Loading...
HomeMy WebLinkAboutMiscellaneous - 76 COMPASS POINT ROAD 4/30/2018Date ..tom7.� ` �..... TOWN OF NORTH ANDOVER PERMIT FOR PLUMBING rN G This certifies that... .... 111 �i'o-,, .,- V\ �� i ...."o. ........... .......................................................... has permission to perform .).--.1 D..'J...... 1 !!.............................................. 2�/i r , �/l'1,�41 an 5 -- plumbing . l in t e buildings of ... �...._............ �.............................................. ..................... at ........ �..10 ..............--� �� Q'...................., North Andover, Mass. FeeAKA..'."..... Lic. No. �'--> 12 Ji..... ....... �V ...................................................................... PLUMBING INSPECTOR Check # Lo" -2 S f - _ POWNER TYPE OR PRINT CLEARLY MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM PLUMBING WORK N 0 6CITY NORTH ANDOVER MA. DATE 5-22-14 PERMIT # JOBSITE ADDRESS76 COMPASS POINT OWNER'S NAME TRUST CONSTRUCTION ADDRESS: 1. 51 MT JOY DRIVE TEWKSBURY MA J TEL: 5083209337 FAX: OCCUPANCY TYPE: COMMERCIAL ❑ EDUCATIONAL ❑ RESIDENTIAL ❑■ NEW: ❑■ RENOVATION: ❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES ❑ NO ❑ FIXUTRES Z FLOORS- Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BATHTUB CROSS CONN DEVICE DEDICATED SPECIAL WASTE SYS DEDICATED GAS/OIUSAND SYS DEDICATED GREASE SYSTEM DEDICATED GRAY WATER SYS DEDICATED WATER REUSE SYS DISHWASHER DRINKING FOUNTAIN FOOD WASTE GRINDER UNIT FLOOR / AREA DRAIN INTERCEPTOR INTERIOR KITCHEN SINK LAVATORY ROOF DRAIN SHOWER STALL SERVICE / MOP SINK TOILET URINAL WASHING MACHINE CONNECTION WATER HEATER ALL TYPES WATER PIPING SPIGOTS 2 INSURANCE COVERAGE I have a current liability insurance policy or its substantial equivalent which meets the requirements of MGL. Ch. 142 YES ❑■ NO ❑ If you have checked YES, please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY ❑■ OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. SIGNATURE OF OWNER OR AGENT CHECK ONE ONLY: OWNER ❑ AG E] I hereby certify that all of the details and information I have submitted (or entered) regarding this applicati a true an ccur a to the best of my Knowledge and that all plumbing work and installations performed under the permit issued for this appli io will be compli ce with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. / �4 PLUMBER NAME: MIKE BURKE LICENSE # 13127AT RE COMPANY NAME: POWERHOUSE PLUMBING AND HEATING CORP 1 ADDRESS: P0 BWX 896 CITY: I PLAISTOW _ j STATE: NH _ ZIP: 03865 FAX: 16033780040 _ TEL: 16033780020 _ CELL: 1,19784909385 EMAIL: I J.LAURENCIO@POWERHOUSEPLUMBING.COM MASTER Q JOURNEYMAN ❑ CORPORATION ❑■ # 2482 - PARTNERSHIP ❑ # LLC ❑ # _._ /� w F F U � a� z a Q z w � O El Z z }❑ o w �D w O W a at z O a w > N a O � QLLJ p a zo a � w a � v J a a esu a = w f- a w F O z 0 F U W 0, C7 ` z as w IS w 0 x Date.... .................. TOWN OF NORTH ANDOVER PERMIT FOR GAS INSTALLATION ............ This certifies that .....I.Lk...... ......................... . ............... has permission for gas installation ...... ............................ in the buildin s of ...... ...... C ..................................................... at..... J.(P. .... '- u P..! � t.; A 5 ....... PA ...................... . North Andover, Mass. Fee -1.0-D ......... Lic. No. .... . M. ....................................................... GASINSPECTOR Check #14914 7-15 1 G' – GOWNER TYPE OR PRINT CLEARLY MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK CITY NORTH ANDOVER MA. DATE k5-22714— _ PERMIT # ft'� (Z lT JOBSITE ADDRESS 76 COMPASS POINT OWNER'S NAME 1,11RUST ONSTRUCTION ADDRESS: 51 MT JOY DRIVE TEWKSBURY MA TEL: 1,5083209337 FAX: OCCUPANCY TYPE: COMMERCIAL ❑ EDUCATIONAL ❑ RESIDENTIAL ❑Q NEW: RENOVATION: ❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES ❑ NO ❑ FIXUTRES 7 FLOOR— Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BOILER BOOSTER CONVERSION BURNER COOK STOVE DIRECT VENT HEATER DRYER FIREPLACE FRYOLATOR FURNACE GENERATOR GRILLE LABORATORY COCKS MAKEUP AIR UNIT OVEN POOL HEATER ROOM / SPACE HEATER ROOF TOP UNIT TEST UNIT HEATER UNVENTED ROOM HEATER WATER HEATER INSURANCE COVERAGE 4have a current liability insurance policy or its substantial equivalent which meets the requirements of MGL. Ch.142 YES ❑■ NO ❑ If you have checked YES, please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY ❑■ OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER AGENT ❑ SIGNATURE OF OWNER OR AGENT hereby certify that all of the details and information I have submitted (or entered) regarding this application a true d acc ate the best of my Knowledge and that all plumbing work and installations performed under the permit issued for this applica ' n will in c plia a with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER/GASFITTER NAME: MIKE BURKE LICENSE # _13127 _AGNATjdRy COMPANY NAME: POWERHOUSE PLUMBING AND HEATING CORP ADDRES PO BOX 89 CITY: I STATE: _ NH ZIP: 038 1. 65 FAX:_6033780040 TEL: 6033780020 CELL: L97849Q9385. EMAIL: J.L. URENCIO@POWERHOUSEPLUMBINGAND_HEATING OM MASTER N JOURNEYMAN ❑ LP INSTALLER ❑ CORPORATION # 2482 PARTNERSHIP ❑ #� LLC ❑ #1 _ .M, 1 W F O .r z 0 U W a a � Q z w . . . . . . . .. . . . . . . O El Z z }El o w LU O W a z O a w a a W a oc 3 U a O o a w a � U J IL IL uV Q N tiJ 2 W H LL F O z z 0 F U W a rA z rA Q o a° The Commonwealth of Massachusetts Department of IndustrialAccidents 4 Office of Investigations 1 Congress Street, Suite 100 Boston, MA 02114-2017 www mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): POWERHOUSE PLUMBING CORP Address: PO BOX 896 PLAISTOW, NH 03865 Phone #: 6033780020 Are you an employer? Check the appropriate box: 1.0 I am a employer with 6 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub -contractors 2. ❑ I am a sole proprietor or partner- listed on the attached sheet. ship and have no employees These sub -contractors have working for me in any capacity. employees and have workers' [No workers' comp. insurance comp. insurance.: required.] 5. ❑ We are a corporation and its 3. ❑ I am a homeowner doing all work officers have exercised their myself. [No workers' comp. right of exemption per MGL insurance required.] t c. 152, §1(4), and we have no employees. [No workers' coma. insurance reouired.l Type of project (required): 6. 0 New construction 7. ❑ Remodeling 8. ❑ Demolition 9. ❑ Building addition 10.❑ Electrical repairs or additions 11. ❑ Plumbing repairs or additions 12.❑ Roof repairs 13.❑ Other *Any applicant that checks box #I must also fill out the section below showing their workers' compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub -contractors and state whether or not those entities have employees. If the sub -contractors have employees, they must provide their workers' comp. policy number. I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: HARTFORD UNDERWRITERS INSURANCE COMP Policy # or Self -ins. Lic. #: 04WECIT2480 Expiration Date: 7-28-14 Job Site Address: 76 Compass point City/State/Zip: N Andover ma 01845 Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year im risonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day Inst the vi or. Be advised that a copy of this statement may be forwarded to the Office of Investigations oft for ins e cg*rage verification. I do hereby celfy Oder th�aj6s#ddlenalties ofperjury that the information provided above is true and correct. Official use only. Do not write in this area, to be completed by city or town official. City or Town: Permit/License # I-, Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone #: � ^� " CERTIFICATE OF LIABILITY INSURANCEF5/13/2014 DATE (MM/DD/YYYY) TYPE OF INSURANCE ADDLSUER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certtfit ate holder In lieu of such endorsement(s). PRODUCER Insurance Solutions Corporation 60 Westville Rd NAMEACT Kathleen Miller, CISR, CPIW PHONE (603) 382-4600 FAX (603)382-2034 EMAIL .kmi3.ler@isc-insurance.com INSURERS AFFORDING COVERAGE NAIC # Plaistow NH 03865 INSURER AMerchants 3329 INSURED Powerhouse Plumbing & Heating Corp. PO BOX 896 INSURERB:Hartford Underwriters Ins. Co. INSURER C: INSURER D: INSURER E : Plaistow NH 03865 r'nvcoAr+oc ..�...�.�...._-...._---- --' ..--. INSURERF: - -" -" -- - --- - - r[CY IJIVIY ry V MOCK: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TR TYPE OF INSURANCE ADDLSUER POLICY NUMBER POLICY EFF MMID /YYYY POLICY EXP (MMI DD/YYYY1 LIMITS GENERAL LIABILITY A X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE a OCCUR BOP1065497 /1/2014 /1/2015 EACH OCCURRENCE $ 1,000,000 DAMAGE ToRENT5D_ PREMISESIE.occurrence) $ 500,000 MED EXP (Any one person) $ 15,000 PERSONAL & ADV INJURY $ Included GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: X POLICY PRO- Jrr_T El LOC PRODUCTS - COMP/OP AGG $ 2,000,000 $ A AUTOMOBILE X LIABILITY ANY AUTO ALL OWNED SCHEDULEDAPI058154 AUTOS AUTOS /1/2014 /1/2015 COMBINED SINGLE LIMIT Ea accident 11000,000 BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ HIRED AUTOS NON -OWNED AUTOS DAMAGE Per accident $ Medical payments $ 5 000 UMBRELLA LIAB EXCESS LIAB OCCUR CLAIMS -MADE EACH OCCURRENCE $ AGGREGATE $ B DED I I RETENTION $ WORKERS COMPENSATION EMPLOYERS' LIABILITY Y / N ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED?a (Mandatoryin NH) (Iy describe under DESCRIPTION OF OPERATIONS below N / A 4WECIT2460 /28/2013 /28/2014 $ WC STATU- OH- 7T E.L. EACH ACCIDENT $ 100 000 E.L. DISEASE - EA EMPLOYE $ 100,000 E.L. DISEASE -POLICY LIMIT $ 500,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space is required) Jobsite: 64 Stanton Way rCOYICI^A�0 ural - (978)688-9542 Town of North Andover 1600 Osgood St No Andover, MA 01845-1048 ernlan 11a r'3n4nrnc% SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE th Maglia/RRM - - - v -1 s00-ZU1 U AGOItU CORPORATION. All rights reserved. INS025 r?mnnsi m Tho Ar e)pn name anr( lnnn aro ronictorort mnrirc of ArnRn • r rr�rrnr vi r1�t BUREAU OF BUILDING SAFETY & CONSTRUCTION PLUMBING SAFETY SECTION N0"�3 S14270954- NAME MICHAEL W BURK LIC #: 3801 M I° ,v rn st cow Is I"i EXPIRES: 05/31 /2015 — `IIAYI Rl 1, VA 0101 m/LM71•Mrrit.vsfN! State of New Hampshire -- , 11COMMONWEALTH OF MASSA+CHUS Voluntary Heating Technician . s .. a , NAME MICHAEL BURKE BOARD OF 1 PLUMBERS AND GASFITTERS " �' CE E ENDORSEMENTS H10/HSC. � �_ ISSUES THE FOLLOWING LI t 3' REGISTERED AS A PLUMBING �CO DATE ISSUED 02M8/2014 MICHAEL W BURKE DATE EXPIRES: 02/29/2016 �. I POWERHOUSE PL8 b HEATING 00 61 CORLISS HILL RD LICENSE #: HT 1400207 HAVERH 1 Lt MA 01830-1613 ° ., 2482 05/01/16 99223 { Commonwealth of Massachusetts 1103=19=- • • Department of Public Safety 0.1 !turner Technician ( crrlffcate License: BU-059572 MICHAEL W BURKE 61 COR LLSS H119L ~, Haverhill MA Otm r..�.. ,e►,t. ,,ti, Expiration Commissioner 05/26/2016 Date ..... 7. ... .. �.-.�`... TOWN OF NORTH ANDOVER PERMIT FOR WIRING This certifies that .....,14� C PR0 5 .....�................................................................� has permission to perform ......,', 4:-U) 014 t)� ...................... wiring in the building of....� 1ZC15..........�~r.`.......................................................... at -G7r�Q Sf �� �L{�"� „ North Andover, Mass. ......................................................................................... ' Feeg6O.....DC7 ... Lic. No. .1J PT ...`. W ............................................................................ . ELECTRICAL INSPECTOR/, Check #� COMMOnwea/th oj Massachusetts Department of Fire Services BOARD OF FIRE PREVENTION REGULATIONS Official Use Only Permit No. — ' ZiSe-' 7 2 Occupancy and Fee Checked APPLICATION FOR PERMIT TO pcC� 1/07 (leave blank) All work to be Performed in accordance with the Massachusetts ELECTRICAL WORK (PLEASEPPATI11rNKOR TYpEALL INFO Cod � >> 527 CMR 12.00 City or Town of: NORTH RMATION) Date: Wo" BYthisapplication the undersignedgives notieoOvorR r intentiontoperformthee To pep Location (Street & Number U f LYiYes.' �;}- �� ^7/ ec cal work descr' d below. Owner or Tenant _ n I L (� %C�/ �' -, 07— Owner's Address Telephone No. Is this permit in conjunction with o Nc co _ uilding permit? 13 Purpose of B ' yes ❑ N I uilding ° (CheckAppropriate Box) Existing Servicefly Utility Authorization No. Ps /b Volts Overhead New�Ce Amps ❑ Undgrd,� No. of Meters Number of Feeders and Ampacity , Volts Overhead ElUnd rd g No. of Meters Locationand Nature of Proposed Electrical Work: r fire. Of Recessed Luminaires of Luminaire Outlets ------------ of Luminaires of Receptacle Outlets S10 I't'40• of Switches No. of Ranges V o. of Waste Disposers lo. of Dishwashers o. of Dryers o. of Water Heaters KW NO, Hydromassage Bathtubs OTHER: Vo. of Ceil.-Susp. (Paddle) Fan 10. of Hot Tubs wimming pool Above rnd. ❑ Irnd. 0. of Oil Burners o. of Gas Burners 3. of Air Cond. Total f Space/Area Heating KW Heating Appliances KW Vo. of No. of Signs Ballasts Jo. of Motors Total HP table may be waived by the No. m Generators o. o mergem Battery Units :PME ALARMS KVA KVA o. of Zones o2 o. of Alerting Devices 0. Of Elf-('nn4 a of ❑ Other Estimated Value of Electrical c Attach additional detail ifdesired, oras re zzired b Work: 9 y the Inspector of jn es. Work to Start: 2 (When required by municipal policy.) INSURAly CE C Inspections to be requested in accordance with AMC Rule 10, and upon completion. E: Unless waived by the owner, no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including "completed operation" Covera e or its undersigned certifies that such coverage is in force, and has exhibited proof of same to the oris is CHECK O g substantial equivalent. The ONE: 1NSURANcE ❑ BOND ❑ OTHER P suing office. I certify, under the pains and penalties o El ❑ (specify:) FIRM NA%ena fP J rY, that the information on this application is true and complete. Licensee: tl( O1? Signature LIC. NO.:lk ilfapplicable, er "exempt" in th license number line. Address: 1 LTC. NO.: `Per M.G.L c. 147, s. 57-61, securi A Bus. Tel. No. dot- EKE_ �; 333 OWNER'S INSURANCE �y t' w r requires Department of Public Safe Alt. Tel. No.: 411 required b law. B AIVER: I am aware that the Licensee does not have the. lliliability ins an e ooverage riortna 1 3' BYMY signature below, o. I hereby waive this requirement. I am the (check one) y Signature ) ❑ owner ❑ owner's agent. Telephone No. PERMITFEE. $ ❑ 2012 Massachusetts Electrical Code Amendments 527 CMR 12.00 § Rule 8: In accordance with the provisions of M.G.L. c. 143, § 3L, the �I permit application form to provide notice of installation of wiring shall be uniform throughout the Commonwealth, and applications shall be filed 'a on the prescribed form. After a permit application has been accepted by an Inspector of Wires appointed pursuant to M. G.L c. 166, § 32, an electrical permit shall be issued to the person, firm or corporation stated on the permit application. Such entity shall be responsible for the notification of completion of the work as required in M.G.L. c. 143, § 3L. Permits shall be limited as to the time of ongoing construction activity, and may be deemed by the Inspector of Wires abandoned and invalid if J or she has determined that the authorized work has not commenced or has not progressed during the preceding 12 -month period. Upon written application, an extension of time for completion of work shall be permitted for reasonable cause. A permit shall be terminated upon the written request of either the owner or the installing entity stated on the permit application. ❑ The Permit Extension Act was created by Section 173 of Chapter 240 of the Acts of 2010 and extended by Sections 74 and 75 of Chapter 238 of the Acts of 2012. The purpose of this act is to promote job growth and long-term economic recovery and the Permit Extension Act furthers this purpose by establishing an automatic four-year extension to certain permits and licenses concerning the use or development of real property. With limited exceptions, the Act automatically extends, for four years beyond its otherwise applicable expiration date, any permit or approval that was "in effect or existence" during the qualifying period beginning on August 15, 2008 and extending -through August 15, 2012. ❑ Rule 8 — Permit/Date Closed: *** Note: Reapply for new permit ❑ ❑ Permit Extension Act — Permit/Date Closed: Trench Inspection Pass 0 Failed Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: SERVICE INSPECTION: Pass M Failed (] Re- Inspection Required ($.) ❑ Inspectors Comments: -0-2-A Inspectors Signature: Date: PARTIAL ROUGH INSPECTION: Pass F?] Failed 0 Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: ROUGH INSPECTION: Pass IN Failed 0 Re- Inspection Required ($.) ❑ Inspectors Comments: ^ Inspectors Signature: Date: FINAL INSPECTION: Pass Failed Re- Inspection Required ($.) ❑ Inspectors Com ts: Inspectors Signature: Date: -- v DEB WEINHOLD ... TOWN OF MERRIMAC, MA........dweinhold@townofinerrimac.com b The Commonwealth of Massachusetts - Department ofIndustrial Accidents Office of Investigations 600 Washington Street Boston, MA 02111 www.massgov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Address: IN� Sfi City/State/Zip: JMM6&� Phone W01 —1333 Are you an employer? Check the appropriate box: mployer with LYeloyees 4. ❑ I am a general contractor and I (full and/or part-time).* have hired the sub -contractors AM ole proprietor or partner- listed on the attached sheet. I ship and'have no employees These sub -contractors have working for me in any capacity. workers' comp. insurance. [No workers' comp. insurance 5. ❑ We are a corporation and its required.] officers have exercised their 3. ❑ 1 am a homeowner doing all work right of exemption per MGL myself. [No workers' comp. c. 152, § 1(4), and we have no insurance required.] t employees. [No workers' comp. insurance required.] Type of project (required): 6. ❑ New construction 7. ❑ Remodeling 8. ❑ Demolition 9. ❑ Building addition 10. ❑ Electrical repairs or additions 11.❑ Plumbing repairs or additions 12.❑ Roof repairs 13. ❑ Other *Any applicant that checks box #1 must also fill out the section below showing their workers' compensation policy information. i -Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit anew affidavit indicating such. tContractors that checkthis box must attached an additional sheet showing the name of the sub -contractors and their workers' comp. policy information. I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:, S v l t f�,N Policy # or Self -ins. Lie. #:M ) G) 6 0 q ) d (�— Expiration Date: Job Site Address: joop ,, j �`� 44k Act W XCity/State/Zip:_____ _A91 - Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as requiredunder Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one=year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. Ido hereby certify unde floe pains penalties of perjury that the information provided above is true and correct. Sienature: A nate. n ks I � L/ Phone #: Official use only. Do not write in this area, to be completed by city or town official. City or Town: Permit/License # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other - - 11 Contact Person: Phone #: II Information and Instructions Massachusetts General Laws chapter 152 requires all employers to provide workers' compensation for their employees. Pursuant to this statute, an employee is defined as "...every person in the service of another under any contract of hire, express or implied, oral or written." An employer is defined as "an individual, partnership, association, corporation or other legal entity, or any two or more of the foregoing engaged in a joint enterprise, and including the legal representatives of a deceased employer, or the receiver or trustee of an individual, partnership, association or other legal entity, employing employees. However the owner of a dwelling house having not more than three apartments and who resides therein, or the occupant of the dwelling house of another who employs persons to do maintenance, construction or repair work on such dwelling house or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer." MGL chapter 152, §25C(6) also states that "every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced -acceptable evidence of compliance with the insurance coverage required." Additionally, MGL chapter 152, §25C(7) states "Neither the commonwealth nor any of its political subdivisions shall enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority." Applicants Please fill out the workers' compensation affidavit completely, by checking the boxes that apply to your situation and, if necessary, supply sub -contractors) name(s), address(es) and phone number(s) along with their certificate(s) of insurance. Limited Liability Companies (LLC) or Limited Liability Partnerships (LLP) with no employees other than the members or partners, are not required to carry workers' compensation insurance. If an LLC or LLP does have employees, a policy is required. Be advised that this affidavit may be submitted to the Department of Industrial Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be returned to the city or town that the application for the permit or license is being requested, not the Department of Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers' compensation policy, please call the Department at the number listed below. Self-insured companies should enter their self-insurance license number on the appropriate line. City or Town Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant. Please be sure to fill in the permit/license number which will be used as a reference number. In addition, an applicant that must submit multiple permit/license applications in any given year, need only submit one affidavit indicating current policy information (if necessary) and under "Job Site Address" the applicant should write "all locations in (city or town)." A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each year. Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture (i.e. a dog license or permit to burn leaves etc.) said person is NOT required to complete this affidavit. The Office of Investigations would like to thank you in advance for your cooperation and should you have any questions, please do not hesitate to give us a call. The Department's address, telephone and fax number: The Commonwalth of Massachwetts Department of Industrial .Accidents Office of Investigations 600 Washington Street Boston, MA. 02111 Tel, # 617-7274900 ext 406 or 1-877:MASS.A.F.1, Revised 5-26-05 Fax # 617-727-7749 www.mass,gov1dia Date...... . ............ ,AORTN TOWN OF NORTH ANDOVER pf t��ao ti0 OL p PERMIT FOR MECHANICAL INSTALLATIV This certifies that-.) .�.............. j .�.. ......... 1 has permission for mechanical installation ................ . the 'Id' ngs of .......' .... ....... ;:'.......`.............. . ......... North;,Andover, Mass. Fee..' ..::.. Lic. No. �.'.. .... ............-...r .... . . GASINSPECTOR WHITE: Applicant CANARY: Building Dept. PINK: Treasurer Commonwealth of Massachusetts Sheet Metal Permit Date: S ' 2 Y i� — Permit # Estimated Job Cost: $ 300 o Permit Fee: $... Plans Submitted: YES NO Plans Reviewed: YES NO Business License # 196 Applicant License # Business Information: Property Owner / Job Location Information: Name: J&J Heating & Air Conditioning Name:p&. I - Street: 17 Arlington St. StreAc City/Town: Dracut, MA 01826 City/Town: IV, i ild ou r e /L1,4 D Ig Y S TClcphone: 978-454-8197 Telephone: 30 3 ©- 3 3 '] Photo [.D. required / Copy of .Pljoto LD. attached: YES NO stfrrr���:i J-1 / M -1 -unrestricted license t/ J-2 / M -2 -restricted to dwellings 3 -stories or less and commercial up to 1.0,000 sq. ft. / 2 -stories or less Residential: 1-2 family ✓ Multi -family Condo / Townhouses Other Commercial: Office Retail Industrial Institutional Other Square Footage: under 10,000 sq. ft. ''over 10,000 sq. ft. Sheet metal work to be completed: New Work: Educational Number ol'Stories: Renovation: 1 -[ VAC Metal Watershed Roofing Kitchen Exhaust System MQtal Chimney/ Venus Air Balancing Provide detailed description of work to be done: Supply and install metal duct work for HVAC system — Residen ial New Construction INSURANCE COVERAGE: I have a current liability insurance policy or its equivalent which meets the requirements of M.G.L. Ch. 112 Yes ❑�P E] If you have checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this box❑, I hereby certify that all of the details and information I have submitted (or entered) regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO Date . Progress Inspections Comments Final Inspection Date Comments Type of License: By Master Title ❑ Master -Restricted City/Town ❑Journeyperson Signature of Licensee Permit # ❑Journeyperson-Restricted License Number: ! 5 6 k - Fee $ ❑ Check at www.mass.gov/dpi Inspector Signature of Permit Approval MASSACHUSETTS r SHEET METAL ':;;.WORKE,�,� ISSUES THE FOLLOWING �I>rENSE. AS A ;MASTER -UNR STRICTE — X J.- & 1 HEATING &::::::lC 1CI , R ';:::R KLINE: J H EAM I NG :6 AC 17.-AR.W NGTON ST :-JOR.A., MA o1826-3936 t58 0;/28/16 2145,9 State of New; Hampshire GAS FITTERS LICENSE NAME: ERIC KLINE, ' ENDORSEMENTS: STNTP DATE ISSUED: 04/21/2014 i. DATE EXPIRES: 05/31/2016 LICENSE #: GF0700971 .'.d(i ..• The C(I111111o11111e(Illh of/ Il(!ssacllusellsPrint Form 11 ,a'Dept of I!J(luslrinl Aeci(lellls 1 Jr eIi�' v/lice of limesllb(JllO11,C ,11 / Con-recs Slreel, Suite 100 '1I Bavlorl, MA 02114-20.17 �,;r.r, `\,cy�• IV IVIV.I)!p'SS.f�'(1V�(l10 Workers' Compellsation Lnsurance Affidavit: 1.3ui1(Icr s/Contractors/-l�lcctr iciarrs/1'lunnc�r s A � rlicant lnfornralion Please I'l•int Le jlll Ni.1111C(Ilnsincss/Or�;lniz;llion/Inclivillnal); J&.1 iteatj-nf; & Air. Conditioning, :Cine. ArTirftgtcm St. Oily/Stale/7...ip:_0r_u_nt, rtn 01826 1,11011c, 97A —IL SA -511 Q7 Are you an employer? Check the approprinle box: I.0 I an) a employer Will) 40 4. ❑ I tun a ger)cral contractor and employees 0,1111 and/or pall-(in)c).* 2. ❑ have hired the sub -contractors I and a soic proprietor or parllicr_ listed on file al ached sheet. ship and h;lvc no employees "I'hese sub -contractors have workings liar Inc in any capacity. employees and have workers' No \Volker,' Conlp. insurance comp. illslu'ancc.t req nired. 1 (( I all) a ImIllct)wllcl' doing all Wolk 5. ❑ We arc a corporation an(I ifs off ccrs have excl'clsed (hell' myself. 1 N \vorkcrs' crimp. rig Ill 01'exenlption per MGL Illslll';MCC I'C(I1111'ed. j t C. 152, `Y 1 (4), and we llave 110 employees. [No workers' — C01111). IIIS(Irance rc(1Uil-M.1 T;ypc of' Iwo •ject (rc(luircil): 6. ❑ Ncw construction 7. ❑ Rcinodcling; 8. ❑ Demolition 9. ❑ 131-lilding addition 10.❑ Electrical repairs or "Iddilions 11.0 Plumbing; repairs or additions 12.0 Roofrepairs 13. , "i\ny ;ihplicnnl Ihal check hn, 1l I must at,) Dill ouf the suction hclow showing (heir workers' compells;ltion policy inlol'nultion. t I forncownci:s who suhmif this.alI,idavil itlic;1ling Ihcy arc doing all work and filen hire outside conlraCtors must suhmil a new aflidavil indic;lling snch Il'onlraclnrs 111:11 chcCk This hus 11111,1 altachcd all addilional,hcc( showing the name ol(hc sub -contractors and slate whclher or not (hose cnfilics have enapinyces. II'Ihc,uh-conlrac.lm:e have empinyees, they nmsl provide Ihcir worl:cl:ti' comp. policy nnnaba. / It'll 11)1 elup/nper Moll iv lWopirlin,� wot-kel'S'' c01!lpell.vnlloll nlsill mee /!ll• mp emphOpees. BelolV 1.1' !be pulley nuc! job ,vile' inJilr•uuNiull. • Insurance Con)pany Nanlc: A. 1--M. Mutual- Insrrr-ance 1'olicy /1 or tical=ins. Lic. ll: 650I3A - ---WM7-800-80053-2 ------- _-- -- _ I xpirafion Date: _ 06/02/2014 _ Joh Silc Address: -_111:2 Sites_:b1_koY t"� 14h City/State/tip:_--_-_ _ Allaeh a copy of the workers' conipeusalion policy (Iecial-alion page (showing; file policy number and expiration dale). I allure to secure coverag;c as re(Illircd under Section 25A of MGI_, c. 152 call lead to the II11posltloll of cl'1111inal IJCnaltICS 0 titlef a up lc, $1,500.00 an(I/or one-year Imprisonment, as well as civil penalties in the form of a S`I.OP WORK ORDER alld a line ofup 1o. 2J)<O ((,1t" list the violator. Re advise(] tial a copy of this statement may be forwarded to the Office of Invcslif;a40rls oft1w DIA)or Immlllllce"Coverag;e verification. / r/r1 hetej�,, )Yvelp 11 u(ld, 1. mills rill lellrl/liM o xrl•'ul•y lbnl the in o/nullln// prnvlrle!/nbnve is /Lite nit(/col-rect. Sinn Ilurc Phone Il: IIOJ/icing u.ce nuly. DO /fol write ill INS I fell, to he complelerl by cilp Ili- lolVn o/ U(II--u—_--- Oily or Town: ('omit/License # Issuing, Authority (circle our): I. Board of Ileallh 2. Building; Department 3. City/•Town Clerk d. Electrical Inspector S. Plumbing; Inspector 6. Other Contac) Person: I'hone #: ACORD,1 CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) PRODUCER 978.887.490006/03/2013 FAX 978.887, 2404 Edward F. Serlrtott Insurance Agency, Inc, THIS CERTIFICATE IS ISSUED AS A MATTER OF IN ONLY 16 South Main AND CONFERS NO RIGHTS UPON THE CERTIFICATE Street HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR P. 0. Box 457 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Topsfield, MA 01983 INSURED ]$] ��e�t�n� & /fir• Conditng, jnC_ "--- INSURERS AFFORDING COVERAGE NAICN 17 Arlington Street INSURFRA; Great American Alliance Ins Co Dracut, MA 01826 INSURERB: Safety Insurance Company 39454 INSURERC: A.I.M. Mutual Insurance Co. INSURER D: — COVERAGES INSURER E: 1 FIE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN POLICIES. AGGREGATE= LIMITS SHOWN MAY HAVE BEEN REDUCED WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS BY PAID CLAIMS. OF SUCH lin NSFIt TYPE OF INSURANCE POLICY NUMBER GENERAL TTY POLICY EFFECTIVE POLICY EXPIRATION DATE MM DD TII DATE MM DD YVY LIMITS PAC6418906-07 X 06/01/2013 06/01/2014 ERCT COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,00 _ CLAIMS MADE �XXXX� OCCUR nMA L SRL TEf-J r -- PREMISBS (Ea occurroncoj_ $ 300,00 A MED EXP (Any ono person) $ 10,000 PERSONAL B ADV INJURY $ 1,000,00 GF LAGGEGAIEItI_....---.._......__._.__. GI°N'L nGGREGATE It IMI APPLIES PER GENf_RAI_AGGREGATE $ 2 ----_____,._. r POLICY JF O IOC _ _000,00 PRODUCTS - COMP/OP AGG $ 2 , O00 , OO _AUTOMOBILE LIABILITY 2434550 06/01/2013 06/01/2014 — ANY AUTO COMBINED SINGLE LIMIT $ ALL OWNED AUTOS (Ea accident) 1,000,000 B X_ SCHEDULED AUTOS BODILY INJURY X HIREDAUTOS (Per person) $ X NON -OWNED AUTOS BODILY INJURY (Per accident) $ GARAGE LIABILITY PROPERTY DAMAGE $ (Per accident) ANY AUTO AUTO ONLY - EA ACCIDENT $ --- OTHER THAN EA ACC $ ExcEss/uMonr-1_tsLlnBllrry UMB6418958-05 X_ l OCCUR I`_� CLAIMS MADE AUTO ONLY: AGG 06/01/2013 06/01/2014 EACH OCCURRENCE 2,000,00 A 2,000,00 _ DEDUCIIBLE RETI-NTION $ COMPENSATION WMZ-800-8006553-2013A FMPI.OVF_RS' IABILITY ANY 06/02/2013 06/02/2014AND PROPFIIE'i"OnP/XCU I Vj- C OFFICER/MFMnFR EXCLUDI.D? (Mandatory In NH) II E.L. EACH ACCIDENT $ 1,000,00C yrs, rlrsaibe under SPLCIAI. PROVISIONS (,01,)w E.L. DISEASE - FA EMPLOYEE $ 1 QQQ QQ OTfIF_R E.L. DISEASE - POLICY LIMIT $ 11000,000 UF_SCRIPTION OF OPERATIONS /LOCATIONS /VEHICLES! EAULUSIUNS ADDED BY -ENDORSEMENT/ SPECIAL PROVISIONS CERTIFICATE HOLDEN CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR Evidence Of Insurance REPRESENTATIVES. AUTHORIZED REPRESENTATIVE Peter ACOF2(2009/0 21) Sennett/AAM The ACORD name logo © 1988-2009 ACORD CORPORATION. All rights reserved. and are registered marks of ACORD HEATING EQUIPMENT Area COOLING EQUIPMENT Clg load Make n/a Clg AVF Make n/a (Btuh) (Btuh) Trade n/a (cfm) 2nd floor d Trade n/a 47865 29857 Model n/a 1250 1st floor system d Cond n/a 43447 28883 AHRI ref n/a 1314 Basemnt/1st sys d Coil n/a 91312 58857 2565 2817 Other equip loads AHRI ref n/a 8476 0 Efficiency n/a Equip. is 0.93 RSM Efficiency n/a 54502 Heating input Latent cooling Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor d 2927 47865 29857 1250 1250 1st floor system d 2358 43447 28883 1314 1314 Basemnt/1st sys d 5285 91312 58857 2565 2817 Other equip loads 8476 0 Equip. is 0.93 RSM 54502 Latent cooling 7589 TnTAI Q cnoc nn -700 nnnna nrnr -- Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -tLj. WriihtSOft 2014 -May -01 14:16:32 �/�� r" g Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 1 /T.:i% ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat �,111011911L 0 Btuh 0 Btuh 0 OF 1314 cfm 0.030 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER 0 Btuh 0 Btuh 0 Btuh 1314 cfm 0.046 cfm/Btuh 0 in H2O 0.93 1274 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) basement zone p 1274 24469 16831 740 766 1stfloor p 1084 18978 13036 574 593 1 st floor system d 2358 43447 28883 1314 1314 Other equip loads 3626 0 Equip. @ 0.93 RSM 26745 Latent cooling 2044 TnTAi c A 7073 I 28789 1314 1314 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft% 2014 -May -0114:16:32 r" 9 Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 2 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N wrightsoftt Load Short Form Job: 86 Compass Point 2nd floor Date: May 1 , 2014 By: Croinin Construction Management P. • Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Htg Clg Infiltration Outside db (°F) 12 88 Method Inside db (°F) 70 75 Simplified Design TD (°F) 58 13 Construction quality Ti ht Daily range Fireplaces 1 (Average) Inside humidity (%) 50 50 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFU E 0 Btuh 0 Btuh 0 OF 1250 cfm 0.026 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER Area 0 Btuh 0 Btuh 0 Btuh 1250 cfm 0.041 cfm/Btuh 0 in H2O 0.86 8549 ROOM NAME Area Htg load CIg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Bouns zone p 2nd floor zone p 885 2042 13058 8549 341 350 34807 27010 909 1107 2nd floor d Other equip loads 2927 47865 29857 1250 1250 Equip. @ 0.93 RSM 4850 4096 Latent cooling 31440 5545 TOTALS 2927 52715 36986 1250 1250 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ,,% wrightsoft° Right -Suite® Universal 2013 13.0.07 RSU05790 2014 -May -01 14:16:32 )CCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Page 3 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref n/a Efficiency n/a Htg load Heating input Htg AVF Clg AVF Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a cfm COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Area Htg load Coil n/a Htg AVF Clg AVF AHRI ref n/a (ft2) (Btuh) Efficiency n/a (cfm) Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 18978 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Living room 704 8928 5556 270 253 Kitchen 130 1672 2581 51 117 office 250 8378 4898 253 223 1stfloor p 1084 18978 13036 574 593 Other equip loads 2805 0 Equip. @ 0.93 RSM 12071 Latent cooling 1581 T(1TAI Q lnon 0-1-70134n/ncn c -n rnn Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014 -May -0114:16:32 L 17 wri htsof% Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 4 '11,M ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N HEATING EQUIPMENT Make n/a p n/a Model n/a Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L bedroom 1 Inside humidity (%) 50 50 77 Moisture difference (gr/Ib) 47 28 1432 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref n/a Efficiency n/a Htg load (Btuh) Heating input 0 Btuh Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a 107 COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Coil n/a AHRI ref n/a Efficiency n/a Htg load (Btuh) Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 107 ROOM NAME Area (ft2) Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) Clg AVF (cfm) Ldy 32 1097 294 29 12 Masterbath 65 2667 1501 70 62 Bedroom 2 208 4865 2622 127 107 bedroom 1 176 2952 3058 77 125 1/2 bath 91 1432 375 37 15 Masterbed room 325 8308 7137 217 293 full bath 77 675 171 18 7 2nd floor hall 180 2237 707 58 29 ottin QOO i /%G -7A 444 A A 1-1 vvv � vv• � � � i TT L/ V 7V/ Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft" 2014 -May -0114:16:32 9 Right -Suit,@ Universal 2013 13.0.07 RSU05790 Page 5 ...aft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N 2nd floor zone p 2042 34807 27010 909 1107 Other equip loads 2817 0 Equip. @ 0.93 RSM 25012 Latent cooling 4033 -M-rA 1 0 nn n n n�nn w nn^ — nnn A d n1 GVYG J! VG'+ G.7VY:7 .7V.7 I 1W I Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft' 2014 -May -0114:16:32 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 6 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N +- wrightsoft2 Load Short Form Job: 86 Compass Point basement zone Date: May 1 , 2014 By: Croinin Construction Management P. • Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Htg Clg Infiltration Outside db (°F) 12 88 Method Inside db (°F) 70 75 Simplified Desi n TD °F Construction quality Ti ht g ( ) 58 13 Fireplaces 1 (Average) Daily range _ L Inside humidity (%) 50 50 Moisture difference (gr/lb) 47 28 HEATING EQUIPMENT Clg load Make n/a Clg AVF Trade n/a (cfm) (cfm) Model n/a 16831 740 AHRI ref n/a 59 16831 Efficiency n/a 22 Heating input n/a Heating output 0 Btuh Temperature rise 0 IF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a in H2O ROOM NAME Area Htg load (ft2) (Btuh) Basement 1274 244 basement zone p 1274 244 Other equip loads 8 Equip. @ 0.93 RSM Latent cooling TOTALS 1274 252 COOLING EQUIPMENT Clg load Make n/a Clg AVF Trade n/a (cfm) (cfm) Cond n/a 16831 740 Coil n/a 59 16831 AHRI ref n/a 766 22 Efficiency n/a Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft0 Right -Suite® Universal 2013 13.0.07 RSU05790 2014 -May -01 14:16:32 ACCK ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Page 7 Clg load Htg AVF Clg AVF (Btuh) (cfm) (cfm) 69 16831 740 766 59 16831 740 766 22 0 15585 463 ai ienao Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft0 Right -Suite® Universal 2013 13.0.07 RSU05790 2014 -May -01 14:16:32 ACCK ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Page 7 -- wrightsoftm Load Short Form Bouns zone Croinin Construction Management Job: 86 Compass Point Date: May 1 , 2014 By: P. 0 Box 7237, Lowell, M a 01852 4a" ct a kN" 8 ii�ra d fProJectlnformatlonxa' For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 lll�111 11 fig i Area ® o e e Make n/a Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L 14 Inside humidity (%) 50 50 1132 Moisture difference (gr/Ib) 47 28 AHRI ref n/a HEATING EQUIPMENT Area COOLING EQUIPMENT Clg load Make n/a Clg AVF Make n/a (Btuh) (Btuh) Trade n/a (cfm) bouns room Trade n/a 8866 7083 Model n/a 290 bouns room closet Cond n/a 1248 334 AHRI ref n/a 14 dining room Coil n/a 2944 1132 77 46 Bouns zone p AHRI ref n/a 13058 8549 Efficiency n/a Other equip loads Efficiency n/a 0 Heating input Equip. @ 0.93 RSM Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) bouns room 625 8866 7083 232 290 bouns room closet 70 1248 334 33 14 dining room 190 2944 1132 77 46 Bouns zone p 885 13058 8549 341 350 Other equip loads 2033 0 Equip. @ 0.93 RSM 7916 Latent cooling 1512 Tr1TAI Q 00c Henn nea Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Wil (1tS01� 2014 -May -0114:16:32 �, 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 8 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N wri htsoft. Load Multizone Summary Report Job: 86 Compass Point 9 Date: May 1 , 2014 By: Croinin Construction Management P. 0 Box 7237, Lowell, Ma 01852 RM - �,�.Infiltrat�on'Summar �ps?s NOR k4 a _. 'g�: � ; e � ire' €s€a�°�ri �nWTI . �� ��oadaAnd,A'F umm.a.ry� ROOM NAME Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM Basement ft3 cfm Btuh/ft2 ft3 cfm Btuh/ft2 basement zone 3822 0.41 26 4.2 3822 0.39 25 0.9 1st floor 9756 0.55 89 4.2 9756 0.52 84 0.9 Bouns zone 8975 0.43 64 4.2 8975 0.41 61 0.9 2nd floor zone 13050 0.41 89 4.2 13050 0.39 84 0.9 Basemnt/1st sys 35603 0.16 268 1.5 35603 0.07 253 0.1 'g�: � ; e � ire' €s€a�°�ri �nWTI . �� ��oadaAnd,A'F umm.a.ry� ROOM NAME Area ft2 Htg load Btuh Clg load Btuh Htg AVF cfm Clg AVF cfm Basement 1274 24469 16831 740 766 basement zone 1274 24469 16831 740 766 Living room 704 8928 5556 270 253 Kitchen 130 1672 2581 51 117 office 250 8378 4898 253 223 1st floor 1084 18978 13036 574 593 bouns room 625 8866 7083 232 290 bouns room closet 70 1248 334 33 14 dining room 190 2944 1132 77 46 Bouns zone 885 13058 8549 341 350 Ldy 32 1097 294 29 12 Masterbath 65 2667 1501 70 62 Bedroom 2 208 4865 2622 127 107 bedroom 1 176 2952 3058 77 125 1/2 bath 91 1432 375 37 15 Masterbed room 325 8308 7137 217 293 full bath 77 675 171 18 7 2nd floor hall 180 2237 707 58 29 attic 888 10574 11144 276 457 2nd floor zone 2042 34807 27010 909 1107 Basemnt/1st sys 5285 91312 58857 2565 2817 �wri htsoft 2014 -May -0114:16:32 9 Right-SuiteO Universal 2013 13.0.07 RSU05790 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Page 1 wrightsoft® Building Analysis Job: 86 Compass Point Basemnt/1 st sys Date: May 1 , 2014 Croinin Construction Management y PO Box 7237, Lowell, Ma 01852 x x ,7 a For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Location: Btuh/ft2 Boston Logan Int'I AP, MA, US % of load Elevation: 30 ft 3.7 17.3 Latitude: 420N Outdoor: Heating Cooling Dry bulb (°F) 12 Daily range °F) - Wet bulb (°F� 88 15 ( L Wind speed (mph) 15.0 72 7.5 Component Btuh/ft2 Btuh % of load Walls Glazing 3.7 17.3 19328 19.4 Doors 16.7 5656 702 5.7 0.7 Ceilings Floors 13.9 28587 28.6 Infiltration 4.2 4.2 10371 16975 10.4 17.0 Ducts Piping 9692 9.7 Humidification 0 8476 0 8.5 Ventilation 0 0 Adjustments Total 997881 100.0 Component Btuh/ft2 Btuh % of load Walls Glazing 0.7 22.5 3604 Doors 7.7 7349 323 12.5 0.5 Ceilings 9 Floors 12.1 24815 42.2 Infiltration 0.8 0.9 2071 3509 3.5 6.0 Ducts Ventilation 9447 16.1 Internal gains Blower 0 7740 0 13.2 Adjustments 0 0 0 Total 58857 100.0 Latent Cooling Load = 7589 Btuh Overall U -value = 0.140 Btuh/ft2-°F Data entries checked. Indoor: Indoor temperature (°F) Heating 70 Cooling 75 Design TD (° Relative humidity (%) 58 13 Moisture difference (gr/Ib) 50 46.5 50 Infiltration: 27.8 Method Construction quality Simplified Ti ht Fireplaces 1 Average) + wrightsoft® Ri ht -suite® 2014 -May -01 14:16:32 ..oft HVAC\cronin construction 21 gabriel ay.rup Universal c3 iMJ807 R nt Door Ofaces: N Page 1 Building Anali ss Job: 86 Compass Point wrightsoft� y Date: May 1 , 2014 1st floor system By: Croinin Construction Management P. 0 Box 7237, Lowell, Ma 01852 a�n y air vari .. ry"" y �ro ect nformation: �. .Ae For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 SIMENNSEM Btuh/ft2 Btuh % of load Walls il .. Location: Glazing Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 702 1.5 Indoor temperature (°F) 70 75 Elevation: 30 ft 1.4 Design TD (°F) 58 13 Latitude: 42°N Ducts Relative humidity (%) 0 0 Piping Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27..8 Dry bulb (°F) 12 88 Infiltration: Adjustments 0 Dally range °F) - 15 (L ) Method Simplified 4.2 Wet bulb (°F� - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments v$ N'-wom Component Btuh/ft2 Btuh % of load Walls 3.3 8015 17.0 Glazing 17.3 1233 2.6 Doors 16.7 702 1.5 Ceilings 14.7 25507 54.2 Floors 1.4 729 1.5 Infiltration 4.2 7263 15.4 Ducts 0 0 0 Piping 0.9 0 0 Humidification Ducts 3626 7.7 Ventilation 0 0 0 Adjustments 0 0 Total 47073 1 100.0 Com onent Btuh/ft2 Btuh % of load Walls 0.6 1500 5.2 Glazing 31.1 2217 7.7 Doors 7.7 323 1.1 Ceilings 12.7 22142 76.7 Floors 0 0 0 Infiltration 0.9 1501 5.2 Ducts 0 0 Ventilation 0 0 Internal gains 1200 4.2 Blower 0 0 Adjustments 0 Total 28883 100.0 Latent Cooling Load = 2044 Btuh Overall U -value = 0.130 Btuh/ft2-°F WARNING: window to floor area ratio = 3.0% - less than 5%. 2014 -May -01 14:16:32 wrightsoft® Right-Suite(R) Universal 2013 13.0.07 RSU05790 Page 2 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Building Anal sis Job: 86 Compass Point wrightsoft� y Date: May 1 , 2014 2nd floor By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 I +'R.g ry s€ �"B t � �* -2.�.. °'& �= X .C2a"a ,9H, aR� msr W £-1. " -- �.� e.9 -Component Btuh/ft2 Btuh % of load Walls Location: 11314 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 8.4 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 420N 4.9 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range6 °F) - 15 (L ) Method Simplified 9.2 Wet bulb (° -72 Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments I +'R.g ry s€ �"B t � �* -2.�.. °'& �= X .C2a"a ,9H, aR� msr W £-1. " -- �.� e.9 -Component Btuh/ft2 Btuh % of load Walls 4.0 11314 21.5 Glazing 17.3 4424 8.4 Doors 0 0 0 Ceilings 9.9 3080 5.8 Floors 4.9 9642 18.3 Infiltration 4.2 9713 18.4 Ducts 9692 18.4 Piping 0 0 Humidification 4850 9.2 Ventilation 0 0 Adjustments 0 Total 52715 1 100.0 ��.Coollnq��e',., -Component Btuh/ft2 Btuh % of load Walls 0.8 2104 6.2 Glazing 20.0 5132 15.1 Doors 0 0 0 Ceilings 8.6 2673 7.9 Floors 1.1 2071 6.1 Infiltration 0.9 2008 5.9 Ducts 9330 27.5 Ventilation 0 0 Internal gains 6540 19.3 Blower 4096 12.1 Adjustments 0 Total 33953 100.0 Latent Cooling Load = 5545 Btuh Overall U -value = 0.149 Btuh/ft2-°F Data entries checked. 2014 -May -0114:16:32 " wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 3 ACCK ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Building Anal sis Job: 86 Compass Point wrightsoft° y Date: May 1 , 2014 1st floor By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 �,��" ��� , .. �zY '.`11?` F'r �� �u ;'r � �'$�b:. ,� %, ,�.�,� $ � "i "I : �. Heating s —Component Btuh/ft2 Btuh % of load Walls Location: 4596 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 5.7 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 420N 0 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range °F) - 15 (L ) Method Simplified 12.9 Wet bulb (°� - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments �,��" ��� , .. �zY '.`11?` F'r �� �u ;'r � �'$�b:. ,� %, ,�.�,� $ � "i "I : �. Heating s —Component Btuh/ft2 Btuh % of load Walls 3.7 4596 21.1 Glazing 17.3 1233 5.7 Doors 16.7 702 3.2 Ceilings 14.7 6831 31.4 Floors 0 0 0 Infiltration 4.2 5617 25.8 Ducts 0 0 Piping 0 0 Humidification 2805 12.9 Ventilation 0 0 Adjustments 0 Total 21783 100.0 —Component Btuh/ft2 Btuh % of load Walls 1.0 1221 9.4 Glazing 44.9 3201 24.6 Doors 7.7 323 2.5 Ceilings 12.7 5930 45.5 Floors 0 0 0 Infiltration 0.9 1161 8.9 Ducts 0 0 Ventilation 0 0 Internal gains 1200 9.2 Blower 0 0 Adjustments 0 Total 13036 100.0 Latent Cooling Load = 1581 Btuh Overall U -value = 0.128 Btuh/ft2-°F Data entries checked. 2014 -May -01 14:16:32 �A:t + wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 4 /� �� ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N BuildingAnalysis Job: 86 Compass Point WI"19i1tS0ft� y Date: May 1 , 2014 2nd floor zone By: Croinin Construction Management P. 0 Box 7237, Lowell, Ma 01852 .�» t.:,max .€4 i."-6 . �Pro - ectlli'forrri'atlon For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 -Component o ® • • % of load i� Location: 7899 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 9.0 Indoor temperature (°F) 70 75 Elevation: 30 ft Latitude: Ceilings Design TD (°F) 58 13 420N 6.4 Relative, humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Adjustments 0 Dally range °F) - Wet bulb (°� - 15 (L 72 ) Method Simplified 7.5 Wind Construction quality Ti ht Adjustments speed (mph) 15.0 7.5 Fireplaces 1 Average) 1 -Component Btuh/ft2 Btuh % of load Walls 4.2 7899 21.0 Glazing 17.3 3387 9.0 Doors 0 0 0 Ceilings 8.8 2379 6.3 Floors 6.4 8132 21.6 Infiltration 4.2 5642 15.0 Ducts 19.8 7368 19.6 Piping Adjustments 0 0 Humidification 27010 2817 7.5 Ventilation 0 0 Adjustments 0 Total 1 376241 100.0 -Component Btuh/ft2 Btuh % of load Walls 0.6 1197 4.4 Glazing 35.4 6931 25.7 Doors 0 0 0 Ceilings 7.6 2065 7.6 Floors 1.4 1741 6.4 Infiltration 0.9 1166 4.3 Ducts 8571 31.7 Ventilation 0 0 Internal gains 5340 19.8 Blower 0 0 Adjustments 0 Total 27010 100.0 Latent Cooling Load = 4033 Btuh Overall U -value = 0.182 Btuh/ft2-°F Data entries checked. ^- Wrl htt® 2014 -May -01 14:16:32 � gSo Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 5 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Building Anal sis Job: 86 Compass Point wrightsoft� y Date: May 1 , 2014 basement zone By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 -ro`9ectlrformatlon ..a IWIRIITZI For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 gv,�;� � ..?,.�. .i.=va�.. .�eatln CE,�,3�3�Y'�, A'•eH.. ?. —Component • • e •112M= % of load "I M Location: 3418 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (° 58 13 Latitude: 420N 1.4 Relative humily (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Adjustments 0 Dally range6 °F) - 15 ( L ) Method Simplified 3.2 Wet bulb (° -72 Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments gv,�;� � ..?,.�. .i.=va�.. .�eatln CE,�,3�3�Y'�, A'•eH.. ?. —Component Btuh/ft2 Btuh % of load Walls 2.9 3418 13.5 Glazing 0 0 0 Doors 0 0 0 Ceilings 14.7 18676 73.8 Floors 1.4 729 2.9 Infiltration 4.2 1646 6.5 Ducts 0 0 0 Piping Adjustments 0 0 Humidification 16831 822 3.2 Ventilation 0 0 Adjustments 0 Total 1 25291 100.0 —Component Btuh/ft2 Btuh % of load Walls 0.2 279 1.7 Glazing 0 0 0 Doors 0 0 0 Ceilings 12.7 16212 96.3 Floors 0 0 0 Infiltration 0.9 340 2.0 Ducts 0 0 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 16831 100.0 Latent Cooling Load = 463 Btuh Overall U -value = 0.131 Btuh/ft2-°F WARNING: window to floor area ratio = 0.0% - less than 5%. 2014 -May -0114:16:32 i9CC+ wrightsoft°' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 6 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N —Component •" Btuh % of load Walls Location: 3415 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 6.9 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F)) 58 13 Latitude: 42°N 2.2 Relative humidity (%) 10.0 Infiltration Outdoor: Heating Cooling Moisture difference (gr/Ib) 46 5 27..8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range 6°F) - 15 ( L ) Method Simplified 13.5 Wet bulb (° -72 Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments —Component Btuh/ft2 Btuh % of load Walls 3.7 3415 22.6 Glazing 17.3 1037 6.9 Doors 0 0 0 Ceilings 17.5 701 4.6 Floors 2.2 1510 10.0 Infiltration 4.2 4071 27.0 Ducts 2324 15.4 Piping 0 0 Humidification 2033 13.5 Ventilation 0 0 Adjustments 0 Total 1 15091 100.0 I z ��o A._ _.��e. �., ��.. . _Coo�n E I �: 0 WM .,� —Component Btuh/ft2 Btuh % of load Walls 1.0 907 10.6 Glazing 35.8 2148 25.1 Doors 0 0 0 Ceilings 15.2 609 7.1 Floors 0.5 330 3.9 Infiltration 0.9 841 9.8 Ducts 2514 29.4 Ventilation 0 0 Internal gains 1200 14.0 Blower 0 0 Adjustments 0 Total 1 8549 100.0 Latent Cooling Load = 1512 Btuh Overall U -value = 0.080 Btuh/ft2-°F Data entries checked. 2014 -May -01 14:16:32 - - wrightsofV Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 7 ACCX ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 86 Compass Point wi"IghtSOft� Date: May 1 , 2014 Basemnt/1 st sys By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area Ll -value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-°F ftz °FBtuh Btuh/ftz Btu MOM Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh 15621-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) n 945 0.065 21.0 3.74 Location: 0.99 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 3.74 Indoor temperature (°F) 70 75 Elevation: 30 ft 0.065 Design TD (°F) 58 13 Latitude: 42°N 929 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 11369 0.99 Daily range (°F) - 15 ( L ) Method Simplified 4.43 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 0.073 Construction descriptions Or Area Ll -value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-°F ftz °FBtuh Btuh/ftz Btu MOM Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh 15621-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) n 945 0.065 21.0 3.74 3538 0.99 940 e 573 0.065 21.0 3.74 2145 0.99 570 s 934 0.065 21.0 3.74 3496 0.99 929 w 585 0.065 21.0 3.74 2190 0.99 582 all 3037 0.065 21.0 3.74 11369 0.99 3020 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 n 36 0.300 0 17.3 622 8.04 290 n 24 0.300 0 17.3 415 13.0 313 n 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 e 24 0.300 0 17.3 415 52.7 1265 s 48 0.300 0 17.3 829 16.0 769 s 23 0.300 0 17.3 403 27.4 640 s 64 0.300 0 17.3 1106 27.4 1756 w 36 0.300 0 17.3 622 28.2 1015 all 327 0.300 0 17.3 5656 22.5 7349 2014 -May -01 14:16:32 I wrightsoft' Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 1 /CC -N ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Doors 11 P0: Door, mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 S 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 120 0.026 38.0 1.50 180 1.30 156 gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd fir fnsh, frm flr, 10" thkns, 1/2" 1890 0.255 1.0 14.7 27706 12.7 24050 gypsum board int fnsh C part ceiling,: C part ceiling, frm flr, 10" thkns, 1/2" gypsum board 40 0.304 1.0 17.5 701 15.2 609 int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns 1224 0.368 0 6.90 8442 1.51 1847 19A-30bstp: Part floor, r-30 ins, frm flr, 10" thkns 625 0.034 30.0 1.64 1027 0.36 225 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh 506 0.025 0 1.44 729 0 0 120 0.025 0 1.44 173 0 0 all 626 0.025 0 1.44 901 0 0 2014 -May -01 14:16:32 ,' wrightsofta Right -Suite® Universal 2013 13.0.07 RSU05790 Page 2 �C� ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Component Constructions Job: 86 Compass Point wrightsoft- Date: May 1 , 2014 basement zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 ' "fix. "�.��w::�. :"�.z�.r��-.. .. ".fi,, •�"��. f �ro ec � n orma lone �r�. For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Walls 15821-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh Or Area U -value Insul R Htg HTM Loss CIg HTM Gain ft= Btuh/ft2-°F ft2-°F/Btuh Btuh/ftz Btu MOM Btu n 288 0.042 21.0 N L; Location: 0.24 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 21.0 Indoor temperature (°F) 70 75 Elevation: 30 ft s Design TD (°F) 58 13 Latitude: 420N 1487 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 1179 0.042 Daily range (°F) - 15 ( L ) Method Simplified 279 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Walls 15821-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh Or Area U -value Insul R Htg HTM Loss CIg HTM Gain ft= Btuh/ft2-°F ft2-°F/Btuh Btuh/ftz Btu MOM Btu n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 1274 0.255 1.0 14.7 18676 12.7 16212 506 0.025 0 1.44 729 0 0 2014 -May -01 14:16:32 IA: -+V' wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 3 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N 1151111 Or Area U -value Insul R Htg HTM Location: Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btuh/ftz-°F Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 420N 7.68 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 465 Daily range (°F) - 15 (L ) Method Simplified 21.0 Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 3.74 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 21 0.290 ft2 Btuh/ftz-°F ft2-°FBtuh Btuh/ftz Btu Btu hM2 Btu Walls 10.5 16.7 702 7.68 323 Ceilings 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 468 0.065 21.0 3.74 1752 0.99 465 gypsum board int fnsh, 2"x6" wood frm e 174 0.065 21.0 3.74 651 0.99 173 S 298 0.065 21.0 3.74 1114 0.99 296 w 288 0.065 21.0 3.74 1078 0.99 286 all 1228 0.065 21.0 3.74 4596 0.99 1221 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 13.0 313 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; e 24 0.300 0 17.3 415 52.7 1265 50% outdoor insect screen; foreground = green grass (0.23) s 23 0.300 0 17.3 403 27.4 640 all 71 0.300 0 - 17.3 1233 31.1 2217 Doors 11 P0: Door, mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 S 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 466 0.255 1.0 14.7 6831 12.7 5930 gypsum board int fnsh Floors (none) .` ,.. 2014-May-0114:16:32WI1 htsot Right -Suite® Universal 2013 13.0.07 RSU05790 Page 4 RCCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N WrIQiItSOft- Component Constructions Job: 86 Compass Point Date: May 1 , 2014 Bouns zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 10Mn,Informations "I 'A'' . For: Construction 51 Mount • drive,• i • Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/W-°F ft2-°F/Btuh Btuh/V Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns n 225 0.065 21.0 3.74 842 Location: 224 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 337 Indoor temperature (°F) 70 75 Elevation: 30 ft 21.0 Design TD (°F) 58 13 Latitude: 42°N w 207 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 907 Daily range (°F) - 15 (L ) Method Simplified 415 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/W-°F ft2-°F/Btuh Btuh/V Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns n 225 0.065 21.0 3.74 842 0.99 224 e 90 0.065 21.0 3.74 337 0.99 90 s 390 0.065 21.0 3.74 1460 0.99 388 w 207 0.065 21.0 3.74 775 0.99 206 all 912 0.065 21.0 3.74 3415 0.99 907 s 24 0.300 0 17.3 415 16.0 385 w 36 0.300 0 17.3 622 28.2 1015 all 60 0.300 0 17.3 1037 23.3 1400 40 0.304 1.0 17.5 701 15.2 609 70 0.368 0 6.90 483 1.51 106 625 0.034 30.0 1.64 1027 0.36 225 2014-May-0114:16:32Wrl htsofRight-Suite® Universal 2013 13.0.07 RSU05790 Page 5 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh BtuhM Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board int fnsh n 477 0.065 21.0 3.74 Location: 0.99 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 3.74 Indoor temperature (°F) 70 75 Elevation: 30 ft 0.065 Design TD (°F) 58 13 Latitude: 420N 633 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 6773 0.99 Daily range (°F) - 15 (L ) Method Simplified 4.43 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 0.073 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh BtuhM Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board int fnsh n 477 0.065 21.0 3.74 1786 0.99 474 e 399 0.065 21.0 3.74 1494 0.99 397 S 636 0.065 21.0 3.74 2381 0.99 633 w 297 0.065 21.0 3.74 1112 0.99 295 all 1809 0.065 21.0 3.74 6773 0.99 1799 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 36 0.300 0 17.3 622 8.04 290 n 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 S 48 0.300 0 17.3 829 16.0 769 s 64 0.300 0 17.3 1106 27.4 1756 w 36 0.300 0 17.3 622 28.2 1015 all 256 0.300 0 17.3 4424 20.0 5132 120 0.026 38.0 1.50 180 1.30 156 150 0.255 1.0 14.7 2199 12.7 1909 40 0.304 1.0 17.5 701 15.2 609 i 32 " wriPage ghtsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 2014 -May -01 14:age r 6 6 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Floors 19A-Obstp: Part floor, frm fir, 10" thkns 19A-30bstp: Part floor, r-30 ins, frm flr, 10" thkns 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, the fir fnsh 1224 0.368 0 6.90 8442 1.51 1847 625 0.034 30.0 1.64 1027 0.36 225 120 0.025 0 1.44 173 0 0 wrl htsoft' 2014 -May -0114:16:32 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 7 /�� ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJB Front Door faces: N wri htsoft Component Constructions Job: 86 Compass Point 9 Date: May 1 , 2014 1st floor system By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 7 RN For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-0F ft2-°FBtuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15621-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors 11 P0: Door, mtl pur core type Ceilings C part ceiling,: C part ceiling, hrd wd fl fnsh, frm fl r, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 468 ®- o ® • •11 IN 11 1752 Location: 465 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 651 Indoor temperature (°F) 70 75 Elevation: 30 ft 21.0 Design TD (°F) 58 13 Latitude: 420N w 288 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 1221 Daily range (°F) - 15 (L ) Method Simplified 835 Wet bulb (F) - 72 Construction quality Ti ht 21.0 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) S 513 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-0F ft2-°FBtuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15621-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors 11 P0: Door, mtl pur core type Ceilings C part ceiling,: C part ceiling, hrd wd fl fnsh, frm fl r, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 468 0.065 21.0 3.74 1752 0.99 465 e 174 0.065 21.0 3.74 651 0.99 173 S 298 0.065 21.0 3.74 1114 0.99 296 w 288 0.065 21.0 3.74 1078 0.99 286 all 1228 0.065 21.0 3.74 4596 0.99 1221 n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 S 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 n 24 0.300 0 17.3 415 13.0 313 e 24 0.300 0 17.3 415 52.7 1265 S 23 0.300 0 17.3 403 27.4 640 all 71 0.300 0 17.3 1233 31.1 2217 n 21 0.290 10.5 16.7 351 7.68 161 s 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 1740 0.255 1.0 14.7 25507 12.7 22142 506 0.025 0 1.44 729 0 0 2014 -May -01 14:16:32 wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 8 .�C� ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Stuh/ftl-°F ftz-°F/Btuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns n 252 0.065 21.0 3.74 943 b Location: e 309 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0.99 Indoor temperature (°F) 70 75 Elevation: 30 ft 3.74 Design TD (°F) 58 13 Latitude: 420N 0.065 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 892 n 168 Daily range (°F) - 15 (L ) Method Simplified 0.17 Wet bulb (°F) - 72 Construction quality Ti ht 4.72 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 0.073 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Stuh/ftl-°F ftz-°F/Btuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns n 252 0.065 21.0 3.74 943 0.99 251 e 309 0.065 21.0 3.74 1157 0.99 307 s 246 0.065 21.0 3.74 921 0.99 245 w 90 0.065 21.0 3.74 337 0.99 90 all 897 0.065 21.0 3.74 3358 0.99 892 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 36 0.300 0 17.3 622 8.04 290 n 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 s 24 0.300 0 17.3 415 16.0 385 s 64 0.300 0 17.3 1106 27.4 1756 all 196 0.300 0 17.3 3387 19.0 3732 120 0.026 38.0 1.50 180 1.30 156 150 0.255 1.0 14.7 2199 12.7 1909 1154 0.368 0 6.90 7959 1.51 1741 ,." 2014-May-0114:16:32Wrl htsoft Right -Suite® Universal 2013 13.0.07 RSU05790 Page 9 ACCP, ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh 120 0.025 0 1.44 173 wri htsoft' 2014 -May -0114:16:32 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 10 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N -F9 - Component Constructions Job: 86 Compass Point wri htsoft Compp CDate: May 1 , 2014 Basement By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 3 Nro ect �ntormatlon For: • • Mount51 joy drive,• i • Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh 1274 Ill ill Poll; AN 14.7 18676 12.7 16212 a: Location: 0 1.44 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-°F ft`-°FBtuh BtuhtV Stuh Btuh/ftp Btu Wal I s 15821-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int n 288 0.042 21.0 2.90 835 0.24 68 frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board a 288 0.042 21.0 2.90 835 0.24 68 int fnsh s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh 1274 0.255 1.0 14.7 18676 12.7 16212 506 0.025 0 1.44 729 0 0 _{A:��"_ 2014 -May -01 14:16:32 IA:." r wrightSOW Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 11 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = li Front Door faces: N --9 . Component Constructions Job: 86 Compass Point Wrl i1tSOft P Date: May 1 , 2014 Living room By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 W 0For: Trust Construction » « ,_.��;s Piro ectlnformatior�. t 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2- °F ftz-°F/Btuh Btuh/112 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors 11 P0: Door, mtl pur core type Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors (none) n 243 0.065 21.0 3.74 910 0.99 242 e 174 0.065 21.0 3.74 651 0.99 173 w 198 0.065 21.0 3.74 741 0.99 197 all 615 0.065 21.0 3.74 2303 0.99 612 n e all n 24 ® • 0 0 0 17.3 415 Location: 313 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 415 Indoor temperature (°F) 70 75 Elevation: 30 ft 0 Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 ?Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2- °F ftz-°F/Btuh Btuh/112 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors 11 P0: Door, mtl pur core type Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors (none) n 243 0.065 21.0 3.74 910 0.99 242 e 174 0.065 21.0 3.74 651 0.99 173 w 198 0.065 21.0 3.74 741 0.99 197 all 615 0.065 21.0 3.74 2303 0.99 612 n e all n 24 0.300 0 17.3 415 13.0 313 24 0.300 0 17.3 415 52.7 1265 48 0.300 0 17.3 829 32.9 1577 21 0.290 10.5 176 0.255 1.0 16.7 351 7.68 161 14.7 2580 12.7 2240 t Wil htSOft 2014 -May -0114:16:32 .` 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 12 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors (none) 105 0.065 21.0 3.74 394 0.99 105 12 0.300 0 17.3 202 27.4 320 40 0.255 1.0 14.7 586 12.7 509 2014 -May -0114:16:32 'rwri htsofta Right -Suite® Universal 2013 13.0.07 RSU05790 Page 13 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors (none) 105 0.065 21.0 3.74 394 0.99 105 12 0.300 0 17.3 202 27.4 320 40 0.255 1.0 14.7 586 12.7 509 2014 -May -0114:16:32 'rwri htsofta Right -Suite® Universal 2013 13.0.07 RSU05790 Page 13 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Location: Boston Logan I nt' I AP, MA, US Elevation: 30 ft Latitude: 42°N Outdoor: Heating Dry bulb (°F) 12 Daily range (°F) - Wet bulb (°F) - Wind speed (mph) 15.0 Indoor: Heating Cooling 70 Indoor temperature (°F) 58 Design TD (°F) 50 Relative humidity (%) Cooling Moisture difference (gr/Ib) 88 Infiltration: 15 ( L ) Method . 72 Construction quality 7.5 Fireplaces Heating Cooling 70 75 58 13 50 50 46.5 27.8 Simplified Tiht 1 ?Average) ft2 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 BWh/ftz-°F ft2-°FBtuh BWh/ftz Btu Btu h/ft2 Btu Wal I s 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 225 0.065 21.0 3.74 842 0.99 224 gypsum board int fnsh, 2"W' wood frm s 192 0.065 21.0 3.74 720 0.99 191 w 90 0.065 21.0 3.74 337 0.99 90 all 507 0.065 21.0 3.74 1899 0.99 505 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 12 0.300 0 17.3 202 27.4 320 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors 11 P0: Door, mtl pur core type s 21 0.290 10.5 16.7 351 7.68 161 Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm fir, 10" thkns, 1/2" 250 0.255 1.0 14.7 3665 12.7 3181 gypsum board int fnsh Floors (none) 2014 -May -01 14:16:32 rF WI1 htSOfRight-Suite® Universal 2013 13.0.07 RSU05790 Page 14 .41CCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions 111:11 Area X� Location: Htg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 3.74 449 Daily range (°F) - 15 (L ) Method Simplified 117 Wet bulb (F) - 72 Construction quality Tiht 0.99 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 0.065 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-'F ftz-°F/Btuh Btu h/112 Btu Btu h/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 120 0.065 21.0 3.74 449 0.99 119 gypsum board int fnsh, 2"x6" wood frm e 117 0.065 21.0 3.74 438 0.99 116 all 237 0.065 21.0 3.74 887 0.99 236 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 8.04 193 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 208 0.368 0 6.90 1435 1.51 314 t wri htsoft 2014 -May -0114:16:32 i„.. g Right -Suite® Universal 2013 13.0.07 RSU05790 Page 15 /iCiC� ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 86 Compass Point wrightsoft ppDate: May 1 , 2014 Ld y By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 offliliN MOM Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 BtuhN-°F ft2-°F/Btuh ROM Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns n 36 0.065 21.0 w 45 0.065 21.0 all 81 0.065 21.0 32 0.368 0 3.74 135 0.99 3.74 168 0.99 3.74 303 0.99 6.90 221 1.51 36 45 81 48 -�1�}". 2014 -May -01 14:16:32 .� " wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 16 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N -- wrightsoft� Component Constructions Job: 86 Compass Point Date: May 1 , 2014 bedroom 1 By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative. humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh Btuh/ft' Btu Btu h/ft2 Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" e 75 0.065 21.0 3.74 281 0.99 75 gypsum board int fnsh, 2"W' wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 24 0.300 0 17.3 415 28.2 677 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 176 0.368 0 6.90 1214 1.51 266 wri htsoft� 2014 -May -0114:16:32 _ 9 Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 17 /�� ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 86 Compass Point wrightsoft p Date: May 1 , 2014 1/2 bath By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft? °FBtuh Btuh/ft' Stuh Btu h/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 63 0.065 21.0 3.74 236 0.99 63 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 91 0.368 0 6.90 628 1.51 137 -�d}�" 2014 -May -01 14:16:32 .� " r wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 18 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N 77 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft? °FBtuh Btuh/ft' Stuh Btu h/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 63 0.065 21.0 3.74 236 0.99 63 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 91 0.368 0 6.90 628 1.51 137 -�d}�" 2014 -May -01 14:16:32 .� " r wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 18 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Location: Htg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 14.7 Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 420N 490 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 3.74 753 Daily range (°F) - 15 (L ) Method Simplified 45 Wet bulb (F) - 72 Construction quality Tiht 0.99 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 0.065 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 1.0 14.7 ftz Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 1.51 490 1217-0sw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 201 0.065 21.0 3.74 753 0.99 200 gypsum board int fnsh, 2"x6" wood frm w 45 0.065 21.0 3.74 168 0.99 45 all 246 0.065 21.0 3.74 921 0.99 245 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns 24 0.300 0 17.3 415 16.0 385 125 0.255 1.0 14.7 1832 12.7 1591 325 0.368 0 6.90 2242 1.51 490 2014 -May -01 14:16:32 'rF wrightsoft* Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 19 RCCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 86 Compass Point wrightsoft Date: May 1 , 2014 Masterbath By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 ,� ro, ect nformatlolnq For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns Or Area U -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US BtuhW-°F Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 42°N 3.74 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: all 162 Daily range (°F) - 15 (L ) Method Simplified 0.99 Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 6.90 ft2 BtuhW-°F ft2-°F/Btuh Btuh/ft2 Btu Btu h/ftz Btu e 117 0.065 21.0 3.74 438 0.99 116 s 45 0.065 21.0 3.74 168 0.99 45 all 162 0.065 21.0 3.74 607 0.99 161 25 0.255 1.0 14.7 366 12.7 318 65 0.368 0 6.90 448 1.51 98 •`2014 -May -0114:16:32 Wrl htsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 20 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Component Constructions Job: 86 Compass Point wrightsoft- Date: May 1 , 2014 full bath By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction n orma longi �i ,�'. d immn 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft� Btu hN T ftz-°F/Btuh BtuhtV Btu BION Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns 77 0.368 0 6.90 531 1.51 116 2014 -May -0114:16:32 '-- Wil ItSOft' Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 21 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MA Front Door faces: N hid- i jrekN, Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft� Btu hN T ftz-°F/Btuh BtuhtV Btu BION Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns 77 0.368 0 6.90 531 1.51 116 2014 -May -0114:16:32 '-- Wil ItSOft' Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 21 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MA Front Door faces: N Component Constructions Job: 86 Compass Point wrightsoft- Date: May 1 , 2014 bouns room closet By: Croinin Construction Management P.O Box 7237, Lowell, Me 01852 Nro ect('Pntor�rnation�?,N 0111- MountFor: Trust Construction 51 mill I • • • • tti'" Fj [ 'r Location: Gain Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btu Indoor temperature (°F) 70 75 Elevation: 30 ft 21.0 Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 ?Average) Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns Or Area U -value Insul R Htg HTM Loss Cig HTM Gain W Btuh/ftz-°F ftz-°F/Btuh Btuh/ft2 Btu Btu hM2 Btu S 63 0.065 21.0 3.74 236 0.99 63 70 0.368 0 6.90 483 1.51 106 -�"� 2014 -May -01 14:16:32 AZ_ ' r wrightsoft' Right-SuiteOO Universal 2013 13.0.07 RSU05790 Page 22 "-M ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Component Constructions Job: 86 Compass Point wrightsoft Date: May 1 , 2014 bouns room By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 ectlnformatlon For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh BtuhtP Btu Btu h/ft2 Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns n ® . 0.065 21.0 3.74 842 .a� Location: s Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 584 Indoor temperature (°F) 70 75 Elevation: 30 ft 0.065 Design TD (°F) 58 13 Latitude: 420N 206 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh BtuhtP Btu Btu h/ft2 Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns n 225 0.065 21.0 3.74 842 0.99 224 s 156 0.065 21.0 3.74 584 0.99 155 w 207 0.065 21.0 3.74 775 0.99 206 all 588 0.065 21.0 3.74 2201 0.99 585 S 24 0.300 0 17.3 415 16.0 385 w 36 0.300 0 17.3 622 28.2 1015 all 60 0.300 0 17.3 1037 23.3 1400 625 0.034 30.0 1.64 1027 0.36 225 2014 -May -0114:16:32 'rWI1 htsoftA Right -Suite® Universal 2013 13.0.07 RSU05790 Page 23'I'M ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/112-01` ft=-°F/Btuh Btuh/ft2 Btuh Btu hA2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 33 0.065 21.0 3.74 124 0.99 33 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 12 0.300 0 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 180 0.368 0 17.3 207 8.04 6.90 1241 1.51 97 272 wri htsofta 2014 -May -0114:16:32 ,v�.�+,/ �,r, g Right -Suite® Universal 2013 13.0.07 RSU05790 Page 24 / CO, ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/112-01` ft=-°F/Btuh Btuh/ft2 Btuh Btu hA2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 33 0.065 21.0 3.74 124 0.99 33 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 12 0.300 0 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 180 0.368 0 17.3 207 8.04 6.90 1241 1.51 97 272 wri htsofta 2014 -May -0114:16:32 ,v�.�+,/ �,r, g Right -Suite® Universal 2013 13.0.07 RSU05790 Page 24 / CO, ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-°F ft2-°FBtuh BtuhM Btu Btu h/ft2 Btu Walls 1513-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 166-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 168 0.073 8.0 4.43 744 Location: 29 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 1573 Indoor temperature (°F) 70 75 Elevation: 30 ft 8.0 Design TD (°F) 58 13 Latitude: 420N w 333 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.31 305 Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-°F ft2-°FBtuh BtuhM Btu Btu h/ft2 Btu Walls 1513-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 166-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 48 0.300 0 17.3 829 13.0 625 S 64 0.300 0 17.3 1106 27.4 1756 all 112 0.300 0 17.3 1935 21.3 2381 120 0.026 38.0 1.50 180 1.30 156 120 0.025 0 1.44 173 0 0 Wrl htSOf't: 2014 -May -0114:16:32 �. 9 Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 25 ACCP. ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insult R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft2 Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/ftz Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 337 0.99 Daily range (°F) - 15 (L ) Method Simplified 0.065 Wet bulb (°F) - 72 Construction quality Tiht 170 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 21.0 Construction descriptions Or Area U -value Insult R Htg HTM Loss Clg HTM Gain ft2 BtuhM-°F ft2-°F/Btuh Btuh/V Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" a 90 0.065 21.0 3.74 337 0.99 90 gypsum board int fish, 2"x6" wood frm s 171 0.065 21.0 3.74 640 0.99 170 all 261 0.065 21.0 3.74 977 0.99 260 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, frm flr, 10" thkns, 1/2" gypsum board 40 0.304 1.0 17.5 701 15.2 609 int fnsh Floors (none) 1 W1'1 htsoftT 2014 -May -0114:16:32 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 26 RCCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N