Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miscellaneous - 72 Meridian Way
,_ fi �� �V 361 Date .'. ? l; `.)...... TOWN OF NORTH ANDOVER PERMIT FOR MECHANICAL INSTALLATION F j s This certifies that . I . �.J..--� .-PC...., 4 A / � ....... . ,. has permission for mecha ' _ nical installation h� �; ? ............ in the buildings of ....1..� 4�.-,*' .. �._. !�.................. at North Andover, ass. Fee.... Lic. No.. ............ /'...... GAS INSPECTOR l { WHITE: Applicant CANARY: Building Dept. PINK: Treasurer �� A Commonwealth of Massachusetts Sheet Meta, Permit Date: Estimated Job Cost: 3 G G c CZ r Plaits Submitted: YES NO Business License It 196 Business Information: Name: J&J Heating. & Air Conditioning Street: 17 Arlington St_ Permit ff I Permit Fee: $ Plans Reviewed: YES NO Applicant License it Property Owner / Job Name: s �' Street: p)-5- on Information: City/Town: Dracut, MA 01826 City/Town: North Andover, MA 01845 Telephone: 978-454-8197 Telephone: j c> 53' Photo 1.1). required / Copy of Photo I.D. attached: YES NO staff111ifinl J-1 / M -1 -unrestricted license J-2 / M -2 -restricted to dwellings 3 -stories or less and conunercial up to 10,000 sq. ft. / 2 -stories or less 12csidcutitil: i=2"faliuly Y' - -Multi-family Condo / Towi-Aiouses Other Commercial: Office Retail Industrial _ Educational Institutional Other Square Footage: under 10,000 sq. ft. ✓' over 10,000 sq. ft. Number of Stories: Sheet metal work to be completed: New Work: ✓ Renovation: HVAC ✓ Metal Watershed Roofing Kitchen Exhaust System Metal Chimney / Vents Air Balancing Provide detailed description of work to be done: INSURANCE COVERAGE: I have a current lialAity insurance policy or its equivalentwhich meets the requirements of M.G.L. Ch. 112 Yes [eNNo ❑ If you have checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy [� Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the Insurance coverage required by Chapter 112 of the Massachusetts General Laws, and that my ignature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this boxEl, I hereby certify that all of the details and Information I have submitted (or entered) regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and Installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO Date Date By Title ciiyrrown Permit it Fee y _ Inspector Signature of Permit Approval 11,1•01',ress Inspections Comments Final Inspection Type of License: ❑ Master ❑ Master -Restricted ❑Journeyperson ❑Journeyperson-Restricted Cott mellts Q-/ Sig—nature of Licensee License Number: ) (a, 9 Check at www.mass.clovldpl ACORD,,, CERTIFICATE OF LIABILITY INSURANCE FDATE(MM/DD/YYYY) 05/27/2015 PRODUCER 978, 887, 4900 FAX 978.887.2404 Edward F. Sennott Insurance Agency, Inc. 16 South Main Street P. 0. Box 457 Topsfiel d, MA 01983 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC # INSURED I&J Heating & Air Conditioning, Inc. 17 Arlington Street Dracut, MA 01826 INSURERA: Great American Alliance Ins Co INSURERB: Safety Insurance Company 39454 INSURERC: A.I.M. Mutual Insurance Co INSURER D: INSURER E: THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSRDD' LTR NSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE DATE MM DD POLICY EXPIRATION DATE MM DD LIMITS; GENERAL LIABILITY PAC6418906-09 06/01/2015 06/01/2016 EACH OCCURRENCE $ 1,000,00( X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTEU— PREMISES Ea occurrence)' $ 300,00( CLAIMS MADE FX—]OCCUR MED EXP (Anyone person) $ 10,00( A PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GE]N'L AGGREGATE LIMIT APPLIES PER:JECT PRODUCTS -COMP/OP AGG $ 2,000,000 PRO -POLICY ECT LOC AUTOMOBILE LIABILITY 2434550 06/01/2015 06/01/2016 COMBINED SINGLE LIMIT $ ANY AUTO (Ea accident) 1,000,000 ,000,00 ALL OWNED AUTOS X BODILY INJURY $ B SCHEDULED AUTOS (Per person) X HIRED AUTOS X BODILY INJURY $ NON -OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/ UMBRELLA LIABILITY _X1 UMB6418958-08 06/01/2015 06/01/2016 EACH OCCURRENCE $ 2,000,000 OCCUR FICLAIMS MADE AGGREGATE $ 2,000,00 A $ DEDUCTIBLE RETENTION $' WORKERS COMPENSATION AND EMPLOYERS' WMZ-800-8006553-2015 06/02/2015 06/02/2016X LIABILITY Y / NANY TORY LIMITS ER E.L. EACH ACCIDENT $ 1,000,000 C OFFICE PREIMBER/EXCLUDEDXECUTIVE� (Mandatory In NH) describe under E.L. DISEASE - EA EMPLOYE $ 1,000,000 E.L. DISEASE - POLICY LIMIT $ 1,000,000 Syes, SPECIAL PROVISIONS below OTHER DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS f CQTICIPATC U^1 nGM SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. Evidence of Insurance AUTHORIZED REPRESENTATIVE /% Peter Sennott/LAR �-�4y,�„.,,,`-, ACORD 25 (2009/01) ©1,988-2009 ACORD CORPORATION. All riahts reservArI rhe ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations ' 600 Washington Street Boston, MA 02111 www mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): J & J Heating & Air Conditioning, Inc. Address: 17 Arlington Street City/State/Zip: Dracut, MA. 01826 Phone #: 978-454-8197 Are you an employer? Check the appropriate box: 1. ® I am a employer with 40 4. I am a general contractor and I employees (full and/or part-time).* have hired the sub -contractors 2. ❑ I am a sole proprietor or partner- listed on the attached sheet. ship and have no employees These sub -contractors have working for me in any capacity. employees and have workers' [No workers' comp. insurance comp, insurance.# required.] 5. [] We area corporation and its 3. ❑ I am a homeowner doing all work officers have exercised their myself. [No workers' comp. right of exemption per MGL insurance required.] t c. 152, §1(4), and we have no employees. [No workers' comp. insurance required.] Type of project-(requi'red): 6. ❑ New construction ,7. ❑ Remodeling $. E] Demolition 9. ❑ Building addition 10. ❑ Electrical repairs or additions 11. ❑ Plumbing repairs or additions 12.D Roof repairs . 13.❑ Other *Any applicant that checks box #1 must also fill out the section below showing their workers' compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub -contractors and state whether or not those entities have employees. If the sub -contractors have employees, they must provide their workers' comp. policy number. I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: A. I.M. Mutual Insurance Policy # or Self -ins. Lic. #: WMZ-8006553-2015 Expiration.Date: 06/02/16 Job Site City/State/Zip: Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a st the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigation the DIA fbr insurance_caxQrage verification. I do here fy u er tl a pa -i: and e es of perjury that the information provided above is true and correct. Siggature: Dater p �� Phone #: 978— 54-8197 Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone #: v COMMONWEALTH OF MASSACHUSETTS L CHUS,,IT;S; pRIVER'S ' LICENSE ,p;A iF .a,� 4 ISS I' '4q ENO 4d NUMBER nos -o3 zoic NONE S99655871 i .. 41 EXP,. 3 00 052�2r�016: 2 i7{� .31,980 m1 , 1� yCITSS .12 REST' 1 SEX M 1CIdHG J DM NONE { 1 i ,KEINE 2 ERIC RJ os 22"1980 y 11" �.• ''''2' iu-" n 83 LONG DR DRACUT, MA 01826.2048 ,. O"4-2011 R,,07.11-2009 5 DD OMMONWeALTH OF MlliUS7TS '' oPIRATION UP Load Short Form Job: 51 hight Point Gratfton wrightsoft° Date: Oct 28, 2014 Entire House By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Design Information Htg Clg Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 69 75 Construction quality Tight Design TD (°F) 64 8 Fireplaces 1 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 49 24 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref. n/a Efficiency n/a Heating input Sensible cooling Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Coil n/a AHRI ref. n/a Efficiency n/a Htg load Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 1080 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor d 1508 35704 17827 947 947 (Rest of House) d 1722 37899 26736 1080 1080 Entire House d 3230 73604 44563 2027 2027 Other equip loads 0 0 Equip. @ 0.88 RSM 39082 Latent cooling 5965 TOTAI R ALnA9 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. . ► 2015 -Jun -22 06: + wrightsoft° Right -Suite® Universal 2015 15.0.12 RSU05790 e 1 ACCK Page 1 ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N wrightsoft, Load Short Form Job: 51 hight Point Gratfton Date: Oct 28, 2014 (Rest of House) By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Design Information Htg Clg Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 65 8 Fireplaces 1 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 51 24 HEATING EQUIPMENT Make Amana Trade AMANA Model AMH950704BX AHRI ref 2012268 Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 95 AFU E Area (ft2) 46000 Btuh 44000 Btuh 38 OF 1080 cfm 0.028 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Amana Trade ASX14 SERIES Cond ASX140361C* Coil CA*F3642*6D* AHRI ref 5188426 Efficiency 12.3 EER, Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 15 SEER Area (ft2) 22680 Btuh 9720 Btuh 32400 Btuh 1080 cfm 0.040 cfm/Btuh 0 in H2O 0.90 698 ROOM NAME Area (ft2) Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) Clg AVF (cfm) Study 144 4587 3383 131 137 Lav 42 1340 698 38 28 Family room 448 5549 4272 158 173 Foyer 170 2573 923 73 37 Dinning room 234 5481 4761 156 192 Eating 120 3131 1821 89 74 Kitchen 210 6100 3839 174 155 Laundry room 60 1482 865 42 35 Mud room 60 1058 815 30 33 Hall 42 695 561 20 23 Room13 101) con) An7 A^. I .' V -j Yr C1I 100 IU4 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. C wri htsoft° 2015 -Jun -22 06:50:03 ,- 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 2 ACCA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N (Rest of House) d 1722 37899 26736 1080 1080 Other equip loads 0 0 Equip. @ 0.88 RSM 23448 Latent cooling 2859 TOTALS 1722 37899 26307 1080 1080 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. /4C L + wrightsofte Right -Suite® Universal 2015 15.0.12 RSU05790 ..c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N 2015 -Jun -22 06:50:03 Page 3 {9 m Load Short Form Job: 51 2Point Gratfton wri htsoft Date: Octt 288,, 2014 2nd floor By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Design Information Htg Clg Infiltration Outside db (°F) 5 83 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 63 8 Fireplaces 1 (Average) Daily range - M Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 24 HEATING EQUIPMENT Make Amana Trade AMANA Model AMH950704BX AH R I ref 2012268 Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 95 AFUE Area (ft2) 46000 Btuh 44000 Btuh 44 OF 947 cfm 0.027 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Amana Trade ASX13 SERIES Cond ASX130421C* Coil CA*F3131*6D* AHRI ref 4385601 Efficiency 11.5 EER, Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 14 SEER Area (ft2) 19880 Btuh 8520 Btuh 28400 Btuh 947 cfm 0.053 cfm/Btuh 0 in H2O 0.88 2632 ROOM NAME Area (ft2) Htg load (Btuh) Cig load (Btuh) Htg AVF (cfm) Clg AVF (cfm) bedroom 2 234 5390 1801 143 96 bedroom 4 156 4724 2632 125 140 1/2 bath 60 1053 710 28 38 bedroom 3 180 5086 2960 135 157 Master closet 200 2862 927 76 49 master bed 412 8653 4995 230 265 mastrbed bath 180 4838 3403 128 181 9nd flnnr wall on 3099 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft 2015 -Jun -22 06:50:03 1 9 Right-Suitersl Universal 2015 15.0.12 RSU05790 /ACCP1 ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 4 2nd floor d 1508 35704 17827 947 947 Other equip loads 3190 5120 Equip. @ 0.88 RSM 20124 Latent cooling 3106 TnTAIC 1rno Boone none^ ^A> n.> Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. CWrl htft° 2015 -Jun -22 06:50:03 11, 9soRight-Suite® Universal 2015 15.0.12 RSU05790 Page 5 ACCK ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N '. + wrightsoftm Load Multizone Summary Report J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Job: 51 hight Point Gratfton Date: Oct 28, 2014 By: Load and AVF Summary ROOM NAME Area ft2 Htg load Btuh Clg load Btuh Htg AVF cfm Clg AVF cfm bedroom 2 234 5390 Heating 143 96 Cooling 156 ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM 710 W cfm Btuh/ft2 ft9 cfm Btuh/ft2 2nd floor 13572 0.46 104 2.8 13572 0.40 91 0.3 (Rest of House) 21060 0.21 74 2.9 21060 0.18 65 0.3 Entire House 1 34632 0.16 178 1.5 34632 0.07 155 0.1 Load and AVF Summary ROOM NAME Area ft2 Htg load Btuh Clg load Btuh Htg AVF cfm Clg AVF cfm bedroom 2 234 5390 1801 143 96 bedroom 4 156 4724 2632 125 140 1/2 bath 60 1053 710 28 38 bedroom 3 180 5086 2960 135 157 Master closet 200 2862 927 76 49 master bed 412 8653 4995 230 265 mastrbed bath 180 4838 3403 128 181 2nd floor wall 86 3099 399 82 21 2nd floor 1508 35704 17827 947 947 Study 144 4587 3383 131 137 Lav 42 1340 698 38 28 Family room 448 5549 4272 158 173 Foyer 170 2573 923 73 37 Dinning room 234 5481 4761 156 192 Eating 120 3131 1821 89 74 Kitchen 210 6100 3839 174 155 Laundry room 60 1482 865 42 35 Mud room 60 1058 815 30 33 Hall 42 695 561 20 23 Room13 192 5903 4797 168 194 (Rest of House) 1722 37899 26736 1 1080 1080 Entire House 3230 73604 44563 T2027 2027 AL � wrightsoft' Right -Suite® Universal 2015 15.0.12 RSU05790 2015 -Jun -22 06:50:03 Page 1 ..c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Building Analysis Job: 51 hight Point Gratfton wrightsoft® y Date: Oct 28, 2014 Entire House By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Me 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Jesion Conditir Location: Btuh/ft' Indoor: Heating Cooling Worcester, MA, US 15831 Indoor temperature (°F) 69 75 Elevation: 1010 ft 7.8 Design TD (°F) 64 8 Latitude: 420N Ceilings Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 49.4 23.6 Dry bulb (°F) 5 83 Infiltration: Ducts Daily ran a °F) - (°F� 17 ( M) Method Simplified 0 Wet bulb - 69 Construction quality Tight 0 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Adjustments Heating Component Btuh/ft' Btuh % of load Walls 4.1 15831 21.5 Glazing 18.6 5715 7.8 Doors 18.9 792 1.1 Ceilings 11.0 19365 26.3 Floors 6.0 12383 16.8 Infiltration 2.9 12020 16.3 Ducts 7497 10.2 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 1736041 100.0 Cooling Component Btuh/ft' Btuh % of load Walls 0.6 2407 5.4 Glazing 26.3 8087 18.1 Doors 6.1 255 0.6 Ceilings 9.5 16641 37.3 Floors 0.7 1510 3.4 Infiltration 0.3 1268 2.8 Ducts 4035 9.1 Ventilation 0 0 Internal gains 10360 23.2 Blower 0 0 Adjustments 0 Total 445631 100.0 Latent Cooling Load = 5965 Btuh Overall U -value = 0.153 Btuh/ft'-OF Data entries checked. .!Qlt.Wrl htsoft° 2015 -Jun -22 06:50:03 .►. 9 Right -Suite® Universal 2015 15.0.12 RSU05790 ,CA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 1 wrightsoft® Building Analysis y Btuh Job: 51 hight Point Gratfton Date: Oct 28, 2014 Walls (Rest of House) 6519 By: Glazing 18.9 J&J Heating and Air Conditioning 7.6 Doors 18.9 17 Arlington st, Dracut, Ma 01826 2.1 Ceilings 11.2 19307 50.9 Floors 1.9 1007 2.7 Infiltration 2.9 5102 13.5 Project• • 2307 6.1 For: Trust Construction 0 0 Humidification 51 Mt Joy Dr, Tewksbury, Ma 01876 Ventilation 0 0 Adjustments 0 Design Conditions Total 1 137899 Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 70 75 Elevation: 1010 ft Design TD (°F) 65 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: Dally range °F) - 17 ( M) Method Simplified Wet bulb (°F� Wind speed (mph) - 69 15.0 7.5 Construction quality Fireplaces Ti ht 1 Average) • Component Btuh/ft' Btuh % of load Walls 4.2 6519 17.2 Glazing 18.9 2865 7.6 Doors 18.9 792 2.1 Ceilings 11.2 19307 50.9 Floors 1.9 1007 2.7 Infiltration 2.9 5102 13.5 Ducts 2307 6.1 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 137899 100.0 Cooling Component Btuh/ft' Btuh % of load Walls 0.6 973 3.6 Glazing 26.0 3949 14.8 Doors 6.1 255 1.0 Ceilings 9.6 16600 62.1 Floors 0.2 119 0.4 Infiltration 0.3 529 2.0 Ducts 431 1.6 Ventilation 0 0 Internal gains 3880 14.5 Blower 0 0 Adjustments 0 Total 1267361 100.0 Latent Cooling Load = 2859 Btuh Overall U -value = 0.118 Btuh/ft'-OF Data entries checked. Ak Wrl htsoft® 2015 -Jun -22 06:50:03 9 Right -Suite® Universal 2015 15.0.12 RSU05790 ,4M ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = M.18 Front Door faces: N Page 2 - Building Analysis Job: 51 hightPoint Gratfon wrightsoftDate: Oct 28, 2014 2nd floor By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Location: Worcester, MA, US Elevation: 1010 ft Latitude: 420N Outdoor: Dry bulb (°F) Daily ran a °F) Wet bulbg(°F� Wind speed (mph) Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Heating Component Indoor: Heating Cooling Walls Indoor temperature (°F) 68 75 Glazing Design TD (°F) 63 8 Doors Relative humidity (%) 50 50 Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 5 83 Infiltration: 11376 29.2 - 17g ( M) Method Simplified 17.8 Ducts Construction quality Tight 13.3 15.0 7.5 Fireplaces 1 (Average) 0 Heating Component Btuh/ft2 Btuh % of load Walls 4.1 9312 23.9 Glazing 18.3 2850 7.3 Doors 0 0 0 Ceilings 1.6 57 0.1 Floors 7.5 11376 29.2 Infiltration 2.8 6918 17.8 Ducts 28.2 5191 13.3 Piping Adjustments 0 0 Humidification 1229461 3190 8.2 Ventilation 0 0 Adjustments 0 Total 1 1388941 100.0 Cooling Component Btuh/ft2 Btuh % of load Walls 0.6 1434 6.2 Glazing 26.5 4138 18.0 Doors 0 0 0 Ceilings 1.2 40 0.2 Floors 0.9 1390 6.1 Infiltration 0.3 740 3.2 Ducts 3604 15.7 Ventilation 0 0 Internal gains 6480 28.2 Blower 5120 22.3 Adjustments 0 Total 1229461 100.0 Latent Cooling Load = 3106 Btuh Overall U -value = 0.188 Btuh/ft2-°F Data entries checked. ' Rihtsoft I-^- f 1 .�.. � W 9 Right-SufteO Universal 2015 15.0.12 RSU05790 2015 -Jun -22 06:50:03 ACCK ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 3 - Component Constructions Job: 51 hight Point Gratfton wrightsoft Date: Oct 28, 2014 Entire House By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 ]esian Conditir Location: 0.065 Indoor: Heating Cooling Worcester, MA, US 690 Indoor temperature (°F) 69 75 Elevation: 1010 ft 4227 Design TD (°F) 64 8 Latitude: 420N 21.0 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 49.4 23.6 Dry bulb (°F) 5 83 Infiltration: all 3817 0.065 Daily range (°F) - 17 ( M) Method Simplified 2407 Wet bulb (°F) - 69 Construction quality Tight 396 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 10.5 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft'-'F ft?'FBtuh Btuh/ft' Btu BtuhM2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors 11 P0: Door, mtl pur core type Ceilings n 1095 0.065 21.0 4.14 4535 0.63 690 e 1014 0.065 21.0 4.17 4227 0.63 639 s 951 0.065 21.0 4.13 3928 0.63 600 w 757 0.065 21.0 4.15 3141 0.63 477 all 3817 0.065 21.0 4.15 15831 0.63 2407 n 12 0.290 0 18.9 226 7.39 89 e 144 0.290 0 18.6 2673 27.6 3970 s 12 0.290 0 18.3 219 14.0 168 w 140 0.290 0 18.6 2597 27.6 3860 all 308 0.290 0 18.6 5715 26.3 8087 e 21 0.290 10.5 18.9 396 6.06 127 w 21 0.290 10.5 18.9 396 6.06 127 all 42 0.290 10.5 18.9 792 6.06 255 16A-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceiI ins, 1/2" 618 0.026 38.0 1.69 1044 1.67 1035 gypsum board int fnsh 35 0.026 38.0 1.64 57 1.15 40 all 653 0.026 38.0 1.69 1102 1.65 1075 C part ceiling,: C part ceiling, hrd wd flr fnsh, frm fir, 10" thkns, 1/2" 1104 0.255 1.0 16.5 18263 14.1 15566 gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns 1508 0.368 0 7.54 11376 0.92 1390 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 543 0.034 30.0 1.85 1007 0.22 119 wri htsoft' 2015 -Jun -22 06:50:04 ,.� 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 1 �CA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N wri htsoft® Component Constructions Job: 51 hight Point Gratfton 9 Date: Oct 28, 2014 2nd floor By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 e-roject intormation For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 ]esian Conditir Location: 0.065 Indoor: Heating Cooling Worcester, MA, US 443 Indoor temperature (°F) 68 75 Elevation: 1010 ft 1806 Design TD (°F) 63 8 Latitude: 420N 21.0 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: all 2274 0.065 Daily range (°F) - 17 ( M) Method Simplified 1434 Wet bulb (F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuhtft'-°F ft'-°FBtuh Btuh/ft' Btu BtuhtV Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings 166-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceiI ins, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns n 702 0.065 21.0 4.09 2875 0.63 443 e 441 0.065 21.0 4.09 1806 0.63 278 s 690 0.065 21.0 4.09 2826 0.63 435 w 441 0.065 21.0 4.09 1806 0.63 278 all 2274 0.065 21.0 4.09 9312 0.63 1434 e 72 0.290 0 18.3 1315 27.6 1985 s 12 0.290 0 18.3 219 14.0 168 w 72 0.290 0 18.3 1315 27.6 1985 all 156 0.290 0 18.3 2850 26.5 4138 35 0.026 38.0 1508 0.368 0 1.64 57 1.15 40 7.54 11376 0.92 1390 wri htsoft° 2015 -Jun -22 06:50:04 ,v^►.. � 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 2 'I'M ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N wri htsoft® Component Constructions Job: 51 hight Point Gratfton 9 Date: Oct 28, 2014 (Rest of House) By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 IlZifli1ject Intormation For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 ]esion Conditia Location: 0.065 Indoor: Heating Cooling Worcester, MA, US 248 Indoor temperature (°F) 70 75 Elevation: 1010 ft 2421 Design TD (°F) 65 8 Latitude: 420N 21.0 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: all 1543 0.065 Daily range (°F) - 17 ( M) Method Simplified 973 Wet bulb (°F) - 69 Construction quality Tight 396 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 10.5 Construction descriptions Or Area Ll -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft? °F ft? °F/Btuh Btuhtt' Btuh Btuh/V Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors 11 P0: Door, mtl pur core type Ceilings 16A-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns n 393 0.065 21.0 4.22 1660 0.63 248 e 573 0.065 21.0 4.22 2421 0.63 361 S 261 0.065 21.0 4.22 1103 0.63 165 w 316 0.065 21.0 4.22 1335 0.63 199 all 1543 0.065 21.0 4.23 6519 0.63 973 n 12 0.290 0 18.9 226 7.39 89 e 72 0.290 0 18.9 1357 27.6 1985 w 68 0.290 0 18.9 1282 27.6 1875 all 152 0.290 0 18.9 2865 26.0 3949 e 21 0.290 10.5 18.9 396 6.06 127 w 21 0.290 10.5 18.9 396 6.06 127 all 42 0.290 10.5 18.9 792 6.06 255 618 0.026 38.0 1.69 1044 1.67 1035 1104 0.255 1.0 16.5 18263 14.1 15566 543 0.034 30.0 1.85 1007 0.22 119 wri htsoft° 2015 -Jun -22 06:50:04 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 3 ACCA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfton wrightsoft Date: Oct 28, 2014 Study By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 e-roject intormation For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 ]esion Conditic Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 70 75 Elevation: 1010 ft ft' Design TD (°F) 65 8 Latitude: 42°N Btuhtft' Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: n 108 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (F) - 69 Construction quality Tight 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 53 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 22 0.22 ft' Btuh/ft? °F ft' °FBtuh Btuhtft' Btu Btuhtft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 108 0.065 21.0 4.22 456 0.63 68 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud a 84 0.065 21.0 4.22 355 0.63 53 all 192 0.065 21.0 4.22 811 0.63 121 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 24 0.290 0 144 0.255 1.0 12 0.034 30.0 18.9 452 27.6 662 16.5 2382 14.1 2030 1.85 22 0.22 3 JkL wri htsoftm 2015 -Jun -22 06:50:04 ,Z&� ' r- � Right -Suite® Universal 2015 15.0.12 RSU05790 Page 4 - ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N wri htsoft® Component Constructions Job: 51 hight Point Gratfton Q Date: Oct 28, 2014 Lav By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 •ject intormation For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 ]esian Conditir Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 70 75 Elevation: 1010 ft Design TD (°F) 65 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 (M) Method Simplified Wet bulb (°F) - 69 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft'-°F ft'-°FBtuh Btuh/ft' Btuh Btuh/ft' Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 42 0.065 21.0 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk: 2 n glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors (none) 12 0.290 0 42 0.255 1.0 4.22 177 0.63 26 18.9 226 7.39 89 16.5 695 14.1 592 C wri htsoft' 2015 -Jun -22 06:50:04 "I'M1 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 5 ...c\DesktopMrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfton wrightsoft Date: Oct 28, 2014 Family room By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 70 75 Elevation: 1010 ft ft Design TD (°F) 65 8 Latitude: 42°N Btuh/ft' Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: n 72 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (°F) - 69 Construction quality Tiht 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 ?Average) 200 Construction descriptions Or Area U -value Insult R Htg HTM Loss Cig HTM Gain ft Btuh/ft' °F ft'-°FBtuh Btuh/ft' Btu Btuh/ft' Btu Walls 1217-0sw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 72 0.065 21.0 4.22 304 0.63 45 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud a 318 0.065 21.0 4.22 1344 0.63 200 s 72 0.065 21.0 4.22 304 0.63 45 all 462 0.065 21.0 4.22 1952 0.63 291 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 24 0.290 0 18.9 452 27.6 662 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings 16A-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 448 0.026 38.0 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 332 0.034 30.0 1.69 757 1.67 750 1.85 616 0.22 73 C wri htsoft^ 2015 -Jun -22 06:50:04 ,.I'M1 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 6 ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 Foyer By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 70 75 Elevation: 1010 ft ft' Design TD (°F) 65 8 Latitude: 420N Btuh/tN Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: n 18 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (°F) - 69 Construction quality Tight 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 95 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/t? "F ft' °F/Btuh Btuh/k' Btu Btuh/tN Btu Walls Doors 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 18 0.065 21.0 4.22 76 0.63 11 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud w 151 0.065 21.0 4.22 638 0.63 95 all 169 0.065 21.0 4.22 714 0.63 107 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 w 8 0.290 0 18.9 151 27.6 221 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors 11 P0: Door, mtl pur core type w 21 0.290 10.5 18.9 396 6.06 127 Ceilings 16A-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 170 0.026 38.0 1.69 287 1.67 285 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 153 0.034 30.0 1.85 284 0.22 34 wrightsoft® Right-Suit2015-Jun-22 06:50:04e® Universal 2015 15.0.12 RSU05790 Z& ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 7 Component Constructions Job: 51 hightPoint Gratfon wrightsoft Date: Oct 28, 2014 Dinning room By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Me 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 lesion Cnnlditir Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 70 75 Elevation: 1010 ft ft' Design TD (°F) 65 8 Latitude: 420N Btuh/ft' Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: n 9 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (F) - 69 Construction quality Tight 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 59 Construction descriptions Or Area Ll -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft'-°F ft'-°FBtuh Btuh/ft' Muh Btuh/ft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 9 0.065 21.0 4.22 38 0.63 6 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud w 93 0.065 21.0 4.22 393 0.63 59 all 102 0.065 21.0 4.22 431 0.63 64 Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk: 2 w glazing, cir outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 24 0.290 0 234 0.255 1.0 9 0.034 30.0 18.9 452 27.6 662 16.5 3871 14.1 3299 1.85 17 0.22 2 c wri htsoft• 2015 -Jun -22 06:50:04 ti 1 9 Right -Suite® Universal 2015 15.0.12 RSUD5790 Page 8 /TCCA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfton - wrightsoft® Date: Oct 28, 2014 Eating By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 ]esinn Conditic Location: 396 Indoor: Heating Cooling Worcester, MA, US 14.1 Indoor temperature (°F) 70 75 Elevation: 1010 ft Design TD (°F) 65 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' BtuhM2--°F ft'-°FOuh Btuh/ft' Btuh Btuh/112 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" a 69 0.065 21.0 4.22 292 0.63 44 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors 11 P0: Door, mtl pur core type e Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors (none) 21 0.290 10.5 120 0.255 1.0 18.9 396 6.06 127 16.5 1985 14.1 1692 C wri htsoft' 2015 -Jun -22 06:50:04 , 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 9 ACCP. ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfon wrightsof Date: Oct 28, 2014 Kitchen By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 70 75 Elevation: 1010 ft ft' Design TD (°F) 65 8 Latitude: 420N Btuhff Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: a 102 Daily range (°F) - 17 (M) Method Simplified 0.63 Wet bulb (°F) - 69 Construction quality Tight 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 85 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/W-'F ft' °FBtuh Btuh/ft' Btu Btuhff Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" a 102 0.065 21.0 4.22 431 0.63 64 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud s 135 0.065 21.0 4.22 570 0.63 85 all 237 0.065 21.0 4.22 1001 0.63 149 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 24 0.290 0 18.9 452 27.6 662 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm fir, 10" thkns, 1/2" 210 0.255 1.0 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 15 0.034 30.0 wrightsoft° Right -Suite® Universal 2015 15.0.12 RSU05790 ACO, ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N 16.5 3474 14.1 2961 1.85 28 0.22 3 2015 -Jun -22 06:50:04 Page 10 Component Constructions Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 Laundry room By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 ]esion Conditir Location: U -value Indoor: Heating Cooling Worcester, MA, US Gain Indoor temperature (°F) 70 75 Elevation: 1010 ft Btu Design TD (°F) 65 8 Latitude: 42°N 21.0 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M) Method Simplified Wet bulb (F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partifons (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft'--°F ft? °FBtuh Btuhtft' Btu Btuh/ft' Btu s 54 0.065 21.0 4.22 228 0.63 34 60 0.255 1.0 6 0.034 30.0 16.5 993 14.1 846 1.85 11 0.22 1 AL wri htsoft® 2015 -Jun -22 06:50:04 ,.� ' 1" 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 11 SCA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 Mud room By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 i0ject intormation For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 ]esion Conditir Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 70 75 Elevation: 1010 ft Design TD (°F) 65 8 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M) Method Simplified Wet bulb (F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft? °F ft'-°FBtuh Btuh/ft' Btuh Btuh/ft' Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 60 0.255 1.0 16.5 993 14.1 846 gypsum board int fns Floors (none) .+ * wrightsoft°° Right -Suite® Universal 2015 15.0.12 RSU05790 Z& ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N 2015 -Jun -22 06:50:04 Page 12 Component Constructions Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 Hall By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Me 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 lesion Conditic Location: Indoor: Heating Cooling Worcester, MA, US Indoor temperature (°F) 70 75 Elevation: 1010 ft Design TD (°F) 65 8 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 69 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area Ll -value Insult R Htg HTM Loss Clg HTM Gain ft' Btuh/ft? °F ft? °F/Btuh Btuh/ft' Btu Btuh/ft' Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" Mrs, 1/2" 42 0.255 1.0 16.5 695 14.1 592 gypsum board int fnsh Floors (none) At wri htsoft" 2015 -Jun -22 06:50:04 ,.... 9 Right -Suite® Universal 2015 15.0.12 RSU05790 ACCP....c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 13 Component Constructions Job: 51 hight Point Gratfton - wrightsoftW Date: Oct 28, 2014 Room13 By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 lesion Conditic Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 70 75 Elevation: 1010 ft ft' Design TD (°F) 65 8 Latitude: 420N Btuh/ft' Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 50.9 23.6 Dry bulb (°F) 5 83 Infiltration: n 144 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (°F) - 69 Construction quality Tight 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 45 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft? °F ft'-°FBtuh Btuh/ft' Btuh Btuh/ft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 144 0.065 21.0 4.22 608 0.63 91 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud w 72 0.065 21.0 4.22 304 0.63 45 all 216 0.065 21.0 4.22 913 0.63 136 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 w 36 0.290 0 18.9 679 27.6 993 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 192 0.255 1.0 16.5 3176 14.1 2707 gypsum board int fnsh Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm flr, 10" thkns 16 0.034 30.0 1.85 30 0.22 4 AL wri htsoft® 2015 -Jun -22 06:50:04 � 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 14 ACOA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hightPoint Gratfton wrightsoft� Date: Oct 28, 2014 bedroom 4 By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 r-'roject intormation For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Desian Conditir Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 68 75 Elevation: 1010 ft ft= Design TD (°F) 63 8 Latitude: 420N Btuh/Ft' Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: n 117 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (°F) - 69 Construction quality Tight 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 53 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft= Btuh/ft? °F ftp-°F/Btuh Btuh/fi' Btu Btuh/Ft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 117 0.065 21.0 4.09 479 0.63 74 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud a 84 0.065 21.0 4.09 344 0.63 53 s 117 0.065 21.0 4.09 479 0.63 74 w 18 0.065 21.0 4.09 74 0.63 11 all 336 0.065 21.0 4.09 1376 0.63 212 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 24 0.290 0 18.3 438 27.6 662 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 13 0.026 38.0 1.64 21 1.15 15 gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns 156 0.368 0 7.54 1177 0.92 144 At:. wri htsoft` 2015 -Jun -22 06:50:04 ,�..,. 9 Right-Suitetkl Universal 2015 15.0.12 RSU05790 Page 15 /± & ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 1/2 bath By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Me 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Desinn Cnnditin Location: Area Indoor: Heating Cooling Worcester, MA, US Clg HTM Indoor temperature (°F) 68 75 Elevation: 1010 ft ft? °FBtuh Design TD (°F) 63 8 Latitude: 420N n Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: 4.09 37 Daily range (°F) - 17 ( M) Method Simplified 0.065 Wet bulb (F) - Wind speed (mph) 15.0 69 7.5 Construction quality Fireplaces Tiht 1 Average) 40 Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors (none) Ceilings 166-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns Or Area U -value Insult R Htg HTM Loss Clg HTM Gain ft' Btuhtt' °F ft? °FBtuh BUMP Btuh Btuh/if' Btu n 54 0.065 21.0 4.09 221 0.63 34 S 9 0.065 21.0 4.09 37 0.63 6 all 63 0.065 21.0 4.09 258 0.63 40 6 0.026 38.0 60 0.368 0 1.64 10 1.15 7 7.54 453 0.92 55 C wri htsoft' 2015 -Jun -22 06:50:04 ,V,��.. 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 16 ,'M ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N wri htsoft® Component Constructions Job: 51 hight Point Gratfton 9 Date: Oct 28, 2014 bedroom 3 By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Eject• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 ]esion Conditir Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 68 75 Elevation: 1010 ft ft Design TD (°F) 63 8 Latitude: 420N Btuh/It' Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: n 135 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (°F) - 69 Construction quality Tiht 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 85 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft Btuh/ft' °F ft'-°F/Btuh Btuh/R' Btuh Btuh/It' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 135 0.065 21.0 4.09 553 0.63 85 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud s 135 0.065 21.0 4.09 553 0.63 85 w 84 0.065 21.0 4.09 344 0.63 53 all 354 0.065 21.0 4.09 1450 0.63 223 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 w glazing, clr outr, air gas, vni frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fns Floors 19A-Obstp: Part floor, frm flr, 10" thkns 24 0.290 0 15 0.026 38.0 180 0.368 0 18.3 438 27.6 662 1.64 25 1.15 17 7.54 1358 0.92 166 C wri htsoft" 2015 -Jun -22 06:50:04 ,�.... 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 17 /i & ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N wri htsoft® Component Constructions Job: 51 hight Point Gratfton Q Date: Oct 28, 2014 2nd floor wall By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Me 01826 P�roject intormation For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Desian Conditir Location: 0.065 Indoor: Heating Cooling Worcester, MA, US 119 Indoor temperature (°F) 68 75 Elevation: 1010 ft 37 Design TD (°F) 63 8 Latitude: 420N 21.0 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: Daily range (°F) - 17 ( M) Method Simplified Wet bulb (°F) - 69 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft'-°F ft?'FBtuh Btuh/ft' Btuh Btuh/ft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns e 189 0.065 21.0 4.09 774 0.63 119 s 9 0.065 21.0 4.09 37 0.63 6 w 90 0.065 21.0 4.09 369 0.63 57 all 288 0.065 21.0 4.09 1179 0.63 182 86 0.368 0 7.54 649 0.92 79 wri htsoft° 2015 -Jun -22 06:50:04 9 Right -Suite® Universal 2015 15.0.12 RSU05790 ACCA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 18 Component Constructions Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 bedroom 2 By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 �•ject intormation For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 ]esinn Cnnditin Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 68 75 Elevation: 1010 ft ft' Design TD (°F) 63 8 Latitude: 42°N Btuh/ft' Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: n 162 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (°F) - 69 Construction quality Tight 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 51 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft'-°F ft'-°F/Btuh Btuh/ft' Btu Btuh/ft' Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 162 0.065 21.0 4.09 663 0.63 102 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud s 81 0.065 21.0 4.09 332 0.63 51 w 93 0.065 21.0 4.09 381 0.63 59 all 336 0.065 21.0 4.09 1376 0.63 212 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 w 24 0.290 0 18.3 438 27.6 662 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns 1 0.026 38.0 1.64 2 1.15 1 234 0.368 0 7.54 1765 0.92 216 � + wrightsoft" Right -Suite® Universal 2015 15.0.12 RSU05790 'I'M ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N 2015 -Jun -22 06:50:04 Page 19 Component Constructions Job: 51 hight Point Gratfton - wrightsoft® Date: Oct 28, 2014 mastrbed bath By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 3asion Conditir Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 68 75 Elevation: 1010 ft ft' Design TD (°F) 63 8 Latitude: 420N Btuh/ft' Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: n 108 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (F) - 69 Construction quality Tiht 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 68 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Bluh/ft'-°F ft' °FBtuh Btuh/ft' Btu Btuh/ft' Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 108 0.065 21.0 4.09 442 0.63 68 gypsum board int fnsh, 2"x6" wood firm, 16" o.c. stud s 108 0.065 21.0 4.09 442 0.63 68 w 111 0.065 21.0 4.09 455 0.63 70 all 327 0.065 21.0 4.09 1339 0.63 206 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 w 24 0.290 0 18.3 438 27.6 662 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns 180 0.368 0 7.54 1358 0.92 166 . - + wrightsoft* Right -Suite® Universal 2015 15.0.12 RSU05790 RCCA ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N 2015 -Jun -22 06:50:04 Page 20 wri htsoftW Component Constructions Job: 51 hight Point Gratfton 9 Date: Oct 28, 2014 master bed By: JW Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 •lect intormation For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Design Conditir Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 68 75 Elevation: 1010 ft ft' Design TD (°F) 63 8 Latitude: 420N Btuh/ft' Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: n 126 Daily range (°F) - 17 (M) Method Simplified 0.63 Wet bulb (F) - Wind speed (mph) 15.0 69 7.5 Construction quality Fireplaces Tiht 1 Average) 0.065 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ff--°F ft'-°F/Btuh Btuh/ft' Btuh Btuh/ft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 126 0.065 21.0 4.09 516 0.63 79 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud a 168 0.065 21.0 4.09 688 0.63 106 s 141 0.065 21.0 4.09 577 0.63 89 all 435 0.065 21.0 4.09 1781 0.63 274 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 48 0.290 0 18.3 877 27.6 1323 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; s 12 0.290 0 18.3 219 14.0 168 6.67 ft head ht all 60 0.290 0 18.3 1096 24.9 1492 Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 412 0.368 0 7.54 3108 0.92 380 C wri htsoft® 2015 -Jun -22 06:50:04 ,.� 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 21 ACA,�A ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 51 hight Point Gratfton wrightsoft® Date: Oct 28, 2014 Master closet By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 P-roject intormation For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Design Conditir Location: Or Indoor: Heating Cooling Worcester, MA, US Loss Indoor temperature (°F) 68 75 Elevation: 1010 ft ft' Design TD (°F) 63 8 Latitude: 420N Btuh/ft' Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 47.0 23.6 Dry bulb (°F) 5 83 Infiltration: s 90 Daily range (°F) - 17 ( M) Method Simplified 0.63 Wet bulb (0F) - 69 Construction quality Tight 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 (Average) 28 Construction descriptions Or Area LI -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft2-°F ft'-°F/Btuh Btuh/W Btu Btuh/ft' Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 90 0.065 21.0 4.09 369 0.63 57 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud w 45 0.065 21.0 4.09 184 0.63 28 all 135 0.065 21.0 4.09 553 0.63 85 Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns 200 0.368 0 7.54 1509 0.92 184 C wri htsoft° 2015 -Jun -22 06:50:04 "I -M1 9 Right -Suite® Universal 2015 15.0.12 RSU05790 Page 22 ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Project Summary Job: 51 hight Point Gratfton - wrightsoft® ' 1 Date: Oct 28, 2014 Entire House By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Notes: Design Information Weather: Worcester, MA, US Winter Design Conditions Summer Design Conditions Outside db 5 OF Outside db 83 OF Inside db 69 OF Inside db 75 OF Design TD 64 OF Design TD 8 OF Daily range M Reative humidity 50 % Moisture difference 24 gr/Ib Heating Summary Structure 66106 Btuh Ducts 7497 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Piping 0 Btuh Equipment load 73604 Btuh Infiltration Method Simplified Construction quality Tight Fireplaces 1 (Average) Efficiency Heating Cooling Area (ftZ 3230 3230 Volume �ft3) 34632 34632 Air changes/hour 0.16 0.07 Equiv. AVF (cfm) 178 155 Heating Equipment Summary Make n/a Static pressure 0 Trade n/a Space thermostat n/a Model n/a AHRI ref n/a Efficiency 40527 n/a Heating input 4035 Btuh Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a Trade n/a Sensible Cooling Equipment Load Sizing Structure 40527 Btuh Ducts 4035 Btuh Central vent (0 cfm) 0 Btuh Blower 0 Btuh Use manufacturer's data n Btuh Rate/swing multiplier 0.88 ton Equipment sensible load 39082 Btuh Latent Cooling Equipment Load Sizing Structure 4808 Btuh Ducts 1157 Btuh Central vent (0 cfm) 0 Btuh Equipment latent load 5965 Btuh Equipment total load 45047 Btuh Req. total capacity at 0.70 SHR 4.7 ton Cooling Equipment Summary Make n/a Trade n/a Cond n/a Coil n/a AHRI ref n/a Efficiency n/a Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. rC * wrightsoft' Right -Suite® Universal 2015 15.0.12 RSU05790 2015 -Jun -22 06:50:04 Page 1 ...c\DesktoplWrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N ,t Project Summar, Job: 51 hight Point Gratfton -- wrightsoft® ' 7 Date: Oct 28, 2014 a (Rest of House) By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Ma 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Notes: Design Information Weather: Worcester, MA, US Winter Design Conditions Summer Design Conditions Outside db 5 OF Outside db 83 OF Inside db 70 OF Inside db 75 OF Design TD 65 OF Design TD 8 OF Daily range Relative humidity M 50 % Moisture difference 24 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 35593 Btuh Structure 26305 Btuh Ducts 2307 Btuh Ducts 431 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 37899 Btuh Use manufacturer's data n Rate/swing multiplier 0.88 Infiltration Equipment sensible load 23448 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 2204 Btuh Ducts 656 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft')1722 1722 Volume ft3) 21060 21060 Equipment latent load 2859 Btuh Air changes/hour 0.21 0.18 Equipment total load 26307 Btuh Equiv. AVF (cfm) 74 65 Req. total capacity at 0.70 SHR 2.8 ton Heating Equipment Summary Cooling Equipment Summary Make Amana Make Amana Trade AMANA Trade ASX14 SERIES Model AMH950704BX Cond ASX140361C* AHRI ref 2012268 Coil CA*F3642*6D* Efficiency 95AFUE AHRI ref 5188426 Efficiency 12.3 EER, 15 SEER Heating input 46000 Btuh Sensible cooling 22680 Btuh Heating output 44000 Btuh Latent cooling 9720 Btuh Temperature rise 38 OF Total cooling 32400 Btuh Actual air flow 1080 cfm Actual air flow 1080 cfm Air flow factor 0.028 cfm/Btuh Static pressure 0 in H2O Air flow factor Static pressure 0.040 0 cfm/Btuh in H2O Space thermostat Load sensible heat ratio 0.90 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Wrl htsoft` Ri Right -Suite® Universal 2015 15.0.12 RSU05790 2015-Jun-22 06:50:04 14M .9 ..c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 2 Project Summa Job: 51 hight Point Gratfton - Wrightsoft® Date: Oct 28, 2014 2nd floor By: J&J Heating and Air Conditioning 17 Arlington st, Dracut, Me 01826 Project• • For: Trust Construction 51 Mt Joy Dr, Tewksbury, Ma 01876 Notes: Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. C Wrl htsoft° g 2015 -Jun -22 06:50:04 9 Ri ht -Suite® Universal 2015 15.0.12 RSU05790 ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 3 Design Information Weather: Worcester, MA, US Winter Design Conditions Summer Design Conditions Outside db 5 OF Outside db 83 OF Inside db 68 OF Inside db 75 OF Design TD 63 OF Design TD 8 OF Daily range Relative humidity M 50 % Moisture difference 24 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 30514 Btuh Structure 14223 Btuh Ducts 5191 Btuh Ducts 3604 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 3190 Btuh Blower 5120 Btuh Piping 0 Btuh Equipment load 38894 Btuh Use manufacturer's data n Rate/swing multiplier 0.88 Infiltration Equipment sensible load 20124 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 2604 Btuh Ducts 501 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area 1508 1508 Equipment latent load 3106 Btuh Volumee ()w)13572 13572 Air changes/hour 0.46 0.40 Equipment total load 23230 Btuh Equiv. AVF (cfm) 104 91 Req. total capacity at 0.70 SHR 2.4 ton Heating Equipment Summary Cooling Equipment Summary Make Amana Make Amana Trade AMANA Trade ASX13 SERIES Model AMH950704BX Cond ASX130421C* AHRI ref 2012268 Coil CA*F3131*6D* Efficiency 95AFUE AHRI ref 4385601 Efficiency 11.5 EER, 14 SEER Heating input 46000 Btuh Sensible cooling 19880 Btuh Heating output 44000 Btuh Latent cooling 8520 Btuh Temperature rise 44 OF Total cooling 28400 Btuh Actual air flow 947 cfm Actual air flow 947 cfm Air flow factor 0.027 cfm/Btuh Air flow factor 0.053 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. C Wrl htsoft° g 2015 -Jun -22 06:50:04 9 Ri ht -Suite® Universal 2015 15.0.12 RSU05790 ...c\Desktop\Wrightsoft HVAC\lot 51 High Point.rup Calc = MJ8 Front Door faces: N Page 3