Loading...
HomeMy WebLinkAboutMiscellaneous - 78 COMPASS POINT ROAD 4/30/2018�yDate..........-Ze-................................... TOWN OF NORTH ANDOVER PERMIT FOR WIRING I"'7 This certifies that ............ .... �= .... [.. .. has permission to perform...J..f�CJ.....`..4Z,f........................................... wiring in the building of ..... ...�.. �L.!.�....................................-............................ at.......7........,..��'1!.r....t...._.......��..�..f......1...,:....., North Andover, Mass. •L/ ,Ira�/ ,. Fee... �..L.0.............. Lic. No...C.......... l.i - ELECTRICAL INSPECTOR I l � J Check # �l t✓� `. 12 a, Commonwealth of Massachusetts Department of Fire Services �BOARD OF FIRE PREVENTION REGULATIONS Official Use Only Permit No. 12E (l Occupancy and Fee Checked [Rev. 1/071 leave blank APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code W,,5 7 CMR 12.00 (PLEASE PRINT INMK OR TYPE ALL INFORMATION) Date: City or Town of: NORTH ANDOVER To the Inspector of Wires: By this application the undersigned gives n ticepof his or her intention to perform the electrical work described below. Location (Street & Number) v�, ' I (3 �.1 ��� � /_ NUl to _ 0,»( MA Owner or Tenant Owner's Address Telephone No. a- 3;b- 933 5m Is this permit in conjunction with a building permit? YestU No ❑ (Check App/rloo riatrTox) Purpose of Building Q,,Q1,(+ _QE 0,M6 µ Utility Authorization No. wo 7 - Existing Service Amps lam} / aVolts Overhead ❑ Undgrd No. of Meters /�— New Service (,,0 Amps Q, a / Mb Volts Overhead ❑ Undgrd ( No. of Meters Number of Feeders and Ampacity Location and Natureof Proposed Electrical Work: 0YJI0ee Lv `` fi� 1)N�� �% DIQ Completion ofthe following table may be waived by the Inspector of Wires. No. of Recessed Luminaires No. of Ceil: Susp. (Paddle) Fans v No. of Total Transformers KVA No. of Luminaire Outlets No. of Hot Tubs Generators KVA No. of Luminaires Swimming Pool Above ❑In- 0o. rnd. rnd. o Emergency Lighting Battery Units No. of Receptacle Outlets No. of Oil Burners FIRE ALARMS No. of Zones No. of Switches No. of Gas Burners No. of Detection and Initiating Devices No. of Ranges No. of Air Cond. ]L Total U Tons i No. of Alerting Devices No. of Waste Disposers p Heat Pump Totals: Number ' ' .. Tons ' "".."'.... KW No. of Self -Contained Detection/Alerting Devices No. of Dishwashers Space/Area Heating KW Local ❑ Municipal ❑ Other Connection No. of DryersHeating 1 Appliances KW Security Systems:* No. of Devices or Equivalent No. of Water KW Heaters a No. of No. of Signs Ballasts Data Wiring: No. of Devices or Equivalent No. Hydromassage Bathtubs No. of Motors Total HP Telecommunications Wiring: No. of Devices or E uivalent OTHER: Attach additional detail if desired, or as required by the Inspector of Wires. Estimated Value o EIe trical Work: ]L dp UD (When required by municipal policy.) Work to Start: ' (�t Inspections to be requested in accordance with MEC Rule 10, and upon completion. INSURANCE COVERAGE: Unless waived by the owner, no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including "completed operation" coverage or its substantial equivalent. T e undersigned certifies that such coverage is in force, and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE ❑ BOND ❑ OTHER ❑ (Specify:) I'certify, under the pains andpenaIt'es ofperjury, that the information on this application is tru `anti complete. a FIRM NAME: , �uS ` �Q (c� C� P LIC. NO.:_ Licensee: Al t ,�,•,•t; ( �QR,,�3 Signature A 64LIC. NO.: (If applicable, erste exempt" in thg�licg�se number li e.) Bus. Tel. No.•- X01- 53)3 Address: L /V\�1��1u� wi,MV\i(J_ Alt. Tel. No.:�,-`la- uo� *Per M.G.L c. 147, s. 57-61, security work requires Department of Public Safety "S" License: Lic. No. 125.ga OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally required by law. By my signature below, I hereby waive this requirement. I am the (check one) ❑ owner ❑ owner's agent. Owner/Agent PERMIT FEE: $ 46K Signature Telephone No. ❑ 2012 Massachusetts Electrical Code Amendments 527 CMR 12.00 § Rule 8: In accordance with the provisions of M.G.L. c. 143, § 3L, the permit application form to provide notice of installation of wiring shall be uniform throughout the Commonwealth, and applications shall be filed on the prescribed form. After a permit application has been accepted by an Inspector of Wires appointed pursuant to M. G.L c. 166, § 32, an electrical permit shall be issued to the person, firm or corporation stated on the permit application. Such entity shall be responsible for the notification of completion of the work as required in M.G.L. c. 143, § 3L. Permits shall be limited as to the time of ongoing construction activity, and may be deemed by the Inspector of Wires abandoned and invalid if he or she has determined that the authorized work has not commenced or has not progressed during the preceding 12 -month period. Upon written application, an extension of time for completion of work shall be permitted for reasonable cause. A permit shall be terminated upon the written request of either the owner or the installing entity stated on the permit application. ❑ The Permit Extension Act was created by Section 173 of Chapter 240 of the Acts of 2010 and extended by Sections 74 and 75 of Chapter 238 of the Acts of 2012. The purpose of this act is to promote job growth and long-term economic recovery and the Permit Extension Act furthers this purpose by establishing an automatic four-year extension to certain permits and licenses concerning the use or development of real property. With limited exceptions, the Act automatically extends, for four years beyond its otherwise applicable expiration date, any permit or approval that was "in effect or existence" during the qualifying period beginning on August 15, 2008 and extending'through August 15, 2012. ❑ Rule 8—Permit/Date Closed: *** Note: Reapply for new permit ❑ ❑ Permit Extension Act — Permit/Date Closed: Trench Inspection Pass Failed Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: SERVICE INSPECTION: Pass Failed 0 Re- Inspection Required ($.) ❑ Inspectors Comments: o ct—# l Inspectors Signature: Date: PARTIAL ROUGH INSPECTION: Pass 0 Failed Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: ROUGH INSVECTION: Pass Failed 0 Re- Inspection Required ($.) ❑ Inspectors Co ents: Put" V iA gel' 142 r Inspectors Signature: U Date: FINAL INSPECTION: Pass Failed 0 Re- Inspection Required ($.) ❑ Inspectors Comm s: Q— Inspectors Signature: Date: DEB WEINHOLD ...TOWN OF MERRIMAC, MA........dweinhold@townofinerrimac.com M_ The Commonwealth of Massachusetts Department ofIndustrial Accidents Office of Investigations 600 Washington Street Boston, MA. 02111 www.massgov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information PIease Print Legibly Name (Business/Organization/Individual): Address: `� �k�5 �'-�- 1V City/State/Zip: ml ti„ Phone #: Are you an employer? Check the appropriate box: 1. ❑ am a employer with 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub -contractors 2 I am a sole proprietor or partner- listed on the attached sheet. t ship and'have no employees These sub -contractors have working for me in any capacity, workers' comp. insurance. [No workers' comp. insurance 5. ❑ We are a corporation and its required.] officers have exercised their 3111 am a homeowner doing all work right of exemption per MGL myself. [No workers' comp. c. 152, §1(4), and we have no insurance required.] t employees. [No workers' comp. insurance required.] Type of project (required): 6. P New construction 7. ❑ Remodeling 8. ❑ Demolition 9. ❑ Building addition 10. ❑ Electrical repairs or additions 11. E] Plumbing repairs or additions 12. ❑ Roof repairs 13.❑ Other *Any applicant that checks box #1 must also fill out the section below showing their workers' compensation policy information. i Homeowners who submit this affidavit indicating they a're doing all work and then hire outside contractors must submit a new affidavit indicating such. (Contractors that check this box must attached an additional sheet showing the name of the sub -contractors and their workers' comp. policy information. lam an employer that is providing workers' compensation insurance for my employees. Below is the policy anal job site information. Insurance Company Name: Policy # or Self -ins. Lie. #: 4 a ` 0 100 � 10 � l�" Expiration Date: % � Job Site Address: ' V + ydf�k City/State/Zip: Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as requiredunder Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. / 1 do hereby certo under typains andpena1ti5poqerju94iat the information provided above is trues and correct. Official use only. Do not write in this area, to be completed by city or town official. City or Town: Permit/License # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other - - - Contact Person: Phone #: 4-6 Information and Instructions Massachusetts General Laws chapter 152 requires all employers to provide workers' compensation for their employees. Pursuant to this statute, an employee is defined as "...every person in the service of another under any contract of hire, express or implied, oral or. written." An employer is defined as "an individual, partnership, association, corporation or other legal entity, or any two or more of the foregoing engaged in a j oint enterprise, and including the legal representatives of a deceased employer, or the receiver or trustee of an individual, partnership, association or other legal entity, employing employees. However the owner of a dwelling house having not more than three apartments and who resides therein, or the occupant of the dwelling house of another who employs persons to do maintenance, construction or repair work on such dwelling house or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer." MGL chapter 152, §25C(6) also states that "every state or loeal licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who.has not produced -acceptable evidence of compliance with the insurance coverage required" Additionally, MGL chapter 152, §25C(7) states "Neither the commonwealth nor any of its political subdivisions shall enter into any contract for the performance ofpublic work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority." Applicants Please fill out the workers' compensation affidavit completely, by checking the boxes that apply to your situation and, if necessary, supply sub-contractor(s) name(s), address(es) and phone number(s) along with their certificate(s) of insurance. Limited Liability Companies (LLC) or Limited Liability Partnerships (LLP) with no employees other than the members or partners, are not required to carry workers' compensation insurance. If an LLC or LLP does have employees, a policy is required. Be advised that this affidavit may be submitted to the Department of Industrial Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be returned to the city or town that the application for the permit or license is being requested, not the Department of Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers' compensation policy, please call the Department at the number listed below. Self-insured companies should enter their self-insurance license number on the appropriate line. City or Town Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant. Please be sure to fill in the permit/license number which will be used as a reference number. In addition, an applicant that must submit multiple permit/license applications in any given year, need only submit one affidavit indicating current policy information (if necessary) and under "Job Site Address" the applicant should write "all locations in (city or town)." A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each year. Where a home owner or citizen is obtaining a license ox permit not related to any business or commercial venture (i.e. a dog license or permit to burn leaves etc.) said person is NOT required to complete this affidavit. The Office of Investigations would like to thank you in advance for your cooperation and should you have any questions, please do not hesitate to give us a call. The Department's address, telephone and fax number: The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston, MA 02111 TeX, # 617-72,7-4900 ext 406 or 1-877-MASSAFE Revised 5-26-05 Fax # 617-727-7749 Www-mass,govaa v 0 Date ..... ..7.� �`..... TOWN OF NORTH ANDOVER PERMIT FOR PLUMBING 01, A � I This certifies that ... ..... . -- ............................................... has permission to perform .... .�. � _ .............. vr�. plumbing in the buildings of...........U....................................................... 1 at .......................L.0 ........ --� ?� `................................ North Andover, Mass. ............. Fee4.QY .... Lic. No. ......`............. PLUMBING INSPECTOR Check,, (04 2-v I hereby certify that all of the details and information I have submitted (or entered) regarding this applicatio re le and a urat o the bet of my Knowledge and that all plumbing work and installations performed under the permit issued for this appli ion w' be in "e�thertineni provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER NAME: MIKE BURKE ' LICENSE # 13127 S N COMPANY NAME: POWERHOUSE PLUMBING AND HEATING CORP ADDRESS: PO 13gK 896 CITY: I PLAISTOW STATE: NHZIP: 103865 FAX: 16033780040 TEL: 1,16033780020 CELL: I 19784909385 EMAIL: J.LAURENCIO POWERHOUSEPLUMBING.COM MASTER ❑■ JOURNEYMAN ❑ CORPORATION ■❑ # 2482 PARTNERSHIP ❑ #0 LLC ❑ # MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM PLUMBING WORK - POWNER TYPE OR PRINT CLEARLY CITY NORTH ANDOVER MA. DATE 5-22-14 =PERMIT# ✓� JOBSITE ADDRESS 78 COMPASS POINT OWNER'S NAME [TRUST CONSTRUCTION ADDRESS: 1,51 MT JOY DRIVE TEWKSBURY MA TELI 5083209337 :FAX: OCCUPANCY TYPE: COMMERCIAL ❑ EDUCATIONAL ❑ RESIDENTIAL ❑� NEW: ❑■ RENOVATION: ❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES ❑ NO ❑ FIXUTRES -1 FLOORS— Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BATHTUB 2 CROSS CONN DEVICE DEDICATED SPECIAL WASTE SYS DEDICATED GAS/OlUSAND SYS DEDICATED GREASE SYSTEM DEDICATED GRAY WATER SYS DEDICATED WATER REUSE SYS DISHWASHER DRINKING FOUNTAIN FOOD WASTE GRINDER UNIT FLOOR /AREA DRAIN INTERCEPTOR INTERIOR KITCHEN SINK LAVATORY 1 3 ROOF DRAIN SHOWER STALL 1 SERVICE / MOP SINK TOILET 1 2 URINAL WASHING MACHINE CONNECTION WATER HEATER ALL TYPES 1 WATER PIPING 1 SPIGOTS 2 INSURANCE COVERAGE I have a current liability insurance policy or its substantial equivalent which meets the requirements of MGL. Ch. 142 YES NO ❑ If you have checked YES, please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY ❑■ OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER ❑ AGENT SIGNATURE OF OWNER OR AGENT I hereby certify that all of the details and information I have submitted (or entered) regarding this applicatio re le and a urat o the bet of my Knowledge and that all plumbing work and installations performed under the permit issued for this appli ion w' be in "e�thertineni provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER NAME: MIKE BURKE ' LICENSE # 13127 S N COMPANY NAME: POWERHOUSE PLUMBING AND HEATING CORP ADDRESS: PO 13gK 896 CITY: I PLAISTOW STATE: NHZIP: 103865 FAX: 16033780040 TEL: 1,16033780020 CELL: I 19784909385 EMAIL: J.LAURENCIO POWERHOUSEPLUMBING.COM MASTER ❑■ JOURNEYMAN ❑ CORPORATION ■❑ # 2482 PARTNERSHIP ❑ #0 LLC ❑ # w H z F U W a z w w O El z zO o w rA W o W a st z � Q w a W LLI N CG O W Q 3 N a 0 z a w a � U J a a w a Lii x w H LL W H O z 0 H U W a Qrj z z as a .a a x c� 0 0 x Date.....S.......................................... TOWN OF NORTH ANDOVER PERMIT FOR GAS INSTALLATION 1 l -. This certifies that ....................' ; 2- C.A._ % �ilry 2n0SC� �4... has permission for gas installation ... ..1rr............................................................... "-)✓ in the buildings of ...........,�.t�;�`......�5�............................................... at........ ...�.... �G. g.....'....�............................ o hAndover, Mass. Fee.. ....................... Lic. No.1..��Z. ............i..".0..................................................... GASINSPECTOR Check # IGA COWNER TYPE OR PRINT CLEARLY MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK CITY NORTH ANDOVER I , MA. DATE 5-22-14 1 PERMIT # 1114 JOBSITE ADDRESS 78 COMPASS POINT OWNER'S NAME I.TIWST ONSTRUCTION ADDRESS: 51 MT JOY DRIVE TEWKSBURY MA I TEL: 5083209337 FAX: OCCUPANCY TYPE: COMMERCIAL ❑ EDUCATIONAL ❑ RESIDENTIAL ❑■ NEW: RENOVATION: ❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES ❑ NO ❑ FIXUTRES Z FLOOR- Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BOILER BOOSTER CONVERSION BURNER COOK STOVE DIRECT VENT HEATER DRYER FIREPLACE FRYOLATOR FURNACE GENERATOR GRILLE LABORATORY COCKS MAKEUP AIR UNIT OVEN POOL HEATER ROOM / SPACE HEATER ROOF TOP UNIT TEST UNIT HEATER UNVENTED ROOM HEATER WATER HEATER INSURANCE COVERAGE I have a current liabili insurance policy or its substantial equivalent which meets the requirements of MGL. Ch. 142 YES ❑■ NO ❑ If you have checked YES, please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY ❑■ OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. OF OWNER OR AGENT CHECK ONE ONLY: OWNER ENT El hereby certify that all of the details and information I have submitted (or entered) regarding t4icoAo a an ccurate the best of my Knowledge and that all plumbing work and installations performed under the permit issued fon complia a with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws.PLUMBER/GASFITTER NAME: MIKEBURKE _]LICENSE# 1312 COMPANY NAME: POWERHOUSE PLUMBING AND HEATING CORP ADDRESS: I PO BOX 896 CITY: PLAISTOW STATE: _NH ZIP: 03865 _ FAX: [6033780040 _ 7] TEL: .6033780020 CELL: 9784909385 EMAIL: J.LAURENCIO POWERHOUSEPLUMBINGAND HEATING.CO MASTER W JOURNEYMAN El LP INSTALLER ❑ CORPORATION H# #= PARTNERSHIP PARTNERSHIP El#E= LLC [I# w F, z z O H U W a Z' Q z w , O E] z Z >u) El O w O W O z W au LU GL+ � � W pro p a "' > N a W 19 LU W Q 3 N a p z W f= � a U J CL CLI w a � W 2 W H LL F O O W a z' Q c� x 0 0 x The Commonwealth of Massachusetts Department of Industrial Accidents € Office of Investigations d 1 Congress Street, Suite 100 Boston, MA 02114-2017 www mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Leeibly Name (Business/Organization/Individual): POWERHOUSE PLUMBING CORP Address: PO BOX 896 Citv/State/ZiD: PLAISTOW, NH 03865 Phone #: 6033780020 Are you an employer? Check the appropriate box: 1.9 I am a employer with 6 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub -contractors 2. ❑ I am a sole proprietor or partner- listed on the attached sheet. ship and have no employees These sub -contractors have working for me in any capacity. employees and have workers' [No workers' comp. insurance comp. insurance.: required.] 5. ❑ We are a corporation and its 3. ❑ I am a homeowner doing all work officers have exercised their myself. [No workers' comp. right of exemption per MGL insurance required.] t c. 152, § 1(4), and we have no employees. [No workers' comp. insurance required.] Type of project (required): 6. ❑■ New construction 7. ❑ Remodeling 8. ❑ Demolition 9. E) Building addition 10. El Electrical repairs or additions 11.❑ Plumbing repairs or additions 12.❑ Roof repairs 13.❑ Other *Any applicant that checks box #I must also fill out the section below showing their workers' compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub -contractors and state whether or not those entities have employees. If the sub -contractors have employees, they must provide their workers' comp. policy number. I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: HARTFORD UNDERWRITERS INSURANCE COMP Policy # or Self -ins. Lic. #: 04WECIT2480 Expiration Date: 7-28-14 Job Site Address: 78 Compass point City/State/Zip: N Andover ma 01845 Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage a quired under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/ o e -year impr' ent, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a da agai t the viol r. a advised that a copy of this statement may be forwarded to the Office of Investigations oft DIA or insura e c erage verification. I do hereby cey6fy un f r thepdns aryl penalties of perjury that the information provided above is true and correct. Official ule only. Do not nkiW in this area, to be completed by city or town official. City or Town: Permit/License # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone #: A4 V® CERTIFICATE OF LIABILITY INSURANCE1,5/13/2014NYYY DATE (MMIDD i THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Insurance Solutions Corporation 60 Westville Rd Plaistow NH 03865 CANTACT Kathleen Miller, CISR, CPIW PHONE (603) 382-4600 FAXAIC. Nol, (603)382-2034 'MAIL .kmiller@isc-insurance.com INSURERS AFFORDING COVERAGE NAIC # INSURER AMerchants 23329 INSURED Powerhouse Plumbing & Heating Corp. PO Box 896 Plaistow NH 03865 INSURERB:Hartford Underwriters Ins. Co. INSURER C: INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER-CL1442916255 REVISION NIIMRF_R- THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL UBR POLICY NUMBER POLICY EFF MMIDDIYYYY POLICY EXP MMIDD LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE a OCCUR BOP1065497 /1/2014 /1/2015 DAMATO RENT ED PREMIE Ea occurrence $ 500,000 MED EXP (Any one person) $ 15,000 PERSONAL 8 ADV INJURY $ Include GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2,000,000 X POLICY PRO LOC $ AUTOMOBILE LIABILITY Ea accident SINGLE LIMIT 1 000,000 BODILY INJURY (Per person) $ A X ANY AUTO ALL OWNED SCHEDULED AUTOS AUTOS API058154 /1/2014 /1/2015 BODILY INJURY (Per accident) $ HIRED AUTOS NON -OWNED AUTOS PROPERTY DAMAGE $ Per accident Medical payments $ 5,000 UMBRELLA LIABOCCUR HCLAIMS-MADE EACH OCCURRENCE $ AGGREGATE $ EXCESS LIAR DED I I RETENTION $ B WORKERS COMPENSATION WC STATU- I OTH- FR AND EMPLOYERS' LIABILITY Y / N ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory In NH) NIA 04WECIT2480 /28/2013 /28/2014 E.L. EACH ACCIDENT $ 100,000 E.L. DISEASE - EA EMPLOYEE $ 100,000 I(yS describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ 500,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, It more space Is required) Jobsite: 64 Stanton Way CERTIFICATE HOLDER CANCFI I ATION (978)688-9542 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Town of North Andover ACCORDANCE WITH THE POLICY PROVISIONS. 1600 Osgood St AUTHORIZED REPRESENTATIVE No Andover, MA 01845-1048 Reith Maglia/RRM��--- AGORD 25 (2010105) N S025 rgm nnsi m ©1988-2010 ACORD CORPORATION. All rights reserved. Tho Annizi i normo mnel Innn aro roniefororl mmrlre of Ar'[1Rr1 t BUREAU OF BUILOINo SAFETY &'CONSTRUCTION PLUMBING SAFETY SECTION "AMEMICHAEL W BURKE LIC #:3801 M fi EXPIRES: 05/31/2015 1 ftn State of New Hampshire _ Voluntary Heating Technician t:O1�11fiONWRALT"�e'F a HUS NAME MICHAEL BURKE BOAR • ENDORSEMENTS HJO/HSO, DATE ISSUED 02M8/2014' DATE EXPIRES: 02128/2016 M91 LICENSE #: i3 OF . . `i ND PL BE A. GASF`ITTEiiS, ISSUES THE FOLLOWING L i C'! E . REGISTERED AS A PLUMBING Gti r„ HICHAEL W BURKE / &POWERHOUSE PLO a HEATING' COR ,I jt• , CORLISSHiLL RD' HT 1400207 HAVERH I I.! MA "... i • ., 2482 05/ 01830-1613 01/16199223 Commonweann of Massachusetts Department of public Sarfcty CAI Burner rrchnicran License SU45SR2 .% I I . MICHAEL W BURn , 61 CORLISS HIjjL Howhili MA Ot830 Corrm>+ssronr Expiration 85/2612018 . J Date ..' . �'"? `� ........ . NORTH TOWN OF NORTH ANDOVER p� PERMIT FOR MECHANICAL INSTALLATION s � ,SSACMUSES This certifies that :,: .A. i . .. : has permission for mechanical installation . ... . .. .1 . L- ............. i� e buildings of .... J' ................ ....................... at .. :. 3� .................. , North Andover, Mass. Fee.... ,.... Lic. No....:..�.^.... GASINSPECTOR WHITE: Applicant CANARY: Building Dept. PINK: Treasurer Commonwealth of Massachusetts Sheet Metal Permit �J Date: 5- - r qG' Permit # Estimated Job Cost: $ Permit Fee: $ Plans Submitted: YES NO Plans Reviewed: YES NO Business License 4 196 Applicant License # 156 Business Information: Property Owner/ Job Location Information: Name: J&J Heating & Air Conditioning Name: IP -"St Street: 17 Arlington St. — Street: pass `�"6•� 7— City/Town: Dracut, MA 01826 City/Town: A/ ,�71% YS- "Telephone: 978-454-8197 Telephone: SDS – 3 20 1?33 7 Photo C.D. required / Copy of Photo I.D. attached: YES ✓ NO J-1 / M -1 -unrestricted license Staff Initial J-2 / M -2 -restricted to dwellings 3 -stories or less and commercial up to 1.0, 000 sq. ft. / 2 -stories or less Residential: 1-2 family Multi -family Condo /Townhouses Other Commercial: O ice Retail Industrial Educational Institutional Other Square Footage: under 1.0,000 sq. ft. over 10,000 sq. ft. Number of Stories: Sheet metal work to be completed: New Work: Renovation: I IVAC Metal Watershed Roofing Kitchen Exhaust System a Metal Chimney/ Venus Air .Balancing e Provide detai led description o1" work to be done: Supply and install metal duct work for HVAC system - Residentia1 New Construction INSURANCE COVERAGE: I have a current liability insurance policy or its equivalent which meets the requirements of M.G.L. Ch. 112 Yes 9-110-❑ If you have checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this box0, I hereby certify that all of the details and information I have submitted for entered) regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO Date . Date Prop_ress Inspections Comments Final Inspection Inspector Signature of Permit Approval Comments Signature of Licensee License Number: IS -6e Check at www.mass.gov/dpl Type of License: By aster Title ❑ Master -Restricted City/Town ❑Journeyperson Permit # ❑Journeyperson-Restricted Fee $ ❑ Inspector Signature of Permit Approval Comments Signature of Licensee License Number: IS -6e Check at www.mass.gov/dpl 7lle Connum of Massacll/lsells Print Fonrn7 Deparinlel/t of 11,(Ills11•ial fl ccillenls — �y i1 Y :+li•yy (JJ�/ice ofInvesli"allol/s I Con�l'ess Street, Snile 100 ]E l.Iosloll, 31/1 02114-20.17 IVIV1V.1lla,l'ti.�>OV/lllll Workers' Com)rellsation I.11silrance Affidavit: Builders/Contract:oI-StEled riciarls/N11lit bers Alllllicant Infornlatiorr P)c se Print Lc *1�, Idly NaIt1C (Ihtsiness/Organizalion/I mliviclual):_1h;1_II_eating & Air Conditioning, :Cine. Addl-CSS:----- - 7-Arl_ingCor4 St. (,'ily/Slate/Zip: 1)racnt., MA 01826 Arc you an cmpinyc►'? Checl( the appropriale box: ❑ I am a employer with 40_ 4. ❑ I ant a general contractor an(I employees (full and/or pall-filnc).* 2. ❑ I a111 a sole proprietor or par(ncr- ship incl have no Cu,ployccs working for me in any capacity. No 'workers' comp. insurance -;. ❑ I ant a holllcolwllcr cluing all wort: myself. INo workers' cont,). insnrartcc rc(luircd.J h Phone 11: 978-454-81.97 have hirc(I file sub -contractors lisled on the attached sheet. 'I•hesc sub -contractors have employees and have workers' comp. insurancc.t 5. ❑ We are a corporation and its officers have exercised their right ofcxcnlption per MGL C. 152, § 1(4), and we Ilavc Ilo employees. (No workers' C01111). II1SLII'alICC i-C(ILlil- d Type of project (rc(luired): 6. F1 New construction 7. ❑ Remodeling 8. ❑ Demolition 9. ❑ I31tllding addition 10.❑ Electrical repairs or additions I I.0 Plumbing repairs or additions 12.❑ Roofrepairs 13. ❑ 011ier -- --- _--- . II l ()illi applicant Ilwl checks hos //1 umsl ;Ibm fill oul the section below showing Iheir workers' compelmllion policy informalion. I lomcuwuCrs who Salm,'' Ihis,aflidavil indicating Ihcy arc (1()'119 all work ;,nd IhCn hire outside Contractors must submit a new al'lidavil indicating .each. Il'nnlruciurs Ilcd check this hos mull allac.hcd an addilioual shccl showing the name ()lithe sub -contractors and slalc whether or nnl Ihosc entilics have eml+h,ya's. II'Ihc sail-conlraclurs have employees, Ihcy mull pri,vidc Iheir workers' comp. policy ,,,,,,[)Co. I till' 11/1 C'nlpinper 1h(if iv provlthnf' IVnI'/iC'1'S' t,'rllllpL'ILC!!//(111 inslll•tince 101• nip ellllllt )pees. Below iv thepo/IC), nlJ!//'111 .C1/C in f ormirlioll. Insmaluc Company Millie: A-I.M. Mutual- Insurance Policy U or ticll=ins. Lic. 11: WM'7.-800-7300653-20.13A - ---- -101) site Address: ._n__l_]_ :; des_ ti Ori /Fr ��OY-ey — — city/State/`Lip:— Allach a copy Of 1110 worlccrs' compensation policy declaration pale (showing the policy number and expiration (1,11c). ;blare to scct.lFe coverage as rc(Illii'M undcl- Section 25A of MGI-, C. 152 call lud to illc linpositioll Of cl-itlllll'rll pcl'lallic.s of a floc up to ,h 1,5OO.f)O -111(1/or one year Imprisonment, as well as civil penalties in the form of a S'I.OP WORK ORDER and a line of up to $2 -(:) ;Ijllsl the violator. Ile advised that a copy of this statement may be [orwarded to the Off ice o1, Invcsliga�fons of the I)IA1or insl��llc(ycovcragc vcrilica(ion. 1 rin perch 1-r), i/ii 111.1r1i !. 1,,ill.% till lensllie�' 0 ler 1-u), 1/rut /he in 11r, Dare linit,)inu'r'ed nhnve is tare anll currecl. Z- --_— Phone ll: OJ/irinl nsc nnlh. Uil nal Ivrile in this melt, to he compleletl by city or hnvn olfrcinl City or Town: Issuing; Aulhurily (circle one): Permit/License # I, 1$0,11-41 of Ifeallh 2. Iluil(li T' Ucparlutenl 3. Cily/Town Clerlc 4. Electrical Inspector S. I lumbijig Inspector 6. Other Comae' Perron:`—.-- Phone #: ACORD„ CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD YYYY) PRODUCER < .378.887.4900 FAX 978.887.2404 Edward F. Sennott Insurance Agency, Inc. 16 South Main Street P. 0. Rox 457 lopsfield, MA 01983 INSURED )&I Ilea ting & Air Conditioning, Inc. 17 Arlington Street Dracut, MA 01826 06/03/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC k INSURI-_RA: Great American Alliance Ins Co INSURER e: Safety Insurance Company 39454 INSURERc: A.I.M. Mutual Insurance Co. INSURER D: COVERAGES NSURER E: THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECTTO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. .TR NSR TYPE OF INSURANCE PC GENERAL LIABILITY .X COMMERCIAL GENE=RAL LIABILITY ATCLAIMS MADE L_I OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY 1 PRO -I --I IAC JECT I AUTOMOBILE LIABILITY ANY AUTO ALL OWNED AUTOS X SCI ]FOULED AUTOS X HIRED AUTOS .X _ NON -OWNED AUTOS GARAGE LIABILITY -- I ANY AUTO EXCESS / UMBRELLA LIABILITY .X. I OCCURI —.� CLAIMS MADE A DEDUCIIBLE _ _ __ RETENTION $ WORKFRS COMPENSATION AND EMPI_OVrRS' IJARII_rrY WMZ-800- ANY PnOPIIIETOn/PAnTNFn/EXECU'I1VE C OPFICFR/MEMBFR EXCLUDED? (Mandatory In NH) If yos, describe andel SPECIAL PROVISIONS holew onlr-ls DESCRIPTION OF OPERATIONS /LOCATIONS / VEHICL S / EXCLUSION CrF1TIFICATE Hol _DCR Evidence of Insurance ]_ICY NUMBER PAC6418906-07 POLICY EFFECTIVE DATE MM DO yyy 06/01/2013 POLICY EXPIRATION DATE MM DD YVV 06/01/2014 LIMITS EACH OCCURRENCE DAtvTAZ,i` _r RE TEED — PREMISES(Ea occurronco) $ 1,000,000 $ 300,00 MED EXP (Any ono person) $ 10,00C PERSONAL 8 ADV INJURY $ 1,000,00C GENERAL AGGREGATE _ $ 2,000.00( PRODUCTS-COMP/OPAGG —_ $ 2,000,00 2434550 06/01/2013 06/01/2014 COMBINED SINGLE LIMIT (Ea accident) $ 1,000,000 BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROPERTY DAMAGE (Per accident) $ UMB 418958-05 8006553-2013A 06/01/2013 06/02/2013 06/01/2014 AUTO ONLY - EA ACCIDENT $ OTHER THAN EA ACC AUTO ONLY: AGC EACHOCCURRENCE $ $ $ 2,000,00 AGGREGATE $ 2,000,00 $ $ 06/02/2014 X- TORY LIMITS ER E.L. EACH ACCIDENT $ 1, 000, QO E.L. DISEASE - EA EMPLOYEE $ 1,000,000 E.I... DISEASE - POLICY LIMIT — $ 1 000,000 i ADDED DY ENDORSEMENT/ SPECIAL PROVISIONS SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATIC DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO Do SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE n — ACORD'15 (2009/01) -r..,...........= © 1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD MASSACHUSETTS .,P�:..�X��:*:� SHEET Ml T.Al :WORKERS State of New, Hampshire GAS FITTERS -LICON"SE NAME: ERIC KLINE ENDORSEMENTS: STN STP DATE ISSUED: 04/21/2014 DATE EXPIRES: 05131/2016 LICENSE #: GF0700971 - wrightsofte Load Short Form Basemnt/1 st sys Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: • • Mount51 • drive,• 01876 Job: 84 Compass Point Date: May 1 , 2014 By: HEATING EQUIPMENT Area COOLING EQUIPMENT Clg load Make n/a Clg AVF Make n/a (Btuh) (Btuh) Trade n/a (cfm) 2nd floor d Trade n/a 47865 29857 Model n/a 1250 1st floor system d Cond n/a 43447 28883 AHRI ref n/a 1314 Basemnt/1st sys d Coil n/a 91312 58857 2565 2817 Other equip loads AHRI ref n/a 8476 0 Efficiency n/a Equip. @ 0.93 RSM Efficiency n/a 54502 Heating input Latent cooling Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor d 2927 47865 29857 1250 1250 1st floor system d 2358 43447 28883 1314 1314 Basemnt/1st sys d 5285 91312 58857 2565 2817 Other equip loads 8476 0 Equip. @ 0.93 RSM 54502 Latent cooling 7589 T(17AIQ cnoc nn -700 nnnna ncnr nn4I Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft° 2014 -May -0114:19:03 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 1 ACCK ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N -{9 a Load Short Form Job: 84 Compass Point wri htsoft Date: May 1 , 2014 1st floor system By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFU E 0 Btuh 0 Btuh 0 °F 1314 cfm 0.030 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER Area 0 Btuh 0 Btuh 0 Btuh 1314 cfm 0.046 cfm/Btuh 0 in H2O 0.93 16831 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) basement zone p 1274 24469 16831 740 766 1st floor p 1084 18978 13036 574 593 1st floor system d 2358 43447 28883 1314 1314 Other equip loads 3626 0 Equip. @ 0.93 RSM 26745 Latent cooling 2044 -r lTA 1 C noco Awn- n n—nn I a na A -a n Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft° 2014 -May -0114:19:03 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 2 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N -Wrlt1tSOft. 9 Load Short Form Job: 84 Compass Point Date: May 1 , 2014 2nd floor By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 ''' ra °1"3 -rte i'e', I.S' ""710"M � x �* f ' "r`x �� 9� .F ... - Pro�ectlnfomatlonj r..kr.. For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFU E 0 Btuh 0 Btuh 0 °F 1250 cfm 0.026 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER Area 0 Btuh 0 Btuh 0 Btuh 1250 cfm 0.041 cfm/Btuh 0 in H2O 0.86 8549 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Bouns zone p 885 13058 8549 341 350 2nd floor zone p 2042 34807 27010 909 1107 2nd floor d 2927 47865 29857 1250 1250 Other equip loads 4850 4096 Equip. @ 0.93 RSM 31440 Latent cooling 5545 TnTAIC nnnnn I ­ L0L r JG / 1 J J02700 1 GuU I 1-1.7U Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. c wri htsoft" 2014 -May -0114:19:03 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 3 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N - -9 s Load Short Form Job: 84 Compass Point wri htsoft Date: May 1 , 2014 1st floor By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Area COOLING EQUIPMENT Clg load Make n/a Cig AVF Make n/a (Btuh) (Btuh) Trade n/a (cfm) Living room Trade n/a 8928 5556 Model n/a 253 Kitchen Cond n/a 1672 2581 AHRI ref n/a 117 office Coil n/a 8378 4898 253 223 1st floor p AHRI ref n/a 18978 13036 Efficiency n/a Other equip loads Efficiency n/a 0 Heating input Equip. @ 0.93 RSM Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Cig AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Living room 704 8928 5556 270 253 Kitchen 130 1672 2581 51 117 office 250 8378 4898 253 223 1st floor p 1084 18978 13036 574 593 Other equip loads 2805 0 Equip. @ 0.93 RSM 12071 Latent cooling 1581 Tr)TAI C inon 4nnrn raw Inn Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsofRight-Suite® Universal 2013 13.0.07 RSU05790 2014 -May -0114:19:03 Page 4 BCCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N -wrihtsoft. 9 Load Short Form Job: 84 Compass Point Date: May 1 , 2014 2nd floor zone By: Croinin Construction Management RO Box 7237, Lowell, Ma 01852 01 g s� ncx ° 3`�. w 3'?° 't t''f' �t `hpxr1� "rims„ Pro�ectnformat�on..,s�,7tR; , ,�r For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref n/a Efficiency n/a Htg load (Btuh) Heating input Htg AVF (cfm) Clg AVF (cfm) Heating output 0 Btuh Temperature rise 0 °F Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a cfm COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Area (ft2) Htg load (Btuh) Coil n/a Htg AVF (cfm) Clg AVF (cfm) AHRI ref n/a 32 1097 Efficiency n/a 12 Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 1432 ROOM NAME Area (ft2) Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) Clg AVF (cfm) Ldy 32 1097 294 29 12 Masterbath 65 2667 1501 70 62 Bedroom 2 208 4865 2622 127 107 bedroom 1 176 2952 3058 77 125 1/2 bath 91 1432 375 37 15 Masterbed room 325 8308 7137 217 293 full bath 77 675 171 18 7 2nd floor hall 180 2237 707 58 29 attic 888 10574 11144 276 457 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. WCSOft 2014 -May -0114:19:03 I Iht9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 5 XK;k ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N 2nd floor zone p 2042 34807 27010 909 1107 Other equip loads 2817 0 Equip. @ 0.93 RSM 25012 Latent cooling 4033 TOTAI Q Inn 1] -3-7 OA nnnnc nn n 44nI -��•�v GV'tG J/uG`t G.`7V`+o .7V.7 11ul Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 777- 2014-May-0114:19:03wri htsoft' Right-SuiteUniversal 2013 13.0.07 RSU05790 Page 6 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N wrightsofte P.O Box 7237, Lowell, Ma 01852 Load Short Form basement zone Croinin Construction Management x,. , y����Pro ect nformation �, For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Job: 84 Compass Point Date: May 1 , 2014 By: HEATING EQUIPMENT Area COOLING EQUIPMENT Clg load Make n/a Clg AVF Make n/a (Btuh) (Btuh) Trade n/a (cfm) Basement Trade n/a 24469 16831 Model n/a 766 basement zone p Cond n/a 24469 16831 AHRI ref n/a 766 Other equip loads Coil n/a 822 0 Equip. @ 0.93 RSM AHRI ref n/a 15585 Efficiency n/a Latent cooling Efficiency n/a 463 Heating input T(1TAI C Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Basement 1274 24469 16831 740 766 basement zone p 1274 24469 16831 740 766 Other equip loads 822 0 Equip. @ 0.93 RSM 15585 Latent cooling 463 T(1TAI C -107n nCnn4 4 n A awn inn Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft 2014 -May -0114:19:03 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 7 AC.CI� ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N wrightsoft. Load Short Form Job: 84 Compass Point Date: May 1 , 2014 Bouns zone By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 A� � Pro�e�c �lnform`at>Ion���a3 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref n/a Efficiency n/a Heating input Coil n/a Heating output 0 Btuh Temperature rise 0 °F Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Area Htg load Coil n/a Htg AVF Clg AVF AHRI ref n/a (ft2) (Btuh) Efficiency n/a (cfm) Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 13058 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) bouns room 625 8866 7083 232 290 bouns room closet 70 1248 334 33 14 dining room 190 2944 1132 77 46 Bouns zone p 885 13058 8549 341 350 Other equip loads 2033 0 Equip. @ 0.93 RSM 7916 Latent cooling 1512 T(1TAI C OQG icnn-q nnnn nea UU1J 11JV.7I .7`FGO J4I 30U Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft° 2014 -May -0114:19:03 kt�,/.'��/,`,.r� i 9 Right-SuiteOO Universal 2013 13.0.07 RSU05790 Page 8 k ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N wri htsoft Load Multizone Summary Report Job: 84 Compass Point 9 Date: May 1 , 2014 By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 Infiltration Summa �«AP I P if m a §rsx'is , rd _ a � �'� � z :t� �� T E w: � � a ��A` rot` �„ f F, =.,e. �Lo`adandi4F�Summa �' n k^s �'+x .- . ; ., z ,.fit �k2'- . rt� `� saa t WON ROOM NAME Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM Basement ft3 cfm Btuh/ft2 ft3 cfm Btuh/ft2 i basement zone 3822 0.41 26 4.2 3822 0.39 25 0.9 1st floor 9756 0.55 89 4.2 ' 9756 0.52 84 0.9 Bouns zone 8975 0.43 64 4.2 8975 0.41 61 0.9 2nd floor zone 13050 0.41 89 4.2 13050 0.39 84 0.9 Basemnt/1st sys 35603 0.16 268 1.5 35603 0.07 253 0.1 §rsx'is , rd _ a � �'� � z :t� �� T E w: � � a ��A` rot` �„ f F, =.,e. �Lo`adandi4F�Summa �' n k^s �'+x .- . ; ., z ,.fit �k2'- . rt� `� saa t WON ROOM NAME Area ft2 Htg load Btuh Clg load Btuh HtgAVF cfm C1gAVF cfm Basement 1274 24469 16831 740 766 basement zone 1274 24469 16831 740 766 Living room 704 8928 5556 270 253 Kitchen 130 1672 2581 51 117 office 250 8378 4898 253 223 1st floor 1084 18978 13036 574 593 bouns room 625 8866 7083 232 290 bouns room closet 70 1248 334 33 14 dining room 190 2944 1132 77 46 Bouns zone 885 13058 8549 341 350 Ldy 32 1097 294 29 12 Masterbath 65 2667 1501 70 62 Bedroom 2 208 4865 2622 127 107 bedroom 1 176 2952 3058 77 125 1/2 bath 91 1432 375 37 15 Masterbed room 325 8308 7137 217 293 full bath 77 675 171 18 7 2nd floor hall 180 2237 707 58 29 attic 888 10574 11144 276 457 2nd floor zone 2042 34807 27010 909 1107 Basemnt/1st Sys 5285 91312 58857 2565 2817 t wri htsoft' 2014 -May -0114:19:03 ��� g Right -Suite® Universal 2013 13.0.07 RSU05790 ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Page 1 -Component Btuh/ft2 Btuh % of load Walls Location: 19328 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 5.7 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 42°N 4.2 Relative humldlty (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range (°F) - 15 ( L ) Method Simplified 8.5 Wet bulb (° - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments -Component Btuh/ft2 Btuh % of load Walls 3.7 19328 19.4 Glazing 17.3 5656 5.7 Doors 16.7 702 0.7 Ceilings 13.9 28587 28.6 Floors 4.2 10371 10.4 Infiltration 4.2 16975 17.0 Ducts 9692 9.7 Piping 0 0 Humidification 8476 8.5 Ventilation 0 0 Adjustments 0 Total 1 99788 100.0 IMU -Component Btuh/ft2 Btuh % of load Walls 0.7 3604 6.1 Glazing 22.5 7349 12.5 Doors 7.7 323 0.5 Ceilings 12.1 24815 42.2 Floors 0.8 2071 3.5 Infiltration 0.9 3509 6.0 Ducts 9447 16.1 Ventilation 0 0 Internal gains 7740 13.2 Blower 0 0 Adjustments 0 Total 58857 100.0 Latent Cooling Load = 7589 Btuh Overall U -value = 0.140 Btuh/ft2-°F Data entries checked. 2014 -May -01 14:19:03 wrightsoft' Righl-Suit,S Universal 2013 13.0.07 RSU05790 Page 1 Al. ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Building Anal sis Job: 84 Compass Point wrightsoft� y Date: May 1 , 2014 1st floor system By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 .a�..� Pralect°Information�._ . For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 -Component Btuh/ft2 Btuh % of load Walls Location: 8015 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 2.6 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F)) 58 13 Latitude: 420N 1.4 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range� °F) - 15 (L ) Method Simplified 7.7 Wet bulb (° -72 Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments -Component Btuh/ft2 Btuh % of load Walls 3.3 8015 17.0 Glazing 17.3 1233 2.6 Doors 16.7 702 1.5 Ceilings 14.7 25507 54.2 Floors 1.4 729 1.5 Infiltration 4.2 7263 15.4 Ducts 0 0 Piping 0 0 Humidification 3626 7.7 Ventilation 0 0 Adjustments 0 Total 1 47073 100.0 n 46190 M-1 2111041MVIVA1122assm: .. In -Component Btuh/ft2 Btuh % of load Walls 0.6 1500 5.2 Glazing 31.1 2217 7.7 Doors 7.7 323 1.1 Ceilings 12.7 22142 76.7 Floors 0 0 0 Infiltration 0.9 1501 5.2 Ducts 0 0 Ventilation 0 0 Internal gains 1200 4.2 Blower 0 0 Adjustments 0 Total 28883 100.0 Latent Cooling Load = 2044 Btuh Overall U -value = 0.130 Btuh/ft2-°F WARNING: window to floor area ratio = 3.0% - less than 5%. +wri2014-May-01 14:19:03ghtsoft� Right -Suite® Universal 2013 13.0.07 RSU05790 Page 2 �+� ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N -Component ® • • • s % of load jl "' Location: 11314 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 8.4 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°� 58 13 Latitude: 42°N 4.9 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range6 °F) - 15 (L ) Method Simplified 9.2 Wet bulb (° -72 Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments -Component Btuh/ft2 Btuh % of load Walls 4.0 11314 21.5 Glazing 17.3 4424 8.4 Doors 0 0 0 Ceilings 9.9 3080 5.8 Floors 4.9 9642 18.3 Infiltration 4.2 9713 18.4 Ducts 9692 18.4 Piping 0 0 Humidification 4850 9.2 Ventilation 0 0 Adjustments 0 Total 1 527151 100.0 01i 1"I T 12,204 fir... -Component Btuh/ft2 Btuh % of load Walls 0.8 2104 6.2 Glazing 20.0 5132 15.1 Doors 0 0 0 Ceilings 8.6 2673 7.9 Floors 1.1 2071 6.1 Infiltration 0.9 2008 5.9 Ducts 9330 27.5 Ventilation 0 0 Internal gains 6540 19.3 Blower 4096 12.1 Adjustments 0 Total 1 339531 100.0 Latent Cooling Load = 5545 Btuh Overall U -value = 0.149 Btuh/ft2-°F Data entries checked. 2014 -May -01 14:19:03 wrilghtsaft® Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 3 ACCK ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Building Anal sis Job: 84 Compass Point wrightsoft® y Date: May 1 , 2014 1st floor By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 � eat .n �.�� H Ing,. —Component Btuh/ft2 Btuh % of load Walls Location: 4596 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 5.7 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 42°N 0 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range °F) - 15 ( L ) Method Simplified 12.9 Wet bulb (°F� - 72 Construction quality Ti ht Adjustments Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 1 � eat .n �.�� H Ing,. —Component Btuh/ft2 Btuh % of load Walls 3.7 4596 21.1 Glazing 17.3 1233 5.7 Doors 16.7 702 3.2 Ceilings 14.7 6831 31.4 Floors 0 0 0 Infiltration 4.2 5617 25.8 Ducts 0 0 Piping 0 0 Humidification 2805 12.9 Ventilation 0 0 Adjustments 0 Total 1 21783 100.0 r z3aW � e a ' 'r�}'"' ,, ' ; s , ; ',? : V �%.O' I nMW �'" � ,. ae: x se. —Component Btuh/ft2 Btuh % of load Walls 1.0 1221 9.4 Glazing 44.9 3201 24.6 Doors 7.7 323 2.5 Ceilings 12.7 5930 45.5 Floors 0 0 0 Infiltration 0.9 1161 8.9 Ducts 0 0 Ventilation 0 0 Internal gains 1200 9.2 Blower 0 0 Adjustments 0 Total 13036 100.0 Latent Cooling Load = 1581 Btuh Overall U -value = 0.128 Btuh/ft2-°F Data entries checked. wrightsoft°' Page Right -Suite@ Universal 2013 13.0.07 RSU05790 2014 -May -01 14:19 age4 4 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N —Component Btuh/ft2 Btuh % of load Walls Location: 7899 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 9.0 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F)) 58 13 Latitude: 420N 6.4 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range °F) - 15 (L ) Method Simplified 7.5 Wet bulb (°F� - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments —Component Btuh/ft2 Btuh % of load Walls 4.2 7899 21.0 Glazing 17.3 3387 9.0 Doors 0 0 0 Ceilings 8.8 2379 6.3 Floors 6.4 8132 21.6 Infiltration 4.2 5642 15.0 Ducts 7368 19.6 Piping 0 0 Humidification 2817 7.5 Ventilation 0 0 Adjustments 0 Total 1 376241 100.0 , 4100MORON "INEMIASKIN —Component Btuh/ft2 Btuh % of load Walls 0.6 1197 4.4 Glazing 35.4 6931 25.7 Doors 0 0 0 Ceilings 7.6 2065 7.6 Floors 1.4 1741 6.4 Infiltration 0.9 1166 4.3 Ducts 8571 31.7 Ventilation 0 0 Internal gains 5340 19.8 Blower 0 0 Adjustments 0 Total 27010 100.0 Latent Cooling Load = 4033 Btuh Overall U -value = 0.182 Btuh/ft2-°F Data entries checked. htsoft• 2014 -May -0114:19:03 WI'1 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 5 ACCK ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJS Front Door faces: N Building Anal $I$ Job: 84 Compass Point wrightsoft° y Date: May 1 , 2014 basement zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 TIM —Component ,.F Heat>Ing �w� Com onent Btuh/ft2 Btuh % of load Walls Location: 3418 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 420N 1.4 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Daily range °F) - 15 (L ) Method Simplified 3.2 Wet bulb (°F� - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments TIM —Component ,.F Heat>Ing �w� Com onent Btuh/ft2 Btuh % of load Walls 2.9 3418 13.5 Glazing 0 0 0 Doors 0 0 0 Ceilings 14.7 18676 73.8 Floors 1.4 729 2.9 Infiltration 4.2 1646 6.5 Ducts 0 0 Piping 0 0 Humidification 822 3.2 Ventilation 0 0 Adjustments 0 Total 1 25291 1 100.0 a dry 01 —Component Btuh/ft2 Btuh % of load Walls 0.2 279 1.7 Glazing 0 0 0 Doors 0 0 0 Ceilings 12.7 16212 96.3 Floors 0 0 0 Infiltration 0.9 340 2.0 Ducts 0 0 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 1 16831 100.0 Latent Cooling Load = 463 Btuh Overall U -value = 0.131 Btuh/ft2-°F WARNING: window to floor area ratio = 0.0% - less than 5%. Wrl htsoft" 2014 -May -0114:19:03 g Right -Suites Universal 2013 13.0.07 RSU05790 Page 6 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N —Component Btuh/ft2 mom • • • • Walls 3.7 3415 Location: Glazing 17.3 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0 Indoor temperature (°F) 70 75 Elevation: 30 ft 1510 Design TD (°F) 58 13 Latitude: 420N Ducts Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Adjustments 0 Dally range °F) - 15 (L ) Method Simplified 14.0 Wet bulb (°F� - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments —Component Btuh/ft2 Btuh % of load Walls 3.7 3415 22.6 Glazing 17.3 1037 6.9 Doors 0 0 0 Ceilings 17.5 701 4.6 Floors 2.2 1510 10.0 Infiltration 4.2 4071 27.0 Ducts 2324 15.4 Piping 0 0 Humidification 2033 13.5 Ventilation 0 0 Adjustments 0 0 Total 15091 100.0 —Component Btuh/ft2 Btuh % of load Walls 1.0 907 10.6 Glazing 35.8 2148 25.1 Doors 0 0 0 Ceilings 15.2 609 7.1 Floors 0.5 330 3.9 Infiltration 0.9 841 9.8 Ducts 2514 29.4 Ventilation 0 0 Internal gains 1200 14.0 Blower 0 0 Adjustments 0 Total 8549 100.0 Latent Cooling Load = 1512 Btuh Overall U -value = 0.080 Btuh/ft2-°F Data entries checked. -- wrightsoft9 2014 -May -01 14:19:03 Right -Suit, Universal 2013 13.0.07 RSU05790 Page 7 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 84 Compass Point wrightsoft p Date: May 1 , 2014 Basemnt/1 st sys By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, . 01876 Construction descriptions Walls 1217-0sw: Firm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fish, 2"W' wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int finish 15821-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Or - e • • e Insul R t ., Location: Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ftz-°FBtuh Indoor temperature (°F) 70 75 Elevation: 30 ft n Design TD (°F) 58 13 Latitude: 420N 3538 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 934 0.065 Daily range (°F) - 15 (L ) Method Simplified 929 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 3.74 Construction descriptions Walls 1217-0sw: Firm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fish, 2"W' wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int finish 15821-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 0.300 ft2 Btuh/ftz °F ftz-°FBtuh Btuh/ft2 Btu Btu h/ftz Btu n 945 0.065 21.0 3.74 3538 0.99 940 e 573 0.065 21.0 3.74 2145 0.99 570 S 934 0.065 21.0 3.74 3496 0.99 929 w 585 0.065 21.0 3.74 2190 0.99 582 all 3037 0.065 21.0 3.74 11369 0.99 3020 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 S 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 S 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 in 36 0.300 0 17.3 622 8.04 290 in 24 0.300 0 17.3 415 13.0 313 in 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 e 24 0.300 0 17.3 415 52.7 1265 S 48 0.300 0 17.3 829 16.0 769 s 23 0.300 0 17.3 403 27.4 640 S 64 0.300 0 17.3 1106 27.4 1756 w 36 0.300 0 17.3 622 28.2 1015 all 327 0.300 0 17.3 5656 22.5 7349 wri htsoft 2014 -May -0114:19:03 9 Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 1 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Doors 11 P0: Door, mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 s 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceiI ins, 1/2" 120 0.026 38.0 1.50 180 1.30 156 gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd fl fnsh, frm fl r, 10" thkns, 1/2" 1890 0.255 1.0 14.7 27706 12.7 24050 gypsum board int fnsh C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board 40 0.304 1.0 17.5 701 15.2 609 int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns 1224 0.368 0 6.90 8442 1.51 1847 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns 625 0.034 30.0 1.64 1027 0.36 225 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh 506 0.025 0 1.44 729 0 0 120 0.025 0 1.44 173 0 0 all 626 0.025 0 1.44 901 0 0 wri htsQft' 2014 -May -0114:19:03 9 Right -Suite( Universal 2013 13.0.07 RSU05790 Page 2 /�iCl� ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 84 Compass Point wrightsoft• Date: May 1 , 2014 basement zone By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 j �K �.Yro ectlnformltlon: ,,. .93t, NNE i.ht MMAffmammi • Construction Mount51 joy drive,• i • Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh 1274 • • • 0' 14.7 18676 12.7 Location: 506 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0 Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss CIg HTM Gain ft2 Btuh/ft%'F ft2-°F/Btuh Btuh/ft2 Btu Btuh/112 Btu Walls 15821-Owc-6: Bg wall, heavy dry or light damp soil, 2'W" wood int n 288 0.042 21.0 2.90 835 0.24 68 frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board a 288 0.042 21.0 2.90 835 0.24 68 int fnsh s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh 1274 0.255 1.0 14.7 18676 12.7 16212 506 0.025 0 1.44 729 0 0 2014 -May -01 14:19:03 � � wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 3 )m ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 84 Compass Point 9 1st floor Byte: May 1 , zota Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 rft s� Pro ect4lnformat19nN51 Mount joy drive, Tewskbury, �. For: Trust Construction . 01876 Construction descriptions Or Area U -value Insul R i' Location: Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btuh/V-°F Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 465 Daily range (°F) - 15 ( L ) Method Simplified 21.0 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/V-°F ft' °F/Btuh Btuh/V Btuh Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 468 0.065 21.0 3.74 1752 0.99 465 gypsum board int fish, 2"x6" wood frm e 174 0.065 21.0 3.74 651 0.99 173 S 298 0.065 21.0 3.74 1114 0.99 296 w 288 0.065 21.0 3.74 1078 0.99 286 all 1228 0.065 21.0 3.74 4596 0.99 1221 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 13.0 313 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; e 24 0.300 0 17.3 415 52.7 1265 50% outdoor insect screen; foreground = green grass (0.23) s 23 0.300 0 17.3 403 27.4 640 all 71 0.300 0 17.3 1233 31.1 2217 Doors 11 P0: Door, mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 S 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 466 0.255 1.0 14.7 6831 12.7 5930 gypsum board int fnsh Floors (none) 2014 -May -01 14:19:03 . " wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 4 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions 0 • • • U -value , � r Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ftz Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/ft2 Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 842 0.99 Daily range (°F) - 15 ( L ) Method Simplified 0.065 Wet bulb (F) - 72 Construction quality Tiht 90 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 21.0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ft2-°F/Btuh Btuh/fr1 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 225 0.065 21.0 3.74 842 0.99 224 gypsum board int fnsh, 2"x6" wood frm a 90 0.065 21.0 3.74 337 0.99 90 s 390 0.065 21.0 3.74 1460 0.99 388 w 207 0.065 21.0 3.74 775 0.99 206 all 912 0.065 21.0 3.74 3415 0.99 907 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 24 0.300 0 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) w 36 0.300 0 all 60 0.300 0 Doors (none) Ceilings C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board 40 0.304 1.0 int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns 70 0.368 0 625 0.034 30.0 17.3 415 16.0 385 17.3 622 28.2 1015 17.3 1037 23.3 1400 17.5 701 15.2 609 6.90 483 1.51 106 1.64 1027 0.36 225 2014 -May -0114:19:03 .0_ wri htsoft' Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 5 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh Btuh/V Btu Btuh/ftp Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 166-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board int fnsh n 477 0.065 21.0 3.74 1786 Location: 474 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 3.74 Indoor temperature (°F) 70 75 Elevation: 30 ft 636 Design TD (°F) 58 13 Latitude: 420N 0.99 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.065 21.0 Daily range (°F) - 15 (L ) Method Simplified n Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 744 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°FBtuh Btuh/V Btu Btuh/ftp Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 166-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board int fnsh n 477 0.065 21.0 3.74 1786 0.99 474 e 399 0.065 21.0 3.74 1494 0.99 397 s 636 0.065 21.0 3.74 2381 0.99 633 w 297 0.065 21.0 3.74 1112 0.99 295 all 1809 0.065 21.0 3.74 6773 0.99 1799 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 36 0.300 0 17.3 622 8.04 290 n 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 s 48 0.300 0 17.3 829 16.0 769 S 64 0.300 0 17.3 1106 27.4 1756 w 36 0.300 0 17.3 622 28.2 1015 all 256 0.300 0 17.3 4424 20.0 5132 120 0.026 38.0 1.50 180 1.30 156 150 0.255 1.0 14.7 2199 12.7 1909 40 0.304 1.0 17.5 701 15.2 609 .� �.� 2014-May-0114:19:03Wrl htsofRight-SuiteUniversal 2013 13.0.07 RSU05790 Page 6 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Floors 19A-Obstp: Part floor, frm fir, 10" thkns 19A-30bstp: Part floor, r-30 ins, frm flr, 10" thkns 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh 1224 0.368 0 6.90 8442 1.51 1847 625 0.034 30.0 1.64 1027 0.36 225 120 0.025 0 1.44 173 0 0 2014 -May -01 14:19:03 wrightSOW Right -Suite® Universal 2013 13.0.07 RSU05790 Page 7 �� ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area 1.1 -value yq 9 Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft2 Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/ft= Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 1752 0.99 Daily range (°F) - 15 (L ) Method Simplified 0.065 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 173 Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/112 Btu Btuh/ft= Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 468 0.065 21.0 3.74 1752 0.99 465 gypsum board int fnsh, 2"x6" wood frm a 174 0.065 21.0 3.74 651 0.99 173 s 298 0.065 21.0 3.74 1114 0.99 296 w 288 0.065 21.0 3.74 1078 0.99 286 all 1228 0.065 21.0 3.74 4596 0.99 1221 151321-0wc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int n 288 0.042 21.0 2.90 835 0.24 68 frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board a 288 0.042 21.0 2.90 835 0.24 68 int fnsh s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 13.0 313 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; e 24 0.300 0 17.3 415 52.7 1265 50% outdoor insect screen; foreground = green grass (0.23) s 23 0.300 0 17.3 403 27.4 640 all 71 0.300 0 17.3 1233 31.1 2217 Doors 11 P0: Door, mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 s 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 1740 0.255 1.0 14.7 25507 12.7 22142 gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh 506 0.025 0 1.44 729 0 0 2014 -May -01 14:19:03 i wrightsoftw Right -Suite® Universal 2013 13.0.07 RSU05790 Page 8 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Wal I s 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 16B-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd flr fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns n 252 0.065 21.0 3.74 943 Location: 251 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 3.74 Indoor temperature (°F) 70 75 Elevation: 30 ft 246 Design TD (°F) 58 13 Latitude: 42°N 0.99 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.065 21.0 Daily range (°F) - 15 ( L ) Method Simplified n Wet bulb (F) - 72 Construction quality Tiht 744 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 0.073 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Wal I s 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 16B-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd flr fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns n 252 0.065 21.0 3.74 943 0.99 251 e 309 0.065 21.0 3.74 1157 0.99 307 s 246 0.065 21.0 3.74 921 0.99 245 w 90 0.065 21.0 3.74 337 0.99 90 all 897 0.065 21.0 3.74 3358 0.99 892 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 S 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 36 0.300 0 17.3 622 8.04 290 n 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 s 24 0.300 0 17.3 415 16.0 385 s 64 0.300 0 17.3 1106 27.4 1756 all 196 0.300 0 17.3 3387 19.0 3732 120 0.026 38.0 1.50 180 1.30 156 150 0.255 1.0 14.7 2199 12.7 1909 1154 0.368 0 6.90 7959 1.51 1741 t^_ 2014 -May -0114:19:03 WCI 1tSOf" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 9 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, the fir fnsh 120 0.025 0 1.44 173 2014 -May -01 14:19:03 wrightSOW Right -Suite® Universal 2013 13.0.07 RSU05790 Page 10 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 84 Compass Point wrightsoft Date: May 1 , 2014 Basement By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 W ro e;c norma ion, For: • • Mount51 • drive,• 01876 1111 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ftz-°F f[2-°F/Btuh Btuh/112 Btu BtON Btu Walls 15821-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh n 288 0.042 is ,. Location: 0.24 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 21.0 Indoor temperature (°F) 70 75 Elevation: 30 ft s Design TD (°F) 58 13 Latitude: 420N 1487 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 1179 0.042 Daily range (°F) - 15 (L ) Method Simplified 279 Wet bulb (°F) - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 1111 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ftz-°F f[2-°F/Btuh Btuh/112 Btu BtON Btu Walls 15821-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 1274 0.255 1.0 14.7 18676 12.7 16212 506 0.025 0 1.44 729 0 0 wri htsofta 2014 -May -0114:19:03 ti 9 Right-Suite(g) Universal 2013 13.0.07 RSU05790 Page 11 tC(: A ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N W rl Ji1tSOftComponent Constructions Job: 84 Compass Point Date: May 1 , 2014 Living room By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 y - � �c a � .^,Z spa. s •'� rc... 1' Rauh � � � For: • • Mount51 • drive,• 01876 Construction descriptions ® 0 0 0 • U -value IMM Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft2 Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/ft2 Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 910 0.99 Daily range (°F) - 15 (L ) Method Simplified 0.065 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 173 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 351 7.68 ft2 BtuhM-°F ft2-°F/13tuh Btuh/112 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 243 0.065 21.0 3.74 910 0.99 242 gypsum board int fnsh, 2"W' wood frm e 174 0.065 21.0 3.74 651 0.99 173 w 198 0.065 21.0 3.74 741 0.99 197 all 615 0.065 21.0 3.74 2303 0.99 612 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap 1/4" thl 2 n 24 0.300 0 17.3 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thl 50% outdoor insect screen; foreground = green grass (0.23) a 24 0.300 0 17.3 all 48 0.300 0 17.3 Doors 11 P0: Door, mtl pur core type n 21 0.290 10.5 16.7 Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 176 0.255 1.0 gypsum board int fnsh Floors (none) 415 13.0 313 415 52.7 1265 829 32.9 1577 351 7.68 161 14.7 2580 12.7 2240 •� wri htsafta 2014 -May -0114:19:03 I (' g Right-Suitep0 Universal 2013 13.0.07 RSU05790 Page 12 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 84 Compass Point wrightsoft� p Date: May 1 , 2014 Kitchen By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: • • Mount51 • drive,• 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft� Btuh/ft2-°F ft2-°F/Btuh BtuhtV Btu Btuh/ftz Btu Wal I s 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 105 0.065 21.0 3.74 394 0.99 105 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 12 0.300 0 17.3 202 27.4 320 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 40 0.255 1.0 14.7 586 12.7 509 gypsum board int fnsh Floors (none) .{_�," 2014 -May -01 14:19:03 i " r wrightsofta Right -Suite® Universal 2013 13.0.07 RSU05790 Page 13 ACCP. ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft� Btuh/ft2-°F ft2-°F/Btuh BtuhtV Btu Btuh/ftz Btu Wal I s 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 105 0.065 21.0 3.74 394 0.99 105 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 12 0.300 0 17.3 202 27.4 320 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 40 0.255 1.0 14.7 586 12.7 509 gypsum board int fnsh Floors (none) .{_�," 2014 -May -01 14:19:03 i " r wrightsofta Right -Suite® Universal 2013 13.0.07 RSU05790 Page 13 ACCP. ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insul R Htg HTM Location: Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btuh/ftz-°F Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 224 Daily range (°F) - 15 ( L ) Method Simplified 21.0 Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 3.74 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz-°F ft2-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 225 0.065 21.0 3.74 842 0.99 224 gypsum board int fnsh, 2"x6" wood frm s 192 0.065 21.0 3.74 720 0.99 191 w 90 0.065 21.0 3.74 337 0.99 90 all 507 0.065 21.0 3.74 1899 0.99 505 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 12 0.300 0 17.3 202 27.4 320 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors 11 P0: Door, mtl pur core type s 21 0.290 10.5 16.7 351 7.68 161 Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 250 0.255 1.0 14.7 3665 12.7 3181 gypsum board int fnsh Floors (none) 2014 -May -0114:19:03 ,,z_wri htsoftT Right-SuiteUniversal 2013 13.0.07 RSU05790 Page 14 )CCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions ® e • e • 1.1 -value Insul R � nary '�' ti Location: Gain Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft2-°F/Btuh Indoor temperature (°F) 70 75 Elevation: 30 ft Walls Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 119 gypsum board int fnsh, 2"x6" wood frm Daily range (°F) - 15 ( L ) Method Simplified 3.74 Wet bulb (°F) - 72 Construction quality Tiht all Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 887 Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btu h/ftz Btu Btuh/W Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 120 0.065 21.0 3.74 449 0.99 119 gypsum board int fnsh, 2"x6" wood frm e 117 0.065 21.0 3.74 438 0.99 116 all 237 0.065 21.0 3.74 887 0.99 236 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 8.04 193 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 208 0.368 0 6.90 1435 1.51 314 -{1I�"_ 2014 -May -01 14:19:03 :} i ' wrightsofta Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 15 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions wrightsoft- Component Constructions Job: 84 Compass Point Insul R Htg HTM Ld Date: May 1 , By: 2014 y ft2 Btuh/ft2--F ft� °F/Btuh Croinin Construction Management Btu Btuh/ft2 P.O Box 7237, Lowell, Ma 01852 Walls For: Trust Construction 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 36 51 Mount joy drive, Tewskbury, ma 01876 21.0 3.74 135 Will 11111 M - ;f Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) Wind speed (mph) - 72 Construction quality 15.0 7.5 Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2--F ft� °F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 36 0.065 21.0 3.74 135 0.99 36 gypsum board int fnsh, 2"x6" wood frm w 45 0.065 21.0 3.74 168 0.99 45 all 81 0.065 21.0 3.74 303 0.99 81 Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns 32 0.368 0 6.90 221 1.51 48 2014-May-0114:19:03� WCI htSOf Right -Suite® Universal 2013 13.0.07 RSU05790 Page 16 ACCP. ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft� °F/Btuh Btuh/Rz Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" e 75 0.065 21.0 3.74 281 0.99 75 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 24 0.300 0 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 176 0.368 0 17.3 415 28.2 677 P001 2014 -May -0114:19:03 ,S, Wri htsofRight-SuiteO Universal 2013 13.0.07 RSU05790 Page 17 AC—C, ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N IN Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft� °F/Btuh Btuh/Rz Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" e 75 0.065 21.0 3.74 281 0.99 75 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 24 0.300 0 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 176 0.368 0 17.3 415 28.2 677 P001 2014 -May -0114:19:03 ,S, Wri htsofRight-SuiteO Universal 2013 13.0.07 RSU05790 Page 17 AC—C, ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Component Constructions Job: 84 Compass Point wrightsoft- Date: May 1 , 2014 1/2 bath By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 <_ pro ect�lnform;ation�,.. For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ft2-°F ftl-°FBtuh Btuh/ft2 Btu Btuh/ftz Btu Wal I s 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns n 63 0.065 21.0 91 0.368 0 3.74 236 0.99 63 6.90 628 1.51 137 _CL2014-May-01 14:19:03 iI ta wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 18 ".M ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ft2-°F ftl-°FBtuh Btuh/ft2 Btu Btuh/ftz Btu Wal I s 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns n 63 0.065 21.0 91 0.368 0 3.74 236 0.99 63 6.90 628 1.51 137 _CL2014-May-01 14:19:03 iI ta wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 18 ".M ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 84 Compass Point wrightsoft� p Date: May 1 , 2014 Masterbed room By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 14 .._ "moo M_ro ect lnf�ormatlon�.r For: Trust Construction 51 Mount joy drive, Tewskbury, . 01876 Construction descriptions Or Area U -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ftz Indoor temperature (°F) 70 75 Elevation: 30 ft Btu hM Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 753 0.99 Daily range (°F) - 15 (L ) Method Simplified 0.065 Wet bulb (F) - 72 Construction quality Tiht 45 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 21.0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/W-°F ft2-°F/Btuh Btuh/ftl Btu Btu hM Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 201 0.065 21.0 3.74 753 0.99 200 gypsum board int fnsh, 2"x6" wood frm w 45 0.065 21.0 3.74 168 0.99 45 all 246 0.065 21.0 3.74 921 0.99 245 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 24 0.300 0 17.3 415 16.0 385 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 125 0.255 1.0 14.7 1832 12.7 1591 gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns 325 0.368 0 6.90 2242 1.51 490 t wri htsoft" 2014 -May -0114:19:03 ',&_1 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 19 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N -i1tSOft- 9 Component Constructions Job: 84CompassPoint W CI Date: May 1 , 2014 Masterbath By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 U n�e_-«c;t ETM • Construction t lalo... Mount51 joy drive,• i • Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns Or Area U -value Insul R Htg HTM Location: CIg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft2-°F/Btuh Indoor temperature (°F) 70 75 Elevation: 30 ft e Design TD (°F) 58 13 Latitude: 420N 438 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 162 0.065 Daily range (°F) - 15 (L ) Method Simplified 161 Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns Or Area U -value Insul R Htg HTM Loss CIg HTM Gain 0.368 ftz Btuh/112-°F ft2-°F/Btuh BtuhW Stuh Btuh/ft% Btu e 117 0.065 21.0 3.74 438 0.99 116 S 45 0.065 21.0 3.74 168 0.99 45 all 162 0.065 21.0 3.74 607 0.99 161 25 0.255 1.0 14.7 366 12.7 318 65 0.368 0 6.90 448 1.51 98 {�}{"- 2014 -May -01 14:19:03 .+ " V wrightSOW Right -Suite® Universal 2013 13.0.07 RSU05790 Page 20 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Component Constructions Job: 84 Compass Point wrightsoft- Date: May 1 , 2014 full bath By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Floors 19A-Obstp: Part floor, frm flr, 10" thkns 77 0.368 0 6.90 531 1.51 116 2014 -May -0114:19:03 'rwri htsoft Right -Suite® Universal 2013 13.0.07 RSU05790 Page 21 RCCA ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Component Constructions Job: 84 Compass Point wr'tghtsoft� p Date: May 1 , 2014 bouns room closet By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry bulb (°F) 12 Daily range (°F) - Wet bulb (°F) - Wind speed (mph) 15.0 Construction descriptions Indoor: Wal I s 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns Heating Cooling 70 75 58 13 50 50 46.5 27.8 Simplified Tiht 1 Average) Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ft2-°FBtuh MOM Stuh Btuh/ft2 Btu S 63 0.065 21.0 3.74 236 0.99 63 70 0.368 0 6.90 483 1.51 106 ,., 2014 -May -0114:19:03 wri htsoft Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 22 14C`.� ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Indoor temperature (°F) Design TD (°F) Relative humidity (%) Cooling Moisture difference (gr/Ib) 88 Infiltration: 15 (L ) Method 72 Construction quality 7.5 Fireplaces Wal I s 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns Heating Cooling 70 75 58 13 50 50 46.5 27.8 Simplified Tiht 1 Average) Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ft2-°FBtuh MOM Stuh Btuh/ft2 Btu S 63 0.065 21.0 3.74 236 0.99 63 70 0.368 0 6.90 483 1.51 106 ,., 2014 -May -0114:19:03 wri htsoft Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 22 14C`.� ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 84 Compass Point wrightsoft ppDate: May 1 , 2014 bouns room By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 .s,ro ectInformatio`n,, For: Trust Construction 51 • • • • . Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-°F ft' °FBtuh MOM Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns n 225 0.065 21.0 3.74 842 0.99 Location: s 156 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0.99 Indoor temperature (°F) 70 75 Elevation: 30 ft 3.74 Design TD (°F) 58 13 Latitude: 42°N 0.065 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 385 w 36 Daily range (°F) - 15 (L ) Method Simplified 28.2 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 17.3 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-°F ft' °FBtuh MOM Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns n 225 0.065 21.0 3.74 842 0.99 224 s 156 0.065 21.0 3.74 584 0.99 155 w 207 0.065 21.0 3.74 775 0.99 206 all 588 0.065 21.0 3.74 2201 0.99 585 s 24 0.300 0 17.3 415 16.0 385 w 36 0.300 0 17.3 622 28.2 1015 all 60 0.300 0 17.3 1037 23.3 1400 625 0.034 30.0 1.64 1027 0.36 225 AL.2014-May-01 14:19:03 ti r- wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 23 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N CiJob: 84 Compass Point wri9 htsoft- Component Constructions Date: May 1 , 2014 2nd floor hall By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: • • Mount51 joy drive,• i • Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btu Btu h/ft2 Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N 33 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Partitions Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-'F ft2-°F/Btuh Btuh/ft2 Btu Btu h/ft2 Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 33 0.065 21.0 3.74 124 0.99 33 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 12 0.300 0 17.3 207 8.04 97 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns 180 0.368 0 6.90 1241 1.51 272 2014 -May -01 14:19:03 Ir wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 24 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 84 Compass Point wrightsoft P Date: May 1 , 2014 attic By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 ect.... .. poll , w , NMI For: Trust Construction 51 Mount . .•:. Construction descriptions Or Area U -value Insul R Htg HTM Loss CIg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 168 0.073 8.0 4.43 Location: 0.17 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 8.0 Indoor temperature (°F) 70 75 Elevation: 30 ft s Design TD (°F) 58 13 Latitude: 420N 652 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 986 0.073 Daily range (°F) - 15 ( L ) Method Simplified 305 Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss CIg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 48 0.300 0 17.3 829 13.0 625 s 64 0.300 0 17.3 1106 27.4 1756 all 112 0.300 0 17.3 1935 21.3 2381 120 0.026 38.0 1.50 180 1.30 156 120 0.025 0 1.44 173 0 0 2014 -May -01 14:19:03 Al wrightsoft' Right-Suite(g) Universal 2013 13.0.07 RSU05790 Page 25 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 84 Compass Point 9 Date: May 1 , 2014 dining room By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 r rNro ectInformatlon r . MountFor: Trust Construction 51 • drive,• WN Area U -value Insul R U 77 Location: Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US W-T/Btuh Indoor temperature (°F) 70 75 Elevation: 30 ft e Design TD (°F) 58 13 Latitude: 42°N 337 Relative. humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 261 0.065 Daily range (°F) - 15 ( L ) Method Simplified 260 Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 ?Average) Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors (none) Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F W-T/Btuh Btuh/ftz Btu Btuh/ft2 Btu e 90 0.065 21.0 3.74 337 0.99 90 s 171 0.065 21.0 3.74 640 0.99 170 all 261 0.065 21.0 3.74 977 0.99 260 40 0.304 1.0 17.5 701 15.2 609 2014 -May -01 14:19:03 ,y wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 26 ACCP. ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N -�- wrightsoft° Project Summary Basemnt/1 st sys Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Notes: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Weather Winter Design Conditions Outside db 12 OF Inside db 70 OF Design TD 58 OF Heating Summary Structure 81619 Btuh Ducts 9692 Btuh Central vent (0 cfm) 0 Btuh Humidification 8476 Btuh Piping 0 Btuh Equipment load 99788 Btuh Infiltration Boston Logan Int'I AP, MA, US Method Simplified Construction quality Tight Fireplaces 1 (Average) Efficiency Heating Cooling Area (ft2) 5285 5285 Volume (ft3) 35603 35603 Air changes/hour 0.16 0.07 Equiv. AVF (cfm) 268 253 Heating Equipment Summary Make n/a Static pressure 0 Trade n/a Space thermostat n/a Model n/a AHRI ref n/a Efficiency 88 n/a Heating input 75 OF Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a Trade n/a Job: 84 Compass Point Date: May 1 , 2014 By: Summer Design Conditions Outside db 88 OF Inside db 75 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Sensible Cooling Equipment Load Sizing Structure 49410 Btuh Ducts 9447 Btuh Central vent (0 cfm) 0 Btuh Blower 0 Btuh Use manufacturer's data n Btuh Rate/swing multiplier 0.93 ton Equipment sensible load 54502 Btuh Latent Cooling Equipment Load Sizing Structure 6378 Btuh Ducts 1211 Btuh Central vent (0 cfm) 0 Btuh Equipment latent load 7589 Btuh Equipment total load 62091 Btuh Req. total capacity at 0.80 SHR 5.7 ton Cooling Equipment Summary Make n/a Trade n/a Cond n/a Coil n/a AHRI ref n/a Efficiency n/a Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. I'1 htsoft' 2014 -May -0114:19:03 A ' r W9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 1 C ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N -- wrightsoft- Project Summary 1st floor system Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Notes: Job: 84 Compass Point Date: May 1 , 2014 By: sed DOM n Information" K1 Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range Relative humidity L 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 43447 Btuh Structure 28883 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 3626 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 47073 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 26745 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 2044 Btuh Ducts 0 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft22358 2358 Equipment latent load 2044 Btuh Volume 1-3) 13578 13578 Air changes/hour 0.51 0.48 Equipment total load 28789 Btuh Equiv. AVF (cfm) 115 108 Req. total capacity at 0.70 SHR 3.2 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1314 cfm Actual air flow 1314 cfm Air flow factor 0.030 cfm/Btuh Air flow factor 0.046 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.93 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014 -May -01 14:19:03 —AL- wrightsoft' ACCK Right -Suite® Universal 2013 13.0.07 RSU05790 Page 2 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Project Summar Job: 84 Compass Point wrightsoftm y Date: May 1 , 2014 2nd floor By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 "SIO- ,rk Pro ec��nfor,'mat�on;� ' For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Notes: Weather Winter Design Conditions Outside db 12 °F Inside db 70 °F Design TD 58 °F Heating Summary 0.42 Structure 38172 Btuh Ducts 9692 Btuh Central vent (0 cfm) 0 Btuh Humidification 4850 Btuh Piping 0 Btuh Equipment load 52715 Btuh Infiltration Boston Logan Int'I AP, MA, US Method Simplified Construction quality Tight Fireplaces 1 (Average) Heating Equipment Summary Summer Design Conditions Outside db Heating Cooling Area(ft2) 2927 2927 Volume (ft3) 22025 22025 Air changes/hour 0.42 0.40 Equiv. AVF (cfm) 153 145 Heating Equipment Summary Summer Design Conditions Outside db 88 °F Inside db 75 °F Design TD 13 °F Daily range Relative humidity L 50 % Moisture difference 28 gr/Ib Sensible Cooling Equipment Load Sizing Structure 20528 Btuh Ducts 9330 Btuh Central vent (0 cfm) 0 Btuh Blower 4096 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Equipment sensible load 31440 Btuh Latent Cooling Equipment Load Sizing Structure 4334 Btuh Ducts 1211 Btuh Central vent (0 cfm) 0 Btuh Equipment latent load 5545 Btuh Equipment total load 36986 Btuh Req. total capacity at 0.70 SHR 3.7 ton Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 1250 cfm Actual air flow 1250 cfm Air flow factor 0.026 cfm/Btuh Air flow factor 0.041 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. L WPI htsoft` 9 2014 -May -0114:19:03 ,._ �� Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 3 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Notes: .:Des'i In�lnfo'r""mat�on'..� �s Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range Relative humidity L 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 18978 Btuh Structure 13036 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 2805 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 21783 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 12071 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 1581 Btuh Ducts 0 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2 1084 1084 (ft3) Equipment latent load 1581 Btuh Volume 9756 9756 Air changes/hour 0.55 0.52 Equipment total load 13652 Btuh Equiv. AVF (cfm) 89 84 Req. total capacity at 0.80 SHR 1.3 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft' Right -Suite@ Universal 2013 13.0.07 RSU05790 2014 -May -01 14:19:03 Page 4 .ACCP. ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJS Front Door faces: N For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Notes: �.. .. wa a=;t k✓.""`¢H:. '.,�iD ^N�i ... D.es'i nllnforlmatioi� ,.,., Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range Relative humidity L 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 27439 Btuh Structure 18440 Btuh Ducts 7368 Btuh Ducts 8571 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 2817 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 37624 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 25012 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 3188 Btuh Ducts 846 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 2042 2042 Equipment latent load 4033 Btuh Volume (ft3) 13050 13050 Air changes/hour 0.41 0.39 Equipment total load 29045 Btuh Equiv. AVF (cfm) 89 84 Req. total capacity at 0.80 SHR 2.6 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft" Right -Suite@) Universal 2013 13.0.07 RSU05790 2014 -May -01 14:19:03 Page 5 ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Project Summar Job: 84 Compass Point WrIQiItSOft� y Date: May 1 , 2014 basement zone By: Croinin Construction Management P. 0 Box 7237, Lowell, Ma 01852 F R ; Plo ect Inform � .� �d �� .. rF.� For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Notes: Weather: Winter Design Conditions Outside db 12 OF Inside db 70 OF Design TD 58 OF Heating Summary 0.39 Structure 24469 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 822 Btuh Piping 0 Btuh Equipment load 25291 Btuh Infiltration Boston Logan Int'I AP, MA, US Method Simplified Construction quality Tight Fireplaces 1 (Average) Efficiency Heating Cooling Area (ft21274 Heating input 1274 Volume ff3) 3822 3822 Air changes/hour 0.41 0.39 Equiv. AVF (cfm) 26 25 Heating Equipment Summary Air flow factor Make n/a cfm/Btuh Static pressure Trade n/a in H2O Space thermostat Model n/a Trade n/a AHRI ref n/a Cond n/a Efficiency 88 n/a Heating input 75 OF Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a Trade n/a Summer Design Conditions Outside db 88 OF Inside db 75 OF Design TD 13 OF Daily range Relative humidity L 50 % Use manufacturer's data n Btuh Moisture difference 28 gr/Ib Sensible Cooling Equipment Load Sizing Structure 16831 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Blower 0 Btuh Use manufacturer's data n Btuh Rate/swing- multiplier 0.93 ton Equipment sensible load 15585 Btuh Latent Cooling Equipment Load Sizing Structure 463 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Equipment latent load 463 Btuh Equipment total load 16049 Btuh Req. total capacity at 0.70 SHR 1.9 ton Cooling Equipment Summary Make n/a Trade n/a Cond n/a Coil n/a AHRI ref n/a Efficiency n/a Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. �� -� wrightsoftb Right-SuiteO Universal 2013 13.0.07 RSU05790 2014 -May -01 14:19:03 Page 6 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Project Summar Job: 84 Compass Point wrightsoftm y Date: May 1 , 2014 Bouns zone By: Croinin Construction Management P. 0 Box 7237, Lowell, Ma 01852 , � _ �RUNRY 3ect� _'formatidh*A , For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Notes: �esign��nforrriat'o��� _... w D Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 70 OF Inside db 75 OF Design TD 58 OF Design TD 13 OF Daily range Relative Humidity L 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 10734 Btuh Structure 6035 Btuh Ducts 2324 Btuh Ducts 2514 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 2033 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 15091 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 7916 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 1146 Btuh Ducts 366 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 885 885 Equipment latent load 1512 Btuh Volume (W) 8975 8975 Air changes/hour 0.43 0.41 Equipment total load 9428 Btuh Equiv. AVF (cfm) 64 61 Req. total capacity at 0.80 SHR 0.8 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft" Right-SuiteOO Universal 2013 13.0.07 RSU05790 2014 -May -01 14:19:03 Page 7 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N