Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miscellaneous - 82 COMPASS POINT ROAD 4/30/2018
a� N 71 Date .... 1.1Z41q........... TOWN OF NORTH ANDOVER PERMIT FOR PLUMBING This certifies that ......!......�.....! �...... %� .z ..e- - ............:........................................................... has permission to perform .......;v\j'-� �/) ............................ ...... plumbi in th buildings of. .....�.,°Jut�.�......�...rn..�....,� i/tC�l...._ at .................. ....... 17717..... .:.........................., North Andover, Mass. FeAz..5......... Lic. No. I. -K1.7-1 .................................................................................... PLUMBING INSPECTOR Check it (D I ky— 001 POWNER TYPE OR PRINT CLEARLY MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM PLUMBING WORK CITY I NORTH ANDOVER MA. DATE 3-11-14 PERMIT# JOBSITE ADDRESS 82 COMPASS POINT OWNER'S NAME TRUST CONSTRUCTION ADDRESS: 151 MT JOY DRIVE TEL: 5083209337 FAX: OCCUPANCY TYPE: COMMERCIAL ❑ EDUCATIONAL ❑ RESIDENTIAL ❑E NEW: ❑■ RENOVATION: ❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES ❑ NO ❑ FIXUTRES Z FLOORS- Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BATHTUB 2 CROSS CONN DEVICE DEDICATED SPECIAL WASTE SYS DEDICATED GAS/OIUSAND SYS DEDICATED GREASE SYSTEM DEDICATED GRAY WATER SYS DEDICATED WATER REUSE SYS DISHWASHER DRINKING FOUNTAIN FOOD WASTE GRINDER UNIT FLOOR / AREA DRAIN INTERCEPTOR INTERIOR KITCHEN SINK LAVATORY 1 3 ROOF DRAIN SHOWER STALL 1 SERVICE / MOP SINK TOILET 1 2 URINAL WASHING MACHINE CONNECTION WATER HEATER ALL TYPES 1 WATER PIPING 1 SPIGOTS 2 i INSURANCE COVERAGE I have a current liabili insurance policy or its substantial equivalent which meets the requirements of MGL. Ch. 142 YES ❑■ NO ❑ If you have checked YES, please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY 0 OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER F1 AGENT SIGNATURE OF OWNER OR AGENT I hereby certify that all of the details and information I have submitted (or entered) regarding this applicationee,e and acc to to the best of my Knowledge and that all plumbing work and installations performed under the permit issued for this applic on 'I be in c iance with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER NAME: MIKE BURKE LICENSE # 13127 GNATURE COMPANY NAME: I POWERHOUSE PLUMBING AND HEATING CORP ! ADDRESS: PO BOX 896 CITY: PLAISTOW STATE: NH ZIP: 1,03865 FAX:/6033780040 TEL: 116033780020, _ _ _ _ ., . CELL: 19784909385 _]EMAIL J.LAURENCIO@POWERHOUSEPLUMBING.COM MASTER ❑■ JOURNEYMAN ❑ CORPORATION # 2482 PARTNERSHIP ❑ # LLC ❑ # 01 CODw H 0 z z 0 H U W a rA z a d z w . . . . . . . . . . . . . . . . o� Z z El o � w F a ca O a a a co o > w W d 3 N a 0 a a a � w a J a Q� T w Z W F U- W 0 z z 0 F U W z as a a O ff Date....' I.r .11.9 ....................... TOWN OF NORTH ANDOVER PERMIT FOR GAS INSTALLATION ' I This certifies that ...... ) .........., .........k ...........!7C �' , z LQr has permission for gas installation ... ...... ... ........................... in the buildings of .......... .............. q ................................ at ............ i -If ............................ . North Andover, Mass. Fee... `�7 ....... Lic. No. .1..7?J]j ....... . ................................................... GASINSPECTOR Check# OP4 G TYPE OR PRINT CLEARLY MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK CITY NORTH ANDOVER MA. DATE 3-11-14 PERMIT # l�'� JOBSITE ADDRESS 82 COMPASS POINT OWNER'S NAME TRUST CONSTRUCTION _ _ _ OWNER ADDRESS: 51 MT JOY DRIVE TEWKSBURY MA 01876 TEL: 5083209337 1 FAX: OCCUPANCY TYPE: COMMERCIAL ❑ EDUCATIONAL ❑ RESIDENTIAL ❑■ NEW: RENOVATION: ❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES ❑ NO ❑ FIXUTRES Z FLOOR— Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BOILER BOOSTER CONVERSION BURNER COOK STOVE DIRECT VENT HEATER DRYER FIREPLACE FRYOLATOR FURNACE GENERATOR GRILLE LABORATORY COCKS MAKEUP AIR UNIT OVEN POOL HEATER ROOM / SPACE HEATER ROOF TOP UNIT TEST UNIT HEATER UNVENTED ROOM HEATER WATER HEATER INSURANCE COVERAGE I have a current liabili insurance policy or its substantial equivalent which meets the requirements of MGL. Ch. 142 YES Q NO ❑ If you have checked YES, please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY 0 OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. SIGNATURE OF OWNER OR AGENT CHECK ONE ONLY: OWNER ❑ GENT El hereby certify that all of the details and information I have submitted (or entered) regarding this application ar r and a ate the best of my Knowledge and that all plumbing work and installations performed under the permit issued for this applicati a in pli ce with all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBERIGASFITTERNRME: _MIKE BURKE LICENSE # 13127 S GN URE COMPANY NAME: POWERHOUSE PLUMBING AND HEATING CORP ADDRESS: J,PO BOX CITY: I PLAISTOW STATE: NH ZIP: 03865 FAX: _603, TEL: 6033780020 CELL: _9784909385 EMAIL: J_LAURENCIO(cDPOWERHOUSEPLUMBINGAND HE MASTER X JOURNEYMAN ❑ LP INSTALLER 0 CORPORATION ❑■ # _2482 PARTNERSHIP ❑ # LLC Wi F z z 0 F U W a z a Q w . . . . . . . . . . . . . . . . . op Z a �p z } o w rA F W a °z LU "" FS-W O a a > LUN wd 3 N a O o a a � w a ao C-) J CL a w Q N 111 2 W N LL F ' O 0 Z Z 0 U li V °a � The Commonwealth of Massachusetts Department of IndustrialAccidents Office of Investigations ' d I Congress Street, Suite 100 w Boston, MA 02114-2017 �•v www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Address: PO BOX 896 POWERHOUSE PLUMBING CORP PLAISTOW, NH 03865 Phone #: 6033780020 Are you an employer? Check the appropriate box: 1. ❑■ I am a employer with 6 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub -contractors 2. ❑ I am a sole proprietor or partner- listed on the attached sheet. ship and have no employees These sub -contractors have working for me in any capacity. employees and have workers' [No workers' comp. insurance comp. insurance.: required.] 5. ❑ We are a corporation and its 3. ❑ I am a homeowner doing all work officers have exercised their myself [No workers' comp. right of exemption per MGL insurance required.] t c. 152, § 1(4), and we have no employees. [No workers' comp. insurance required.] Type of project (required): 6. Q New construction 7. ❑ Remodeling 8. ❑ Demolition 9. ❑ Building addition 10. E] Electrical repairs or additions 11.❑ Plumbing repairs or additions 12.❑ Roof repairs 13. ❑ Other "Any applicant that checks box #I must also fill out the section below showing their workers' compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub -contractors and state whether or not those entities have employees. If the sub -contractors have employees, they must provide their workers' comp. policy number. I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: HARTFORD UNDERWRITERS INSURANCE COMP Policy # or Self -ins. Lic. #: 04WECIT2480 Job Site Address: 82 COMPASS POINT Expiration Date: 7-28-14 City/State/Zip: N ANDOVER MA Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or on r imprisonmen well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day aga' Isu violator. B d' ed that a copy of this statement may be forwarded to the Office of Investigations of the D for r ice co ra verification. I do hereby cerdfonder tj(e pains Official use 1nly. Do not write in City or Town: that the information provided above is true and correct. 3-11-14 area, to be completed by city or town official. Permit/License # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone #: NAME: MICHAELxW BURK�, LIC #: 3801 M' Ir:,,� ti EXPIRES: 05/31/2014 �- I.L L 0 M C rM ---- -A -.uMM©NWEALTH OF MASSACHUSETTS � tin o K. z � 1 o n Z C fA . .. G) � a PLU :3ERS AND GASFIT77� RS, ; j L7A1 c -i LICENE Z) AS A MASTER I �A.'ON m ISSUES THE ABOVE LICENSE TO; I z ; N1t +� "' $ MICHAEL 11 BURKE 61 CORLISS HILI. RDa`� 3 HAVERHILL 1A 01830-1613Z'M� o N - - - _ 13127 05/6i/14 160677 ~,}M _Jill I I 0 COMMONWEALTH OF MASSACHUSETTS � z z • . • REGI FRED AS A PLUMB NG .O I ISSUES THE ABOVE LICENSE TO: j MICHAEL W BURKE POWERHOUSE PLB & HEATING C)R ► 61 CORLISS HILL RD HAVERHILL_ MA 01830-161 2482 05/01/14 160675 R Commonwealth of Massachusetts Department of Public Safety Oil Humor Technician Certificate License; SU -059572 MICHAEL W BURKE 61 CORLISS "L Haverhill MA OHM i Commissioner Expiration, 05/26/2094 1w ACORtfCERTIFICATE OF LIABILITY INSURANCE D IDD/YYYY) 3//11/11/ 2014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESj_NTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Kathleen Miller, CISR, CPIW INSURANCE SOLUTIONS CORPORATION PHONE (603) 382-4600 FAX . (603)382-2034 60 Westville Rd AMRIL ESS.kmiller@isc-insurance.com INSURERS AFFORDING COVERAGE NAIC # Plaistow NH 03865 INSURER A'Merchants 23329 INSURED INSURER B .Hartford Underwriters Ins. Co. Powerhouse Plumbing & Heating Corp. INSURER C : PO BOX 896 INSURERD: INSURER E Plaistow NH 03865 INSURERF: CUVEKAGES CERTIFICATE NIIMRFR-CL1372212161 R11=VICIr1A1 NI IIMRFR• THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF MWDD POLICY EXP MWDD LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED PREMISES Ea occurrence $ 500,000 A CLAIMS -MADE Fx_1 OCCUR BOP1065497 /1/2013 /1/2014 MED EXP (Any one person) $ 15,000 PERSONAL &ADV INJURY $ Included GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2,000,000 X POLICY PRO LOC $ AUTOMOBILE LIABILITY Ea B'B EDISINGLE LIMIT 1,000,000 A X ANY AUTO BODILY INJURY (Per person) $ ALL OWNED SCHEDULED AUTOS AUTOS API058154 /1/2013 /1/2014 BODILY INJURY(Peraccident $ ) NON -OWNED HIRED AUTOS AUTOS PROPERTY DAMAGE Peraccdent $ Medical payments $ 5 000 UMBRELLA LIABOCCUR HCLAIMS-MADE EACH OCCURRENCE $ EXCESS LIAB AGGREGATE $ DED RETENTION $ B WORKERS COMPENSATIONX WC STATU- OTH- AND EMPLOYERS' LIABILITY Y / N E.L. EACH ACCIDENT $ 100,000 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? [YK]NIA (Mandatory in NH) 04WECIT2480 /28/2013 7/28/2014 E.L. DISEASE - EA EMPLOYEE $ 100,000 If yes, describe under E.L. DISEASE - POLICY LIMIT $ 500,000 DESCRIPTION OF OPERATIONS below DESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space Is required) CERTIFICATE HOLDER rANrPI I ATInAI (978)688-9542 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Town of North Andover ACCORDANCE WITH THE POLICY PROVISIONS. 1600 Osgood Street AUTHORIZED REPRESENTATIVE North Andover, MA 01845 Keith Maglia/K M AL:UKU 15 (2070/U5) INS025 rgmnnst m ©1988-2010 ACORD CORPORATION. All rights reserved. Tho Arr1Rr1 name anrf Innn aro ronietoroei mnrlra of arr1Rn 21171`f Date................. I........................... TOWN OF NORTH ANDOVER PERMIT FOR WIRING This certifies that ......... has permission to perform 'k)4 -, ............................ _........................................................................_..................... wiring in the building of..... !. ..� .. ,.:k -�!. '%� _7 /p — . .. . ............................................. at �1 ........ v14 E+ ,C >:5.........:.... �. '.................. orth Andover, Mass. ........................... s , Flee. Z`9..r....... Lic. No. �G/.f ............................ .. ............................................ ELECTRICAL INSPECTOR 1 Check # �i _ Commonwealth of Massachusetts Official Use Only Department of Fire Services Permit No. 122 1 Occupancy and Fee Checked BOARD OF FIRE PREVENTION REGULATIONS [Rev. l/07j (leaveblank M APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code (MEC), 527 CMR 12.00 (PLEASE PRINT WINK OR TYPE ALL INFORMATION) Date: lr) 111 City or Town of. NORTH ANDOVER To the Inspector ofWires: By this application the undersigned gives notice of his or her intention to perform the electrical work described below. Location (Street & Number) go i A Owner or Tenant Owner's Address Is this permit in conjunction with a building permit? Purpose of Building Existing Service _W Amps / Volts New Service c�-Q Amps Volts Number of Feeders and Ampacity Telephone No. Yes V No ❑ (Check Appropriate Box) ��"" Utility Authorization No. � Y CD q e` W Overhead ❑ Undgrd ❑ No. of Meters Overhead ❑ Undgrd Lk No. of Meters Location and Nature of Proposed Electrical Work: ^ f e4y Completion ofthe followinz table may be waived by the Inspector of Wires. No. of Recessed Luminaires 10 No. of Ceil.-Susp. (Paddle) Fans No. of Total Transformers KVA No. of Luminaire Outlets (ID No. of Hot Tubs Generators KVA No. of Luminaires Swimming Pool Above ❑ In- Elo. rnd. rnd. o mergency Lighting Battery Units No. of Receptacle Outlets b No. of Oil Burners FIRE ALARMS No. of Zones No. of Switches 7..5 No. of Gas BurnersNo. of Detection and Initiating Devices No. of Ranges l No. of Air Cond. Total Tons No. of Alerting Devices No. of Waste Disposers I Heat Pump Totals: Number ons KW No. of Self -Contained Detection/Alertin Devices No. of Dishwashers i Space/Area Heating KW Local ❑ Municipal ❑ Other Connection No. of Dryers i Heating Appliances KW Security Systems:* No. of Devices or Equivalent No. of Waters KW No. of No. of s Signs Data Wiring: No. of Devices or Equivalent No. Hydromassage Bathtubs No. of Motors Total HP Telecommunications Wiring: No. of Devices or E uivalent OTHER: Attach additional detail if desired, or as required by the Inspector of 97res. Estimated Value of Elec ical Work: dv oo (When required by municipal policy.) Work to Start: '1/11 1'-J Inspections to be requested in accordance with MEC Rule 10, and upon completion. INSURANCE COVERAG : Unless waived by the owner, no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including "completed operation" coverage or its substantial equivalent. The undersigned certifies that such coverage is in force, and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE BOND ❑ OTHER ❑ (Specify:) I certify, under the pains and en ties ofperjury, that the information on this application is true and complete. FIRM NAME:. I � Q W n L ( LIC. NO.: IiAkf�- Licensee: ,� Rtu- Signature V LIC. NO.: (If applicable, enter "exempt" in the license number line) Bus. Tel. No.: Q17- S rd j ..i3b Address: I AQ tt i Stw3m,�, -sr e gm Alt. Tel. No.: *Per M.G.L c. 147, s. 57-61, security work requires Department of Public Safety "S" License Lic. No. OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally required by law. By my signature below, I hereby waive this requirement. I am the (check one) ❑ owner ❑ owner's agent. Owner/Agent PERMIT FEE: $ Signature Telephone No. ❑ 2012 Massachusetts Electrical Code Amendments 527 CMR 12.00 § Rule 8: In accordance with the provisions of M.G.L. c. 143, § 3L, the permit application form to provide notice of installation of wiring shall be uniform throughout the Commonwealth, and applications shall be filed on the prescribed form. After a permit application has been accepted by an Inspector of Wires appointed pursuant to M. G.L c. 166, § 32, arrv� a electrical permit shall be issued to the person, firm or corporation stated on the permit application. Such entity shall be responsible for the notification of completion of the work as required in M.G.L. c. 143, § 3L. Permits shall.be limited as to the time of ongoing construction activity, and may be deemed by the Inspector of Wires abandoned and invalid if he or she has determined that the authorized work has not commenced or has not progressed during the preceding 12 -month period. Upon written application, an extension of time for completion of work shall be permitted for reasonable cause. A permit shall be terminated upon the written request of either the owner or the installing entity stated on the permit application. ❑ The Permit Extension Act was created by Section 173 of Chapter 240 of the Acts of 2010 and extended by Sections 74 and 75 of Chapter 238 of the Acts of 2012. The purpose of this act is to promote job growth and long-term economic recovery and the Permit Extension Act furthers this purpose by establishing an automatic four-year extension to certain permits and licenses conceming the use or development of real property. With limited exceptions, the Act automatically extends, for four years beyond its otherwise applicable expiration date, any permit or approval that was "in effect or existence" during the qualifying period beginning on August 15, 2008 and extending through August 15, 2012. 0. Rule 8—Permit/Date Closed: *** Note: Reapply for new permit ❑ ❑ Permit Extension Act — Permit/Date Closed: Trench Inspection Pass F?1 Failed M Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: SERVICE INSPECTION: Pass Failed Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: PARTIAL ROUGH INSPECTION: Pass 0 Failed Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: ROUGH INSPECTIO Pass Failed Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: FINAL INSPECTION: Pass 0 Failed 0 Re- Inspection Required ($.) ❑ Inspectors Comm s: Inspectors Signature: Date: DEB WEINHOLD ... TOWN OF MERRIMAC, MA........dweinhold@townofinerrimac.com x The Commonwealth of Massachusetts - Department ofIndustrial Accidents Office of Investigations qV 600 Washington Street Boston, MA 02111 www.massgov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/OrganizatiorAndividual): �j��( C, corp Address: City/Stat Are y an employer? Check the appropriate box: 1. I am a employer with 4. ❑ I am a general contractor and I Type of project (required): 6.ew construction employees (full and/or part-time).* 2. ❑ I am a sole proprietor or partner- have hired the sub -contractors listed on the attached sheet. 7. E]Remodeling ship and'have no employees These sub -contractors have 8. ❑ Demolition workingfor me in an capacity. Y p tY• workers' comp. insurance. ' 9. ❑Building addition [No workers' comp. insurance 5. ❑ We are a corporation and its 10.[�Iectrical repairs or additions required.] 3111 am a homeowner doing all work officers have exercised their right of exemption per MGL 11. ❑ Plumbing repairs or additions myself. [No workers' comp. c. 152, §1(4), a -ad we have no 12.❑Roof repairs insurance required.] t employees. [No workers' 13. ❑ Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers' compensation policy information. i'Homeowners who submit this affidavit indicating they aie doing all work and then.hire outside contractors must submit a new affidavit indicating such. #Contractors that check this box must attached an additional sheet showing the name of the sub -contractors and their workers' comp. policy information. lam an employer that is providing workers' compensation insurance for my employees Below is the policy and job site information. Insurance Company Name:, 0 Policy # or Self -ins. Lic. 70 2 9 2 g Expiration Date: 51-2� J 7 Job Site Address; 516— 232 2i� 6ifF-01V CitylState/zip: AV drl O VD60--C— . Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). 'Failure to secure coverage as required.under Section 25A of MGL o. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one=year imprisonment, as well as civil penalties in the form of a STOP. WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do herebycert ee t1 am ) d penalties ofperjury that the information provided above is true andcorrect. official use only. Do not write in this area, to be completed by city or town official. City or Town: Permit/License # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. EIectrical Inspector 5. Plumbing Inspector 6. Other - - - Contact Person: Phone #: J .�.�. �... t . ....... Date... -.4 TOWN OF NORTH ANDOVER PERMIT FOR MECHANICAL INSTALLATION This certifies that .. �_� �,... a :. I .... • . : '` :}. has permission for mechanical installation ... �Z�.11�C''�.. .......... in the buildings of . A'`` ........... at ....... a�.... :S: ? ! ~,Worth Andover, Mass, Fee. ; .... Lic. No. :?� /... .............. t ........ . 7 / GAS INSPECTOR v WHITE: Applicant ~CANARY: Building Dept. PINK: Treasurer _ A Commonwealth of 'Massachusetts Sheet Metal Permit .Date: 515W Estimated Job Cost: $ ym Permit It Permit Fee: $ Ae— Plans Submitted: YES NO Plans Reviewed: YES NO Business License 11 196 Applicant License it Business Information: Property Owner / Job Location Information: Name: J&J heating. & Air Conditioning Name Street: 17 Arlington St.... Street: ( l omloa City/Town: Dracut, MA 01826 City/Town: North Andover, MA 01845 Telephone: 978-454-8197 Telephone:50s"c�-" Photo I.D. required / Copy of Photo I.D. attached: YES oL NO l c�rrn�u�ni J-1 / M-1-wirestrieted license - \L J-2 / M -2 -restricted to dwellings 3 -stories or less and commercial up to 10,000 sq. ft. / 2 -stories or less Residential: T-2`faiYiily � "Iv7ulti-family Condo / Townhouses Other Commercial: Office Retail Industrial Educational Institutional Other Square Footage: under 10,000 sq. it. ✓' over 10,000 sq. ft. Number of Stories: Sheet metal work to be completed: New Work: Renovation: + IIVAC ✓ Metal Watershed Roofing Kitchen Exhaust System Metal Chinmey / Vents Air Balancing Provide detailed description of work to be done: /'n S— Lg r�i e, 7a l d u �7`�u a r l� -Fe w- L INSURANCE COVERAGE: I have a current liability insurance policy or its equivalent which meets the requirements of M.G.L. Ch. 112 Yes ❑ No ❑ If you have checked Yes, indicate the type of coverage by checking the aRpropriate box below: A liability insurance policy 9�Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this boxE], I hereby certify that all of the details and information I have submitted (or entered) regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO Date Date By Title City/Town Pennit # Fee $ Inspector Signature of Permit Approval Piro$,yi-ess Inspections COI1llnents Final Inspection Type of License: Master ❑ Master -Restricted ❑Journeyperson ❑Journeyperson-Restricted ❑ --- Cominents C111 (/ y Y V Signature of Licensee License Number: )5&j8 Check at www.mass.gov/dpl r The Coulluortivealth of Mass(lchuSells Print Fong 111 ,1. Uepnrlutcut ( fludirvirialAccirlertfs lit' Of/ice o/'luveslin(tlioct.s ;) 1 Colttiress Slreel, Suite 100 Boston, 11A 02,114-20.17 Jt1w ) i/ iass.hov1tjj(1 W01'ICCI's' (,o111I1C11S:11.1oll II1slIrance Affidavit: 131.11i(ACI-s/Colli:l',lc%oi-s/]!"Icc1:l-icl,llls/1)111in bel -S Appllc,1111 1111,0r111a1U)ll Please f'1II11 f (�Illly N;line (ltusil,css/(.)lig:ulie:Ilion/Imlividlrll): J&J Heating & Air. Conditioning, Inc. Address: 1.7 Arlington 5t. Dracut, MA 01826 Phone ri: 9713-454-8197 ----- Arc. you an cnlpluycr7 Checic the approprialc _ box: — 1 8111 a cn,Mg,cr wNh 40_ 4. ❑ I an, a general contractor and '1'yl)e of project (required): cnlployccs (full enii/or earl tiule).* have hired the sub -contractors 6• ❑New constrilclion 2. ❑ I am a sale proprietor or partner- listed on the attached sheet.. 7. ❑ Remodeling ship and have no cnlployccs `I'hcse sub -contractors have 8. ❑ Donlolihort worl<i0g for ole in ally capacity. INo worl<crs' coil,,). insorallec employees and have worl<crs' comp. insulance.1 ). ❑Building addition requiled.l t. ❑ I and e hon,eowncr I ❑ We arc a corporation and its of7icers have IU.❑ f3lcadul repairs or additions iloint; aII vvorl< exercised their 11.❑ Plumbing repairs or additions Illysell. INo workers' coinp. insurance "igllt of cxclllpl.ioll i)cl' MGi, 12.0 hoof repairs required. I. c. 152, § q4), and we have no cnlployccs. [No workers' 13.❑ colllp. Insurance required] "Any ;1PPlicutl (hal cheeks box P I muss nlso rill oil the section below showing OWN woIkca's' compensation policy ill R)rnutlion. I I Ionicowuci:c who submit Ihis.;ill'idavil indicrtling Ihcy arc doing ;ill work and then hire oulsidc coutl'nctors nutty submil a new alli(lavil indic>iling such. IC•onlraclots I11:11 check This box onisl allached an addilional sheet shuwinl: the name of the sub-conlroclors and stale whether or not (hose entities h;tve entployr.cs. If the sub-conlrac.lni:c have euytloye.es, Ihcy must provide tltcir workers' comp. policy number. / rllll !N! e1111)I(Tel' that iv 1woviding IVol-ke1•s' coa11)ellsatt(j,1) 111.Ci11•al1Ce )I• my eny)101)Ces. lieloly 1S the 1)r)llC)) ititit 101) .CNC lnlm-111atloll. InsuiallccColllpnly Nen,, A -UM, M itual_ Insurance Policy 11 l 02 or Sell=ins. L,ic. 11: WM'l.-800-80(1Ci`i53-2013A 1?x )iretion Dam: Ofi 0). I - -- -- ._... ----- - - ---- - — I --t _j --- ------- .loh Site nddress:. /111_ i:ilcs iii__ 4��� % Allach a (0py of the worl<crs' compinsalion policy (Ieclaralion page (showing; the policy nurnhim and expiration (late). 1 eilurc to seer"( covc11190 as rawilind under Section 25n of MGI-, c. 152 can lead to the imposition of crin,illal penallies ofa line 1111 to ,$1000.00 and/or one-year inlpriumment, as well its clvd pulaltics in IIID 101'111 of a SI OP WORK ORDL'R. and a We ol' up to $25�-00 a day Il'nsl the violator. 13c advised IhM a copy of this statement may be Foiwardecl to the Off ice of Investi)�:t��"olls ofthc I)In��or instt�ial.lox covcrage verilwation. 1 do het 19'lrrKc IfiV a Idr !Hills lilt . witalties o/ )el•'trl•h that the ill oollation 1u•ovided above is true and correct. LFI -- -----...-- ------ — n I c: I'honc It (lI iiial 11se ooh,. DO not Inl•ite in this arca, to he col l leted by city or tolnu offrcial Oily M- Town: 1'enniolicense 11 Is.�uing )knlhorily (circle one): I. 1103rd ol• I Icallh 2. Building Department 3. Cily/Town Clerlc 6.t)Ihcr Contac•I Person: 4. Electrical In.speclor S. Plumbing Inspeclor Phone Ih �AS'S'13CIIUSJCT (MV .: ,S'DRII ... .. NSE Bron ' A ISSO DN END 4d WMDER 1 05 03N 12011,:, DN..S99655871! 1 ` D06 I (� d-I t. 1 . ods U5H2 1 t' SSI I., '0.1,!12 RF. ST NONE 1 SEX MI�x41 b .- r1;opA KLINE ERIC RJ �' r1„1,� Ew tµ[ti�: t•. 2 83 LONG DR DRACUT, MA 01826.2048 � 5 DD 05.061011 Rev 07.162008 ! / r u' COMMONWEALTH OF MASSACHUSETI A 11 R A -11 •' SHEET ME T o .►. WORKERS AS A MASTER•'iNRESTRIQTEU ? I SSU[S 1 HL'. Af30VE I_ICI NSf:i T0: Ii ERIC R KLINE J & J HEATING 17 ARLINGTON ST. DRACUT MA L1182 —393 V.I 1.568 ACORD CERTIFICATE ®F LIABILITY INSURANCE DATE(MM/DD[MY) "ROU e� ucER 978.887.4900 FAX 978.887,2404 Edward F. SellnOtt Insurance Agency, Inc. 1.6 South Main Street P. 0. Box 457 Topsfield, MA 01983 INSURED J&J Heating At Air Conditioning, Inc. .17 Arlington Street Dracut, MA 01826 06/03/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC N INSURE_RA: Great American Alliance Ins Co _ INSURER B: Safety Insurance Company 39454 INsunERc: A.I.M. Mutual Insurance Co. INSURER D: COVERAGES -.- --- r_: -- 1 Hf. POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREME=NT, TERM OR CONDITION OF ANY CON'rRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TOALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR NSR TYPE OF INSURANCPOLICY NUM E POLICY FFFECTIVF POLICY EXPIRATION BER DATE MM DO YYYV DATE MM DD YYY LIMITS GENERAL UA CIAL PAC6418906-07 06/01/2013 06/01/2014 EACH OCCURRENCE_ $ 1 , 000 , OO X COMMERCIAL GENERAL I_IARILfrY U�MAU`= f Fif=N"TE) 1 CLAIMS MADF OCCUR ( X PREMISES (Ea occurrence)_ $ 300 , OO I__-_ I A MED EXP (Any one porson) $ 10,00 GEN'L AGGREGAT E LIMIT APPIJES PER: �POLICY __—. Pr—to-WC AUTOMOBILE LIABILITY ANY AU10 ALL OWNED AUT"OS 13 X SCI-IEI)U1-rD AUTOS X I IIRED AU1 OS X NON -OWNED All1 OS GARAGE LIABILITY -_- I ANY AUTO EXCESS/ UMBn FL.LA LIABILITY X l OCCUn (—_I CLAIMS MADE n Df_ULJCI IBLI= _ RF.II-N'IION $ '— —--.'-.__- WORI(F.RS COMPr-NSA710N AND FMPLOy FRS' LIABILITY ANY "1101'11117 TOR/PM INIcR/EXr('U I jvT1Y--I C ()PPICFR/MI-MRI EXCLUDED? �_JI (Windalory In NH) II yes, drsr.iibn under SPECIAI. I'110VISIONS bNnw O711ER 24345501 06/01/2013 PERSONAL & ADV INJURY $ _1 , OOO , 00 GENERAL AGGREGATE_ $ - 2 , OOO , OO PRODUCTS - COMP/OP AGG $ 2,000,00o,000,OO 014 COMBINED SINGLE L1-,T7s (Ea accident) UMB6418958-05 06/01/2013 06/01/2014 WMZ-800-8006553-2013A 06/02/2013 06/02/2014 6E6CRIP710N OP OPERATIONS / LOCATIONS / VENICLES / EXCLUSIONS ADDED BY ENDORSEMENT/ SPECIAL PROVISIONS, cffHTIFICATE HOI_DEII BODILY INJURY $ (Por person) BODILY INJURY I $ (Per accident) PROPERTY DAMAGE $(Per accident) AUTO ONLY - EA ACCIDENT $ OTHER THAN EA ACC $ AUTO ONLY: AGG $ EACH OCCURRENCE $ AGGREGATE $ $ E.L. EACH ACCIDENT $ E.L. DISEASE - EA EMPLOYEE E.I-. DISEASE - POLICY LIMIT .$ 1.000 2,000,0 2,000.0 1,000,00 1,000,00 1,000,00 CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATIO DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL. 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OFANY KIND UPON THE INSURER, ITS AGENTS OH Evidence of InsuranceREPRESENTATIVES. AUTHORIZED REPRESENTATIVE _J tAAM Peter Sennetf � ACOHD 25 (2009/01) /t1...._:. © 1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD HEATING EQUIPMENT Make n/a Trade ap �,, � �������` Model Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L cfm Inside humidity (%) 50 50 Static pressure Moisture difference (gr/Ib) 47 28 0 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref n/a Efficiency n/a Htg load Heating input Htg AVF Clg AVF Heating output 0 Btuh Temperature rise 0 °F Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a cfm COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Area Htg load Coil n/a Htg AVF Clg AVF AHRI ref n/a (ft2) (Btuh) Efficiency n/a (cfm) Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor -0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 91312 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor d 2927 47865 29857 1250 1250 1 st floor system d 2358 43447 28883 1314 1314 I. Basemnt/1st sys d 5285 91312 58857 2565 2817 Other equip loads 8476 0 Equip. @ 0.93 RSM 54502 Latent cooling 7589 T(1TAIQ cnoc nn�nn nnnna nrnc nn47 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrilhtSOft%2014-Mar-07 08:56:44 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 1 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N -9 @ Load Short Form Job: Compass Point • wri htsoft ja Date: n14, 2014 1st floor system By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 °Projec �nfolrmaNtlon. Ili 51"I"I"M ,�-�f,1 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFU E 0 Btuh 0 Btuh 0 °F Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L 1st floor system d Inside humidity (%) 50 50 1314 Moisture difference (gr/Ib) 47 28 3626 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFU E 0 Btuh 0 Btuh 0 °F 1314 cfm 0.030 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER 0 Btuh 0 Btuh 0 Btuh 1314 cfm 0.046 cfm/Btuh 0 in H2O 0.93 1274 ROOM NAME Area Htg load Cig load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) basement zone p 1274 24469 16831 740 766 1stfloor p 1084 18978 13036 574 593 1st floor system d 2358 43447 28883 1314 1314 Other equip loads 3626 0 Equip. @ 0.93 RSM 26745 Latent cooling 2044 T('1TA I C 04CQ n -7n -7o 4— a 414 e I Or tl cor 00 IJI-F IJ 1'+ Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ti ri htsoftm 2014 -Mar -07 08:56:44 ti w9 Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 2 ACCN ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N ro Load Short Form Job: 82 Compass Point • Wrlghtsoft Date: jan14, 2014 2nd floor By: Croinin Construction Management P.0 Box 7237, Lowell, Me 01852 IN z�� Pro�e�cinforrnat�on For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFU E 0 Btuh 0 Btuh 0 Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L 1107 Inside humidity (%) 50 50 29857 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFU E 0 Btuh 0 Btuh 0 OF 1250 cfm 0.026 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER Area 0 Btuh 0 Btuh 0 Btuh 1250 cfm 0.041 cfm/Btuh 0 in H2O 0.86 8549 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Bouns zone p 885 13058 8549 341 350 2nd floor zone p 2042 34807 27010 909 1107 2nd floor d 2927 47865 29857 1250 1250 Other equip loads 4850 4096 Equip. @ 0.93 RSM 31440 Latent cooling 5545 TnT,a i c 2927 2 5 715 36986 1250 1250 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ."t.{}�� Wil (1tSOft 2014 -Mar -07 08:56:44 "imi.._- 1 g Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 3 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N -- 9 Load Short Form Job: 82 Compass Point wri htsoft Date: jan14, 2014 1st floor By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Make n/a Trade n/a Model n/a Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L Air flow factor Inside humidity (%) 50 50 0 Moisture difference (gr/Ib) 47 28 18978 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref n/a Efficiency n/a Htg load Heating input Htg AVF Clg AVF Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a cfm COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Area Htg load Coil n/a Htg AVF Clg AVF AHRI ref n/a (ft2) (Btuh) Efficiency n/a (cfm) Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 18978 ROOM NAME Area Htg load Clg. load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Living room 704 8928 5556 270 253 Kitchen 130 1672 2581 51 117 office 250 8378 4898 253 223 1st floor p 1084 18978 13036 574 593 Other equip loads 2805 0 Equip. @ 0.93 RSM 12071 Latent cooling 1581 T(-1TAI C If10A 7-1700 -1nf%rn r_7n rnn Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft® 2014 -Mar -07 08:56:44 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 4 OCCK ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Load Short Form Job: 82 Compass Point -- wrightsofte Date: jan14, 2014 2nd floor zone By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 .. _,. �'roject I�nformat�on� . For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Make n/a Trade n/a Model n/a Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L bedroom 1 Inside humidity (%) 50 50 77 Moisture difference (gr/Ib) 47 28 1432 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref n/a Efficiency n/a Heating input Sensible cooling Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Coil n/a AHRI ref n/a Efficiency n/a Htg load (Btuh) Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 107 ROOM NAME Area (ft2) Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) Clg AVF (cfm) Ldy 32 1097 294 29 12 Masterbath 65 2667 1501 70 62 Bedroom 2 208 4865 2622 127 107 bedroom 1 176 2952 3058 77 125 1/2 bath 91 1432 375 37 15 Masterbed room 325 8308 7137 217 293 full bath 77 675 171 18 7 2nd floor hall 180 2237 707 58 29 7f41!` 000 -1 nC7A 444 AA /171 VVV IV:J/Y I I I" L/O 1F0/ Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft" 2014 -Mar -07 08:56:44 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 5 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N 2nd floor zone p 2042 34807 27010 909 1107 Other equip loads 2817 0 Equip. @ 0.93 RSM 25012 Latent cooling 4033 TC)TAI q 9r1n9 rmenn nnnnc nnn •�n� LVTL IjIU `i r_UU40 .iu27 I IUI Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2014 -Mar -07 08:56:44 i + wrightsoft, Right -Suite® Universal 2013 13.0.07 RSU05790 Page 6 /aCCP....oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N .Load Short Form Job: 82 Compass Point • wri htsofto 9 Date: jan14, 2014 basement zone By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 �lec norma ion s3 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) Htg Clg Infiltration (cfm) Basement Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality 740 Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L 15585 Inside humidity (%) 50 50 463 Moisture difference (gr/Ib) 47 28 Henna 4nnen HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Basement 1274 24469 16831 740 766 basement zone p 1274 24469 16831 740 766 Other equip loads 822 0 Equip. @ 0.93 RSM 15585 Latent cooling 463 T(1TAI C imn Henna 4nnen Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. t wri htsoftw 2014 -Mar -07 08:56:44 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 7 WCCK ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N wrightsoft• Load Short Form Job: 82 Compass Point Date: jan14, 2014 Bouns zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 N Project nfo matin For: • • Mount51 • drive,• 01876 HEATING EQUIPMENT n/a Make n/a Sensible cooling 0 Trade n/a Latent cooling Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L OF Inside humidity (%) 50 50 Air flow factor Moisture difference (gr/Ib) 47 28 0 HEATING EQUIPMENT n/a Make n/a Sensible cooling 0 Trade n/a Latent cooling 0 Model n/a Total cooling 0 AHRI ref n/a Actual air flow 0 Efficiency n/a 0 Heating input Static pressure 0 Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Coil n/a AHRI ref n/a Efficiency n/a Htg load Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 14 ROOM NAME Area Htg load CIg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) bouns room 625 8866 7083 232 290 bouns room closet 70 1248 334 33 14 dining room 190 2944 1132 77 46 Bouns zone p 885 13058 8549 341 350 Other equip loads 2033 0 Equip. @ 0.93 RSM 7916 Latent cooling 1512 TnT41C Doc ACnn-4 nnnn neo nrn Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Wrl F1tSOft® 2014 -Mar -07 08:56:44 �L ., 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 8 'I'M ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N + wrightsoft. Load Multizone Summary Report Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 a�aNlnfiltratow"um u Job: 82 Compass Point Date: jan14, 2014 By: �° Load andA1%F Smma :. e 4rx ROOM NAME Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM Basement ft3 cfm Btuh/ft2 ft3 cfm Btuh/ft2 basement zone 3822 0.41 26 4.2 3822 0.39 25 0.9 1st floor 9756 0.55 89 4.2 9756 0.52 84 0.9 Bouns zone 8975 0.43 64 4.2 8975 0.41 61 0.9 2nd floor zone 13050 0.41 89 4.2 13050 0.39 84 0.9 Basemnt/1st sys 35603 0.16 268 1.5 35603 0.07 253 0.1 �° Load andA1%F Smma :. e 4rx ROOM NAME Area ft2 Htg load Btuh Clg load Btuh Htg AVF cfm Clg AVF cfm Basement 1274 24469 16831 740 766 basement zone 1274 24469 16831 740 766 Living room 704 8928 5556 270 253 Kitchen 130 1672 2581 51 117 office 250 8378 4898 253 223 1st floor 1084 18978 13036 574 593 bouns room 625 8866 7083 232 290 bouns room closet 70 1248 334 33 14 dining room 190 2944 1132 77 46 Bouns zone 885 13058 8549 341 350 Ldy 32 1097 294 29 12 Masterbath 65 2667 1501 70 62 Bedroom 2 208 4865 2622 127 107 bedroom 1 176 2952 3058 77 125 1/2 bath 91 1432 375 37 15 Masterbed room 325 8308 7137 217 293 full bath 77 675 171 18 7 2nd floor hall 180 2237 707 58 29 attic 888 10574 11144 276 457 2nd floor zone 2042 34807 27010 909 1107 Basemnt/1st sys 5285 91312 58857 2565 2817 wrightSO W Right -Suite® Universal 2013 13.0.07 RSU05790 ktA ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: 2014 -Mar -07 08:56:44 Page 1 Component Btuh/ft2 0 170 Mau % of load Walls Location: 19328 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 5.7 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (° 58 13 Latitude: 420N 4.2 Relative humiity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range 6°F) - 15 ( L ) Method Simplified 8.5 Wet bulb (° -72 Construction quality Ti ht Adjustments Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 1 Component Btuh/ft2 Btuh % of load Walls 3.7 19328 19.4 Glazing 17.3 5656 5.7 Doors 16.7 702 0.7 Ceilings 13.9 28587 28.6 Floors 4.2 10371 10.4 Infiltration 4.2 16975 17.0 Ducts 9692 9.7 Piping 0 0 Humidification 8476 8.5 Ventilation 0 0 Adjustments 0 Total 1 997881 100.0 Component Btuh/ft2 Btuh % of load Walls 0.7 3604 6.1 Glazing 22.5 7349 12.5 Doors 7.7 323 0.5 Ceilings 12.1 24815 42.2 Floors 0.8 2071 3.5 Infiltration 0.9 3509 6.0 Ducts 9447 16.1 Ventilation 0 0 Internal gains 7740 13.2 Blower 0 0 Adjustments 0 Total 588571 100.0 Latent Cooling Load = 7589 Btuh Overall U -value = 0.140 Btuh/ft2-°F Data entries checked. wri htsoftw 2014 -Mar -07 08:56:44 Al. AC 9 Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 1 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Buildin Al $ Job: 82 Compass Point • wrightsoft. gnayI$ Date: ian14, 2014 1st floor system By: Croinin Construction Management P. 0 Box 7237, Lowell, Ma 01852 Pro`e,61 nformation For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Component Btuh/ft2 Btuh Location: Walls Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 17.3 Indoor temperature (°F) 70 75 Elevation: 30 ft 702 Design TD (°F) 58 13 Latitude: 420N 54.2 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Piping Daily range °F) - 15 (L ) Method Simplified Wet bulb (°F� - 72 Construction quality Ti ht 0 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Component Btuh/ft2 Btuh % of load Walls 3.3 8015 17.0 Glazing 17.3 1233 2.6 Doors 16.7 702 1.5 Ceilings 14.7 25507 54.2 Floors 1.4 729 1.5 Infiltration 4.2 7263 15.4 Ducts 0 0 Piping 0 0 Humidification 3626 7.7 Ventilation 0 0 Adjustments 0 Total 1 470731 100.0 Component Btuh/ft2 Btuh % of load Walls 0.6 1500 5.2 Glazing 31.1 2217 7.7 Doors 7.7 323 1.1 Ceilings 12.7 22142 76.7 Floors 0 0 0 Infiltration 0.9 1501 5.2 Ducts 0 0 Ventilation 0 0 Internal gains 1200 4.2 Blower 0 0 Adjustments 0 Total 288831 100.0 Latent Cooling Load = 2044 Btuh Overall U -value = 0.130 Btuh/ft2-°F WARNING: window to floor area ratio = 3.0% - less than 5%. -tz2014-Mar-07 08:56:44 - + wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 2 ACCA ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N EMENEMNSIENUMM o ® s o % of load Walls Location: 11314 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 8.4 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (° 58 13 Latitude: 42°N 4.9 Relative humi Ity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Adjustments 0 Dally range °F) - 15 (L ) Method Simplified 9.2 Wet bulb (°F� - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments Component Btuh/ft2 Btuh % of load Walls 4.0 11314 21.5 Glazing 17.3 4424 8.4 Doors 0 0 0 Ceilings 9.9 3080 5.8 Floors 4.9 9642 18.3 Infiltration 4.2 9713 18.4 Ducts 6540 19.3 9692 18.4 Piping Adjustments 0 0 Humidification 1 4850 9.2 Ventilation 0 0 Adjustments 0 Total 1 527151 100.0 Component Btuh/ft2 Btuh % of load Walls 0.8 2104 6.2 Glazing 20.0 5132 15.1 Doors 0 0 0 Ceilings 8.6 2673 7.9 Floors 1.1 2071 6.1 Infiltration 0.9 2008 5.9 Ducts 9330 27.5 Ventilation 0 0 Internal gains 6540 19.3 Blower 4096 12.1 Adjustments 0 Total 1 339531 100.0 Latent Cooling Load = 5545 Btuh Overall U -value = 0.149 Btuh/ft2-°F Data entries checked. 2014 -Mar -07 08:56:44 wrightsoft°' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 3 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Building Analysis Job: 82 Compass Point wrightsoft� g y Date: jan14, 2014 1st floor By: Croinin Construction Management P. 0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 teatinq Component Btuh/ft2 • ®Owl W�111T'1 ®, ® • �. ". Location: Glazing 17.3 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 3.2 Indoor temperature (°F) 70 75 Elevation: 30 ft 0 Design TD (°I) 58 13 Latitude: 420N Ducts Relative humidity (%) 0 Piping Outdoor: Heating Cooling Moisture difference (gr/Ib) 46 5 27 8 Dry bulb (°F) 12 88 Infiltration: Adjustments 0 Dally range6 °F) - 15 ( L ) Method Simplified 9.2 Wet bulb (° -72 Construction quality Ti ht Adjustments Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 1 teatinq Component Btuh/ft2 Btuh % of load Walls 3.7 4596 21.1 Glazing 17.3 1233 5.7 Doors 16.7 702 3.2 Ceilings 14.7 6831 31.4 Floors 0 0 0 Infiltration 4.2 5617 25.8 Ducts 0 0 Piping 0 0 Humidification 2805 12.9 Ventilation 0 0 Adjustments 0 0 Total 1 217831 100.0 Component Btuh/ft2 Btuh % of load Walls 1.0 1221 9.4 Glazing 44.9 3201 24.6 Doors 7.7 323 2.5 Ceilings 12.7 5930 45.5 Floors 0 0 0 Infiltration 0.9 1161 8.9 Ducts 0 0 Ventilation 0 0 Internal gains 1200 9.2 Blower 0 0 Adjustments 0 Total 1 130361 100.0 Latent Cooling Load = 1581 Btuh Overall U -value = 0.128 Btuh/ft2-°F Data entries checked. 2014 -Mar -07 08:56:44 wrightsoft" Right-SuiteOO Universal 2013 13.0.07 RSU05790 Page 4 AC. ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Building Anal sis Job: 82 Compass Point wrightsoft� y Date: ian14, 2014 2nd floor zone By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 zI :, ro ect nforrnat�o'n � � � a , For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 a Component Btuh/ft2 Btuh % of load Walls Location: 7899 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 9.0 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 420N 6.4 Relative humidity (%) 21.6 Infiltration Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27..8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range °F) - 15 (L ) Method Simplified 7.5 Wet bulb (° - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments a Component Btuh/ft2 Btuh % of load Walls 4.2 7899 21.0 Glazing 17.3 3387 9.0 Doors 0 0 0 Ceilings 8.8 2379 6.3 Floors 6.4 8132 21.6 Infiltration 4.2 5642 15.0 Ducts 7368 19.6 Piping 0 0 Humidification 2817 7.5 Ventilation 0 0 Adjustments 0 Total 1 376241 100.0 a L. Component Btuh/ft2 Btuh % of load Walls 0.6 1197 4.4 Glazing 35.4 6931 25.7 Doors 0 0 0 Ceilings 7.6 2065 7.6 Floors 1.4 1741 6.4 Infiltration 0.9 1166 4.3 Ducts 8571 31.7 Ventilation 0 0 Internal gains 5340 19.8 Blower 0 0 Adjustments 0 Total 1 270101 100.0 Latent Cooling Load = 4033 Btuh Overall U -value = 0.182 Btuh/ft2-°F Data entries checked. 2014 -Mar -07 08:56:44 wrightsoft` Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 5 .91, ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Building Analysis Job: 82 Compass Point wrightsoft� g y Date: jan14, 2014 basement zone By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 ��t,,a�a�.;�� <(E,.:� ,SPr�o evclnformat�on For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 H:eating ff Component Btuh/ft2 Btuh % of load Walls Location: 3418 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 420N 1.4 Relative hums lty (%)50 2.9 Infiltration Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27 8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range °F) - 15 (L ) Method Simplified 3.2 Wet bulb (° - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments H:eating ff Component Btuh/ft2 Btuh % of load Walls 2.9 3418 13.5 Glazing 0 0 0 Doors 0 0 0 Ceilings 14.7 18676 73.8 Floors 1.4 729 2.9 Infiltration 4.2 1646 6.5 Ducts 0 0 Piping 0 0 Humidification 822 3.2 Ventilation 0 0 Adjustments 0 Total 1 25291 100.0 00273K-11=511=97 7 i, ,+ i7 Component Btuh/ft2 Btuh % of load Walls 0.2 279 1.7 Glazing 0 0 0 Doors 0 0 0 Ceilings 12.7 16212 96.3 Floors 0 0 0 Infiltration 0.9 340 2.0 Ducts 0 0 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 1 16831 100.0 Latent Cooling Load = 463 Btuh Overall U -value = 0.131 Btuh/ft2-°F WARNING: window to floor area ratio = 0.0% - less than 5%. 2014 -Mar -07 08:56:44 wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 6 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component � o o • o F t, ' �3 Location: 3.7 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 1037 Indoor temperature (°F) 70 75 Elevation: 30 ft 0 Design TD (° 58 13 Latitude: 42°N Floors Relative hums Ity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Piping Dally range °F) - 15 (L ) Method Simplified 2033 Wet bulb (°� - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) 0 Component Btuh/ft2 Btuh % of load Walls 3.7 3415 22.6 Glazing 17.3 1037 6.9 Doors 0 0 0 Ceilings 17.5 701 4.6 Floors 2.2 1510 10.0 Infiltration 4.2 4071 27.0 Ducts 2324 15.4 Piping 0 0 Humidification 2033 13.5 Ventilation 0 0 Adjustments 0 Total 1 15091 1 100.0 Component Btuh/ft2 Btuh % of load Walls 1.0 907 10.6 Glazing 35.8 2148 25.1 Doors 0 0 0 Ceilings 15.2 609 7.1 Floors 0.5 330 3.9 Infiltration 0.9 841 9.8 Ducts 2514 29.4 Ventilation 0 0 Internal gains 1200 14.0 Blower 0 0 Adjustments 0 Total 1 85491 100.0 Latent Cooling Load = 1512 Btuh Overall U -value = 0.080 Btuh/ft2-°F Data entries checked. &121=1-21 N4 21 ALLL2-11 77 2014 -Mar -07 08:56:44 ACCP+ wrightsoftm Right -Suite® Universal 2013 13.0.07 RSU05790 Page 7 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh 15B21-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Or Area U -value Insul R Htg HTM Location: Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft2-°F/Btuh Indoor temperature (°F) 70 75 Elevation: 30 ft n Design TD (°F) 58 13 Latitude: 420N 3538 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 934 0.065 Daily range (°F) - 15 (L ) Method Simplified 929 Wet bulb (°F) - 72 Construction quality Tiht 3.74 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 3037 Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh 15B21-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 0.300 ft2 Btuh/ft2-°F ft2-°F/Btuh Btu h/ft2 Btu ROM Btu n 945 0.065 21.0 3.74 3538 0.99 940 e 573 0.065 21.0 3.74 2145 0.99 570 s 934 0.065 21.0 3.74 3496 0.99 929 w 585 0.065 21.0 3.74 2190 0.99 582 all 3037 0.065 21.0 3.74 11369 0.99 3020 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 n 36 0.300 0 17.3 622 8.04 290 n 24 0.300 0 17.3 415 13.0 313 n 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 e 24 0.300 0 17.3 415 52.7 1265 s 48 0.300 0 17.3 829 16.0 769 s 23 0.300 0 17.3 403 27.4 640 s 64 0.300 0 17.3 1106 27.4 1756 w 36 0.300 0 17.3 622 28.2 1015 all 327 0.300 0 17.3 5656 22.5 7349 2014 -Mar -07 08:56:44 wrightsoftW Right -Suite a0 Universal 2013 13.0.07 RSU05790 Page 1 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Doors ` 11 P0: Door, mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 s 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 120 0.026 38.0 1.50 180 1.30 156 gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 1890 0.255 1.0 14.7 27706 12.7 24050 gypsum board int fnsh C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board 40 0.304 1.0 17.5 701 15.2 609 int fish Floors 19A-Obstp: Part floor, frm fir, 10" thkns 1224 0.368 0 6.90 8442 1.51 1847 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns 625 0.034 30.0 1.64 1027 0.36 225 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh 506 0.025 0 1.44 729 0 0 120 0.025 0 1.44 173 0 0 all 626 0.025 0 1.44 901 0 0 2014 -Mar -07 08:56:44 wrightSOW Right -Suite® Universal 2013 13.0.07 RSU05790 Page 2 �tCCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 82 Compass Point WPI Ji1iSOft• p Date: 1an14, 2014 basement zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 �` � • ��.��..��M. � .:,Pro�e�c't�•Rlnfo'matlon�- a For: • • 51 Mount joy drive,• i • Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ftz °F/Btuh Btuh/ftz Btu Btuh/ft2 Btu Walls 15B21-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fish Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 288 0.042 • • • 021 835 0.24 Location: e 288 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0.24 Indoor temperature (°F) 70 75 Elevation: 30 ft 2.90 Design TD (°F) 58 13 Latitude: 420N 0.042 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 279 Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ftz °F/Btuh Btuh/ftz Btu Btuh/ft2 Btu Walls 15B21-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fish Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 1274 0.255 1.0 14.7 18676 12.7 16212 506 0.025 0 1.44 729 0 0 t ^� 2014 -Mar -07 08:56:44wri htsofRight-SuiteO Universal 2013 13.0.07 RSU05790 Page 3 ACCA ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N •82 Compass Job: 8ms Point - - wrightsoft- Component Constructions Date: pas 014 1st floor By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R F,. Location: Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btuh/ftz-°F Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 465 Daily range (°F) - 15 ( L ) Method Simplified 21.0 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ftz-°F ft2-°F/Btuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 468 0.065 21.0 3.74 1752 0.99 465 gypsum board int fnsh, 2"x6" wood frm e 174 0.065 21.0 3.74 651 0.99 173 s 298 0.065 21.0 3.74 1114 0.99 296 w 288 0.065 21.0 3.74 1078 0.99 286 all 1228 0.065 21.0 3.74 4596 0.99 1221 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 13.0 313 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; e 24 0.300 0 17.3 415 52.7 1265 50% outdoor insect screen; foreground = green grass (0.23) s 23 0.300 0 17.3 403 27.4 640 all 71 0.300 0 17.3 1233 31.1 2217 Doors 11 P0: Door, mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 S 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 466 0.255 1.0 14.7 6831 12.7 5930 gypsum board int fnsh Floors (none) wri htsoft 2014 -Mar -07 08:56:44 1 -a-L- g Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 4 ACCA ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MA Front Door faces: N •Job: 82 Compass Point wri htsoft- Component Constructions 9 Date: ian14,2014 Bouns zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 'Wmwm� IN AMM mom For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area YX Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft� Indoor temperature (°F) 70 75 Elevation: 30 ft Btu h/ftz Design TD (°F) 58 13 Latitude: 420N 622 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 842 0.99 Daily range (°F) - 15 ( L ) Method Simplified 0.065 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 90 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft� BtuhtV-°F ft2-°F/Btuh Btuh/V Btu Btu h/ftz Btu Walls 0 17.3 622 28.2 1015 all 60 0.300 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 225 0.065 21.0 3.74 842 0.99 224 gypsum board int fnsh, 2"x6" wood frm a 90 0.065 21.0 3.74 337 0.99 90 s 390 0.065 21.0 3.74 1460 0.99 388 w 207 0.065 21.0 3.74 775 0.99 206 609 all 912 0.065 21.0 3.74 3415 0.99 907 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 24 0.300 0 17.3 415 16.0 385 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) w 36 0.300 0 17.3 622 28.2 1015 all 60 0.300 0 17.3 1037 23.3 1400 Doors (none) Ceilings C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board 40 0.304 1.0 17.5 701 15.2 609 int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns 70 0.368 0 6.90 483 1.51 106 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns 625 0.034 30.0 1.64 1027 0.36 225 .{]}."� 2014 -Mar -07 08:56:44 .L ' r" wrightsoftw Right -Suite® Universal 2013 13.0.07 RSU05790 Page 5 Ar -C& ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N i Component Constructions Job: 82 Compass Point wrightsoft� p Date: jan14, 2014 2nd floor By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 ax i • • 0 .Ila *'gadMW c For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, frm flr, 10" thkns, 1/2" gypsum board int fnsh Or Area U -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btuh/ft2 °F Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 420N 3.74 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: s 636 Daily range (°F) - 15 ( L ) Method Simplified 0.99 Wet bulb (F) - 72 Construction quality Ti ht 21.0 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) all Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, frm flr, 10" thkns, 1/2" gypsum board int fnsh Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 0.300 3 Btuh/ft2 °F ft2-°F/Btuh Btuh/V Btu Btuh/ft2 Btu n 477 0.065 21.0 3.74 1786 0.99 474 e 399 0.065 21.0 3.74 1494 0.99 397 s 636 0.065 21.0 3.74 2381 0.99 633 w 297 0.065 21.0 3.74 1112 0.99 295 all 1809 0.065 21.0 3.74 6773 0.99 1799 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 36 0.300 0 17.3 622 8.04 290 n 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 s 48 0.300 0 17.3 829 16.0 769 s 64 0.300 0 17.3 1106 27.4 1756 w 36 0.300 0 17.3 622 28.2 1015 all 256 0.300 0 17.3 4424 20.0 5132 120 0.026 38.0 1.50 180 1.30 156 150 0.255 1.0 14.7 2199 12.7 1909 40 0.304 1.0 17.5 701 15.2 609 2014 -Mar -07 08:56:44 'rF wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 6 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Floors 19A-Obstp: Part floor, frm fir, 10" thkns 1224 0.368 0 6.90 8442 1.51 1847 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns 625 0.034 30.0 1.64 1027 0.36 225 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, the fir fnsh 120 0.025 0 1.44 173 0 0 .: Wrl htsoftW 2014 -Mar -07 08:56:44 1 g Right -Suite® Universal 2013 13.0.07 RSU05790 Page 7 ACOI, ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 82 Compass Point wrightsoft- Date: jan14, 2014 1st floor system By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 .�. ,x. i'ro e`ctlnfo;'Xmation For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Location: Or Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Loss Indoor temperature (°F) 70 75 Elevation: 30 ft ft� Design TD (°F) 58 13 Latitude: 420N Stuh/W Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: n 468 Daily range (°F) - 15 (L ) Method Simplified 0.99 Wet bulb (°F) - 72 Construction quality Tiht 0.065 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 173 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ftl-°F ft2-°F/Btuh Btuh/ft2 Btu Stuh/W Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 468 0.065 21.0 3.74 1752 0.99 465 gypsum board int fnsh, 2"x6" wood frm e 174 0.065 21.0 3.74 651 0.99 173 s 298 0.065 21.0 3.74 1114 0.99 296 w 288 0.065 21.0 3.74 1078 0.99 286 all 1228 0.065 21.0 3.74 4596 0.99 1221 15821-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int n 288 0.042 21.0 2.90 835 0.24 68 frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board a 288 0.042 21.0 2.90 835 0.24 68 int fnsh s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 13.0 313 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; e 24 0.300 0 17.3 415 52.7 1265 50% outdoor insect screen; foreground = green grass (0.23) s 23 0.300 0 17.3 403 27.4 640 all 71 0.300 0 17.3 1233 31.1 2217 Doors 11 P0: Door, mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 s 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 1740 0.255 1.0 14.7 25507 12.7 22142 gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh 506 0.025 0 1.44 729 0 0 .� Wr 1 htsoftr 2014 -Mar -07 08:56:44 ti 9 Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 8 RCCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N MINEIR ME 9-M 252 0.065 21.0 �J. wri htsoft 9 - Component Constructions Job: Date: 82 Compass Point 2014 f 2nd floor zone By: jan14, 70 75 Croinin Construction Management 0.99 Design TD (°F) P.0 Box 7237, Lowell, Ma 01852 Latitude: 420N 0.065 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) - Dry bulb (°F) 12 88 Infiltration: 3.74 Daily range (°F) - 15 (L For: Trust Construction Wet bulb (°F) - 72 Construction quality 51 Mount joy drive, Tewskbury, ma 01876 Wind speed (mph) 15.0 7.5 MINEIR ME 9-M 252 0.065 21.0 3.74 Location: 0.99 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0.065 Indoor temperature (°F) 70 75 Elevation: 30 ft 0.99 Design TD (°F) 58 13 Latitude: 420N 0.065 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 3.74 Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2--F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ftp Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 16B-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns n 252 0.065 21.0 3.74 943 0.99 251 e 309 0.065 21.0 3.74 1157 0.99 307 S 246 0.065 21.0 3.74 921 0.99 245 w 90 0.065 21.0 3.74 337 0.99 90 all 897 0.065 21.0 3.74 3358 0.99 892 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 S 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 36 0.30b 0 17.3 622 8.04 290 n 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 s 24 0.300 0 17.3 415 16.0 385 s 64 0.300 0 17.3 1106 27.4 1756 all 196 0.300 0 17.3 3387 19.0 3732 120 0.026 38.0 1.50 180 1.30 156 150 0.255 1.0 14.7 2199 12.7 1909 1154 0.368 0 6.90 7959 1.51 1741 Wrl 11tSOf#" 2014 -Mar -0708:56:44 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 9 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N 219-24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh 120 0.025 0 1.44 173 wri htsoftT 2014 -Mar -07 08:56:44 g Right -Suite® Universal 2013 13.0.07 RSU05790 Page 10 ,qcc% ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N •Job: 82 Compass Point wri htsoft- Component Constructions 9 Date: jan14, 2014 Basement By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, . 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/(t2-°F ft2-°F/Btuh BtuhM Btu Btuh/ft2 Btu Walls 15B21-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 288 0.042 21.0 2.90 835 Location: 68 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 835 Indoor temperature (°F) 70 75 Elevation: 30 ft 21.0 Design TD (°F) 58 13 Latitude: 420N w 90 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.24 279 Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/(t2-°F ft2-°F/Btuh BtuhM Btu Btuh/ft2 Btu Walls 15B21-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 S 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 1274 0.255 1.0 14.7 18676 12.7 16212 506 0.025 0 1.44 729 0 0 2014 -Mar -07 08:56:44 rF wrightsOft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 11 ACCp'.... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N •Job: 82 Compass Point wri htsoW Component Constructions 9 Date: jan14, 2014 Living room By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 , For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft�-'F/Btuh Btuh/ft2 Btu RAM Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors 11 P0: Door, mtl pur core type Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors (none) n 243 0.065 21.0 e 174 0.065 21.0 w 198 0.065 21.0 all 615 0.065 21.0 n 24 0.300 0 e 24 Location: 0 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0.290 Indoor temperature (°F) 70 75 Elevation: 30 ft 161 Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft�-'F/Btuh Btuh/ft2 Btu RAM Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors 11 P0: Door, mtl pur core type Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors (none) n 243 0.065 21.0 e 174 0.065 21.0 w 198 0.065 21.0 all 615 0.065 21.0 n 24 0.300 0 e 24 0.300 0 all 48 0.300 0 n 21 0.290 10.5 176 0.255 1.0 3.74 910 0.99 242 3.74 651 0.99 173 3.74 741 0.99 197 3.74 2303 0.99 612 17.3 415 13.0 313 17.3 415 52.7 1265 17.3 829 32.9 1577 16.7 351 7.68 161 14.7 2580 12.7 2240 2014 -Mar -07 08:56:44 „t � wrightsoft' Right-Sufte@ Universal 2013 13.0.07 RSU05790 Page 12 �� ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Y Component Constructions Job: 82 Compass Point wrightsoft� Date: jan14, 2014 Kitchen By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Ism XQ Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftp-°F ft2-°FBtuh Btuh/fis Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 105 0.065 21.0 3.74 394 0.99 105 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 12 0.300 0 17.3 202 27.4 320 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 40 0.255 1.0 14.7 586 12.7 509 gypsum board int fnsh Floors (none) 2014 -Mar -07 08:56:44 wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 13 /�� ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 82 Compass Point wrightsoft ponenonsrucons Date: jan14, 2014 office By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 -M.,-.,, t For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Location: Htg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 16.7 Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 420N 3181 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 3.74 842 Daily range (°l) - 15 (L ) Method Simplified 192 Wet bulb (°F) - 72 Construction quality Tiht 0.99 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 0.065 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 10.5 16.7 ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btu h/ftz Btu Walls 12.7 3181 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 225 0.065 21.0 3.74 842 0.99 224 gypsum board int fnsh, 2"W' wood frm s 192 0.065 21.0 3.74 720 0.99 191 w 90 0.065 21.0 3.74 337 0.99 90 all 507 0.065 21.0 3.74 1899 0.99 505 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors 11 P0: Door, mtl pur core type s Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors (none) 12 0.300 0 17.3 202 27.4 320 21 0.290 10.5 16.7 351 7.68 161 250 0.255 1.0 14.7 3665 12.7 3181 .` WI'1 htsoftp 2014 -Mar -07 08:56:44 r,,., 'i'µ g Right-Suite(g) Universal 2013 13.0.07 RSU05790 Page 14 ACCP. ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 82 Compass Point wrightsoft p Date: jan14, 2014 Bedroom 2 By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Location: Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btuh/V-°F Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 119 Daily range (°F) - 15 (L ) Method Simplified 21.0 Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 3.74 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 112 Btuh/V-°F ft2-0F/Btuh Btuh/ft2 Btuh Btuh/112 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 120 0.065 21.0 3.74 449 0.99 119 gypsum board int fnsh, 2"x6" wood frm a 117 0.065 21.0 3.74 438 0.99 116 all 237 0.065 21.0 3.74 887 0.99 236 Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 8.04 193 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns 208 0.368 0 6.90 1435 1.51 314 ti 2014 -Mar -07 08:56:44 -Fp- WI1 hlsQftp Right -Suite® Universal 2013 13.0.07 RSU05790 Page 15 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N •Job: 82 Compass Point wri htsoft- Component Constructions Q Date: jan14, 2014 Ld y By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 -� . Pro ect )nformation;�� n For: Construction 51 Mount • drive,• . 01876 Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns Or Area U -value Ni„, Htg HTM Loss Location: Gain Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btu h/112 Indoor temperature (°F) 70 75 Elevation: 30 ft 36 Design TD (°F) 58 13 Latitude: 420N 0.99 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.065 21.0 Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-°F ft'-°F/Btuh Btu h/112 Btu Btuh/ft= Btu n 36 0.065 21.0 3.74 135 0.99 36 w 45 0.065 21.0 3.74 168 0.99 45 all 81 0.065 21.0 3.74 303 0.99 81 32 0.368 0 6.90 221 1.51 48 2014 -Mar -07 08:56:44 wrightsoft° Right -Suite® Universal 2013 13.0.07 RSU05790 Page 16 �.C� ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N •Job: 82 Compass Point wri htsoft- Component Constructions 9 Date: jan14, 2014 bedroom 1 By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction Mi 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/R�'F ft2-'F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" e 75 0.065 21.0 3.74 281 0.99 75 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 24 0.300 0 glazing, clr outr, air gas, vni frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 176 0.368 0 17.3 415 28.2 6.90 1214 1.51 677 266 2014 -Mar -07 08:56:44 r wrightsoft* Right -Suite® Universal 2013 13.0.07 RSU05790 Page 17 /�� ...oft HVAClcronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N ® ® ® o o f Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/R�'F ft2-'F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" e 75 0.065 21.0 3.74 281 0.99 75 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 24 0.300 0 glazing, clr outr, air gas, vni frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 176 0.368 0 17.3 415 28.2 6.90 1214 1.51 677 266 2014 -Mar -07 08:56:44 r wrightsoft* Right -Suite® Universal 2013 13.0.07 RSU05790 Page 17 /�� ...oft HVAClcronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 63 0.065 21.0 3.74 236 0.99 63 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 91 0.368 0 6.90 628 1.51 137 t11 1 wri htsoft" 2014 -Mar -07 08:56:44 ,., 9 Right-Suitep0 Universal 2013 13.0.07 RSU05790 Page 18 ACOA ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 63 0.065 21.0 3.74 236 0.99 63 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 91 0.368 0 6.90 628 1.51 137 t11 1 wri htsoft" 2014 -Mar -07 08:56:44 ,., 9 Right-Suitep0 Universal 2013 13.0.07 RSU05790 Page 18 ACOA ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Component Constructions Job: 82 Compass Point wrightsoft� Date: jan14, 2014 Masterbed room By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 v, Pro'ect Informationk a drive,For: Trust Construction 51 Mount joy • Construction descriptions ®- • • • •. U -value Location: Htg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 14.7 Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 420N 490 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 3.74 753 Daily range (°F) - 15 (L ) Method Simplified 45 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 0.99 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 1.0 14.7 ft2 Btuh/ftz-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 1.51 490 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 201 0.065 21.0 3.74 753 0.99 200 gypsum board int fnsh, 2"x6" wood frm w 45 0.065 21.0 3.74 168 0.99 45 all 246 0.065 21.0 3.74 921 0.99 245 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns 24 0.300 0 17.3 415 16.0 385 125 0.255 1.0 14.7 1832 12.7 1591 325 0.368 0 6.90 2242 1.51 490 2014 -Mar -07 08:56:44 wrightsoft" Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 19 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 82 Compass Point wrightsoft- Date: jan14, 2014 Masterbath By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 ConstructionFor: Trust Mount51 • drive,• 01876 Construction descriptions Or Area U -value MR Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft2 Indoor temperature (°F) 70 75 Elevation: 30 ft Btu h/ft2 Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 438 0.99 Daily range (°F) - 15 (L ) Method Simplified 0.065 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 45 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain 448 1.51 ft2 Btuh/ft� °F ftz-°F/Btuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" e 117 0.065 21.0 3.74 438 0.99 116 gypsum board int fnsh, 2"x6" wood frm s 45 0.065 21.0 3.74 168 0.99 45 all 162 0.065 21.0 3.74 607 0.99 161 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns 25 0.255 1.0 14.7 366 12.7 318 65 0.368 0 6.90 448 1.51 98 .t wri htsoft' 2014 -Mar -07 08:56:44 �,, g Flight-Suite(g) Universal 2013 13.0.07 RSU05790 Page 20 'CM ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Component Constructions Job: 82 Compass Point WP19i1tS0�°Date: jan14, 2014 full bath By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 �. ON,o"eclnformatio�nTO N r _m For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft'-°F/Btuh Btuh/ft2 Btu Btu h/ftz Btu 77 0.368 0 6.90 531 1.51 116 ,.� 2014 -Mar -07 08:56:44wrl htsoft Right -Suite® Universal 2013 13.0.07 RSU05790 Page 21 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft'-°F/Btuh Btuh/ft2 Btu Btu h/ftz Btu 77 0.368 0 6.90 531 1.51 116 ,.� 2014 -Mar -07 08:56:44wrl htsoft Right -Suite® Universal 2013 13.0.07 RSU05790 Page 21 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N wrft i htso- Component Constructions Job: 82 Compass Point ' 9 Date: jan14, 2014 bouns room closet By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 ,� L :ter orm'ation For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F W-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns S 63 0.065 21.0 70 0.368 0 3.74 236 0.99 63 6.90 483 1.51 106 C WI'1 htsoftp 2014 -Mar -07 08:56:44 ^� g Right -Suite® Universal 2013 13.0.07 RSU05790 Page 22 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N M� s o e • 1v'3>` Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F W-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns S 63 0.065 21.0 70 0.368 0 3.74 236 0.99 63 6.90 483 1.51 106 C WI'1 htsoftp 2014 -Mar -07 08:56:44 ^� g Right -Suite® Universal 2013 13.0.07 RSU05790 Page 22 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Wrl htsoft- Component Constructions Job: 82 Compass Point 9 Date: jan14, 2014 bouns room By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 H��.: �..Nro ectlnformation . ConstructionFor: Trust 51 Mount joy drive,• Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft� °F ftz °FBtuh Btuh/ft2 Btu Btuh/W Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-30bstp: Part floor, r-30 ins, frm flr, 10" thkns n 225 0.065 21.0 3.74 Location: 0.99 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 3.74 Indoor temperature (°F) 70 75 Elevation: 30 ft 0.065 Design TD (°F) 58 13 Latitude: 420N 206 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method' Simplified Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft� °F ftz °FBtuh Btuh/ft2 Btu Btuh/W Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-30bstp: Part floor, r-30 ins, frm flr, 10" thkns n 225 0.065 21.0 3.74 842 0.99 224 s 156 0.065 21.0 3.74 584 0.99 155 w 207 0.065 21.0 3.74 775 0.99 206 all 588 0.065 21.0 3.74 2201 0.99 585 s 24 0.300 0 17.3 415 16.0 385 w 36 0.300 0 17.3 622 28.2 1015 all 60 0.300 0 17.3 1037 23.3 1400 625 0.034 30.0 1.64 1027 0.36 225 2014 -Mar -07 08:56:44 I.&-,� wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 23 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 82 Compass Point WrI J�1tSOft� p Date: ian14, 2014 2nd floor hall By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 maim For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Location: Loss Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ftz °FBtuh Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ftz-°F ftz °FBtuh Btuh/112 Btu Btuh/ft2 Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 33 0.065 21.0 3.74 124 0.99 33 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 12 0.300 0 17.3 207 8.04 97 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 180 0.368 0 6.90 1241 1.51 272 2014 -Mar -07 08:56:44 wrightsoft" Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 24 /�.CA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N a Component Constructions Job: 82 Compass Point wrightsoft� p Date: jan14, 2014 attic By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 s 0 • 0 r3°�t rcm r x3+:u kw ;ctp°_ For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area Ll -value Location: Htg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 420N 17.3 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 4.43 744 Daily range (°F) - 15 ( L ) Method Simplified 333 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 0.40 Construction descriptions Or Area Ll -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/W-°F W-T/Btuh Btuh/ft2 Btu Btuh/ftp Btuh Walls 0 17.3 1106 27.4 1756 all 112 0.300 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, n 168 0.073 8.0 4.43 744 0.17 29 r-8 ins, 8" thk, 1/2" gypsum board int fnsh a 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 156 all 986 0.073 8.0 4.61 4541 0.31 305 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 48 0.300 0 17.3 829 13.0 625 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) s 64 0.300 0 17.3 1106 27.4 1756 all 112 0.300 0 17.3 1935 21.3 2381 Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 120 0.026 38.0 1.50 180 1.30 156 gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh 120 0.025 0 1.44 173 0 0 2014 -Mar -07 08:56:44 . wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 25 RCCA ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MA Front Door faces: N Component Constructions Job: 82 Compass Point wrightsoft Date: jan14, 2014 dining room By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftl-°F ft2-°F/Btuh BtuhtV Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors (none) e 90 0.065 21.0 S 171 0.065 21.0 all 261 0.065 21.0 40 0.304 1.0 3.74 337 0.99 90 3.74 640 0.99 170 3.74 977 0.99 260 17.5 701 15.2 609 2014 -Mar -07 08:56:44 Ir wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 26 /iCCp....oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N „�34 iG Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (OF) - 15 (L ) Method Simplified Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftl-°F ft2-°F/Btuh BtuhtV Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors (none) e 90 0.065 21.0 S 171 0.065 21.0 all 261 0.065 21.0 40 0.304 1.0 3.74 337 0.99 90 3.74 640 0.99 170 3.74 977 0.99 260 17.5 701 15.2 609 2014 -Mar -07 08:56:44 Ir wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 26 /iCCp....oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Level 2 Job #: 82 Compass Point Performed for: Trust Construction 51 Mount joy drive Tewskbury, ma 01876 Croinin Construction Management P.O Box 7237 Lowell, Ma 01852 Scale: 1 : 101 Page 2 Right -Suite® Universal 2013 13.0.07 RSU05790 2014 -Mar -07 08:57:01 ... construction 21 gabriel wayrup level 3 Job #: 82 Compass Point Performed for: Trust Construction 51 Mount joy drive Tewskbury, ma 01876 Croinin Construction Management P.O Box 7237 Lowell, Ma 01852 Scale: 1 : 101 Page 3 Right -Suite® Universal 2013 13.0.07 RSU05790 2014 -Mar -07 08:57:01 ... construction 21 gabriel wayrup 7 wri htsofto Duct System Summary Job: 82 Compass Point 9 Date: jan14, 2014 1st floor system By: Croinin Construction Management R 0 Box 7237, Lowell, Ma 01852 � '� �� aye "� ra'�a�„ �' �^�„�' a^t��,+ x.CR1m �€ p"�` d .:. "'Ps : •�.° �� '•�,'`, �;' s �� ro�e�ctlnf�m,at�oiri For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 External static pressure Pressure losses Available static pressure Supply / return available pressure Lowest friction rate Actual air flow Total effective length (TEL) Heating 0 in H2O 0 in H2O 0 in H2O 0.000 / 0.000 in H20 0 in/100ft 1314 cfm Cooling 0 in H2O 0 in H2O 0 in H2O 0.000 / 0.000 in H2O 0 in/100ft 1314 cfm 0 ft 153 � .. taxi abl f, Supply Branc Die I T Name Design (Btuh) Htg (cfm) Cig (cfm) Design FR Diam (in) H x W (in) Duct Matl Actual Ln (ft) Ftg.Egv Ln (ft) Trunk Basement c 3366 148 153 0 0 0X0 ShMt 0 0 easement -A C 3366 148 153 0 0 Ox 0 ShMt 0 0 easement -B c 3366 148 153 0 0 Ox 0 ShMt 0 0 Basement -C c 3366 148 153 0 0 Ox 0 ShMt 0 0 Basement -D c 3366 148 153 0 0 0x0 ShMt 0 0 Kitchen C 2581 51 117 0 0 0x0 ShMt 0 0 Living room h 2778 135 126 0 0 Ox 0 ShMt 0 0 Living room -A h 2778 135 126 0 0 0x0 ShMt 0 0 office h 2449 127 111 0 0 Ox 0 ShMt 0 0 office -A h 2449 127 111 0 0 Ox 0 ShMt 0 0 Return B�ra ,Sch De ail Tab e07 Name Grill Size (in) Htg (cfm) Clg (cfm) TEL (ft) Design FR Veloc (fpm) Diam (in) H x W (in) Stud/Joist Opening (in) Duct Matl Trunk rb4 Ox 0 1166 1206 0 0 0 0 Ox 0 ShMt 1 2014 -Mar -07 08:56:44Wrl htSOfRight-Suite® Universal 2013 13.0.07 RSU05790 Page 1 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N b 'WPI htsoft. Duct System Summary Job: 82 Compass Point g Date: jan14, 2014 2nd floor By: Croinin Construction Management P. 0 Box 7237, Lowell, Me 01852 "�`.a,�r,�,�,Vt 1„a�'rs.�t .t t For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 External static pressure Pressure losses Available static pressure Supply / return available pressure Lowest friction rate Actual air flow Total effective length (TEL) Heating 0 in H2O 0 in H2O 0 in H2O 0.000 / 0.000 in H20 0 in/100ft 1250 cfm NMI Design .. �,. , Cooling 0 in H2O 0 in H2O 0 in H2O 0.000 / 0.000 in H2O 0 in/100ft 1250 cfm Oft 15 Name Design (Btuh) Htg (cfm) Clg (cfm) Design FR Diam (in) H x W (in) Duct Matl Actual Ln (ft) Ftg.Egv Ln (ft) Trunk 1/2 bath h 375 37 15 0 0 0x0 ShMt 0 0 2nd floor hall h 707 58 29 0 0 Ox 0 ShMt 0 0 Bedroom 2 h 2622 127 107 0 0 0x0 ShMt 0 0 Ldy h 294 29 12 0 0 Ox 0 ShMt 0 0 Masterbath h 1501 70 62 0 0 Ox 0 ShMt 0 0 Masterbed room c 3569 109 146 0 0 Ok 0 ShMt 0 0 Masterbed room -A C 3569 109 146 0 0 Ox 0 ShMt 0 0 attic c 3716 92 152 0 0 Ox 0 ShMt 0 0 attic -A c 3715 92 152 0 0 Ox 0 ShMt 0 0 attic -B c 3715 92 152 0 0 Ox 0 ShMt 0 0 bedroom 1 c 3058 77 125 0 0 OX 0 ShMt 0 0 bouns room c 3541 116 145 0 0 0X0 ShMt 0 0 bouns room closet h 334 33 14 0 0 Ox 0 ShMt 0 0 bouns room -A c 3541 116 145 0 0 0x0 ShMt 0 0 dining room h 1132 77 46 0 0 Ox 0 ShMt 0 0 full bath h 171 18 7 0 0 Ox 0 ShMt 0 0 Re urn Branch D a� 't , Name Grill Size (in) Htg (cfm) Clg (cfm) TEL (ft) Design FR Veloc (fpm) Diam (in) H x W (in) Stud/Joist Opening (in) Duct Matl Trunk rb3 Ox 0 1250 1458 0 0 0 0 Ox 0 ShMt 2014 -Mar -07 08:56:44 wrightSO W Right -Suite® Universal 2013 13.0.07 RSU05790 Page 2 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N