Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miscellaneous - 80 COMPASS POINT ROAD 4/30/2018
n CP 3 �e e _ ®Q N Q z *- n L W0 d O �a O r � s tp• s obt od 10 t o n LocationZ�,o co" No. c 5— 14 Check #-1115 Date 7 TOWN OF NORTH ANDOVER Certificate of Occupancy $ Building/Frame Permit Fee $ Foundation Permit Fee $ Other Permit Fee $ TOTAL (:�2 1 ?-6A-$ Building Inspector NUMBER TOWN OF NORTH ANDOVER SCHEDULE OF DEPARTMENTAL PAYMENTS DEPARTMENT: BUILDING DATE: GENERAL LEDGER A/C # 1001001.1.1.2.0241.0000.0 FROM WHOM SOURCE AMOUNT TOTAL 1001001.1.1.2.0241.0000.0.433300. BLDG 1001001.1.1.2.0241.0000.0.433500. ELEC 1001001.1.1.2.02,41.0000.0.433400. PLB 1001001.1.1.2.0241.0000.0.433800. GAS 600'.ze 0000. 0, �3� gOCA c7f . oo COMMONWEALTH OF MASSACHUSETTS TOWN OF NORTH ANDOVER NUMBER DATE: -1 A Iq To the Accounting Officer: The above is detailed list o moneys colt cted b,yy e, amounting in the aggregate To sum of c)r. CX© vup r---1< Dollars, For the Peri nding218 6"1 which I have paid to the Town Treasurer, whose receipt I Hold therefor. A TITLE White: Departmental Copy Pink: Accounting Yellow: Treasurer t r'� 28 -Jul -14 Check No# $ Amt. 7773 $5,000.00 Total $5,000.00 Date .1..��<.."1........... TOWN OF NORTH ANDOVER PERMIT FOR PLUMBING This certifies that ........ j.v.!....1.1 Q, V 1t ,2 ........................................................................................... has permission to perform ......►v��.......Y) (!� lumbin inre buildings of...........�...(:<ln .........!m�j!.G. p g l......... V at........� .................... 0 ...................................�/North Andover, Mass. Fee.4,2 ...... Lic. No. , !.7j.i... {� d' �.... 1................................................................. PLUMBING INSPECTOR Check # a � �Lj r� t� POWNER TYPE OR PRINT CLEARLY MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM PLUMBING WORK CITY I NORTH ANDOVER_. _ _ MA. DATE 3-11-14 PERMIT # JOBSITE ADDRESS 180 COMPASS POINT OWNER'S NAME TRUST CONSTRUCTION ADDRESS: 51 MT JOY DRIVE TEL: 15083209337 FAX: OCCUPANCY TYPE: COMMERCIAL ❑ EDUCATIONAL ❑ RESIDENTIAL ❑■ NEW: ❑■ RENOVATION: ❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES ❑ NO ❑ FIXUTRES -1 FLOORS— Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BATHTUB 2 CROSS CONN DEVICE DEDICATED SPECIAL WASTE SYS DEDICATED GASIOIUSAND SYS DEDICATED GREASE SYSTEM DEDICATED GRAY WATER SYS DEDICATED WATER REUSE SYS DISHWASHER DRINKING FOUNTAIN FOOD WASTE GRINDER UNIT FLOOR 1 AREA DRAIN INTERCEPTOR INTERIOR KITCHEN SINK LAVATORY 1 3 ROOF DRAIN SHOWER STALL 1 SERVICE / MOP SINK TOILET 1 2 URINAL WASHING MACHINE CONNECTION 1 WATER HEATER ALL TYPES 1 WATER PIPING 1 SPIGOTS 2 r INSURANCE COVERAGE I have a current liability insurance policy or its substantial equivalent which meets the requirements of MGL. Ch. 142 YES N NO ❑ If you have checked YES, please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY [9 OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER ❑ AGENT 01/ SIGNATURE OF OWNER OR AGENT I hereby certify that all of the details and information I have submitted (or entered) regarding this application a teiandaz�rai�Aoth e b tofmy Knowledge and that all plumbing work and installations performed under the permit issued for this applica ' n mpli ce wit Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER NAME: MIKE BURKE LICENSE # 13127 1Z IG RE COMPANY NAME: POWERHOUSE PLUMBING AND HEATING CORP I ADDRESS: I PO BO 896 CITY: PLAISTOW _ STATE: NH ZIP: 103865 _. _ FAX: 16033780040 TEL: I 16033780020CELL: 19784909385 EMAIL: J.LAURENCIO@POWERHOUSEPLUMBING.COM MASTER 0 JOURNEYMAN ❑ CORPORATION ❑■ # 2482 PARTNERSHIP ❑ # LLC ❑ # x .A r.01 - w F O z� 0 F U W W m a 1� Q � w o� Z o � w F W °z W a 4t GT, }'W O Q a > a W o > W Q 3 N a 0 o a a w Q � U J O. Q � N W S W H LL W O z z 0 0.0U W z z z 0.0a a x o a Date.. . ........... ........ TOWN OF NORTH ANDOVER PERMIT FOR GAS INSTALLATION This certifies that .......M,..! .?i��,,:', .................... ii ................................................ has permission for gas.installation ,..t' ...................... . 0 „j !1 i! -j- ........................... in the buildings of ........................................1. �- .............................. ..........1 ............................ at......... b .... .....:n: J—i?7.)...... .,et.. et ................................ North Andover, Mass. Fee . P. ......... Lic.1No. ..J 2. i 1 i... 1..-}.............................................................. GAS INSPECTOR Check # ��� hereby certify that all of the details and information I have submitted (or entered) regarding this application e e and acc to the best of my Knowledge and that all plumbing work and installations performed under the permit issued for this applic on a in co pli a with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General t PLUMBER/GASFITTER NAME: MIKE BURKE LICENSE #7 Z U COMPANY NAME: POWERHOUSE PLUMBING AND HEATING CORP ADDRESS: PO BOX_896_____ CITY: PLAISTOW _ _ STATE: NH ZIP: 103865 _ . FAX: 6033780040 TEL: 16033780020 _ CELL: 19784909385 EMAIL: I J.LAURENCIO POWERHOUSEPLUMBINGAND HEATING.0 A MASTER N JOURNEYMAN ❑ LP INSTALLER ❑ CORPORATION 0 # 2482 _ PARTNERSHIP ❑ # LLC ❑ #Ar MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK _ - GOWNER TYPE OR PRINT CLEARLY CITY NORTH ANDOVER , MA. DATE 3-11_14 PERMIT # �LN JOBSITE ADDRESS I 80 COMPASS POINT OWNER'S NAME J TRUST CONSTRUCTION —� ADDRESS: 151 MT JOY DRIVE TEWKSBURY MA 01876 TEL: 5083209337 FAX: OCCUPANCY TYPE: COMMERCIAL ❑ EDUCATIONAL ❑ RESIDENTIAL ❑■ NEW: ❑■ RENOVATION: ❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES ❑ NO ❑ FIXUTRES Z FLOOR- Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BOILER BOOSTER CONVERSION BURNER COOK STOVE DIRECT VENT HEATER DRYER FIREPLACE FRYOLATOR FURNACE > > GENERATOR GRILLE LABORATORY COCKS MAKEUP AIR UNIT OVEN POOL HEATER ROOM / SPACE HEATER ROOF TOP UNIT TEST UNIT HEATER UNVENTED ROOM HEATER WATER HEATER INSURANCE COVERAGE I have a current liability insurance policy or its substantial equivalent which meets the requirements of MGL. Ch. 142 YES ❑■ NO ❑ If you have checked YES, please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY 9 OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER ❑ AGENT ❑ SIGNATURE OF OWNER OR AGENT hereby certify that all of the details and information I have submitted (or entered) regarding this application e e and acc to the best of my Knowledge and that all plumbing work and installations performed under the permit issued for this applic on a in co pli a with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General t PLUMBER/GASFITTER NAME: MIKE BURKE LICENSE #7 Z U COMPANY NAME: POWERHOUSE PLUMBING AND HEATING CORP ADDRESS: PO BOX_896_____ CITY: PLAISTOW _ _ STATE: NH ZIP: 103865 _ . FAX: 6033780040 TEL: 16033780020 _ CELL: 19784909385 EMAIL: I J.LAURENCIO POWERHOUSEPLUMBINGAND HEATING.0 A MASTER N JOURNEYMAN ❑ LP INSTALLER ❑ CORPORATION 0 # 2482 _ PARTNERSHIP ❑ # LLC ❑ #Ar w F z° z U W P. z w ... . . . . . . . . . . . . . . . . . 00 z z �El o � w F IL LLI w O a a W�W tx w C4 O > W a 3 N a O z a w� as a U J G. Q fA H LLI 2 W F- LL. F O b z z 0 � F U � a � � cal u x a � The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations ' tl I Congress Street, Suite 100 Boston, MA 02114-2017 www mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Le6bly Name (Business/Organization/Individual): Address: PO BOX 896 POWERHOUSE PLUMBING CORP PLAISTOW, NH 03865 Phone #: 6033780020 Are you an employer? Check the appropriate box: 1.0 I am a employer with 6 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub -contractors 2. ❑ I am a sole proprietor or partner- listed on the attached sheet. ship and have no employees These sub -contractors have working for me in any capacity. employees and have workers' [No workers' comp. insurance comp. insurance.= required.] 5. ❑ We are a corporation and its 3. ❑ I am a homeowner doing all work officers have exercised their myself [No workers' comp. right of exemption per MGL insurance required.] t c. 152, § 1(4), and we have no employees. [No workers' comp. insurance required.] Type of project (required): 6. ❑■ New construction 7. ❑ Remodeling 8. ❑ Demolition 9. ❑ Building addition 10. El Electrical repairs or additions 11.❑ Plumbing repairs or additions 12. ❑ Roof repairs 13.❑ Other *Any applicant that checks box # 1 must also fill out the section below showing their workers' compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub -contractors and state whether or not those entities have employees. If the sub -contractors have employees, they must provide their workers' comp. policy number. I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: HARTFORD UNDERWRITERS INSURANCE COMP Policy # or Self -ins. Lic. #: 04WECIT2480 Job Site Address: 80 COMPASS POINT Expiration Date: 7-28-14 City/State/Zip: N ANDOVER MA Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 a nd/ -year impriso t, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a dahe violato a vised that a copy of this statement may be forwarded to the Office of Investigations of thesuranc cover averification. I do hereby cert' un r the pa' sand pe alties of perjury that the information provided above is true and correct. 3-11-14 Official useonly. Do not write in this area, to be completed by city or town official. City or Town: Permit/License # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone #: The Commonwealth of Massachusetts Department of IndustrialAccidents Office of Investigations 0 1 Congress Street, Suite 100 Boston, MA 02114-2017 www mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): POWERHOUSE PLUMBING CORP Address: PO BOX 896 • PLAISTOW, NH 03865 Phone #: 6033780020 Are you an employer? Check the appropriate box: 1. K I am a employer with 6 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub -contractors 2. ElI am a sole proprietor or partner- listed on the attached sheet. ship and have no employees These sub -contractors have working for me in any capacity. employees and have workers' [No workers' comp. insurance comp. insurance.: 5. ❑ We are a corporation and its required.] 3. I am a homeowner doing all work officers have exercised their myself. [No workers' comp. right of exemption per MGL insurance required.] t c. 152, § 1(4), and we have no employees. [No workers' comp. insurance required.] Type of project (required): 6. ❑■ New construction 7. ❑ Remodeling 8. ❑ Demolition 9. ❑ Building addition 10.❑ Electrical repairs or additions 11.0 Plumbing repairs or additions 12. ❑ Roof repairs 13.❑ Other applicant that checks box # 1 must also fill out the section below showing their workers' compensation policy information. ieowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. ractors that check this box must attached an additional sheet showing the name of the sub -contractors and state whether or not those entities have yees. If the sub -contractors have employees, they must provide their workers' comp. policy number. I am, an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site Company Name: HARTFORD UNDERWRITERS INSURANCE COMP # or Self -ins. Lic. #: 04WECIT2480 Expiration Date: 7-28-14 Job �Iite Address: 86 COMPASS POINT City/State/Zip: N ANDOVER MA Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failu%e to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine 1p to $1,500.00 and/or one-year tmpriso ent, as well as civil penalties in the form of a STOP WORK ORDER and a fine of upto$250.00 a day against the violato . e advised that a copy of this statement may be forwarded to the Office of Investigations of the insuranc co a verification. I do hereby cer unde the pai an enal�ies of perjury that the information provided above is true and correct. / 3-11-14 only. Do notArite in this area, to be completed by city or town official. City or Town: Issuing Authority (circle one): 1. Board of Health 2. Building Department 6. Other I Person: Phone #: Permit/License # 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector NAME: MICHAEL'W BURK E LIC #: 3801 M' EXPIRES: 05/31/2014 �t n 1 r M C t..vMMONWEALTH OF MASSACHUSETTS n Z a ca PLUM3ERS AND GASFItTERS,. { w IT1 a c m LICEN..;7 AS A MASTER PLUMBEX,F 0 ISSUES THE ABOVE LICENSE TO: z (4. MICHAEL Az MICHAEL 11 BURKE } Gy 61 CORLISS HILI. RU HAV RHILL 4A 01830 _1.613 Z " E _ 0 (A 13127 05/0 i /14 160677 C 'y ti. r r r. • 11 C COMN+!©NWEALTH OF MASSACHUSETTS z • � r • r f � it • r PLUMBERS AND GASFITTEF REGISTERED AS A PLUMBING 11.10�,} ISSUES THE ABOVE LICENSE TO: \ ! v MICHAEL W BURKE R1POWERHOUSE PLB & HEATING C)R 61 CORLISS HILL RD N HAVERHILL MA 01830-1612 41 2482 05/01/14 160675 Commonwealth of Massachusetts Department of Public Safety Oil Ramer Technician Certificate License: BU -059572 NUCHAEL W B<liiKE 1 61 CORLISS HIIVL Haverhill MA 0iI330 f e} CommissionerExpi ration. 05/26/2014 ,. . k. COCERTIFICATE OF LIABILITY INSURANCEF3/11/2014 � DATE (MM/DD/YYYY) THIS, CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER INSURANCE SOLUTIONS CORPORATION 60 Westville Rd Plaistow NH 03865 CONTACT Kathleen Miller, CISR, CPIW PHONE (603) 382-4600 FAXC. , (603)382-2034 E -p Ra .kmiller@isc-insurance.com INSURERS AFFORDING COVERAGE NAIC # INSURER AMerchants 23329 INSURED Powerhouse Plumbing & Heating Corp. PO Box 896 Plaistow NH 03865 INSURERB:Hartford Underwriters Ins. Co. INSURER C : INSURER D: INSURER E : INSURER F: COVERAGES CERTIFICATE NUMBER:CL1372212161 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF MMIDD POLICY EXP MMIDD LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE I—XI OCCUR BOPI065497 /1/2013 /1/2014 DAMAGE TO RENTED PREM E Ea occurrence $ 500,000 MED EXP (Any one person) $ 15,000 PERSONAL & ADV INJURY $ Included GENERAL AGGREGATE $ 2,000,000 GE ER: PRODUCTS-COMP/OPAGG $ 2,000,000 X POLICY AFCT PRO LOC $ AUTOMOBILE LIABILITY OMBB NED SINGLE LIMIT 1,000,000 BODILY INJURY (Per person) $ p' X ANY AUTO ALL OWNED SCHEDULED AUTOS AUTOS API058154 /1/2013 /1/2014 BODILY INJURY (Per accident) $ NON -OWNED HIRED AUTOS AUTOS PROPERTY DAMAGE $ Per acc=t Medical payments $ 5 000 UMBRELLA LIAB OCCUR EACH OCCURRENCE $ AGGREGATE $ EXCESS LIAB CLAIMS -MADE DED I I RETENTION $ $ B WORKERS COMPENSATION AND EMPLOYERS' LIABILITY Y / N ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory In NH) NIA 04WECIT2480 /28/2013 7/28/2014 X WC STATU- I OTH. E.L. EACH ACCIDENT $ 100 000 E.L. DISEASE - EA EMPLOYEE $ 100,000 If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ 500,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space Is required) CERTIFICATE HOLDER CANCELLATION (978)688-9542 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Town of North Andover ACCORDANCE WITH THE POLICY PROVISIONS. 1600 Osgood Street AUTHORIZED REPRESENTATIVE North Andover, MA 01845 Keith Maglia/KRM�— ACORD 25 (2010/05) INS025 f,2ninnm nt ©1988-2010 ACORD CORPORATION. All rights reserved. Tha Ar.(1Rf) name nnr( Innn aro ran)cfararl mnrkc of A(.t)Pn Date ?//z/z./............... TOWN OF NORTH ANDOVER PERMIT FOR WIRING This certifies that ........A...!.; � '.. G `.P ........-..................................... has permission to perform....h ............. .,I 1 %.,----� wiring in the building of... ,ic ...... .... .... ���: - .r...... ........ ...... Fee.... r............... `�.. Lic. No. r e Check # ;J� U l orth Andover, Massi 4�F ................................. ... f.! . ... ELL CAL INSPECTOR Commonwealth of Massachusetts ti Department of Fire Services a BOARD OF FIRE PREVENTION REGULATIONS Official Use O y Permit No. /aQa Occupancy and Fee Checked [Rev. 1/071 (leave blank APPLICATION FOR PERMIT TO PERFORM ELECTRICAL All work to be performed in accordance with the Massachusetts Electrical Code (NEC), 527 CMR 12.00 (PLEASE PRINT INMK OR TYPE ALL INFORMATION) Date: WORK City or Town of: NORTH ANDOVER To the Inspector of Wires: By this application the undersigned gives notice of his or her intention torperform the electrical work described below. Location (Street & Number) (�!n1/YA1C-)a'-g -�2jl rN i A) A r Owner or Tenant Owner's Address Is this permit in conjunction with a building permit? Purpose of Building - Existing Service Amps / Volts New Service - Amps I MI Volts Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work: Telephone No. Yes V No ❑ (Check Appropriate Box). Utility Authorization No. �O Overhead ❑ Undgrd ❑ No. of Meters Overhead ❑ Undgrd No. of Meters 1 Completion ofthe following table may be waived by the Inspector of Wires. No. of Recessed Luminaires No. of Ceil: Susp. (Paddle) FansNo. I of Total Transformers KVA No. of Luminaire Outlets 2,0 No. of Hot Tubs Generators KVA No. of Luminaires Swimming Pool Above ❑ In- E] rnd. rnd. No. o Emergency Lighting Batteiy Units No. of Receptacle Outlets D No. of Oil Burners FIRE ALARMS No. of Zones No. of Switches No. of Gas BurgersNo. of Detection and Initiating Devices No. of Ranges No. of Air Cond. Tons Tot No. of Alerting Devices No. of Waste Disposers p Heat Pump Totals: Number ' " ' Tons KW """"............. No. of Self -Contained Detection/AlertingDevices No. of Dishwashers Space/Area Heating KW Local ❑ Municipal ❑ Other Connection No. of Dryers 1 Heating Appliances KW Security Systems:* No. of Devices or Equivalent No. of Water KW Heaters No. of No. of Signs Ballasts Data Wiring: No. of Devices or Equivalent No. Hydromassage Bathtubs No. of Motors Total HP Telecommunications Wiring: No. of Devices or Equivalent OTHER: Attach additional detail if desired, or as required by the Inspector of Wires. Estimated Value of Electrical Work: (When required by municipal policy.) *ork to Start: Inspections to be requested in accordance with MEC Rule 10, and upon completion. INSURANCE OVERAGE: Unless waived by the owner, no permit for the performance of electrical work may issue unless the licensee provides proof of liability ' surance including "completed operation" coverage or its substantial equivalent. The undersigned certifies that such YBONDEI e is in force, and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE OTHER ❑ (Specify:) I certify, under thepains andpenalties ofperjury, that the information on this application is true and complete. FIRM NAME:. t/i(� (C.� LTC. NO.: - 100!Y4109 Licensee: Signature LTC. NO.: (If applicable, en"exempt" in the license number line.) Bus. Tel. No. • 9,"5<337 te Address: P- VVS, ST - Alt. Tel. No.: *Per M.G.L c. 147, s. 57-61, security work requires Department of Public Slfefy "S" License: Lic. No. WNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally ;red by law. By my signature below, I hereby waive this requirement. I am the (check one) ❑ owner ❑ owner's agent. /Agent ,PERMIT FEE: $ .lure Telephone No. ❑ 2012 Massachusetts Electrical Code Amendments 527 CMR 12.00 § Rule 8: In accordance with the provisions of M.G.L. c. 143, § 3L, the permit application form to provide notice of installation of wiring shall be uniform throughout the Commonwealth, and applications shall be filed on the prescribed form. After a permit application has been accepted by an Inspector of Wires appointed pursuant to M. G.L c. 166, § 32, an electrical permit shall be issued to the person, firm or corporation stated on the permit application. Such entity shall be responsible for the t notification of completion of the work as required in M.G.L. c. 143, § 3L. Permits shall.be limited as to the time of ongoing construction activity, and may be deemed by the Inspector of Wires abandoned and invalid if he or she has determined that the authorized work has not commenced or has not progressed during the preceding 12 -month period. Upon written application, an extension of time for completion of work shall be permitted for reasonable cause. A permit shall be terminated upon the written request of either the owner or the installing entity stated on the permit application. ❑ The Permit Extension Act was created by Section 173 of Chester 240 of the Acts of 2010 and extended by Sections 74 and 75 of Chapter 238 of the Acts of 2012. The purpose of this act is to promote job growth and long-term economic recovery and the Permit Extension Act furthers this purpose by establishing an automatic four-year extension to certain permits and licenses concerning the use or development of real property. With limited exceptions, the Act automatically extends, for four years beyond its otherwise applicable expiration date, any permit or approval that was "in effect or existence" during the qualifying period beginning on August 15, 2008 and extending through August 15, 2012. 0. Rule 8—Permit/Date Closed: *** Note: Reapply for new permit ❑ ❑ Permit Extension Act — Permit/Date Closed: Trench Inspection Pass Failed I] Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: SERVICE INSPECTION: Pass 0 Failed 0 Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: PARTIAL ROUGH INSPECTION: Pass IN Failed Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: ROUGH INSPECTION: Pass F?1 Failed Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: FINAL INSPEC I N: Pass Failed 0 Re- Inspection Required ($.) ❑ Inspectors Comme s: Inspectors Signature: Date: U DEB WEINHOLD ...TOWN OF MERRIMAC, MA. .......dweinhold@townofinerrimac.com The Commonwealth of Massachusetts Department of IndustrialAccidiks Office of Investigations 600 Washington Street .Boston, MA. 02111 www.massgov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Learibly Name (Business/Organization/Individual): � � C'i`T(%�(, C, c3rp Address: Irl/l.l� (�L'T'�2f�1 S S' -C UkJ�Llr A,( 1A Aqn-b-1 M4 ami City/State/Zip: Phone #: 979 $n? Are y an employer? Check the appropriate box: 1. I am a employer with ZI 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub -contractors 2. ❑ I am a sole proprietor or partner- listed on the attached sheet. t ship and'have no employees These sub -contractors have working for me in any capacity. workers' comp. insurance. [No workers' comp. insurance 5. ❑ We are a corporation and its required.] officers have exercised their 3. ❑ I am a homeowner doing all work right of exemption per MGL myself. [No workers' comp. c. 152, §1(4), and we have no insurance required.] employees. [No workers' comp. insurance required.] Type of project (required): 6. P-1<e,w construction 7. E] Remodeling 8. ❑ Demolition 9. ❑ Building addition 10. �- Iectrical repairs or additions 11. F1 Plumbing repairs or additions 12. ❑ Roof repairs 13.❑ Other *Any applicant that checks box#1 must also fill out the section below showing their workers' compensation policy information. Homeowners who submit this affidavit indicating they aie doing all work and thenhire outside contractors must submit anew affidavit indicating such. (Contractors that checkthis box must attached an additional sheet showing the name of the sub -contractors and their workers' comp, policy information. ,i am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:. � � , l � � V4 Policy # or S elf -ins. Lic. #:- w e 70 2S 2 Expiration Date: ,/ 2� J 7 Job Site Address: C� ' �2I/il� jl VI City/State/Zip: AV�t I Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as requiredunder Section 25A of MGL o. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one=year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby cert a tl ain dpenalties ofperjury that the information provided above is true andJ correct. S')nature: Date: —/ / — / q Phone #: Official use only. Do not write in this area, to be completed by city or town official. City or Town: Permit/License # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other - - Contact Person: Phone #: WCOMMONWEALTH OF MAS J Date ... ... .J•! ......... . NORTry TOWN OF NORTH ANDOVER p` PERMIT FOR MECHANICAL INSTALLATION F r r This certifies that .... .. U has permission for mechanical installation .. . ;L ............ in the buildings of ....: j ..'� L . c"'....rk..'.................. . at i ..... ;(�.. • • .. / .. • • • • • • • North Andover, Mass. Fee. fr.. .. Lic. No:: ' f..... ..'....................... . } GAS INSPECTOR WHITE: Applicant CANARY: Building Dept. PINK: Treasurer Commonwealth of Massachusetts Sheet Metal Permit y, Date: Permit # r OD Estimated Job Cost: $ YW64 _ Permit Fee: $ Plans Submitted: YES NO Business License # 196 Business Information: Name: J&J Heating_ & Air Conditioning Street: 17 Arlington St. City/Town: Dracut, MA 01826 Telephone: 978-454-8197 Plans Reviewed: YES NO Applicant License # '15(0 P) Property Owner / Job Location Information: Name:.--T(U"� i 6ft,: ffLX-A1DC Street• S_i ln'� City/Town: North Andover, MA 01845 Telephone: Photo I.D. required / Copy of Photo I.D. attached: YES +L NO _ _ Staff Initial J-1 / M -1 -unrestricted license J-2 / M -2 -restricted to dwellings 3 -stories or less and commercial up to 10,000 sq. ft. / 2 -stories or less Residential 'T" -2 -family " --multi-family Condo % Townhouses Other Commercial: ' Office Retail Industrial Educational Institutional Other Square rootage: wider 10,000 sq. ft. ✓' over 10,000 sq. ft. Number of Stories: Sheet metal work to be completed: New Work: ✓ Renovation: HVAC ✓ Metal Watershed Roofing Kitchen Exhaust System Metal Chimney / Vents Air Balancing Provide detailed description of work to be done: S � - d u 6 -t -IV INSURANCE COVERAGE: I have a current liability insurance policy or its equivalent which meets the requirements of M.G.L. ChAl2 Yes ❑ No ❑ If you have checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy Other type of indemnity El Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this boxEl, I hereby certify that all of the details and information I have submitted (or entered) regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Date Date Duct inspection required prior to insulation installation: YES NO Progress Inspections Comments Final Inspection Inspector Signature of Permit Approval Comments Signature of Licensee lt_lo License Number: 8 Check at www.mass.gov/dpi Type of License: By Omaster Title ❑ Master -Restricted City/Town ❑Journeyperson Permit # ❑Journeyperson-Restricted Fee $ ❑ Inspector Signature of Permit Approval Comments Signature of Licensee lt_lo License Number: 8 Check at www.mass.gov/dpi The Commonwealth oflVlassachuSelty f -Int Form ,. 1: /)cprrrtrncul afInduvh•ialAccideuts (%lice o/'Ilrncsli-alions •II 117 :•[. 7 Al Can, ress Street, Suite 100 Baviou, A411 02.114-20.17 tulvll. mnss.� n v/dia �Vorlccrs' Cont1>'cnsa11.ion Insurance Affidavit: 13uildcrs/Contractors/.hlcctricia ns/1,Inmhers AIilllicant Information Please Pi int I (Ribly Name(it nsincss/(.)rg;ulizalion/Indivillnal): J&J heat Addres": 1.7 Ar..1_inl;Lon SL. (_Ily/tilillc/l..,ip: Ura.cut Mn 01876 & Air. Conditioning, lbe. Rhone i/ 978-454-81.97 Are You an employcr7 Chccl< the appropriate box: --- 1, [Ax I alll it Clllphlyer with 40 4. ❑ I atll 'a general contractor and I Clllployces (11111 and/ol• pill 1-I title).* 11r.IVC hired the $LII)-Collll'iICtol'S 2. ❑ 1 :1111 it sole propriclor ol, partncl_ listed on the attached sheet. . ship :incl have no employees `I'I)Cse sub -contractors have work int; for ale in any capacity. employees and have workers' INo workers' comp. insurance comp. insurancc.l ICg111te1.1 ;.❑ 1 ant a homeowner doing all,.vork 5. ❑ we alC cl corporation and its oflicers have exercised their myscl l'. I No \.vorl<crs' Collip, right of excnlpl ion per MGL insurance rcyuirell.j I C. 152, §1(q), and vvc have no employees. [No workers' ------ _- �_-- corllp. insrlrancC rcquirecl.l Type of project (required): 6. E]New construction 7. ❑ Remodeling 8. ❑ Denu>liliorl 9. ❑ 13u11cling adclitiLm 10. El 131cctrical repairs or additions I L❑ Plumbing repairs or additions 12.0 Roof repairs 13.❑ Other *Ally applicanl Thal checks hnx I/ I mull alai Iill nal the scclion helow showing Iheir workers' compcasalion policy inlbrmnlion. I Iomcowners who snhmil Ill is,;lIIidaviI indicating dwy lire doing llll work and Ihen hire oulside Coln IIndms marl sIll) Ill iIll new affidavit indicating such, 'Coufraclols that check Ihis hog\ nnisl allached an addilional shecl showing the name of the Sub-conlraclors and stale wholier or not Ihnse enlilics have cniploycCS II'the suh-conlraclors have employees, tile), must provide their workel:s' comp, policy number. 0/1/)/oYer that is providing IVI//'/iers, CQllipellsat/o// hull /Yl/1CC //l/• My C/liplopees. Below is the poliC)/ eme1/011 site ililllJ'matioll• InsnrallccC:onlpally Mime: A-T.M. Mueua.l. Immrance Policy // or SCII=ins. L,ic. 11 WM%-800-8006553-701.3A hxpiration Dale: 06/02/201-4 ------ 101, Site Address: ,_nl-;�_ Sl_es ►�i_—�tl >—�11(�QyC�Y Y I — Allach a copy of the workers' compensalion policy declaration pale (showing; the policy number and expiration dale). I ailurc to scone cover<lgc as rc<ltlircd under Section 25A of MGL c. 152 can lead to the imposition of criminalnofa pe,iltics line up to $ I,Soo.00 and/or one-year Imprisonnlclll, as \-vell as civil pcnallics in the form of a S'T'OP WORK ORDER and a fine of tip to $2 y (ffl ;Iil;ly fits( the violator. 13C advised That a copy of this statement may be forwarded to (he Off ice of invest iha ons of the DIA),or insu;;,it.tce`cova•agc vcrilication. 1 do helchj*, kr I r l d Jl utiles u/1 lellollirs o/ lcr'rrry lhal the 111 rli-mation provided above iv true mul col'l'ect. I'honc /I (Wiciul lice only DO nut write in this area, to be coalpleled by cily or town official. City or Town: Permit/License 11 Issuing Authorify (circle one): I. Board of Ileallh 2. lioilding Department 3. Cily/Town Clerk 6. Offer Contact 1'crson: 4, Electrical Inspector S. Plumbing Inspeclor Phone #: ^ � COM88ONVVE8LTHOFMASSACHUSETTS SHEETK82T^�, WORKERS ASANlASTER'`MRESTR|CTED ERIC R KLINE M ml J & J HEATING & .\I",' 17 ARLINGTON BT DRACUT MA 018Z 1. 568'3�8�� ACQRDCERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YVYY) PRODUCER 978,887.4900 FAX 978.887.2404 Edward F. Sennott Insurance Agency, Inc. 16 South Main Street P• 0. Box 457 Topsfield, MA 01983 INSURED j&I Heating 8, Air Conditioning, Inc. 17 Arlington Street Dracut, MA 01826 06/03/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC N INSURERA: Great American Alliance Ins Co _j_9_4-5 INSURER B: Safety Insurance Company _ 39454 INSURERc: A.I.M. Mutual Insurance Co. INSURER D: — COVERAGES NSURER E: AUTO ONLY - EA ACCIDENT $ THE POLICIES OF INSURANCE LISTED BELOW I4AVE BEEN ISSUED TO THE INSURED NAMED ABOVE ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER MAY FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR PERTAIN, THE INSURANCE AFFORDED BY'iHE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, POLICIES. AGGREGATE LIMITS risn SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. 6115 ----- — ---- EXCLUSIONS AND CONDITIONS OF SUCH LTR n!LL --- TYPE OF INSURANCE_ POLICY NUM DER POLICV EFFECTIVE_ DATE MM DD YYYY POLICY FXPIRATION GENERAL LIABILITY PAC6418906-07 06/01/2013 DATE (MM/DD YYV LIMITS 06/01/2014 X COMMERCIAL GENE-IIAI_ I_IARIUtry EACH OCCURRENCE $ 1,000,00 CLAIMS MAUI'= X OCCUR � D'MA- I RGNT--i FJ PREMISES Ea occurranca)_ & 300,00 A --I MED EXP (Any ono porson) $ 10,00 PERSONAL & ADV INJURY $ 1,000,00 GENT_ AGGREGATE LIMIT APPI-IIcS PEn: GENERAL AGGREGATE $ 2,000,00 POLICY I'I10 JECT I I LOG PRODUCTS - COMP/OP AGG $ 2,000,00 AUTOMOBILE LIABILITY 2434550 06/01/2013 06/01/2014 — ANY AUTO COMBINED SINGLE LIMIT $ ALL OWNED AUTOS (Ea accident) —1 000 001 X SCI IEDULI'D AUTOS BODILY INJURY $ X ITIRED AUTOS (Per person) _ X NON -OWNED AO IOS BODILY INJURY (Per accident) $ GARAGE LIABILITY ANY AU I() EXCESS / UMDRLt_tA LIABiu TV X`, OCCun El CLAIMS MADE n _ UEDUC1IDLE _ _ —_I [IF'IFNI-ION $ WORI(F,RS COMPENSATION AND FMPLOYERS' LIABILITY ANY PROPnIF TOR/PAnTNFR/I'XI-CUITVGIY� C OFFIC.FII/MFMRCR EXGI_UUED'., (Mandatory In NII) II yes, rlesc"ll, under Al. IROVISIUNS ho,nw OTIIER UMB64189SS-051 06/01/2013 WMZ-800-8006553-2013A 06/02/2013 UESCRIPTIUN OF OPERAIIONS / LOCA1 IONS/ VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT/ SPECIAL PROVISIONS 2,000,00 2.000.00 F.L. EACH ACCIDENT $ 1 000 00( E.L. DISEASE - EA El PLOYf_F $ v— 1,000,00C E.L. DISEASE - POLICY LIMIT' $ 1,000,00C CEFITIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATIO DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR Evidence of Insurance REPRESENTATIVES. AUTHORIZED REPRESENTATIVE — Peter Sennott/AAM ACORD 25 (2002009/Ot) © 1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks,of ACORD PROPERTY DAMAGE $ (Per accident) AUTO ONLY - EA ACCIDENT $ OTHER'TNAN EA ACC $ AUTO ONLY: AGG $ 2014 EACH OCCURRFNCE $ AGGREGATE $ $ 2014 I X r ., , ,.... _. 2,000,00 2.000.00 F.L. EACH ACCIDENT $ 1 000 00( E.L. DISEASE - EA El PLOYf_F $ v— 1,000,00C E.L. DISEASE - POLICY LIMIT' $ 1,000,00C CEFITIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATIO DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR Evidence of Insurance REPRESENTATIVES. AUTHORIZED REPRESENTATIVE — Peter Sennott/AAM ACORD 25 (2002009/Ot) © 1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks,of ACORD -+- wrightsoft, Load Short Form Basemnt/1 st sys Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 Job: 80 Compass Point Date: ian14, 2014 By: SProiectlnformation: n�..g. ���.�-. 26 For: Trust Construction 51 Mount . .0. HEATING EQUIPMENT Area COOLING EQUIPMENT Clg load Make n/a Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L 1314 Inside humidity (%) 50 50 58857 Moisture difference (gr/Ib) 47 28 AHRI ref n/a HEATING EQUIPMENT Area COOLING EQUIPMENT Clg load Make n/a Clg AVF Make n/a (Btuh) (Btuh) Trade n/a (cfm) 2nd floor d Trade n/a 47865 29857 Model n/a 1250 1st floor system d Cond n/a 43447 28883 AHRI ref n/a 1314 Basemnt/1st sys d Coil n/a 91312 58857 2565 2817 Other equip loads AHRI ref n/a 8476 0 Efficiency n/a Equip. @ 0.93 RSM Efficiency n/a 54502 Heating input Latent cooling Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor d 2927 47865 29857 1250 1250 1st floor system d 2358 43447 28883 1314 1314 Basemnt/1st sys d 5285 91312 58857 2565 2817 Other equip loads 8476 0 Equip. @ 0.93 RSM 54502 Latent cooling 7589 Tr1TAI Q c13QG nn goo bnnn4 nrnr nna Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft" 2014 -Mar -07 09:02:48 g Right -Suited Universal 2013 13.0.07 RSU05790 Page 1 ACCK ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N wri htsoft, Load Short Form Job: 80 Compass Point g Date: jan14, 2014 1st floor system By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 :0w.:z�. Pro�ectInformaion .,. For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFU E 0 Btuh 0 Btuh 0 °F 1314 cfm 0.030 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER Area 0 Btuh 0 Btuh 0 Btuh 1314 cfm 0.046 cfm/Btuh 0 in H2O 0.93 16831 ROOM NAME Area Htg load Cig load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) basement zone p 1274 24469 16831 740 766 1st floor p 1084 18978 13036 574 593 1st floor system d 2358 43447 28883 1314 1314 Other equip loads 3626 0 Equip. @ 0.93 RSM 26745 Latent cooling 2044 T()TAI C 7r]GO n -n-713 nn1nn I -4A . « V GoIoz? IJ I'+ 1314 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft, 2014 -Mar -07 09:02:48 ,.� g Right -Suite® Universal 2013 13.0.07 RSU05790 Page 2 ACCP ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N ` -WrlhtSOft. 9 Load Short Form Job: 80 Compass Point Date: jan14, 2014 2nd floor By: Croinin Construction Management P. 0 Box 7237, Lowell, Ma 01852 r$21� ,xE ,,�ro1e,010nformatlon�t For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFUE 0 Btuh 0 Btuh 0 OF 1250 cfm 0.026 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER 0 Btuh 0 Btuh 0 Btuh 1250 cfm 0.041 cfm/Btuh 0 in H2O 0.86 885 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Bouns zone p 885 13058 8549 341 350 2nd floor zone p 2042 34807 27010 909 1107 2nd floor d 2927 47865 29857 1250 1250 Other equip loads 4850 4096 Equip. @ 0.93 RSM 31440 Latent cooling 5545 T(1T41Q 0n0-7 nnnnr 1 4ncn anrn GvG / :.7G1 IQ OQUOU I Guu 1 GOu Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft' Right -Suite@ Universal 2013 13.0.07 RSU05790 I—CA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N 2014 -Mar -07 09:02:48 Page 3 -- wrightsofto Load Short Form 1st floor Croinin Construction Management Job: 80 Compass Point Date: jan14, 2014 By: P.0 Box 7237, Lowell, Me 01852 � r �E , � � , .mew ��». .amu .�� �. i. , e�,t�,. ,� • w�;� � �s_+ . For: • • Mount51 • drive,• 01876 HEATING EQUIPMENT Area COOLING EQUIPMENT CIg load Make n/a Clg AVF Make n/a (Btuh) (Btuh) Trade n/a (cfm) Living room Trade n/a 8928 5556 Model n/a 253 Kitchen Cond n/a 1672 2581 AHRI ref n/a 117 office Coil n/a 8378 4898 253 223 1st floor p AHRI ref n/a 18978 13036 Efficiency n/a Other equip loads Efficiency n/a 0 Heating input Equip. @ 0.93 RSM Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load CIg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Living room 704 8928 5556 270 253 Kitchen 130 1672 2581 51 117 office 250 8378 4898 253 223 1st floor p 1084 18978 13036 574 593 Other equip loads 2805 0 Equip. @ 0.93 RSM 12071 Latent cooling 1581 TnTA I Q i non n.1 -700 4 nnrn r -e. rnn Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014 -Mar -07 09:02:48 A wri htsoftRight-Suite® Universal 2013 13.0.07 RSU05790 Page 4"C ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N -- wrightsofta Load Short Form 2nd floor zone Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 Job: 80 Compass Point Date: jan14, 2014 By: Nro�eCt, i -for=�matiortx For: Trust Construction 51 Mount . 01876 HEATING EQUIPMENT Area (ft2) COOLING EQUIPMENT Clg load (Btuh) Make n/a CIg AVF (cfm) Ldy Make n/a 1097 294 Trade n/a 12 Masterbath Trade n/a 2667 1501 Model n/a 62 Bedroom 2 Cond n/a 4865 2622 AHRI ref n/a 107 bedroom 1 Coil n/a 2952 3058 77 125 1/2 bath AHRI ref n/a 1432 375 Efficiency n/a Masterbed room Efficiency n/a 7137 Heating input 293 full bath Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area (ft2) Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) CIg AVF (cfm) Ldy 32 1097 294 29 12 Masterbath 65 2667 1501 70 62 Bedroom 2 208 4865 2622 127 107 bedroom 1 176 2952 3058 77 125 1/2 bath 91 1432 375 37 15 Masterbed room 325 8308 7137 217 293 full bath 77 675 171 18 7 2nd floor hall 180 2237 707 58 29 9++;P 000 i n=A 444 A A 1_^ A— Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft' 2014 -Mar -07 09:02:48 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 5 ACCK ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N 2nd floor zone p 2042 34807 27010 909 1107 Other equip loads 2817 0 Equip. @ 0.93 RSM 25012 Latent cooling 4033 T(1TAIQ Onnn 13-7enn nn AC n 44n1 Gv'tG J/VG`t G.7V`FJ 7V.'7 I Iu/ Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft 2014 -Mar -07 09:02:48 ICK9 Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 6 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N wrightsofto P.O Box 7237, Lowell, Ma 01852 Load Short Form basement zone Croinin Construction Management -_��� Proiectlranformat�orax For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Job: 80 Compass Point Date: jan14, 2014 By: HEATING EQUIPMENT Area COOLING EQUIPMENT Clg load Make n/a Clg AVF Make n/a (Btuh) (Btuh) Trade n/a (cfm) Basement Trade n/a 24469 16831 Model n/a 766 basement zone p Cond n/a 24469 16831 AHRI ref n/a 766 Other equip loads Coil n/a 822 0 Equip. @ 0.93 RSM AHRI ref n/a 15585 Efficiency n/a Latent cooling Efficiency ' n/a 463 Heating input Tr)TAI C Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Basement 1274 24469 16831 740 766 basement zone p 1274 24469 16831 740 766 Other equip loads 822 0 Equip. @ 0.93 RSM 15585 Latent cooling 463 Tr)TAI C -4/]7A 4n^An IAn -inn Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft� 2014 -Mar -07 09:02:48 9 Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 7 ACCK ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N -- wrightsofto Load Short Form Bouns zone Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 v project` Inf rm I n. � For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Job: 80 Compass Point Date: jan14, 2014 By: HEATING EQUIPMENT Area COOLING EQUIPMENT Clg load Make n/a Cig AVF Make n/a (Btuh) (Btuh) Trade n/a (cfm) bouns room Trade n/a 8866 7083 Model n/a 290 bouns room closet Cond n/a 1248 334 AHRI ref n/a 14 dining room Coil n/a 2944 1132 77 46 Bouns zone p AHRI ref n/a 13058 8549 Efficiency n/a Other equip loads Efficiency n/a 0 Heating input Equip. @ 0.93 RSM Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Cig AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) bouns room 625 8866 7083 232 290 bouns room closet 70 1248 334 33 14 dining room 190 2944 1132 77 46 Bouns zone p 885 13058 8549 341 350 Other equip loads 2033 0 Equip. @ 0.93 RSM 7916 Latent cooling 1512 TnTAIQ 00a 1Cnn4 nnnn nwa nrn Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. .—. �`f' }� wri htsoft° 2014 -Mar -07 09:02:48 "im' Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 8 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N ` -- wrightsoft. Load Multizone Summary Report Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 Job: 80 Compass Point Date: jan14, 2014 By: glg E , '.010" 1 H.. ROOM NAME Area ft2 Htg load Btuh Clg load Btuh HtgAVF cfm C1gAVF cfm Basement 1274 24469 ZONE NAME Volume Heating ACH AVF HTM Volume Cooling ACH AVF HTM Living room ft3 8928 5556 cfm Btuh/ft2 ft3 130 1672 cfm 51 Btuh/ft2 basement zone 3822 0.41 4898 26 4.2 3822 0.39 18978 25 574 0.9 1st floor 9756 0.55 7083 89 4.2 9756 0.52 1248 84 33 0.9 Bouns zone 8975 0.43 1132 64 4.2 8975 0.41 13058 61 341 0.9 2nd floor zone 13050 0.41 294 89 4.2 13050 0.39 2667 84 70 0.9 Basemnt/1st sys 35603 0.16 2622 268 1.5 35603 0.07 2952 253 77 0.1 glg E , '.010" 1 H.. ROOM NAME Area ft2 Htg load Btuh Clg load Btuh HtgAVF cfm C1gAVF cfm Basement 1274 24469 16831 740 766 basement zone 1274 24469 16831 740 766 Living room 704 8928 5556 270 253 Kitchen 130 1672 2581 51 117 office 250 8378 4898 253 223 1st floor 1084 18978 13036 574 593 bouns room 625 8866 7083 232 290 bouns room closet 70 1248 334 33 14 dining room 190 2944 1132 77 46 Bouns zone 885 13058 8549 341 350 Ldy 32 1097 294 29 12 Masterbath 65 2667 1501 70 62 Bedroom 2 208 4865 2622 127 107 bedroom 1 176 2952 3058 77 125 1/2 bath 91 1432 375 37 15 Masterbed room 325 8308 7137 217 293 full bath 77 675 171 18 7 2nd floor hall 180 2237 707 58 29 attic 888 10574 11144 276 457 2nd floor zone 2042 34807 27010 909 1107 Basemnt/1st sys 5285 91312 58857 2565 2817 2014 -Mar -07 09:02:48wri htsoftRight-Suite@ Universal 2013 13.0.07 RSU05790 Page 1 ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N BuildingAnalysis Job: 80 Compass Point WC19Itt50� y Date: jan14, 2014 Basemnt/1 st sys By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry bulb (°F) 12 Daily rangeFS °F) - Wet bulb (° - Wind speed (mph) 15.0 Component Indoor: Heating Cooling Walls Indoor temperature (°F) 70 75 Glazing Design TD (°F) 58 13 Doors Relative hums lty (%) 50 50 Cooling Moisture difference (gr/Ib) 46.5 27.8 88 Infiltration: 10371 10.4 15 (L ) Method Simplified 17.0 72 Construction quality Tiht 9.7 7.5 Fireplaces 1 Average) 0 Component Btuh/ft2 Btuh % of load Walls 3.7 19328 19.4 Glazing 17.3 5656 5.7 Doors 16.7 702 0.7 Ceilings 13.9 28587 28.6 Floors 4.2 10371 10.4 Infiltration 4.2 16975 17.0 Ducts 9692 9.7 Piping 0 0 Humidification 8476 8.5 Ventilation 0 0 Adjustments 0 Total 1 997881 100.0 Component Btuh/ft2 Btuh % of load Walls 0.7 3604 6.1 Glazing 22.5 7349 12.5 Doors 7.7 323 0.5 Ceilings 12.1 24815 42.2 Floors 0.8 2071 3.5 Infiltration 0.9 3509 6.0 Ducts 9447 16.1 Ventilation 0 0 Internal gains 7740 13.2 Blower 0 0 Adjustments 0 Total 1 588571 100.0 Latent Cooling Load = 7589 Btuh Overall U -value = 0.140 Btuh/ft2-°F Data entries checked. 2014 -Mar -07 09:02:48 - - wrightsoft® Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 1 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N BuildingAnalysis Job: 80 Compass Point WI'I jittsOft® y Date: jan14, 2014 1st floor system By: Croinin Construction Management P. 0 Box 7237, Lowell, Ma 01852 1 r° ra w Inform talon ."� S 12" "231M S P ro' e.c. a a i For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 k'P NOR 61,14-EN-MIN.,s3�I.,_ 6ix pRUN- p Component Btuh/ft2 Btuh % of load Walls Location: 8015 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 2.6 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (° 58 13 Latitude: 420N 1.4 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Daily range6 °F) - 15 (L ) Method Simplified 7.7 Wet bulb (° -72 Construction quality Ti ht Adjustments Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 1 k'P NOR 61,14-EN-MIN.,s3�I.,_ 6ix pRUN- p Component Btuh/ft2 Btuh % of load Walls 3.3 8015 17.0 Glazing 17.3 1233 2.6 Doors 16.7 702 1.5 Ceilings 14.7 25507 54.2 Floors 1.4 729 1.5 Infiltration 4.2 7263 15.4 Ducts 0 0 Piping 0 0 Humidification 3626 7.7 Ventilation 0 0 Adjustments 0 Total 1 470731 100.0 Component Btuh/ft2 Btuh % of load Walls 0.6 1500 5.2 Glazing 31.1 2217 7.7 Doors 7.7 323 1.1 Ceilings 12.7 22142 76.7 Floors 0 0 0 Infiltration 0.9 1501 5.2 Ducts 0 0 Ventilation 0 0 Internal gains 1200 4.2 Blower 0 0 Adjustments 0 Total 28883 100.0 Latent Cooling Load = 2044 Btuh Overall U -value = 0.130 Btuh/ft2-°F WARNING: window to floor area ratio = 3.0% - less than 5%. y 2014 -Mar -07 09:02:48 wrightsoft" Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 2 fK . ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N ' wrightsoft� Building Anal sis y Btuh % of load Job: 80 Compass Point 4.0 2nd floor Glazing Date: jan14, By: 2014 Doors Croinin Construction Management 0 0 Ceilings P.O Box 7237, Lowell, Ma 01852 3080 5.8 Floors 4.9 9642 18.3 Infiltration 4.2 9713 18.4 Ducts 2071 9692 18.4 Piping 0.9 0 0 For: Trust Construction 4850 9.2 Ventilation 27.5 0 0 51 Mount joy drive, Tewskbury, ma 01876 0 0 Total 52715 100.0 19.3 Blower 4096 12.1 Adjustments Location: 0 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range °F) - 15 ( L ) Method Simplified Wet bulb (° Wind - 72 Construction quality Ti ht speed (mph) 15.0 7.5 Fireplaces 1 Average) Component Btuh/ft2 Btuh % of load Walls 4.0 11314 21.5 Glazing 17.3 4424 8.4 Doors 0 0 0 Ceilings 9.9 3080 5.8 Floors 4.9 9642 18.3 Infiltration 4.2 9713 18.4 Ducts 2071 9692 18.4 Piping 0.9 0 0 Humidification Ducts 4850 9.2 Ventilation 27.5 0 0 Adjustments 0 0 Total 52715 100.0 Component Btuh/ft2 Btuh % of load Walls 0.8 2104 6.2 Glazing 20.0 5132 15.1 Doors 0 0 0 Ceilings 8.6 2673 7.9 Floors 1.1 2071 6.1 Infiltration 0.9 2008 5.9 Ducts 9330 27.5 Ventilation 0 0 Internal gains 6540 19.3 Blower 4096 12.1 Adjustments 0 Total 1 33953 100.0 Latent Cooling Load = 5545 Btuh Overall U -value = 0.149 Btuh/ft2-°F Data entries checked. �n 2014 -Mar -07 09:02:48 i wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 3 Ar -CK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N BuildingAnalysis Job: 80 Compass Point WC19iit5i?ft� y Date: jan14, 2014 1st floor By: Croinin Construction Management P. 0 Box 7237, Lowell, Me 01852 Project nformatlon For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Component Btuh/ft2 Btuh % of load Walls Location: 4596 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 5.7 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 420N 0 Relative humsdity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range °F) - 15 (L ) Method Simplified 12.9 Wet bulb (° - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments Component Btuh/ft2 Btuh % of load Walls 3.7 4596 21.1 Glazing 17.3 1233 5.7 Doors 16.7 702 3.2 Ceilings 14.7 6831 31.4 Floors 0 0 0 Infiltration 4.2 5617 25.8 Ducts 0 0 Piping 0 0 Humidification 2805 12.9 Ventilation 0 0 Adjustments 0 Total 1 1217831 100.0 Component Btuh/ft2 Btuh % of load Walls 1.0 1221 9.4 Glazing 44.9 3201 24.6 Doors 7.7 323 2.5 Ceilings 12.7 5930 45.5 Floors 0 0 0 Infiltration 0.9 1161 8.9 Ducts 0 0 Ventilation 0 0 Internal gains 1200 9.2 Blower 0 0 Adjustments 0 Total 1 130361 100.0 Latent Cooling Load = 1581 Btuh Overall U -value = 0.128 Btuh/ft2-°F Data entries checked. 2014 -Mar -07 09:02:48 wrightsoft- Right -Suite® Universal 2013 13.0.07 RSU05790 Page 4 ACCK ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Buildin Anal $I$ Job: 80 Compass Point wrightsoft° y Date: jan14, 2014 2nd floor zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 .x EHeat�nq a Y_ ;, Component Btuh/ft2 Btuh % of load �; Location: 7899 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 9.0 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 420N 6.4 Relative humldlty (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range �°F) - 15 ( L ) Method Simplified 7.5 Wet bulb (°F -72 Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments .x EHeat�nq a Y_ ;, Component Btuh/ft2 Btuh % of load Walls 4.2 7899 21.0 Glazing 17.3 3387 9.0 Doors 0 0 0 Ceilings 8.8 2379 6.3 Floors 6.4 8132 21.6 Infiltration 4.2 5642 15.0 Ducts 7368 19.6 Piping 0 0 Humidification 2817 7.5 Ventilation 0 0 Adjustments 0 Total 37624 100.0 Component Btuh/ft2 Btuh % of load Walls 0.6 1197 4.4 Glazing 35.4 6931 25.7 Doors 0 0 0 Ceilings 7.6 2065 7.6 Floors 1.4 1741 6.4 Infiltration 0.9 1166 4.3 Ducts 8571 31.7 Ventilation 0 0 Internal gains 5340 19.8 Blower 0 0 Adjustments 0 Total 270101 100.0 Latent Cooling Load = 4033 Btuh Overall U -value = 0.182 Btuh/ft2-°F Data entries checked. �� +wrightsoft® Right -Suite® Universal 2013 13.0.07 RSU05790 2014 -Mar -07 09:02:48 Page 5 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Building AnalJob: 80 Compass Point ss wrightsoft° y Date: jan14, 2014 basement zone By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 .� �� � ,� �.•,, � f�►.�: Pro ec��lnformatt�on `` � �r� :,,.. ,. For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Fftg- ., �.�.N.. .Heat' hM�� Component Btuh/ft2 Btuh % of load Walls Location: 3418 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0 Indoor temperature (°) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 42°N 1.4 Relative hums lty (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Daily range°F) - 15 (L ) Method Simplified 3.2 Wet bulb (°6 - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments Fftg- ., �.�.N.. .Heat' hM�� Component Btuh/ft2 Btuh % of load Walls 2.9 3418 13.5 Glazing 0 0 0 Doors 0 0 0 Ceilings 14.7 18676 73.8 Floors 1.4 729 2.9 Infiltration 4.2 1646 6.5 Ducts 0 0 Piping 0 0 Humidification 822 3.2 Ventilation 0 0 Adjustments 0 Total 1 25291 100.0 Component Btuh/ft2 Btuh % of load Walls 0.2 279 1.7 Glazing 0 0 0 Doors 0 0 0 Ceilings 12.7 16212 96.3 Floors 0 0 0 Infiltration 0.9 340 2.0 Ducts 0 0 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 16831 100.0 Latent Cooling Load = 463 Btuh Overall U -value = 0.131 Btuh/ft2-°F WARNING: window to floor area ratio = 0.0% - less than 5%. 2014 -Mar -07 09:02:48 -- wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 6 ACCK ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Building AnalysisJob: 80 Compass Point wrightsoft° g Date: jan14, 2014 Bouns zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 own Component w • MO4• • e % of load c Location: 3415 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 6.9 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 420N 2.2 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range6 °F) - 15 (L ) Method Simplified 13.5 Wet bulb (° -72 Construction quality Ti ht Adjustments Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 1 own Component Btuh/ft2 Btuh % of load Walls 3.7 3415 22.6 Glazing 17.3 1037 6.9 Doors 0 0 0 Ceilings 17.5 701 4.6 Floors 2.2 1510 10.0 Infiltration 4.2 4071 27.0 Ducts 2324 15.4 Piping 0 0 Humidification 2033 13.5 Ventilation 0 0 Adjustments 0 Total 1 15091 100.0 �.� 3 g b �:: x3a..ar gray .2 Component Btuh/ft2 Btuh % of load Walls 1.0 907 10.6 Glazing 35.8 2148 25.1 Doors 0 0 0 Ceilings 15.2 609 7.1 Floors 0.5 330 3.9 Infiltration 0.9 841 9.8 Ducts 2514 29.4 Ventilation 0 0 Internal gains 1200 14.0 Blower 0 0 Adjustments 0 Total 8549 100.0 Latent Cooling Load = 1512 Btuh Overall U -value = 0.080 Btuh/ft2-°F Data entries checked. 2014 -Mar -07 09:02:48 wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 7 ACCN ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 80 Compass Point wrightsoft- Date: jan14, 2014 Basemnt/1 st sys By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 3V WN' R n. >r, .E.. F?r0 eCt lnf01'11tat10n` � x. For: Trust Construction 51 Mount joy drive, Tewskbury, ma0:. Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft� °F ftz-°F/Btuh Btuh/ft2 Btu Btu h/ft2 Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall r-8 ins, 8" thk, 1/2" gypsum board int fnsh 15821-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) n 945 0.065 21.0 3.74 3538 Location: 940 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 2145 Indoor temperature (°F) 70 75 Elevation: 30 ft 21.0 Design TD (°F) 58 13 Latitude: 42°N w 585 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 3020 Daily range (°F) - 15 ( L ) Method Simplified 744 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 8.0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft� °F ftz-°F/Btuh Btuh/ft2 Btu Btu h/ft2 Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall r-8 ins, 8" thk, 1/2" gypsum board int fnsh 15821-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) n 945 0.065 21.0 3.74 3538 0.99 940 e 573 0.065 21.0 3.74 2145 0.99 570 S 934 0.065 21.0 3.74 3496 0.99 929 w 585 0.065 21.0 3.74 2190 0.99 582 all 3037 0.065 21.0 3.74 11369 0.99 3020 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 S 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 n 36 0.300 0 17.3 622 8.04 290 n 24 0.300 0 17.3 415 13.0 313 n 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 e 24 0.300 0 17.3 415 52.7 1265 S 48 0.300 0 17.3 829 16.0 769 s 23 0.300 0 17.3 403 27.4 640 S 64 0.300 0 17.3 1106 27.4 1756 w 36 0.300 0 17.3 622 28.2 1015 all 327 0.300 0 17.3 5656 22.5 7349 AL .` WCI htSOft� 2014 -Mar -07 09:02:48 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 1 14r.Cp....oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N v Doors 11 P0: Door, mtl pur core type Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 cell ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board intfnsh C part ceiling,: C part ceiling, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns 19A-30bstp: Part floor, r-30 ins, frm flr, 10" thkns 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 21 0.290 10.5 16.7 351 7.68 161 S 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 120 0.026 38.0 1.50 180 1.30 156 1890 0.255 1.0 14.7 27706 12.7 24050 40 0.304 1.0 17.5 701 15.2 609 1224 0.368 0 6.90 8442 1.51 1847 625 0.034 30.0 1.64 1027 0.36 225 506 0.025 0 1.44 729 0 0 120 0.025 0 1.44 173 0 0 all 626 0.025 0 1.44 901 0 0 2014 -Mar -07 09:02:48 wri htsofta Right -Suite@) Universal 2013 13.0.07 RSU05790 Page 2 �ICCP....oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 80 Compass Point Wrightsoft ppDate: jan14, 2014 basement zone By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 exctklnfo matron' 4r � 'N , For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/112-01' ft2 °F/Btuh Btuh/V Btu Btuh/ft2 Btu Walls 15821-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fish, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 288 lg ® ® • _ • y .3k n a, Location: e 288 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0.24 Indoor temperature (°F) 70 75 Elevation: 30 ft 2.90 Design TD (°F) 58 13 Latitude: 420N 0.042 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 279 Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/112-01' ft2 °F/Btuh Btuh/V Btu Btuh/ft2 Btu Walls 15821-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fish, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 S 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 1274 0.255 1.0 14.7 18676 12.7 16212 506 0.025 0 1.44 729 0 0 •-t;� wri htsoftp 2014 -Mar -07 09:02:48 g Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 3 ACCA ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N WI'19htS0Component Constructions Job: 80 Compass Point Date: jan14, 2014 1st floor By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Location: Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btuh/ft2-°F Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 465 Daily range (°F) - 15 ( L ) Method Simplified 21.0 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Doors Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; e ft2 Btuh/ft2-°F ft2-°FBtuh Btuh/ftz Btu Btuh/112 Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 468 0.065 21.0 3.74 1752 0.99 465 gypsum board int fnsh, 2"x6" wood frm e 174 0.065 21.0 3.74 651 0.99 173 Doors s 298 0.065 21.0 3.74 1114 0.99 296 11 PO: Door, mtl pur core type w 288 0.065 21.0 3.74 1078 0.99 286 all 1228 0.065 21.0 3.74 4596 0.99 1221 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 13.0 313 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; e 24 0.300 0 17.3 415 52.7 1265 50% outdoor insect screen; foreground = green grass (0.23) s 23 0.300 0 17.3 403 27.4 640 all 71 0.300 0 17.3 1233 31.1 2217 Doors 11 PO: Door, mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 s 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 466 0.255 1.0 14.7 6831 12.7 5930 gypsum board int fnsh Floors (none) 2014 -Mar -07 09:02:48 wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 4 ACCA ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Wr1gi11tSC)°° Component Constructions Job: 80 Compass Point Date: jan14, 2014 Bouns zone By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 MountFor: Trust Construction 51 drive,• . Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ftz-°F ftz-°FBtuh Btuh/ftp Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns n 225 • o 0 0P 3.74 .. Location: 224 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 337 Indoor temperature (°F) 70 75 Elevation: 30 ft 21.0 Design TD (°F) 58 13 Latitude: 420N w 207 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 907 Daily range (°F) - 15 ( L ) Method, Simplified 1027 Wet bulb (°F) - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ftz-°F ftz-°FBtuh Btuh/ftp Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns n 225 0.065 21.0 3.74 842 0.99 224 e 90 0.065 21.0 3.74 337 0.99 90 S 390 0.065 21.0 3.74 1460 0.99 388 w 207 0.065 21.0 3.74 775 0.99 206 all 912 0.065 21.0 3.74 3415 0.99 907 s 24 0.300 0 17.3 415 16.0 385 w 36 0.300 0 17.3 622 28.2 1015 all 60 0.300 0 17.3 1037 23.3 1400 40 0.304 1.0 17.5 701 15.2 609 70 0.368 0 6.90 483 1.51 106 625 0.034 30.0 1.64 1027 0.36 225 wri htsoft 2014 -Mar -07 09:02:48 AIL_ 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 5 /SCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component ComConstructions Job: 80 Compass Point wrightsoftM P Date: jan14, 2014 2nd floor By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft2-°F W-T/Btuh Btu hN Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 16B-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, frm flr, 10" thkns, 1/2" gypsum board int fnsh n 477 0.065 21.0 3.74 1786 0.99 474 Location: 0.065 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 397 Indoor temperature (°F) 70 75 Elevation: 30 ft 2381 Design TD (°F) 58 13 Latitude: 42°N 21.0 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: n 168 0.073 Daily range (°F) - 15 (L ) Method Simplified 29 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 1573 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft2-°F W-T/Btuh Btu hN Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 16B-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, frm flr, 10" thkns, 1/2" gypsum board int fnsh n 477 0.065 21.0 3.74 1786 0.99 474 e 399 0.065 21.0 3.74 1494 0.99 397 s 636 0.065 21.0 3.74 2381 0.99 633 w 297 0.065 21.0 3.74 1112 0.99 295 all 1809 0.065 21.0 3.74 6773 0.99 1799 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 36 0.300 0 17.3 622 8.04 290 n 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 s 48 0.300 0 17.3 829 16.0 769 s 64 0.300 0 17.3 1106 27.4 1756 w 36 0.300 0 17.3 622 28.2 1015 all 256 0.300 0 17.3 4424 20.0 5132 120 0.026 38.0 1.50 180 1.30 156 150 0.255 1.0 14.7 2199 12.7 1909 40 0.304 1.0 17.5 701 15.2 609 2014 -Mar -07 09:02:48 'twri htsOt" Right-SuiteOUniversal 2013 13.0.07 RSU05790 Page 6 ACCP. ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Floors ` 19A-Obstp: Part floor, frm flr, 10" thkns 19A-30bstp: Part floor, r-30 ins, frm flr, 10" thkns 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh 1224 0.368 0 6.90 8442 1.51 1847 625 0.034 30.0 1.64 1027 0.36 225 120 0.025 0 1.44 173 0 0 2014 -Mar -07 09:02:48 wrightsaft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 7 /��....oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Component Constructions Job: 80 Compass Point WrIQhtSOft Date: jan14, 2014 1st floor system By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 N' For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions ®_ • 0 0 0MOM 8§N1ZMff=_ Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft% Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/ft2 Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 1752 0.99 Daily range (°F) - 15 (L ) Method Simplified 0.065 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 173 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft% Bluh/ftl-°F ft2-°FBtuh BtuhtV Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 468 0.065 21.0 3.74 1752 0.99 465 gypsum board int fnsh, 2"x6" wood frm a 174 0.065 21.0 3.74 651 0.99 173 S 298 0.065 21.0 3.74 1114 0.99 296 w 288 0.065 21.0 3.74 1078 0.99 286 all 1228 0.065 21.0 3.74 4596 0.99 1221 15B21-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int n 288 0.042 21.0 2.90 835 0.24 68 frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board a 288 0.042 21.0 2.90 835 0.24 68 int fnsh s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 Partitions (none) Windows 2 glazing, clr outr, air gas, vni frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 13.0 313 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; e 24 0.300 0 17.3 415 52.7 1265 50% outdoor insect screen; foreground = green grass (0.23) s 23 0.300 0 17.3 403 27.4 640 all 71 0.300 0 17.3 1233 31.1 2217 Doors 11 P0: Door, mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 s 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 1740 0.255 1.0 14.7 25507 12.7 22142 gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh 506 0.025 0 1.44 729 0 0 wri htsoftp 2014 -Mar -07 09:02:48 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 8 ACCP+ ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N wri htsoft Component Constructions Job: 80 Compass Point 9 Date: jan14, 2014 2nd floor zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 ' 0.065 21.0 ® • 943 • • •` 251 ,'' Location: 21.0 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US s 246 Indoor temperature (°F) 70 75 Elevation: 30 ft 0.99 Design TD (°F) 58 13 Latitude: 420N 3.74 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.073 8.0 Daily range (°F) - 15 ( L ) Method Simplified e 333 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 0.40 Construction descriptions Or Area LI -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftp °F ft? °F/Btuh Btuh/ft2 Btu Btuh/tt2 Btu Wal I s 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 156-11 Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 16B-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns n 252 0.065 21.0 3.74 943 0.99 251 e 309 0.065 21.0 3.74 1157 0.99 307 s 246 0.065 21.0 3.74 921 0.99 245 w 90 0.065 21.0 3.74 337 0.99 90 all 897 0.065 21.0 3.74 3358 0.99 892 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 In 36 0.300 0 17.3 622 8.04 290 n 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 s 24 0.300 0 17.3 415 16.0 385 s 64 0.300 0 17.3 1106 27.4 1756 all 196 0.300 0 17.3 3387 19.0 3732 120 0.026 38.0 1.50 180 1.30 156 150 0.255 1.0 14.7 2199 12.7 1909 1154 0.368 0 6.90 7959 1.51 1741 2014 -Mar -07 09:02:48 i 1 wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 9 ACCk ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh 120 0.025 0 1.44 173 wri htsoft" 2014 -Mar -07 09:02:48 �." g Right-Suite(D Universal 2013 13.0.07 RSU05790 Page 10 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ftz-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 15B21-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh n 288 0.042 21.0 oil 835 0.24 68 e 288 0.042 Location: 2.90 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0.042 Indoor temperature (°F) 70 75 Elevation: 30 ft 121 Design TD (°F) 58 13 Latitude: 420N 261 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (OF) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ftz-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 15B21-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 1274 0.255 1.0 506 0.025 0 14.7 18676 12.7 16212 1.44 729 0 0 ^_ 2014 -Mar -07 09:02:48wri htsot Right-SuiteUniversal 2013 13.0.07 RSU05790 Page 11 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Com onent Constructions Job: Compass Point ja • wrightsoft- P Date: n14, 2014 Living room By: Croinin Construction Management P. 0 Box 7237, Lowell, Ma 01852 For: • • Mount51 • drive,• 01876 �. .� WAA Eli ® • • • • U -value g, 415 Location: 1265 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Gain Indoor temperature (°F) 70 75 Elevation: 30 ft ft2-°FBtuh Design TD (°F) 58 13 Latitude: 420N Walls Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.065 21.0 Daily range (°F) - 15 ( L ) Method Simplified gypsum board int fnsh, 2"x6" wood frm Wet bulb (°F) - 72 Construction quality Tiht 3.74 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) w Construction descriptions Or Area U -value Insul R 415 52.7 1265 17.3 Htg HTM Loss Cig HTM Gain 351 7.68 ft2 Btuh/ftz-°F ft2-°FBtuh Btuh/ft2 Btu Btuh/112 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 243 0.065 21.0 3.74 910 0.99 242 gypsum board int fnsh, 2"x6" wood frm a 174 0.065 21.0 3.74 651 0.99 173 w 198 0.065 21.0 3.74 741 0.99 197 all 615 0.065 21.0 3.74 2303 0.99 612 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) e 24 0.300 0 all 48 0.300 0 Doors 11 P0: Door, mtl pur core type n 21 0.290 10.5 Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 176 0.255 1.0 gypsum board int fnsh Floors (none) 17.3 415 13.0 313 17.3 415 52.7 1265 17.3 829 32.9 1577 16.7 351 7.68 161 14.7 2580 12.7 2240 2014 -Mar -07 09:02:48 „1 _rF wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 12 /�C�l ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 80 Compass Point WrICJiItSOft' p Date: jan14, 2014 Kitchen By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 ` ro-ec n orma. io,nnxd For: Trust Construction 51 Mount joy drive, Tewskbury, ma0. R, ® o • • r Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-"F ft2-°F/Btuh Btu hM2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 105 0.065 21.0 3.74 394 0.99 105 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 12 0.300 0 17.3 202 27.4 320 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 40 0.255 1.0 14.7 586 12.7 509 gypsum board int fnsh Floors (none) 2014 -Mar -07 09:02:48 rF wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 13 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 80 Compass Point wrightsoft Date: jan14, 2014 office By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft2 Indoor temperature (°F) 70 75 Elevation: 30 ft ROM Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 842 0.99 Daily range (°F) - 15 (L ) Method Simplified 0.065 Wet bulb (F) - 72 Construction quality Tiht 191 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 21.0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ftz-°FBtuh Btuh/ft2 Btu ROM Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 225 0.065 21.0 3.74 842 0.99 224 gypsum board int fnsh, 2"x6" wood frm s 192 0.065 21.0 3.74 720 0.99 191 w 90 0.065 21.0 3.74 337 0.99 90 all 507 0.065 21.0 3.74 1899 0.99 505 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors 11 P0: Door, mtl pur core type s Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors (none) 12 0.300 0 21 0.290 10.5 250 0.255 1.0 17.3 202 27.4 320 16.7 351 7.68 161 14.7 3665 12.7 3181 2014 -Mar -07 09:02:48 . wrightsoft• Right-Suite(R) Universal 2013 13.0.07 RSU05790 Page 14 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N m Component Constructions Job: 80 Compass Point wrightsoft Date: jan14, 2014 Bedroom 2 By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, Construction descriptions Or Area U -value Insul R Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Clg HTM Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/ft2-°F Design TD (°F) 58 13 Latitude: 420N Btu Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 120 0.065 Daily range (°F) - 15 ( L ) Method Simplified 119 Wet bulb (°F) - 72 Construction quality Tiht 21.0 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ft� °F/Btuh Btuh/ftp Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 120 0.065 21.0 3.74 449 0.99 119 gypsum board int fnsh, 2"x6" wood frm e 117 0.065 21.0 3.74 438 0.99 116 all 237 0.065 21.0 3.74 887 0.99 236 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 8.04 193 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns 208 0.368 0 6.90 1435 1.51 314 2014 -Mar -07 09:02:48 wrightsoft" Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 15 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 80 Compass Point 9 LdY Byte: jan14, 2014 Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 ectInfo matlong�wi�.,AF�Fiz•�^ For: • • Mount51 joy drive,• i • Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ftz-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns n 36 0.065 21.0 w 45 0.065 21.0 all 81 0.065 21.0 32 0.368 0 3.74 135 0.99 3.74 168 0.99 3.74 303 0.99 6.90 221 1.51 36 45 81 48 -��-}.�"_ 2014 -Mar -07 09:02:48 i " F wrightsoft" Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 16 ACCP. ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N 1-1 Zixi Mimi Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ftz-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns n 36 0.065 21.0 w 45 0.065 21.0 all 81 0.065 21.0 32 0.368 0 3.74 135 0.99 3.74 168 0.99 3.74 303 0.99 6.90 221 1.51 36 45 81 48 -��-}.�"_ 2014 -Mar -07 09:02:48 i " F wrightsoft" Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 16 ACCP. ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 80 Compass Point wrightsoft� Date: jan14, 2014 bedroom 1 By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/V-°F ftz-°FBtuh' Btuh/ft2 Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" a 75 0.065 21.0 3.74 281 0.99 75 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk: 2 e 24 0.300 0 17.3 415 28.2 677 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns 176 0.368 0 6.90 1214 1.51 266 2014 -Mar -07 09:02:48 wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 17 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N • o ® �, " Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/V-°F ftz-°FBtuh' Btuh/ft2 Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" a 75 0.065 21.0 3.74 281 0.99 75 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk: 2 e 24 0.300 0 17.3 415 28.2 677 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns 176 0.368 0 6.90 1214 1.51 266 2014 -Mar -07 09:02:48 wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 17 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Job: 80 Compass Point -- wrightsoft- Component Constructions Date: jan14, 2014 1/2 bath By: Croinin Construction Management RO Box 7237, Lowell, Ma 01852 pro a„ct Intormation .,x ..., , � _ 5 _.L. For: • • Mount51 joy drive,• i • Construction descriptions Or Area Ll -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz °F ftz °F/Btuh Btuh/ftp Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2” wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns n 63 0.065 21.0 91 0.368 0 3.74 236 0.99 63 6.90 628 1.51 137 2014 -Mar -07 09:02:48 wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 18 .M ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area Ll -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz °F ftz °F/Btuh Btuh/ftp Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2” wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns n 63 0.065 21.0 91 0.368 0 3.74 236 0.99 63 6.90 628 1.51 137 2014 -Mar -07 09:02:48 wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 18 .M ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 80 Compass Point wrightso� Date: jan14, 2014 Masterbed room By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 pro ectlnformat�onj Q,{ For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Insul R Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Btuh/ft2 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" Daily range (°F) - Wet bulb (°F) - 15 (L 72 ) Method Simplified 3.74 Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Ti ht 1 Average) w Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ftz-°F ft2-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 201 0.065 21.0 3.74 753 0.99 200 gypsum board int fnsh, 2"x6" wood frm w 45 0.065 21.0 3.74 168 0.99 45 all 246 0.065 21.0 3.74 921 0.99 245 Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 24 0.300 0 17.3 415 16.0 385 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 125 0.255 1.0 14.7 1832 12.7 1591 gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns 325 0.368 0 6.90 2242 1.51 490 Wii htSOftA 2014 -Mar -07 09:02:48 9 Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 19 ACCA ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N - - wrightsoft, P.0 Box 7237, Lowell, Ma 01852 Component Constructions Masterbath Croinin Construction Management Job: 80 Compass Point Date: jan14, 2014 By: ..a_� 1�� I 'r Pro ect Information, _ w £_ In For: Trust Construction 51 Mount joy drive, Tewskbury, . 01876 Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry bulb (°F) 12 Daily range (°F) - Wet bulb (°F) - Wind speed (mph) 15.0 Indoor: Heating Cooling 70 Indoor temperature (°F) 58 Design TD (°F) 50 Relative humidity (%) Cooling Moisture difference (gr/Ib) 88 Infiltration: 15 (L ) Method 72 Construction quality 7.5 Fireplaces Heating Cooling 70 75 58 13 50 50 46.5 27.8 Simplified Ti ht 1 Average) Construction descriptions Or Area Ll -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ft2-°FBtuh Btuh/ftz Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" e 117 0.065 21.0 3.74 438 0.99 116 gypsum board int fnsh, 2"x6" wood frm s 45 0.065 21.0 3.74 168 0.99 45 all 162 0.065 21.0 3.74 607 0.99 161 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns 25 0.255 1.0 14.7 366 12.7 318 65 0.368 0 6.90 448 1.51 98 .: Wrl htSOft 2014 -Mar -07 09:02:48 �, - 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 20 ACCP. ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Component Constructions Job: 80 Compass Point wrightsoft- Date: jan14, 2014 full bath By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 a- For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 11 oil f Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42'N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ftp-°F ftl-°FBtuh Btuh/ft2 Btu Btuh/112 Btu 77 0.368 0 6.90 531 1.51 116 • wri htsoft 2014 -Mar -07 09:02:48 ,. g Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 21 AC CA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 80 Compass Point wrightsoft� p Date: jan14, 2014 bouns room closet By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 e�ct Info W'_ For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-'F ft� °F/Bbih Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns S 63 0.065 21.0 70 0.368 0 3.74 236 0.99 63 6.90 483 1.51 106 2014 -Mar -07 09:02:48 r� � wrightSOft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 22 LICCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N IN S ® s o • e Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-'F ft� °F/Bbih Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns S 63 0.065 21.0 70 0.368 0 3.74 236 0.99 63 6.90 483 1.51 106 2014 -Mar -07 09:02:48 r� � wrightSOft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 22 LICCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N -- wrightsofto P.O Box 7237, Lowell, Ma 01852 Component Constructions bouns room Croinin Construction Management Job: 80 Compass Point Date: jan14, 2014 By: .gc Piro e0For: Trust Construction lnfo�matisonVISM IN- M1 Mount51 drive,a 01876 Construction descriptions Or OEM m U -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft� Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/f2 Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 842 0.99 Daily range (°F) - 15 (L ) Method Simplified 0.065 Wet bulb (°F) - 72 Construction quality Tiht 155 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 21.0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ftz-°F ftz-°F/Btuh Btuh/ft2 Btu Btuh/f2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 225 0.065 21.0 3.74 842 0.99 224 gypsum board int fnsh, 2"x6" wood frm s 156 0.065 21.0 3.74 584 0.99 155 w 207 0.065 21.0 3.74 775 0.99 206 all 588 0.065 21.0 3.74 2201 0.99 585 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 24 0.300 0 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) w 36 0.300 0 all 60 0.300 0 Doors (none) Ceilings (none) Floors 19A-30bstp: Part floor, r-30 ins, frm flr, 10" thkns 625 0.034 30.0 17.3 415 16.0 385 17.3 622 28.2 1015 17.3 1037 23.3 1400 1.64 1027 0.36 225 wri htsofta 2014 -Mar -07 09:02:48 ,.,_ 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 23 ACM ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 80 Compass Point wrightsoft Date: jan14, 2014 2nd floor hall By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Location: Gain Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btu h/ft2 Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Partitions Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/W-°F ft2-°F/Btuh Btu h/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 33 0.065 21.0 3.74 124 0.99 33 gypsum board int fnsh, 2'x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 12 0.300 0 17.3 207 8.04 97 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 180 0.368 0 6.90 1241 1.51 272 2014 -Mar -07 09:02:48 wrightsofta Right -Suite® Universal 2013 13.0.07 RSU05790 Page 24 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N . Component Constructions Job: 80 Compass Point Wrightsoft Date: jan14, 2014 attic By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 NEAMMUMM ®- ® • • . 4.43 744 Location: 29 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 1573 Indoor temperature (°F) 70 75 Elevation: 30 ft 8.0 Design TD (°F) 58 13 Latitude: 42°N w 333 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.31 305 Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area Ll -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/112-°F ft2-°F/Btuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 48 0.300 0 17.3 829 13.0 625 s 64 0.300 0 17.3 1106 27.4 1756 all 112 0.300 0 17.3 1935 21.3 2381 120 0.026 38.0 1.50 180 1.30 156 120 0.025 0 1.44 173 0 0 .� 2014 -Mar -07 09:02:48 wri htsofRight-SuiteUniversal 2013 13.0.07 RSU05790 Page 25 /iC.C� ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Component Constructions Job: 80 Compass Point wrightsoft- Date: jan14, 2014 dining room By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 • • o rr For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors (none) Or Area ® • o • o� Htg HTM ?: Location: Gain Indoor: Heating Cooling Boston Logan Int'I AP, MA, US BtuhtV Indoor temperature (°F) 70 75 Elevation: 30 ft 90 Design TD (°F) 58 13 Latitude: 42'N 0.99 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.065 21.0 Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors (none) Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F W-T/Btuh BtuhtV Btu Btu h/ftz Btuh e 90 0.065 21.0 3.74 337 0.99 90 s 171 0.065 21.0 3.74 640 0.99 170 all 261 0.065 21.0 3.74 977 0.99 260 40 0.304 1.0 17.5 701 15.2 609 wri htsoft'2014-Mar-07 09:02:48 Right-SuiteOO Universal 2013 13.0.07 RSU05790 Page 26 .�C� ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N J. wrightsoft* Right -J® Worksheet Job: Date: ja Compass Point Basemnt/1st sys n14, 2014 By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 1 Room name Basemnt/1st sys 2nd floor 2 Exposed wall 619.0 ft 339.0 ft 3 Room height 9.2 ft d 9.3 ft d 4 Room dimensions 5 Room area 5285.0 ft2 2927.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ftz°F) (Btuh/ft2) or perimeter (ft) (Bt h) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Vj✓' 12F-0sw 0.065 n 3.74 0.99 1026 945 3538 940 513 477 1766 474 2 glazing, cir outs, 0.300 n 17.28 8.04 36 0 622 290 36 0 622 290 Ili --GG 2 glazing, cir outr, 0.300 n 17.28 13.03 24 0 415 313 0 0 0 0 D 11P0 0.290 n 16.70 7.68 21 21 351 161 0 0 0 ; 0 11 15B-8s3c-6 0.100 n 4.43 0.17 216 168 744 29 216 168 744 29 2 qlazinq, clr outr, 0.300 n 17.28 13.03 48 0 625 48 0 829 625 W 15B21-Owc-6` 0.067 n 2.90 0.24 288 288 .......,,,829 835 68 0 00 0 V�J 12F-Osw 0.065 a 3.74 0.99 621 573 2145 570 423 399 1494 397 IL-�G 2 glazing, clr outr, 0.300 e 17.28 28.20 24 0 415 677 24 0 415 677 2 glazinq,. clr outr, 0.300 a 17.28 52.69 24 0 415 1,265 0 0 0 0 W 15B-8s3c-6 0.100 a 4.72 0.40 333 333 1573 133 ... 333. 333 1573 133 W .. 15B21-Owc-6 0.067 a 2.90 0.24 288 288 835 68 0 0 00 12F-Osw 0.065 s 3.74 0.99 1026 934 3496 929 684 636 2381 _ 633 2 glazing, cIr outr, 0.300 s 17.28 16.02 48 0 829 769 48 0 829 769 2 glazing, cir outr, 0.300 s 17.28 27.43 23 0 403 640 0 0 0 0 11 PO 0.290 s 16.70 7.68 21 21 351 161 _ _ 0 0 .... .. 0 0 yJ 15B-8s3c-6 0.100 s 4.29 0.06 216 152 652 10 216 152 652 10 I --G 2 glazing, clr outr, 0.300 s 17.28 27.43 64 0 1106 1756 64 0 1106 1756 W 15B21-0wc-6 0.067 s. 2,90 0.24 513 513 1487 121 0 0 0 0 1217-0sw 0.065 w 3.74 0.99 621 585 2190 582 333 297 1112 295 2 glazinq, clr outr, 0.300 w 17.28 28.20 36 0 622 1015 36 0 622 1015 W 15B-8s3c-6 0.100 w 4.72 0.40 333 333 1573 133 333 333 1573 133 W 15621-Owc-6 0.067 w 2.90 0.24 90 90 261 21 0 0 0 0 C 16B-38ad 0.026 - 1.50 1.30 120 120 180 156 120 120 180 156 C C part ceilinq, 0.255 - 14.66 12.73 1890 1890 27706 24050 150 150 2199 1909 C C part ceiling, 0.304 - 17.53 15.22 40 40 701 609 40 40 701 609 F 19A-Obstp 0.368 - 6.90 1.51 1224 1224 8442 1847 1224 1224 8442 1847 F 19A-30bstp 0.034 1.64 0.36 625 625 1027 225 625 625 1027 225 F 21A -24t 0.025 - 1.44 0.00 506 506 729 0 0 0 0 0 F 21A -24t 0.025 - 1.44 0.00 120 120 173 0 .. .120 120 173 0 i 6 c) AED excursion 0 0 Envelope loss/gain 64644 38162 28460 11980 12 a) Infiltration 16975 3509 9713 2008 b) Room ventilation 0 0 0 0 13 Intemal gains: Occupants @ 230 8 1840 8 1840 Appliances/other 5900 4700 Subtotal (lines 6 to 13) 81619 49410 38172 20528 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 81619 49410 38172 20528 15 Duct loads 12% 19% 9692 9447 25% 46% 9692 9330 Total room load 91312 58857 47865 29857 Air required (cfm) 25651281711250 1250 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. �A -F wrightsaft" 2014 -Mar -07 09:02:49 Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 1 ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N wrightsoft• Right -J® Worksheet Job: 80 Compass Point Basemnt/1st sys Date: jan14, 2014 Croinin Construction Management By: P.O Box 7237, Lowell, Ma 01852 1 Room name 1st floor system s4 2 Exposed wall P80.0 3 Room height 9.0 ft d 4 Room dimensions 5 Room area 2358.0 ft2 Ty Construction U -value Or HTM Area (ftz) Load Area Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 12F-Osw 0.065 n 3.74 0.99 513 468 1752 465 2 glazing, clr outr, 0.300 n 17.28 8.04 0 0 0 0 2 glazing, clr outr, 0.300 n 17.28 13.03 24 0 415 313 D 11Po 0.290 n 16.70 7.68 21 21 351 161 11 15B-8s3c-6 0.100 n 4.43 0.17 0 0 0 0 L ---G 2 glazinq, clr outr, 0.300 n 17.28 13.03 0 0 0 0 W 15B21-Owc-6 0.067 n 2.90 0.24 288 288 835 68 12F-Osw 0.065 a 3.74 0.99 198 174 651 173 glazing, clr outr, 0.300 a 17.28 28.20 0 0 0 0 LLLj2 2 glazing, clr outr, 0.300 a 17.28 52.69 24 0 415 1265 W 158-8s3c-6 0.100 a 4.72 0.40 0 0 O 0 W 15B21-Owc-6 0.067 a 2.90 0.24 288 288 835 68 12F-Osw 0.065 s 3.74 0.99 342 298 1114 296 2 glazing, clr outr, 0.300 s 17.28 16.02 0 0 0 0 2 glazing, clr outr, 0.300 s 17.28 27.43 23 0 403 640 11P0 0.290 s 16.70 7.68 21 21 351 161 yJ 15B-8s3c-6 0.100 s 4.29 0.06 0 0 0 0 L -G 2 glazinq, clr outr, 0.300 s 17.28 27.43 0 0 0 0 W 15821-Owc-6 0.067 s 2.90 0.24 513 513 1487 121 V►/ 12F-Osw 0.065 w 3.74 0.99 288 288 1078 286 __6 2 glazing, cir outr, 0.300 w 17.28 28.20 0 0 0 0 W 15B-8s3c-6 0.100 w 4.72 0.40 0 0 0 0 W 15B21-Owc-6 0.067 w 2.90 0.24 90 90 261 21 C 16B-38ad 0.026 - 1.50 1.30 0 0 0 0 C C part ceiling, 0.255 14.66 12.73 1740 1740 25507 22142 C C part ceiling, 0.304 - 17.53 15.22 0 0 0 0 F 19A-Obstp 0.368 6.90 1.51 0 0 0 0 F 19A-30bstp 0.034 - 1.64 0,36 0 0 0 0 F 21A -24t 0.025 1.44 0.00 506 506 729 0 F 21A -24t 0.025 1.44 0.00 0 0 0 0 6 c) AED excursion 0 Envelope loss/gain 36184 26182 12 a) Infiltration 7263 1501 b) Room ventilation 0 0 13 Internal gains: Occupants @ 230 0 0 Appliances/other 1200 Subtotal (lines 6 to 13) 43447 28883 Less external load 0 0 Less transfer 0 0 Redistribution 0 0 14 Subtotal 43447 28883 15 Duct loads 0% 00/0 0 0 Total room load 43447 28883 Air required (cfm) 1314 1314 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. A+ wrightsoft® 2014 -Mar -07 09:e 2 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 2 ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N F- wrightsoft° Right -J® Worksheet Job: 80 Compass Point 1st floor system Date: jan14, 2014 Croinin Construction Management By: P.O Box 7237, Lowell, Ma 01852 1 Room name 1st floor system basement zone 2 Exposed wall 280.0 ft 131.0 ft 3 Room height 9.0 ft d 9.0 ft p 4 Room dimensions 5 Room area 2358.0 ft2 1274.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ftz°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 12F-Osw 0.065 n 3.74 0.99 513 468 1752 - - 465 0 .. 0 0 . 0 2 glazing, clr outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr outr, 0.300 n 17.28 13.03 24 0 415 313 0 0 0 0 11PO 0.290 n 16.70 7.68 21 21 351 161: 0 0 0 0 11 VL 15B-8s3c-6 0.100 n 0.00 0.00 0 0 0 0 0 0 0 0 -G 2 glazinq, clr outr, .. 0.300 n . 0,00 0.00 0 0 0 0 0 0 0 W 15621-Owc-6 0.067 n 2.90 0.24 .0 .288 288 835 68 288 288 835 68 12F-Osw 0.065 a 3.74 0.99 198 174 651 173 0 0 0 0 2 glazing, clr outr, 0.300 a 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr outr, 0.300 e 17.28 24 0 415 1265 0 0 0 0 W 15B-8s3c-6 0.100 a 0.00 , .52.69 0.00 0 0 0 0 0 0 0 0 W 15821-Owc-6_. 0.067 a 2.90 0.24 288 288 835 68 288 288 835 ..... 68 Vh12F-Osw 0.065 s 3.74 0.99 342 298 1114 ._ 296 0 0 0 0 2 glazing, ctr outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr outr, 0,300 s 17.28 27.43 23 0 403 640 0 0 0 0 11PO 0.290 s_ 16.70 7.68 21 21 351 161. 0 0 0 0 yJ 15B-8s3c-6 0.100 s 0.00 0.00 0 0 0 0 0 0 0 0 -- 2 glazinq, clr outr, 0,300 s 0.00 0.00 0 0 0 0 0 00 0 W 15821-Owc-6 0.067 s: 2.90 0.24 513. 513 1487 121' 513 513 1487, 121 12F-Osw 0.065 w 3.74 0.99 288 288 1078 286 0 0 0 0 2 qlazinq, clr outr, 0.300 w 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-Bs3c-6 0.100 w 0.00 0.00 0 0 0 0 0 0 0; 0 W 15821-Owc-6 0.067 w 2.90 0.24 90 90 261 21 90 90 261 21 C 16B-38ad 0.026 - 0.00 0.00 0 0 0 0 0 0 0 0 C C part ceiling, 0.255 14.66 12.73 1740 1740 25507 22142 1274 1274 18676 16212 C C part ceiling,. 0.304 - 0.00 0.00 0 0 0 0 0 0 0 0 F 19A-Obstp 0.368 0.00 0.00 0 0 0 0 0 0 0 0 F 19A-30bstp 0.034 .- 0.00 0.00 0 0 0 0 0 0 0' 0 F 21A -24t . 0.025 1.44 0.00 506 506 72 9 0 506 506 729 0 F 21A -24t 0.025 0.00 0.00 0 _.. 0 ..... .. 0 0 0 .. 0 0 0 6 c) AED excursion 0 0 Envelope loss/gain 36184 26182 22823 16491 12 a) Infiltration 7263 1501 1646 340 b) Room ventilation 0 0 0 0- 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 1200 0 Subtotal (lines 6 to 13) 43447 28883 24469 16831 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 43447 28883 24469 16831 15 Duct loads 0% 0% 0 0 0% 0% 0 0 Total room load 43447 28883 24469 16831 Air required (cfm) 1314 13141 740 766 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed QZ wrightsoft- 2014 -Mar -07 09:02:49 Right-Suite(q)Universal 2013 13.0.07 RSU05790 Page 3 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N 1141 rrr wrightsoft° Right -J® Worksheet Job: Date: ja Compass Point 1st floor system n14, 2014 By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 1 Room name 1st floor 2 Exposed wall 149.0 ft 3 Room height 9.0 ft p 4 Room dimensions 5 Room area 1084.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Bt h) or perimeter Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 \h12F-0sw 0.065 n 3.74 0.99 513 468 1752 465 2 glazing, clr outr, 0.300 n 0.00 0.00 0 0 0 0 2 glazing, clr outr, 0.300 n 17.28 13.03 24 0 415 313 11P0 0.290 n 16.70 7.68 21 21 351 161 11 VL_G 15B-8s3c-6 0.100 n 0.00 0.00 0 0 0 0 2 glazinq, clr outr, 0.300 n 0.00 0.00 0 00 0 W 15B21-Owc-6 0.067 n 2.90 0.24 0 0 - 0 p 0.065 a 3.74 0.99 198 174 651 173 Tj12F-Osw 2 glazing, clr outr, 0.300 a 0.00 0.00 0 0 0 0 2 glazing, clr outr, 0.300 a 17.28 52.69 24 0 415 1265 W 156-8s3c-6 0.100 a .0.00 0.00 0 0 0 0 W 15821-Owc-6 0.067 a 2.90 0.24 0 0 0 0.065 s 3.74 0.99 .0 342 298 1114 296 Ti12F-0sw 2 glazing, clr outr, 0.300 s 0.00 0.00 0 0 0 0 2 glazing, clr outr, 0.300 s 17.28 27.43 23 0 403 640 11PO 0.290 s 16.70 7.68 21. 21 351 161 15B-8s3c-6 0.100 s 0.00 0.00 0 0 0 0 2 glazing, clr outr, 0.300 s 0.00 0.00 0 0 0 0 W 15621-Owc-6 0.067 s 2.90 0.24 0 0 0 0 tVt/ 12F-0sw 0.065 w 3.74 0.99 288 288 1078 286 - 2 glazinq, clr outr, 0.300 w 0.00 0.00 0 0 0 0 W 15B-8s3c-6 0.100 w 0.00 0.00 0 0 0 0 W 15B21-Owc-6 0.067 w 2.90 0.24 0 0 0 0 C 16B-38ad 0.026 0.00 0.00 0 0 0 0 C C part ceilinq, 0.255 14.66 12.73 466 466 6831 5930 C C part ceiling, 0.304 0.00 0.00 0 0 0 0 F 19A-Obstp 0.368 0.00 0.00 0 0 0 0 F 19A-30bstp 0.034 - 0.00 0.00 0 0 0 0 F 21A -24t 0.025 1.44 0.00 0 0 0 0 F 21A -24t 0.025 - 0.00 0.00 _ 0 0 0 0 6 c) AED excursion 984 Envelope loss/gain 13362 10675 12 a) Infiltration 5617 1161 b) Room ventilation p p 13 Internal gains: Occupants @ 230 0 0 Appliances/other 1200 Subtotal (lines 6 to 13) 18978 13036 Less external load 0 0 Less transfer 0 0 Redistribution 0 0 14 Subtotal 18978 13036 15 Duct loads 0% 0% 0 0 Total room load 18978 13036 Air required (cfm) 574 593 Calculations approved by ACCA to meet all reauirements of Manual J 8th Ed wrightsoft' 2014 -Mar -07 09:02:49 ^�A Right -Suite® Universal 2013 13.0.07 RSU05790 Page 4 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N -+ wrightsoft• Right -J® Worksheet Job: 80 Compass Point 2nd floor Date: jan14, 2014 Croinin Construction Management By: P.0 Box 7237, Lowell, Ma 01852 1 Room name 2nd floor Bouns zone 2 Exposed wall 339.0 ft 108.0 ft 3 Room height 9.3 ft d 10.1 ft p 4 Room dimensions 5 Room area 2927.0 ft2 885.0 ft2 Ty Construction U -value Or HTM Area (W) Load Area (W) Load number (Btuh/ft2-°F) (Bt ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Vh12F-0sw 0.065 n 3.74 0.99 513 477 - 1786 474 225 225 842 224 2 glazing, cir outr, 0.300 n 17.28 8.04 36 0 622 290 0 0 0 0 2 glazing, cir outs, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 11 PO 0.290 n 0.00 0.00 0 0 0 0 0 0 0 0 11 T__G 15B-8s3c-6 0.100 n 4.43 0.17 216 168 744 29 0 0 0 0 2 glazinq, cir outr, 0.300 n. 17.28 13.03 48 0 829 625 0 0 0 0 W 15821-Owc-6 0.067 n 0.00 0.00 0 0 0 0 0 0 0 0 12F-0sw 0.065 a 3.74 0.99 423 399 1494 397 90 90 337 90 2 glazing, clr outr, 0.300 a 17.28 28.20 24 0 415 677 0 0 0 0 2 glazing, clr outr,_ 0.300 a 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 a 4.72 0.40 333 333 1573 133 0 0 0 0 W . 15B21-Owc-6 0.067 a 0.00. 0 0 0 0 0 0 00 12F-0sw 0.065 s 3.74 .0.00 0.99 684 636 2381 633 414 390 1460 388 2 glazing, clr outr, 0.300 s 17.28 16.02 48 0 829 769 24 0 415 385 2 glazing, cls outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 11P0 0.290 s 0.00 0.00 0 0 0 0 0 0 0 0 15B-8s3c-6 0.100 s 4.29 0.06 216 152 652 10 0 0 0 0 2 glazinq, clr outr, 0.300 s 17.28 27.43 64 0 1106 1756 0 0 0 0 W 15621-Owc-6 0.067 s 0.00 0.00 0 0 0 0 0 0 0 0 Vt1 12F-Osw 0.065 w 3.74 0.99 333 297 1112 295 243 207 775 206 I --G 2 glazinq, clr outr, 0.300 w 17.28 28.20 36 0 622 1015 36 0 622 1015 W 15B-8s3c-6 0.100 w 4.72 0.40 333 333 1573 133 0 0 0 0 W 15821-Owc-6 0.067 w 0.00 0.00 0 0 0 0 0 0 0 0 C 16B-38ad 0.026 1.50 1.30 120 120 180 156 0 0 0 0 C C part ceilinq, 0.255 14.66 12.73 150 150 2199 1909 0 0 0 0 C C part ceiling,. 0.304 ` - 17.53 15.22 40 40 701 609 40 40 . 701 609 F 19A-Obstp 0.368 6.90 1.51 1224 1224 8442 1847 70 70 483 106 F 19A-30bstp 0.034 - 1.64 0.36'x' 625 625 1027 225 625 625 1027 225 F 21A -24t 0.025 0.00 0.00 0 0 0 0 0 0 0 0 F 21A -24t 0.025 1.44 0.00 120 120 173 0 0 0 0 0 6 c) AED excursion 0 748 Envelope loss/gain 28460 11980 6663 3994 12 a) Infiltration 9713 2008 4071 841 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 8 1840 0 0 Appliances/other 4700 1200 Subtotal (lines 6 to 13) 38172 20528 10734 6035 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 38172 20528 10734 6035 15 Duct loads 25% 46%1 9692 9330 22% 41% 2324 2514 Total room load 47865 29857 13058 8549 Air required (cfm) 1250 1250 341 350 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. A Ad- wrightsoft^ 2014 -Mar -07 09:e 5 Right-SuiteC� Universal 2013 13.0.07 RSU05790 Page 5 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N ►- wrightsoft' Right -J® Worksheet Job: 80 Compass Point 2nd floor Date: jan14, 2014 Croinin Construction Management By: P.O Box 7237, Lowell, Ma 01852 1 Room name 2nd floor zone 2 Exposed wall 231.0 ft 3 Room height 9.0 ft p 4 Room dimensions 5 Room area 2042.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area Load number (Btuh/ftz°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 it!,12F -18w 0.065 n -3.74 0.99 288 252 943 251 2 glazing, clr outr, 0.300 n 17.28 8.04 36 0 622 290' 2 glazing, clr outr, 0.300 n 0.00 0.00 0 0 0 0 11130 0.290 n 0.00 0.00 0 0 0 0 11 VL 15B-8s3c-6 0.100 n 4.43 0.17 216 168 744 29 -G 2 glazinq, cir outr, 0.300 n 17.28 13.03 48 0 829 625 W 15B21-Owc-6 0.067 n 0.00 0.00 0 0 0 '0 12F-Osw 0.065 a 3.74 0.99 333 309 1157 307 2 glazing, clr outr, 0.300 e 17.28 28.20 24 0 415 677 2 qlazinq, cir outr, ., 0.300 a 0.00 0.00 0 0 0 0 W 158-8s3c-6 0.100 a 4.72 0.40 .333 � 333..... 1573 133 W 15621-Owc-6..... 0.067 e. ....., 0.00 0.00 0 0 0 0 12F-Osw 0.065 s 3.74 0.99 270 246 921 245 2 glazing, cir outr, 0.300 s 17.28 16.02 24 0 415 385 2 glazing, cir outr, 0.300 s 0.00 0.00 0 0 0 0 D .11 PO 0.290 s 0.00 0.00 0 0 0 .. 0. 15B-8s3c-6 0.100 s 4.29 0.06 216 152 652 10 2 alazinq, clr outr, 0.300 s 17.28 27.43 64 0 1106 1756 W 15B21-Owc-6 0.067 s 0.00 0.00 0 0 0 0 yJ 12F-Osw 0.065 w 3.74 0.99 90 90 337 90 I ---G 2 alazinq, clr outr, 0.300 w 17.28 28.20 0 0 0 0 W 15B-8s3c-6 0.100 -W 4.72 0.40 333 333` 1573 133 W 15B21-Owc-6 0.067 w 0.00 0.00 00 0 0 C 16B-38ad 0.026 - 1.50 1.30 120. 120 180 156 C C part ceiling, 0.255 14.66 12.73 150 150 2199 1909 C C part ceiling, 0.304 - 17.53 15.22 0 0 0 0 F 19A-Obstp 0.368 6.90 1.51 1154 ...... 1154 7959 1741 F 19A-30bstp _ 0.034 - 1.64 0.36 0 0 0 0 F 21A -24t 0.025 0.00 0.00 ..... 0 0 0 0 . F 21A -24t. 0.025 1.44 0.00 120 120 173 0 6 c) AED excursion 3199 Envelope loss/gain 21797 11933 12 a) Infiltration 5642 1166 b) Room ventilation 0 0 13 Internal gains: Occupants @ 230 8 1840 Appliances/other 3500 Subtotal (lines 6 to 13) 27439 18440 Less external load 0 0 Less transfer 0 0 Redistribution 0 0 14 Subtotal P7439 18440 15 Duct loads 27% 47%, 7368 8571 Total room load 34807 27010 Air required (cfm) 909 1107 Calculations approved by ACCA to meet all reauirements of Manual J 8th Ed. wrightsoft" 2014 -Mar -07 09:02:49 .4C�P� Right -Suite® Universal 2013 13.0.07 RSU05790 Page 6 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N wrightsoft' Right -J® Worksheet Job: 80 Compass Point 1St floor Date: jan14, 2014 By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 1 Room name 1st floor Living room 2 Exposed wall 149.0 ft 76.0 ft 3 Room height 9.0 ft p 9.0 ft heat/cool 4 Room dimensions 32.0 x 22.0 ft 5 Room area 1084.0 ft2 704.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Vh12F-0sw 0.065 n 3.74 0.99 513 468 1752 465 288 243 910 242 2 glazing; clr outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, cir outr, 0.300 n 17.28 13.03 24 0 415 313 24 0 415 313 11130 0.290 n 16.70 7.68 21 21 351) 161 21 21 351 161 11 VL 15B-8s3c-6 0.100 n 0.00 0.00 0 0 0 0 0 0 0 0 -G 2 glazinq, clr outr, 0.300 n 0.00 0.00 0 0. 0 0 0 0 0 0 W 15621-Owc-6 0.067 n 0.00 0.00 0 0 0 0 0 0 0 0 12F-Osw 0.065 a 3.74 0.99 198 174 651 173 198 174 651 173 2 glazing, cir outr, 0.300 a 0.00 0.00 0 0 0 0 0 0 0 0 2 giazinq, clr outr, 0.300 e 17,28 52.69 24 0 415 1265 24 0 415 1265 W 15B-8s3c-6 0.100 a 0.00 0.00 0 0 0` 0 0 0 0 .- 0 W 15821-Owc-6 0,067 a 0.00 0.00 0 0 0 0 0 0 0 0 0.065 s 3.74 0.99 342 298 1114 296 0 0 0 0 TE�12F-Osw 2 glazing, clr outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, cir outr, 0.300 s 17.28 27.43 23 0 403 640 0 0 0 0 11PO 0.290 s 16.70 7.68 21 21 _ 351 161 0 0 0 __ 0 y! 15B-8s3c-6 0.100 s 0.00 0.00 0 0 0 0 0 0 0 0 I --G 2 glazing, cir outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 W 15821-Owc-6 0.067 s 0.00 0.00 0 0 0 0 0 0 0 0 Vj! 12F-Osw 0.065 w 3.74 0.99 288 288 1078 286 198 198 741 197 -- 2 plazinq, cir outr, 0.300 w 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 w 0.00. 0.00 0 0 0, 0 0 0 0 0 W 15821-Owc-6 0.067 w 0.00 0.00 0 0 0 0 0 0 0 0 C 16B-38ad 0.026 0.00 0.00 0 0 0 0 0 0 0 0 C C part ceiiinq, 0.255 14.66 12.73 466 466 6831 5930 176 176 2580 2240 C C part ceiling, 0.304 0.00 0.00 0 0 0 0 0 0 0 0 F 19A-Obstp 0.368 0.00 0.00 0 0 0 0 0 0 00 F 19A-30bstp 0.034 - 0.00 0.00 0 0 0 0 0 0 0 0 F 21A -24t 0.025 0.00 0.00 0 .. 0 0 0 0 0 0 0 F 21A -24t 0.025 0.00 0.00 0 0 0 0 0 0 0 0 6 c) AED excursion 984 374 Envelope loss/gain 13362 10675 6063 4964 12 a) Infiltration 5617 1161 2865 592 b) Room ventilation 0 01 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 1200 0 Subtotal (lines 6 to 13) 18978 13036 8928 5556 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 18978 13036 8928 5556 15 Duct loads 01/. 0% 0 0 -0% 0% 0 0 Total room load 18978 13036 8928 5556 Air required (cfm) 574 593 270 253 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft" 2014 -Mar -07 09:02:49 ^�A Right -Suite® Universal 2013 13.0.07 RSU05790 Page 7 ..oft HVAC\cronin construction 21 gabriei way.rup Calc = MJ8 Front Door faces: N - wrightsoft° P.0 Box 7237, Lowell, Ma 01852 Right -J® Worksheet 1st floor Croinin Construction Management Job: 80 Compass Point Date: jan14, 2014 By: 1 Room name Kitchen office 2 Exposed wall 13.0 ft 60.0 ft 3 Room height 9.0 ft heat/cool 9.0 ft heat/cool 4 Room dimensions 13.0 x 10.0 ft 25.0 x 10.0 ft 5 Room area 130.0 ft2 250.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 12F-Osw 0.065 n 3.74 0.99 0 0 0 0 225 225 842 224 2 glazing, clr outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr outs, 0.300 n 17.28 13.03 0 0 0 0 0 0 0 0 11 PO 0.290 n 16.70 7,68 0 0 0 0 0 0 0 0 11 yJ 15B-8s3c-6 0.100 n 0.00 0.00 0 0 0 0 0 0 0 0 t --G 2 glazinq, clr outr,. ... 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 W 15B21-Owc-6 0.067 n ,. 0.00 0.00 0 0 0 0 0 0 0 0 VIJ 12F-Osw 0.065 a 3.74 0.99 0 0 0 0 0 0 0 0 2 glazing, clr outr, 0.300 a 0.00 0.00 0 0 0 0 0 0 0 0 I��3G 2 glazing, clr outr, 0.300 a 17.28 52.69 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 a 0.00 0.00 ... 0 0 0 0 0 0. 0 0 W 151321-0wc-6 0.067 a 0.00 0.00 0 0 0 0 0 0 0 0 0:065 s 3.74 0.99 117 105 394 105 225 192 720 191 TE�12F-Osw 2 glazing, cir outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr outr, 0.300 s 17.28 27.43 12 0 202 320 12 0 202 320 11P0 0.290 5 16.70 7.68 0 0 0 0 21 21 351 161 15B-8s3c-6 0.100 s 0.00 0.00 0 0 0 0 0 0 0 0 2 glazinq, clr outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 W 15821-Owc-6 0.067 s 0.00 0.00 0` 0 0 0 0 0 0 0 12F-Osw 0.065 w 3.74 0.99 0 0 0 0 90 90 337 90 2 glazing, clr outr, 0.300 w 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 w 0.00 0.00 0 0 0 0 0 0 0 0 W 15B21-Owc-6 0.067 w 0.00 0.00 0 0 0 0 0 0 0 0 C 16B-38ad 0.026 - 0.00 0.00 0 0 0 0 0 0 0 0 C C part ceiling, 0.255 14.66 12.73 40 40 586 509 250 250 3665 3181 C C part ceiling, 0.304 0.00 0.00 0 0 0 0 0 `.. 0 0 0 F 19A-Obstp 0.368 0.00 0.00 0 0 0 0 0 _ 0 0 0 F 19A-30bstp 0.034 0.00 0.00 0 0 0 0 0 0 0 0 F 21A -24t 0.025 0.00 0.00 0 0 0 0 0 0 0 0 F 21A -24t 0.025 0.00 0.00 0_ 0 0 0 0 0 0 0 6 c) AED excursion 346 264 Envelope loss/gain 1182 1280 6117 4431 12 a) Infiltration 490 101 2262 467 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 1200 0 Subtotal (lines 6 to 13) 1672 2581 8378 4898 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 1672 2581 8378 4898 15 Duct loads -00/0 0% 0 0 -00/0 0°/G 0 0 Total room load 1672 2581 8378 4898 Air required (cfm) 51 117 1253 223 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft` 2014 -Mar -07 09:02:49 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 8 ,O�k ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N +1- wrightsoft' Right -J® Worksheet Job: 80 Compass Point 2nd floor zone Date: jan14, 2014 Croinin Construction Management By: P.0 Box 7237, Lowell, Ma 01852 1 Room name 2nd floor zone Ldy 2 Exposed wall 231.0 ft 9.0 ft 3 Room height 9.0 ft p 9.0 ft heat/cool 4 Room dimensions 4.0 x 8.0 ft 5 Room area 2042.0 ft2 32.0 ft2 Ty Construction LI -value Or HTM Area (ftz) Load Area (ft2) Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Vh12F-Osw 0.065 n 3.74 0.99 288 252 943 251 36 36 ` 135 36 2 glazing, cir outr, 0.300 n 17.28 8.04 36 0 622 290 0 0 0 0 2 glazing; cir outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 11 PO 0.290 n 0.00 0.00 0 0 0 0 0 0 0 0 11 VI/ 15B-8s3c-6 ( 0.100 n 4.43 0.17 216 168 744 29 0 0 0 0 �-G 2 glazinq, cir outr, 0.300 n 17.28 13.03 48 0829 625 0 0 0 0 W 15621-0wc-6 0.067 n, 0.00 OM 0 0 0 0 0 _0. 0 ...... ...0 V 12F-Osw 0.065 a 3.74 0.99 333 309 1157 307 0 0 0 0 2 glazing, cir outr, 0.300 a 17.28 28.20 24 0 415 677 0 0 0 0 2 glazinq, cir outr,.. 0.300 a 0.00 0.00 0 0 00 0 0 0 0 W 15B-8s3c-6 0.100 e 4.72 0.40 333 .,333 1573 133 0 0 0 0 W 15B21-Owc-6 , 0.067 a 0.00 0.00 00 0 0 0 0 0 0 12F-Osw 0.065 s 3.74 0.99 1 270 246 245 921 0 0 ..0 0 TE�` 2 glazing, oir outr, 0.300 s 17.28 16.02 24 0 415 385 0 0 0 0 2 glazing, cir outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 11PO 0.290 s 0.00 0.00 0 0 0 0 0 0 0 0 15B-8s3c-6 0.100 s 4.29 0.06 216 152 652 10 0 0 0 0 2 glazinq, cir outr, 0.300 s 17.28 27.43 64 0 1106 17560 0 0 0 W 15B21-Owc-6 0.067 s 0.00 0.00 0 0 0 0. 0 0 0' 0 V►/ 12F-Osw 0.065 w 3.74 0.99 90 90 337 90 45 45 168 45 L -G 2 glazinq, clr outr, 0.300 w 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 w 4.72 0.40 333 333 1573 133 0 0 0 0 W 15B21-Owc-6 0.067 w 0.00 0.00 0 0 0 0 0 0 0 0 C 16B-38ad 0.026 - 1.50 1.30 120 120 180 156 0 0 0 0 C C part ceilinq, 0.255 14.66 12.73 150 150 2199 1909 0 0 0 0 C C part ceiling, 0.304 - 0.00 0.00 0 0 0, 0 0 0` 0 0 F 19A-Obstp 0.368 6.90 1.51 1154 1154 7959 ..... 1741 32 32 221 48 F 19A-30bstp 0.034• - 0.00 0.00 0 0 0 0 0 0 00 F 21A -24t 0.025 0.00 0.00 0 0 0 0 0 0 0_ 0 F 21A -24t 0.025 1.44 0.00 120 120 173 0 0 0 0 0 6 c) AED excursion 3199 -3 Envelope loss/gain 21797 11933 524 125 12 a) Infiltration 5642 1166 339 70 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 8 1840 0 0 Appliances/other 3500 0 Subtotal (lines 6 to 13) 27439 18440 863 196 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 27439 18440 863 196 15 Duct loads 27% 47% 7368 8571 27% 500/0 233 98 Total room load 34807 27010 1097 294 Air required (cfm) 909 1107 29 12 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. .4C= � wrightsoft` 2014 -Mar -0709:02:49 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 9 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N - wrightsoft' Right -J® Worksheet Job: Compass Point ja Date: 2nd floor zone n14, 2014 By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 1 Room name Masterbath Bedroom 2 2 Exposed wall 18.0 ft 29.0 ft 3 Room height 9.0 ft heat/cool 9.0 ft heat/cool 4 Room dimensions 5.0 x 13.0 ft 16.0 x 13.0 ft 5 Room area 65.0 ft2 208.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6Ti 12F-Osw 0.065 n 3.74 0.99 0 0 0 0 144 120 449 119.30 2 glazing, clr outr, 00 n 17.28 8.04 0 0 0 0 24 0 415 193 2 glazing, clr outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 11130 0.290 n 0.00 0.00 0 0 0 0 0 0 0 0 11 VL 15B-8s3c-6 0.100 n 4.43 0.17 0 0 0 0 0 0 0 0 -G 2 glazinq, clr outr, 0.300 n 17.28 13.03 0 0 0 0 0 0 0 0 W 15B21-Owc-6 0.067 n 0.00 0.00 0 0 0 0 0 0 0 0 12F-Osw 0.065 a 3.74 0.99 117 117 438 116 117 117 438 116 2 glazing, clr outr, 0.300 a 17.28 28.20 0 0 0 0 0 0 0 0 2 glazinq, clr outr, 0.300 a 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 a 4.72 0.40 0 0 0 0 0 0 0 0 W 15B21-Owc-6 0.067 a 0.00 0.00 0 0 0 0 0 0 0 0 0.065 s 3.74 0.99 45 45 168 45 0 0 0 0 Ti12F-Osw 2 glazing, cir outr, 0.300 s 17.28 16.02 0 0 0 0 0 0 0 0 2 glazing, cir outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 11PO 0.290 s 0.00 0.00 0 0 0_ 0 0 0 0 0 V)J 15B-8s3c-6 0.100 s 4.29 0.06 0 0 0 0 0 0 0 0 -G 2 glazinq, clr outr, 0.300 s 17.28 27.43 0 0 0 0 0 0 0 0 W 15B21-Owc-6 0.067 s 0.00 0.00 0 0 0 0 0 0 0 0 yJ 12F-Osw 0.065 w 3.74 0.99 0 0 0 0 0 0 0 0 t --G 2 glazinq, clr outr, 0.300 w 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 w 4.72 0.40 0 0 0 0 0 0 0 0 W 15B21-Owc-6 0.067 w 0.00 0.00 0 0 0 0 0 0 0 0 C 16B-38ad 0.026 - 1.50 1.30 0 0 0 0 0 0 0 0 C C part ceiling, 0.255 14.66 12.73 25 25 366 318 0 0 0 0 C C part ceiling, 0.304 0.00 0.00 0 0 0 0 0 0 0 0 F 19A-Obstp 0.368 6.90 1.51 65 65 448 98 208 208 1435 314 F 19A-30bstp 0.034 .- 0.00 0.00 0 .. 0 0 0 0 0 0 0 F 21A -24t 0.025 0.00 0.00 0 0 0 0 0 0 0 0 F 21A -24t 0.025 1.44 0.00 0 0 0 0 0 0 0 0 6 c) AED excursion 1-171 148 Envelope loss/gain 1421 560 2737 791 12 a) Infiltration 679 140 1093 226 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 1 230 Appliances/other 300 500 Subtotal (lines 6 to 13) 2100 1000 3830 1747 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 2100 1000 3830 1747 15 Duct loads 27% 50% 568 501 27% 50% 1035 875 Total room load 2667 1501 4865 2622 Air required (cfm) 70 62 127 107 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. F1.- wrightsoft" Right -Suite@ Universal 2013 13.0.07 RSU05790 2014 -Mar -07 09:02:49 Pa 10 AC(:;k ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N ge ALLIT wrightsoft' Right -J® Worksheet Job: Compass Point ja Date: 2nd floor zone n14, 2014 By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 1 Room name bedroom 1 1/2 bath 2 Exposed wall 11.0 ft 7.0 ft 3 Room height 9.0 ft I heat/cool 9.0 ft heat/cool 4 Room dimensions 16.0 x 11.0 ft 7.0 x 13.0 ft 5 Room area 176.0 ft2 91.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Bt W) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 12F-Osw 0.065 n 3.74 0.99 0 0 0 0 63 63 236 63 11 2 glazing, cir outr, 0.300 n 17.28 8.04 0 0 0 0 0 0 0 0 2 glazing, cir outs, 0.300 n 0.00 0.00 0 0 . 0 0 0 0 0 0 11PO 0.290 n 0.00 0.00 0 0 0 0 0 0 0 0 11 VL 15B-8s3c-6 0.100 n 4.43 0.17 0 0 0 0 0 0 0 0 t-( 2 glazinq, clr outr, 0.300 n 17.28 13.03 0 0 0 00 0 0 0 W 15B21-0wc-6 0.067 n 0.00 0.00 0 0 0 0 0 0 0 0 0.065 a 3.74 0.99 99 75 281 75 0 0 0 0 2 glazing, clr outr, 0.300 a 17.28 28.20 24 0 415 677 0 0 0 0 IILL212F-Osw 2 glazinq, clr outr, 0.300 a 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 a 4.72 0.40 0 0 0 0 0 0 0 0 W. 15821-Owc-6 0.067 a 0.00. 0 0 0 0 0 0 0 _ 0 0.065 s 3.74 ..0.00 0.99 0 0 0 0 0 0 0 0 Ti12F-Osw 2 glazing, cir outr, 0.300 s 17.28 16.02 0 0 0 0 0 0 0 0 2 glazing, clr outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 11130 0.290 s 0.00 0.00 0 0 0 0 0 0 0 0 VN 15B-8s3c-6 0.100 s 4.29 0.06 0 0 0 0 0 0 0 0 -G 2 glazinq, clr outr, 0.300 s 17.28 27.43 0 0 0 0 0 0 0 0 W 15B21-Owc-6 0.067 s 0.00 0.00 0 0 0 0 0 0 0 0 12F-Osw 0.065 w 3.74 0.99 0 0 0 0 0 0 0 0 2 glazinq, clr outr, 0.300 w 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 w 4..72 0.40 0 0 0 0 0 0 0 0 W 15B21-Owc-6 0.067 w 0.00 0.00 0 0 0 0 0 0 0 0 C 168-38ad 0.026 1.50 1.30 0 0 0 0 0 0 0 0 C C part ceilinq, 0.255 14.66 12.73 0 0 0 0 0 0 0 0 C C part ceiling, 0.304 - 0.00 0.00 0 0 0 0 0 0 0 0 F 19A-Obstp 0.368 6.90 1.51 176 176 1214 266 91 91 628 137 F 19A-30bstp 0,034 - 0.00 0.00 0 0 0 0 0 0 0 F 21A -24t 0.025 0.00 0.00 0 0 .0 0 0 0 0 0 0 F 21A -24t 0.025 1.44 0.00 0 0 0 0 0 0 0 0 6 c) AED excursion 205 -4 Envelope loss/gain 1909 1222 864 196 12 a) Infiltration 415 86 264 55 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 1 230 0 0 Appliances/other 500 0 Subtotal (lines 6 to 13) 2324 2037 1127 250 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 2324 2037 1127 250 15 Duct loads 27% 50% 628 1021 270/c 50% 305 125 Total room load 2952 3058 1432 375 Air required (cfm) 77 125 37 15 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. .` 'F' wrightsoft" 2014 -Mar -07 09:02:49 Right -Suite® Universal 2013 13.0.07 RSU05790 AWN ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Page 11 wrightsoft• P.O Box 7237, Lowell, Ma 01852 Right -J® Worksheet 2nd floor zone Croinin Construction Management Job: 80 Compass Point Date: jan14, 2014 By: 1 Room name Masterbed room full bath 2 Exposed wall 30.0 ft 0 ft 3 Room height 9.0 ft heat/cool 9.0 ft heat/cool 4 Room dimensions 25.0 x 13.0 ft 7.0 x 11.0 ft 5 Room area 325.0 ft2 77.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ftz°F) (Bt ft2) or perimeter (ft) (Bt h) or perimeter (ft) (Btuh) Heat Coot Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Vh12F-0sw 0.065 n 3.74 0.99 0 0 0 0 0 0 0 0 2 glazing, cir outr, 0.300 n 17.28 8.04 0 0 0 0 0 0 0 0 2 glazing, cir outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 11P0 0.290 n 0.00 0.00 0 0 0 0 0 0 0 0 11 VI 1513-8s3c-6 0.100 n 4.43 0.17 0 0 0 0 0 0 0 0 ---G 2 glazinq, clr outr, 0.300 n 17.28 13.03 0 0 0 0 0 0 0 0 W 15621-Owc-6 0.067 n 0.00 0.00 0 0 0 0 0 0 0 0 12F-Osw 0.065 a 3.74 0.99 0 0 0 0 0 0 0 0 glazing, clr outr, 0.300 a 17.28 28.20 0 0 0 0 0 0 0 0 ��--12 2 glazing, clr outr, 0.300 a 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 e 4.72 0.40 0 0 0 0 0 0 0 0 W I 15B21-Owc-6 0.067 a 0.00 0.00 0 0 0 00 0 0 0 Vh12F-Osw 0.065 s 3.74 0.99 225 201 753 200 ........ 0 0 0 0 2 glazing, clr outr, 0.300 s 17.28 16.02 24 0 415 385 0 0 0 0 2 glazing, cir outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 11 PO 0.290 s 0.00 0.00 0 0 0 0 s0 0 0 0 15B-8s3c-6 0.100 s 4.29 0.06 0 0 0 0 0 0 0 0 2 glazinq, cir outr, 0.300 s 17.28 27.43 0 0 0 0 0 0 0 0 W 151321-Owc-6 0.067 s 0.00 0.00 0 0 0 0 0 0 0 0 12F-Osw 0.065 w 3.74 0.99 45 45 168 45 0 0 0 0 2 glazinq, clr outr, 0.300 w 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 w 4.72 0.40 0 0 0 0 0 0 0 0 W 15821-Owc-6 0.067 w 0.00 0.00 0 0 0 0 0 0 0 0 C 16B-38ad 0.026 - 1.50 1.30 0 0 0 0 0 0 0 0 C C part ceilinq, 0.255 14.66 12.73 125 125 1832 1591 0 0 0 0 C C part ceiling, 0.304 - 0.00 0.00 0 0 0 0 0 0 0 0 F 19A-Obstp 0.368 6.90 1.51 325 325 2242 490 77 77 531 116 F 19A-30bstp 0,034 - 0.00 0.00 0 0' 0 0 0 0 0 0 F 21A -24t 0.025 0.00 0.00 0 0 0 0 0 0 0 0 F 21A -24t 0.025 1.44 0.00 0 0 0 0 0 _. 0 0 0 6 c) AED excursion 351 -2 Envelope loss/gain 5410 3061 531 114 12 a) Infiltration 1131 234 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 2 460 0 0 Appliances/other 1000 0 Subtotal (lines 6 to 13) 6541 4755 531 114 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 6541 4755 531 114 15 Duct loads 27% 50% 1768 2382 27% 50% 144 57 Total room load 8308 1 7137 675 171 Air required (cfm) 1217 293 18 7 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. At= -Fk wrightsoft 2014 -Mar -07 09:02:49 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 12 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N - wrightsoft• Right -J® Worksheet Job: 80 Compass Point 2nd floor zone Date: jan14,2014 Croinin Construction Management By: P.0 Box 7237, Lowell, Ma 01852 1 Room name 2nd floor hall attic 2 Exposed wall 5.0 ft 122.0 ft 3 Room height 9.0 ft heat/cool 9.0 ft heat/cool 4 Room dimensions 1.0 x 180.0 ft 24.0 x 37.0 ft 5 Room area 180.0 ft2 888.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2 °F) (Btuh/ft2) or perimeter (ft) (Bt h) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 12F-Osw 0.065 n 3.74 0.99 45 33 124 33 0 0 0 0 V 2 glazing, clr outr, 0.300 n 17.28 8.04 12 0 207 97 0 0 0 0 2 glazing, clr outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 11 PO 0.290 n 0.00 0.00 0 0 0 0 0 0 0 0 11 V�/ 15B-8s3c-6 0.100 n 4.43 0.17 0 0 0 0 216 168 744 29 I --G 2 qlazinq, clr outr, 0.300 n 17.28 13.03 0 0 0 48 0 829 625 W 15B21-Owc-6 0.067 n 0.00 0.00 .. .0 0 0 0 0 0 0 0 0 12F-0sw 0.065 a 3.74 0.99 0 0 0 0 0 0 0 0 2 glazing, clr outr, 0.300 a 17.28 28.20 0 0 0 0 0 0 0 0 2 glazinq, clr outr, 0.300 a 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 a 4.72 0.40 0 0 0 0 333 333 1573 133 W 15B21-Owc-6 0.067 a 0.00 0.00 0 0 0 0 0 0 0 0 V 0.065 s 3.74 .99 0 0 0 0 0 0 0 0 2glazsw 2 glazing, clr outr, 0.300 s 17.28 166.02 0 0 0 0 0 0 0 0 2 glazing, clr outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 111PO 0.290 s 0.00 0.00 0 0 0 0 0 _0 _ 0 0 15B-8s3c-6 0.100 s 4.29 0.06 0 0 0 0 216 152 652 10 2 qlazinq, clr outr, 0.300 s 17.28 27.43 0 0 0 0 64 0 1106 1756 W 15B21-0wc-6 0.067 s 0.00 0.00 0 0 0 0 0 0 0 0 12F-0sw 0.065 w 3.74 0.99 0 0 0 0 0 0 0 0 2 qlazinq, clr outr, 0.300 w 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 w 4.72 0.40 0 0 0 0 333 333 1573 133 W 15B21-Owc-6 0.067 w 0.00 0.00 0 0 0 0 0 0 0 0 C 16B-38ad 0.026 1.50 1.30 0 0 0 0 120 120 180 156 C C part ceiling, 0.255 14.66 12.73 0 0 0 0 0 0 0 0 C C part ceiling, 0.304 - 0.00 0.00 0 0 0 0 0 0 0 0 F 19A-Obstp 0.368 6.90 1.51 180 180 1241 272 0 0 0 0 F 19A-30bstp 0.034 - 0.00 0.00 0 0 0 0 0 0 0 0 F 21A -24t 0.025 0.00 0.00 0 0 0 0 0 0 0 0 F 21A -24t 0.025 - 1.44 0.00 0 0 0 0 120 120 173 _ _ 0 6 c) AED excursion 31 2591 Envelope loss/gain 1572 432 6829 5433 12 a) Infiltration 188 39 1533 317 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 4 920 Appliances/other 0 1200 Subtotal (lines 6 to 13) 1761 471 8362 7870 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 1761 471 8362 7870 15 Duct loads 27% 50% 476 236 26% 42% 2212 3275 Total room load 2237 707 10574 11144 Air required (cfm) 58 291 2761 457 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft• 2014 -Mar -07 09:02:49 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 13 '��p ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N -1- wrightsoft• Right -J® Worksheet Job: 80 Compass Point basement zone Date: jan14, 2014 Croinin Construction Management By: P.0 Box 7237, Lowell, Ma 01852 1 Room name basement zone Basement 2 Exposed wall 131.0 ft 131.0 ft 3 Room height 9.0 ft p 9.0 ft heat/cool 4 Room dimensions 1.0 x 1274.0 ft 5 Room area 1274.0 ft2 1274.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Vb12F-0sw 6.065 n 0.00 0.00 0 0 0 0 6 0 6 0 2 glazing, clr outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 11 PO 0.290 n 0.00 0.00 0 0 0 0 0 0 0 0 11 T 15B-8s3c-6 0.100 n 0.00 0.00 0 0 0 0 0 0 0 0 �{ 2 alazinq, clr outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 W 15821-Owc-6 0.067 n 2.90 . 0.24 288 288 835 68 288 288 835 68 12F-0sw 0.065 a 0.00 0.00 0 0 0 _ 0 0 0 0 0 2 glazing, clr outr, 0.300 a 0.00 0.00 0 0 0 0 0 0 0 0 2 glazinq, clr outr, 0.300 a 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 a 0.00 0.00 0 0 0 0 0 0 0 0 W .15821-owc-6 0.067 a 2.90. 0.24 288 288 835 68 288 288 835 68 12F-0sw 0.065 s 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, ctr outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 11 PO 0.290 s 0.00 0.00 0 0 0 0 0 0 0 0 t 15B-8s3c-6 0.100 s 0.00 0.00 0 0 0 0 0 0 0 0 -G 2 glazinq, clr outr, 0.300 s 0.00 0.00 0 0 0 0 0 00 0 W 15B21-Owc-6 0.067 s 2.90 0.24 513 513 1487 121 513 513 1487 121 V1J 12F-0sw 0.065 w 0.00 0.00 0 0 0 0 0 0 0 0 t --G 2 glazinq, clr outr, 0.300 w 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 w 0.00 0.00 0 0 0 0 0 0 0 0 W 15821-Owc-6 0.067 w 2.90 0.24 90 90 261 21 90 90 261 21 C 16B-38ad 0.026 - 0.00 0.00 0 0 0 0 0 0 0 0 C C part ceiling, 0.255 14.66 12.73 1274 1274 18676 16212 1274 1274 18676 16212 C C part ceiling, 0.304 0.00 0.00 0 0 0 0 0 0 0 0 F 19A-Obstp 0.368 0.00 0.00 0 0 0 0 0 0 0 0 F 19A-30bstp 0.034 0.00 0.00 0 0 0 0 0 0 0 0 F 21A -24t 0.025 1.44 0.00 506 506 729 0 506 506 7290 F 21A -24t 0.025 0.00 0.00 0 0 0 0 _ 0, . ......... 0 0 ... 0 6 c) AED excursion 0 0 Envelope loss/gain 22823 16491 22823 16491 12 a) Infiltration 1646 340 1646 340 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 24469 16831 24469 16831 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 24469 16831 24469 16831 15 Duct loads 0% 00/0 0 0 -01/6 0% 0 0 Total room load 2446916831 24469 16831 Air required (cfm) 740 766 740 766 Calculations approved by ACCA to meet all reauirements of Manual J 8th Ed. wrightsoft" 2014 -Mar -07 09:02:49 �� Right -Suite® Universal 2013 13.0.07 RSU05790 Page 14 ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N - wrightsoft° Right -J® Worksheet Job: 80 Compass Point Bouns zone Date: jan14,2014 Croinin Construction Management By: P.0 Box 7237, Lowell, Ma 01852 1 Room name Bouns zone bouns room 2 Exposed wall 108.0 ft 72.0 ft 3 Room height 10.1 ft p 10.6 ft heat/cool 4 Room dimensions 1.0 x 625.0 ft 5 Room area 885.0 ft2 625.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ftz°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 y✓ 12F-Osw 0.065 n 3.74 0.99 225 225 842 224 225 225 842 - 224 2 glazing, clr outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 {{��-G 2 glazing, clr outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 D 11PO 0.290 n 0.00 0.00 0 0 0 0 0 0. 0 0 11 V►/ 15B-8s3c-6 0.100 n 0.00 0.00 0 0 0 0 0 0 0 0 G 2 glazinq, clr outr, 0.300 n 0.00 0.00 0 0 0 0 00 0 0 W 15621-Owc-6 0.067 n 0.00 0.00 0 0 0 0 0 .. .....0 0 0 V�J 12F-Osw 0.065 a 3.74 0.99 90 90 337 90 0 0 0 0 2 glazing, clr outr, 0.300 a 0.00 0.00 0 0 0 0 0 0 0 0 L��G 2 glazinq, clr outr, 0.300 a 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-Ss3c-6 0.100 a 0.00 0.00 0 0 0 0 0 0 0 0 W 15821-Owc-6 0.067 a 0.00 0.00 0 0_ 0 0 0 0 0 0 0.065 s 3.74 0.99 414 390 1460 388 180 156 584 155 TE�12F-Osw 2 glazing, clr outr, 0.300 s 17.28 16.02 24 0 415 385 24 0 415 385 2 glazing, cir outr, 0.300 s 0.00 0.00 0 0 0 i 0 0 0 0 0 11 P O 0.290 s 0.00 0.00 0 0 0 0 0 0 0 0 V►/ 15B-8s3c-6 0.100 s 0.00 0.00 0 0 0 0 0 0 0 0 __G 2 glazinq, clr outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 W 151321-Owc-6 0.067 s 0.00 0.00 0 0 0 0 0 0 0 0 Vt/ 12F-Osw 0.065 w 3.74 0.99 243 207 775 206 243 207 775 206 �--G 2 glazinq, clr outr, 0.300 w 17.28 28.20 36 0 622 1015 36 0 622 1015 W 15B-8s3c-6 0.100 w 0.00 0.00 0 0 0 0 0 0 0 0 W 15621-Owc-6 0.067 w 0.00 0.00 0 0 0 0 0 0 0 0 C 166-38ad 0.026 0.00 0.00 0 0 0 0 0 0 0 0 C C part ceilinq, 0.255 0.00 0.00 0 0 0 0 0 0 0 0 C C part ceiling, 0.304 17.53 15.22 40 40 701: 609 0 0 0 0 F 19A-Obstp 0.368 6.90 1.51 70 70 483 106 0 0 0 0 F 19A-30bstp 0.034 - 1.64 0.36 625. 625 1027 225 625 625 1027 225 F 21A -24t 0.025 0.00 0.00 0 0 0 0 0 0 0 0 F 21A -24t 0.025 0.00 0.00 0_ 0 0 0_ 0 _ 0 .0 0 6 c) AED excursion 748 748 Envelope loss/gain 6663 3994 4266 2957 12 a) Infiltration 4071 841 2714 561 b) Room ventilation 0 01 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 1200 1200 Subtotal (lines 6 to 13) 10734 6035 6980 4718 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 10734 6035 6980 4718 15 Duct loads 22% 41% 2324 2514 27% 50% 1886 2364 Total room load _F 13058 8549 8866 7083 Air required (cfm) 341 350 232 290 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ,.A -Fk wrightsoft® 2014 -Mar -07 09:02:49 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 15 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N an14, 2014 rF wrightsoft° Right -J® Worksheet Job: Date: jCompass Point Bouns zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 1 Room name bouns room closet dining room 2 Exposed wall 7.0 ft 29.0 ft 3 Room height 9.0 ft heat/cool 9.0 ft heat/cool 4 Room dimensions 7.0 x 10.0 ft 19.0 x 10.0 ft 5 Room area 70.0 ftz 190.0 ft2 Ty Construction U -value Or HTM Area (ftz) Load Area (ftz) Load number (Btuh/ftz°F) (Btuh/ftz) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 yJ 12F-0sw 0.065 n 3.74 0.99 0 0 0 0 0 0 0 0 2 glazing, clr outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, cir outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 IIF--CGpI 11P0 0.290 n 0.00. 0.00 0 0 0 0 0 0 0 0 11 V 15B-8s3c-6 0.100 n 0.00 0.00 0 0 0 0 0 0 0 0 C 2 glazing, clr outr, 0.300 n 0.00 0.00 0 0 0 0 0 0 0 0 W 15B21-Owc-6 0.067 n 0.00 0.00 0 0 0 0 0 0 0 0 12F-Osw 0.065 a 3.74 0.99 0 0 0 0 90 90 337 90 2 glazing, clr outr, 0.300 a 0.00 0.00 0 0 0 0 0 0 0 0 2 glazinq, clr outr, 0.300 a 0.00 0.00 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 a 0.00 0.00 0 ... 0 0 0 0 0 0 0 W 15B21-Owc-6 0.067 a 0.00 0.00 0 0 0 0 0 0 0 0 0.065 s 3.74 0.99 63 63 236 63 171 171 640 170 TE�12F-0sw 2 glazing, cir outr, 0.300 s 17.28 16.02 0 0 0 0 0 0 0 0 2 glazing, cir outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 11 PO 0.290 s 0.00 0.00 0 0 0 0 0 0 0 0 15B-8s3c-6 0.100 s 0.00 0.00 0 0 0 0 0 0 0 0 2 glazinq, cir outr, 0.300 s 0.00 0.00 0 0 0 0 0 0 0 0 W 15621-Owc-6 0.067 s 0.00 0.00 0 0 0 0 0 0 0 0 V►/ 12F-0sw 0.065 w 3.74 0.99 0 0 0 0 0 0 0 0 C 2 qlazinq, clr outr, 0.300 w 17.28 28.20 0 0 0 0 0 0 0 0 W 15B-8s3c-6 0.100 w 0.00 0.00 0 0 0 0 0 0 0 0 W 15B21-Owc-6 0.067 w 0.00 0.00 0 0 0 0 0 0 0 0 C 16B-38ad 0,026 - 0.00 0.00 0 0 0: 0 0 0 0 0 C C part ceilinq, 0.255 0.00 0.00 0 0 0 0 0 0 0 0 C C part ceiling, 0.304 17.53 15.22 0 0 0 0 40 40 701 609 F 19A-Obstp 0.368 6.90 1.51 70 70 483 106 0 0 0 0 F 19A-30bstp 0.034 - 1.64 0.36 0 0 0 0 0 0 0 F 21A -24t 0.025 0.00 0.00 0 0 .0 0 0 0 0 0 0 F 21A -24t 0.025 0.00 0.00 0 0 0 0 0 0 0 0 6 c) AED excursion 0 0 Envelope loss/gain 719 168 1678 868 12 a) Infiltration 264 55 1093 226 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 983 223 2772 1094 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 983 223 2772 1094 15 Duct loads 27% 50% 266 112 6% 3% 172 38 Total room load 1248 334 1 2944 1132 Air required (cfm) 33 14 77 46 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -... -Pk wrightsoft` 2014 -Mar -07 09:02:49 ACARight-Suite@ Universal 2013 13.0.07 RSU05790 Page 16 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N