HomeMy WebLinkAboutMiscellaneous - 84 COMPASS POINT ROAD 4/30/20180
IM)
FIJI
Goa
us 8
Z T -
w CID
Con
Enter construction cost for fee cal -
North Andover Fee Calculation
Construction Cost
$ 183800.00
m
$ -
$
225.60
-Plumbing Fee
$
28.20
-Gas Fee 100 comm.
$
100.00
-Electrical Fee
$
28.20
Total fees collected
$
382.00
23 Sullivan street
467-14 on 12/2/2013
1 Ox1 0 Bedroom over existing foyer
Le
vv, -DX
Dat0/.I/KV
I I
TOWN OF NORTH ANDOVER
PERMIT FOR WIRING
This certifies that / ................... .. . .............................................
...... .. ... ... . .... ...........
has permission to perform .... zyj 4r�
............................................................................................ :;:� .......
s
wiring in the building of ...... ....... . ... ........ .................................... ....................
at ......... Z�-/ ........ ....... .......................... . Nrth Andover, Mass.
.... Lic. Nyo.
Pee",�?. ...... . . . .. ........
Ctieck # KECIAICAL INSPEcrOR
C-,
Official Use Only
Commonwealth of Massachusetts
Permit No. J-2.2 0
Department of Fire Services .1
Occupancy and Fee Checked
% BOARD OF FIRE PREVENTION REGULATIONS [Rev. I/o7] (leaveblank)
APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK
All work to be performed in accordance with the Massachusetts Electrical Code (MEC), 527 CNM 12.00
(PLEASEPRTNTIN)NK OR TYPE ALLMFORAMTION) Date:
City or Town oh NORTH ANDOVER To the Inspector of Wires:
By this application the undersigned gives notice of his or her intention to perform the electrical work described below.
Location (Street & Number)_ 7S q Cm fb-ss� R�/ P) 7: /Q jq -
Owner or Tenant TAA.S; �,&Y15vLA—CTi-(jr\ ou-e, Telephone No.
Owner's Address
Is this permit in'conjunction with a building permit? yes,211*' No [I (Check Apprpriate Box)
Purpose of Building Utility Authorization No.
Existing Service Amps Volts
New Service ^7,C0 Amps VC)/ 245t3e�volts
Number of Feeders and Ampacity
Location and Nature of Proposed Electrical Work:
OverheadEl UndgrdE:l No. of Meters
OverheadF] Undgrd �� No. of Meters
ComDletion ofthe followinz table mav be waived bv the Inspector of Wires.
No. of Recessed Luminaires p
No. of Ceil.-Susp. (Paddle) Fans
I
No. of Total
Transformers KVA
No. of Luminaire Outlets li-o
No. of Hot Tubs
Generators KVA
No. of Luminaires
Swimming Pool Above o In-
grnd. grnd.
No-.--oTEmergency Lighting
Battery Units
No. of Receptacle Outlets �SV
No. of Oil Burners
FIRE ALARMS
lNo. of Zones
No. of Switches
No. of Gas Burners 1),
No. of Detection and
Initiating Devices
No. of Ranges
No. of Air Cond. Total
�,- Tons
No. of Alerting Devices
No. of Waste Disposers
Heat Pump
Totals:
I Number I ToR�
*****' 1 .1
K.W ...........
..... .....
No. of Self -Contained
Detection/Alerting Devices
No. of Dishwashers
Space/Area Heating KW
LocalEl Mun'c'PP' El Other
Connection
No. of Dryers
Heating Appliances KW
Security Systems:*
No. of Devices or Equivalent
No. of Water
Heaters KVG_
NO. of No. of
Signs Ballasts
Data Wiring:
. No. of Devices or Equivalent
No. Hydromassage Bathtubs
No. of Motors Total HP
Telecommunications Wiring -
No. of Devices or Equivafent
OTHER:
Attach additional detail if desired, or as required by the Inspector of ff7res.
Estimated Value of Electrical Work: 1%6 1 &b (When required by municipal policy.)
Wdrk to Start: 3 1 )] ) 1� Inspections to be requested in accordance with YMC Rule 10, and upon completion,
INSURANCE COVERAGIVk: Unless w ived by the owner, no permit for the performance of electrical work may issue unless
n'
the licensee provides proof of li/ability' surance including "completed operation7' coverage or its substantial equivalent. The
�u
undersigned certifies that such cover e is in force, and has exhibited proof of same to the permit issuing office.
CFJECK ONE: INSUIRANCE BONDE] OTHER n (Specify:)
I certify, under thepains andp, nalfieso�fperju that the information on this application is true and complete.
FJORM NAME: r,NQe LIC. NO.
Licensee: Signature W - .- LTC. NO.:.
to r / -
(1fapplicable, enter "exempt" in 1he license number line) ---Bus. Tel. No. --
Address: mwkc� Sr & ON,-\ Alt.Tel.No.:
*Per M.G.L c. 147, s. 57-61, security Work r5eqtdres Department 6vplll@fd S Lic. No.
OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not Lave the liability insurance coverage normally
required by law. By my signature below, I hereby waive this requirement. I am the (check one) [I owner El owner's agent.
Owner/Agent
Signature Telephone No. PERMIT FEE: $
0 2012 Massachusetts Electrical Code Amendments 527 CMR 12.00 § Rule 8: In accordance -with the provisions of M.G.L. c. 143, § 3L, the
permit application form to provide notice of installation of wiring shall be uniform throughout the Commonwealth, and applications shall be filed
on the prescribed form. After a permit application has been accepted by an Inspector of Wires appointed pursuant to M. G1 c. 166, § 32, an
electrical permit shall be issued to the person, firm or corporation stated on the permit application. Such entity shall be responsible for the
notification of completion of the work as required in M.G.L. c. 143, § 3L.
Permits shali.be limited as to the time of ongoing construction activity, and may be deemed by the Inspector of Wires abandoned and invalid if he
or she has determined that the authorized work has not commenced or has not progressed during the preceding 12 -month period. Upon written
application, an extension of time for completion of work shall be permitted for reasonable cause. A permit shall be terminated upon the written
request of either the owner or the installing entity stated on the permit application.
El The Permit Extension Act was created by Section 173 of Chapter 240 of the Acts of 20 10 and extended by Sections 74 and 75 of Chapter 238 of
the Acts of 2012. The purpose of this act is to promote job growth and long-term economic recovery and the Permit Extension Act furthers this
purpose by establishing an automatic four-year extension to certain permits and licenses concerning the use or development of real property. With
limited exceptions, the Act automatically extends, for four years beyond its otherwise applicable expiration date, any permit or approval that was
"in effect or existence" during the qualifying period beginning on August 15, 2008 and extending through August 15, 2012.
0 Rule 8 — Permit/Date Closed: Note: Reapply for new permit 0
0 Permit Extension Act — Permit/Date Closed:
Trench Inspection
Pass [N
Failed
Re- Inspection Required 0
Inspectors Comments:
Inspectors Signature:
Date:
SERVICE INSPECTION:
Pass M
Failed
Re- Inspection Required 0
Inspectors Comments:
Inspectors Signature:
Date:
PARTIAL ROUGH INSPECTION:
Pass M
Failed
Re- Inspection Required ($.) 0
Inspectors Comments:
Inspectors Signature:
Date:
ROUGH ]N§PECTION:
Pass IN K
Failed
Re- Inspection Required 0
Inspectors Corplfilqnts:
A
Inspectors Signature:
Date:
FINAL INSPECTION:
Pass MX
Failed
Re- Inspection Required El
lnspectors)�b_Nments:
7, -
Inspectors Signatu4-
Date:
DEBWEINHOLD ... TOWN OF MERRIMAC, MA . ....... dweinhold@townofmerrimac.com
The Commonwealth ofMassachusetis
Department of lndustriqlAccidi�ts
Office of Investigations
600 Washington Street
Boston, MA 02111
www.mass.gov1d1a
Workers' Compensation Insurance Affidavit: BuUders/Contractors/Electricians/Plumbers
Applicant Information Please Print Legib
Nanie (Business/Organizationftdividual): (_-,T� C, - C-0 rp
Address: tv k&A U-J�Lll Al 1AATn-f/'1 t1/14
City/State/Zip:
Phone #:
Are YQdan employer? Check the appropriate box:
f
ER'i am a employer with 2��
4. El I am a general contractor and I
employees (fall and/or pait-time).*
have hired the sub -contractors
2. El I am a sole proprietor or partner-
listed on the attached sheet. I
ship and'have no employees
These sub -contractors have
working for me in any capacity.
workers' comp. insurance.
[No workers' comp. insurance
5. El We are a corpora#on and its
required.]
officers have exercised their
3. El I am a homeowner doing all work
right of exemption per MGL
myself. [No workers' comp.
c. 152, § 1(4), and we have no
insurance required.] t
employees. [No workers'
comp, insurance required.]
Type of project (required):
6. PI(ew con * straction
7. Remodeling
8. Demolition
9. E] Building addition
10.0-L111'ectrical, repairs or additions
ILE] Plumbing repairs or additions
12.0 Roof repairs
131J Other
'Any applicant that checks box #1 must also fill out the section below showing their workers' compensationpolicy information.
I Homeowners who submit this affidavit indicating they itie doing all work and thenhire outside contractors must submit a new affidavit indicating such.
TContractors that check this box must attached an additional sheet showing the name of the sub -contractors and their workers' comp. policy information.
lam an employer that isproviding workers'compensation insuranceformy employees. Below is thepollcy andjoh site
information.
Insurance Company Name:.
iq
Policy # or S elf -ins. Lic. Sz a Lf Expir 1571-
70-2 ation Date:
Job Site Address: 516- a9- - �f a:74q &fr5> ?Ot/V I citylstate/zip:
Attach a copy of the workers' compensation -policy declaration page (showing the policy number and expiration date).
Failure to secure coverage as requiredunder Section 25A of MGL o. 152 can lead to the imposition of criminal penalties of a
fine up to $1,500.00 and/or oneuyear imprisonment, as well as civil penalties in the form of a STOP. WORK ORDER and a fine
ofup to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I doMereby ceryl pena les
d Iti ofperjury that the information provided above is true and correct.
7 -0 nni-A. �?) - /. 7— / q
Official use only. Do not write in this area, to he com
pleted by city or town official.
City or Town:
PermitMcense 9
Issuing Authority (circle one):
1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector
6. Other
Contact Person:
Phone 9:
OF
Date .... .........
TOWN OF NORTH ANDOVER
PERMIT FOR PLUMBING
V 2
This certifies that ......... 1 11 1-:, --7L',,? lLr,-
........................... ........... ...................................................................
has permission to perform ..... N (--) It\ I *Y�
........................ 1� ................................. I ......................
.... ..... ..
plumbing in Ah.e buildings of ( .... ...............
at ..... �f .................................. North Andover, Mass,
Feeq.,.O ........ Lic. No. ��Jlj ..... lt�).P .....................................................................
Check# - UA(
172 vr,-
PLUMBING INSPECTOR
Id, 11�
POWNER
TYPE OR
PRINT
CLEARLY
MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM PLUMBING WORK
CITY I NORTH ANDOVER MA. DATE 13-1.1-14 __jPERMIT4
JOBSITE ADDRESS 1_84 COMPASS POINT OWNER'S NAME
--- --- - -1 _TFP_qT_ ONSTRUCTION
ADDRESS: I �1 Y DRIVE TEL1,5083209337 FAX:j
OCCUPANCY TYPE: COMMERCIAL EDUCATIONAL RESIDENTIAL
NEW: RENOVATION: REPLACEMENT: PLANS SUBMITTED: YES[] NOE]
FIXUTRES -1 FLOORS- 13smt 1 2 3 4' 5 6 7 8 9' 10 11 12 13 14
BATHTUB 2
CROSS CONN DEVICE
DEDICATED SPECIAL WASTE SYS
DEDICATED GAS/OIUSAND SYS
DEDICATED GREASE SYSTEM
DEDICATED GRAY WATER SYS
DEDICATED WATER REUSE SYS
DISHWASHER
DRINKING FOUNTAIN
FOOD WASTE GRINDER UNIT
FLOOR / AREA DRAIN
INTERCEPTOR INTERIOR
KITCHEN SINK
LAVATORY 1 3
ROOF DRAIN
SHOWER STALL 1
SERVICE / MOP SINK
110—ILET 1 2
URINAL
WASHING MACHINE CONNECTION
WATER HEATER ALL TYPES 1
, TER PIPING 1
SPIGOTS 2
INSURANCE COVERAGE
I have a current liability insurance policy or its substantial equivalent which meets the requirements of MGL. Ch. 142 YES F0 NO E:1
If you have checked YES, please indicate the type of coverage by checking the appropriate box below.
LIABILITY INSURANCE POLICY X OTHER TYPE INDEMNITY 0 BOND
OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the
Massachusetts General Laws, and that my signature on this permit application waives this requirement.
CHECK ONE ONLY: OWNER [–] AGENT F�
SIGNATURE OF OWNER OR AGENT
I hereby certify that all of the details and information I have submitted (or entered) regarding this application ar Fr and
Knowledge and that all plumbing work and installations performed under the permit issued for this applicati in c(
provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. A! W
PLUMBER NAME: I MIKE BURKE LICENSE# Fj— I r �z
COMPANY NAME: I -POWERHOUSE PLUMBING AND HEATING CORP ADDRESS: PO B
CITY: I PLAISTOW I STATE: ZIP:
to the best of my
with all Pertinent
,TURE
FAX: 160337-kO
TEL: 116033780020_ CELL: 1197849 EMAIL: I J.LAURENCIO@POWERU�USEPWMBING.COM
I
MASTER F0 JOURNEYMAN CORPORATION FE -1 # PARTNERSHIP [j # LLC Fj #
0
z
z
u
w
114
rA
z
z
�:l
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
z
U)
�!El
z
0 rA
w
ft z
u
ow
>
z
w <
U) 04
0 z 96
0
C)
:3
IL
CLILU
LL.
0
z
z
0
rA
z
z
W. -O
Date ........
TOWN OF NORTH ANDOVER
PERMIT FOR GAS INSTALLATION
Iz
This certifies that ..... ...... I ...... I L -P- "-)
........................................................................
M C j K �,,j—
has permission for gasinstallation ....... f ................ . ................
in the b *ld*ngs of
......... .. .. ...............................................................
V ) :!�? ... k .......................................... I North Andover, Mass.
at ............... I ................. 1,11P
Fee.�.6.� .. ........... Lic No. ....... vj .. 0 ..........................................................
Check# GASINSPECTOR
- I-
hereby certify that all of the details and information I have submitted (or entered) regarding this applic/ationar rue nd7rate to the best of my
Knowledge and that all plumbing work and installations performed under the permit issued for this applicai nwil ei c ce Wth all Pertinent
provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws.
PLUMBER/GASFITTER NAME: MIKE BURKE LICENSE # tGrNURE
6x
COMPANY NAME: I POWERHOUSE PLUMBING AND HEATING CORP A[ 6�96
CITY: IME— STATE: � ZIP: 103865 FAX: 1603MQQ��-_
TEL: 1603F��0?Q___ __,__._]CELL: 197849093 EMAIL: I_J.LAURENCIOiPOWERHOUSEPLUMBINGAND
MASTER N JOURNEYMAN 0 LP INSTALLER [] CORPORATION H # PARTNERSHIP [] # LLC
MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK
GOWNER
TYPE OR
PRINT
CLEARLY
CITY 1_ NORT"NDOVER MA. DATE 1_3-11-1�_ PERMIT# IH5-9�'
JOBSITE ADDRESS 1_�4�qCM!!A§§_POINT OWNER'S NAME I TRUST CONSTRUCTION
ADDRESS: 151 MT JOY DRIVE TEWKSBURY MA 01876 TEL: 5083209337 FAX:
OCCUPANCY TYPE: COMMERCIAL EDUCATIONAL RESIDENTIAL
NEW: RENOVATION: El REPLACEMENT: El PLANS SUBMITTED: YES E] NOE]
FIXUTRES I FLOOR- Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14
BOILER
BOOSTER
CONVERSION BURNER
COOK STOVE
DIRECT VENT HEATER
DRYER
FIREPLACE
FRYOLATOR
FURNACE
GENERATOR
GRILLE
LABORATORY COCKS
MAKEUP AIR UNIT
OVEN
POOL HEATER
ROOM / SPACE HEATER
ROOF TOP UNIT
TEST
UNIT HEATER
UNVENTED ROOM HEATER
WATER HEATER
INSURANCE COVERAGE
I have a current liability nsurance policy or its substantial equivalent which meets the requirements of MGL. Ch. 142 YES N NO Ej
If you have checked YES, please indicate the type of coverage by checking the appropriate box below.
I BOND F
LIABILITY INSURANCE POLICY N OTHER TYPE INDEMNITY [- -1
OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the
Massachusetts General Laws, and that my signature on this permit application waives this requirement.
CHECK ONE ONLY: OWNER E] AGENT El
SIGNATURE OF OWNER OR AGENT -.1
hereby certify that all of the details and information I have submitted (or entered) regarding this applic/ationar rue nd7rate to the best of my
Knowledge and that all plumbing work and installations performed under the permit issued for this applicai nwil ei c ce Wth all Pertinent
provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws.
PLUMBER/GASFITTER NAME: MIKE BURKE LICENSE # tGrNURE
6x
COMPANY NAME: I POWERHOUSE PLUMBING AND HEATING CORP A[ 6�96
CITY: IME— STATE: � ZIP: 103865 FAX: 1603MQQ��-_
TEL: 1603F��0?Q___ __,__._]CELL: 197849093 EMAIL: I_J.LAURENCIOiPOWERHOUSEPLUMBINGAND
MASTER N JOURNEYMAN 0 LP INSTALLER [] CORPORATION H # PARTNERSHIP [] # LLC
j.j
z
z
0
00
.
.
.
.
.
.
.
.
.
.
.
z
El
LLI
IL ft z
uj
pro U) 0-4
>
LU
z
LLI <
U) 04
z A4
0
:3
IL
ILILLI
LL.
z
z
The Commonwealth of Massachusetts
Department of IndustrialAccidents
Office of Investigations
I Congress Street, Suite 100
Boston, AM 02114-2017
www.mass.govldia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Leizibly
Name (Business/Organization/Individual): POWERHOUSE PLUMBING CORP
Address: PO BOX 896
tate/Zil): PLAISTOW, NH 03865
Phone #: 6033780020
Are you an employer? Check the appropriate box:
1. N I am a employer with 6
4. F] I am a general contractor and I
employees (full and/or part-time).*
have hired the sub -contractors
2.0 1 am a sole proprietor or partner-
listed on the attached sheet.
ship and have no employees
These sub -contractors have
working for me in any capacity.
employees and have workers'
[No workers' comp. insurance
comp. insurance.1
required.]
5. M We are a corporation and its
3.0 1 am a homeowner doing all work
officers have exercised their
myself [No workers' comp.
right of exemption per MGL
insurance required.] t
c. 152, § 1(4), and we have no
employees. [No workers'
insurance
Type of project (required):
6. New construction
7. Remodeling
8. E] Demolition
9. F1 Building addition
10.E] Electrical repairs or additions
I I.[] Plumbing repairs or additions
12.E] Roof repairs
13.F Other
*Any applicant that checks box # I must also fill out the section below showing their workers' compensation policy information.
I Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
tContractors that check this box must attached an additional sheet showing the name of the sub -contractors and state whether or not those entities have
employees. If the sub -contractors have employees, they must provide their workers' comp. policy number.
I am an employer that is providing workers' compensation insurancefor my employees. Below is the policy andjob site
information.
Insurance Company Name: HARTFORD UNDERWRITERS INSURANCE COMP
Policy # or Self -ins. Lie. #: 04WECIT2480
Job Site Address: 84 COMPASS POINT
Expiration Date: 7-28-14
City/State/Zip: N ANDOVER MA
Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to $250.00 aday agao 3 0J. -V advised that a copy of this statement may be forwarded to the Office of
i qe violat
Investigations of the 139ellor)"suz 5plcov
y(age �qification.
I do hereby cert an
_,�periury that the information provided above is true and correct.
3-11-14
Official use 6n1y. Do not jf�te' in this area, to be completed by city or town official.
City or Town:
Permit/License #
Issuing Authority (circle one):
1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector
6. Other
Contact Person: Phone
The Commonwealth of Massachusetts
Department of IndustrialAccidents
Office of Investigations
I Congress Street, Suite 100
Boston, AM 02114-2017
wwwmass.gov1dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Leizibly
Name (Business/Organization/Individual): POWERHOUSE PLUMBING CORP
Address: PO BOX 896
- PLAISTOW, NH 03865
Phone #: 6033780020
Are you an employer? Check the appropriate box:
1. N I am a employer with 6
4. E] I am a general contractor and I
employees (full and/or part-time).*
have hired the sub -contractors
2.0 1 am a sole proprietor or partner-
listed on the attached sheet.
ship and have no employees
These sub -contractors have
working for me in any capacity.
employees and have workers'
[No workers' comp. insurance
comp. insurance.:
required.]
5. F1 We are a corporation and its
3.0 1 am a homeowner doing all work
officers have exercised their
myself [No workers' comp.
right of exemption per MGL
insurance required.] t
c. 152, § 1(4), and we have no
employees. [No workers'
comi). insurance required.]
Type of project (required):
6. FE -1 New construction
7. F� Remodeling
8. n Demolition
9. E] Building addition
10.n Electrical repairs or additions
I I.E] Plumbing repairs or additions
12.F1 Roof repairs
13.0 Other
*Any applicant that checks box #I must also fill out the section below showing their workers' compensation policy information.
t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
tContractors that check this box must attached an additional sheet showing the name of the sub -contractors and state whether or not those entities have
employees. If the sub -contractors have employees, they must provide their workers' comp. policy number.
I am an employer that is providing workers' compensation insurancefor my employees. Below is the policy andjob site
information.
Insurance Company Name: HARTFORD UNDERWRITERS INSURANCE COMP
Policy # or Self -ins. Lic. #: 04WECIT2480
Job Site Address: 86 COMPASS POINT
Expiration Date: 7-28-14
City/State/Zip: N ANDOVER MA
Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to $1,500.00 and/or one-year i riso ent, as well as civil penalties in the form of a STOP WORK ORDER and a fine
'p
m
of up to $250.00 a day against thev . lal c advised that a copy of this statement may be forwarded to the Office of
Investigations of the�PM_ �brinsuranc co verification.
I do hereby;�4 unythe ��t ofperjury that the information provided above is true and correct.
— 3-11-14
Official uo only. Do
City or Town:
in this area, to be completed by city or town official.
Issuing Authority (circle one):
1. Board of Health 2. Building Department
6. Other
Permit/License #
3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector
Contact Person: Phone #:
0
. Tf�
NAME:M1C1HAEk.W BURk
LIC #: 3801 M
EXPIRES: 05/31/2014
z
0 r
M C
?.
M W
%,vMMONWEALTH OF MASSACHUSETTS ig ;
0 '0* 0 z
-glijing" G)
(J" >
PLUi-11,3ERS AND QASF1TTjkS-,..
C4 M 30 M
:t
LICEN—c't,*) AS A MASTER PI . IMSE R
r 0
ISSUES THE ABOVE LICENSE TO�
h3 12
IrG) Z
MICHAEL 11 BURKE
3:
61 CORLISS HILt RD
z
HAVERHILL 1A 01830-1613 0 0
13127 05/0", /14 160677
0
COMMONWEALTH OF MASSACHUSETTS 0
MR".
PL
AND GASFITTEF%�
REGIRMEBREERDSAS A PLUMBINGIO
ISSUES THE ABOVE UCENSE TO-.
1 3
771
MICHAEL W BURKE
POWERHOUSE PLB & HEATING C)R�x
61 CORLISS HILL RD
HAVERHILL MA 01830-1611-
2482 05/01/14 160675
Commonwealth of Massachusetts
Department of Public S2tety
Ql Burner -rechnionn Ccrtificatr
License: SU -059672
MICHAELWBUM
61 CORLLSS 11E�L
H1xverhI11MA 01630 1
Expi ration,
Commmsioner 05/26/2014
1W
ACCORtIr
k.� CERTIFICATE OF LIABILITY INSURANCE
DATE (MM/DDIYYYY)
F3/11/2014
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORIANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER
INSURANCE SOLUTIONS CORPORATION
60 Westville Rd
Plaistow NH 03865
Co MT CT Kathleen Miller, CISR, CPIW
NA r
PHONE
(AIc.N,.rtI, (603)382-4600 Nolm (603) 382 -2034
E-MAIL kmiller@±sc-insurance.com
ADPRESS:
INSURER(S) AFFORDING COVERAGE NAIC #
INSURER A.Merchants 23329
INSURED
Powerhouse Plumbing & Heating Corp.
PO Box 896
,Plaistow NH 03865
INSURER B .Hartford Underwriters Ins. Co.
INSURERC:
INSURER D:
INSURER E:
INSURER F:
COVERAGES CERTIFICATE NUMBER:CL1372212161 RFVISION NI1]MRFR-
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
TYPE OF INSURANCE
ADDLSUBR
JU&
Wyn
EOLICY NUMBER
POLICY EFF
(MMIDDIYYYY)
POLICY EXP
(MMIDDIYYYYl
LIMITS
GENERAL LIABILITY
EACH OCCURRENCE $ 1,000,000
A
X COMMERCIAL GENERAL LIABILITY
CLAIMS -MADE Fx-1OCCUR
BOPI065497
5/1/2013
5/1/2014
DAMAGE TO RENTED
PREMISES (Ea occurrence) $ 500,000
MED EXP (Any one person) $ 15,000
PERSONAL & ADV INJURY $ Included
GENERAL AGGREGATE $ 2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS - COMP/OP AGG $ 2,000,000
X1 POLICYF- � JR,0� r I LOC
$
AUTOMOBILE
LIABILITY
COMBINED TINGLE —LIMIT
(Ea accident) $ 1,000,000
BODILY INJURY (Per person) $
A
X
ANY AUTO
ALL OWNED SCHEDULED
AUTOS AUTOS
CAP1058154
5/1/2013
/1/2014
BODILY INJURY (Per accident) $
HIRED AUTOS NON -OWNED
AUTOS
PROPERTY DAMAGE $
(Per accident)
Medical payments $ 51000
UMBRELLA LIAB
HCLAIMS-MADE
OCCUR
EACH OCCURRENCE $
AGGREGATE $
EXCESS LIAB
DED I I RETENTION$
$
B
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY YIN
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED? F;T1
(Mandatory In NH)
N/A
04WECIT2480
7/28/2013
7/28/2014
X 15,STATU- —TOTH-
LIM TS I I EEL
E.L. EACH ACCIDENT $ 100,000
E.L. DISEASE - FA EMPLOYEE $ 100,000
Uesri
desc; be under
D RIPTION OF OPERATIONS below
S6
E . DISEASE - POLICY LIMIT $ 500,000
I
DESCRIPTION OF OPERATIONS/ LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space Is required)
CERTIFICATE HOLDER CANCFLLATIC)N
(978)688-9542
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
Town of North Andover
ACCORDANCE WITH THE POLICY PROVISIONS.
1600 Osgood Street
AUTHORIZED REPRESENTATIVE
North Andover, MA 01845
Keith Maglia/KRM
ACORD 25 (2010105)
INS025igninnsini
@ 1988-2010 ACORD CORPORATION. All rights reserved.
Tha Arripiri nnmgz =nrl Innn ara rarticfarart mnrifc nf Arnpn
Date ....
TOWN OF NORTH ANDOVER
PERMIT FOR MECHANICAL INSTALLATION
0
-1 A� �) 1 -4 -" A
This certifies that . �'� ....... k. - ..... !,.d ......
�as permission for me - chanical installation ..... 1. ..........
'
i the,�ildings of ... ...................
........ i qf�a.-z ........ �pNorth Andover, Mass.
... Lic. No 11(;�k ... ....
GASINSPECTOR
WkITE: Applicant CANARY: Building Dept. PINK: Treasurer
4
Commonwealth of 'Massachusetts
Sheet Metal Permit
Date:
Estimated Jo Cost: L90
Plans Submitted: YE S NO
Business License 4 196
Business Information:
Name: J&j Reatiug 6 Air cOuditiOuing
Street: 17 Arliugtou St.;.
City/Toym: Dracuts MA 01826
Telephone: -978-454-8197
Permit # :'P�o
Pen -nit Fee: $
Plans Reviewed: YE S NO
Applicant License # 9�
Property Owner / Job Location Information:
Name:. 1�-Cxs+ r,)y)aW::A1,QQ
Street:
And m& 01845
City/Town: North overs,
Telephone: 5DF3 -600— C?83T
131, + T n ;rprl / ("n ofPhotolD attached: YES �L NO I I
V V . . A-li- F.7
Staff Initial
J-1 / M-1 -unrestricted license
J-2 / M -2 -restricted to dwellings 3 -stories or less and commercial up to 10,000 sq. ft. / 2 -stories or less
Res identiah"'T:-21 rY _-Vii1ti-faMilY Condo / Townhouses- Other
Commercial: Office Retail Industrial Educational
Institutional Other
Square Footage: wider 10,0.00 sq. ft. V over 10,000 sq. ft. Number of Stories:
Sheet metal work to be completed: New Work: Renovation:
HVAC Metal Watershed Roofing Kitchen Exhaust System
Metal Chimney / Vents Air Balancing
Provide detailed description of work to be done:
S n�c fa I/ /tj e,7a t-lv e f
hNSURANCE COVERAGE:
I have a current liability insurance policy or its equivalent which meets the requirements of M.G.L. Ch. 1112 Yes D No
If you have checked Yes, indicate the type of coverage by checking the aRpropriate box below:
A liability insurance policy V - Other type of Indemnity El Bond El
OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the
Massachusetts General Laws, and that my *ignature on this permit application waives this requirement.
Check One Only
Owner El Agent E]
Signature of Owner or Owner's Agent
By checking this boxEl, I hereby certify that all of the details and Information I have submitted (or entered) regarding this application are true and
accurate to the best of my knowledge and that all sheet metal work and installations performed under the permit issued for this application will be
in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws.
Duct inspection required prior to insulation installation: YES NO
Date
Date
Progress Inspections
Conurtents
Final Inspection
By
Type of License:
r4master
Title
F1 Master -Restricted
City/Town
Eliourneyp6rson
Permit #
FlJourneyperson-Restricted
Fee $
El
inspector Signature of Permit Approval
Conirnents
e_
Signature of Licensee
License Number:
Check at www.mass.gov/dpi
Ple Colunim wealth of Massachusetts;
lalliceidents
Department of 111d"Stl
witions
fice qfhtvest�,
I Con-re.y.vStreel, Suile 100
Bo.stoii, MA 02114-20.17
11MV111Y.Mass'. (Yov/dia
Workers, Compensalioll Insurance Affidavit: 10
3t,ii(ic"S/Coiiti-.ietot-s/Electi-iciiiis/l)ltiitil)ci-s
Al)p1jc.ljjj� Infoll-matioll
Please Print 11,C1,61fly
Name Illeating & Air Conditioning, kric.
Addrcss: , I AV-Uli),Lon SL.
------- — -----
MA 018M
Phone 11: 978-454-81.97
Are yollall employer? Check I lie appropriale hox:
aill a employer with 40 4.0 1 1111 a gellel-al eOjlt:I.,jctoI- allcl I Ty 1) e o 11, 1) ro ject (re(joil-C(l):
6. E] New cons( ri lcholl
cillployces (I'lilland/ol. paill-tillic).* have hired file sub-conji-act.ol-s
2.1:1 1 all, a sole I)I.oI)I- ic, ol. oI. listed oil theattached slice(. 7, E] Renlodeling
Ship and have llo employees Thc�,L; Stl b -Coll t ract Ors have 8. E] Dcniolition
Nvolking FOrI Ile ill ally capaci ty. elliployces mid have workers,
NO wol-I(el-s, coil,,), Illskil'allec comp. insuranceJ 9. [:] RILlildifIg additi011
ired. 5.0 We al -c a col-po .at ioll �111(1 its 10. E] 1-:1ectrical repairs oradditiolis
I mil a hoilleowlici-dollig all -vvoik oflkcrs have exercised thell. II -[j Plumbing repairs oi- additions
Illyscil'. INo worl(cl-s, coil,,). I ight 01'excillpf ion per MGL
illsiliallce Fe(plired. I c. 152, § 1 (11), a,,(I \vc I)avc 110 12.0 Roofl-cpail.s
employees. I No worl(cl-s' 13F] OtIicr_____________
col"P. i"Surallce rcquired.]
*Ally appiwant 111M dicch" hox 111 11111"1 illso fill olli IllescCloll hClow.0lowing llwir %'Vojkcis'compcij.,;jjlioIj p()licy
I follicowlicis who �llklllil flik"Al'idavil indicilling (hey mcdoillgall wolkand Illen hilu oulsidC Collijaclolls must Slibillk :I I)C\v affidavif indicaling "llch.
111:lt LhCCk t1lis J)ON MUNI ;tj(;jcjlU(l �ljj jj(lLli(iol,l 6CCI showing file nallu; ot'llic sub-connaclors and stnic wlicilici 0, ,of (iios.c Clifincs lwVC
clllployccs, It (husill) Coll I nIC(ol.,z havc. Cniployces, IhCY "I'M Illovide. flicii woikcis'comp. p()licy lltltlll)cl.
(I'll till emploper Mot is: pl-ol,iijilIg workery
ilifill-matioll. . compelm illioll insil rull Ce.for In.), employees. Belo w iv the polic.); till (Ijoh site
IllsM Mice Company Nallic: A-]--�J- M"Llizi-l- Insurance
1)o 1 1 cy // o 1� "" c 1 WMZ-800-8006553—ZO13A
F'Apl rit foil Date: 06/0Z/201.4
,loll SlIc Addrcs.s:,..AJA-
13q
Allach a coil), oj* the workers' Coil] pellsatioll policy declarailion page (Sholving tile policy litimbel. and expiratioll d"11C).
l.'ailurc (o) sccure coverago; as required Illidul. Sechon 25A of'MCil-, c. 152 call lead to the imposition of,crimillal pell".11tics of'a
hille 111) to $ I,.W0.00 and/or olle-yeal. implisollnull, as \veil as civil Pellallics if) Ilic. form ol'a STOP WOII�I( ORDII'lz and a f -Inc
ofilp to $2S Ofia day a list (lie Violitor. 110 advised (1121 a COPY OfIllis statemeni may be Convarded to (lie Offic'e of
Invest �(o�.s o f I I u ),()I' insti�uncep)velage Verl I Icat.1011.
I ilo helV1',p- ./.
Y14�1�tj p lljfjt� Lillis tilt i1woollit's Ofpel"1111) Il/ell the illtormotioll provi(led tihove is true tilt(/ Correct
L-, n
Datel I I q
ri Zi 11-1 --1,
Cilly
Permil/Licellse #
Issnilig Aolhorilly (cit-cle olle):
I. B-II'd ot'llealth 2. Boilding Depal-fillcot 3. Cilly/Town Clerk
6. Other
4. Electrical Inspector S. 1,111111biog Inspector
Contact
Phone U:
s
6.
D 4"
RIVE
LICENSE -
W i!.
0.1s
P iND 1 4dWM0ER_;
005703 201�1,,,, NONE....,
S996.55871
'�I' 6p u a I)OB''.t. t I "i
2 REST
F
�!D NONE
4�JXLINE'
83 LONG DR
DRACUT, MA 01826-2048
V.15.2009
5 DD D5.04-2011 R-
F c
COMMONWEAl-TH OF MASSACHUSET1
SHEET METo k. WORKERS
AS A MASTEUMIRESTRIQTED
ISSUES -1 ABOVE LIG L_.NSl__'T'0:
ERIC R KLINE
J & J HEATING
17 ARLINGTON ST.-
DRACUT MA 018�6— 93
1. 5 6 8
ACORD F --�ATE (.M/DD[YYYY)
CERTIFICATE OF LIABILITY INSURANCE
""' 918. 88 7. 4900 FAX 978-887.2404
k-dward F. Sennott Insurance Agency, Inc.
16 South Main Street
V. 0. Box 457
Topsheld, MA 01983
INSURED j&I-Ifea-t-in-g—
ir ondition-h I 14c.
17 Arlington Street
Dracut, MA 01826
_I 06/03/2013
fH-E7CERTIFICATE IS �ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
INSURERS AFFORDING COVERAGE NAIC #
INSURER& Great American Alliance Ins Co
INSunER8: Safety Insurance Company 39454
INSURERc: A.I.M. Mutual In
;�urance Co.
INSURER D:
COVERAGES
......
GARAGE LIABILITY
(Per accident)
I HE FOLICIFS OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING
ANY HFQUIREME:NT,Tf-Rm OR CONDITION OF ANY CONTRACT OR OTHER
MAY PERTAIN,
DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS
POLICIES, AGGREGATE LIMITS SHOWN MAY HAVE
-
NSR
-r
)15;i
BEEN REDUCED BY PAID CLAIMS,
—
OF SUCH
Lin
NsnL
TYPE or INSURANCE
GENFRAL LIABILITY
POLICY NUMBER
P6L-1CYrFFEC--rIVr
DATE (MM/DDjYYY'�)
—6-L
P FCY —FXPIRITIOR-
DATE (MMIDDfYYYYJ
LIMITS
$
X-
IAL GENERAL I� IA131LI I'Y
I-Ak-bq189Ub-07
06/01/2013
06/01/2014
EACHOCCURFENCE
$ 1,000,00
If Y's"I
=,11F IA�'�Ifi,(.jV
- I. -—
E.L. DISEASE - EA EMPLOY I
Er -1,000,00(
.1
-.COMMrll('
CLAIMS MADF OC;,,,,
Ur-cn1PTI6N or UPERAHON% LOCATIONS VEHICLES EXCLUSIONS ADDED BY ENDORSEMENT/
SPECIAL PROVISIONS
occLrrqnc:e)_
I 300,00
A
CANCELLATION
I—
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE ISSUING INSURE, WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN
-a
MED EXP (Any one person) --
$ 10,00
IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR
Lvidence of' Insurance
REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE
L—
XCO�'Fi5
_j2009/0 1)
D -ter Sennott/AAM
PERSONAL & ADV INJURY
$ 1,000,00
The ACORD name and logo are registered marks of ACORD
-GI-N'L. AGGAEGAI E LIMIT APPLIr'-s rFn:
GENERAL AGGREGATE
2,000,00
POLICY. j, C11c,
PRODUCTS - COMP/Cp AGG
$ 2,000,00
AUTOMOBILE LIABILITY
2434550
06/01/2013
6—/01/2014
ANY A U10
COMBINED SINGLE LIMIT
$
ALL OWNFI) AU I OS
(Ea accident)
1,000,00,
X
SCI IE0tJI-I-D AU I OS
BODILY INJURY
$
X
IIIREDAUIOS
(Per person)
X
NON-OWNCI) AtJ I D1,;
BODILY INJURY
(Per accident)
$
PROPERTY DAMAGE $
GARAGE LIABILITY
(Per accident)
ANY AU'l 0
AUTO ONLY - EA ACCIDENT s
OT14ER THAN EA ACC $
EXCESS / UMBRELLA LIABILITY
oc;cun
_66 AUTO ONLY: AGG $
UMB6418958-os 06/01/2013 14 EACH OCCURRENCE
/01/2C�_ $ 2,000,00
.-X E-1 CLAIMS MADE
_
A
AGGREGATE $ 2,000,00
DEDUCTIBLE
$
Hf-il-NI-ION $
$
$
AND UMPLOYERS' LIA1311-1 I Y
Y/N
WMZ-800-8006553-2 06/02/2013 06/02/2014 X
ANY "ROPRIF I 0R/PAnTNIz n/t-xr CU I IVF
C z
TOR' LIMITS ---�`EE`
(IFFIG.F1 - .,
I/MI-MRI-n EXCIA.1111-1)
(MI110,11 O,y In NII)
E.L. EACH ACCIDENT $ 1,000,061
If Y's"I
=,11F IA�'�Ifi,(.jV
- I. -—
E.L. DISEASE - EA EMPLOY I
Er -1,000,00(
UHIER
E.L. DISEASE - POLICY LIMIT $ 1-2000,00
Ur-cn1PTI6N or UPERAHON% LOCATIONS VEHICLES EXCLUSIONS ADDED BY ENDORSEMENT/
SPECIAL PROVISIONS
11- 1101-DEII
CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE ISSUING INSURE, WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR
Lvidence of' Insurance
REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE
L—
XCO�'Fi5
_j2009/0 1)
D -ter Sennott/AAM
@ 1988-2009 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
wrightsofte Load Short Form
Basemntllst sys
Croinin Construction Management
P.0 Box 7237, Lowell, Ma 01852
, ' Q "ir
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Job: 84 Compass Point
Date: jan14, 2014
By:
HEATING EQUIPMENT
Area
COOLING EQUIPMENT
Clg load
Make n/a
Htg
Cig
Infiltration
Outside db (OF)
12
88
Method Simplified
Inside db (OF)
70
75
Construction quality Tight
Design TD (OF)
58
13
Fireplaces 1 (Average)
Daily range
-
L
1314
Inside humidity (%)
50
50
58857
Moisture difference (gr/lb)
47
28
AHRI ref n/a
HEATING EQUIPMENT
Area
COOLING EQUIPMENT
Clg load
Make n/a
CIg AVF
Make n/a
(13tuh)
(Btuh)
Trade n/a
(cfm)
2nd floor d
Trade n/a
47865
29857
Model n/a
1250
1st floor system d
Cond n/a
43447
28883
AHRI ref n/a.
1314
Basemnt/lst sys d
Coil n/a
91312
58857
2565
2817
Other equip loads
AHRI ref n/a
8476
0
Efficiency
n/a
Equip. @ 0.93 RSM
Eff iciency
n/a.
54502
Heating input
Latent cooling
Sensible cooling
0
Btuh
Heating output
0
Btuh
Latent cooling
0
Btuh
Temperature rise
0
OF
Total cooling
0
Btuh
Actual air flow
0
cfm
Actual air flow
0
cfm
Air flow factor
0
cfm/Btuh
Air flow factor
0
cfm/l3tuh
Static pressure
0
in H20
Static pressure
0
in H20
Space thermostat
n/a
Load sensible heat ratio
0
ROOM NAME
Area
Htg load
Clg load
Htg AVF
CIg AVF
(ft2)
(13tuh)
(Btuh)
(cfm)
(cfm)
2nd floor d
2927
47865
29857
1250
1250
1st floor system d
2358
43447
28883
1314
1314
Basemnt/lst sys d
5285
91312
58857
2565
2817
Other equip loads
8476
0
Equip. @ 0.93 RSM
54502
Latent cooling
7589
Tr)TA I Q
r -130C
rVI-700
flnnn4
I'll
-4
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
A I 2014 -Mar -07 08:53:55
I—:_- rF wrightSOW Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 1
ACCK ... oft HVAC\cro.in construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
Load Short Form Job: 84 Compass Point
wrightsoft, Date: ian14, 2014
1st floor system By:
Croinin Construction Management
P.0 Box 7237, Lowell, Ma 01852
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
HEATING EQUIPMENT
Make
Trade
Model
AHRI ref
Efficiency
Heating input
Heating output
Temperature rise
Actual air flow
Air flow factor
Static pressure
Space thermostat
80 AFU E
0
Btuh
0
Btuh
0
'F
1314
cfm
0.030
cfm/Btuh
0
in H20
COOLING EQUIPMENT
Make
Trade
Cond
Coil
AHRI ref
Efficiency
Sensible cooling
Latent cooling
Total cooling
Actual air flow
Air flow factor
Static pressure
Load sensible heat ratio
0 SEER
0
Btuh
0
Btuh
0
Btuh
1314
cfm
0.046
cfm/Btuh
0
in H20
0.93
1274
ROOM NAME
Area
Htg load
Clg load
Htg AVF
Clg AVF
(ft2)
(13tuh)
(Btuh)
(cfm)
(cfm)
basement zone p
1274
24469
16831
740
766
1st floor p
1084
18978
13036
574
593
1 st floor system d
2358
43447
28883
1314
1314
Other equip loads
3626
0
Equip. @ 0.93 RSM
26745
Latent cooling
2044
-rn-rA I C'
nn -nn
I 4n4 A
4n4 A
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2014 -Mar -07 08:53:55
wrightSOft' Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 2
OCCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
Load Short Form Job: 84 Compass Point
wrightsoft, Date: jan14, 2014
2nd floor By:
Croinin Construction Management
P. 0 Box 7237, Lowell, Ma 01852
r,q �jtj 7,nf�lowffir—
in �",
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
HEATING EQUIPMENT
Make
Trade
Model
AHRI ref
Efficiency
Heating input
Heating output
Temperature rise
Actual air flow
Air flow factor
Static pressure
Space thermostat
80AFUE
0
Btuh
0
Btuh
0
OF
1250
cfm
0.026
cfm/Btuh
0
in H20
COOLING EQUIPMENT
Make
Trade
Cond
Coil
AHRI ref
Eff iciency
Sensible cooling
Latent cooling
Total cooling
Actual air flow
Air flow factor
Static pressure
Load sensible heat ratio
0 SEER
0
Btuh
0
Btuh
0
Btuh
1250
cfm
0.041
cfm/Btuh
0
in H20
0.86
885
ROOM NAME
Area
Htg load
Clg. load
Htg AVF
Clg AVF
(ft2)
(Btuh)
(Btuh)
(cfm)
(cfm)
Bouns zone p
885
13058
8549
341
350
2nd floor zone P
2042
34807
27010
909
1107
2nd floor d
2927
47865
29857
1250
1250
Other equip loads
4850
4096
Equip. 9 0.93 RSM
31440
Latent cooling
5545
TnTA I CZ
nnnnn
1 4 n1n
4 nl^
�U�t 1jr- I I 'i
11 -OU I '�Ju
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
zz.
, + wriightSOW Right -Suite@ Universal 2013 13.0.07 RSU05790
ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces:
2014 -Mar -07 08:53:55
Page 3
wrightsofte Load Short Form Job: 84 Compass Point
Date: jan14, 2014
1st floor By:
Croinin Construction Management
P.0 Box 7237, Lowell, Ma 01852
R
NW-11ME.M. 1-g-'r6ject AMR`
1p=
L
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
HEATING EQUIPMENT
Area
COOLING EQUIPMENT
Cig load
Make n/a
Cig AVF
Make n/a
(Btuh)
(13tuh)
Trade n/a
(cfm)
Living room
Trade n/a
8928
5556
Model n/a
253
Kitchen
Cond n/a
1672
2581
AHRI ref n/a
117
off ice
Coil n/a
8378
4898
253
223
1 st floor P
AHRI ref n/a
18978
13036
Eff iciency
n/a
Other equip loads
Eff iciency
n/a
0
Heating input
Equip. @ 0.93 RSM
Sensible cooling
0
Btuh
Heating output
0
Btuh
Latent cooling
0
Btuh
Temperature rise
0
'F
Total cooling
0
Btuh
Actual air flow
0
cfm
Actual air flow
0
cfm
Air flow factor
0
cfm/Btuh
Air flow factor
0
cfm/l3tuh
Static pressure
0
in H20
Static pressure
0
in H20
Space thermostat
n/a
Load sensible heat ratio
0
ROOM NAME
Area
Htg load
Cig load
Htg AVF
Cig AVF
(ft2)
(Btuh)
(13tuh)
(cfm)
(cfm)
Living room
704
8928
5556
270
253
Kitchen
130
1672
2581
51
117
off ice
250
8378
4898
253
223
1 st floor P
1084
18978
13036
574
593
Other equip loads
2805
0
Equip. @ 0.93 RSM
12071
Latent cooling
1581
Tr)TA I Q
-4 nO A
n -t �nn
—11
1 I -A
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2014 -Mar -07 08:53:55
wrightSOft' Right-Suite(R) Universal 2013 13.0.07 RSU05790 Page 4
,4CrA ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
HEATING EQUIPMENT
Load Short Form
Job: 84 Compass Point
wrightsofte
Make n/a
Date: jan14, 2014
Ldy
2nd floor zone
By:
294
Croinin Construction Management
12
P.0 Box 7237, Lowell, Me 01852
Trade n/a
2667
1501
Model n/a
62
Bedroom 2
Cond n/a
4865
For:
Trust Construction
107
bedroom 1
51 Mount joy drive, Tewskbury, ma 01876
2952
3058
77
125
1/2 bath
Htg Cig
Infiltration
Outside db (OF)
12 88 Method
Simplified
Inside db (OF)
70 75 Construction quality
Tight
Design TD (OF)
58 13 Fireplaces
1 (Average)
Daily range
- L
0
Inside humidity (%) 50 50
Heating output
Moisture difference (gr/lb) 47 28
Btuh
HEATING EQUIPMENT
Area
(ft2)
COOLING EQUIPMENT
CIg load
(Btuh)
Make n/a
CIg AVF
(cfm)
Ldy
Make n/a
1097
294
Trade n/a
12
Masterbath
Trade n/a
2667
1501
Model n/a
62
Bedroom 2
Cond n/a
4865
2622
AHRI ref n/a
107
bedroom 1
Coil n/a
2952
3058
77
125
1/2 bath
AHRI ref n/a
1432
375
Efficiency
n/a
Masterbed room
Eff iciency '
n/a
7137
Heating input
293
full bath
Sensible cooling
0
Btuh
Heating output
0
Btuh
Latent cooling
0
Btuh
Temperature rise
0
OF
Total cooling
0
Btuh
Actual air flow
0
cfm
Actual air flow
0
cfm
Air flow factor
0
cfm/Btuh
Air flow factor
0
cfm/Btuh
Static pressure
0
in H20
Static pressure
0
in H20
Space thermostat
n/a
Load sensible heat ratio
0
ROOM NAME
Area
(ft2)
Htg load
(Btuh)
CIg load
(Btuh)
Htg AVF
(cfm)
CIg AVF
(cfm)
Ldy
32
1097
294
29
12
Masterbath
65
2667
1501
70
62
Bedroom 2
208
4865
2622
127
107
bedroom 1
176
2952
3058
77
125
1/2 bath
91
1432
375
37
15
Masterbed room
325
8308
7137
217
293
full bath
77
675
171
18
7
2nd floor hall
180
2237
707
58
29
�++;�
000
4 r%= A
44 4 A A
nl�
Al -
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
Q, -a-L- wrightSOft* Right-S,ite@ Universal 2013 13.0.07 RSU05790 2014 -Mar -07 08:53:55
1- FF Page 5
OCCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
2nd floor zone P
2042
34807
27010
909
1107
Other equip loads
2817
0
Equip. @ 0.93 RSM
25012
Latent cooling
4033
Tr)TA I Q
On A
13� - n A
nnn.,
C -V -+C- %3 1 ul�-+ ZIUZI I I U
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
,,,Z- + wrightSOW Right -Suite@ Universal 2013 13.0.07 RSU05790
ACCA ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
2014 -Mar -07 08:53:55
Page 6
wrightsoftm Load Short Form Job: 84 Compass Point
Date: jan14, 2014
basement zone By:
Croinin Construction Management
P. 0 Box 7237, Lowell, Ma 01852
I
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
HEATING EQUIPMENT
Make
n/a
Trade
n/a
Model
n/a
AHRI ref
n/a
Efficiency
n/a
Htg load
Heating input
0
Btuh
Heating output
0
Btuh
Temperature rise
0
OF
Actual air flow
0
cfm
Air flow factor
0
cfm/Btuh
Static pressure
0
in H20
Space thermostat
n/a
766
COOLING EQUIPMENT
Make n/a
Trade n/a
Cond n/a
Coil n/a
AHRI ref n/a
Efficiency
n/a
Htg load
Sensible cooling
0
Btuh
Latent cooling
0
Btuh
Total cooling
0
Btuh
Actual air flow
0
cfm
Air flow factor
0
cfm/Btuh
Static pressure
0
in H20
Load sensible heat ratio
0
766
ROOM NAME
Area
Htg load
Clg load
Htg AVF
Clg AVF
(ft2)
(Btuh)
(Btuh)
(cfm)
(cfm)
Basement
1274
24469
16831
740
766
basement zone p
1274
24469
16831
740
766
Other equip loads
822
0
Equip. (—@ 0.93 RSM
15585
Latent cooling
1
463
Tr)TA I CZ
I ')-7A
1
4 nn An
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2014 -Mar -07 08:53:55
wrightSOft' Right-Suite(g) Universal 2013 13.0.07 RSU05790 Page 7
ACCIN, ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N
Load Short Form Job: 84 Compass Point
wrightsofte Date: jan14, 2014
Bounszone By:
Croinin Construction Management
R 0 Box 7237, Lowell, Ma 01852
jewaml� M, WEEK t 'W -
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
HEATING EQUIPMENT
Make
n/a
Trade
n/a
Model
Htg
Cig
Infiltration
Outside db (OF)
12
88
Method Simplified
Inside db (OF)
70
75
Construction quality Tight
Design TD (OF)
58
13
Fireplaces 1 (Average)
Daily range
-
L
cfm
Inside humidity (%)
50
50
Static pressure
Moisture difference (gr/lb)
47
28
0
HEATING EQUIPMENT
Make
n/a
Trade
n/a
Model
n/a
AHRI ref
n/a
Eff iciency
n/a
Htg load
Heating input
Htg AVF
Clg AVF
Heating output
0
Btuh
Temperature rise
0
OF
Actual air flow
0
cfm
Air flow factor
0
cfm/Btuh
Static pressure
0
in H20
Space thermostat
n/a
cfm
COOLING EQUIPMENT
Make n/a
Trade n/a
Cond n/a
Area
Htg load
Coil n/a
Htg AVF
Clg AVF
AHRI ref n/a
(ft2)
(Btuh)
Eff iciency
n/a
(cfm)
Sensible cooling
0
Btuh
Latent cooling
0
Btuh
Total cooling
0
Btuh
Actual air flow
0
cfm
Air flow factor
0
cfm/Btuh
Static pressure
0
in H20
Load sensible heat ratio
0
13058
ROOM NAME
Area
Htg load
Cig load
Htg AVF
Clg AVF
(ft2)
(Btuh)
(13tuh)
(cfm)
(cfm)
bouns room
625
8866
7083
232
290
bouns room closet
70
1248
334
33
14
dining room
190
2944
1132
77
46
Bouns zone p
885
13058
8549
341
350
Other equip loads
2033
0
Equip. 9 0.93 RSM
7916
Latent cooling
1512
Tr)TA I Q
00C
A r-f)r%A
r%AnO
nA4
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
2014 -Mar -07 08:53:55
wrightSOft' Flight-SOW91 Universal 2013 13.0.07 RSU05790 Page 8
....ft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
wrightsoft. Load Multizone Summary Report
Croinin Construction Management
P.0 Box 7237, Lowell, Me 01852
Job: 84 Compass Point
Date: jan14, 2014
By:
M 'LIT
a
W-0
ROOM NAME
Heating
Cooling
ZONE NAME
Volume ACH AVF HTM
Volume ACH AVF HTM
Basement
ft3 CfM Btuh/ft2
ft3 1 CfM Btuh/ft2
basement zone
3822
0.41
26
4.2
3822
0.39
25
0.9
1st floor
9756
0.55
89
4.2
9756
0.52
84
0.9
Bouns zone
8975
0.43
64
4.2
8975
0.41
61
0.9
2nd floor zone
13050
0.41
89
4.2
13050
0.39
84
0.9
Basemnt/lst sys
35603
I
0.16
I
268
I
1.5
I
35603
I
0.07
I
253
I
0.1
I
M 'LIT
a
W-0
ROOM NAME
Area
ft2
Htg load
Btuh
Clg load
Btuh
HtgAVF
CfM
ClgAVF
Orn
Basement
1274
24469
16831
740
766
basement zone
1274
24469
16831
740
766
Living room
704
8928
5556
270
253
Kitchen
130
1672
2581
51
117
office
250
8378
4898
253
223
1st floor
1084
18978
13036
574
593
bouns room
625
8866
7083
232
290
bouns room closet
70
1248
334
33
14
dining room
190
2944
1132
77
46
Bouns zone
885
13058
8549
341
350
Ldy
32
1097
294
29
12
Masterbath
65
2667
1501
70
62
Bedroom 2
208
4865
2622
127
107
bedroom 1
176
2952
3058
77
125
1/2 bath
91
1432
375
37
15
Masterbed room
325
8308
7137
217
293
full bath
77
675
171
18
7
2nd floor hall
180
2237
707
58
29
attic
888
10574
11144
276
457
2nd floor zone
2042
34807
27010
909
1107
Basemnt/lst Sys
5285
1
91312
1 —
58857
I
2565
I
2817
I
p- wrightSOW Right -Suite@ Universal 2013 13.0.07 RSU05790
ACCA ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces:
2014 -Mar -07 08:53:55
Page I
wrightsoft<,
Building Analysis
Btuh
Job: 84 Compass Point
Date: jan14, 2014
Walls
Basemntllst sys
19328
By:
Glazing
17.3
Croinin Construction Management
5.7
Doors
P.0 Box 7237. Lowell, Ma 01852
702
0.7
Ceilings
13.9
28587
28.6
Floors
4.2
10371
10.4
Infiltration
...........
..........
17.0
For:
Trust Construction
9692
9.7
Piping
51 Mount joy drive, Tewskbury, ma 01876
0
Humidification
8476
8.5
Ventilation
01, R 110,
1; 1; 111,
3i
1,1 W,
1� k7
0
Location:
Total
Indoor:
Heating
Cooling
Boston Logan I nt'l AR MA, US
Indoor temperature (OF)
70
75
Elevation: 30 ft
Design TD (OF
3ty
58
13
Latitude: 420N
Re
50
50
Outdoor:
Heating Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF)
12 88
Infiltration:
Daily range�F)
- 15 (L
Method'
Simplified
Wind speed (mph)
- 72
15.0 7.5
Construction quality
Fireplaces
Ti ht
1 ?Anverage)
ult mp-jr Fr , n'
Component
Btuh/ft2
Btuh
% of load
Walls
3.7
19328
19.4
Glazing
17.3
5656
5.7
Doors
16.7
702
0.7
Ceilings
13.9
28587
28.6
Floors
4.2
10371
10.4
Infiltration
4.2
16975
17.0
Ducts
9692
9.7
Piping
0
0
Humidification
8476
8.5
Ventilation
0
0
Adjustments
0
Total
1
1 99788,
100.0
Component
Btuh/ft2
Btuh
% of load
Walls
0.7
3604
6.1
Glazing
22.5
7349
12.5
Doors
7.7
323
0.5
Ceilings
12.1
24815
42.2
Floors
0.8
2071
3.5
Infiltration
0.9
3509
6.0
Ducts
9447
16.1
Ventilation
0
0
Internal gains
7740
13.2
Blower
0
0
Adjustments
0
Total
1
1 58857,
100.0
Latent Cooling Load = 7589 Btuh
Overall U -value = 0.140 Btuh/ft2-0F
Data entries checked.
-2
2014 -Mar -07 08:53:55
I -Z7- + wrightSoft' Flight-Suil,@ Universal 2013 13.0.07 RSU05790 Page 1
ACCA ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N
Component
Btuh/ft2
Btuh
% of load
Walls
Location:
8015
Indoor: '
Heating
Cooling
Boston Logan I nt'l AP, MA, US
2.6
Indoor temperature (OF)
70
75
Elevation: 30 ft
Ceilings
Design TD (OF)
58
13
Latitude: 420N
1.4
Relative humidity
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
0
Daily range6OF) -
15 ( L
Method
Simplified
7.7
-
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Ti ht
1 ?Anverage)
Adjustments
Component
Btuh/ft2
Btuh
% of load
Walls
3.3
8015
17.0
Glazing
17.3
1233
2.6
Doors
16.7
702
1.5
Ceilings
14.7
25507
54.2
Floors
1.4
729
1.5
Infiltration
4.2
7263
15.4
Ducts
0
0
Piping
0
0
Humidification
3626
7.7
Ventilation
0
0
Adjustments
0
Total
1
47073
100.0
Component
Btuh/ft2
Btuh
% of load
Walls
0.6
1500
5.2
Glazing
31.1
2217
7.7
Doors
7.7
323
1.1
,Ceilings
12.7
22142
76. 7
Floors
0
0
0
Infiltration
0.9
1501
5.2
Ducts
0
0
Ventilation
0
0
Internal gains
1200
4.2
Blower
0
0
Adjustments
0
1 Total
1
1 288831
100.0
Latent Cooling Load = 2044 Btuh
Overall U -value = 0.130 Btuh/ft2-'F
WARNING: window to floor area relio = 3.0% - less than 5%.
14�-L + wrightSOft' Flight-S,ileO Universal 2013 13.0.07 RSU05790
ACCK ... oft HVAMcronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces
2014 -Mar -07 08:53:55
Page 2
wrightsoft.
Building Analysis
Btuh
Job: 84 Compass Point
Date: jan14, 2014
Walls
2nd floor
11314
By:
Glazing
Croinin Construction Management
4424
P. 0 Box 7237, Lowell, Ma 01852
Doors
0
0
0
Ceilings
9.9
3080
5.8
Floors
4.9
For:
Trust Construction
Infiltration
4.2
9713
51 Mount joy drive, Tewskbury, ma 01876
Ducts
6540 19.3
...
18.4
Piping
. ........ 1,
Rafe M'
0
0
Location:
Indoor:
Heating Cooling
Boston Logan Int'l AP, MA, US
Indoor temperature (OF)
70 75
Elevation: 30 ft
Adjustments
Design TD (OF
ly
58 13
Latitude: 42'N
Total
Re
50 50
Outdoor:
Heating Cooling
Moisture difference (gr/lb)
46.5 27.8
Dry bulb (OF)
12 88
Infiltration:
Daily range�F)
- 15 (L
Method
Simplified
Wind speed (mph)
- 72
15.0 7.5
Construction quality
Fireplaces
Ti ht
1 ?Anverage)
Component
Btuh/ft2
Btuh
% of load
Walls
4.0
11314
21.5
Glazing
17.3
4424
8.4
Doors
0
0
0
Ceilings
9.9
3080
5.8
Floors
4.9
9642
18.3
Infiltration
4.2
9713
18.4
Ducts
6540 19.3
9692
18.4
Piping
Adjustments
0
0
Humidification
4850
9.2
Ventilation
0
0
Adjustments
0
Total
1
1 52715,
100.0
Component
Btuh/ft2
Btuh % of load
Walls
0.8
2104 6.2
Glazing
20.0
5132 15.1
Doors
0
0 0
Ceilings
8.6
2673 7.9
Floors
1.1
2071 6.1
Infiltration
0.9
2008 5.9
Ducts
9330 27.5
Ventilation
0 0
Internal gains
6540 19.3
Blower
4096 12.1
Adjustments
0
Total
33953 100.0
Latent Cooling Load = 5545 Btuh
Overall U -value = 0.149 Btuh/ft2-oF
Data entries checked.
In
A
2014 -Mar -07 08:53:55
wrightSOft' Fligh,-Suitel� Universal 2013 13.0.07 RSU05790 Page 3
ACCA ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MA Front Door faces: N
wrightsoft- Building Analysis Job: 84 Compass Point
Date: jan14, 2014
1st floor By:
Croinin Construction Management
P. 0 Box 7237, Lowell, Ma 01852
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
OEM
Btuh/ft2
Btuh
k779
Location:
3.7
Indoor:
Heating
Cooling
Boston Logan I nt'l AP, MA, US
1233
Indoor temperature (OF)
70
75
Elevation: 30 ft
3.2
Design TD (OF
3ty
58
13
Latitude: 420N
Floors
Re
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
Piping
Daily range�F) -
15 (L
Method
Simplified
2805
12.9
72
Construction quality
Ti ht
n
0
Wind speed (mph) 15.0
7.5
Fireplaces
1 ?Average)
Total
Component
Btuh/ft2
Btuh
% of load
Walls
3.7
4596
21.1
Glazing
17.3
1233
5.7
Doors
16.7
702
3.2
Ceilings
14.7
6831
31.4
Floors
0
0
0
Infiltration
4.2
5617
25.8
Ducts
0
0
Piping
0
0
Humidification
2805
12.9
Ventilation
0
0
Adjustments
0
Total
21783
100.0
Component
Btuh/ft2
Btuh
% of load
Walls
1.0
1221
9.4
Glazing
44.9
3201
24.6
Doors
7.7
323
2.5
Ceilings
12.7
5930
45.5
Floors
0
0
0
Infiltration
0.9
1161
8.9
Ducts
0
0
Ventilation
0
0
Internal gains
1200
9.2
Blower
0
0
Adjustments
0
Total
13036
100.0
Latent Cooling Load = 1581 Btuh
Overall U -value = 0.128 Btuh/ft2-'F
Data entries checked.
2014 -Mar -07 08:53:55
,O�+ wrightSoft' Right-S,itee Universal 2013 13.0.07 RSU05790 Page 4
... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
Component
Btuh/ft2
Btuh
Location:
Walls
Indoor:
Heating
Cooling
Boston Logan Int'l AP, MA, US
17.3
Indoor temperature (OF)
70
75
Elevation: 30 ft
0
Design TD (OF
ly
58
13
Latitude: 420N
6.3
Re
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
19.6
Piping
Daily range6`17) -
15 L
Method
Simplified
-
72
Construction quality
Ti ht
0
Wind speed (mph) 15.0
7.5
Fireplaces
1 ?Anverage)
Component
Btuh/ft2
Btuh
% of load
Walls
4.2
7899
21.0
Glazing
17.3
3387
9.0
Doors
0
0
0
,Ceilings
8.8
2379
6.3
Floors
6.4
8132
21.6
Infiltration
4.2
5642
15.0
Ducts
7368
19.6
Piping
0
0
Humidification
2817
7.5
Ventilation
0
0
Adjustments
0
Total
1
1 376241
100.0
WOO
Component
Btuh/ft2
Btuh
% of load
Walls
0.6
1197
4.4
'Glazing
35.4
6931
25.7
Doors
0
0
0
'Ceilings
7.6
2065
7.6
Floors
1.4
1741
6.4
Infiltration
0.9
1166
4.3
Ducts
8571
31.7
Ventilation
0
0
Internal gains
5340
19.8
Blower
0
0
Adjustments
0
Total
1
1 270101
100.0
Latent Cooling Load = 4033 Btuh
Overall U -value = 0.182 Btuh/ft2-0F
Data entries checked.
7,t7477
771
2014 -Mar -07 08:53:55
wrightSOft' Right-S,ilek Universal 2013 13.0.07 RSU05790 Page 5
ACCA ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N
Building Analysis Job: 84 Compass Point
wrightsoft Date: jan'14, 2014
basementzone By:
Croinin Construction Management
P. 0 Box 7237, Lowell, Ma 01852
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Location:
Boston Logan Int'l AP, MA, US
Elevation: 30 ft
Latitude: 42'N
Outdoor: Heating
Dry bulb (OF) 12
Daily range6F) -
Wind speed (mph) 15.0
Indoor:
Heating Cooling
70 75
58 13
50 50
46.5 27.8
Simplified
Ti ht
1 ?Anverage)
N"if 1:12:
ASIAMM" got A
Component
Indoor temperature (OF)
Btuh
Design TD (OF
�ity
Walls
Re (%)
Cooling
Moisture difference (gr/lb)
88
Infiltration:
15 ( L
Method
72
Construction quality
7.5
Fireplaces
Heating Cooling
70 75
58 13
50 50
46.5 27.8
Simplified
Ti ht
1 ?Anverage)
N"if 1:12:
ASIAMM" got A
Component
Btuh/ft2
Btuh
% of load
Walls
2.9
3418
13.5
Glazing
0
0
0
Doors
0
0
0
Ceilings
14.7
18676
73.8
Floors
1.4
729
2.9
Infiltration
4.2
1646
6.5
Ducts
0
0
Piping
0
0
Humidification
822
3.2
Ventilation
0
0
Adjustments
0
Total
1
25291
100.0
0, 4*4
81, V
—Component
Btuh/ft2
Btuh
% of load
Walls
0.2
279
1.7
Glazing
0
0
0
Doors
0
0
0
Ceilings
12.7
16212
96.3
Floors
0
0
0
Infiltration
0.9
340
2.0
Ducts
0
0
Ventilation
0
0
Internal gains
0
0
Blower
0
0
Adjustments
0
Total
16831
100.0
Latent Cooling Load = 463 Btuh
Overall U -value = 0.131 Btuh/ft2-'F
WARNING: window to floor area rlio = 0.0% - less than 5%.
2014 -Mar -07 08:53:55
wrightSoft' Right-S,itea Universal 2013 13.0.07 RSU05790 Page 6
... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
Component
Btuh/ft2
Btuh
% of load
Location:
3.7
Indoor:
Heating
Cooling
Boston Logan I nt'l AP, MA, US
1037
Indoor temperature (OF)
70
75
Elevation: 30 ft
0
Design TD (OF)
58
13
Latitude: 420N
Floors
Relative humidity
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
Piping
Daily range6F) -
15 L
Method
Simplified
2033
-
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Ti ht
1 ?Anverage)
0
Component
Btuh/ft2
Btuh
% of load
Walls
3.7
3415
22.6
'Glazing
17.3
1037
6.9
Doors
0
0
0
'Ceilings
17.5
701
4.6
Floors
2.2
1510
10.0
Infiltration
4.2
4071
27.0
Ducts
2324
15.4
Piping
0
0
Humidification
2033
13.5
Ventilation
0
0
Adjustments
0
Total
1
15091
100.0
N— 77,7,77-7 *,777,777
2 NINE,'
N&M
77
7 77
7, 7 T,, 7
�,�,77777
MMEL&I
Component
Btuh/ft2
Btuh
% of load
Walls
1.0
907
10.6
Glazing
35.8
2148
25.1
Doors
0
0
0
Ceilings
15.2
609
7.1
Floors
0.5
330
3.9
Infiltration
0.9
841
9.8
Ducts
2514
29.4
Ventilation
0
0
Internal gains
1200
14.0
Blower
0
0
Adjustments
0
Total
1
1 85491
100.0
Latent Cooling Load = 1512 Btuh
Overall U -value = 0.080 Btuh/ft2-'F
Data entries checked.
2014 -Mar -07 08:53:55
wrightsoft, Flighl-S,itelP Universal 2013 13.0.07 RSU05790 Page 7
ACCK ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
Component Constructions Job: 84 Compass Point
wrightsoft Date: jan14, 2014
Basemntllst sys By:
Croinin Construction Management
P. 0 Box 7237, Lowell, Ma 01852
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Construction descriptions Or Area U -value Insull R Htg HTM Loss Clg HTM Gain
ft� Btuh/ft2-OF ft2-0F/l3tuh Btuh/ft2 Btu h Btuh/ft2 Stu h
Walls
12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board int fnsh, 2"x6" wood frm
15B-8s3c-6: Bg wall, heavydry or light damp soil, concrete wall,
r-8 ins, 8" thk, 1/2" gypsum board int fnsh
151321-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int
frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board
int fnsh
Partitions
(none)
Windows
2 glazing, cir outr, air gas, vni frm mat, clr innr, 1/4" gap, 1/4" thk: 2
glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
n 945
0.065
21.0
K" dF'M'M01
-s
Z22' A! N", "i
Location:
940
Indoor:
Heating
Cooling
Boston Logan I nt'l AP, MA, US
2145
Indoor temperature (OF)
70
75
Elevation: 30 ft
21.0
Design TD (OF)
58
13
Latitude: 420N
w 585
Relative humidity
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
0.99
3020
Daily range (OF) -
15 (L
Method
Simplified
744
Wet bulb (OF) -
72
Construction quality
Ti ht
8.0
Wind speed (mph) 15.0
7.5
Fireplaces
1 ?Anverage)
s 152
Construction descriptions Or Area U -value Insull R Htg HTM Loss Clg HTM Gain
ft� Btuh/ft2-OF ft2-0F/l3tuh Btuh/ft2 Btu h Btuh/ft2 Stu h
Walls
12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board int fnsh, 2"x6" wood frm
15B-8s3c-6: Bg wall, heavydry or light damp soil, concrete wall,
r-8 ins, 8" thk, 1/2" gypsum board int fnsh
151321-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int
frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board
int fnsh
Partitions
(none)
Windows
2 glazing, cir outr, air gas, vni frm mat, clr innr, 1/4" gap, 1/4" thk: 2
glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
n 945
0.065
21.0
3.74
3538
0.99
940
e 573
0.065
21.0
3.74
2145
0.99
570
s 934
0.065
21.0
3.74
3496
0.99
929
w 585
0.065
21.0
3.74
2190
0.99
582
all 3037
0.065
21.0
3.74
11369
0.99
3020
n 168
0.073
8.0
4.43
744
0.17
29
e 333
0.073
8.0
4.72
1573
0.40
133
s 152
0.073
8.0
4.29
652
0.06
10
w 333
0.073
8.0
4.72
1573
0.40
133
all 986
0.073
8.0
4.61
4541
0.31
305
n 288
0.042
21.0
2.90
835
0.24
68
e 288
0.042
21.0
2.90
835
0.24
68
S 513
0.042
21.0
2.90
1487
0.24
121
w 90
0.042
21.0
2.90
261
0.24
21
all 1179
0.042
21.0
2.90
3418
0.24
279
n 36
0.300
0
17.3
622
8.04
290
n 24
0.300
0
17.3
415
13.0
313
n 48
0.300
0
17.3
829
13.0
625
e 24
0.300
0
17.3
415
28.2
677
e 24
0.300
0
17.3
415
52.7
1265
S 48
0.300
0
17.3
829
16.0
769
s 23
0.300
0
17.3
403
27.4
640
S 64
0.300
0
17.3
1106
27.4
1756
w 36
0.300
0
17.3
622
28.2
1015
all 327
0.300
0
17.3
5656
22.5
7349
-ELL. wrightSOft* Right -Suite@ Universal 2013 13.0.07 RSU05790 2014 -Mar -07 08:53:55
rF Page 1
... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N
Doors
11 PO: Door, mtl pur core type
n
21
0.290
10.5
16.7
351
7.68
161
s
21
0.290
10.5
16.7
351
7.68
161
all
42
0.290
10.5
16.7
702
7.68
323
Ceilings
16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2"
120
0.026
38.0
1.50
180
1.30
156
gypsum board i nt fnsh
C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2"
1890
0.255
1.0
14.7
27706
12.7
24050
gypsum board int fnsh
C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board
40
0.304
1.0
17.5
701
15.2
609
int fnsh
Floors
19A-Obstp: Part floor, frm f1r, 10" thkns
1224
0.368
0
6.90
8442
1.51
1847
19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns
625
0.034
30.0
1.64
1027
0.36
225
21A -24t: Bg floor, heavy dry or light damp soil, 6'depth, tile fir fnsh
506
0.025
0
1.44
729
0
0
120
0.025
0
1.44
173
0
0
all
626
0.025
0
1.44
901
0
0
d I 2014 -Mar -07 08:53:55
lz�, -rF wrightSOW Right-Suite(!D Universal 2013 13.0.07 RSU05790 Page 2
W—'CK ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/W-*F ft2-*F/Btuh Btuh/112 Btu h Btu h X2 Btj h
Walls
15B21-Owc-6: Bg wall, heavy dry or light damp soil, Tx4" wood int
frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board
int fnsh
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
C part ceiling,: C part ceiling, hrd wd flr fnsh, frm f1r, 10" thkns, 1/2"
gypsum board i nt fnsh
Floors
21A -24t: Bg floor, heavydry or light damp soil, Udepth, tile flr fnsh
n 288
0.042
21.0
2.90
835
71N TJ+
0
Location:
e 288
Indoor:
Heating
Cooling
Boston Logan Int'l AP, MA, US
0.24
Indoor temperature (T)
70
75
Elevation: 30 ft
2.90
Design TD (T)
58
13
Latitude: 42'N
0.042
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (T) 12
88
Infiltration:
279
Daily range (T) -
15 (L
Method -
Simplified
Wet bulb (T) -
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Ti ht
1 ?Anverage)
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/W-*F ft2-*F/Btuh Btuh/112 Btu h Btu h X2 Btj h
Walls
15B21-Owc-6: Bg wall, heavy dry or light damp soil, Tx4" wood int
frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board
int fnsh
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
C part ceiling,: C part ceiling, hrd wd flr fnsh, frm f1r, 10" thkns, 1/2"
gypsum board i nt fnsh
Floors
21A -24t: Bg floor, heavydry or light damp soil, Udepth, tile flr fnsh
n 288
0.042
21.0
2.90
835
0.24
68
e 288
0.042
21.0
2.90
835
0.24
68
s 513
0.042
21.0
2.90
1487
0.24
121
w 90
0.042
21.0
2.90
261
0.24
21
all 1179
0.042
21.0
2.90
3418
0.24
279
1274 0.255 1.0
506 0.025 0
14.7
18676
12.7
16212
1.44
729
0
0
2014 -Mar -07 08:53:55
AL. wrightSOft* Right-Suiteg Universal 2013 13.0.07 RSU05790 Page 3
rF
A'CK ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
Component Constructions Job: 84 Compass Point
wrightsoft Date: jan14, 2014
1st floor By:
Croinin Construction Management
P. 0 Box 7237, Lowell, Ma 01852
in� I
EffMMff4.-MNT4t Mf 7ffi U .1 ffffM
N'14' YN A1'__!N1ik1`L1A1'11
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Construction descriptions
Walls
12F-Osw: Frm wall, vni ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board int fnsh, 2"W' wood frm
Partitions
(none)
Windows
2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2
glazing, clr outr, air gas, vni frm mat, clr inmr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
Doors
11 PO: Door, mtl pur core type
Ceilings
C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2"
gypsum board int fnsh
Floors
(none)
Or Area U -value Insull R Htg HTM Loss Clg HTM Gain
ft2 BtuhV-T W-T/Btuh Btuh/ft2 Btu h Btuh/ft2 Btu h
n 468
0.065
21.0
3.74
Mile
Location:
465
Indoor:
Heating
Cooling
Boston Logan I nt'I AP, MA, US
651
Indoor temperature (OF)
70
75
Elevation: 30 ft
21.0
Design TD (OF)
58
13
Latitude: 42oN
w 288
Relative humidity
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
0.99
1221
Daily range (OF) -
15 (L
Method
Simplified
351
Wet bulb (OF) -
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Ti ht
1 ?Anverage)
10.5
Construction descriptions
Walls
12F-Osw: Frm wall, vni ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board int fnsh, 2"W' wood frm
Partitions
(none)
Windows
2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2
glazing, clr outr, air gas, vni frm mat, clr inmr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
Doors
11 PO: Door, mtl pur core type
Ceilings
C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2"
gypsum board int fnsh
Floors
(none)
Or Area U -value Insull R Htg HTM Loss Clg HTM Gain
ft2 BtuhV-T W-T/Btuh Btuh/ft2 Btu h Btuh/ft2 Btu h
n 468
0.065
21.0
3.74
1752
0.99
465
e 174
0.065
21.0
3.74
651
0.99
173
s 298
0.065
21.0
3.74
1114
0.99
296
w 288
0.065
21.0
3.74
1078
0.99
286
all 1228
0.065
21.0
3.74
4596
0.99
1221
n 24
0.300
0
17.3
415
13.0
313
e 24
0.300
0
17.3
415
52.7
1265
S 23
0.300
0
17.3
403
27.4
640
all 71
0.300
0
17.3
1233
31.1
2217
n 21
0.290
10.5
16.7
351
7.68
161
S 21
0.290
10.5
16.7
351
7.68
161
all 42
0.290
10.5
16.7
702
7.68
323
466
0.255
1.0
14.7
6831
12.7
5930
2014 -Mar -07 08:53:55
AL_ wrightSOft' Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 4
ACCK ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N
Job: 84 Compass Point
wrightsoft- Component Constructions Date: jan14, 2014
Bounszone By:
Croinin Construction Management
P.0 Box 7237, Lowell, Ma 01852
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Location:
Boston Logan Int'l AP, MA, US
Elevation: 30 ft
Latitude: 420N
Outdoor: Heating
Dry bulb (OF) 12
Daily range (OF) -
Wet bulb (OF) -
Wind speed (mph) 15.0
Indoor:
Heating Cooling
70
Indoor temperature (OF)
58
Design TD (OF)
50
Relative humidity
Cooling
Moisture difference (gr/lb)
88
Infiltration:
15 ( L
Method
72
Construction quality
7.5
Fireplaces
Heating Cooling
70
75
58
13
50
50
46.5
27.8
Simplified
0
Ti ht
ft2
1 ?Anverage)
ft2-'F/Btu h
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Clg HTM
Gain
0
17.3
ft2
Btuh/W-T
ft2-'F/Btu h
Btuhtft2
Btu h
Btuh/112
Btu h
Walls
23.3
1400
12F-Osw: Frm wal I, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2"
n
225
0.065
21.0
3.74
842
0.99
224
gypsum board i nt fnsh, 2"x6" wood frm
e
90
0.065
21.0
3.74
337
0.99
90
s
390
0.065
21.0
3.74
1460
0.99
388
w
207
0.065
21.0
3.74
775
0.99
206
all
912
0.065
21.0
3.74
3415
0.99
907
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s
glazing, clr outr, air gas, vni frm mat, cir innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23) w
all
Doors
(none)
Ceilings
C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board
int fnsh
Floors
19A-Obstp: Part floor, frm f1r, 10" thkns
19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns
24
0.300
0
17.3
415
16.0
385
36
0.300
0
17.3
622
28.2
1015
60
0.300
0
17.3
1037
23.3
1400
40 0.304 1.0
70 0.368 0
625 0.034 30.0
17.5 701 15.2 609
6.90 483 1.51 106
1.64 1027 0.36 225
r] I 2014 -Mar -07 08:53:55
Z. _rF wrightSOft* Right -Suite@ Universal 2013 13.0.07 RSU05790
I Page 5
Ar -C -N ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btu h/ft2-'F ft2-'F/Btuh Btuh/ft2 Btu h Btuh/ft2 Btu h
Walls
12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board i nt fnsh, 2"x6" wood frm
15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall,
r-8 ins, 8" thk, 1/2" gypsum board int fnsh
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2
glazing, clr outr, air gas, vnl frim mat, clr innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
Doors
(none)
Ceilings
1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2"
gypsum board i nt fnsh
C part ceiling,: C part ceiling, hrd wd flr fnsh, frm f1r, 10" thkns, 1/2"
gypsum board i nt fnsh
C part ceiling,: C part ceiling, frm f1r, 10" thkns, 1/2" gypsum board
int fnsh
n 477
0.065
21.0
3.74
Location:
0.99
Indoor:
Heating
Cooling
Boston Logan I nt'l AR MA, US
3.74
Indoor temperature (OF)
70
75
Elevation: 30 ft
0.065
Design TD (OF)
58
13
Latitude: 420N
633
Relative humidity
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
6773
0.99
Daily range (OF) -
15 ( L
Method
Simplified
4.43
Wet bulb (OF) -
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Ti ht
1 ?Anverage)
0.073
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btu h/ft2-'F ft2-'F/Btuh Btuh/ft2 Btu h Btuh/ft2 Btu h
Walls
12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board i nt fnsh, 2"x6" wood frm
15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall,
r-8 ins, 8" thk, 1/2" gypsum board int fnsh
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2
glazing, clr outr, air gas, vnl frim mat, clr innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
Doors
(none)
Ceilings
1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2"
gypsum board i nt fnsh
C part ceiling,: C part ceiling, hrd wd flr fnsh, frm f1r, 10" thkns, 1/2"
gypsum board i nt fnsh
C part ceiling,: C part ceiling, frm f1r, 10" thkns, 1/2" gypsum board
int fnsh
n 477
0.065
21.0
3.74
1786
0.99
474
e 399
0.065
21.0
3.74
1494
0.99
397
s 636
0.065
21.0
3.74
2381
0.99
633
w 297
0.065
21.0
3.74
1112
0.99
295
all 1809
0.065
21.0
3.74
6773
0.99
1799
n 168
0.073
8.0
4.43
744
0.17
29
e 333
0.073
8.0
4.72
1573
0.40
133
s 152
0.073
8.0
4.29
652
0.06
10
w 333
0.073
8.0
4.72
1573
0.40
133
all 986
0.073
8.0
4.61
4541
0.31
305
n 36
0.300
0
17.3
622
8.04
290
n 48
0.300
0
17.3
829
13.0
625
e 24
0.300
0
17.3
415
28.2
677
s 48
0.300
0
17.3
829
16.0
769
s 64
0.300
0
17.3
1106
27.4
1756
w 36
0.300
0
17.3
622
28.2
1015
all 256
0.300
0
17.3
4424
20.0
5132
120 0.026 38.0 1.50 180 1.30 156
150 0.255 1.0 14.7 2199 12.7 1909
40 0.304 1.0 17.5 701 15.2 609
-LLJL 2014 -Mar -07 08:53:55
wrightSOW Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 6
HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
Fidors
19A-Obstp: Part floor, frm fir, 10" thkns
19A-30bstp: Part floor, r-30 ins, frmflr, 10" thkns
21A -24t: Bg floor, heavy dry or light damp soil, Ei'depth, tile fir fnsh
1224 0.368 0 6.90 8442 1.51 1847
625 0.034 30.0 1.64 1027 0.36 225
120 0.025 0 1.44 173 0 0
-XII. 2014 -Mar -07 08:53:55
rF wrightSOft' Right-SuiteID Universal 2013 13.0.07 RSU05790 Page 7
WCCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
Construction descriptions
Or
Area
U -value
Location:
Htg HTM
Indoor:
Heating
Cooling
Boston Logan I nt'l AP, MA, US
7.68
Indoor temperature (OF)
70
75
Elevation: 30 ft
Btu h
Design TD (OF)
58
13
Latitude: 420N
Relative humidity
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
3.74
1752
Daily range (OF) -
15 (L
Method
Simplified
174
Wet bulb (OF) -
72
Construction quality
Ti ht
0.99
Wind speed (mph) 15.0
7.5
Fireplaces
1 ?Anverage)
0.065
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Cig HTM
Gain
702
7.68
W
Btu h/ft2-*F
ft2-'F/Btuh
Btu h/ft2
Btu h
E�uh/112
Btu h
Walls
0
12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2"
n
468
0.065
21.0
3.74
1752
0.99
465
gypsum board int fnsh, 2"W' wood frm
e
174
0.065
21.0
3.74
651
0.99
173
s
298
0.065
21.0
3.74
1114
0.99
296
w
288
0.065
21.0
3.74
1078
0.99
286
all
1228
0.065
21.0
3.74
4596
0.99
1221
151321 -Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int
n
288
0.042
21.0
2.90
835
0.24
68
frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board
e
288
0.042
21.0
2.90
835
0.24
68
int fnsh
s
513
0.042
21.0
2.90
1487
0.24
121
w
90
0.042
21.0
2.90
261
0.24
21
all
1179
0.042
21.0
2.90
3418
0.24
279
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2
n
24
0.300
0
17.3
415
13.0
313
glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
e
24
0.300
0
17.3
415
52.7
1265
50% outdoor insect screen; foreground = green grass (0.23)
s
23
0.300
0
17.3
403
27.4
640
all
71
0.300
0
17.3
1233
31.1
2217
Doors
11 PO: Door, mtl pur core type
Ceilings
C part ceiling,: C part ceiling, hrd wd flr fnsh, frm f1r, 10" thkns, 1/2"
gypsum board int fnsh
Floors
21A -24t: Bg floor, heavy dry or light damp soil, 6'depth, tile flr fnsh
n 21 0.290 10.5
s 21 0.290 10.5
all 42 0.290 10.5
1740 0.255 1.0
506 0.025 0
16.7
351
7.68
161
16.7
351
7.68
161
16.7
702
7.68
323
14.7
25507
12.7
22142
1.44
729
0
0
J - 2014 -Mar -07 08:53:55
.z- -Fj+ wrightSOW Right-Suite(R) Universal 2013 13.0.07 RSU05790 Page 8
ACCK ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/ft2-'F ft2-'F/Btuh Btu h/ft2 Btu h Btuh/ft2 Btu h
Walls
12F-Osw: Frrn wal I, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board i nt fnsh, 2"x6" wood frm
1513-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall,
r-8 ins, 8" thk, 1/2" gypsum board int fnsh
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2
glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
Doors
(none)
Ceilings
1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2"
gypsum board int fnsh
C part ceiling,: C part ceiling, hrd wd fir fnsh, frm f1r, 10" thkns, 1/2"
gypsum board int fnsh
Floors
19A-Obstp: Part floor, frm fir, 10" thkns
n 252
0.065
21.0
3.74
-7.7
Location:
251
Indoor:
Heating
Cooling
Boston Logan I nt'l AP, MA, US
1157
Indoor temperature (T)
70
75
Elevation: 30 ft
21.0
Design TD (OF)
58
13
Latitude: 42'N
w 90
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
0.99
892
Daily range (OF) -
15 L
Method
Simplified
744
Wet bulb (OF) -
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Ti ht
1 ?Anverage)
8.0
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/ft2-'F ft2-'F/Btuh Btu h/ft2 Btu h Btuh/ft2 Btu h
Walls
12F-Osw: Frrn wal I, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board i nt fnsh, 2"x6" wood frm
1513-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall,
r-8 ins, 8" thk, 1/2" gypsum board int fnsh
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2
glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
Doors
(none)
Ceilings
1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2"
gypsum board int fnsh
C part ceiling,: C part ceiling, hrd wd fir fnsh, frm f1r, 10" thkns, 1/2"
gypsum board int fnsh
Floors
19A-Obstp: Part floor, frm fir, 10" thkns
n 252
0.065
21.0
3.74
943
0.99
251
e 309
0.065
21.0
3.74
1157
0.99
307
S 246
0.065
21.0
3.74
921
0.99
245
w 90
0.065
21.0
3.74
337
0.99
90
all 897
0.065
21.0
3.74
3358
0.99
892
n 168
0.073
8.0
4.43
744
0.17
29
e 333
0.073
8.0
4.72
1573
0.40
133
s 152
0.073
8.0
4.29
652
0.06
10
w 333
0.073
8.0
4.72
1573
0.40
133
all 986
0.073
8.0
4.61
4541
0.31
305
n 36
0.300
0
17.3
622
8.04
290
n 48
0.300
0
17.3
829
13.0
625
e 24
0.300
0
17.3
415
28.2
677
s 24
0.300
0
17.3
415
16.0
385
S 64
0.300
0
17.3
1106
27.4
1756
all 196
0.300
0
17.3
3387
19.0
3732
120 0.026 38.0 1.50 180 1.30 156
150 0.255 1.0 14.7 2199 12.7 1909
1154 0.368 0 6.90 7959 1.51 1741
+11-1 . 2014 -Mar -07 08:53:55
- wrightSOft* Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 9
".M ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
21A -24t: Bg floor, heavy dry or light damp soil, 6'depth, tile flr fnsh 120 0.025 0 1.44 173
2014 -Mar -07 08:53:55
wrightSOW Right-Suite<R) Universal 2013 13.0.07 RSU05790 Page 10
ACCK ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N
wrightsoft-
Component Constructions
Job: 84 Compass Point
Date:
U -value
Basement
jan14,2014
By:
Loss
Cig HTM
Croinin Construction Management
P. 0 Box 7237, Lowell, Ma 01852
Btuh/112--F
W-T/Eftu h
Btuh/ft'
Eftu h
Btuh/112
Btuh
Walls
For:
Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
n
288
0.042
21.0
2.90
835
Location:
Indoor:
Heating
Cooling
Boston Logan Int'l AP, MA, US Indoor temperature ('F)
70
75
Elevation: 30 ft
Design TD ('F)
58
13
Latitude: 42'N
Relative humidity (%)
50
50
Outdoor:
Heating Cooling Moisture difference (gr/lb)
46.5
27.8
Dry bulb ('F)
12 88 Infiltration:
w
90
Daily range (*F)
- 15 L Method
Simplified
261
Wet bulb ('F)
- 72 Construction quality
Ti ht
all
Wind speed (mph)
15.0 7.5 Fireplaces
1 ?Anverage)
2.90
Construction descriptions
Or
Area
U -value
insul R
Htg HTM
Loss
Cig HTM
Gain
W
Btuh/112--F
W-T/Eftu h
Btuh/ft'
Eftu h
Btuh/112
Btuh
Walls
151321-0wc-6: Bg wall, heavydryor light damp soil, 2"x4" wood int
n
288
0.042
21.0
2.90
835
0.24
68
frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board
e
288
0.042
21.0
2.90
835
0.24
68
i nt fnsh
S
513
0.042
21.0
2.90
1487
0.24
121
w
90
0.042
21.0
2.90
261
0.24
21
all
1179
0.042
21.0
2.90
3418
0.24
279
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 1274 0.255 1.0 14.7 18676 12.7 16212
gypsum board int fnsh
Floors
21A -24t: Bg floor, heavy dry or light damp soil, 6'depth, tile fir fnsh 506 0.025 0 1.44 729 0 0
AL_ wrightSOft' Right -Suite@ Universal 2013 13.0.07 RSU05790 2014 -Mar -07 08:53:55
77,
Page 11
ACCk ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
Location:
Boston Logan Int'l AP, MA, US
Elevation: 30 ft
Latitude: 420N
Outdoor: Heating
Dry bulb (OF) 12
Daily range (OF) -
Wet bulb (OF) -
Wind speed (mph) 15.0
Indoor:
Heating Cooling
70
Indoor temperature (OF)
58
Design TD (OF)
50
Relative humidity
Cooling
Moisture difference (gr/lb)
88
Infiltration:
15 ( L
Method
72
Construction quality
7.5
Fireplaces
Heating Cooling
70
75
58
13
50
50
46.5
27.8
Simplified
829
Ti ht
n
ft2
1 ?Average)
ft2-OF/Btu h
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Cig HTM
Gain
829
32.9
ft2
Btuh/ft2-01'
ft2-OF/Btu h
Btuh/V
Btu h
Btuh/ft2
Btuh
Walls
2240
12F-Osw: Firm wal I, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2"
n
243
0.065
21.0
3.74
910
0.99
242
gypsum board int fnsh, 2"x6" wood frm
e
174
0.065
21.0
3.74
651
0.99
173
w
198
0.065
21.0
3.74
741
0.99
197
all
615
0.065
21.0
3.74
2303
0.99
612
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0
glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23) e 24 0.300 0
all 48 0.300 0
Doors
11 PO: Door, mtl pur core type n 21 0.290 10.5
Ceilings
C part ceiling,: C part ceiling, hrd wd fir fnsh, frm f1r, 10" thkns, 1/2" 176 0.255 1.0
gypsum board i nt fnsh
Floors
(none)
F wrightSOft' Right -Suite@ Universal 2013 13.0.07 RSU05790
ACC K ... off HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N
17.3
415
13.0
313
17.3
415
52.7
1265
17.3
829
32.9
1577
16.7
351
7.68
161
14.7
2580
12.7
2240
2014 -Mar -07 08:53:55
Page 12
wrightsoft- Component Constructions Job: 84 Compass Point
Date: ian14, 2014
Kitchen By:
Croinin Construction Management
P. 0 Box 7237, Lowell, Ma 01852
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Y
Location:
Indoor:
Heating
Cooling
Boston Logan I nt'l AP, MA, US
Indoor temperature (OF)
70
75
Elevation: 30 ft
Design TD (OF)
58
13
Latitude: 42'N
Relative, humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
Daily range (OF) -
15 (L
Method
Simplified
Wet bulb (OF) -
72
Construction quality
Ti ht
Wind speed (mph) 15.0
7.5
Fireplaces
1 ?Anverage)
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuh/ft2-'F ft2-*F/Btuh MOM Btu h ROM Btu h
Walls
12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 105 0.065 21.0 3.74 394 0.99 105
gypsum board int fnsh, 2"x6" wood frm
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl fmn mat, clr innr, 1/4" gap, 1/4" thk: 2 s 12 0.300 0 17.3 202 27.4 320
glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
Doors
(none)
Ceilings
C part ceiling,: C part ceiling, hrd wd flr fnsh, frm f1r, 10" thkns, 1/2" 40 0.255 1.0 14.7 586 12.7 509
gypsum board int fnsh
Floors
(none)
_d. 1. 2014 -Mar -07 08:53:55
rF wrightSOft* Right -Suit,@ Universal 2013 13.0.07 RSU05790 Page 13
ACCA ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N
wrightsoft- Component Constructions Job: 84 Compass Point
Date: jan14, 2014
office By:
Croinin Construction Management
P.0 Box 7237, Lowell, Ma 01852
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Cig HTM
Gain
Location:
W
Indoor:
Heating
Cooling
Boston Logan Int'l AP, MA, US
Btu h /W
Indoor temperature (OF)
70
75
Elevation: 30 ft
Design TD (OF)
58
13
Latitude: 42'N
Relative humidity
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
192
0.065
Daily range (OF) -
15 (L
Method
Simplified
191
Wet bulb (OF) -
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Ti ht
1 ?Anverage)
21.0
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Cig HTM
Gain
W
Btuh/fV-'F
ft2-*F/Btuh
Btuh/ft'
Btu h
Btu h /W
Btu h
Walls
12F-Osw: Frrn wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2"
n
225
0.065
21.0
3.74
842
0.99
224
gypsum board i nt fns h, Tx6" wood frm
s
192
0.065
21.0
3.74
720
0.99
191
w
90
0.065
21.0
3.74
337
0.99
90
all
507
0.065
21.0
3.74
1899
0.99
505
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk: 2 s
glazing, clr outr, air gas, vni frm mat, clr innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
Doors
11 PO: Door, mt] pur core type s
Ceilings
C part ceiling,: C part ceiling, hrd wd flr fnsh, frm f1r, 10" thkns, 1/2"
gypsum board int fnsh
Floors
(none)
12 0.300 0
21 0.290 10.5
250 0.255 1.0
17.3 202 27.4 320
16.7
351
7.68
161
14.7
3665
12.7
3181
d I 2014 -Mar -07 08:53:55
_rF wrightSoft' Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 14
ACCA ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N
wrightsoft-
Component Constructions
Job: 84 Compass Point
Date: 2014
U -value
Bedroom 2
jan14,
By:
Loss
Cig HTM
Croinin Construction Management
P.0 Box 7237, Lowell, Ma 01852
Btuh/ft2-'F
ft2--F/Btuh
Btu h/ft2
Btu h
BtuhM
Btuh
Walls
For:
Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
n
120
0.065
21.0
3.74
449
0.99
119
gypsum board int fnsh, 2"x6" wood frm
Location:
Indoor:
Heating
Cooling
Boston Logan Int'l AP, MA, US Indoor temperature (OF)
70
75
Elevation: 30 ft
Design TD (OF)
58
13
Latitude: 420N
Relative humidity
50
50
Outdoor:
Heating Cooling Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF)
12 88 Infiltration:
Daily range (OF)
- 15 (L Method
Simplified
Wet bulb (OF)
- 72 Construction quality
Ti ht
Wind speed (mph)
15.0 7.5 Fireplaces
1 ?Anverage)
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Cig HTM
Gain
ft,
Btuh/ft2-'F
ft2--F/Btuh
Btu h/ft2
Btu h
BtuhM
Btuh
Walls
12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2"
n
120
0.065
21.0
3.74
449
0.99
119
gypsum board int fnsh, 2"x6" wood frm
e
117
0.065
21.0
3.74
438
0.99
116
all
237
0.065
21.0
3.74
887
0.99
236
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 8.04 193
glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
Doors
(none)
Ceilings
(none)
Floors
19A-Obstp: Partfloor, frm f1r, 10" thkns 208 0.368 0 6.90 1435 1.51 314
-d.l. 2014 -Mar -07 08:53:55
rF wrightSOft' Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 15
ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJS Front Door faces: N
wrightsoft- Component Constructions Job: 84 Compass Point
Date: jan14, 2014
Ldy By:
Croinin Construction Management
P. 0 Box 7237, Lowell, Ma 01852
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Construction descriptions
Or
Area
U-valUe
0
Htg HTM
Loss
Location:
Gain
Indoor:
Heating
Cooling
Boston Logan I nt'l AP, MA, US
ft2-*F/Btuh
Indoor temperature (OF)
70
75
Elevation: 30 ft
Walls
Design TD (OF)
58
13
Latitude: 42'N
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
36
gypsum board i nt fnsh, 2"x6" wood frm
Daily range (OF) -
15 (L
Method
Simplified
3.74
Wet bulb (OF) -
72
Construction quality
Ti ht
all
Wind speed (mph) 15.0
7.5
Fireplaces
1 ?Anverage)
303
Construction descriptions
Or
Area
U-valUe
Insul R
Htg HTM
Loss
Cig HTM
Gain
ft2
BWh/ft2-'F
ft2-*F/Btuh
%h/ft2
Btu h
Btu h /V
Btu h
Walls
12F-Osw: Frrn wal I, vni ext, 1/2" wood shth, r-21 cav ins, 1/2"
n
36
0.065
21.0
3.74
135
0.99
36
gypsum board i nt fnsh, 2"x6" wood frm
w
45
0.065
21.0
3.74
168
0.99
45
all
81
0.065
21.0
3.74
303
0.99
81
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
(none)
Floors
19A-Obstp: Partfloor, frm f1r, 10" thkns
32 0.368 0 6.90 221 1.51 48
2014 -Mar -07 08:53:55
wrightSOft* Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 16
AC CA ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N
wrightsoft- Component Constructions Job: 84 Compass Point
Date: jan14, 2014
bedroom 1 By:
Croinin Construction Management
P.0 Box 7237, Lowell, Ma 01852
1_3
F1
IN k i n ro'
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Construction descriptions Or Area
U -value
lnsulR
..........
Loss
Location:
Gain
Indoor:
Heating
Cooling
Boston Logan I nt'l AP, MA, US
Btu h
Indoor temperature (OF)
70
75
Elevation: 30 ft
Design TD (OF)
58
13
Latitude: 420N
12F-Osw: Frm wall, vni ext, 1/2" wood shth, r-21 cav ins, 1/2" e 75
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
Daily range (OF) -
15 (L
Method
Simplified
Wet bulb (OF) -
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Ti ht
1 ?Anverage)
Construction descriptions Or Area
U -value
lnsulR
Htg HTM
Loss
Cig HTM
Gain
ft2
Btuhtft2-'F
ft�-'F/Btu h
Btu h/ft2
Btu h
Btuh/ft2
Btu h
Walls
12F-Osw: Frm wall, vni ext, 1/2" wood shth, r-21 cav ins, 1/2" e 75
0.065
21.0
3.74
281
0.99
75
gypsum board int fnsh, 2"x6" wood frm
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vni frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 24
0.300
0
17.3
415
28.2
677
glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
Doors
(none)
Ceilings
(none)
Floors
19A-Obstp: Part floor, frm flr, 10" thkns
176 0.368 0 6.90 1214 1.51 266
-CL 2014 -Mar -07 08:53:55
, r wrightSOft' Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 17
ACCX ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
wrightsoft- Component Constructions Job: 84 Compass Point
Date: jan-14, 2014
112 bath By:
Croinin Construction Management
P. 0 Box 7237, Lowell, Ma 01852
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain
ft2 Btuh/ft2-*F ft2-*F/Btuh Btuh/ft' Btu h Btuh/112 Btu h
Walls
12F-Osw: Frm wall, vni ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board int fnsh, 2"W' wood frm
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
(none)
Floors
19A-Obstp: Part floor, frm f1r, 10" thkns
n 63 0.065 21.0
91 0.368 0
3.74 236 0.99 63
6.90 628 1.51 137
AL 2014 -Mar -07 08:53:55
. V wrightSOft' Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 18
XCCK ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
M5
MO ';141
Location:
Indoor:
Heating
Cooling
Boston Logan I nt'l AP, MA, US
Indoor temperature (OF)
70
75
Elevation: 30 ft
Design TD (OF)
58
13
Latitude: 420N
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
Daily range (OF) -
15 L
Method
Simplified
Wet bulb (OF) -
72
Construction quality
Ti ht
Wind speed (mph) 15.0
7.5
Fireplaces
1 ?Anverage)
Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain
ft2 Btuh/ft2-*F ft2-*F/Btuh Btuh/ft' Btu h Btuh/112 Btu h
Walls
12F-Osw: Frm wall, vni ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board int fnsh, 2"W' wood frm
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
(none)
Floors
19A-Obstp: Part floor, frm f1r, 10" thkns
n 63 0.065 21.0
91 0.368 0
3.74 236 0.99 63
6.90 628 1.51 137
AL 2014 -Mar -07 08:53:55
. V wrightSOft' Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 18
XCCK ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
mmlmml�
�W
Area
74111
Location:
Htg HTM
Indoor:
Heating
Cooling
Boston Logan I nt'l AP, MA, US
14.7
Indoor temperature (OF)
70
75
Elevation: 30 ft
Btu h
Design TD (OF)
58
13
Latitude: 420N
490
Relative humidity
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
3.74
753
Daily range (OF) -
15 (L
Method
Simplified
45
Wet bulb (OF) -
72
Construction quality
Ti ht
0.99
Wind speed (mph) 15.0
7.5
Fireplaces
1 ?Anverage)
0.065
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Cig HTM
Gain
1.0
14.7
ft2
Btuh/ft2-*F
ft2-'F/Btuh
Btuh/ft2
Btu h
Btuh/ft2
Btu h
Walls
1.51
490
12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/21,
s
201
0.065
21.0
3.74
753
0.99
200
gypsum board int fnsh, 2"x6" wood frm
w
45
0.065
21.0
3.74
168
0.99
45
all
246
0.065
21.0
3.74
921
0.99
245
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s
glazing, clr outr, air gas, vni frm mat, cir innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
Doors
(none)
Ceilings
C part ceiling,: C part ceiling, hrd wd flr fnsh, frm f1r, 10" thkns, 1/2"
gypsum board int fnsh
Floors
19A-Obstp: Part floor, frm flr, 10" thkns
24
0.300
0
17.3
415
16.0
385
125
0.255
1.0
14.7
1832
12.7
1591
325
0.368
0
6.90
2242
1.51
490
-Fl+-J � 2014 -Mar -07 08:53:55
wrightSOft* Right-Suite(�) Universal 2013 13.0.07 RSU05790 Page 19
ACC& ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJB Front Door faces: N
wrightsoft- Component Constructions Job: 84 Compass Point
Date: jan14, 2014
Masterbath By:
Croinin Construction Management
P. 0 Box 7237, Lowell, Ma 01852
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
MEN -1172 _452123,411"'i",
F
112�01
3.74
2K
Location:
116
s 45
Indoor:
Heating
Cooling
Boston Logan I nt'l AP, MA, US
0.99
Indoor temperature (OF)
70
75
Elevation: 30 ft
3.74
607
Design TD (OF)
58
13
Latitude: 42'N
1.0
14.7
Relative humidity
50
50
Outdoor:
Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF)
12
88
Infiltration:
Daily range (OF)
-
15 (L
Method
Simplified
Wet bulb (OF)
-
72
Construction quality
Ti Int
Wind speed (mph)
15.0
7.5
Fireplaces
1 ?Anverage)
Construction descriptions Or Area U -value InsuIR Htg HTM Loss Cig HTM Gain
ft2 Btuh/ft2-*F W-*F/Btuh Btuh/ft2 Btu h Btu h A2 Btu h
Walls
12F-Osw: Frm wall, vni ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board i nt fnsh, 2"x6" wood frm
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2"
gypsum board i nt fnsh
Floors
19A-Obstp: Part floor, frm fir, 10" thkns
e 117
0.065
21.0
3.74
438
0.99
116
s 45
0.065
21.0
3.74
168
0.99
45
all 162
0.065
21.0
3.74
607
0.99
161
25
0.25�
1.0
14.7
366
12.7
318
65
0.368
0
6.90
448
1.51
98
ri I 2014 -Mar -07 08:53:55
_rF wrightSOft' Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 20
.4 C CA ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
Component Constructions Job: 84 Compass Point
wrightso Date: janl4,2014
full bath By:
Croinin Construction Management
P. 0 Box 7237, Lowell, Ma 01852
77
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Construction descriptions
Walls
(none)
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
(none)
Floors
1 9A-Obstp: Part floor, frm fl r, 10" thkns
Or Area U -value Insul R Htg HTM Loss Cig HTM Gain
ft2 Btuh/ft2-*F ft2-*F/Bbih Btuh/ft2 Btu h Btuhtft2 Btu h
77 0.368 0 6.90 531 1.51 116
Jd I 2014 -Mar -07 08:53:55
rF wrightSOft* Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 21
ACCA ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJB Front Door faces: N
7 -
Location:
Indoor:
Heating
Cooling
Boston Logan Int'l AP, MA, US
Indoor temperature (OF)
70
75
Elevation: 30 ft
Design TD (OF)
58
13
Latitude: 420N
Relative humidity
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
Daily range (OF) -
15 (L
Method
Simplified
Wet bulb (OF) -
72
Construction quality
Ti ht
n1
Wind speed (mph) 15.0
7.5
Fireplaces
1 ?Average)
Construction descriptions
Walls
(none)
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
(none)
Floors
1 9A-Obstp: Part floor, frm fl r, 10" thkns
Or Area U -value Insul R Htg HTM Loss Cig HTM Gain
ft2 Btuh/ft2-*F ft2-*F/Bbih Btuh/ft2 Btu h Btuhtft2 Btu h
77 0.368 0 6.90 531 1.51 116
Jd I 2014 -Mar -07 08:53:55
rF wrightSOft* Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 21
ACCA ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJB Front Door faces: N
wrightsoft- Component Constructions Job: 84 Compass Point
Date: jan14, 2014
bouns room closet By:
Croinin Construction Management
P.0 Box 7237, Lowell, Ma 01852
pron
g_
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Construction descriptions
Walls
12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board int fnsh, 2"W' wood frm
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
(none)
Floors
19A-Obstp: Partfloor, frm f1r, 10" thkns
Or Area
11.1 -value
Insul R
Htg HTM
Location:
Clg HTM
Indoor:
Heating
Cooling
Boston Logan Int'l AP, MA, US
BtuhtV
Indoor temperature (OF)
70
75
Elevation: 30 ft
0.065
Design TD (OF)
58
13
Latitude: 420N
63
Relative humidity
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
Daily range (OF) -
15 ( L
Method,
Simplified
Wet bulb (OF) -
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Ti ht
1 ?Anverage)
Construction descriptions
Walls
12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2"
gypsum board int fnsh, 2"W' wood frm
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
(none)
Floors
19A-Obstp: Partfloor, frm f1r, 10" thkns
Or Area
11.1 -value
Insul R
Htg HTM
Loss
Clg HTM
Gain
ft2
Btuh/ft2-'F
ftl-*F/BtLih
BtuhtV
Btu h
Btuh/ft'
Btu h
S 63
0.065
21.0
3.74
236
0.99
63
70 0.368 0 6.90 483 1.51 106
..1d I 2014 -Mar -07 08:53:55
rF wrightSOft' Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 22
... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
wrightsoft- Component Constructions Job: 84 Compass Point
Date: jan14, 2014
bouns room By:
Croinin Construction Management
P. 0 Box 7237, Lowell, Me 01852
VarlROP"'A i rPtifflow
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
=man=
off
N
, lzi;1111:1111;
5MRTM! ......... ..
NZ14W1
Insul R
Location:
Loss
Indoor: .
Heating
Cooling
Boston Logan Int'IAP, MA, US
ft2
Indoor temperature (OF)
70
75
Elevation: 30 ft
Btuh/ft2
Design TD (OF)
58
13
Latitude: 42'N
Relative humidity
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
842
0.99
Daily range (OF) -
15 L
Method
Simplified
0.065
Wet bulb (OF) -
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Ti ht
1 I?Anverage)
155
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Clg HTM
Gain
ft2
Btuh/ft2-'F
W-T/13tuh
Btu h/ft2
Btu h
Btuh/ft2
Btu h
Walls
12F-Osw: Frm wall, vnl exi, 1/2" wood shth, r-21 cav ins, 1/2"
n
225
0.065
21.0
3.74
842
0.99
224
gypsum board int fnsh, 2"x6" wood frm
s
156
0.065
21.0
3.74
584
0.99
155
w
207
0.065
21.0
3.74
775
0.99
206
all
588
0.065
21.0
3.74
2201
0.99
585
Partitions
(none)
Windows
2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2
s
24
0.300
0
17.3
415
16.0
385
glazing, cir outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
w
36
0.300
0
17.3
622
28.2
1015
all
60
0.300
0
17.3
1037
23.3
1400
Doors
(none)
Ceilings
(none)
Floors
19A-30bstp: Part floor, r-30 ins, frm f1r, 10" thkns 625 0.034 30.0 1.64 1027 0.36 225
-ELL 2014 -Mar -07 08:53:55
p- wrightSOft* Right-Suite(R) Universal 2013 13.0.07 RSU05790 Page 23
ACC -N ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
wrightsoft- Component Constructions Job: 84 Compass Point
Date: jan14, 2014
2nd floor hafl By:
Croinin Construction Management
P.0 Box 7237, Lowell, M a 01852
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain
ft2 Btuh/ft2-oF W-T/Btuh Btu h /ft2 Btu h Btu h A2 Btu h
Walls
12F-Osw: Frm wal I, vni ext, 1/2" wood shth, r-21 cav ins, 1/2" n 33 0.065 21.0 3.74 124 0.99 33
gypsum board int fnsh, 2"x6" wood frm
Partitions
(none)
Windows
2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 12 0.300 0 17.3 207 8.04 97
glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
Doors
(none)
Ceilings
(none)
Floors
19A-Obstp: Part floor, frm f1r, 10" thkns 180 0.368 0 6.90 1241 1.51 272
-1A I 2014 -Mar -07 08:53:55
-rF wrightSOft* Right-Suitlib Universal 2013 13.0.07 RSU05790 Page 24
AGCK ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJS Front Door faces: N
g",
A SKE711
A
Location:
Indoor:
Heating
Cooling
Boston Logan I nt'l AP, MA, US
Indoor temperature (OF)
70
75
Elevation: 30 ft
Design TD (OF)
58
13
Latitude: 420N
Relative humidity (%)
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb (OF) 12
88
Infiltration:
Daily range (OF) -
15 (L
Method
Simplified
Wet bulb (OF) -
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplac . es
Ti ht
n
1 ?Average)
Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain
ft2 Btuh/ft2-oF W-T/Btuh Btu h /ft2 Btu h Btu h A2 Btu h
Walls
12F-Osw: Frm wal I, vni ext, 1/2" wood shth, r-21 cav ins, 1/2" n 33 0.065 21.0 3.74 124 0.99 33
gypsum board int fnsh, 2"x6" wood frm
Partitions
(none)
Windows
2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 12 0.300 0 17.3 207 8.04 97
glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23)
Doors
(none)
Ceilings
(none)
Floors
19A-Obstp: Part floor, frm f1r, 10" thkns 180 0.368 0 6.90 1241 1.51 272
-1A I 2014 -Mar -07 08:53:55
-rF wrightSOft* Right-Suitlib Universal 2013 13.0.07 RSU05790 Page 24
AGCK ... oft HVAC\cronin construction 21 gabriel way. rup Calc = MJS Front Door faces: N
wrightsoft- Component Constructions Job: 84 Compass Point
Date: jan14, 2014
attic By:
Croinin Construction Management
P. 0 Box 7237, Lowell, Ma 01852
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuhtft2-OF ft2-OF/Btuh MOM Btu h Btuh/ft2 Btu h
Walls
15B-8s3c-6: Bg wall, heavydry or light damp soil, concrete wall,
r-8 ins, 8" thk, 1/2" gypsum board int fnsh
Partitions
(none)
Windows
n 168
0.073
ow I WE M
"R,
LN M.
WN."
744
Location:
29
Indoor:
Heating
Cooling
Boston Logan Int'l AP, MA, US
1573
Indoor temperature (*F)
70
75
Elevation: 30 ft
8.0
Design TD ('F)
58
13
Latitude: 42'N
w 333
Relative humidity
50
50
Outdoor: Heating
Cooling
Moisture difference (gr/lb)
46.5
27.8
Dry bulb ('F) 12
88
Infiltration:
0.31
305
Daily range (*F) -
15 (L
Method
Simplified
Wet bulb ('F) -
Wind speed (mph) 15.0
72
7.5
Construction quality
Fireplaces
Ti ht
1 ?Anverage)
Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain
ft2 Btuhtft2-OF ft2-OF/Btuh MOM Btu h Btuh/ft2 Btu h
Walls
15B-8s3c-6: Bg wall, heavydry or light damp soil, concrete wall,
r-8 ins, 8" thk, 1/2" gypsum board int fnsh
Partitions
(none)
Windows
n 168
0.073
8.0
4.43
744
0.17
29
e 333
0.073
8.0
4.72
1573
0.40
133
s 152
0.073
8.0
4.29
652
0.06
10
w 333
0.073
8.0
4.72
1573
0.40
133
all 986
0.073
8.0
4.61
4541
0.31
305
2 glazing, cir outr, air gas, vni fmn mat, clr innr, 1/4" gap, 1/4" thk: 2 n 48 0.300 0
glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk;
50% outdoor insect screen; foreground = green grass (0.23) s 64 0.300 0
all 112 0.300 0
Doors
(none)
Ceilings
16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 120 0.026 38.0
gypsum board i nt fnsh
Floors
21A -24t: Bg floor, heavy dry or light damp soil, 6'depth, tile fir fnsh 120 0.025 0
17.3
829
13.0
625
17.3
1106
27.4
1756
17.3
1935
21.3
2381
1.50
180
1.30
156
1.44
173
0
0
A, 2014 -Mar -07 08:53:55
rF wrightsoft* Right-Suite(R) Universal 2013 13.0.07 RSU05790 Page 25
ACCA ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N
wrightsoft- Component Constructions Job: 84 Compass Point
Date: ian14, 2014
dining room By:
Croinin Construction Management
P. 0 Box 7237, Lowell, Me 01852
For: Trust Construction
51 Mount joy drive, Tewskbury, ma 01876
Location:
Boston Logan I nt'l AP, MA, US
Elevation: 30 ft
Latitude: 420N
Outdoor: Heating
Dry bulb (OF) 12
Daily range (OF) -
Wet bulb (OF) -
Wind speed (mph) 15.0
Indoor:
Heating
Indoor temperature (OF)
70
Design TD (OF)
58
Relative humidity
Cooling
Moisture difference (gr/lb)
88
Infiltration:
15 (L
Method
72
Construction quality
7.5
Fireplaces
Heating
Cooling
70
75
58
13
50
50
46.5
27.8
Simplified
ft2
Ti ht
1 ?Anverage)
ft2-*F/Btuh
Construction descriptions
Or
Area
U -value
Insul R
Htg HTM
Loss
Cig HTM
Gain
ft2
Btuh/ft2-*F
ft2-*F/Btuh
Btu h/ft2
Btu h
Btuh/ft2
Btu h
Walls
12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2"
e
90
0.065
21.0
3.74
337
0.99
90
gypsum board int fnsh, 2"x6" wood frm
s
171
0.065
21.0
3.74
640
0.99
170
all
261
0.065
21.0
3.74
977
0.99
260
Partitions
(none)
Windows
(none)
Doors
(none)
Ceilings
C partceiling,: C part ceiling, frmf1r, 10"thkns, 1/2" gypsum board
int fnsh
Floors
(none)
40 0.304 1.0 17.5 701 15.2 609
2014 -Mar -07 08:53:55
wrightsOft' Right-Suite(R) Universal 2013 13.0.07 RSU05790 Page 26
... oft HVAC\cronin construction 21 gabriel way. rup Calc = MA Front Door faces: N