2815 12.7 2443 1.64 118 0.36 26 2015 -Apr -02 09:23:52 Page 5 wrightsoft' Component Constructions Job: BLD2 70 Meridian way Brkfst Bate: April 12015 By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 " s • • • For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Y3 Construction descriptions vi Or Area U -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ftz Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/ft2 Design TD (°F) 58 13 Latitude: 420N 238 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 553 0.99 Daily range (°F) - 15 ( L ) Method Simplified 0.065 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Average 60 all Fireplaces 0 21.0 Y3 Construction descriptions vi Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 207 25.5 ftz Btuh/ftz-°F ftz °FBtuh Btuh/ft2 Btuh Btuh/ft2 Btu Walls 0 6.67 ft head ht 238 0.36 52 all 24 0.300 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" ne 148 0.065 21.0 3.74 553 0.99 147 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud se 60 0.065 21.0 3.74 225 0.99 60 all 208 0.065 21.0 3.74 778 0.99 207 Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" 8 0.091 13.0 o.c. stud 213 20.3 250 Windows 207 25.5 305 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 ne 12 0.300 0 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; se 12 0.300 0 6.67 ft head ht 238 0.36 52 all 24 0.300 0 Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 145 0.026 38.0 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd fir fnsh, r-30 ins, frm flr, 10" thkns 145 0.034 30.0 5.24 42 0 0 17.3 213 20.3 250 17.3 207 25.5 305 17.3 420 22.8 556 1.50 217 1.30 189 1.64 238 0.36 52 I--- Wr! htsoft, 2015 -Apr -02 09:23:52 g Right -Suite® Universal 2015 15.0.12 RSU05790 ACCA C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Page 6 Component Constructions Job: BLD270 Meridian way wrightsoftT Date: April 12015 M. bed By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 Pro'ectlnf rmatllon �. ���� 3 `� t For: Trust Construction 51 Mount Joy Drive, Tewksbury, .0:. Construction descriptions Or Area 11.1 -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ftz Indoor temperature (°F) 70 75 Elevation: 30 ft Btu h/ftz Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 30 0.99 Daily range (°F) - 15 (L ) Method Simplified 0.065 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Average 131 nw Fireplaces 0 21.0 Construction descriptions Or Area 11.1 -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-1F ft� °FBtuh Btuh/ftp Btu Btu h/ftz Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" se 8 0.065 21.0 3.74 30 0.99 8 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud sw 132 0.065 21.0 3.74 494 0.99 131 nw 108 0.065 21.0 3.74 404 0.99 107 all 248 0.065 21.0 3.74 929 0.99 247 Partitions (none) Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 sw 36 0.300 0 17.3 622 25.5 916 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; nw 12 0.300 0 17.3 207 20.3 244 6.67 ft head ht all 48 0.300 0 17.3 829 24.2 1160 Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 315 0.255 1.0 14.7 4618 12.7 4008 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd fir fnsh, r-30 ins, frm fir, 10" thkns 15 0.034 30.0 1.64 25 0.36 5 2015 -Apr -02 09:23:52Wrl htSOft Right -Suite@ Universal 2015 15.0.12 RSU05790 ACCP. C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Page 7 wri htsoft Component Constructions Job: BLD270 Meridian way Date: April 12015 Master bath By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 0 ! 0 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ftz-°F ft2-°F/Btuh Btuh/ft2 Btu Btu hA2 Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" nw 68 0.065 21.0 3.74 256 0.99 68 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" 56 0.091 13.0 5.24 o.c. stud Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 nw 12 0.300 0 17.3 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fl fnsh, frm fl r, 10" thkns, 1/2" 70 0.255 1.0 gypsum board int fnsh Floors (none) 294 0 0 202 20.3 237 14.7 1026 12.7 891 L4 I 2015 -Apr -02 09:23:52WCI FtSO� Right -Suite® Universal 2015 15.0.12 RSU05790 ACCP. C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Page 8 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Average Fireplaces 0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ftz-°F ft2-°F/Btuh Btuh/ft2 Btu Btu hA2 Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" nw 68 0.065 21.0 3.74 256 0.99 68 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" 56 0.091 13.0 5.24 o.c. stud Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 nw 12 0.300 0 17.3 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fl fnsh, frm fl r, 10" thkns, 1/2" 70 0.255 1.0 gypsum board int fnsh Floors (none) 294 0 0 202 20.3 237 14.7 1026 12.7 891 L4 I 2015 -Apr -02 09:23:52WCI FtSO� Right -Suite® Universal 2015 15.0.12 RSU05790 ACCP. C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Page 8 wri htsoft- Component Constructions Job: BLD270 Meridian way 9 Bath Bate: April 12015 By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 F For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area 1.11 -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft2-°F ft2-°FBtuh Btuh/ft2 Btu Btu hM2 Btu Walls (none) Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" o.c. stud Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors (none) 64 0.091 13.0 80 0.255 1.0 5.24 335 0 0 14.7 1173 Location: 1018 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Dailybulb range 72 ( L ) Method Simplified Wet - Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Average 0 Construction descriptions Or Area 1.11 -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft2-°F ft2-°FBtuh Btuh/ft2 Btu Btu hM2 Btu Walls (none) Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" o.c. stud Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors (none) 64 0.091 13.0 80 0.255 1.0 5.24 335 0 0 14.7 1173 12.7 1018 WCi htsaft d I 2015 -Apr -0209:23:52 9 Right -Suite® Universal 2015 15.0.12 RSU05790 ACC% C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Page 9 Component Constructions Job: BLD2 70 Meridian way wrightsoft- Date: April 12015 Laun By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ftz-°F/Btuh Btuh/ftz Btu Btuh/ftz Btu Walls (none) Partitions 12C-Osw: Firm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" 48 0.091 13.0 5.24 252 0 0 o.c. stud Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, firm fir, 10" thkns, 1/2" 60 0.255 1.0 14.7 880 12.7 764 gypsum board int fnsh Floors (none) 2015 -Apr -02 09:23:52 -�- wrightsoft% Right -Suite® Universal 2015 15.0.12 RSU05790 Page 10 ACCP. C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N BMW Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ftz-°F/Btuh Btuh/ftz Btu Btuh/ftz Btu Walls (none) Partitions 12C-Osw: Firm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" 48 0.091 13.0 5.24 252 0 0 o.c. stud Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, firm fir, 10" thkns, 1/2" 60 0.255 1.0 14.7 880 12.7 764 gypsum board int fnsh Floors (none) 2015 -Apr -02 09:23:52 -�- wrightsoft% Right -Suite® Universal 2015 15.0.12 RSU05790 Page 10 ACCP. C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft2 Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/ftz Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 584 0.99 Daily range (°F) - 15 ( L ) Method Simplified 0.065 Wet bulb (°F) - 72 Construction quality Average 175 Wind speed (mph) 15.0 7.5 Fireplaces 0 21.0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft'-T/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" ne 156 0.065 21.0 3.74 584 0.99 155 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud se 176 0.065 21.0 3.74 659 0.99 175 nw 172 0.065 21.0 3.74 644 0.99 171 all 504 0.065 21.0 3.74 1887 0.99 501 Partitions (none) Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 ne 12 0.300 0 17.3 207 20.3 244 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; nw 12 0.300 0 17.3 207 20.3 244 6.67 ft head ht all 24 0.300 0 17.3 415 20.3 487 Doors (none) Ceilings 16B-30ad: Attic ceiling, asphalt shingles roof mat, r-31 roof ins, 375 0.032 30.0 1.84 691 1.60 600 r-30 ceil ins Floors 19A-Obswp: Part floor, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 375 0.295 0 6.38 2394 1.40 524 gypsum board intfnsh 141. wrightsoft" Right -Suite® Universal 2015 15.0.12 RSU05790 ACC( C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N 2015 -Apr -02 09:23:52 Page 11 Component Constructions Job: BLD270 Meridian way wrightsoft Date: April 12015 Bedroom 2 By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 Lf& 3' • 0 0 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Location: Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btuh/ft2-°F Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 111 Daily range (°F) - 15 ( L ) Method Simplified 21.0 Wet bulb (F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 3.74 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ftz °F/Btuh Btuh/ft2 Btuh Btuh/112 Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" se 112 0.065 21.0 3.74 419 0.99 111 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud sw 133 0.065 21.0 3.74 497 0.99 132 nw 108 0.065 21.0 3.74 406 0.99 108 all 353 0.065 21.0 3.74 1322 0.99 351 Partitions (none) Windows 2 glazing, cir outr, air gas, wd frm mat, cir innr, 1/4" gap, 1/8" thk: 2 sw 35 0.300 0 17.3 611 25.5 899 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; nw 12 0.300 0 17.3 202 20.3 237 6.67 ft head ht all 47 0.300 0 17.3 812 24.2 1136 Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor, hrd wd fl fnsh, frm fl r, 10" thkns, 1/2" 300 0.295 0 6.38 1915 1.40 419 gypsum board int fnsh ti Wrl i1tSOfit 2015 -Apr -02 09:23:52 ,4 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 12 ACCk C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N wrightsoft Component Constructions Job: BLD2 70 Meridian way Date: April 12015 WIC By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 T, ■ For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Rq MA Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 C� ­­ 1--11111111111"A= IMEMMM Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ftz-°F ftz-°F/Btuh Btuh/ft2 Btu BtuhN Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" nw 80 0.065 21.0 3.74 300 0.99 80 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 70 0.295 0 6.38 447 1.40 98 gypsum board int fnsh "PF wrightsoft' Right -Suite@ Universal 2015 15.0.12 RSU05790 ACCA C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N 2015 -Apr -02 09:23:52 Page 13 Component Constructions Job: BLD270 Meridian way wrightsoft`' p Date: April 12015 2nd floor bath By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 c V F —"'1 11 151"1" For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 F&3VQ }ih ort. nh Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ftz-°F/Btuh Btuh/ftz Btu Btuh/ftp Btu 140 0.295 0 6.38 894 1.40 195 ...._. wri htSof° Right -Suite® Universal 2015 15.0.12 RSU05790 2015 -Apr -02 09:23:52 ACCX C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Page 14 wrrightsoft` Component Constructions Job: BLD2 70 Meridian way Date: April 12015 Loft By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry bulb (°F) 12 Daily range (°F) - Wet bulb (°F) - Wind speed (mph) 15.0 Indoor: Heating Cooling 70 Indoor temperature (°F) 58 Design TD (°F) 50 Relative humidity (%) Cooling Moisture difference (gr/Ib) 88 Infiltration: 15 ( L ) Method 72 Construction quality 7.5 Fireplaces Heating Cooling 70 75 58 13 50 50 46.5 27.8 Simplified Average 0 Construction descriptions Or Area 11.1 -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftl-°F ftz-°F/Btuh Btu h/ftz Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" ne 148 0.065 21.0 3.74 554 0.99 147 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud se 176 0.065 21.0 3.74 659 0.99 175 sw 147 0.065 21.0 3.74 552 0.99 147 nw 80 0.065 21.0 3.74 300 0.99 80 all 551 0.065 21.0 3.74 2064 0.99 548 Partitions (none) Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 ne 12 0.300 0 17.3 207 20.3 244 glazing, cir outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; sw 13 0.300 0 17.3 219 25.5 322 6.67 ft head ht all 25 0.300 0 17.3 426 22.9 566 Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 356 0.295 0 6.38 2272 1.40 497 gypsum board int fnsh -}_��"1`-. 2015 -Apr -02 09:23:52 wrightsoft' Right -Suite® Universal 2015 15.0.12 RSU05790 Page 15 ACCR C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Component Constructions Job: BLD2 70 Meridian way wrightsoft Date: April 12015 HAII By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area U -value Insul R .: Loss Clg HTM Gain Location: Btuh/ftz-°F Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btu Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N ne 10 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" Wind speed (mph) 15.0 7.5 Fireplaces 0 881 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ftz-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" ne 10 0.065 21.0 3.74 37 0.99 10 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" 168 0.091 13.0 5.24 881 0 0 o.c. stud Windows (none) Doors 11 DO: Door, wd sc type ne 22 0.390 0 22.5 498 10.3 229 Ceilings 16B-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 84 0.026 38.0 1.50 126 1.30 109 gypsum board int fnsh Floors 19C-19cscp: Flr floor, frm flr, 6" thkns, carpet flr fnsh, r-2 ext ins, 84 0.049 30.0 0.98 82 0.21 18 r-19 cav ins, tight crwl ovr, r-11 wall insul 2015 -Apr -02 09:23:52 ,y -ff- wrightsoft Right -Suite® Universal 2015 15.0.12 RSU05790 Page 16 ACCK C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Load Short Form Job: BLD2 70 Meridian way WCIgiItSOfto Date: April 12015 Entire House By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 .nk'Y',°° *� „ •' : s Btuh 0 v +^ 0 Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Average Design TD (°F) 58 13 Fireplaces 0 Daily range - L 218 Inside humidity (%) 50 50 1093 Moisture difference (gr/Ib) 47 28 315 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFU E 0 Btuh 0 Btuh 0 OF 1573 cfm 0.028 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER Area (ft2) 0 Btuh 0 Btuh 0 Btuh 1573 cfm 0.047 cfm/Btuh 0 in H2O 0.90 3479 ROOM NAME Area (ft2) Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) CIg AVF (cfm) Lving room 257 4102 1622 114 77 Dining room 236 4669 3479 129 165 Kitchen 192 4004 4596 111 218 Brkfst 145 2593 1093 72 52 M. bed 315 7820 6739 217 319 Master bath 70 2164 1318 60 62 Bath 80 1606 1019 45 48 Laun 60 1204 1766 33 84 Bedroom 3 375 8892 3700 247 175 Bedroom 2 300 6696 3980 186 189 WIC 70 1260 266 35 13 2nd floor bath 140 1124 259 31 12 Loft 356 8301 2812 230 133 HAII OA 1)0 -t n cnrn n. ' �� • � vvv Vim' LJ Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015 -Apr -02 09:24:52 ,� wrigMtsoft9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 1 A"'r . C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Entire House d 2680 56748 33185 1573 1573 Other equip loads 0 2389 Equip. @ 0.93 RSM 32942 Latent cooling 3876 TnTAI Q Orion cn-7nn nnn4� 4C�n 4r�n v i�w QO!'+O JOOI! 10/0 IQ/J Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ti WCI i1tSOft 2015 -Apr -02 09:24:52 _ 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 2 ACCA C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Loads for Multiple Orientations Job: BLD270 Meridian way -- wrightsof't� p ons Date: April 1 2015 Entire House By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 42°N Outdoor: Heating Dry bulb (°F) 12 Daily range (°F) - Wet bulb (°F) - Wind speed (mph) 15.0 Front Door Indoor: Heating Cooling Southeast Indoor temperature (°F) 70 75 Northwest Design TD (°F) 58 13 32377 Relative humidity (%) 50 50 Cooling Moisture difference (gr/Ib) 46.5 27.8 88 Infiltration: 3830 3868 15 (L ) 3872 3835 Total Load (Btuh) 72 36602 36245 35221 7.5 36388 36592 35616 Front Door -'.'North Northeast East Southeast South Southwest West Northwest Sensible Load (Btuh) 32942 32731 32377 31391 32399 32520 32720 31781 Latent Load (Btuh) 3876,, 3871 3868 3830 3868 3868 3872 3835 Total Load (Btuh) 368j 7 36602 36245 35221 36267 36388 36592 35616 HeatingAVF (cfm) '-1573 1560 1548 1504 1549 1551 1562 1520 Cooling AVF (cfm) 1573 1 15601 15481 1504 1549 1551 1562 1520 Building Orientation Cooling Load Direction Front Door faces Current Orientation: Front Door faces North Highest Cooling Load: Front Door faces North Jho Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ti W rl Ilt SOf t ° 2015 -Apr -02 09:24:52 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 1 ACCP, C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N MVAD • • • % of load Walls Location: 10944 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 6.2 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 420N 4.9 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range °F) - 15 ( L ) Method Simplified 0 We bulb (°F� - 72 Construction quality Average Adjustments Wind speed (mph) 15.0 7.5 Fireplaces 0 1567481 -Component Btuh/ft2 Btuh % of load Walls 3.9 10944 19.3 Glazing 17.3 3519 6.2 Doors 22.5 1756 3.1 Ceilings 8.5 15389 27.1 Floors 4.9 8807 15.5 Infiltration 3.2 8655 15.3 Ducts 7677 13.5 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1567481 35574 100.0 -Component Btuh/ft2 Btuh % of load Walls 0.9 2417 6.8 Glazing 24.9 5063 14.2 Doors 10.3 808 2.3 Ceilings 7.4 13359 37.6 Floors 1.1 1927 5.4 Infiltration 0.3 792 2.2 Ducts 3741 10.5 Ventilation 0 0 Internal gains 5080 14.3 Blower 2389 6.7 Adjustments 0 Total 35574 100.0 Latent Cooling Load = 3876 Btuh Overall U -value = 0.140 Btuh/ft2-0F Data entries checked. �. 2015 -Apr -02 09:24:52 wrightsoftm Right -Suite® Universal 2015 15.0.12 RSU05790 /CCA C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Page 1 Component Constructions Job: BLD2 70 Meridian way -- wrightsoft" Date: April 12015 Entire House By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area 1.1 -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ftz Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/ftz Design TD (°F) 58 13 Latitude: 420N 84 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 1788 0.99 Daily range (°F) - 15 (L ) Method Simplified 0.065 Wet bulb (°F) - 72 Construction quality Average 800 Wind speed (mph) 15.0 7.5 Fireplaces 0 21.0 Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain 0 17.3 ftz Btuh/ft2-°F ft2 °F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 25.5 916 84 0.300 0 17.3 1452 25.5 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" ne 478 0.065 21.0 3.74 1788 0.99 475 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud se 804 0.065 21.0 3.74 3010 0.99 800 6.38 sw 532 0.065 21.0 3.74 1992 0.99 529 nw 617 0.065 21.0 3.74 2309 0.99 613 all 2430 0.065 21.0 3.74 9099 0.99 2417 Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" o.c. stud Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 ne glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; se 6.67 ft head ht sw nw all Doors 11 DO: Door, wd sc type Ceilings 16B-30ad: Attic ceiling, asphalt shingles roof mat, r-31 roof ins, r-30 ceil ins 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obswp: Part floor, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh 352 0.091 13.0 5.24 1845 0 0 36 0.300 0 17.3 628 20.3 737 36 0.300 0 17.3 622 25.5 916 84 0.300 0 17.3 1452 25.5 2138 47 0.300 0 17.3 818 20.3 961 204 0.300 0 17.3 3519 23.3 4752 ne 22 0.390 0 22.5 498 10.3 229 sw 56 0.390 0 22.5 1258 10.3 579 all 78 0.390 0 22.5 1756 10.3 808 375 0.032 30.0 1.84 691 1.60 600 486 0.026 38.0 1.50 728 1.30 632 953 0.255 1.0 14.7 13970 12.7 12127 1241 0.295 0 6.38 7922 1.40 1733 2015 -Apr -02 09:24:52 ,:Sj. wrightsoft" Right -Suite@ Universal 2015 15.0.12 RSU05790 Page 1 ACCP. C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N 19A-30bswp: Part floor, hrd wd fir fnsh, r-30 ins, frm fir, 10" thkns 19C-19cscp: Fir floor, frm fir, 6" thkns, carpet f I r fnsh, r-2 ext ins, r-19 cav ins, tight crwl ovr, r-11 wall insul 489 0.034 30.0 1.64 804 0.36 84 0.049 30.0 0.98 82 0.21 176 18 ..._- 2015 -Apr -02 09:24:52t WCI itSQft Right -Suite® Universal 2015 15.0.12 RSU05790 Page 2 ACCK C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N wri htsott- Component Constructions Job: BLD2 70 Meridian way g Date: April 12015 Lving room By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 rmatllon For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Htg HTM Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Btu Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" ne Daily range (°F) - 15 ( L ) Method Simplified 60 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Average 104 0.065 21.0 Fireplaces 0 0.99 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" ne 16 0.065 21.0 3.74 60 0.99 16 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud se 104 0.065 21.0 3.74 389 0.99 103 sw 112 0.065 21.0 3.74 419 0.99 111 all 232 0.065 21.0 3.74 869 0.99 231 Partitions (none) Windows (none) Doors 11 DO: Door, wd sc type Ceilings 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board intfnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns sw 56 0.390 0 257 0.026 38.0 257 0.034 30.0 22.5 1258 10.3 579 1.50 385 1.30 334 1.64 422 0.36 92 .: .+ h 2015 -Apr -02 09:24:52 WPI itS0t" Right -Suite® Universal 2015 15.0.12 RSU05790 Page 3 ACCP. C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N wri htsoft- Component Constructions Job: BLD270 Meridian way 9 Date: April 12015 Dining room By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 01 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions D o o • o U -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ftz Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/ft2 Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 314 0.99 Daily range (°F) - 15 ( L ) Method Simplified 0.065 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Average 0 8 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz-°F ftz-°F/Btuh Btu h/ftz Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" se 84 0.065 21.0 3.74 314 0.99 84 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud sw 8 0.065 21.0 3.74 30 0.99 8 all 92 0.065 21.0 3.74 344 0.99 91 Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" 8 0.091 13.0 5.24 42 0 0 o.c. stud Windows 2 glazing, cir outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 se 12 0.300 0 17.3 207 25.5 305 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 236 0.255 1.0 14.7 3460 12.7 3003 gypsum board int fnsh Floors (none) twri htft- 2015 -Apr -02 09:24:52 e.. 1 gsoRight-Suite@) Universal 2015 15.0.12 RSU05790 Page 4 ACCP, C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N wri htsoft Component Constructions Job: BLD270 Meridian way 9 Date: April 12015 Kitchen By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ftz-°F ft2-°FBtuh Btuh/ft2 Btu Btu h/ftz Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" Be 84 0.065 21.0 3.74 314 0.99 84 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 2 glazing, cir outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 Be 12 0.300 0 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 192 0.255 1.0 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd fir fnsh, r-30 ins, frm fir, 10" thkns 72 0.034 30.0 17.3 207 25.5 305 14.7 2815 12.7 2443 1.64 118 0.36 26 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ftz-°F ft2-°FBtuh Btuh/ft2 Btu Btu h/ftz Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" Be 84 0.065 21.0 3.74 314 0.99 84 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 2 glazing, cir outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 Be 12 0.300 0 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 192 0.255 1.0 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd fir fnsh, r-30 ins, frm fir, 10" thkns 72 0.034 30.0 17.3 207 25.5 305 14.7 2815 12.7 2443 1.64 118 0.36 26 2015 -Apr -02 09:24:52 ,Z- wrightsoft* Right -Suite® Universal 2015 15.0.12 RSU05790 Page 5 ACCO. C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N wri htsoft- Component Constructions Job: BLD2 70 Meridian way 9 Brkfst Bate: April 12015 Y J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area U -value Location: 42 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Htg HTM Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Btu Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" ne Daily range (°F) - 15 ( L ) Method Simplified 553 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Average 0 60 Construction descriptions Or Area U -value 5.24 42 0 0 o.c. stud Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ftz-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 ne 12 0.300 0 17.3 213 20.3 250 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" ne 148 0.065 21.0 3.74 553 0.99 147 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud se 60 0.065 21.0 3.74 225 0.99 60 all 208 0.065 21.0 3.74 778 0.99 207 Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" 8 0.091 13.0 5.24 42 0 0 o.c. stud Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 ne 12 0.300 0 17.3 213 20.3 250 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; se 12 0.300 0 17.3 207 25.5 305 6.67 ft head ht all 24 0.300 0 17.3 420 22.8 556 Doors (none) Ceilings 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 145 0.026 38.0 1.50 217 1.30 189 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 145 0.034 30.0 1.64 238 0.36 52 -� Wrl htsoft' 2015 -Apr -02 09:24:52 ..... � 9 Right -Suite® Universal 2015 15.0.12 RSU05790 SCI\ C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Page 6 wri htsoft Component Constructions Job: BLD270 Meridian way 9 M. bed Byte: April 12015 J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 gar0 all For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions 0r Area U -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft2 Indoor temperature (°F) 70 75 Elevation: 30 ft Btu h/ftz Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 30 0.99 Daily range (°F) - 15 ( L ) Method Simplified 0.065 Wet bulb (°F) - 72 Construction quality Average 131 Wind speed (mph) 15.0 7.5 Fireplaces 0 21.0 Construction descriptions 0r Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/fi ft2-°F/Btuh Btuh/fV Btu Btu h/ftz Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" se 8 0.065 21.0 3.74 30 0.99 8 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud sw 132 0.065 21.0 3.74 494 0.99 131 nw 108 0.065 21.0 3.74 404 0.99 107 all 248 0.065 21.0 3.74 929 0.99 247 Partitions (none) Windows 2 glazing, clr outr, air gas, wd firm mat, clr innr, 1/4" gap, 1/8" thk: 2 sw 36 0.300 0 17.3 622 25.5 916 glazing, clr outr, air gas, wd firm mat, clr innr, 1/4" gap, 1/8" thk; nw 12 0.300 0 17.3 207 20.3 244 6.67 ft head ht all 48 0.300 0 17.3 829 24.2 1160 Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, firm fir, 10" thkns, 1/2" 315 0.255 1.0 14.7 4618 12.7 4008 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd fir fnsh, r-30 ins, firm fir, 10" thkns 15 0.034 30.0 1.64 25 0.36 5 -ems -d I WPI htsoft 2015 -Apr -02 09:24:52 .. _ 1" g Right -Suite® Universal 2015 15.0.12 RSU05790 Page 7 ACOA C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N wri htsoft- Component Constructions Job: BLD270 Meridian way g Date: April 12015 Master bath By: JW Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 0 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz-°F ft2-°F/Btuh Btuh/ftz Btu Btuh/112 Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" nw 68 0.065 21.0 3.74 256 0.99 68 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" 56 0.091 13.0 5.24 o.c. stud Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 nw 12 0.300 0 17.3 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 70 0.255 1.0 gypsum board int fnsh Floors (none) 294 0 0 202 20.3 237 14.7 1026 12.7 891 W` wri htsoft 2015 -Apr -02 09:24:52 1 g Right -Suite® Universal 2015 15.0.12 RSU05790 Page 8 ACCK C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Average 0 Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz-°F ft2-°F/Btuh Btuh/ftz Btu Btuh/112 Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" nw 68 0.065 21.0 3.74 256 0.99 68 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" 56 0.091 13.0 5.24 o.c. stud Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 nw 12 0.300 0 17.3 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 70 0.255 1.0 gypsum board int fnsh Floors (none) 294 0 0 202 20.3 237 14.7 1026 12.7 891 W` wri htsoft 2015 -Apr -02 09:24:52 1 g Right -Suite® Universal 2015 15.0.12 RSU05790 Page 8 ACCK C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N wri htsoft- Component Constructions Job: BLD2 70 Meridian way 9 Bath Bate: April 12015 By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 0 OJ 0 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ftz-°F ft2-°FBtuh Btuh/ftz Btu Btu h/ftz Btu Walls (none) Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" o.c. stud Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors (none) 64 0.091 13.0 80 0.255 1.0 5.24 335 0 0 14.7 Location: 12.7 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ftz-°F ft2-°FBtuh Btuh/ftz Btu Btu h/ftz Btu Walls (none) Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" o.c. stud Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors (none) 64 0.091 13.0 80 0.255 1.0 5.24 335 0 0 14.7 1173 12.7 1018 ..` Wil Ilt soft 2015 -Apr -02 09:24:52 1" Right-SuiteOO Universal 2015 15.0.12 RSU05790 Page 9 ACCR C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N wri htsoft- Component Constructions Job: BLD2 70 Meridian way 9 Date: April 12015 Laun By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 EM Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Walls (none) Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" o.c. stud Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors (none) Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btu h/ft2 Btu 48 0.091 13.0 60 0.255 1.0 5.24 252 0 0 14.7 880 12.7 764 wri htsoft 2015 -Apr -02 09:24:52 1 g Right -Suite® Universal 2015 15.0.12 RSU05790 ACCA C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Page 10 wri htsoft Component Constructions Job: BLD2 70 Meridian way 9 Date: April 12015 Bedroom 3 By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876. Wa �. a i t ,'a . f 0 • 0: U -value Insul R Htg HTM Location: Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btuh/ftz-°F Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 155 Daily range (°F) - 15 ( L ) Method Simplified 21.0 Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 3.74 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ft2-°F/Btuh Btu h/ft2 Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" ne 156 0.065 21.0 3.74 584 0.99 155 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud se 176 0.065 21.0 3.74 659 0.99 175 nw 172 0.065 21.0 3.74 644 0.99 171 all 504 0.065 21.0 3.74 1887 0.99 501 Partitions (none) Windows 2 glazing, cir outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 ne 12 0.300 0 17.3 207 20.3 244 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; nw 12 0.300 0 17.3 207 20.3 244 6.67 ft head ht all 24 0.300 0 17.3 415 20.3 487 Doors (none) Ceilings 1613-30ad: Attic ceiling, asphalt shingles roof mat, r-31 roof ins, 375 0.032 30.0 1.84 691 1.60 600 r-30 ceil ins Floors 19A-Obswp: Part floor, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 375 0.295 0 6.38 2394 1.40 524 gypsum board int fnsh -I - -}_�"- Wrl htSOftfl 2015 -Apr -02 09:24:52 i.._.. " I-' 9 Right -Suite® Universal 2015 15.0.12 RSU05790 ACCA C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Page 11 wri htsoft- Component Constructions Job: BLD2 70 Meridian way 9 Date: April 12015 Bedroom 2 By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area 1.1 -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ftz Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/ftz Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 419 0.99 Daily range (°F) - 15 ( L ) Method Simplified 0.065 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Average 0 132 Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz-°F ft2-°F/Btuh Btuh/ftz Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" se 112 0.065 21.0 3.74 419 0.99 111 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud sw 133 0.065 21.0 3.74 497 0.99 132 nw 108 0.065 21.0 3.74 406 0.99 108 all 353 0.065 21.0 3.74 1322 0.99 351 Partitions (none) Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 sw 35 0.300 0 17.3 611 25.5 899 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk; nw 12 0.300 0 17.3 202 20.3 237 6.67 it head ht all 47 0.300 0 17.3 812 24.2 1136 Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor, hrd wd flr fnsh, frm fl r, 10" thkns, 1/2" 300 0.295 0 6.38 1915 1.40 419 gypsum board int fnsh ,,Z 2015 -Apr -02 09:24:52WPI htsofRight-Suite® Universal 2015 15.0.12 RSU05790 Page 12 ACCA C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Component Constructions Job: BLD270 Meridian way Wr([jhfisoft- Date: April 12015 WIC By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 R 77 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F W-°F/Btuh BtuhN Btu Btu h/ftz Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh nw 80 0.065 21.0 70 0.295 0 3.74 300 0.99 6.38 447 1.40 80 98 gam. � wrightsoft" Right -Suite® Universal 2015 15.0.12 RSU05790 2015 -Apr -02 09:24:52 Page 13 .�}i: A C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F W-°F/Btuh BtuhN Btu Btu h/ftz Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh nw 80 0.065 21.0 70 0.295 0 3.74 300 0.99 6.38 447 1.40 80 98 gam. � wrightsoft" Right -Suite® Universal 2015 15.0.12 RSU05790 2015 -Apr -02 09:24:52 Page 13 .�}i: A C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N �ti,.atv? . ',. r d 0 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ftz-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu 140 0.295 0 6.38 894 1.40 195 wrightsoft" Right -Suite® Universal 2015 15.0.12 RSU05790 ACCA C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N 2015 -Apr -02 09:24:52 Page 14 wri htsoft- Component Constructions Job: BLD2 70 Meridian way 9 Loft Byte: April 12015 J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 For: • • Mount51 •Tewksbury,• Construction descriptions Or Area U -value Insul R Htg HTM Loss Location: Gain Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft�-°F/Btuh Indoor temperature (°F) 70 75 Elevation: 30 ft Walls Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 147 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Daily range (°F) - 15 ( L ) Method Simplified 3.74 Wet bulb (°F) - 72 Construction quality Average sw Wind speed (mph) 15.0 7.5 Fireplaces 0 552 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftl-°F ft�-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" ne 148 0.065 21.0 3.74 554 0.99 147 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud se 176 0.065 21.0 3.74 659 0.99 175 sw 147 0.065 21.0 3.74 552 0.99 147 nw 80 0.065 21.0 3.74 300 0.99 80 all 551 0.065 21.0 3.74 2064 0.99 548 Partitions (none) Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 ne 12 0.300 0 17.3 207 20.3 244 glazing, cir outr, air gas, wd frm mat, cir innr, 1/4" gap, 1/8" thk; sw 13 0.300 0 17.3 219 25.5 322 6.67 ft head ht all 25 0.300 0 17.3 426 22.9 566 Doors (none) Ceilings (none) Floors 19A-Obswp: Part floor, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 356 0.295 0 6.38 2272 1.40 497 gypsum board int fnsh 2015 -Apr -02 09:24:52wri htsoft' Right -Suite@ Universal 2015 15.0.12 RSU05790 ACCK C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N Page 15 Component Constructions Job: BLD270 Meridian way wrightsoft Date: April 12015 HAIL By: J&J Heating and Air Conditioning 17 Arlington, Dracut, ma 01826 • 4 0 For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ftl-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" ne 10 0.065 21.0 3.74 37 0.99 10 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" o.c. stud Windows (none) Doors 11 DO: Door, wd sc type Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 19C-19cscp: Fir floor, frm fir, 6" thkns, carpet fir fnsh, r-2 ext ins, r-19 cav ins, tight crwl ovr, r-11 wall insul 168 0.091 13.0 ne 22 0.390 5.24 881 0 0 0 22.5 498 10.3 229 84 0.026 ME MM 1.50 84 0.049 30.0 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ftl-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, wd ext, 1/2" wood shth, r-21 cav ins, 1/2" ne 10 0.065 21.0 3.74 37 0.99 10 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm, 16" o.c. stud Windows (none) Doors 11 DO: Door, wd sc type Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 19C-19cscp: Fir floor, frm fir, 6" thkns, carpet fir fnsh, r-2 ext ins, r-19 cav ins, tight crwl ovr, r-11 wall insul 168 0.091 13.0 ne 22 0.390 5.24 881 0 0 0 22.5 498 10.3 229 84 0.026 38.0 1.50 84 0.049 30.0 0.98 126 1.30 109 82 0.21 18 Wit i1tSOft 2015 -Apr -02 09:24:52 ,,.Z- 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 16 ACCP. C:\Users\eric\Desktop\M-J - Copy\Been osgood.rup Calc = MJ8 Front Door faces: N For: Trust Construction 51 Mount Joy Drive, Tewksbury, ma 01876 Notes: IOUI In Inforrnat�on Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range Relative humidity L 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 49071 Btuh Structure 29444 Btuh Ducts 7677 Btuh Ducts 3741 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 2389 Btuh Piping 0 Btuh Equipment load 56748 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 32942 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 2278 Btuh Ducts 1598 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 2680 2680 Equipment latent load 3876 Btuh Volume (ft3) 21440 21440 Air changes/hour 0.32 0.16 Equipment total load 36817 Btuh Equiv. AVF (cfm) 137 57 Req. total capacity at 0.80 SHR 3.4 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1573 cfm Actual air flow 1573 cfm Air flow factor Static pressure 0.028 cfm/Btuh 0 in H2O Air flow factor Static pressure 0.047 0 cfm/Btuh in H2O Space thermostat Load sensible heat ratio 0.90 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 1i I WI1 iICSOft' Right -Suite® Universal 2015 15.0.12 RSU05790 2015 -Apr -0209:24:52 Page 1 C:\Users\eric\Desktop\M-J - Copy\been osgood.rup Calc = MJS Front Door faces: N